UNOLS FIC report to UNOLS Council September 26, National Science Foundation Arlington, VA

Similar documents
Greening the Research Fleet. January 10-11, 2012 Nicholas School of the Environment. ?????

Arctic Icebreaker Coordinating Committee (AICC) Report

Research Vessel Operators Committee. NEWSLETTER Vol. 25, No. 1, January 2000

NSWCCD-SSES SSES COMMAND OVERVIEW. 12 June Patricia C. Woody Department Head Machinery Research and Engineering

Support for FLIP/ORB. Fred H. Fisher. Final Report to the Office of Naval Research Contract N D-0142 (DO#26)

Experimenting into the future Mr Ed Gough Deputy Commander Naval Meteorology and Oceanography Command

103 First Officer (D)

Freedom Variant (LCS 1) Littoral Combat Ship Launch and Handling System Lessons Learned November 2012

SENATE APPROPRIATIONS COMMITTEE FY16 HOMELAND SECURITY APPROPRIATIONS U.S. COAST GUARD As of June 22, 2015

Incumbents may perform one or more of these functions in support of a wide range of equivalent marine engineering activities.

Unmanned Systems Operational Demonstration along the Mississippi Gulf Coast

Advancing Ocean Science to the Navy s Advantage

Joint Russian-American Long-term Census of the Arctic (RUSALCA) Research Program in the Bering and Chukchi Seas

Deep Submergence Mapping

MARINE NOTICE NO. 6/2015

Polar Science Systems Branch Polar Icebreaker Support

S. ll. To provide for the improvement of the capacity of the Navy to conduct surface warfare operations and activities, and for other purposes.

UNOLS Council Meeting Report

INFORMATION BULLETIN No. 153

Systems Engineering Analysis of Unmanned Maritime Vehicles for USCG Mission Threads. LT J.B. Zorn, USCG CRUSER Group February 15, 2013

UNOLS Vessel Usage Survey Statistics. 357 Surveys Completed

Provide a Vessel to Conduct Observations and Deploy Sound Source for a Behavioral Response Study of Cetaceans off Southern California in 2011

ST. VINCENT AND THE GRENADINES

DEPARTMENT OF THE NAVY

LOA: 35' 5" (10.79m) Beam: 20' 0" (6.10m) Max Draft: 1' 7" (0.48m) Max Speed: 2 Kts. (2 MPH)

DDG 1000 Class Destroyer

Subj: MISSION, FUNCTIONS AND TASKS OF DIRECTOR, STRATEGIC SYSTEMS PROGRAMS, WASHINGTON NAVY YARD, WASHINGTON, DC

National Maritime Center

Signals, Noise & Swans in a Changing Arctic Environment

Drill Monitoring Annual Report. Prepared By: Roy Robertson Prince William Sound Regional Citizens Advisory Council

US Naval Academy Offshore Sail Training Squadron (OSTS) Prospective Volunteer Open House 30 August 2017

OHIO Replacement. Meeting America s Enduring Requirement for Sea-Based Strategic Deterrence

Revision of DoD Design Criteria Standard: Noise Limits (MIL-STD-1474) Award Winner: ARL Team

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

Bath Iron Works Awarded Potential $102 Million Navy Contract for Post Shakedown Availabilities on DDG 51-Class Ships in West Coast Homeports

Inspector General FOR OFFICIAL USE ONLY

A Warming Arctic and National Security

National Ocean Research Leadership Council

ANNOUNCEMENT. Request for Proposals (RFP) This RFP covers requests for use on/at an FIO infrastructure, to include:

Icebreaking Program Update from Headquarters

In order to keep the continuity of the layout, the story is on the next page.

Employing Merchant Vessels for Offshore Presence and Launch of US Military Operations

UNCLASSIFIED FY This program develops and demonstrates advanced technologies, including Electromagnetic (EM) Rail Gun for naval weapon systems.

