Remote Electrification Readiness Program. Program Details and Background: Question & Answer

Similar documents
Economic Diversification Grant Application Guide January 2018

Aboriginal Community Capital Grants Program Guide

Application Guide for the Aboriginal Participation Fund

Regional Partnership Grant Application Guide January 2018

Nishnawbe-Aski Legal Services Corporation. Annual Report

PROFESSIONAL AND INSTITUTIONAL DEVELOPMENT PROGRAM: PROGRAM GUIDELINES

ONTARIO SENIORS SECRETARIAT SENIORS COMMUNITY GRANT PROGRAM GUIDELINES

Community Transportation Pilot Grant Program Application Guidelines and Requirements

Business & Community Fund (Stream 1) Application Guide

Municipal Stream. Community Transportation Grant Program. Application Guidelines and Requirements Issued: December 2017

First Nations Clean Energy Business Fund. Guidelines for Funding

Taking Action Against Elder Abuse Coordinated Community Response Grant Program

Legal Aid Ontario 2013/ /16 Public business plan

Susan Robinson, PHCNP, RN(EC)Project Coordinator, Shibogama Health Authority Mary Lou Winter, Assistant Health Director, Kingfisher Lake First Nation

Aboriginal Languages Initiative (ALI) Funding Guide

Application Guide for the Aboriginal Participation Fund

Aboriginal Service Plan and Reporting Guidelines

Ministry of Seniors Affairs

4 YORK REGION SMALL BUSINESS ENTERPRISE CENTRE 2004 ANNUAL REPORT AND 2005 WORK PROGRAM

Ab o r i g i n a l Operational a n d. Revised

Seniors Active Living Centres. Program Expansion. Call for Proposals

Canada Cultural Investment Fund (CCIF)

Accountability Framework and Organizational Requirements

Application Package. Iakoienawá:se nonkwe shón: a Here for the needs of the People

Parents Reaching Out (PRO) Grants School Grant Proposal Kit

Ontario s Far North Study: Broadband Best Practices and Benefits in Fort Severn and Big Trout Lake

Canada Ontario Resource Development Agreement (CORDA) Application Form

QUESTIONS AND ANSWERS

Age-Friendly Newfoundland and Labrador: Community Grants Application Guidelines

Alberta Indigenous Green Energy Development Program Guidelines

RECOMMENDATION STATUS OVERVIEW

CREATING, KNOWING AND SHARING INDIGENOUS ORGANIZATIONS

Invitation to CDCs to apply for: Advancing Equitable Development in Milwaukee HUD Section 4 Capacity Building Grants

Matawa Broadband Development Project

PO Box 1132 Station F Toronto, ON M4Y 2T8

Ministry of Citizenship and Immigration Citizenship and Immigration Programs. Multicultural Community Capacity Grant Program

Guidelines. Ministry of Natural Resources and Forestry Land Stewardship and Habitat Restoration Program (LSHRP) Ontario.

Application Guidelines

GLOBAL MARKET ACCELERATION FUND (GMAF) Program Guidelines

Aboriginal Economic Development Fund (AEDF) Handbook

Newcomer Settlement Program

B.C. Language Initiative Program Funding Guide. Application Deadline: April 8, p.m.

Community Health Centre Program

20 Gerrard Street East Toronto ON M5B 2P3. Residence: Business: (416) Fax #: (416)

York Region Community Investment Strategy Report

MATAWA FIRST NATIONS MANAGEMENT

Program Design: Mental Health and Addiction Nurses in District School Board Program

The Government of Canada s Homelessness Initiative. Supporting Community Partnerships Initiative COMMUNITY GUIDE

Ontario Aboriginal Procurement Program

ALBERTA HISTORICAL RESOURCES FOUNDATION MUNICIPAL HERITAGE PARTNERSHIP PROGRAM Guidelines

EMERGENCY SOLUTIONS GRANT APPLICATION PACKET FY 2018 OCTOBER 1, SEPTEMBER 30, 2018

Charities Partnership and Outreach Program. Funding Guide and Application

Papua New Guinea: Implementation of the Electricity Industry Policy

MINISTRY OF HEALTH AND LONG-TERM CARE

May 25, Prosperity and Growth Strategy for Northern Ontario

BC Capacity Initiative

International Energy Demonstration Fund Program Guidelines

Urban Partnerships (UP) Program

CLEAN TECHNOLOGY BUSINESS INNOVATION

i) Who have society status for minimum of 2 (two) years and be in good st anding ii) Who operate within Village

