Grant Contract (hereinafter referred to as the Contract ) for Project No. xxxxxxx

Similar documents
Regulation on the implementation of the European Economic Area (EEA) Financial Mechanism

PART II: GENERAL CONDITIONS APPLICCABLE TO GRANTS FROM THE NORWEGIAN MINISTRY OF FOREIGN AFFAIRS

Republic of Latvia. Cabinet Regulation No. 50 Adopted 19 January 2016

STANDARD TERMS AND CONDITIONS ON NORWAY GRANTS FROM INNOVATION NORWAY

Annex 3 Information and Communication Requirements EEA and Norway Grants

Sub-granting. 1. Background

STANDARD GRANT APPLICATION FORM 1 REFERENCE NUMBER OF THE CALL FOR PROPOSALS: 2 TREN/SUB

GRANT AGREEMENT FOR AN ACTION ACTION 2 - ERASMUS MUNDUS PARTNERSHIPS Financing exclusively by lump sum contribution(s) and/or unit contribution(s)

General Terms and Conditions

GRANT APPLICATION FORM 1

DOCUMENTS GPOBA GRANT NUMBER TF Global Partnership on Output-based Aid. Grant Agreement

Open call for proposals VP/2004/021. Initiatives to promote gender equality between women and men, including activities concerning migrant women

III. The provider of support is the Technology Agency of the Czech Republic (hereafter just TA CR ) seated in Prague 6, Evropska 2589/33b.

Subsidy contract for the project. Click here to enter text.

Funding Agreement 1. concluded between the. Federal Government. as Funding Provider. and. Company name Street Post code / town Company register number

Long-term Intersectoral Cooperation

Incentive Guidelines Research and Development - Tax Credits INDUSTRIAL RESEARCH PROJECTS; EXPERIMENTAL DEVELOPMENT PROJECTS; INTELLECTUAL PROPERTY

GRANT CONTRACT - EXTERNAL ACTIONS OF THE EUROPEAN UNION -

COMIC RELIEF AWARDS THE GRANT TO YOU, SUBJECT TO YOUR COMPLYING WITH THE FOLLOWING CONDITIONS:

Support for Applied Research in Smart Specialisation Growth Areas. Chapter 1 General Provisions

R U L E S F O R G R A N T I N G S C H O L A R S H I P S OF THE CZECH TECHNICAL UNIVERSITY IN PRAGUE

Statutes of the Copernicus Science Centre I. GENERAL PROVISIONS

EARLY-CAREER RESEARCH FELLOWSHIP GRANT AGREEMENT

1. daa plc, whose principal address is at Old Central Terminal Building, Dublin Airport, Co Dublin (Funder)

U.S. Department of Housing and Urban Development Community Planning and Development

KENYA INFRASTRUCTURE AND PPP PROJECT SOUTH EASTERN KENYA UNIVERSITY HOSTELS PPP PROJECT

FRAMEWORK PARTNERSHIP AGREEMENT FOR ACTION GRANTS FRAMEWORK AGREEMENT NUMBER [ ] SUPPORT FOR TRAINING

Transatlantic Strategy Forum

Focusing and Integrating Community Research. 9. Horizontal Research Activities involving SMEs. Work Programme

NAS Grant Number: 20000xxxx GRANT AGREEMENT

and Commission on the amended Energy Efficiency Directive and Renewable Energies Directives. Page 1

CALL FOR PROPOSALS DG EAC No EAC/18/2011. Preparatory Action in the Field of Sport (Open call) (2011/C 131/09) Guidelines for Applicants

Model Agreement between Lead Partners and partners of an INTERREG IVC project (Partnership Agreement) 1

Focusing and Integrating Community Research. 9. Horizontal Research Activities involving SMEs. Work Programme

ANALOG DESIGN CONTEST RULES FOR UNIVERSITY OF TEXAS AT DALLAS

AGREEMENT BETWEEN THE BAKU-TBILISI-CEYHAN PIPELINE COMPANY AND THE GOVERNMENT OF GEORGIA ON THE ESTABLISHMENT OF A GRANT PROGRAM FOR GEORGIA