BRAC Commissioner Turner Visit. Naval Submarine Base New London Wednesday 27 July 2005

Agenda. DoD as an Energy Consumer. Defense Energy Challenges. Adapting to a New Environment. DoD Operational Energy Strategy. Current Initiatives

ARMY CORPS OF ENGINEERS. Action Needed to Ensure the Quality of Maintenance Dredging Contract Cost Data

The Integral TNO Approach to NAVY R&D

COMDTPUB P16721 NVIC August 25, 2014

Command Overview Naval Surface Warfare Center, Carderock Division

oft Office of the Inspector General Department of Defense

MEETING MINUTES UNOLS

Inspector General FOR OFFICIAL USE ONLY

NORAD and USNORTHCOM J8 Science & Technology

UAV s And Homeland Defense Now More Critical Than Ever. LCDR Troy Beshears UAV Platform Manager United States Coast Guard

Naval Unmanned Combat Air Vehicle

Land/Ocean Biogeochemical Observatories (LOBOs) for Water Quality Sampling in the St. Lucie Estuary and Indian River Lagoon (DEP Agreement S0770)

To : Director of Naval History (N09BH) of the USS FALCON (MHC-59) is submitted for the calendar year. Ser 00/ Jan 06

Use of Mockups to aid design of the USCG SENTINEL Class patrol boat. Office of Human Systems Integration for Acquisitions (CG-1B3)

MAINTENANCE SUPPORT FM CHAPTER 9

U.S. Department of the Navy SBIR/STTR PROGRAM

Ladies and gentlemen, it is a pleasure to once again six years for me now to

UNCLASSIFIED R-1 ITEM NOMENCLATURE

NOAA Fisheries Update

Technology Development in Support of Port Security. Michael S. Bruno Stevens Institute of Technology July 19, 2012

States Pacific Command (USPACOM). Its secondary mission is to transfer the ammunition at sea using the Modular Cargo Delivery System (MCDS).

Amphibious Ships and Landing Craft Data Book

Selection report for Regional 1- Polar and Subpolar Call, Super-Integration and Embarked Equipment Version 1

OPNAVINST C N43 18 Jun Subj: NAVY EXPEDITIONARY TABLE OF ALLOWANCE AND ADVANCED BASE FUNCTIONAL COMPONENT POLICY

Update: (12 April 2017) USNS HERSHEL "WOODY" WILLIAMS EXPEDITIONARY SEA BASE SHIP T-ESB 4

Is a dry-dock and internal structural exam required prior to the Coast Guard issuing the initial Certificate of Inspection?

First Announcement/Call For Papers

Environmental Impact Statement/Overseas Environmental Impact Statement (EIS/OEIS) for the Northwest Training Range Complex (NWTRC). An EIS/OEIS is con

ASSIGNMENT 4. Textbook Assignment: Chapter 6 Naval Organization and chapter 7 Basic Seamanship.

USN Arctic Roadmap SCICEX SAC meeting. CDR Nick Vincent 21 May 2014

1 of 18 DOCUMENTS *** THIS SECTION IS CURRENT THROUGH THE AUGUST 7, 2006 ISSUE OF *** *** THE FEDERAL REGISTER ***

COLUMBIA Class Submarine Program

Call title: "The Ocean of Tomorrow 2013"

Navy CG(X) Cruiser Design Options: Background and Oversight Issues for Congress

This Page Intentionally Left Blank

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

Service Foreign Support

Non-Pipeline Solutions Pre-RFP Webinar. January 24, 2018

Department of Defense DIRECTIVE

SANCTUARY OPERATIONS REVISED STRATEGIES AND ACTIVITIES WITH SUMMARY OF AC COMMENTS Submitted to the OCNMS Advisory Council on November 20, 2009

Subj: FULL POWER AND ECONOMY TRIAL REQUIREMENTS FOR NON-NUCLEAR SURFACE SHIP CLASSES

TO: Related departments of CCS Headquarters; Branches and Offices; and Ship Companies

DOD Leases of Foreign-Built Ships: Background for Congress

MERIT PROMOTION OPPORTUNITY ANNOUNCEMENT Announcement # MP Title, Series, Ordinary Seaman (W) WM East Coast Vessels

UNCLASSIFIED UNCLASSIFIED

MEMORANDUM OF AGREEMENT. Cooperative Institute for Oceanographic Satellite Studies (CIOSS)