Alberta Indigenous Climate Capacity Program Guidelines

Sponsorship Agreement/Sub-Grant Posted Date June 6, 2016 Due Date for Applications Cycle 1: Cycle 2: July 15, 2016 January 13, 2017

ABORIGINAL CONSULTATION PLAN FOR THE NANTICOKE SOLAR PROJECT

Grant to Enhance Governance in For Public Benefit Organizations Call for Proposals

Rapid Intervention Service Kenora (RISK) Table Report May May 2017

Micro Enterprise Assistance Program District 2 Guidelines FY

MINISTRY OF HEALTH AND LONG-TERM CARE

GRANTS TO YOUTH ORGANIZATIONS Public Engagement Division 2018/2019 FUNDING APPLICATION

City Enrichment Fund Arts Program

Interim Resource Management Assistance (IRMA) Program. Guidelines. March IRMA Program Proposal Guidelines Page 1 of 13

E m e rgency Health S e r v i c e s Syste m M o d e r n i zation

EXPRESSION OF INTEREST. Niagara Homelessness Service System Funding July 2017-March Service Priority Supported Transitional Housing

First Nations and Inuit Health Services Accreditation Community. Information. September 2014

2016/ /19 SERVICE PLAN

Use of External Consultants

Newcomer Settlement Program

Northline Solar Project

REQUEST FOR PROPOSALS

UCC-SPC Community Development Fund

Ontario Black Youth Action Plan

grant guidelines Community Investment Program (CIP) Arts Operating Grant - Professional CADAC Purpose Eligibility Evaluation criteria

IDENTIFY N IMPACT INI Grant Guidelines. Investment Funding Program. City of Toronto - Social Development, Finance & Administration Division

City of Ottawa 2018 One-time Non- Renewable Community Project Funding Guidelines and Checklist

The City of Sandusky. Community Development Block Grant Program (CDBG) Non-Profit Provider Application 501(c) 3 for Program Year 2015

Apprenticeship Enhancement Fund (AEF) Guidelines

TABLE OF CONTENTS EXECUTIVE SUMMARY 3 COMMUNITY INVESTMENT PROGRAM 4 COMMUNITY BEAUTIFICATION GRANT 5 COMMUNITY DEVELOPMENT FUNDING 7

Healthy Babies Healthy Children Service Levels and Update on Provincial Review

Community Donation, Grant, and Sponsorship Fund Policy

2017 Citizenship and Immigration Programs Call for Proposals

First Nations Health Authority: Transforming a public health perspective. Presented by Dr. Shannon Waters & Dr. Naomi Dove

Aboriginal Suicide Critical Incidence Response Team. C o o r d i n a t o r s G a t h e r i n g

Project Application Webinar

Youth Job Strategy. Questions & Answers

Instructions for completing the Grant Funding Application:

Ontario Libraries Capacity Fund Research and Innovation

Annual Funding PROVINCIAL GUIDELINES

Our vision is balance and well-being for Anishinabek children, families, and communities.

PROGRAM GUIDE: THE CLEAN TECHNOLOGY COMMERCIALIZATION PROGRAM

MINISTRY OF HEALTH AND LONG-TERM CARE

Corporate Communication Plan. April 2011 March 2012

Transcription:

Remote Electrification Readiness Program Program Details and Background: Question & Answer

