SHELLFISH AQUACULTURE PERMITTING PROGRAM UPDATE

Similar documents
Shellfish Aquaculture Permitting Program Update

GOLD AWARD PROPOSAL FORM

Healthy Options Serving Basic Health, and Medicaid: TANF, CHIP Foster Children and Blind and Disabled clients

2017 Nationwide Permit Reissuance

Health Home Overview 10/1/2013

Washington State. Nonprofit Sector REPORT

Leveraging Care Coordination Organizations in Medicaid Health Homes: The Washington Way

Health Homes: Perspectives from the Leaders

Regulatory Division General Information: January 2016

Behavioral Healthcare System Redesign

A CDL Permit (Commercial Driver s License permit) is required for dispatch (job assignment) in the apprenticeship program

U.S. ARMY CORPS OF ENGINEERS

Corps Regulatory Program Update

OCCUPATIONAL PROFILE: PSYCHIATRIC ADVANCED REGISTERED NURSE PRACTITIONERS (ARNPs)

OCCUPATIONAL PROFILE: COMMUNITY HEALTH WORKERS

ARRA EECBG Small City & County Awards $6.7M Last updated: February 2012

U.S. Army Corps of Engineers PHILADELPHIA DISTRICT

PUBLIC NOTICE Application for Permit

Washington Connection Advisory Committee Meeting Executive Sponsor: AGENDA Committee Members:

You Can Make a Difference! A Citizen s Guide to Periodic Comprehensive Plan and Development Regulation Updates

ARRA Efficiency & Conservation Block Grant Program (EECBG) Awards Last updated: June 2012

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, PORTLAND DISTRICT P.O. BOX 2946 PORTLAND, OREGON August 9, 2016

Case 1:16-cv JEB Document 218 Filed 05/04/17 Page 1 of 11 IN THE UNITED STATES DISTRICT COURT FOR THE DISTRICT OF COLUMBIA

VOLUNTEER WASHINGTON A CASE FOR COMMUNITY VOLUNTEERISM

St. Anthony Hospital. Community Health Needs Assessment

Regulatory Guidance Letter 92-01

SPD Emergency Procedures and SPK Regional General Permit 8 for Emergency Actions

Maryland State Programmatic General Permit (MDSPGP)

Public Notice No. PUBLIC NOTICE ANNOUNCING REGIONAL CONDITIONS AND WATER QUALITY CERTIFICATION FOR NATIONWIDE PERMITS

Atlantic States Marine Fisheries Commission

PUBLIC NOTICE Application for Permit

Department of Army Permit Evaluation Process

Welcome to Kaiser Permanente

Taking Stock 2016: Draft Final Report. Growth Management Policy Board February 2, 2017

WSFMA Regional Leads Program

City of San Diego Master Plans for the Montgomery-Gibbs Executive and Brown Field Airports Public Involvement Plan

1. Name of Grant/Program: Consolidated Homeless Grant/Washington State Department of Commerce

Gulf of Mexico Oyster Aquaculture Small Grants Program (2017)

Puget Sound Gateway Program

June 24, 2015 PETITION FOR: (1) SPECIAL CASE DETERMINATION; AND (2) APPROVED JURISDICTIONAL DETERMINATION UNDER 404 OF THE CLEAN WATER ACT

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

Page 1 of NATIONWIDE PERMIT (NWP) PROGRAM - SUMMARY - ALABAMA CERTIFICATION & PRE-CONSTRUCTION INFOMATION

Relicensing Process Overview

PENNSYLVANIA STATE PROGRAMMATIC GENERAL PERMIT-4 STANDARD OPERATING PROCEDURES. June 5, 2014

Texas Department of State Health Services

Lifespan Respite Washington Voucher System

Monthly Decisions for May Page 1 of 15

Overview January, 2017

City of Seattle Partnering Agreement. December 2017

REQUEST FOR PROPOSALS (RFP) Information Technology Services

Home Care Assistants

2018 Project Selection Process. Transportation Policy Board January 11, 2018

United States Army Corps of Engineers Pittsburgh District Regulatory Program. Westmoreland County 2014 Engineers Workshop. March 20 th & 21 st, 2014

New Solar Homes Partnership Program Webinar

July 17, Mr. Edward Randolph Energy Division Director California Public Utilities Commission 505 Van Ness Avenue San Francisco, CA 94102

-2- 4) The Corps will ensure the biological assessment is prepared in accordance with the Corps' "Biological Assessment Template."

