UNCLASSIFIED AD NUMBER LIMITATION CHANGES

Similar documents
MAINTENANCE SUPPORT FM CHAPTER 9

UNCLASSIFIED AD NUMBER LIMITATION CHANGES

Army Assault Forces - Normandy 6-7 June 1944

CHAPTER 4 DETERMINATION OF REQUIREMENTS FOR BASE DEVELOPMENT

The Army Proponent System

LESSON 2: THE U.S. ARMY PART 1 - THE ACTIVE ARMY

Standards in Weapons Training

SUPPLY AND SERVICES, MAINTENANCE, AND HEALTH SERVICE SUPPORT Section I. INTRODUCTION

UNIT AWARDS JOINT MERITORIOUS UNIT AWARD... I MERITORIOUS UNIT COMMENDATION... II ARMY SUPERIOR UNIT AWARD... III

Training and Evaluation Outline Report

OPNAVINST F N4 5 Jun 2012

H. R. ll [Report No. 115 ll]

MCO A C Apr Subj: ASSIGNMENT AND UTILIZATION OF CENTER FOR NAVAL ANALYSES (CNA) FIELD REPRESENTATIVES

COPY -- REGULATIONS FOR CIVILIAN OPERATIONS ANALYSTS, SCIENTIFIC CONSULTANTS, AND TECHNICAL OBSERVERS ACCOMPANYING U. S. ARMY FORCES IN THE FIELD.

Training and Evaluation Outline Report

UNCLASSIFIED AD NUMBER LIMITATION CHANGES

Training and Evaluation Outline Report

US 5th Army 14 August 1944

AUSA BACKGROUND BRIEF

PORTS (OVERSEA) HEADQUARTERS AND HEADQUARTERS COMPANIES REFERENCE USE ONLY WAR DEPARTMENT FIELD. MANUAL .!AR OEPARTMENT - MAY MHI.

Organizational Summary American Armored Division 12 February 1944 Table of Organization 17

MHI "Y ~FM 54-2 DEPARTMENT OF THE ARMY FIELD MANUAL DIVISION LOGISTICS AND PORT COMMAND HEADQUARTERS, DEPARTMENT OF THE ARMY DECEMBER 1961 AGO 2978B

111I11 _, MICROCOPY RESOLUTION TEST CHART. 5jj38 flil 1 2W NATIONAL BUREAU OF STANDARDS- 963-A

TABLES OF ORGANIZATION AND EQUIPMENT

INDIVIDUAL AUGMENTATION READINESS PLAN

Training and Evaluation Outline Report

UNCLASSIFIED AD NUMBER LIMITATION CHANGES

Training and Evaluation Outline Report

Training and Evaluation Outline Report

GARY BAGWELL LETTERS Mss Inventory. Compiled by Luana Henderson

Department of Defense INSTRUCTION

FM Appendix C Life Support and Base Operations

Summary Report for Individual Task L-2038 Comply With TAMMS (The Army Maintenance Management System) Standards Status: Approved

551-88K-4722 Conduct Life Boat Navigation. Status: Approved

PRE-DISASTER MITIGATION (PDM)

Training and Evaluation Outline Report

FM References-1

BASE SECURITY Evaluation of Alleged Weaknesses at the Miesau Army Depot

RECRUIT SUSTAINMENT PROGRAM SOLDIER TRAINING READINESS MODULES Army Structure/Chain of Command 19 January 2012

Department of Defense DIRECTIVE

United States Forces Korea Regulation Unit #15237 APO AP Personnel - General AMERICAN RED CROSS PROGRAM AND PERSONNEL IN KOREA

Welcome to CASCOM Army Watercraft

ADDENDUM. Data required by the National Defense Authorization Act of 1994

Thi Directiveo: I

Command Logistics Review Program

150-MC-0006 Validate the Protection Warfighting Function Staff (Battalion through Corps) Status: Approved

DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS 3000 MARINE CORPS PENTAGON WASHINGTON, D.C MCO A LPC-2 22 MAR 2015

Temporary Cross-Border Movement of Land Forces Between the United States and Canada

Human Capital. DoD Compliance With the Uniformed and Overseas Citizens Absentee Voting Act (D ) March 31, 2003

Training and Evaluation Outline Report

Munitions Support for Joint Operations

MG Joe M. Ernst Assistant Deputy Commanding General USAR U.S. Army Materiel Command

DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS 3000 MARINE CORPS PENTAGON WASHINGTON, DC

ARMY

HQ USFJ INST April

3 rd BATTALION, 7 th INFANTRY REGIMENT. LTC David E. Funk

MERITORIOUS UNIT COMMENDATION

JUSTIFICATION AND APPROVAL USTRANSCOM JUSTIFICATION FOR OTHER THAN FULL AND OPEN COMPETITION

SUBJECT: Eighth Army Command Policy Letter # 46 - Command Sponsorship Program (CSP)

* We strongly encourage seafarers to apply now, to avoid a last minute rush that may occur at the end of 2016

SS- S/ terengi FM FIELD MANUAL. HEADQUARTERS, DEPARTMENT OF T\H E ARMY i \ AUGUST ^û^o THE ARMY LIBRARY WASHINGTON, D. C. f.

