Prepared for: The Board of Trustees of the California State University 401 Golden Shore Long Beach, California 90802

Similar documents
Fresno County Little Bear Solar Project EIR SCOPING MEETING Thursday, September 14, :30 pm - 7:30 pm

CITY OF SACRAMENTO COMMUNITY DEVELOPMENT CALIFORNIA 300 Richards Blvd. DEPARTMENT

WESTERN SLOPE CIP AND TIM FEE UPDATE

UNIVERSITY OF CALIFORNIA, SANTA CRUZ

NOTICE OF AVAILABILITY TIERED DRAFT ENVIRONMENTAL IMPACT REPORT FOR THE SAN FRANCISCO STATE UNIVERSITY CREATIVE ARTS & HOLLOWAY MIXED-USE PROJECT

NOTICE OF PREPARATION OF AN ENVIRONMENTAL IMPACT REPORT AND SCOPING MEETING FOR THE DOWNTOWN SPECIFIC PLAN COMMENT PERIOD

Public Scoping Meeting for the Environmental Impact Report

REPORT. To the Honorable Mayor and City Council From the City Manager. May 9, 2016

Addendum. Final Environmental Impact Report for North Campus Project. California State University Los Angeles SCH# March 2018.

1 Introduction. 1.1 Specific Plan Background

RESOLUTION NO. -- The applicant, PPF OFF 100 West Walnut, LP ("Applicant"),

Cal Poly EXECUTIVE SUMMARY. Cal Poly Master Plan. In Fall 1999, the average GPA and SAT scores for incoming freshmen were 3.64 and 1162.

CEDARS-SINAI MEDICAL CENTER WEST TOWER PROJECT

Order of Business. D. Approval of the Statement of Proceedings/Minutes for the meeting of January 24, 2018.

C81st Avenue Library December 18, 2014 OLISEUM AREA SPECIFIC PLAN

PRESENTATION ITEMS. 1. Furniture, Fixtures and Equipment (FF&E) Program

TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY

City of Lynwood MODIFIED REQUEST FOR PROPOSALS FOR

Board of Supervisors' Agenda Items

Board of Supervisors' Agenda Items

THE CALIFORNIA STATE UNIVERSITY

CITY COUNCIL File #

AGENDA COMMITTEE ON CAMPUS PLANNING, BUILDINGS AND GROUNDS

Nob Hill Pipeline Improvements Project

ENVIRONMENTAL IMPACT REPORT

REQUEST FOR CITY COUNCIL ACTION

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 1590 ADAMSON PARKWAY, SUITE 200 MORROW, GEORGIA FEB O

City of Sacramento City Council 915 I Street, Sacramento, CA,

2:00 p.m. on Monday, August 11, 2014

Trustees of the California State University. Resolutions

Order of Business. D. Approval of the Statement of Proceedings/Minutes for the meeting of March 14, 2018.

CITY OF ORANGE LOCAL CEQA GUIDELINES

Mission City Corporate Center

Order of Business. D. Approval of the Statement of Proceedings/Minutes for the meeting of January 10, 2018.

Mission Bay Master Plan File No M September 27, 1990

LOCAL MEASURES FOR NOVEMBER 8, 2016 COUNTY OF SAN DIEGO

California State University - Stanislaus Public Review Draft Physical Master Plan Update Program Environmental Impact Report

Request for Proposals For General Plan Update

4.b. 6/22/2017. Local Agency Formation Commission. George J. Spiliotis, Executive Officer

AGENDA COMMITTEE ON CAMPUS PLANNING, BUILDINGS AND GROUNDS

Humboldt-Toiyabe National Forest

Order of Business. D. Approval of the Statement of Proceedings/Minutes for the meeting of August 2, 2017.

