Action plan. Part I General information. Project: FINERPOL. Partner organisation: CEiiA Centre of Engineering and Product Development

Similar documents
INTERREG ATLANTIC AREA PROGRAMME CITIZENS SUMMARY

Interreg Europe. National Info Day 26 May 2015, Helsinki. Elena Ferrario Project Officer Interreg Europe Secretariat

The INTERREG IVC approach to capitalise on knowledge

ELENA TECHNICAL ASSISTANCE

Interreg Europe Annual Implementation Report 2016 CITIZEN SUMMARY

EIT Climate-KIC - Urban Transitions. Request for Proposals Experts Framework

III. The provider of support is the Technology Agency of the Czech Republic (hereafter just TA CR ) seated in Prague 6, Evropska 2589/33b.

EUROPEAN COMMISSION DIRECTORATE-GENERAL REGIONAL AND URBAN POLICY

Towards a Common Strategic Framework for EU Research and Innovation Funding

COMMISSION OF THE EUROPEAN COMMUNITIES

SA GREEN FUND. OECD/AfDB, Green Growth in Africa Workshop: 16 January, 2013

Presentation of Interreg Europe

November Dimitri CORPAKIS Head of Unit Research and Innovation DG Research and Innovation European Commission

European Funding Programmes in Hertfordshire

Syntheses and research projects for sustainable spatial planning

URBACT III Programme Manual

Building a successful partnership

10. Secure, clean and efficient energy

Chapter Two STATE FUNCTIONS FOR ENERGY EFFICIENCY PROMOTION Section I Governing Bodies

CAPACITIES WORK PROGRAMME PART 3. (European Commission C (2011) 5023 of 19 July 2011) REGIONS OF KNOWLEDGE

Research and innovation strategies for smart specialization and smart and sustainable development

REGGIO EMILIA URBAN DEVELOPMENT STRATEGY

EU FUNDING. Synergies in funding opportunities for research, technological development and innovation (RTDI)

Cleantech Camp Objectives. 2. Requirements for applications

Syntheses and research projects for sustainable spatial planning

Main audit findings on State aid

CALL FOR THEMATIC EXPERTS

Building synergies between Horizon 2020 and future Cohesion policy ( )

Operational Programme Enterprise and Innovation for Competitiveness (OP EIC)

EIT: Synergies and complementarities with EU regional policy

Interreg Europe: what you need to know

Portfolio Holder for Environment and Sustainability. Llandrindod Wells Powys LD1 6NT

EIB Financing Tools for Energy Efficiency in Buildings

EVALUATION OF THE SMALL AND MEDIUM-SIZED ENTERPRISES (SMEs) ACCIDENT PREVENTION FUNDING SCHEME

CALL FOR PROPOSALS FOR THE CREATION OF UP TO 25 TRANSFER NETWORKS

STATE AID applied to European Territorial Cooperation programmes

THE ERDF MARCHE REGION R.O.P. AND MED PROGRAMME IN RESEARCH AND INNOVATION INTERVENTIONS

RESEARCH & INNOVATION (R&I) HEALTH & LIFE SCIENCES AND RENEWABLE ENERGY

Operational Programme Entrepreneurship and Innovations for Competitiveness Regional Office of CzechInvest for South Moravia region

Basic organisation model

Community Energy: A Local Authority Perspective

and Commission on the amended Energy Efficiency Directive and Renewable Energies Directives. Page 1

Energy Efficiency Call 2018/19 Overview. Céline TOUGERON Project Advisor Executive Agency for SMEs Unit B1 Energy

URBACT INFO DAN SLOVENIJA POZIV ZA PRENOSNA OMREZJA

United Nations Development Programme. Country: Armenia PROJECT DOCUMENT

07/01/2010 ACTUAL START

DOE Request for Information (RFI) DE-FOA Weatherization Assistance Program Sustainable Energy Resources for Consumers Grants