U.S. Army Ammunition Management in the Pacific Theater

A Ready, Modern Force!

Ammunition Peculiar Equipment

)Q 3 /S/V /^ferenc8. Referent DEPARTMENT OF THE ARMY FIELD MANUAL TR NSPORTATION HARBOR CRAFT UNITS AND MARINE MAINTENANCE UNITS

HEADQUARTERS 39TH ENGINEER BATTALION (COMBAT)(ARMY) AMEICAL DIVIDION APO SUBJECT: After Action Report of Operation Multnomah and Lake

CHAPTER FIVE RECOVERY AND EVACUATION

DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS WASHINGTON, DC MCO G LPP-2 20 Aug 93

DEPARTMENT OF THE ARMY *III CORPS & FH REG HEADQURTERS III CORPS AND FORT HOOD FORT HOOD, TEXAS MAY 2002

USAREUR Announces FY07 Transformation actions

US Marine Corps Tactical Wheeled Vehicle Strategy Update Briefing to NDIA Tactical Wheeled Vehicle Conference 2 February 2009

S. ll. To provide for the improvement of the capacity of the Navy to conduct surface warfare operations and activities, and for other purposes.

Summary Report for Individual Task H-3511 Direct Lashing Containers on the Deck of a Landing Craft Status: Approved

DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS 2 NAVY ANNEX WASHINGTON, DC MCO LPP 2 Apr 97

UNIT HISTORY. 1 January December 1966

UNCLASSIFIED. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

The distance between the battery centre and a target. An instrument used to determine the distance between an observer and the target.

Roles and Relationships

GAO. DEPOT MAINTENANCE The Navy s Decision to Stop F/A-18 Repairs at Ogden Air Logistics Center

Summary Report for Individual Task N-1103 Prepare Labels for Shipment Status: Approved

Headquarters 1st Battalion, 5th Marines 1st Marine Division, Fleet Marine Force c/o Fleet Post Office, San Francisco, California

DEC CCO 3571.lA 3B. COMBAT CENTER ORDER 3571.lA. From: To: Commanding General Distribution List. Subj: EXPLOSIVE ORDNANCE DISPOSAL

Conduct Field Maintenance on a Hydra-start System Status: Approved

UNIT MOVEMENT PLANNING

Department of Defense DIRECTIVE

NEW ZEALAND. I. Army. Area ,ooo sq. km. Population (XII. 1933)

POLICY AND BUDGETARY GUIDANCE FOR EXERCISE OF THE MARITIME PREPOSITIONING SHIPS (MPS) AND AVIATION LOGISTIC SUPPORT SHIPS (T-AVB)

United States Forces Korea Regulation Unit #15237 APO AP Financial Administration

Training and Evaluation Outline Report

Training and Evaluation Outline Report

Ship's Organization and Regulations 119

GAO AIR FORCE WORKING CAPITAL FUND. Budgeting and Management of Carryover Work and Funding Could Be Improved

NAVY WEIGHT HANDLING PROGRAM FOR SHORE ACTIVITIES

Training and Evaluation Outline Report

TRAINING AND CONTROL MEASURES FOR DOCKWORKERS, SECURITY GUARDS AND PRIVATE GUARDS

DCCUMENT RESUME. (Army Inventory Management in Korea.]. LCD ; B May 9, pp.

Department of Defense DIRECTIVE. SUBJECT: Marine Sanitation Devices for Vessels Owned or Operated by the Department of Defense

UNITED STATES MARINE CORPS MARINE CORPS BASE QUANTICO, VIRGINIA

Required PME for Promotion to Captain in the Infantry EWS Contemporary Issue Paper Submitted by Captain MC Danner to Major CJ Bronzi, CG 12 19

Summary Report for Individual Task H-1532 Operate 5K Light Capacity Rough Terrain Forklift (LCRTF) Without a Load Status: Approved

Transcription:

TO: UNCLASSIFIED AD NUMBER AD824985 LIMITATION CHANGES Approved for public release; distribution is unlimited. Document partially illegible. FROM: Distribution authorized to U.S. Gov't. agencies and their contractors; Critical Technology; 14 FEB 1967. Other requests shall be referred to Assistant Chief of Staff for Force, Army, Attn: FOR-OT-RDWashington, DC 20310. Document partially illegible. This document contains export-controlled technical data. AUTHORITY AGO D/A ltr, 29 Apr 1980 THIS PAGE IS UNCLASSIFIED

THIS REPORT HAS BEEN DELIMITED AND CLEARED FOR PUBLIC RELEASE UNDER DOD DIRECTIVE 5200.20 AND NO RESTRICTIONS ARE IMPOSED UPON ITS USE AND DISCLOSURE. DISTRIBUTION STATEMENT A APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED. BEST COPY AVAILABLE