Aircraft Carriers Enduring and Transformational

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 P-1 Line #18

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 R-1 Line #16

1. Enclosure (1) is forwarded in accordance, with reference (a).

EXHIBIT R-2, RDT&E Budget Item Justification. February COST ($ in Millions) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013

INTERNATIONAL NAVAL SHIPS DECEMBER 2014

CERTIFICATE OF COMPETENCY

US Navy Ships. Surface Warfare Officer First Tours

Subj: CERTIFICATION OF THE AVIATION CAPABILITY OF SHIPS OPERATING AIRCRAFT

ROYAL CANADIAN SEA CADETS PHASE ONE INSTRUCTIONAL GUIDE SECTION 1

Transcription:

UNOLS FIC report to UNOLS Council September 26, 2002 National Science Foundation Arlington, VA

Bottom Line The fleet replacement process has started (none to soon) We need to Provide material as needed Muster community support Be adaptable to changing agency schemes (funding schemes)

House Armed Services Committee Authorization Report FY03 107-436 The committee recognizes the age of the UNOLS fleet and the need for a rational plan for renewal of the fleet over the next ten years. Therefore, the committee directs the Secretary of the Navy to submit to the Senate Committee on Armed Services and House Committee on Armed Services no later than February 1, 2003, a report detailing specific requirements and outlining a specific plan for UNOLS fleet renewal. The report should include specific recommendations on the numbers of each class of ship to be maintained in the UNOLS fleet, their geographic distribution, the schedule for their replacement, and estimates of ship construction costs.

House Armed Services Committee Authorization Report FY03 107-436 The committee believes that scientific knowledge of the oceans and ocean environments makes a critical contribution to U.S. national security and commercial vitality. The committee notes, that in large part, U.S. scientific expertise in oceanography and ocean sciences is sustained by the Office of Naval Research and the National Science Foundation partnership that provides oversight of the University-National Oceanographic Laboratory System (UNOLS) fleet.

NSF Mechanism for Funding New Research Vessels Dr. Yoder indicated NSF is seeking a way to fund intermediate infrastructure. Support for <$25M Regional Ships may be possible Will need regional ship SMR soon (December)

Navy Scalable, Common Hull Study To reduce the Navy s acquisition cost for new oceanographic ships by investigating the feasibility of using a common hull platform for future T-AGS(X) and UNOLS Ocean Class ships.

Navy Common Hull Study Results indicate that a Common Hull for the TAGS, TAGSX and Ocean Class vessels is not feasible.

FIC Roadmap UNOLS Ship Renewal Process Introduction and FIC s Role Community Input We are here Community Input Develop SMRs Solicit Proposals and Award Concept Design Contract(s) Develop Concept Designs Vessel Operator Selection and Funding Establish Implementation Committee for the Vessel(s) to be Renewed A d v i s o r y Community Input Develop Preliminary Vessel Design Builder s Design and Construction R o l e

Ocean and Regional Class SMR Community meetings held this summer. Draft SMR s available on website. Based on FIC meeting Summary added Table of parameters (re. Henlopen) SMRs being reviewed by workshop participants then by oceanographic community

Science Mission Requirements Mission statement, size and general requirements Accommodations and habitability Accommodations crew & non-crew; Habitability Operational characteristics Endurance; Range; Speed; Sea keeping; Station keeping; Track line following; Ship control; Ice strengthening Over-the-side and weight handling Over the side handling; Winches; Wires; Cranes; Towing Science and shipboard systems Navigation; Data network and onboard computing; Real time data acquisition system; Communications - internal; Communications external; U/W data collection & sampling; Acoustic systems; Visiting system installation and power; Discharges Construction, operation & maintenance Maintainability; Operability; Life cycle costs; Regulatory issues Science working spaces Working deck area Laboratories: Type & number; Layout & construction; Services Vans; Storage; Science load; Work boats; Masts; On deck incubations Marine mammal/bird observations

Ocean Class and Regional Class SMRs ~ Issues Requiring Additional Attention ~ Identify areas where consensus could not be reached Regulatory Concerns. Should regional stay <500 GT and < $25M The Gap - Should the Regional Class be a class of vessels that are identical or nearly identical? Geographic Differences Other Issues?