South Sacramento HCP Regional General Permit

Update on USACE Civil Works Program Authorities, Policies, and Guidance

City of Batavia Downtown Improvement Grant

Dear Friends, Piper Henry Keller Board President

PUBLIC NOTICE Application for Permit

July 5, JOINT PUBLIC NOTICE Savannah District/State of Georgia

Integrated Managed Care Clinical Symposium North Central (Chelan, Douglas, Grant counties) Co-Hosted by:

ITS Maryland 2013 Annual Conference October 8, 2013

2016 OLYMPIA ECONOMIC SYMPOSIUM Labor Market and Performance Analysis

The Impact of Medicaid Primary Care Payment Increases in Washington State

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

Seattle ACS & King County MST

Provider Services. ISBE Nutrition & Wellness Programs Day Care Homes

CHAPTER 3: CORPS OF ENGINEERS WETLANDS PROGRAM

US Army Corps of Engineers. Section 408 Overview. Regulatory Workshop July 22, Kim Leonard/Kevin Lee BUILDING STRONG

Lifespan Respite Washington Voucher System

Northwest Educational Service District 189 Request for Proposal (RFP) Electronic Medical Records System

REQUEST FOR PROPOSAL

DEPARTMENT OF THE ARMY U.S. Army Corps of Engineers Los Angeles District, Phoenix Office 3636 N. Central Ave., Suite 900 Phoenix, AZ 85012

DEPARTMENT OF THE ARMY GENERAL PERMIT

Instructions to Bidders Asbestos Abatement

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

Project Descriptions for Funded Organizations Community Energy Efficiency Pilot Program

Working Together for a Healthier Washington

City of Seattle Comprehensive Plan Update

Regulatory Program Open House Building Public Trust

BACKGROUND, PURPOSE & SCOPE 1.0 BACKGROUND 1.1

Washington State Registered Nurse Supply and Demand Projections:

GULF STATES MARINE FISHERIES COMMISSION FY2018 REQUEST FOR PROPOSALS (RFP)

REQUEST FOR PERMISSION TO MODIFY A U.S. ARMY CORPS OF ENGINEERS PROJECT UNDER SECTION 408

BELOW MARKET RATE (BMR) RENTAL UNIT SELECTION PROCESS COLONNADE APARTMENT HOMES LOS ALTOS

Pierce County Community Connections

FRONTLINES. Frontlines. Washington Association of Designated Mental Health Professionals. President s Letter. Dear brother and sister DMHPs,

SNOHOMISH COUNTY PUBLIC HOSPITAL DISTRICT NO. 3 RESOLUTION NO. 447 RECITALS/FINDINGS

Georgia Environmental Conference

SKAGIT COUNTY PUBLIC HOSPITAL DISTRICT NO. 1 RESOLUTION NO RECITALS/FINDINGS

Measuring Health Care in Washington State

Flexible Network FAQs

Billing Code P DEPARTMENT OF ENERGY. Federal Energy Regulatory Commission. [Docket No. PF ] Notice of Intent to Prepare an

JEN: Prior to embarking on a new master plan, infrastructure project or major policy change, ports need to get buy-in from those who will be affected.