FOR OFFICIAL USE ONLY DEPARTMENT OF THE ARMY OFFICE OF THE ADJUTANT GENERAL WASHINGTON, D.C. IOSIO T oo SUBJECT: IN RMLY NtPIR TO AGAM-P (M) (16 Jun 67) FOR OT 21 June 1967 Operational Report - Lessons Learned, 159th Transportation Battalion (Terminal) TO: SEE DISTRIBUTION 1. Forwarded as inclosure Is Operational Report - Lessons Learned, 159th Transportation Battalion (Terminal) for quarterly period ending 31 January 1967. Information contained In this report should be reviewed and evaluated by CDC In accordance with paragraph 6f of AR 1-19 and by CONARC In accordance with paragraph 6c and d of AR 1-19. Evaluations and corrective actions should be reported to ACSFOR OT within 90 days of receipt of covering letter. 2. Information contained in this report is provided to the Com- ^ mandants of the Service Schools to Insure appropriate benefits in the future from lessons learned during current operations, and may be adapted, for use in developing training material. H ( BY ORDER OF THE SECRETARY OF THE ARMY: H 1 i 670t6^- ^L*jL>hi dr. MUMA^- 1 Incl KENNETH G. WICKHAM as Major General, USA The Adjutant General DISTRIBUTION: Commanding General US Array Combat Development Command US Continental Army Command Commandants US Army Command and General Staff College US Array War College US Array Air Defense School US Array Artillery and Missile School US Array Armor School US Array Chemical Corps School US Army Engineer School US Army Military Police School US Array Infantry School US Array Intelligence School US Array Medical Field Service School (Continued on page 2) ^na 33^ FOR OFFICIAL USE ONLY c ^ ^nn nn 3. J(\N i s ^ \ n (-1 -H

FOR OmciAl USE ONLY DISTRIBUTION (Cont'd) US Army Ordnance School US Army Quartermaster School US Army Security Agency School US Army Transportation School US Army Signal School US Army Special Warfare School US Army Civil Affairs School US Army Aviation School I Copies furnished: Office, Joint Chief of Staff (SASM) Office, Chief of Staff, US Army Deputy Chiefs of Staff Chief of Research and Development Assistant Chiefs of Staff Chief of Engineers Chief of Communications-Electronics The Provost Marshal General Director of Defense Research and Engineering ODD(SEAM), ODDR&E Research Analysis Corporation (Library) «> Security Officer, Los Alamos Scientific Laboratory National Aeronautics and Space Administration, Office of Defense Affairs Commanding General, US Army Weapons Command b r /3!H U ai 1 it" 'fw W '.\ 1 1 %\ 2 FOR OFFICIAL USE ONLY

159TH TRANSPORTATION BATOION (TERMINAL) APO 96238 AVCA QN-TTRCO 14 February 1967 SUBJECT: Operational Report en Leas one Learned for Quarterly Period Ending 31 January 1967, (RCS CSGPO-28 (RI)) TO: SEE DISTRIBUTION: PöCOTCO SECTION I SIGNIFICANT ORGANIZATIONAL ACTIVITIES The mlsblon of the 159th Transportation Battalion (Terminal) was significantly altered on 21 November 1966 when tr/o terminal service units were attached. This action by the 5th Transportation Cemnand (Terminal A) converted the battalion operation from that of strictly lighterage operations to a true terminal responsibility of both lighterage and stevedore functions. Along with the two terminal service companies came the full responsibility to operate two major cargo discharge points, the LST Beach, and a floating lighterage and barge discharge pier, called the "Can Docks". The 394th Transportation Battalion (Terminal), a sister battalion also vuvder the 5th Transportation Command (Terminal A), relinguishod operational responsibility for these two areas and now concentrates on cargo operations from a newly constructed De Long Pier in the inner barber of the Port of Qui Nhon, Vietnam. The following units are now attached to the 159th Transportation Battalion (Terminal); 14th Transportation Platoon (BARC) 26Cth Transportation Detachment (Supply) 272nd Transportation Detachment (Tug) 274th Tronsportatien Detachment (Crane) 285th Transportation Company (Terminal Service) 396th Transportation Detachment (Barge) 474th Transportation Detachment (Reefer) 485th Transportation Detachment (Reefer) 522nd Transportation Platoon (BARC) 544th Transportation Company (Medium Boat) 554th Transportation Platoon (BARC) 585th Transportation Detachment (Materials Handling) 854th Transportation Company (Terminal Service) 1098th Transportation Company (Medium Boat) With these resources of men and equipnent, the 159th is fulfilling the following mission: a. Providing command, administrative, technical, and operational supervision for attached units. b. Transporting, as reouired, all personnel, equipment, supplies, etc., from ship to shore and/or from shore to ship in the harbor of Qui Nlwn. c. Transporting by water from and/or to the harbor of Qui Nhon to any other point personnel, equipment, supplies, etc., as directed. d. Maintaining operational control and maintenance supervision over the barges and tugs of the civilian contracted firm of Han Jin Transportation Company e. Discharging and/or backloading cargo from deep draft vessels to lighterage and lighterage to trucks or beach and vice versa. f. Discharging and/or backloading cargo from LST's to truck and/or beach and vice versa. * _ ' g. Supervising Han Jin stevedore operations on Can Dock and on ves- ^ ^^ ^ sols at anchorage. FOR OFFICIAL USE ONLY I

