NDIA ATE Army Liaison Report

Similar documents
UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 20 R-1 Line #98

UNCLASSIFIED. Cost To Complete Total Program Element ED8: Paladin Integrated Management (PIM)

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 25 R-1 Line #165

COL Michael Milner Project Manager Armored Multi-Purpose Vehicle

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

International Defense Industry Fair Modernizing the Army Materiel Enterprise

Advanced Planning Brief to Industry 01 May 2012 PM-Towed Artillery Systems

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / ADVANCED TANK ARMAMENT SYSTEM (ATAS)

2017 NDIA Munitions Executive Summit. COL M. Gutierrez, Project Manager, Maneuver Ammunition Systems MAR 2017

U.S. Army representatives used the venue of the 2012

Tactical Wheeled Vehicle Sustainment

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

The Army s Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

Army Fiscal Programming For Equipment

System of Systems (SoS) Systems Engineering in Acquisition Program Planning

NDIA Joint Armaments Conference

DoD AUTOMATIC TEST SYSTEMS EXECUTIVE DIRECTORATE

The Army s Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress

260D. Chris Giggey NAVAIR PMA260 DPM for ATS 28 Oct 2014

Omnibus Contract Update

Advanced Planning Briefing to Industry April 5-7, Robotic Systems Joint Project Office. Jeffrey Jaczkowski, Deputy Project Manager

Navy ManTech Program. ManTech Update. Tom Hite CTC 15 October 2014

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001

Technician Skill Based Training Course Titles & Course Scopes. (As of: 11 April 2018)

Omnibus Contract Update

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 21 R-1 Line #102

PRODUCT MANAGEMENT/ PRODUCT DIRECTOR OFFICE TEAM OF THE YEAR (05 LEVEL)

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED UNCLASSIFIED

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Physical Security Equipment

KC-46A Tanker DoD Budget FY2013-FY2017. RDT&E U.S. Air Force

Cryptologic & Cyber Systems Division Contract/Acquisition Forecast

DoD AUTOMATIC TEST SYSTEMS EXECUTIVE DIRECTORATE

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

OUTLINE CONTRACTING BUDGET ITEMS FOR PROCUREMENT TACOM BUSINESS DRIVERS CONTRACTING POINTS OF CONTACT

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

PEO-GCS Website: PEO-GCS Managed Systems Current Force

COST (Dollars in Millions) FY07 FY08 FY09 FY10 FY11 FY12 FY12

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

U.S. Army The U.S. Army is America s primary land

UNCLASSIFIED. LandWarNet Army Request for IT (ARFIT) Information Exchange Forum (IEF)

Exhibit R-2, RDT&E Budget Item Justification

An Aerospace and Defense Company

The Ship Acquisition Process: Status and Opportunities. NDIA Expeditionary Warfare Conference 24 October 07

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Joint Air-to-Ground Missile (JAGM) FY 2012 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 6 R-1 Line #62

RECORD VERSION STATEMENT BY LIEUTENANT GENERAL JAMES O. BARCLAY III DEPUTY CHIEF OF STAFF OF THE ARMY, G-8 BEFORE THE

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #91

Mr. James Hondo Geurts Deputy Director for Acquisition United States Special Operations Command

DoD Automatic Test Systems Strategies and Technologies. JTEG Forum on ATE/ATS

NGAUS 140th GENERAL CONFERENCE ARNG RESOLUTIONS PACKAGE

FOR IMMEDIATE RELEASE No June 27, 2001 THE ARMY BUDGET FISCAL YEAR 2002

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED UNCLASSIFIED

1THE ARMY DANGEROUSLY UNDERRESOURCED' AUSA Torchbearer Campaign Issue

PEO GCS Unmanned Ground Vehicle Overview. Mr. Scott Davis, PEO GCS 23 March 2011

Program Manager Training Systems PM 203

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

COL Mike Flanagan Project Manager Training Devices

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 P-1 Line #50

Multiple Award Task Order Contracts (MATOCs) Update

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

Welcome to CASCOM Army Watercraft

NAWCWD Long Range Acquisition Forecast (LRAF) Requirements. Distribution Statement A - Approved for public release, distribution is unlimited.