SMR Areas that need closer attention to the details Speed Ranges ok, speed control values realistic Seakeeping May need better definitions of terms (RMS) and tied to existing vessel performance, check actual values, specify type of work and best heading for some criteria. Station keeping Are limits realistic and required? Trackline following Crab angle, speed, distance off track Ice strengthening (Ocean Class only) specify classification? Weight handling & Cranes Are values realistic and how do they compare to existing? Define minimum (required) and desired (maximum) values Towing Do values relate to actual experience?

SMR Areas that need closer attention to the details Deck, labs & storage size (square or cubic footage) Review to be sure sizes are realistic and how they compare to existing. Deck and bolt down strength Is ABS criteria for deck strength adequate, higher point loads? What is the required strength rating for 1 bolt down sockets? HVAC, noise and other environmental standards Cite specific standards or references or at least refer to them as current examples. Electrical for labs, vans and decks Verify required voltages, amps, etc. and specify quality (droop, freq) Acoustic systems One degree resolution for multi-beam? Are we be specific enough or too specific for all system? Maintainability, operability, life cycle costs and regulatory issues Need operator review and input on these sections Mission scenarios and regional/ocean differences Need more scenarios and better definition of regional differences

FINISH SMRs! STAY FOCUSSED Get community input to SMR s Prepare short summary and table of SMR s Get article in EOS for both SMR s. Regional Class Add section upfront noting regional differences Because of NSF deadlines we need process completed by December. Approval by email by FIC Ocean Class Available at AGU/San Francisco FIC approval at winter meeting.

Alaska Regional Research Vessel Model tests nearly complete and reports ready Helo pad removed Stateroom size reduced to increase berthing Funding will be mentioned by Director Colwell tomorrow.

Assessment of the Kilo Moana The RV KILO MOANA is the first SWATH vessel in the UNOLS fleet. The unique characteristics of this vessel make atsea operations different than normally done on a standard monohull vessel. The design of a SWATH vessel puts constrains on the layout and operation of the vessel. This questionnaire is to evaluate the use of a SWATH vessel for oceanographic research and aid in any decision process of constructing future SWATH vessels and improvements to this platform.

Kilo Moana Shakedown Planning Goal - assure adequate assessment by oceanographers for oceanographers Process Post Cruise Debrief Interviews Science Systems Testing Hull Evaluation

Post Cruise Debrief Personal call from FIC member and questions in advance Please describe all of the different scientific operations conducted during the cruise. Examples are CTD casts, water sampling, coring (both piston and box), mooring deployment and recovery, towing of scientific packages (nets, CTD, ADCP, etc) and acoustic systems (ADCP, multibeam). A. What were the most positive aspects of your research cruise on the R/V KILO MOANA with a SWATH hull form compared to your previous experience on a monohull? B. What were the most negative aspects of your research cruise on the R/V KILO MOANA with a SWATH hull form compared to your previous experience on a monohull? C. Did you have difficulty loading/unloading the scientific gear from the ship?

Post Cruise Debrief (continued) D. Were the labs adequate (location, size, accessibility) for you? E. Were the underway systems (thermosalinograph, running seawater) working adequately? F. Were communications with the bridge, winch and crane operators easy to conduct? G. Were the accommodations adequate (e.g., size, location, accessibility)? H. Were there ship vibrations or other motions that made it difficult to work and live on the ship? I. At any time, did you feel the ship was not sea-worthy at certain sea states? Were there times when you felt that you rather be on a monohull ship? A SWATH ship?

Post Cruise Debrief (continued) J. Were deck crane and winch operations safe and efficient? Did it take more personnel to perform the operation that you expected? K. Were there any weight distributions problems with heavy science payload such as vans? L. Was dynamic positioning used? And was it useful? M. Were the multibeam or acoustic Doppler systems working properly under all conditions? N. Were any heavy gear deployments undertaken such as moorings or sediment sampling? O. Comments to Dave Hebert or Terry Whitledge

SWATH MONO Evaluation Recommend NSF/ONR support proposals to evaluate ship motion on SWATH and mono-hull vessels.