& & : FOR OFFICIAL USE UHU SECTION II PART I OBSERVATIONS (U5SOMS IflARNaD) 1. Personnel: Itom; Personnel Shortages Diqcuaslon; Non-operational requirements for man-power Imposed by this or higher headquarters to perform necessary security and fatigue-type work has imposed some limitation on mission capability. This is particularly aggravated in some units which are understrength duo to a lack cf timely replacements, such as the 285th Transportation Company (Terminal Service) which has been operating at a nearly onethird understrength level since being attached to this battalion. Obaervationa; Aside from the obvioua prcbloms of manpower replacement which cannot be solved at this level, a couple of items become apparent. Firstly, the practice of hiring and training local national personnel to perform both fatigue and mission type work has rolldved much pressure on personnel resources. Vietnamese nationals have proven effective as stevedores, seamen and, in some cases, engineer's helpers. Training is tedious, and turn-over hampers reaching proficient skill levels, but despite the drawbacks, these individuals have made a definite contribution. Care must be token to plan for shortages during holiday periods, however. Secondly, careful planning must be undertaken to reduce the sffect of a period of rotational hump when many men in one unit rotate at the some approximate time. Resources must be screened to provide a proper overlap for triining replacements and maintaining minsion capability. This can be done by shifting skilled personnel within the command, and spreading the rotational period over a two-month to tenwoük time frame. 2. Operations: a. Item: Reduced Cargo Operations Discussion: Cargo operations were reduced in the outer harbor throughout the reporting period because of high winds and heavy seas caused by the winter monsoon season. Observatlcn; The construction and utilization of the Da Long Pier in the inner harbor offset the partially reduced operations in the outer harbor, so that the overall loss in tonnage was not too great. To further compensate for the bad weather, additional ships were assigned anchorages in the inner harbor and two ships were breasted on the vessels moored to thi outer facing of the De Long Pier. b. Item; Slow Troop Movements Discussion; The weather that adversely affected cargo operations also hampered the discharge of troop ships. Observation! The use of save-all nets and Jacobs ladders from ship-side into LCM'a proved highly successful in discharging troops and transporting them to shore during the rough wester. BARC's were used In periods of good weather, but were not considered safe for the discharge of troops in rough seas. c'. Itom: Beach Erosion Discmfton: During the high tides and rough weather there was considerable gouging and eroding of the LST Beach, causing a substantial loss of cargo storage space on the beach. Observation! Engineers have begun the use of a rock fill in the beach area to replace the many sections affected by the extreme erosion of the monsoon weather. FOR OFFICIAL USE mi

V FOR OFFICIAL USE ONLlf d. Item; Bockloading Korean Troops DlsouBfiloni Republic of Korea personnel who are back].o:;dod o» lighterage (usually BARC'B) for transfer to a troop ship do not ship hold baggage separately. Instead, at the time of departure frcm Vietnam, all baggage Is hand carried. To move both troops and accompanying baggage In the some BARC proved to be a dangerous pruetloo because even a moderate ssa would cause hazardous conditions of personnel attempting to carry their own baggage up a ship's ladder. Qbaervatloni The safest method to transport both personnel and quantities of baggage Is to load each In separats BARC's. Ones at ships Ids, the baggage Is loadsd via cargo nets, and troops safely climb boarding ladders unencumbered to reclaim their personal gear on deck, e. Ibami EiRC Tiro Pressure Dlflcuasioni The BARC operator's manual states normal operating pressure for BARC tires Is 50 psl. Hcwovsr, at this pressure, when wneols are even slightly out of lino at the time of beaching, the bead can be broken and a flat tire result. Ohoervatlon; A tire pressure of 70 pel has proven to be satisfactory. f. Item; Stevedore Crew Change Dlscuosion; Because terminal service companies do not have enough organic vehicle transportation to transport a shift change in one trip, (a situation further aggravated by levies for vehicles), a great amount of lost time h«a resulted. Trucks are having to make two trips each to make a complete change, resulting In additional mileage as well as man-hours lost in crews waiting for the complete shift to be assembled. Observation: Crew change, while still made on a two-trip basis, is sometimes alleviated by the use of S&P trailers (when available), and "cattle car" personnel trailers (when available). Weather conditions permitting, LCM's and BARC's con make shift changes on the beaches near whore the terminal service units are billeted. This is dependent also on available lighterage. g. Item; Platoon Structure Djgnussion; For operational purposes, a day is split into '.wo 12-hour shifts. Medium boat company platoons also had been split according to the two-shift standard. This resulted in half the boots being controlled by each platoon, and only half of each platoon working on any shift. The 5W*th Transportation Company (Medium Boat) decided to schedule one entire platoon for each twelve-hour shift In order to better take advantadge of the integrity and control inherent within the platoon organization. Observation; Though many administrative items were simplified as a result of the change, preventive maintenance an the boats suffered due to the lack of direct responsibility for any particular vessel, and too great an effort had to be expended to Insure proper maintenance to be worth the administrative simplification derived. 3. Training a. Item: Untrained Personnel Discussion; Two boat companies and one terminal service company of this battalion experienced a large turnover of personnel during the month of January, and the rör 1 aceiu?nt3 received in those units. ere, for the most part, untrained and inexperienced in boat or stevedore operations. With the departure of the experienced personnel, there was a noticeable lack of propor operating technique and procedures. FOR OFFICIAL USE ONUf m '^*^mmmmmi#^i&mi$#-!i