Welcome Master Plan Process Working Goals and Principles DRAFT Master Plan Development Concepts Comments and Suggestions

Presented by: James Moose Remy, Thomas, Moose and Manley, LLP. With: Stephen L. Jenkins, AICP Michael Brandman Associates

REQUEST FOR PROPOSALS EASTERN COACHELLA VALLEY S ACTION PLAN FOR CLIMATE RESILIENCE BACKGROUND AND GENERAL DESCRIPTION

Long Range Campus Plan 3.0 December 4, 2015

APPENDIX B.3 SCOPING SUMMARY REPORT

Appendix B Meeting Presentation. PowerPoint Presentation Informational Boards

Downtown Oakland Specific Plan Frequently Asked Questions

ATTACHMENT A. Nova Homes Residential Project. Initial Study/Mitigated Negative Declaration City Council Resolution

M E M O R A N D U M. The Project and the items that the Commission will be considering at the June 15 th, 2010 meeting are summarized below.

CITY OF MERCED Planning & Permitting Division

AGENDA COMMITTEE ON INSTITUTIONAL ADVANCEMENT

H I G H WAY D I G I TA L S IGNS L AND D E V E L O M P E N T C O D E A M E N D M E N T A DDENDUM

AGENDA COMMITTEE ON CAMPUS PLANNING, BUILDINGS AND GROUNDS

AGENDA COMMITTEE ON CAMPUS PLANNING, BUILDINGS AND GROUNDS

EXECUTIVE SUMMARY 1.0 EXECUTIVE SUMMARY

L AK E S TRE ET V E N T U R E S 1

Environmental Administrator. Lyon County. Minnesota. Lyon County is seeking a collaborative leader to be our next Environmental Administrator.

Crystal M. Craig, Local Government Analyst II LAFCO ANNEXATION 21 TO COUNTY SERVICE AREA 134. (SPECIFIC PLAN 327)

Subject: Audit Report 16-14, Spartan Complex Renovation, San Jose State University

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

VI. UNIVERSITY PURCHASING AND PAYROLL

Subject: Audit Report 16-13, Student Housing Phase II, California State University, Northridge

REQUEST FOR PROPOSALS FOR. ENVIRONMENTAL ANALYSIS and ENTITLEMENTS REPORT FOR the SFUSD ArtsCenter Campus

AGENDA COMMITTEE ON CAMPUS PLANNING, BUILDINGS AND GROUNDS. Meeting: 10:30 a.m. Tuesday, March 15, 2005 Glenn S. Dumke Auditorium

PUBLIC FACILITIES FINANCING

SILVERTHORNE COMPREHENSIVE PLAN APPENDIX A - ECONOMIC DEVELOPMENT ELEMENT

07/01/2010 ACTUAL START

Board of Supervisors' Agenda Items

Synopsis of Revised Changes to DCA s Rules for Developments of Regional Impact

Blanket Travel Request Travel Expense Claim (blanket mileage) Policy and Procedures (travel prior to 12/1/14)

APPLICATION FOR PARCEL MAP

AGENDA COMMITTEE ON INSTITUTIONAL ADVANCEMENT

A NEW AMERICAN UNIVERSITY Comprehensive Development Plan. Tempe Campus.

The City of San Rafael is issuing this Request for Proposals (RFP) to solicit proposals from qualified consultants to provide:

CALIFORNIA COMMUNITY COLLEGES CHANCELLOR S OFFICE 1102 Q STREET, SUITE 4400 SACRAMENTO, CA (916)

Kaiser Riverside-Cirby Medical Office Building Project

GENERAL ASSEMBLY OF NORTH CAROLINA SESSION 2013 SESSION LAW HOUSE BILL 484

Trustees of the California State University. Resolutions

Subject: Audit Report 17-75, Extended Learning Building, California State University, Northridge

AUXILIARY ORGANIZATIONS

UC Merced Integrated Planning to Expand a Campus

CAIS Trustee Head Conference 2014 Developing a Successful Project Entitlements Team & Strategy

The California State University Office of Audit and Advisory Services CSU CLERY ACT. San Diego State University

GENERAL PLAN GENERAL PLAN ADVISORY COMMITTEE. General Plan 101 and Safety Element. Yucca Valley Community Center November 14, 2012