Remote Electrification Readiness Program - Question & Answer Q1: What is the purpose of the Program? Ontario s 2013 Long-Term Energy Plan (LTEP) identified the connection of remote First Nation communities in northwestern Ontario as a priority for the province. The Ontario Power Authority is considering transmission connections for First Nations in northwestern Ontario that currently rely on diesel for electricity generation. The LTEP also recognized that Aboriginal participation in the energy sector is one of the keys to economic development for Aboriginal communities. The Remote Electrification Readiness Program (the Program) is a new, 3-year targeted program ($1M/year from 2014-15 2016-17) to assist remote First Nation communities that are set to be impacted by proposed electrification investments in northwestern Ontario and connection to renewable energy sources. The Program will aim to assist these communities to quantify gaps and develop and implement community readiness plans; and, to build community capacity to retain economic development opportunities in the communities. Q2: Who is eligible for funding under the Program? The following 25 remote First Nations who currently rely on diesel fuel for power generation can submit joint applications for program funding. Alternately, the following Tribal Councils can submit joint applications on behalf of the member communities listed below: Eligible Tribal Councils Eligible First Nation Communities Independent First Nations Alliance Kitchenuhmaykoosib Inninuwug Muskrat Dam Pikangikum Whitesand* Keewaytinook Okimakanak Deer Lake Fort Severn* Keewaywin North Spirit Lake Poplar Hill Matawa First Nations Tribal Council Eabametoong Marten Falls Neskantaga Nibinamik Webequie Weenusk* Kiashke Zaaging Anishinaabek* Sandy Lake Shibogama First Nations Council Kasabonika Lake Kingfisher Lake Wapekeka Wawakapewin Wunnumin Lake Windigo First Nations Council Bearskin Lake Weagamow Sachigo Lake Remote Electrification Readiness Program - Q & A 2

Exceptions*: Exceptions to the requirement for joint applications are allowed for the following remote First Nations (Weenusk, Fort Severn, Whitesand, Kiashke Zaaging Anishinaabek) to apply individually. These 4 communities are not a part of the Long-term Energy Plan (LTEP) and will not be connected to the grid, however, opportunities to pursue renewable energy projects will still require them to identify community programming needs that will allow them to benefit from economic development opportunities. Q3: What are the Program objectives? The objectives of the Program are to assist remote First Nation communities in identifying, prioritizing accessing and participating in programs that address their specific social programming needs. This can be achieved through the development of Community Readiness Plans in order to fully benefit from the socio-economic opportunities associated with planned connection to transmission lines or renewable energy sources. Q4: What is a Community Readiness Plan? A community readiness plan is a planning tool that outlines baseline data on a series of identified socioeconomic indicators; compiles an inventory of existing programs and resources; identifies programming needs and develops an action plan that prioritizes a community s needs in order to benefit from future economic development opportunities. Elements of a Community Readiness Plan could include: Extensive community communications and engagement; Research to develop a baseline on community well-being data (addiction rates, mental health supports, employment and training needs, etc.,); Analysis and identification of existing or needed government programming and a strategy to implement programs in communities; Job-specific training; Relevant health programs; and Business innovation/incubation mentoring. See Appendix 1 for a sample Community Readiness Plan. Q5: What is the application process for the Program? A holistic, multi-community, aggregate approach to identifying and securing programming needs creates the best opportunity for First Nation success. As such, joint applications are required except for the 4 communities noted above. Applications will be accepted from Tribal Councils or from other groupings of First Nations (e.g. 3 or more communities). Band Council Resolutions are required for individual and group applications to demonstrate community agreement and to delegate authority to the Tribal Council to develop the community readiness plan. Eligible First Nations can only be represented in one application for Program Funding, whether the application is joint or individual. Q6: Can a First Nation be represented in multiple applications such as through a Tribal Council and a joint First Nation application? No, eligible First Nations can only be represented in one application for Program Funding. Q7: Who manages the Remote Electrification Readiness Program? The Program is administered by the Ministry of Aboriginal Affairs. Remote Electrification Readiness Program - Q & A 3