FOR OFFICIAL USE OMtf Observation! Formal training on all phases of boat opera- tions were Initiated by each medium boat company using a nucleus of experienced personnel as Instructors. These classes, along with practical experience gained while on the Job, are enabling new personnel to quickly attain the skills necessary for the successful operation of their boats. Similar situations were experienced by terminal service units, who relied heavily on experienced personnel for on-the-job training of stevedores aad equipment Operators. A side-product of this aggressive program was the development, particularly in terminal service units, of several excellent Junior non-commissioned officers. / b. Item: Cross-training of BARC Crew Members Discussion: The E'iRC operations section (all three platoons»re operated Jointly under a provisional company) has stressed the crosstraining of individual crew members, ka a result, seamen have been trained as engineers and engineers as operators when and where conditions permit. Observation: In the recent rotation of members of the 522nd Transportation Platoon (BARC), cross-training of individual crew members provided a sound base for training new personnel, as well as insuring a smooth transition during the period of personnel turnover. o. Item: Unit Training Discussion: Some difficulty has been encountered in obtaining maximum attendance in unit training programs due to the 24-hours operation. Observation: Most units have conducted required training classes two to throe different times in a twenty-four hour period in order to reach all personnel. However, the availability of training aids and polished instructor personnel are limitations in all unit programs. 4. Intelligence (None) 5 Logistics a. Item: Potable Water for Floating Craft Discussion; The hand based water point for LCU's continues to be erratic. There have heen numerous breakdowns at the point, and the present VJII is not adequate to supply water for increasing demands. Use of a 1,000 gallon tanker which is now organic to this headquarters is still not on adequato measure. Observation: Previous recommendation for a sheltered water supply for vessels, by the use of a water barge or pipeline is still voiced. Additionally, tho capacity of the present water site should be increased and new wells constructed to meet the increasing potable water demands in the Qul Khon area. b. 1 VTI: Line for Vessels ^jqcusslon: Considerable difficulty has been experienced in obtaining seven to nine inch nylon or manila line from in-country sources and channels. The use of Red Ball channels and opportune sources have bean the only means of obtaining this item. Observation: The use of this large type line, especially nylon, is required for lighters used within the Port of Qul Nhon. Automatic stockage should be effected and all users in Vietnam be screened for annual requirements so that projected needs will be programmed to fill the supply system. c. Item: Beaching of Landing Craft for Repair Dire"."ion: The meuiod of using tractor doaers to retrieve vessels to the beach area for general maintenance continues to be unsatisfactory. Tide flooding, congestion of beach facilities and the use of obsolete A-frame cranes for retrieving landing craft hinders timely re-

MM ObBervaClon; Trie FpisOTitTiaAnlrMllitonance boach should bo e^xmded by a "dredge-in fill-out" method and a marine railway and four pull-on romps be Installed In this area. This, together with expanded sheltered maintenance facilitias now under construction, will vastly improve the marine maintenance program. d. Itajn; MHE Mrintenmce Discussion; The battalion assumed control of the Qui Nhon LST Bsach on 21 Novtuaber 1966. It was determined that unit MHE maintenance facilities were in need of much improvonent. Observation! This headquarters has initiated actions to construct a consolidated semi-pormanont hardstond MHE maintenance facility. In addition, new lights have been installed to assist in night repair. The construction of this repair facility will greatly improve the availability of MIE, in thnt the consolidated talent, clean facilities, and over all program of maintenance will be pooled, oontralized, and properly supervised. Construction completion date is estimated late February 1967«liSE! Forklift Requirement DiBcusoion; A rough terrain forklift has been found to be an essential item of squipnont in suppprt of 2&RC maintenance. The excossivo weight of tho tires (3325 pounds) requires a forklift to remove and replace them. Even more importantly, tho traversing Torks on on RT pormit proper replacement of the wheel hub without damage, which la likely whon using a conventional forklift. Currently, on RT must be borrowed in support of BARC maintenance, but this has resulted in numerous maintenance hold-ups which could be avoided if an RT wore organic. A USARV Form hi (Request for Equipmont in Excess of Authorized allowances) has been submitted. Observation; A rouyh tarrain forklift is needed to provide prompt responsivuness to requirements of BARC maintenance. f. Item; Crow Rations of Class A Vessels Diacusaion: Difficulty has been encountered in providing Class "Af vessels (those upon which crews liva) a proper ration breakdown in appropriate quantities. Arrangements were made for a commissary account for each vessel, but even the commissary would not issue rations in anything lass than case lots, which has proved impractical for MU's due to tho relatively small number of crow members (12) and tho limited rofrigerated storage space. Observation; Although not entirely satisfactory, crews must overcome the li:nit.ation3 of commissary accounts by pooling requirements. This arrangement is totally unsatisfactory during times when one or more LCD's aro out of the harbor for an extended coastal mission. SECTION II?.&1 II RECOMMEND.VnONS No:-.:i U ö..^idu DAVID C. THATCHER T,TC, TC Cowmanding FOR OFFICIAL USE ONLr