Incentive Guidelines Research and Development INDUSTRIAL RESEARCH PROJECTS; EXPERIMENTAL DEVELOPMENT PROJECTS; EUREKA AND EUROSTARS

PART 3 COMPLIANCE REQUIREMENTS

( ) Page: 1/24. Committee on Subsidies and Countervailing Measures SUBSIDIES

Request for Proposal. Mobile Application for Customer Interface. October 6 th, 2017 Procurement Contact Holly Hussey

Call for proposals 2013 for pilot projects EU AID VOLUNTEERS. Guidelines for Grant Applicants. Contents

Incentive Guidelines Start-Up Finance

Law on Medical Devices

Standard Projects 2019 Preamble Content

Privacy Code for Consumer, Customer, Supplier and Business Partner Data

General Rules of the Contest: Romantic Stay in Cosmopolitan Prague Hotel

Global Partnership on Output-based Aid Grant Agreement

Trust Fund Grant Agreement

General terms and conditions of Tempo funding

Grant Agreement. The. - hereinafter referred to as "the Recipient" and

Guideline for Research Programmes Rules for the establishment and implementation of programmes falling under the Programme Area Research

CALL FOR PROPOSALS HOME/2014/PPXX/AG/SPBX NEW INTEGRATED MECHANISMS FOR COOPERATION BETWEEN PUBLIC AND PRIVATE ACTORS TO IDENTIFY SPORTS BETTING RISKS

MARATHON COUNTY DEPARTMENT OF SOCIAL SERVICES REQUEST FOR PROPOSALS RESTORATIVE JUSTICE PROGRAMS

Czech Republic Ministry of Education, Youth and Sports

Elder Academy Development Foundation. Funding Guidelines Elder Academies in Primary and Secondary Schools

EARLY-CAREER RESEARCH FELLOWSHIP GRANT AGREEMENT [SAMPLE Public Institutions]

Call for Proposals Guidelines for the Programme: Wehubit BEL

Masaryk University Scholarship and Bursary Regulations

Farm Energy and Agri-Processing Program Terms and Conditions

Joint Operational Programme Romania Republic of Moldova

Public Diplomacy, Policy Research and Outreach Devoted to the European Union and EU-Canada Relations

Community Dispute Resolution Programs Grant Agreement

Policy Rules for the ORIO Grant Facility

2018 Terms and Conditions for Support of Grant Awards Revised 7 th June 2018

Galileo : EGNSS Awareness raising and capacity building

International Projects 2019 Preamble Content

CALL FOR PROPOSALS. GRANT FOR ROMACT "SUPPORT ORGANISATIONS" IN SLOVAKIA SRSGRoma/SPU/2017/27. Joint EU/CoE Projects ROMACT3 and ROMACT4

H2020 Work Programme : Spreading Excellence and Widening Participation Call: H2020-TWINN-2015: Twinning Frequently Asked Questions (FAQ)

COMMISSION IMPLEMENTING DECISION. of

CORRIGENDUM no.1 to Guidelines

Call for proposals. COSME Enterprise Europe Network 2015/2020 COS-WP EUROPEAN COMMISSION

HERCULE III PROGRAMME CALL FOR PROPOSALS REF. Hercule III 2014 ANTI-FRAUD TRAINING E PROGRA MME ANTI-FRAU

Part I. Project identification and summary

TEAM TECH PROGRAMME COMPETITION DOCUMENTATION

Terms and Conditions of studentship funding

World Bank Iraq Trust Fund Grant Agreement

CALL FOR PROPOSALS LOCAL INITIATIVES ON INTER-MUNICIPAL COOPERATION IN MOLDOVA

Call International Mobility of Researchers. Operational Programme Research, Development and Education

COPY REGULATION OF THE MINISTER OF FINANCE OF THE REPUBLIC OF INDONESIA NUMBER 223/PMK.011/2012

ADVANCED MANUFACTURING FUTURES PROGRAM REQUEST FOR PROPOSALS. Massachusetts Development Finance Agency.