The BASREC CCS NETWORK INITIATIVE

Low-Carbon Building Skills Training Fund for Ontario Non-College Training Delivery Agents

2014 to 2020 European Structural and Investment Funds Growth Programme. Call for Proposals European Social Fund. Priority Axis 2 : Skills for Growth

TRANSNATIONAL COOPERATION PROGRAMME INTERREG V-B BALKAN - MEDITERRANEAN CO-FINANCED BY THE EUROPEAN REGIONAL DEVELOPMENT FUND (ERDF)

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL. Financial support for energy efficiency in buildings. (Text with EEA relevance)

Priority Axis 4: Supporting the Shift Towards. Towards a Low Carbon Economy in All Sectors

Operational Programme Competitiveness and Economic Growth (Slovakia)

NEEDS ANALYSIS FOR THE ERDF AND ESF CO-FINANCED OPERATIONAL PROGRAMMES Investing in Your Future

Regional policy: Sharing Innovation and knowledge with regions

Criteria for selection of operations

CEI Know-how Exchange Programme (KEP) KEP AUSTRIA Call for Proposals 2011

ERDF WORKSHOP. ERDF 20/12/2016

Annex 1: Conceptual Framework of the Swiss- Bulgarian Cooperation Programme

Investing in health with the European Structural and Investment Funds. Katarzyna Glowacka - Rochebonne

A grand tour of social innovation in Europe. By Henriette van Eijl and Liesbet de Letter

An Interregional cooperation project for improving technology transfer and innovation strategies 1.

customised solutions for enhancing access to water and sanitation services

Synergies between H2020 and ESIF: Clean Sky pilot case. Juan Francisco Reyes Sánchez CDTI 1 (14/10/2016)

Highlights. Make. the. right. FACEBOOK.COM/ DHCPLUS. euroheat.org stratego-project.

CIP Innovation and entrepreneurship, ICT and intelligent energy

European Union funds for the years A Guide for Investors. KPMG.pl

Primary care P4P in Portugal

EIT: Making innovation happen! EIT Member State Configuration meeting. Martin Kern EIT Interim Director. 17 October 2017

Worldbank Flickr. Roadmap for Scaling Up Resource Efficiency in Israel

ERDF Call Launch Event

HORIZON 2020 WORK PROGRAMME

SHARED SPACE and SERVICES

Frequently Asked Questions

Local Energy Challenge Fund

RETE EUROPA 2020 DRAFT PROJECT. Planes of auto-sustainable mobility inside EU

( ) Page: 1/24. Committee on Subsidies and Countervailing Measures SUBSIDIES

European Funding Opportunities & Outlook from Mark Schneider Manager of the European Service West Midlands Councils

Capacity Building in the field of youth

Incentive Guidelines. ERDF Research and Development Grant Scheme

COMMUNICATION FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT, THE COUNCIL, THE EUROPEAN ECONOMIC AND SOCIAL COMMITTEE AND THE COMMITTEE OF THE REGIONS

TABLE OF CONTENTS I.INTRODUCTION 2 II.PROGRESS UPDATE 4 III.FINANCIAL MANAGEMENT 7 IV. MOBILIZATION OF RESOURCES 11 V. OUTLOOK FOR

Economy and entrepreneurship in the Danube region. Smart Cities. 21. Oktober Uhr bis Uhr Stift Göttweig A-3511 Stift Göttweig

Public consultation on the Establishment of the Innovation Fund

Opportunities for support from Regional Programmes:

Call for the expression of interest Selection of six model demonstrator regions to receive advisory support from the European Cluster Observatory

*Note: An update of the English text of this Act is being prepared following the amendments in SG No. 59/ , SG No. 66/26.07.