ATTACHMENT A: DRAFT PROPOSED SCOPE OF WORK

METHODOLOGY - Scope of Work

Attachment B. Long Range Planning Annual Work Program

634 NORTH PARK AVENUE

Dupont Diebold Economic Development Area Plan

7/23/2013. Downtown Greenville s Success. Downtown Greenville s Success

Public and Agency Involvement. 8.1 Scoping Meetings and Noticing. Chapter 8

TRUSTEES OF THE CALIFORNIA STATE UNIVERSITY

RE: Planning Case No: ZA CUB, ENV CE Project Address: 300 S Grand Ave, Los Angeles, CA 90071

CITY GATE COMMERCE PARK DRI NOTICE OF PROPOSED CHANGE IN COLLIER COUNTY

CSU Dominguez Hills & DH Foundation University Village-Mixed-Use Development/Market Rate Housing LETTER OF INVITATION REQUEST FOR QUALIFICATIONS

TREASURE COAST REGIONAL PLANNING COUNCIL M E M O R A N D U M. To: Council Members AGENDA ITEM 5H

Economic Development Subsidy Report Pursuant to Government Code Section 53083

City Council Report 915 I Street, 1 st Floor Sacramento, CA

Transcription:

NOTICE OF PREPARATION OF DRAFT ENVIRONMENTAL IMPACT REPORT AND INITIAL STUDY; NOTICE OF PUBLIC INFORMATION/SCOPING MEETINGS; SAN DIEGO STATE UNIVERSITY MISSION VALLEY CAMPUS MASTER PLAN PROJECT Prepared for: The Board of Trustees of the California State University 401 Golden Shore Long Beach, California 90802 Prepared by: San Diego State University Facilities Planning, Design, and Construction 5500 Campanile Drive San Diego, California 92182-1624

January 18, 2019 NOTICE OF PREPARATION OF A DRAFT ENVIRONMENTAL IMPACT REPORT; NOTICE OF PUBLIC INFORMATION/SCOPING MEETINGS To: State of California Office of Planning and Research State Clearinghouse 1400 Tenth Street Sacramento, California 95812 From: The Board of Trustees of the California State University Laura Shinn, Director Facilities Planning, Design, and Construction Business and Financial Affairs San Diego State University 5500 Campanile Drive San Diego, California 92182-1624 The Board of Trustees of the California State University (CSU), which is the State of California acting in its higher education capacity, will be the lead agency for the preparation of an environmental impact report (EIR) in accordance with the California Environmental Quality Act (CEQA; Public Resources Code section 21000 et seq.), and Title 14 of the California Code of Regulations section 15000 et seq. (hereafter CEQA Guidelines ). CSU has prepared this Notice of Preparation (NOP) in accordance with CEQA Guidelines sections 15082(a) and 15375. San Diego State University (SDSU) is one of 23 campuses in the CSU system. The EIR will address the environmental effects of the proposed SDSU Mission Valley Campus Master Plan project (proposed project) to be developed at 9449 Friars Road, San Diego, California 92108. The proposed project site is located south of Friars Road, west of Interstate 15 (I-15), north of the San Diego River, and east of the Fenton Marketplace shopping center (see NOP Figure 1, Vicinity Map). The proposed project is referenced in San Diego Municipal Code section 22.0908, Sale of Real Property to SDSU, which was adopted after the SDSU West Campus Research Center, Stadium, and River Park Initiative (Measure G) was approved by City of San Diego voters on November 6, 2018, enabling the City of San Diego to sell the existing property site to CSU for this proposed project. The proposed project would include (a) development of a Mission Valley campus for SDSU, including facilities for educational, research, technology, and support programs within a mixed-use campus village and research park; (b) demolition of the existing San Diego County Credit Union Stadium ( Stadium, previously known as San Diego Stadium, Jack Murphy Stadium, and Qualcomm Stadium ); (c) construction of a new, multipurpose stadium; (d) creation of the River Park; (e) passive and active recreation space and parks; and (f) associated infrastructure and amenities. Specifically, the proposed project would consist of development of facilities to accommodate the new 35,000-seat multipurpose stadium; approximately 1.6 million square feet for campus uses; approximately 4,600 residential units; two hotels with approximately 400 hotel rooms; approximately 95,000 square feet of commercial/retail uses to support SDSU s Mission Valley campus and related project facilities; approximately 84 acres of parks, recreation, and open space, SDSU Mission Valley Campus 1 Notice of Preparation

