UNCLASSIFIED UNCLASSIFIED

Similar documents
UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2007 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2007 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2007 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7

EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA4

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 R-1 Line #208

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing EF4: Integrated Broadcast System

EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/Space and Electronic Warfare (SEW) Support

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2008 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

N/SHIP SELF DEFENSE - DEM/VAL

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Unmanned Combat Air Veh(UCAV) Adv Cp/Proto Dev. FY 2011 Total Estimate. FY 2011 OCO Estimate

B. Program Change Summary: RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) FEBRUARY 2008 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED FY This program develops and demonstrates advanced technologies, including Electromagnetic (EM) Rail Gun for naval weapon systems.

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

EXHIBIT R-2, RDT&E, N Budget Item Justification RDT&E / BA-5. COST ($ in Millions) FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 6 R-1 Line #162

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #211

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate

EXHIBIT R-2, RDT&E Budget Item Justification. February COST ($ in Millions) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

COST (Dollars in Millions) FY07 FY08 FY09 FY10 FY11 FY12 FY12

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE K: Minimum Essential Emergency Communications Network (MEECN)

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 19 R-1 Line #71

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. R-1 Program Element (Number/Name) PE J / Joint Integrated Air & Missile Defense Organization (JIAMDO) Prior Years FY 2013 FY 2014

N/JT CNTR RADIO CONTROLLED IED ELEC WAR (JCREW)

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Page 1 of 23. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5

CLASSIFICATION: UNCLASSIFIED. DATE February 2008 EXHIBIT R-2, RDT&E BUDGET ITEM JUSTIFICATION N/AMPHIBIOUS TACTICAL SUPPORT UNITS

UNCLASSIFIED. Cost To Complete Total Program Element S750: Mission Training and Preparation Systems FY 2015

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 8 R-1 Line #77

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Specialized Undergraduate Pilot Training. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. Cost To Complete Total Program Element : Undersea Warfare Advanced Technology

UNCLASSIFIED. R-1 Program Element (Number/Name) PE M / (U)Ground/Air Task Oriented Radar (G/ATOR) Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: ASW Systems Development

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RDT&E,N/ 07

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Counter Narcotics Technology Program Office

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. Cost To Complete Total Program Element : DIGITAL BATTLEFLD COMM.

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

PROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD)

UNCLASSIFIED FY Quantity of RDT&E Articles

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Air Control

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #44

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: C2ISR Tactical Data Link FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED FY 2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2008 Exhibit R-2

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Distributed Common Ground/Surface Systems. Prior Years FY 2013 FY 2014 FY 2015

Exhibit R-2, RDT&E Budget Item Justification February 2004

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: NUCLEAR WEAPON MODERNIZATION FY 2012 OCO

Transcription:

EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4 0603261N Tactical Airborne Reconnaissance COST ($ in Millions) FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Total PE Cost 2.029 6.386 3.938 3.950 11.646 11.891 12.137 12.386 2467 UAV CONOPS 2.029 6.386 3.938 3.950 11.646 11.891 12.137 12.386 A. MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: The Department of the Navy leadership is committed to Naval Unmanned Aerial Vehicles (UAVs) and to procuring an operational UAV capability as soon as possible. The Naval UAV Strategy employs a family of UAVs to perform tactical, persistent and penetrating ISR in support of Naval and Joint missions from forward bases and naval ships. In support of the Navy's overall UAV strategy, this program develops Concept of Operations (CONOPS) that integrate UAVs into CNO/Navy Vision of Sea Power 21 (Sea Shield, Sea Strike, Sea Basing, and FORCEnet). By providing fleet input based on current operations with UAVs in a simulated combat environment, this CONOPS development investment is the foundation of how the Carrier Strike Group will operate a combined Manned and Unmanned Naval Air Force. Specifically: - Demonstrates CONOPS and assesses manning requirements of a ship-based tactical UAV. - Leverages and assesses joint utility of Global Hawk Maritime Demonstration System and Predator integration into Expeditionary and Carrier Strike Group operations. - Demonstrates UAV integration into USN battlespace dominance operations and network centric warfare. - Demonstrates UAV integration into USN sensor-to-shooter and Sea Strike. - Supports development of Joint UAV CONOPS through ISR Time Sensitive Operations Joint Test and Evaluation (JTE). - Develops Intelligence, Surveillance, and Reconnaissance CONOPS in support of strike, Military Operations Other Than War (MOOTW), Anti-Air Warfare (AAW), Combat Search and Rescue (CSAR). - Demonstrates UAV cross-cueing capability with theater and strategic intelligence sources. - Develop Tactics, Techniques, and Procedures for multi- dissimilar UAV control, operations, and data dissemination utilizing NATO STANAG 4586. Exhibit R-2, RDTEN Budget Item Justification (Exhibit R-2, page 1 of 10)