Overview of fi-compass. advisory platform and its activities. ENERGY EFFICIENCY FINANCE MARKET PLACE Ja n u a r y

Rural Web Energy Learning Network for Action erenet

EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE

URBAN II Evaluation Project Case Study: URBAN ON LINE (Gijon)

Department of Agriculture, Environment and Rural Affairs (DAERA)

Get Ready for Horizon 2020

Summary of a Survey on the Europe 2020 Flagship Initiative Innovation Union. Executive Summary

CEI Know-how Exchange Programme (KEP) Guidelines for the completion of the Application Form 2018

MISSION INNOVATION ACTION PLAN

Access to finance for innovative SMEs

Guidelines for applicants LIFE Environment and Resource Efficiency

Invitations to provide Specialist Support to the Built Environment Climate Change Innovations Project

Transcription:

European Union European Regional Development Fund Sharing solutions for better regional policies Action plan Part I General information Project: FINERPOL Partner organisation: CEiiA Centre of Engineering and Product Development Country: Portugal NUTS2 region: Northern Region Contact person: Catarina Selada email address: catarina.selada@ceiia.com phone number: (+351) 916 109 786 Part II Policy context The Action Plan aims to impact: Investment for Growth and Jobs programme European Territorial Cooperation programme Other regional development policy instrument Name of the policy instrument addressed: NORTE 2020 - Northern Region Operational Programme 2014-2020 - Investment Priority 4.3 - "Supporting energy efficiency, smart energy management and the use of renewable energy in public infrastructure, including public buildings and the housing sector." 1

The Northern Region Operational Programme 2014-2020 - "NORTE 2020" is directed exclusively to the NUTS II Northern Region of Portugal, with a financial support for the regional development of EUR 3,400 million of Community funds (ERDF and ESF), plus the national counterpart (public and private). In addition to this financial envelope, the Northern Region has access to thematic operational programmes and other financial instruments to achieve the vision of the NORTE 2020 regional development strategy: "In 2020, the Northern Region will be able to generate a level of production of tradable goods and services that will enable the regain of its convergence with the European trajectory, ensuring a sustainable increase in income and employment for its population and promoting economic, social and territorial cohesion". This Action Plan refers to the Priority Axis 3 - "Low Carbon Economy", IP 4.3 - Support energy efficiency, intelligent energy management and the use of renewable energy sources in public infrastructures, namely in public buildings and in the residential sector. This IP has a total ERDF budget of EUR 107,019,526 and includes the following specific objectives: Specific Objective 1: Increase energy efficiency in public local administration infrastructures by supporting the implementation of integrated measures to promote energy efficiency and rationalizing consumption. Specific Objective 2: Increase energy efficiency in the social housing sector by supporting the implementation of integrated measures to promote energy efficiency and rationalizing consumption. By the end of April 2018, three calls for proposals had been opened under the IP 4.3 - two related to EE in local public administration infrastructures (Specific Objective 1), in October 2016 and November 2017, and other related to energy renovation in social housing buildings (Specific Objective 2), in February 2017. 4,948 projects were approved under NORTE 2020, but only 8, related to energy renovation in social housing buildings, under the IP 4.3. Of the EUR 107,019,526 ERDF planned to be approved under this IP until 2020, only EUR 11,728,361.05 were already approved. On one hand, the call for proposals launched for NORTE 2020 IP 4.3 Specific Objective 1, in October 2016, worth EUR 70 million, did not receive applications. In November 2017, a new call was opened. Since this call is still open, there are no results yet. On the other hand, NORTE 2020 IP 4.3 Specific Objective 2, launched in February 2017, received several applications, so the approval process is delayed. During Phase 1 of the FINERPOL project, the Portuguese Council of Ministers approved a Resolution establishing the strategic vision, objectives and instruments of action for a New Generation of Housing Policies. In order to create the conditions for rehabilitation to pass from exception to rule, becoming the predominant form of intervention, the New Generation of Housing Policies required a joint action on the legal and regulatory framework (adapting it to the specificities of the rehabilitation), and on the financing of the interventions, guaranteeing the existence of favourable conditions to the investment in rehabilitation. In this 2