Notice Of Preparation of a Draft Environmental Impact Report; Notice of Public Information/Scoping Meetings including the approximate 34-acre River Park and bike and pedestrian trails; transit opportunities due to the existing on-site transit station; and associated infrastructure and other amenities (see NOP Figure 2, Site Plan). The proposed project will accommodate up to 15,000 full-time equivalent students (FTES) 1 at buildout at the SDSU Mission Valley campus, as well as additional faculty and staff, and will require approval of a SDSU Mission Valley Campus Master Plan. The proposed project implementation and development will arise from a Purchase and Sale Agreement (PSA) between the City of San Diego and CSU, in accordance with San Diego Municipal Code section 22.0908, and include preparation of a CSU Campus Master Plan. Though not required by the CSU Campus Master Plan process, CSU shall use the content requirements of a Specific Plan, prepared pursuant to California Government Code section 65461(a), in completing the SDSU Campus Master Plan for this proposed project. CSU is seeking public and agency input regarding the scope and content of the environmental information to be contained in the Draft EIR. Further, while not required by CEQA, CSU/SDSU is requesting feedback on the site plan shown in Figure 2, which will help inform the Campus Master Plan process. Any responsible or trustee agency may need to use the EIR when considering permits or other project approvals. The failure to respond to this notice, or otherwise object to the conclusions made in the accompanying Initial Study, may prevent later assertions that issues excluded by the Initial Study should have been included in the Draft EIR. Consistent with CEQA Guidelines section 15082, all responses must be sent at the earliest possible date, but not later than 30 days after receipt of this notice. All written comments received on or before 5:00 p.m. PST February 18, 2019, will be considered. Please send your written response to mvcomments@sdsu.edu. Please provide the name of the contact person for commenting parties or agencies. Written responses may also be sent via mail to Laura Shinn, Director; Facilities Planning, Design, and Construction; SDSU, 5500 Campanile Drive, San Diego, California 92182-1624. Project Title: SDSU Mission Valley Campus Master Plan project Location: The project site is located south of Friars Road, west of I-15, north of the San Diego River, and east of the Fenton Marketplace shopping center (see NOP Figure 1, Vicinity Map). List of Probable Environmental Effects: A more detailed description of the proposed project, the project location, and the potential environmental effects associated with development of the 1 One full-time equivalent student (FTES) is defined as one student taking 15 course units (which is considered to be a full course load ). Two part-time students, each taking 7.5 course units, also would be considered one FTES; therefore, the total student headcount enrolled at the university is higher than the FTES enrollment. SDSU projects that at buildout, when enrollment reaches 15,000 FTES at the SDSU Mission Valley campus, total students enrolled at the Mission Valley campus could be approximately 20,000 students. SDSU Mission Valley Campus 2 Notice of Preparation