DISTRIBUTION: j Commanding Officer, 5th Transportation Coramand (Terminal A) APO 96238 Commanding Officer, US Army Support Command, Qui Nhon, ATTN: AVCA QN- GO (Historian), APO 96238 Commanding General, 1st Logistical Command, ATTN: AVCA-GO-0, APO 96307 Commanding General, US Army Vietnam, ATTN: AVC, APO 96307 Commander in.chief, US Army, Pacific, ATTN: GPOP-MH, APO US Force? 96557 Asst Chief of Staff for Force Development, Department of the Army, Washington, D.C. 20310

mmm FOR OFFICIAL ÜäL uiiir 7 AVCA QN-TTCO (IH Feb 67) 1st Ind SUBJlSCTt Operational Report on Lessons Learned for Quarterly Period Ending 31 January 1967, (RCS CSCiPO-28 (RI)) HE^jQUAIiTERS 5th Transportation Command (Terminal A), APO 96236 2 8 FEB 1967 TOi Commanding Officer, US Army Support Command, Qui Fhon, ATTNi AVCA QN-OO (Historian), APO 96236 Reference Section II, basic comunication. The following comments are furnished i a* Item 5a - Potable Water for Floating Craft«The present watsr point, located at a Vietnamese pier, is overtaxed at the present tine* A deep water well and storago tanks, to include an eight-inch water line to the Qui Mhon pier, is scheduled during phase two of the present construction project in that area* Recommend this item be expeditioualy approved with a hif.h priority completion* This project should be completed during present phase of construction to prevent additional work of trenching, as area Is being prepared for capping at present* This recommendation was submitted in previous report. b* Item Number $b - Line for Veasels* Each depot in an overseas theater supporting harbor craft operations should be required to stock, on an annual basis, twelve coils of seven to nine-inch nylon line* c* Item Number 5c - Beaching of Landing Craft for Repairs. The location to construct an adequate marine maintenance facility has not been determined* Upon approval of an adequate location, a work order will be submitted giving specifications of work to be accomplished* This should be resolved in the very near future* d. Item Number 5e - Forklift Requirements* Rough terrain forklif#s.-ire available and are organic to units attached. Normally, rou^i terrain forklifts will be available to assist in changing tires in any complex where the BARG is used extensively. In the event a BARC unit is deployed to an isolated area where rough terrain forklifts, or a suitable substitute, are not available, a letter of authorization should be approved. e. Item Number I?f - Grew Rations of Glass A Vessels. Arrangements have been made for the commissary to issue rations in less than case lots, which has alleviated the problem. TEL: QNL U66 HkviD c. Lt Colonel, Acting Commander 7^ 7 sr «r f 1 t ' '

,,.,.i ^^-^ '.. -^.n.!,, 1. FOR OFFICIAL OSE ONLY AVGA-QN-G0(1U P»b 67) 2nd Ind SUBJECTi Opermtional Report on Lessons Learned for Querierly Perlci Ending 31 Jinumiy 1967 (RCS CSOPO-28(ia)). «MAR 1S 57 HEADQUARTERS US ARMY SUPPORT COMMAND, QUI NHON, APO SAN FRANCISOO 96238 THRU: Conundlng Qenerel, Ist Logistical Conmand, ATTNj AVCA-OO-O, APO 96307 Deputy Connanding General, US Aray, Vietnam, ATTN: AVHGC-DH, APO 96307 Coanander-in-Ghief, US Any, Pacific, ATTNi GFOP-OT, APO 96558 TO: Assistant Chief of Staff for Force Development, Department of the Amy, Washington, D.C. 20310 Attached report is considered adequate with following comnentet a«reference Section n, basic conminieatlon. b. Item 5a - Information received fron li5th Engineer Group indicates that the water line to the Qui Nhon pier is scheduled in Conmand Directive 65-201-05-T6S, Port Facilities«Qui Nhon, Increment 1. Work is to be psffozned by RMK contractor. If RMK is unable to complete water line project prior to their scheduled phase out. Engineer troop effort must be diverted to complete this high priority project. FOR THE COKMANDERi QNL 11*2/167 tpt, AGO Assistant Adjutant General FOR OFFICIAL OSE ONLY,..,»_««.