5 th NATIONAL AQUACULTURE EXTENSION WORKSHOP/CONFERENCE 1

The purpose of the presentation is to provide an overview of the changes that occurred between the Pennsylvania State Programmatic General Permit-4

Jacksonville Harbor Deepening

P UBLIC PARTICIPATION P LAN

Transcription:

SHELLFISH AQUACULTURE PERMITTING PROGRAM UPDATE 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 1 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 102 56 48 130 120 111 Seattle District US Army Corps of Engineers 21 June 2017 The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.

AGENDA 2 Welcome by Seattle District Commander COL John Buck Introductions 2017 Nationwide Permit 48 Procedures Eelgrass Delineation Guidance Questions & Answers Closing Remarks

SHELLFISH AQUACULTURE 3 Permitting Team 2017 Matthew Bennett Section Chief 206-764-3428 Pam Sanguinetti Clallam and Jefferson County (206) 764-6904 Kiley Zaubi Grays Harbor and Pacific County (206) 764-3262 Frank Nichols Island County (206) 764-6182 Katie Heard Kitsap County 206-764-3480 Jason Sweeney Mason County (206) 764-3450 Tom Bloxton Pierce County (206) 764-3443 Daniel Krenz Pierce County (206) 316-3153 Ron Wilcox Skagit County (206) 316-3893 Jerry Gregory Snohomish County (206) 764-6665 Brandon Clinton Thurston County (206) 316-3164 Randel Perry Whatcom and San Juan County (360) 734-3156

2017 NWP 48 VERIFICATION PROCEDURES 4 Verified approximately 730 NWP 48 s for Commercial Shellfish Aquaculture under the 2012 NWP 48 2017 NWP s Published March 2017 Summarize 2017 NWP 48 *New operations have not been in commercial operation in 100 years *Option to group multiple leases into 1 project area Objective: A streamlined, predictable and transparent process compliant with Corps regulatory requirements.

2017 NWP 48 VERIFICATION PROCEDURES FOR 2012 NWP 48 AUTHORIZED PROJECTS 5 Procedures apply to previously authorized 2012 NWP 48 with no changes or for the period of time the NWP is valid Applicants will receive 2 copies of a verification letter and attachments If no changes have occurred, and are not expected to occur, one copy is signed and returned to the Corps, Second copy for grower s records ESA coverage from 2012 NWP 48 will carry-over Instructional Cover Sheet included & PA issued June 9, 2017 Operations with no previous verification follow standard PCN procedures

2017 NWP 48 VERIFICATION PROCEDURES FOR 2012 NWP 48 AUTHORIZED PROJECTS 6 Q: What if I ve made changes or plan to before March 2022? A: Contact your Corps of Engineers Project Manager Q: What if I don t expect to make changes but later decide I want to make a change? A: Contact your Corps of Engineers Project Manager Changes may include: *altering the area of cultivation *changing species or cultivation method (for example, bottom culture to elevated)

2017 NWP 48 VERIFICATION PROCEDURES FOR 2012 NWP 48 AUTHORIZED PROJECTS 7 Schedule: Start verifying previously verified NWP 48s summer 2017 Request response within 45 days Current verifications expire March 2018

EELGRASS DELINEATION GUIDANCE 8 NEED: Eelgrass is a special aquatic site requiring identification per General Condition 32- Notification DRAFT Guidance made available to public May 2016 DRAFT Guidance is for Regulatory Program and is discretionary Solicited user feedback and comment Training for user groups conducted and additional comments received All comments received to date have been considered and incorporated into a DRAFT Version 2.

EELGRASS DELINEATION GUIDANCE 9 Eelgrass present in project area Yes Eelgrass to be avoided Yes Tier 1 No No Preliminary method Tier 2 (minimal) Tier 3 (> minimal)

EELGRASS DELINEATION GUIDANCE 10 A new eelgrass delineation is typically not required for previously verified operations with no changes Identification of eelgrass will be required for expansion of existing operations, OR; New operations requiring a Department of the Army Permit (per GC 32), OR Identification of eelgrass will be required for operations returning to areas uncultivated since 2007 which contain eelgrass (for ESA coverage per PBO)

Questions