context, the following Financial Instruments, which stand out within the scope of FINERPOL project, were readjusted and complemented with new programmes: Programme for urban rehabilitation of social neighbourhoods in the energy efficiency strand: supports interventions aimed at increasing energy efficiency and the use of renewable energies for self-consumption in social housing buildings; Casa Eficiente 2020 Programme: aims at financing, in favourable conditions (compared to the market), operations that promote the improvement of the environmental performance of buildings and dwellings, with a special focus on energy and water efficiency, as well as on urban waste management; Financial Instrument for Urban Rehabilitation and Revitalization (IFRRU 2020): aims to support urban rehabilitation and revitalization (buildings rehabilitation, in particular), and to promote energy efficiency. IFRRU 2020 stands out for the flexibility in the eligibility criteria, together with the simplicity and support given in the application process. Considering the range of financing options available in Portugal for EE in buildings, through Programmes and Financial Instruments (recently readjusted), crowdfunding and Energy Performance Contracting (EPC), in the analysis of possible actions for this Action Plan, CEiiA focused on specific characteristics inherent to Financial Instruments, with potential to complement the gaps identified to the Operational Programme of the Northern Region of Portugal, instead of the creation of new Financial Instruments. 3

Part III Details of the actions envisaged The background Local/regional learning process Stakeholder group In an initial phase, CEiiA sought to identify weaknesses inherent to the Policy Instrument "NORTE 2020" IP 4.3 to justify the obtained results. In this aspect, within the Exchange of Experience process of Phase 1 of the FINERPOL project, the local/regional stakeholder meetings were very enlightening. The multidisciplinary group was composed of public and private, local and regional entities (including the Managing Authority of the Operational Programme NORTE2020, who actively participated) and very productive discussions were generated. A wide range of disincentives to investment in EE in buildings was identified, within which, in the scope of the Policy Instrument "NORTE 2020" IP 4.3, the following two were highlighted: a) Counter productivity of the eligibility criteria of the IP 4.3.: There are some limitations in the eligibility criteria concerning the support of alternative building materials to External Thermal Insulation Composite Systems (ETICS). In fact, standard costs are exclusively defined for ETICS, making it difficult to apply alternative solutions, namely the use of materials and building systems appropriate to specific situations in which ETICS solutions do not work correctly, blocking the adoption of more technically adequate and efficient solutions, in a medium and long-term basis. Financing does not consider the life cycle of building materials and energy-efficient equipment, namely solar and photovoltaic panels, heating systems and storage of water with thermal insulation, in particular its maintenance, making it costlier to the municipalities. b) Inadequacy of the result indicators of the IP 4.3.: Due to the climatic conditions of the Northern Region, thermal comfort solutions are more relevant than energy efficiency measures. Therefore, emphasis should be placed on passive energy efficiency measures (ex: thermal control, insulation and ventilation). On the other hand, the social neighbourhoods dwelling interior energy expenses are ensured by the residents. Due to their socio-economic conditions, social housing residents have almost null energy costs, as they do not spend money on heating or cooling. Energy renewal actions in these buildings result in theoretical consumption reductions, but not in actual reductions. With the installation of photovoltaic/thermal solar panels, consumption can even increase in less sunny seasons, which results in residents' discontent. Under these conditions, the NORTE 2020 IP 4.3 Specific Objective 2 result indicator Households with improved energy consumption does not adapt to the dwelling interior. In this type of housing, energy certification does not translate energy consumption, and the result indicator "Social housing dwellings with improved energy class" loses relevance. This scenario raises the question of whether the priority should be the increase in EE or the minimization of discomfort, improving living conditions 4