Cape Henlopen Replacement Highly capable 138 ship 33 beam. ~$10M Model of how to do it. Construction starts 2004 In business 2006

Design and Construction Timeline: Ocean Class 02 2003 2004 2005 2006 2007 2008 2009 SMR Development Concept Proposals & Award Concept Design Operator Selection & Prel. Design Award Preliminary Design Funding Request & Appropriation Request Appropriation Construction Proposals & Award Construction - Ocean Class Note: Community Review will be an integral part of all Design phases. 02 2003 2004 2005 2006 2007 2008 2009 ARRV NE Atlantic Ocean

Design and Construction Timeline: Regional Class 02 2003 2004 2005 2006 2007 2008 2009 SMR Development Concept Proposals & Award Concept Design Operator Selection & Prel. Design Award Preliminary Design Funding Request & Appropriation Construction Proposals & Award Construction - Regional Class Vessel Request Appropriation Note: Community Review will be an integral part of all Design phases. 02 2003 2004 2005 2006 2007 2008 2009 Gulf of Mex. 2011 Pac. and Atl. Regional

FIC Tasks Proceed with SMR s Community Input Keep the Renewal Process Moving Revise Kilo Moana debriefing questions and intiate process Recommend NSF/ONR support proposals to evaluate ship motion on SWATH and mono-hull vessels. FIC review of RV Cape Henlopen Call for nominations for new members of FIC

The Emerging Mosquito Fleet R/V FAY SLOVER - ODU Vessel 8,400 lbs over the stern tests

Ocean Class Research Vessel PROGRAM COST DISTRIBUTION "Low Risk Model" Design, Incl. Model Tests & support during const 10% $ 5,000,000 Management: Program, contracting & on site 5% $ 2,500,000 Initial Outfit - ship's gear & spares 4% $ 2,000,000 Science outfit 5% $ 2,500,000 Construction 63% $ 31,500,000 Reserve, Change Orders, etc. 8% $ 4,000,000 Mission Trials 60 day operations with science 2% $ 1,000,000 Post Shakedown Availability 3% $ 1,500,000 Total Program 100% $ 50,000,000

Regional Class Research Vessel PROGRAM COST DISTRIBUTION "Low Risk Model" Design, Incl. Model Tests & support during const 10% $ 2,500,000 Management: Program, contracting & on site 5% $ 1,250,000 Initial Outfit - ship's gear & spares 4% $ 1,000,000 Science outfit 5% $ 1,250,000 Construction 63% $ 15,750,000 Reserve, Change Orders, etc. 8% $ 2,000,000 Mission Trials 60 day operations with science 2% $ 500,000 Post Shakedown Availability 3% $ 750,000 Total Program 100% $ 25,000,000

FIC Membership UNOLS Operator Reps: Dave Hebert, URI - Physical O. (9/99 9/02) ->Bill Smethie, LDEO Marine Geochemistry (10/96 10/02) Kelly Falkner OSU Chemist West Coast Terry Whitledge, U.Alaska Arctic Research/Bio O. (7/00-9/04) Non-Operator Reps: Larry Atkinson, ODU - Coastal/Physical O. (7/95-10/03) ->Mark Brzezinski, UCSB - Biological O. (9/99-9/02) ->??? Ron Benner Micro South Car., non op Hugh Ducklow VIMS micro non-op Karen Van Damm UNH geochem non-op Al Hine USF geo non-op Any UNOLS Inst: Chris Measures, U.Hawaii - Chemical O. (9/98 9/04)

FIC Membership The UNOLS Charter requires that at least three FIC members be from UNOLS operator institutions, at least three members be from institutions or organizations other than operators, and two members be from any UNOLS institution. Terms for all members are three years, for no more than two consecutive terms. The two vacancies on the FIC are both for Non-operator Institution representatives. An individual with a biology background would be beneficial for one of the FIC positions. An individual from the West Coast is also desired for one of the positions. Individuals with an interest in Fleet Renewal issues (particularly the Ocean Class and Regional Class efforts) should be considered. Note: Bill Smethie will complete 2 nd term in October 02 will need to fill Operator position: Discipline = geochemistry