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 11 R-1 Line #92

Exhibit R-2, RDT&E Budget Item Justification February 2008

BG William M. Lenaers Commanding General

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

Huntsville Aerospace Marketing Association (HAMA)

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Transportation & Parking Advisory Committee

USMC Small Arms Modernization Brief

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Consolidated Afloat Network Ent Services(CANES) FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Mission-Based Test & Evaluation Strategy: Creating Linkages between Technology Development and Mission Capability

Technician Maintenance Course Titles & Course Scopes. COURSE TITLE: Tactical Water Purification System (TWPS) 80hr Technician Maintenance Course

Marine Corps Amphibious Combat Vehicle (ACV): Background and Issues for Congress

AMC INDUSTRIAL ENTERPRISE

NDIA TWV Conference. DISTRIBUTION A: Approved for Public Release (1) 16 May 2017

Defense Consortia A Proven Way to Rapidly Develop and Deploy New Armament Capability in Today s Environment

MULTIPLE LAUNCH ROCKET SYSTEM (MLRS) M270A1 LAUNCHER

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 12 P-1 Line #51

Ready to Profit: Corporate Beneficiaries of Congressional Add-Ons to 1. the FY 2018 Pentagon Budget

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Combat Identification FY 2012 OCO

Product Manager Air Warrior Update AAAA ASE Symposium

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #164

SCIENCE & TECHNOLOGY ENABLING ARMAMENTS ACQUISITION MODERNIZATION

Marine Corps Warfighting Laboratory. Dragon Fire II Experimental System NDIA Briefing

Transcription:

NDIA ATE Army Liaison Report 1 November 2015 Scott Brown

Agenda Office of Assistant Secretary of the Army PEO Ground Combat Systems (GCS) Organization Armored Multi-Purpose Vehicle (AMPV) GCS Platform Modernization PEO Combat Support & Combat Service Support (CS&CSS) Organization Portfolio Joint Light Tactical Vehicle (JLTV) Test Measurement & Diagnostic Equipment (TMDE) Portfolio Next Generation Automatic Test System (NGATS) Acquisitions Picatinny Automatic Test System Division (ATSD) Acquisitions Programs 2

Office of the Assistant Secretary of the Army 3

PEO Ground Combat Systems SB Updated New Assignment New Assignment PD: Ms. Constance Tucker 4

Armored Multi-Purpose Vehicle (AMPV) AMPV Engineering and Manufacturing Development (EMD) contract awarded to BAE Systems Land & Armaments Dec 23 2014 Provides a replacement for M113 Family of Vehicles Initial award 52-month base term ~$388M Includes 29 vehicles Potential $1.2B EMD and Low Rate initial Production Currently anticipate 2,897 vehicles 5

Ground Combat Systems Modernization GCS Modernization - Primarily Executed through the ECP Process Abrams GDLS awarded ECP 1 development contract Sep 2012 Fielding scheduled for FY17 Bradley ECP 1 production contract awarded BAE awarded ECP 2 development contract Sep 2012 ECP 2 fielding scheduled for FY17 Stryker BCT On 14 Mar 2013, the Army Systems Acquisition Requirements Council (ASARC) approved ECP R&D Phase II Phase II award to GDLS Sep 13 ECP Production FY18 Paladin SPHS (PIM Program) BAE Sole Source LRIP contract awarded in FY14 FRP FY17, Production Quantities: 580 sets 6

PEO Combat Support & Combat Service Support 7

PEO CS&CSS Portfolio 8

PEO CS&CSS Portfolio 9

Joint Light Tactical Vehicle 27-month FFP EMD Contracts, 22 Aug 2012 AM General: $64.5M LM: $66.5M Oshkosh: $56.4M EMD Prototypes (22 ea.) delivered Aug 2013 for testing Oshkosh awarded Production Contract on 25 Aug 2015 $6.7B (17,000 vehicles) Procurement thru ~2040, ~55,000 Total vehicles (~$30B) LM protest September 2015 10