Model terms and conditions of service for a salaried general practitioner employed by a GMS practice ( Practice )

Trust Fund Grant Agreement

Technology Bank for the Least Developed Countries

Conditions and procedure for applying for, awarding and amending the amount of institutional research funding. Chapter 1 General Provisions

Call for proposals DG EAC/21/06

PICK-ME Kick-off meeting Political, scientific, contractual and financial aspects

INTERNATIONAL RESEARCH AGENDAS PROGRAMME. Competition Documentation

Incentive Guidelines. ERDF Research and Development Grant Scheme

EARLY INTERVENTION SERVICE COORDINATION GRANT AGREEMENT. July 1, 2017 June 30, 2018

INCENTIVE SCHEME TOWARDS THE ORGANISATION OF CONFERENCES / MEETINGS AND INCENTIVE TRIPS TO CYPRUS

Dear Colleague. Performers List National Application Arrangements. Summary

EXPRESSION OF INTEREST

Part I. Project identification and summary

PUBLIC. Brusels,19March 2014 (OR.fr) COUNCILOF THEEUROPEANUNION 7465/14 LIMITE CSDP/PSDC148 PESC250 COAFR83 RELEX213 CONUN61 CSC55 EUCAP MALI1

Education, Audiovisual and Culture Executive Agency GRANT DECISION FOR AN ACTION. Decision Nr

RECOMMENDATIONS ON CLOUD OUTSOURCING EBA/REC/2017/03 28/03/2018. Recommendations. on outsourcing to cloud service providers

Grant Agreement. The. - hereinafter referred to as "the Recipient" and

Guidance on the Biocidal Products Regulation

LIBRARY COOPERATIVE GRANT AGREEMENT BETWEEN THE STATE OF FLORIDA, DEPARTMENT OF STATE AND [Governing Body] for and on behalf of [grantee]

Chapter Two STATE FUNCTIONS FOR ENERGY EFFICIENCY PROMOTION Section I Governing Bodies

Transcription:

Grant Contract (hereinafter referred to as the Contract ) for Project No. xxxxxxx financed within the priority from the funds of the EEA Financial Mechanism 2009-2014 (hereinafter referred to as EEA Grants ), within the Programme CZ03 The Fund for Non-Governmental Organisations (hereinafter referred to as the NGO Fund ) established by the Programme Agreement of October 31, 2013. Parties to the Contract: Grant Provider: Name: Nadace rozvoje občanské společnosti / Nadace Partnerství (Civil Society Development Foundation / Environmental Partnership Foundation) according to the priority Registered office: Represented by: (hereinafter referred to as the Programme Operator ) and Grant Beneficiary: Name: Registered office: Represented by: (hereinafter referred to as the Grant Beneficiary ) enter into this Contract pursuant to 1746 of the Act No. 89/2012 Coll., the Civil Code.