EXHIBIT R-2a, RDT&E Project Justification COST ($ in Millions) FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 2467 UAV CONOPS Research 2.029 6.386 3.938 3.950 11.646 11.891 12.137 12.386 RDT&E Articles Qty A. MISSION DESCRIPTION AND BUDGET ITEM JUSTIFICATION: The Department of the Navy leadership is committed to Naval Unmanned Aerial Vehicles (UAVs) and to procuring an operational UAV capability as soon as possible. The Naval UAV Strategy employs a family of UAVs to perform tactical, persistent and penetrating ISR in support of Naval and Joint missions from forward bases and naval ships. In support of the Navy's overall UAV strategy, this program develops Concept of Operations (CONOPS) that integrate UAVs into CNO/Navy Vision of Sea Power 21 (Sea Shield, Sea Strike, Sea Basing, and FORCEnet). By providing fleet input based on current operations with UAVs in a simulated combat environment, this CONOPS development investment is the foundation of how the Carrier Strike Group will operate a combined Manned and Unmanned Naval Air Force. Specifically: - Demonstrates CONOPS and assesses manning requirements of a ship-based tactical UAV. - Leverages and assesses joint utility of Global Hawk Maritime Demonstration System and Predator integration into Expeditionary and Carrier Strike Group operations. - Demonstrates UAV integration into USN battlespace dominance operations and network centric warfare. - Demonstrates UAV integration into USN sensor-to-shooter and Sea Strike. - Supports development of Joint UAV CONOPS through ISR Time Sensitive Operations Joint Test and Evaluation (JTE). - Develops Intelligence, Surveillance, and Reconnaissance CONOPS in support of strike, Military Operations Other Than War (MOOTW), Anti-Air Warfare (AAW), and Combat Search and Rescue (CSAR). - Demonstrates UAV cross cueing capability with theater and strategic intelligence sources. - Develop Tactics, Techniques, and Procedures for multi- dissimilar UAV control, operations, and data dissemination utilizing NATO STANAG 4586. Exhibit R-2a, RDTEN Project Justification (Exhibit R-2a, page 2 of 10)

EXHIBIT R-2a, RDT&E Project Justification B. Accomplishments/Planned Program Accomplishments/Effort/Subtotal Cost 1.529 1.600 1.400 1.400 Naval Strike Warfare - Studies and Demonstrations for CONOPS development. Accomplishments/Effort/Subtotal Cost 0.500 0.300 JTE UAV Support. Accomplishments/Effort/Subtotal Cost 2.362 1.500 1.400 Standards Based - Develops NATO STANAG 4586 tool and validation capability to certify interoperability compliance. Conducts CONOPS studies for multiple dissimilar UAV interoperability. Exhibit R-2a, RDTEN Project Justification (Exhibit R-2a, page 3 of 10)

EXHIBIT R-2a, RDT&E Project Justification B. Accomplishments/Planned Program (Cont.) Accomplishments/Effort/Subtotal Cost 1.620 0.738 0.850 Shipboard CONOPS - Conducts CONOPS studies for data relay and weapons employment. Assesses manning requirements of ship based tactical UAV to identify manpower reduction opportunities. Accomplishments/Effort/Subtotal Cost 0.504 0.300 0.300 Program office travel, and contract support services. Accomplishments/Effort/Subtotal Cost Exhibit R-2a, RDTEN Project Justification (Exhibit R-2a, page 4 of 10)

EXHIBIT R-2a, RDT&E Project Justification C. PROGRAM CHANGE SUMMARY: Funding: Previous President's Budget: 2.029 6.448 3.906 3.903 Current BES 2.029 6.386 3.938 3.950 Total Adjustments 0.000-0.062 0.032 0.047 Summary of Adjustments Congressional program reductions Congressional undistributed reductions -0.060 Congressional rescissions SBIR/STTR Transfer Other -0.002-0.006-0.004 Economic Assumptions 0.038 0.051 Reprogrammings Congressional increases Subtotal 0.000-0.062 0.032 0.047 Schedule: In FY2004 4Q CVW-XX demonstration exercise was cancelled. Schedule reflects current planning through FY 2011. Technical: Not Applicable Exhibit R-2a, RDTEN Project Justification (Exhibit R-2a, page 5 of 10)

EXHIBIT R-2a, RDT&E Project Justification D. OTHER PROGRAM FUNDING SUMMARY: Not Applicable E. ACQUISITION STRATEGY: Not Applicable Exhibit R-2a, RDTEN Project Justification (Exhibit R-2a, page 6 of 10)