Q8: How much funding is available? The Ontario 2014-15 Budget allocated $1M per year for 3 years (2014-15 to 2016-17) towards this program. Q9: Is there a maximum level of funding under the Program? Funding for Program activities will be determined through a competitive process with joint applications receiving proportionate funding. Depending on the number of successful applicants and the nature of community readiness planning outlined in proposals, funding amounts may be adjusted following the evaluation period. Any increase or decrease in funding will be discussed with successful applicants in advance of entering into a Funding Agreement. The Ministry may also adjust funding amounts to ensure adequate community readiness planning in northwestern Ontario. Q10: Are multi-year funding agreements allowable under the Program? For the first year of the program (2014-15) one-year funding agreements will be established. Multi-year funding agreements will be considered under the Program in 2015-16 for two-year funding. Q11: What activities are eligible under the Program? To support the development of Community Readiness Plans, eligible activities could include: 1. Identifying community resources: including skills, resources, facilities, capacities and capabilities that currently exist within the community(ies) (e.g., through community engagement sessions). 2. Undertaking a gap analysis: through which communities can identify their programming needs (e.g., supports for: mental health, wellness and life skills programs, addictions recovery, academic upgrading, skills training, etc.) to better capture future benefits of transmission connection. Note: For communities that have already completed a gap analysis or who have identified and prioritized their community needs, Program funds could be used to build on these activities to develop the community readiness plan. MAA would require submission of the prior community gap analysis/needs assessment along with the Program application. 3. Developing an action plan: Researching other funding and programs to leverage; Building on existing resources and planning initiatives; Developing new partnerships or leveraging existing; and Investments in new or existing economic and social programs, business development opportunities required to enable First Nation communities (either individually or as a collective) to capture maximum value from the transmission line projects. 4. Implementing and monitoring: Iimplementing the actions identified above within a coordinated community framework. Monitoring and evaluating progress with appropriate criteria. Remote Electrification Readiness Program - Q & A 4

Q12: What expenditures are eligible under the Program? Eligible costs that CAN be funded include: Partnering with an institution that has expertise in developing gap analysis and the community readiness plan in partnership with the community; Staffing to coordinate the development of the community readiness plan at the community or Tribal Council level; Costs related to developing the knowledge and skills needed to collaborate, partner, and work jointly with other communities/institutions on initiatives related to the identified community priorities; Enhancing existing planning or initiatives that are not fully funded and that support the objectives of the Program; Travel costs for activities directly related to the work plan including those charged by consultants; Professional fees, consultants and/or technicians for technical expertise relating to the project work plan activities e.g. to develop the community readiness plan; Honoraria, payments to Elders for their attendance at a meeting/event or to individuals for their Aboriginal ceremonial participation at a meeting/event. The definition includes payments made to Elders for their specialized knowledge (e.g. on cultural sites, sacred knowledge); Community Outreach, for activities such as community meetings, presentations and workshops related to the work plan. (e.g. printing materials, room rates, etc.); and Administration costs must be directly related to the work plan. Eligible costs include: utilities; telephone/fax charges; network charges; postage/courier charges; photocopying charges; financial institution service fees; office supplies. A maximum of 10% of the transfer payment s total budget (pre-administration) may to allotted to administration, and the costs must be specified Q13: Can consultants be hired to help develop the Community Readiness Plan? Yes, applicants could work with external partners or institutions which have expertise to work with communities, to develop the community readiness plans. Q14: What expenditures are ineligible under the Program? Costs that CANNOT be funded include: Costs related to any initiative that is already fully funded through other sources; Costs related to initiatives that do not meet the Program Objectives (see Section A-2 OBJECTIVES of this Guide); Honoraria to individuals already receiving a salary from the applicant and/or a represented community or institution; Capital asset costs other than the initial purchase of eligible office equipment for new staff funded by the Program; Litigation or other legal costs; Research undertaken for the purpose of pursuing land claims or litigation; Debt reduction costs; and Purchasing of goods for resale. Remote Electrification Readiness Program - Q & A 5

Q15: What is the evaluation process for the Program? Applications will be assessed on a competitive basis. Priority will be given for applications that: Build on existing initiatives and community planning Leverage community resources and existing programs to meet community priorities Demonstrate efficient use of resources Demonstrate expertise in community planning capacity-building Q16: What stages are involved in the evaluation process for the Program? The evaluation process for Program applications will be in two stages as follows: Stage 1: Initial review of applications will include: Eligibility and financial viability of the organization; Application meets program objectives; and Work plan and budget. Stage 2: Multi-ministry panel review: Applications that meet the organizational and proposal requirements through the initial review will then be reviewed and prioritized by a multi-ministry panel that will make recommendations to MAA; MAA will make the final decisions regarding successful applications. Remote Electrification Readiness Program - Q & A 6