Article I Introductory Provision 1. The Programme Operator shall implement the NGO Fund based on the following: a. The Contract on provision of the NGO Fund implementation between the Ministry of Finance of the Czech Republic and the Civil Society Development Foundation (NROS) from January 10, 2014; b. The Memorandum on Implementation of the NGO Fund between the Ministry of Finance of the Czech Republic and the Civil Society Development Foundation (NROS) from January 10, 2014; c. The Decision on Subsidy provided by the Ministry of Finance of the Czech Republic to from March 20, 2014; d. FOR PRIORITY IV: The Partnership Agreement between the Civil Society Development Foundation (NROS) and the Environmental Partnership Foundation (Nadace Partnerství, NaP) from March 20, 2012. 2. Within the NGO Fund implementation the Programme Operator provides individual grants stemming from the funds of the EEA Grants to non-profit organisations to implement their specific projects. 3. The Parties note that the Contract shall comply with the legal regulations of the Czech Republic in force. In addition to that, the Contract shall comply with the legal framework of the EEA Grants as defined in the clause 1.4 of the Regulation on the Implementation of the EEA Financial Mechanism 2009-2014, and with relevant provisions of all process documents and rules issued by the Financial Mechanism Office and the Ministry of Finance of the Czech Republic, in particular the Programme Agreement to Finance the NGO Fund and the Regulation on the Implementation of the EEA Financial Mechanism 2009-2014, as well as all the procedures guidelines and rules issued by the Programme Operator. 4. Upon the request of the Programme Operator the Grant Beneficiary shall sign an Amendment to the Contract pursuant to the clause VIII 3 of the Contract as proposed by the Programme Operator provided the Programme Operator concludes that there is a need to sign such Contract due to updates in any of the documents listed in the previous clause. 5. The Grant Beneficiary shall comply with all provisions of the Contract and all its Annexes that form its inseparable part. Unless expressly stated otherwise any reference to the Contract means also a reference to its Annexes. Article II Scope of the Contract 1. The aim of the Contract is to define rules for allocation and use of the grant provided as part of the NGO Fund from the funds of the EEA Grants, pursuant to Article I of the Contract, in order to implement the project defined below (hereinafter referred to as the Grant ). 2. The Grant shall be provided in the form of an endowment contribution (grant) pursuant to the provisions of 353 and subsequent of the Act No. 89/2012 Coll., the Civil Code. 3. The Grant is provided to implement the below-specified project: Project Name: Page 2 of 9

Project Number: (hereinafter referred to as the Project ) 4. The Grant Beneficiary accepts the provided Grant and shall dispose of the Grant exclusively and only in relation to the Project implementation. 5. The Project Specification, including description of different activities, goals and outputs of the Project, is in the Annex I hereof. 6. All Project parameters listed in the Annex I of the Contract shall be obligatory for the Grant Beneficiary. Article III Project Implementation Period 1. The Project implementation starts on 1. 4. 2015 and ends on 31. 3. 2016. Article IV Basic Financial Provisions and Provisions for Grant Payments 1. The Project budget is included in the Annex II of the Contract. The estimated total eligible costs of the Project as specified in the Annex II of the Contract amount to CZK. The criteria for eligibility of costs as defined within the Article 11 of the Annex III hereof apply to all Project costs regardless of the source of financing. 2. The Programme Operator provides the Grant of up to CZK to the Grant Beneficiary to finance a part of the Project costs mentioned in the previous clause. The Contractual Grant Ratio is xx,xxxxxxx %. The Contractual Grant Ratio is defined as a ratio of the Grant to the estimated total eligible costs of the Project as mentioned in the previous clause subtracted by the amount of the estimated direct Project revenues. The final Grant amount shall be specified pursuant to the Article 14 of the Annex III hereof. 3. Considering the Contractual Grant Ratio specified in the previous clause the Grant Beneficiary shall co-finance at least xx,xxxxxxx % of the total eligible Project costs subtracted by the amount of the estimated direct Project revenues duly used for financing of the eligible Project costs. Co-financing means any funds to finance eligible Project costs with the exception of the Grant and direct Project revenues. Eligible co-financing is specified in Article 12 of the Annex III hereof. At the same time the Grant shall constitute the main source of Project financing; the ratio of the Grant to the total eligible Project costs shall not fall below 51 %. 4. The Programme Operator shall provide the Grant to the Grant Beneficiary pursuant to the clause IV 2 hereof by means of credit transfers to a bank account of the Grant Beneficiary. These Grant payments shall be made in compliance with the following clauses. The bank account shall be conducted in Czech crowns in a bank authorized to provide banking services in the Czech Republic and shall be identified in a Financial Identification form prescribed by the Programme Operator. Page 3 of 9