TMDE Overview At-Platform Test Equipment: Maintenance Support Device (MSD), Internal Combustion Engine Kit (ICE, SWICE) Off-Platform Test Equipment: BSTF, Next Generation Automatic Test System (NGATS) General Purpose Electronic Test Equipment Modernization (TEMOD) Calibration Sets (CALSETS): Calibration Instruments & Standards Used by all weapon systems maintainers at Field and Sustainment Levels to perform At platform maintenance. Supports repair of Line Replaceable Modules at Field and Sustainment Levels for multiple weapon systems. Provides Field and Sustainment Level testing of weapon systems operational tolerances. Performs Sustainment Level calibration / quality assurance for General Purpose Electronic Test Equipment that supports weapon systems. Innovation for Today and Tomorrow's Expeditionary Forces 11

Next Generation Automatic Test System Automatic Test Station TPS Storage Description: A highly mobile, rapidly deployable, general-purpose, reconfigurable automatic test system which directly supports testing and screening of Army weapon systems to maintain their readiness to shoot, move, and communicate. Designated to replace Direct Support Electronic Systems Test Set (DSESTS), Base Shop Test Facilities (BSTF), versions 3 and 5, and other legacy ATE. NGATS Fielding: NGATS will replace legacy ATE Projected AAO is 186 systems NGATS Status: Console contract awarded September 2014 First Article Test completed September 2015 NGATS Shelter RFP released May 2015 12

13 Current and Future Major Weapon Systems Supported by an Off Platform Test System MLRS M1A1 AIM M109A6 (Rehost), M109A7 (New TPSs) Paladin Apache CROWS M1A2 SEP Stryker Spider DAGR Firefinder Husky HDMS CREW Duke M2/3A2 M2/3A2 ODS M2/3A3 NGATS will be Capable of Supporting Existing and Future Army Platforms LW155 M3A3 BFIST Avenger M113A3 BCV ODS BCV A3 Kiowa Warrior M3A2 Update

TMDE Programs Next Generation Automatic Test System (NGATS) Console/System Integration Full Rate Competition Awarded Sept 2014 to Boeing First Article Test Complete Sept 2015 Army Reliability Test Event Anticipate March 2016 (Free Standing) Anticipate October 2016 (Shelter Configuration) 14

TMDE Acquisitions NGATS Shelters NGATS Shelter competition (ATE, TPS Shelters) RFP closed 31 Jul 2015 Anticipate contract award Jan 2016 15

TMDE Acquisitions Misc. Various General Purpose Electronic Test Equipment Modernization projects (TEMOD) anticipated FY16 Contract Awards ME-572()/U Ammeter (2QFY16) OS-305/U Oscilloscope (2QFY16) OS-307/U Oscilloscope (2QFY16) TS-4548/P RF Power Meter (2QFY16) TS-4544/U Telecommunications Test Set (3QFY16) Multiple Calibration instruments & standards acquisitions Maintenance Support Device & SWICE Production MSD-V4 (Rugged) RFP anticipated release 2QFY16 MSD-V4 (Light) RFP anticipated release 4QFY16 SWICE production ongoing 16

Picatinny ATSD Acquisitions ATE Engineering Services IDIQ ATE Engineering Services IDIQ Large Business IDIQ Continuing to release tasks ATE Engineering Services IDIQ Small Business IDIQ Continuing to release tasks Approaching current ceiling Anticipate new contract RFP early CY 16 17

Picatinny ATSD Activity Current NGATS TPS rehost/development activity Abrams/Bradley (all variants) STRYKER (all variants) STRYKER MGS CREW DUKE/THOR FireFinder Paladin PIM CROWS M777 Husky Spider Other Army Field level maintenance study in-process 18

19