Notice Of Preparation of a Draft Environmental Impact Report; Notice of Public Information/Scoping Meetings proposed project, are provided in the Initial Study. A copy of this NOP and the Initial Study are available for review on the SDSU website at http://sdsu.edu/missionvalley. As described in the Initial Study, the proposed project potentially would affect the following environmental impact factors which will be addressed in the Draft EIR: aesthetics, air quality, biological resources, cultural resources, energy, geology/soils, greenhouse gas emissions, hazards/hazardous materials, hydrology/water quality, land use/planning, mineral resources, noise, population/housing, public services, recreation, transportation, tribal cultural resources, utilities/service systems, and wildfire. Government Code Section 65962.5 List: Based on a preliminary review, a portion of the project site is identified on a list of hazardous materials sites compiled pursuant to Government Code section 65962.5, and the specific case was closed as of February 11, 2014. Inclusion of the project site on any such list will be further evaluated in the Draft EIR. Public Information/Scoping Meeting: CSU will hold public information/scoping meetings to discuss the proposed project, to obtain information regarding the content and scope of the Draft EIR, and to obtain public input on the proposed project s site plan, which was circulated during the Measure G initiative depicting CSU s/sdsu s vision of the SDSU Mission Valley campus. The meetings will take place as follows: January 29, 2019 3:30 p.m. to 5:30 p.m. at Parma Payne Goodall Alumni Center, 5250 55th Street, San Diego, California 92182 January 30, 2019 5:30 p.m. to 7:30 p.m. at Mission Valley Marriott, 8757 Rio San Diego Drive, San Diego, California 92108 February 7, 2019 5:00 p.m. to 7:00 p.m. at Mission Valley Marriott, 8757 Rio San Diego Drive, San Diego, California 92108. All public agencies, organizations, and interested parties are encouraged to attend and participate at the meetings. The failure of any public agency, organization, or interested party to attend the scoping meetings or submit written comments may prevent that agency, organization, or party from later asserting that issues excluded by the Initial Study should have been included in the Draft EIR. Distribution List: A list of the federal, state, and local agencies, and organizations to which this notice has been distributed is provided in Section 8 of the Initial Study. SDSU Mission Valley Campus 3 Notice of Preparation

Notice Of Preparation of a Draft Environmental Impact Report; Notice of Public Information/Scoping Meetings Table 1 Campus Land Use Summary Proposed Campus Land Uses Footprint (acres) # of Buildings Stories Homes Units Hotel Rooms Parks, Recreation and Open Space 1 83.6 2 3 Mixed-use Campus (Including Stadium) 28.6 17 3-5 Campus Residential 24.6 16 3-24 4,600 Campus Hospitality 4 5.2 2 3-22 400 Circulation 27.4 Total 5 169.4 34 4,600 400 Source: Carrier Johnson 2017 Notes: 1 Includes trails. 2 Excludes 1.3-acre MTD fee-title for San Diego Trolley Line; no development proposed within that area. 3 A dash ( ) signifies that the information does not apply for a given category. 4 Hotel H1 includes both hotel and residential uses. 5 All values are approximate and subject to change in the Draft EIR. SDSU Mission Valley Campus 4 Notice of Preparation

SDSU Mission Valley Campus Master Plan Project Boundary Detailed 163 5 SDSU Campus Boundary 15 805 8 Existing Trolley Line Existing Trolley Stations 0.5 1 SAN DIEGO 15 MILE 94 Friars Rd. Lake Murray Fenton Pkwy Camino Del Rio North Montezuma Rd. College Ave. 8 Adams Ave. ajo C El d. lv nb 805 SDSU Mission Valley Campus Master Plan EIR NOP Figure 1 Vicinity Map

Notice Of Preparation of a Draft Environmental Impact Report; Notice of Public Information/Scoping Meetings INTENTIONALLY LEFT BLANK SDSU Mission Valley Campus 6 Notice of Preparation

SDSU Mission Valley Campus Master Plan Project Boundary Campus Parks, Recreation and Open Space Residential Mission Village Dr. Friars Rd. Murphy Canyon Creek Hotel San Diego Mission Road Stadium Existing Trolley Line Northside Dr. Existing Trolley Station 15 Rancho Mission Rd. Fenton Pkwy. Trolley Station San Diego River 8 Carrier Johnson 2018; SANGIS 2018; USGS NHD 2018 0 500 1,000 Feet Mission City Pkwy. Camino Del Rio North Camino Del Rio South SDSU Mission Valley Campus Master Plan EIR NOP Figure 2 Site Plan

Notice Of Preparation of a Draft Environmental Impact Report; Notice of Public Information/Scoping Meetings INTENTIONALLY LEFT BLANK SDSU Mission Valley Campus 8 Notice of Preparation