1 VOR OmCIAL USE ONW AVCA 30-0 (14 Feb 67) 3d Ind SllBJWGTi Operational Report for Quarterly Period rinding 31 January 1967 (RCS CSFOR-65) HiiADCiUARTPES, 1ST LOOISTICA!; CO^iAND, /JO 96307 ^ f MAR f9g7 TOt Coimanding Officer, US Army Support Coiurend, '$1 Nhon, APO 96238 1«The Operational Report - Lessons Letrned for the 159th Transportatclon Battalion forwarded by your heedquarters is returned for additional information. 2«Section I, Significant Organization Activities, should contain in narrative form, activities relating not only to what happened, but how and why and the underlying reasons governing decisions includir.ir the outcome, whether favorable or unfavorable. This must be an impartial and factual account of the organization's principal operations, activities and adirinistrction. This necessitates input from all staff sections, and eliminates the requirement to submit a separate Historical Report, 3. The Lessons Learned are commendable, k» Request your Headquarters revievf LiSARV Regulation 870-2 and forward the corrective action outlined in paragraph 2 above by indorsement to this Headquarters NLT 3 April 1967. FOR THE COmNDERl TKLi lynx 430/782 V A J*30$0d 2</&~~ 1 Incl as Opt. AGC "i FOR OFFICIAL USE ONLY

FOR OFFICIAL OS ONLY AVCA-QN-GO (Ik Feb 67) ; i*th Ind ; SUBJECT: Operational Report on Lessons Learned for Quarterly Period /^ Ending 31 January 1967, (RCS CSGPCU28 (RI)) HEADQUARTERS, US ARMY SUPPORT COMMAND, QU1 WHON, APO 96238 24 MAR 1967 TO: Commanding Officer, 5th Transportation Command (Terminal A), APO 96236 1«Recommend you review and become familiar with USARV Reg 870-2, dated 19 July 1966. 2* Necessary action will be initiated to preclude submission of unacceptable reports in the future. 3* Request corrective action as required by 3d indorsement and forward to this headquarters NLT 31 March 1967. FOR THE COMMANDER I TEL: QNL 167/11*2 ;PT, AGC 1 Incl Asst Adjutant General no FOB OFFICIAL USE ONLY -

mmummmmamytiim, It AVCA QN-TTC (14 Feb 67) 5th Ind '' SUBJECT: Operational Report for Quarterly Period Jhding 31 January 1967 (RCS CSFOR-65) HISADOUARTERS 5th Traneportation Conmnd (Terminal A), APO 96238 2 5 MAR 19b/ TO: Connanding Officer, 159th Transportation Battalion (Terminal), APO 9623«Returned for compliance with 3rd Indorsement and return to this Headnuarters NLT 30 March 1967. FOR THE C0M1 ANDER: T3L: QNL 470 // ' '-

' /'. I ' - ran OFFICIAL m om AVGA-QN-TTR-J (14 w*h 1967) 6th Ind SUBJECT«f.'jeratiüMil Hep«rt for Quarterly Perlorl ü^-try ji Januery 196? (RCS OSTOl - 65) /? fleadqiiarti'ss, I59TH TRANHPOjf'l'A'PION BATTALION (TO^MNA 7^, APO 96238 30 Par 1^67 TO: Commanding Office, ^fh "Vansportation Comraend (Terminal A), AH) 9623P WormvAnfl in nonrvrr^ t^fth 3rd Indorsement. PCJR THE OOi'i'AlTO?! 'TCLi S?II 1*9 stan+ -^irtant r. 1.i i) FOR OFFICIAL USE ONLY

mmmmmmmmfmäm- FOR OFFICIAL USE ONLY IP AVCA QN-TTC (14 Feb 6?) 7th Ind SUBJECT: Operational Report for Quarterly Period Ending 31 January 1967 (RCS CSFOR - 65) HEADQUARTERS 5th Transportation Comnand (Terminal A) APO 96238 1 APR 1967 TO: Coonandlng Officer» US Anqr Support Command, Qul Nhon, APO 96238 Returned In compliance with 4th Indorsement. FOR THE COMMANDER: 1 ind. n/c MU, AGC Adjutant TEL: QNL 470 /3 FOR OFFICIAL USE ONLY /

FOR OFFICIAL USE ONLY AVCA-vJN-OO-O (Hi Feb 6?) 8th Ind JUDJiüCT; Operational Report ior Quarterly Period Ending 31 January id 1967 (RCS CSFQR - 65) ' ' HEADQUASIiaHS, U3 AHi'H SUPPORT OOfclAND, QUi :MOK, APÜ 96238 5 APR t9b/ TO: ComiTAnding General, 1st Logistical Command, ATTN: APO 96307 AVCA GO-0, Returned in compliance with 3d Indorsement. FOR Tita CCMLAND-ft: TEL: 3NL 167/562 ^ttlilil R/SD^" * ' OPT, AGC 1 Incl Asst Adjutant General no rofl OFFICIAL USE ONLY 11. - --.