and the residents quality of life. Achieving a high-energy class entails requirements in terms of equipment to be installed, which later involve high maintenance costs for municipalities. Interregional learning process To identify the actions for reversing this situation, the interregional learning process was essential, enabling the share of experience and good practices between project partners. The following points describe the events and the best practices with special relevance for the elaboration of the AP: a) Interregional events Tartu, January 2018 During this event, partners presented their draft Ex-Ante Assessments, allowing the comparison between the different local/regional situations. It was possible to identify some similarities between the gaps identified in the Policy Instruments tackled by CEiiA and Trento. After this meeting, CEiiA and Trento maintained contact for exchange of ideas in the elaboration of the AP. Porto, May 2018 Within the learning camp activity held during this event, partners presented their AP and then gathered in smaller groups to evaluate the different actions proposed. This activity allowed a peer review between CEiiA and Trento. b) Good practices FINERPOL partners identified many examples of financial instruments for EE in buildings and evaluated them according to criteria developed by the partnership. These included the aim of the FI, who was involved, its financial performance, and impact on reducing carbon emissions. In order to adapt public policies to the local reality and to the needs of the beneficiaries (the needs identified by CEiiA and the local stakeholder group to improve the Northern Region Operational Programme), monitoring and actions to promote improved capacity for policy makers, such as direct contact with potential beneficiaries and cooperation between different sectors, are considered essential tools. Actions to improve monitoring processes are reflected in this Action Plan through the quantitative measurement of the effectiveness and efficiency of different adopted technical solutions in energy retrofitting, in real context (Action 1) and the development of a database to systematically collect energy data on local public administration infrastructures (Action 3). The following Good Practices and respective characteristics influenced the definition of this strategy: EPC (Energy Performance Contract) method for public buildings in Czech city of Moravská Třebová: This project focused on monitoring the operation and energy consumption of installed equipment, as well as on the evaluation of savings and optimisation of operating parameters including central controlling system for energy management. The city now has a permanent overview of the heat, electricity and water consumption, as well as possibilities for further optimisation of energy expenditure. 5

EPC for Landstinget i Östergötland: This project is also an example in terms of monitoring systems. In fact, green management control systems were applied in 189 public buildings through an EPC. Actions to promote improved capacity for policy makers are reflected in this Action Plan through the stakeholder meeting that will be held, aiming to combine technical knowledge, municipal experience and real context experimental data to restructure the result indicators of a forthcoming call for proposals for NORTE 2020 IP 4.3 Specific Objective 2 (Action 2) and the presentation of position papers to the Managing Authority of the Operational Programme NORTE 2020 reflecting the results of all three actions. The following Good Practices and respective characteristics influenced the definition of this strategy: Urban Development Fund: Urban Development Fund in Pomorskie is an ERDF co-funded financial instrument, managed by Bank Gospodarstwa Krajowego (BGK), the State Development Bank of Poland. It supported urban projects in the region's four major cities: Gdańsk, Gdynia, Sopot and Stupsk. To CEiiA, very close cooperation between the final recipient, BGK and Pomerania Development Agency (ARP), happening during the preliminary implementation stage was key to highlight this Good Practice. This allowed stakeholders to adapt their mentality and attitudes, be more proactive, open and engage in dialogue with others. Fedesco: Fedesco was created as a public ESCO to study and implement energy efficiency projects in Belgian federal public buildings and created a Knowledgecenter department to provide EPC facilitation services to non-federal public authorities, i.e. regions, provinces, cities and municipalities. Lourdes Renove: Lourdes Renove project was conceived as the first phase of an Integral Energy Rehabilitation of the Lourdes District in Tudela city. Within this project, the Lourdes Renove Office was opened, as a meeting point between technicians and residents, so that they could share knowledge and define the best strategy of action. Implementing this AP, CEiiA will promote the restructuring of the tackled Policy Instrument under the period 2014-2020, including policy changes of Type 1 Implementation of new projects and Type 2 Improved governance, by promoting changes in the contents of the calls for proposals, improving the governance model of the PI (eligibility criteria and result indicators), and encouraging new projects using funds from the PI. ACTION 1 - Restructure the eligibility criteria of a forthcoming call for proposals for NORTE 2020 IP 4.3 1. Action Within Phase 2 of the FINERPOL project CEiiA will act on the maturation of the NORTE 2020 IP 4.3 eligibility criteria, making the choice of technologies, to be applied in the financed projects, more flexible. By making the eligibility criteria more favourable to the promoters, CEiiA will contribute to the maximization of the application of energy efficiency funds. 6