Q17: What application materials/documents are required to be submitted as part of the application? You can use this chart as a tool to ensure that your application is complete. Information/Document Requirements for a Complete Submission Completed? Review the Remote Electrification Readiness Program Applicant Guide Review the Remote Electrification Readiness Program: Question and Answer Document Complete and submit the Application Form in Grants Ontario by November 14, 2014 Complete and submit the Budget document as an attachment by November 14, 2014 List of Chief and Council or Board of Directors (as applicable) with portfolio information Copy of Letters Patent/Certificate of Incorporation (if applicable) Organizational Chart(s) (if available) Proof of Insurance Complete and unabridged audited financial statements from the most recent available fiscal year are required (no earlier than 2012-13). The audited financial statements must include: Auditors cover letter Auditors Management letter Balance Sheet Income Statement Statement of Changes in Net Assets Statement of Changes in Fund Balances Summary of Significant Accounting Policies Notes to the Financial Statements All Schedules of Revenue and Expenditures from all sources of funding Schedules of Salaries, Honoraria, Travel and Meal Expense If incorporated for less than two years, a copy of your organization s by-laws, constitution and mandate; information on your governance structure, and information on your membership requirements Additional Documents and Information Band Council Resolutions for individual and group applications Current contact list(s) of Executive Committee Remote Electrification Readiness Program - Q & A 7

Q18: What are the requirements for successful applicants of the Program? Successful applicants will be required to: Sign an Ontario Funding Agreement with the Ontario Government outlining the terms and conditions for receiving and using funds; Seek at least $2 million commercial general liability insurance coverage, and to add Her Majesty the Queen in Right of Ontario as represented by the Ontario Government as a co-insured on this coverage before the Ontario Funding Agreement can be executed; Report back to the ministry on the use of funds, service deliverables and outcomes achieved. Applicants must submit Final Expenditure and Work Plan Report form and RERP Audited Schedule to provide this information; and Permit the Province to verify/audit information submitted (at the discretion of the Province) to ensure that it is complete and accurate, and that funds were used for the purpose(s) intended. Q19: What is the deadline to apply? Remote Electrification Readiness Program DRAFT applications for 2014-2015 must be received by November 14, 2014 on Grants Ontario. For those DRAFT applications received by November 14, 2014 an additional 7-days will be provided to applicants to finalize your application through Grants Ontario with a closing deadline date of November 21, 2014. Q20: Who do we contact about the Program? Email or telephone enquiries about the program may be directed to: Ministry of Aboriginal Affairs Aboriginal Relations and Ministry Partnerships Division Aboriginal & Ministry Relationships Branch 160 Bloor Street East, 9 th Floor Toronto, ON M7A 2E6 Telephone: 416-326-4740 Toll-free: 1-866-381-5337 TTY/Teletypewriter (for the hearing impaired): 1-866-686-6072 Or Corwin Troje Telephone: 416-325-4044 Email: Corwin.Troje@ontario.ca Trish Malone Telephone: 416-327-9594 Email: Trish.Malone@ontario.ca Remote Electrification Readiness Program - Q & A 8

Appendix 1: Sample Community Electrification Readiness Plan Community Readiness Plan Step 1: Identify community resources Step 2: Undertake a gap analysis and prioritize community needs Step 3: Develop an action plan to leverage programs, services and community resources to address identified gaps/community needs Step 4: Implementation and on-going monitoring Activities Undertake community surveys to establish/collect baseline data Leverage baseline data that may exist for: Education (i.e. student attendance/ participation, student achievement, EQAO, etc.); Well-being (e.g. life expectancy, health outcomes, family violence, birth rates, language retention, etc.) Well-being studies; Child Welfare data; Labour Force and Composition; Wait times for services offered; Mental Health/ Addictions (e.g. prescription drug abuse, youth suicide, etc.) as well as other health indicators; and Public Safety (e.g. victimization, crime reduction, etc.). Develop a research plan including priority setting activities Identify community needs e.g.: Health/Social Supports Education (academic upgrading) Employment and Training Business mentoring Community engagement on electrification opportunities Identify existing programs and services (federal, provincial, non-profit etc.) Develop an action plan Develop a protocol to enable on-going community assessment and monitoring of community readiness/preparedness Remote Electrification Readiness Program - Q & A 9