Exhibit R-3 Cost Analysis (page 1) APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT PROJECT NUMBER AND NAME Cost Categories Contract Performing Total FY 05 FY 06 FY 07 Method Activity & PY s FY 05 Award FY 06 Award FY 07 Award Cost to Total Target Value & Type Location Cost Cost Date Cost Date Cost Date Complete Cost of Contract Primary Hardware Development 0.000 Ancillary Hardware Development 0.000 Aircraft Integration 0.000 Shipboard Integration C/TBD TBD 0.800 02/05 0.200 12/05 0.200 12/06 0.000 1.200 1.200 Ship Suitability 0.000 Systems Engineering Test Tool WX NAWCAD, Pax River, MD 0.362 12/04 0.300 12/05 0.200 12/06 0.862 Training Development 0.000 Licenses 0.000 Tooling 0.000 GFE 0.000 Award Fees 0.000 Subtotal Product Development 0.000 1.162 0.500 0.400 0.000 2.062 Remarks: Development Support WX NSAWC, Fallon, NV 1.600 12/04 1.400 12/05 1.400 12/06 Continuing Continuing Software Interoperability C/CPAF Raytheon, Falls Church, Va 1.500 03/05 0.800 12/05 0.800 12/06 0.000 3.100 3.100 Integrated Logistics Support 0.000 Configuration Management 0.000 Technical Data 0.000 Studies & Analyses 0.000 GFE 0.000 Award Fees 0.000 Subtotal Support 0.000 3.100 2.200 2.200 Continuing Continuing Remarks: Exhibit R-3, Project Cost Analysis (Exhibit R-3, page 7 of 10)

Exhibit R-3 Cost Analysis (page 2) APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT PROJECT NUMBER AND NAME Cost Categories Contract Performing Total FY 05 FY 06 FY 07 Method Activity & PY s FY 05 Award FY 06 Award FY 07 Award Cost to Total Target Value & Type Location Cost Cost Date Cost Date Cost Date Complete Cost of Contract Developmental Test & Evaluation WX JUAV, Vicksburg, MS 0.500 0.300 12/04 0.800 Operational Test & Evaluation 0.000 Live Fire Test & Evaluation 0.000 Interoperability Testing MP JTC/SIL Huntsville, AL 0.500 12/04 0.400 12/05 0.400 12/06 1.300 Tooling 0.000 GFE 0.000 Award Fees 0.000 Subtotal T&E 0.500 0.800 0.400 0.400 0.000 2.100 Remarks: Contractor Engineering Support 0.000 Government Engineering Support WX NAWCAD Pax River 1.529 0.820 12/04 0.538 11/05 0.650 11/06 3.537 Program Management Support WX NAWCAD Pax River 0.454 12/04 0.250 11/05 0.250 11/06 Continuing Continuing Travel WX NAWCAD Pax River 0.050 12/04 0.050 11/05 0.050 11/06 Continuing Continuing Transportation 0.000 SBIR Assessment 0.000 Subtotal Management 1.529 1.324 0.838 0.950 Continuing Continuing Remarks: Total Cost 2.029 6.386 3.938 3.950 Continuing Continuing Remarks: Exhibit R-3, Project Cost Analysis (Exhibit R-3, page 8 of 10)

CVX-X EXHIBIT R4, Schedule Profile Fiscal Year 2004 2005 2006 2007 2008 2009 2010 2011 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 Acquisition Milestones Desert Desert CVW-XX Desert Desert Desert Test & Evaluation CVW- CVW-XX Rescue Rescue Desert Rescue CVW-XX Rescue CVW-XX Desert Rescue Milestones 17 CVW-XX CVW-XX CVW-XX Rescue CVW-XX Rescue CVX-XX LGB CVW-XX CVW-XX CVW-XX CVW-XX Operational Test TAC CVW-14 CVW-XX CVW-XX CVW-XX CVW-XX (Planning Schedule) D&E CVW-XX CVW-XX CVW-XX CVW-XX CVX-XX CVW-XX CVW-XX CVX-XX CVX-XX CVW-3 CVW-XX Tactics Development and Evaluation Standards Based Interoperability Shipboard CONOPS Exhibit R-4, Schedule Profile (Exhibit R-4, page 9 of 10)

UNCLASSFIED Exhibit R-4a, Schedule Detail APPROPRIATION/BUDGET ACTIVITY PROGRAM ELEMENT PROJECT NUMBER AND NAME RDT&BA-4 0603261N Tactical Airborne Reconnaissance 2467 UAV CONOPS Schedule Profile FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Carrier Air Wing Test & Evaluation CVW-14 2Q CVW-17 3Q CVW-3 3Q CVW-XX (TBD) 1Q-4Q 1Q-4Q 1Q-4Q 1Q-4Q 1Q-4Q 1Q-4Q 1Q-4Q Desert Rescue (Joint Search & Rescue): Desert Rescue # (TBD) 4Q 4Q 4Q 4Q 4Q 4Q 4Q Tactics Development & Evaluation: Standards Based Interoperability 1Q-4Q 1Q-4Q 1Q-4Q 1Q-4Q 1Q-4Q Shipboard CONOPS 1Q-4Q 1Q-4Q 1Q-4Q 1Q-4Q 1Q-4Q Exhibit R-4a, Schedule Detail (Exhibit R-4a, page 10 of 10)