Within this action, the following activities will be developed: a) Identification of the most effective and efficient technical solutions in the market: The University of Minho is an active member of the local stakeholder group and is currently developing investigation projects in this thematic. Since this entity need help in finding energy renewal projects in the design or implementation phases to quantitatively measuring the effectiveness and efficiency of different adopted technical solutions, in real context, CEiiA will work as a mediator between them and municipalities. b) Production of a position paper reflecting the obtained results: CEiiA will produce a position paper reflecting the background and the results of the investigation conducted in partnership with the University of Minho, including lifecycle cost-effectiveness analysis of different technical solutions and the formulation of different scenarios reflecting their validation within the eligibility criteria of the NORTE 2020 IP 4.3. c) Presentation of the position paper to the Managing Authority of the Operational Programme NORTE 2020 : CEiiA will arrange a meeting with CCDR-N, the Managing Authority of the Operational Programme, for the presentation of the produced position paper, proving the added value of having wider eligibility criteria and influencing the restructure of a forthcoming call for proposals for NORTE 2020 IP 4.3. d) Monitoring of new applications to the Policy Instrument NORTE 2020 IP 4.3, depleted by the restructure of calls for proposals: In close collaboration with the Managing Authority of the Operational Programme, CEiiA will create a questionnaire, which will be sent to the entities applying for the modified call for proposals, quantifying the extent to which the widening of the eligibility criteria had influence in their application. 2. Players involved CCDR-N, the Managing Authority of the Operational Programme NORTE 2020, will be involved in the entire process of implementing this action. The University of Minho will support CEiiA with knowledge on measurement techniques. The energy renewal projects to be selected will preferably be located in the municipalities of Matosinhos, Porto and Vila Nova de Gaia. CEiiA will produce the position paper and the monitoring questionnaires. 7

3. Timeframe September to October 2018 Selection of the energy renewal projects to be analysed; November 2018 to March 2019 Measurement of the effectiveness and efficiency of different adopted technical solutions, in real context; April 2019 Production of the position paper reflecting the obtained results; May 2019 Presentation of the position paper to the MA of the OP; June 2019 to March 2020 Monitoring of new applications to the PI NORTE 2020 IP 4.3, depleted by the restructure of calls for proposals. ACTION 2 Restructure the result indicators of a forthcoming call for proposals for NORTE 2020 IP 4.3 Specific Objective 2 1. Action CEiiA will produce a position paper to be presented to the MA of the OP NORTE 2020 for the restructuring of the result indicators of a forthcoming call for proposals for NORTE 2020 IP 4.3 Specific Objective 2. Within this action, the following activities will be developed: a) Stakeholder meeting: One stakeholder meeting will be held, aiming to combine technical knowledge, municipal experience and real context experimental data to produce the position paper. Within this action, the most relevant stakeholders are municipalities and the Faculty of Engineering of the University of Porto, with a lot of experience in this thematic. b) Production of the position paper: After collecting the contributions from the stakeholders, CEiiA will produce a position paper for the restructuring of the result indicators of a forthcoming call for proposals for NORTE 2020 IP 4.3 Specific Objective 2. c) Presentation of the position paper to the MA of the OP NORTE 2020 : CEiiA will arrange a meeting with CCDR-N, the Managing Authority of the Operational Programme, for the presentation of the produced position paper, influencing the restructuring of the result indicators of a forthcoming call for proposals for NORTE 2020 IP 4.3 Specific Objective 2. d) Monitoring of new applications to the PI NORTE 2020 IP 4.3 Specific Objective 2, depleted by the restructure of the result indicators: The influence of this action, traduced in new applications to the PI NORTE 2020 IP 4.3 Specific Objective 2, will be monitored using the questionnaire proposed for the monitoring of action 1. 8