5. The Grant Beneficiary shall receive a Grant advance payment amounting to 80 % of the Grant; i.e. CZK. The Grant advance payment shall be paid pursuant to the valid Contract within 15 working days from the beginning of Project implementation. If the Contract is signed after the beginning of the Project implementation the Grant advance payment shall be paid within 15 working days after the Contract is signed by the last party to the Contract. The amount of the Grant advance payment shall be rounded down to the nearest Czech crown. 6. The Grant Beneficiary shall receive a final Grant payment of up to 20 % of the Grant; i.e. CZK. The final Grant payment shall be made within 15 working days from the day a Final Project Report was approved by the Programme Operator in accordance with Article 4 of the Annex III hereof. The actual amount of the final Grant payment shall be calculated based on the Project financial reconciliation in accordance with Article 14 of the Annex III hereof. 7. Grant payments are considered paid on the day the amount is debited from the bank account of the Programme Operator. Regardless of the deadlines set for individual Grant payments the Programme Operator is obliged to meet these deadlines towards the Grant Beneficiary only provided the Programme Operator receives for this purpose and in time respective funds from the superior bodies of the EEA Grants implementation structure and provided the Programme Operator receives in time all necessary background information and documents from the Grant Beneficiary required to make a Grant payment. The deadline for a Grant payment as specified within this Article IV shall be extended by the time during which the conditions defined in the previous sentence are not met. 8. The Programme Operator is entitled to suspend Grant payments to the Grant Beneficiary or request all the funds already paid as part of the Grant be returned by Grant Beneficiary if so requested by the superior bodies of the EEA Grants implementation structure or authorized bodies of state administration (including in particular the entities specified in clause 13.3 of the Annex III hereof) or if proceeded in accordance with the Article VI hereof. The Grant Beneficiary shall return all such requested funds within 15 working days from the delivery of request to do so in accordance with the Article 15 of the Annex III hereof unless the Programme Operator sets a longer deadline. Any request according to the previous sentence or any other written communication between the Programme Operator and the Grant Beneficiary sent by post in relation to this Contract shall be considered delivered on the third working day from its dispatching. 9. The fixed rate of eligible indirect Project costs (hereinafter referred to as the fixed rate ) applicable to the Grant Beneficiary has been set at xx,xxxxxxx %. The purpose and use of the fixed rate is defined in the clause 11.5 of the Annex III hereof. Estimated eligible indirect Project costs of the Grant Beneficiary amount to CZK. IF APPLICABLE: The fixed rate applicable to the Project Partner and relevant estimated eligible indirect costs of the Project Partner are defined in the clause VII 4 hereof. 10. PLEASE SELECT THE APPLICABLE: The Grant is not provided as public aid pursuant to the Article 107 of the Treaty on the Functioning of the European Union. / The Grant is fully provided as de minimis public aid pursuant to the Regulation of the Committee (EU) No. 1407/2013. Article V Page 4 of 9