MMÜli FOR OFFICIAL ÜSE ONIY y/ AVCA QO-0 (14 Feb 6?) 9th Lid SUBJBCTt Optratlonal Report for Quarterly Period Ending 31 January 1967 (RC3 CSFCR-65) HEADQUARTERS, 1ST LOGISTICAL COMAND, AR) 96307 8 APR 1967 TOi Deputy Confflandlng General, United Statee Army Vietnam» ATTK: AVHQC-DH, APO 96307 1. The Operational Report - Leeeone Learned eubmltted by the 159th Traneportation Battalion for the quarterly period ending 31 January 1967 la forwarded herewith«2«reference paragraph 1, page 2t Current strength figures at this headquarters show that the 159th Traneportation Battalion, including all attached units, is understrength only 25 personnel as of 17 March 1967* Concur that careful planning must be made to reduce the rotational hump* 3«The 159th Transportation Battalion engaged in combat support operations for 92 days during the reporting period. A» Concur with the basic report as modified by the comments contained in the preceding indorsements. The report is considered adequate. FOR THE COMMANDER: TELi lynx 430/782 ^^ LS^TASO 1 " /r FOR OFFICIAL USE ONLY /

. FOR OFFICIAL USE ONLY AVH(}C- r )3T (15 Feb 67) 10th Ind SUBJECTS operational Report-I.essons Learned for the Period Ending 31 Januar' 1967 (RGJ CSFO:i-65) HS'tlXiÜAaTEaS, WJITH) CTATE3.ilillY VTZTNAM, AFC San Prancloco 9630? /b. ÖMAY^'' TO: Comnander in Ch'ef, United States "rry. Pacific, ^TTNi QFOP-OT APO 96558 1. This headquarters has reviewed t 1 "? Operational neport-lessons Learned for the period endinß 31 -.'anuary 196? frcn Headquarters, 159th Transportation Hattalion (TerminalJ as indoraed,?. Perfcinent conments follow: a. Reference Paragraph 5a, Pa^je h\ Paragraph a, lat indorsement; and Paragraph b,?d Indorsement, conoerning potable water for float In» ''raft: This rejueat has been included in US Arry Srtgineor Command Hipeotive 65-?01-05-T65. The relative priority to be given this project. wh 1 be determined by the ÜSARV Facilities Reviei; 3oard at their ncrt neeting. b. Ileferonce Parag-ap'^ 5'', Page /+; and Paragraph b, 1st Indorsement, ^oncerring nylon lines for vessels: Stockage levels of the seven to nine inch line will be established automatically and uj.'dated at depot lovc"! based on der'^ids. However, depot demand may be so low as to preclude an ASL stockage. Units should forecast roquiremerts and submit requisitions far enough in advance to allow the depot to procure the line. c. Reference Paragr-aph 5e, Page 5, and Paragraph d, 1st Indorsement, concerning forklift requirements: Paragraph 226, AP, 31CK34 provides guidance for securing equipment on tenporaty loan f->r non-continuing requirenents. If equipment is required on a permanent basis by a specific unit, fftce should be submitted by that unit in accordance with the pro- riaions of USA-'iV Ueceage (L T > AVHGC-OT 19073, DTC VWPZ Karch 1967, subject! Changes in 3quipment Authorization. ffiv? ""!"" rrvt",»tn"- 1 Incl n." Ci'T.;.(.(; v AMt AcJjuiont Geoeral FOB OFFICIAL USE ONLY

mmttm FOR OFFICIAL USE ONLY J? GPOP-OT (15 Feb 67) 11th Ind SUBJECT; Operational Report - Lessons Learned for the Period Ending 31 January 1967 (RCS CSFOR-6S), 159th Transportation Battalion (Terminal) HQ, US ARMY, PACIFIC, APO San Francisco 96558 2 JÜN 1967 TO; Assistant Chief of Staff for Force Development, Department of the Army, Washington, D. C. 20310 This headquarters concurs in the basic report as Indorsed. FOR THE COMMANDER IN CHIEF; 1 Incl ^H/ SNjDER nc OPT/iQO Asst A0 Protective markings are cancelled when separated from protected material 17 FOR OFFICIAL USE ONLY r-^nmflwtm^limm^iiimatlfciiim- i i rifriritytr Ml

FOR OFFICIAL OSE Olir I I I I 16 He, 5 i 1 i! i 544th Trans Co {, i /> a- ri W 1-3 ft O o if g? g S" Ui! ff 33 I 43 I to 9 i c+ i _ I o a.i i f 11 &i FOR OFFICIAL USE ONLf /f 5? *ii*»t* : tu.. J*.«... J i