2. Players involved CCDR-N, the Managing Authority of the Operational Programme NORTE 2020, will be involved in the entire process of implementing this action. CEiiA will produce the position paper based on contributions from the municipalities constituting the local stakeholder group of the FINERPOL project and the Faculty of Engineering of the University of Porto. 3. Timeframe October 2018 - Stakeholder meeting; November 2018 to April 2019 - Production of the position paper; May 2019 - Presentation of the position paper to the MA of the OP NORTE 2020 ; June 2019 to March 2020 - Monitoring of new applications to the PI NORTE 2020 IP 4.3 Specific Objective 2, depleted by the restructure of the result indicators. ACTION 3 Encourage applications for NORTE 2020 IP 4.3 Specific Objective 1 1. Action Taking as a sample the municipalities of Matosinhos, Porto and Vila Nova de Gaia, CEiiA will develop a set of activities, encouraging applications for NORTE 2020 IP 4.3 Specific Objective 1, as follows: a) Assessment of application intentions within the call currently open under NORTE 2020 IP 4.3 Specific Objective 1: CEiiA will organize one meeting with these municipalities to assess whether they have applied or count on applying to the currently open call for proposals for energy efficiency projects in public local administration infrastructures. If no intention to do so is revealed, the motives will be identified. b) Development of a database to systematically collect energy data on local public administration infrastructures: This tool will help the envisaged municipalities to keep control of the actual status of their buildings in terms of energy consumption and to better evaluate the benefits that can come from implementing energy efficiency projects. CEiiA will create the database and then organize specific events aimed at introducing it to the municipalities and explaining them the advantages of its implementation. c) Widespread of the projects approved under NORTE 2020 IP 4.3 Specific Objective 1: CEiiA will develop a digital platform to facilitate the widespread of projects approved under NORTE 2020 IP 4.3 Specific Objective 1 in the envisaged municipalities. 9

d) Monitoring of new applications to the PI NORTE 2020 IP 4.3 Specific Objective 1, depleted by the creation of the database and digital platform: The influence of these new tools will be monitored using the questionnaire proposed for the monitoring of action 1, applied to the three envisaged municipalities. e) Production of a position paper reflecting the obtained results: CEiiA will produce a position paper reflecting the background and the results of the methodology applied to the envisaged municipalities. f) Presentation of the position paper to the MA of the OP NORTE 2020 : CEiiA will arrange a meeting with CCDR-N, the Managing Authority of the Operational Programme, for the presentation of the produced position paper, tackling the implementation of the applied methodology in the remaining municipalities of the Northern Region of Portugal and the coupling of the new digital platform with the existing platform dedicated to the OP. The OP has a dedicated platform, in which public access to the approved projects is allowed. However, the details of the projects are presented in excel format and there is no reference to results obtained in terms of energy efficiency. With the platform to be created, CEiiA will promote public access to more information, in a more appealing format, encouraging the replication of this type of projects. 2. Players involved CCDR-N, the Managing Authority of the Operational Programme NORTE 2020, will be involved in the entire process of implementing this action. This methodology will be applied to the municipalities of Matosinhos, Porto and Vila Nova de Gaia. CEiiA will create the database and digital platform. 3. Timeframe September 2018 - Assessment of application intentions within the call currently open under NORTE 2020 IP 4.3 Specific Objective 1; October 2018 to March 2019 Development of the database and digital platform; April 2019 Presentation of the database to the envisaged municipalities; May 2019 to January 2020 Monitoring of new applications to the PI NORTE 2020 IP 4.3 Specific Objective 1, depleted by the creation of the database and digital platform; February 2020 - Production of a position paper reflecting the obtained results; March 2020 - Presentation of the position paper to the MA of the OP NORTE 2020 10

Date: 31/07/2018 Signature: 11