Obligations of the Grant Beneficiary 1. The Grant Beneficiary shall comply with all the obligations specified in the Contract and all its Annexes, in particular Annexes III and IV hereof, and shall act accordingly to meet all requirements and other regulations listed in clause I 3 hereof. 2. The Grant Beneficiary shall implement the Project with due care, efficiency and transparency in compliance with the best practice in the field and in compliance with the Contract. The Grant Beneficiary shall perform all Project activities according to the time schedule, meet the defined goals and outputs of the Project according to the Annex I hereof and comply with the approved Project budget according to the Annex II hereof. 3. The Grant Beneficiary shall implement any and all Project changes only in compliance with the Article 8 of the Annex III hereof. 4. The Grant Beneficiary shall inform the Programme Operator of all facts that could affect the Project implementation, performance of the Contract or its validity. In this regard the Grant Beneficiary shall proceed in particular in compliance with the Article 4 of the Annex III hereof and Article 8 of the Annex III hereof. 5. When it comes to any subcontracting within the Project the Grant Beneficiary shall proceed according to the Annex IV hereof. The Grant Beneficiary declares to be aware that any subcontracting within the Project constitutes public procurement pursuant the Act No. 137/2006 Coll., the Public Procurement as amended. 6. The Grant Beneficiary shall archive all documents connected to the Project implementation in compliance with the legal regulations of the Czech Republic but in any case at least for 10 years beginning from January 1 of the year following after the year when the NGO Fund Programme Final Report is approved by the Financial Mechanism Office. The Grant Beneficiary shall be informed by the Programme Operator of the date when the Programme Final Report is approved by the Financial Mechanism Office. As of the signing of the Contract it is estimated that all documents connected to the Project implementation should be archived until January 1, 2028. 7. The Grant Beneficiary shall create suitable conditions for auditing, monitoring or evaluating the Project and also for controlling the compliance with the Contract in accordance with the Article 13 of the Annex III hereof. 8. The Grant Beneficiary shall inform the Programme Operator of any and all Project controls or monitoring performed by other entities and not the Programme Operator. The Grant Beneficiary shall without any delay inform the Programme Operator of any and all controls or monitoring, their results, proposed corrective measures as well as approval and implementation of such corrective measures. At the same time the Grant Beneficiary shall also inform of approval and implementation of corrective measures the entity performing the control or monitoring and requesting such corrective measures. 9. The Grant Beneficiary declares to be aware of duplicity financing being prohibited. The Grant Beneficiary shall not request payment for any Project cost that has already been covered by any other way and any other entity. 10. The Grant Beneficiary shall return to the Programme Operator all the funds owed due to the provisions of the Contract in compliance with the Article 15 of the Annex III hereof. The Page 5 of 9

Grant Beneficiary shall repay to the Programme Operator fully any payment an authorized body requested from the Programme Operator as a result of a breach of obligations by the Grant Beneficiary. 11. The Grant Beneficiary agrees to information about the Project being published pursuant to the Act No. 106/1999 Coll., on Free Access to Information, as amended, and the Act No. 101/2000 Coll., on the Protection of Personal data, as amended. In addition, the Grant Beneficiary also agrees to the Project information being used in the information and accounting systems of the Programme Operator, of the Ministry of Finance of the Czech Republic, of the Financial Mechanism Office or other relevant entities for the purposes of EEA Grants administration. The Grant Beneficiary shall obtain all agreements necessary to publish and use the corresponding personal data and inform the parties concerned in compliance with the regulations specified above. 12. The Grant Beneficiary shall comply with the obligations in the area of Project publicity and inform the public about the Project in accordance with the respective instructions by the Programme Operator. 13. The Grant Beneficiary shall dispose of all the assets acquired as part of the Project with due care. The Grant Beneficiary is not authorized to burden the assets with rights of third parties, including the right of lien, to sell or to misappropriate the assets in any other way. If the assets are destroyed, damaged, lost, stolen or subjected to other harmful event or claim the Grant Beneficiary shall procure the assets again, using resources outside the Project, or shall restore the assets back into their original condition as soon as possible but at the latest by the day the Project implementation ends. 14. The Grant Beneficiary shall not assign, transfer or pledge the Contract or any rights, obligations, debts, receivables or claims arising from this Contract without a previous written consent of the Programme Operator. Article VI Noncompliance, Dispute Management and Settlement 1. If the terms and conditions of the Contract are breached the Programme Operator shall proceed in accordance with the Article 10 of the Annex III hereof. The Grant Beneficiary cannot release themselves from their responsibility for breaching the terms and conditions of the Contract (the provisions of 2913 (2) of the Civil Code do not apply). 2. The parties shall try and prevent any disputes but if such dispute arises the parties shall try to reach an agreement in compliance with the legal regulations of the Czech Republic. Should there be any disputes arising from the Contract and in connection to the Contract the Party can refer the matter to the court having the jurisdiction in the area where the registered office of the Programme Operator is located. Page 6 of 9

Article VII Project Partner 1. If the Project is implemented in cooperation with a Project Partner (hereinafter referred to as the Partner ), the Grant Beneficiary shall comply with the principles of the project partnerships and obligations arising from the partnership pursuant to the Article 2 of the Annex III hereof. 2. In the relationship with the Programme Operator the Grant Beneficiary has the sole responsibility for Project implementation and for compliance with the terms and conditions of the Contract, this also applies to the part of the Project that is implemented by the Partner. 3. The Partner is an organisation implementing a part of the Project based on the Partnership Agreement signed with the Grant Beneficiary (hereinafter referred to as the Agreement ). The cooperation of the Partner with the Grant Beneficiary within the scope of Project implementation shall not be a relationship between a supplier and customer. The maximum number of Partners is limited to four. 4. IF APPLICABLE: The Partner mentioned in the previous clause, PLEASE SELECT: is a belowlisted organisation / are the below-listed organisations. The Grant Beneficiary shall sign the Agreement with each Partner, using the format of the Agreement provided by the Programme Operator, and submit the Agreement to the Programme Operator before signing the Contract hereof. The Grant Beneficiary shall make sure that any consequent changes to the Agreement submitted to the Programme Operator in accordance with the previous sentence are in compliance with the legal regulations of the Czech Republic and regulatory framework of the EEA Grants. The Grant Beneficiary shall submit any change made in the Agreement to the Programme Operator. The Programme Operator shall be authorized to request the Grant Beneficiary take appropriate measures within the deadline defined by the Programme Operator should the Programme Operator find any such change fails to comply with the legal regulations of the Czech Republic or regulatory framework of the EEA Grants. If requested so in accordance with the previous sentence the Grant Beneficiary shall amend the Agreement as instructed by the Programme Operator. a) Name of organisation: Fixed rate, pursuant to the clause IV 9 hereof: xx,xxxxxxx % Estimated eligible indirect costs: CZK b) Name of organisation: Fixed rate, pursuant to the clause IV 9 hereof: xx,xxxxxxx % Estimated eligible indirect costs: CZK c) Name of organisation: Fixed rate, pursuant to the clause IV 9 hereof: xx,xxxxxxx % Estimated eligible indirect costs: CZK d) Name of organisation: Fixed rate, pursuant to the clause IV 9 hereof: xx,xxxxxxx % Page 7 of 9

Estimated eligible indirect costs: CZK Article VIII Concluding Provisions 1. The Contract is governed by the legislation of the Czech Republic and becomes valid and effective on the day it has been signed by the last of its parties. 2. The Contract represents the full agreement between the parties and replaces all previous arrangements or agreements not referred to in the Contract. The Contract is signed for a period ending 10 years after January 1 following the year when the Final NGO Fund Programme Report is approved by the Financial Mechanism Office. If the provisions of the Contract result in obligations of the Grant Beneficiary that have not been met within this deadline than the Contract continues to be valid until such obligations are met. The Grant Beneficiary waives the right to demand their obligations under this Contract be cancelled. 3. The Contract can be changed only by written amendments numbered in ascending order. 4. Communication related to the Project can have an electronic form; or if requested by the Programme Operator it shall be a document on paper. Each document shall be numbered and shall include the Project name in compliance with the clause II 3 hereof. 5. All abbreviations and established terminology explained herein shall have the same meaning in all provisions of the annexes of the Contract. The term organisation used in the Annex III and IV of the Contract means the Grant Beneficiary and any and all Project Partners. 6. The Contract has been made in two copies and each of them shall have the force of an original. One copy is for the Programme Operator and the other one for the Grant Beneficiary. 7. The Grant Beneficiary declares that all data provided by the Grant Beneficiary and specified in the Contract and its Annexes are true and correct. Article IX Annexes The following Annexes form an inseparable part of the Contract: Annex I Annex II Annex III Annex IV Annex V Project Specification Project Budget General Terms and Conditions of the Contract Public Procurement Procedures De Minimis Aid Declaration Page 8 of 9

For the Programme Operator [Name] [Name and surname of authorized representative] For the Grant Beneficiary [Name] [Name and surname of authorized representative]..... Signature Signature xx. xx. 2015 xx. xx. 2015 Page 9 of 9