OPPORTUNITIES IN THE CONTINUING AUTHORITIES PROGRAM AND PLANNING

Similar documents
Update on USACE Civil Works Program Authorities, Policies, and Guidance

Planning for the Beneficial Use of Dredged Material: A Success Story in Mississippi and an Opportunity in Texas

Civil Works Process Overview

Sabine Pass to Galveston Bay, Texas

Public Information Meeting Rahway River Basin, New Jersey Flood Risk Management Feasibility Study

CURRENT AND FUTURE STUDIES

SUBJECT: South Atlantic Division Regional Programmatic Review Plan for the Continuing Authorities Program

Planning Modernization & WRRDA Implementation

King County Flood Control District 2017 Work Program

CHESAPEAKE BAY COMPREHENSIVE WATER RESOURCES AND RESTORATION PLAN

U.S. Army Corps of Engineers Navigation Program Update

PONCE DE LEON INLET MANAGEMENT STUDY IMPLEMENTATION PLAN CERTIFICATE OF ADOPTION

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

PUBLIC NOTICE. Attn: Mr. Christopher Layton 1200 Duck Road Duck, North Carolina CB&I 4038 Masonboro Loop Road Wilmington, North Carolina 28409

APPENDIX J FUNDING SOURCES

TEXOMA Same Conference

Are You Planning Work in a Waterway Or Wetland?

DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA JANUARY 25, 2017

Building and Preserving Alaska s Future

Public Notice U.S. ARMY CORPS OF ENGINEERS, GALVESTON DISTRICT AND TEXAS COMMISSION ON ENVIRONMENTAL QUALITY

PUBLIC NOTICE. Town of Ocean Isle Beach Attn: Ms. Debbie Smith, Mayor 3 West Third Street Ocean Isle Beach, North Carolina 28469

CESAM-RD-M May 2, 2013 PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS MOBILE DISTRICT

PUBLIC NOTICE Application for Permit

SUMMARY REPORT. OPERATIONS and MAINTENANCE PLANS and CRITERIA. HOUSATONIC RIVER and NAUGATUCK RIVER FLOOD PROTECTION PROJECTS SECTION 1

Hurricane Sandy Coastal Resiliency Competitive Grants Program

Corps Regulatory Program Update

U.S. Army Corps of Engineers PHILADELPHIA DISTRICT

Lisa Mangione is a Senior Regulatory Project Manager with the Army Corps of Engineers Los Angeles District. She has over 25 years of professional

DEPARTMENT OF THE ARMY GENERAL PERMIT

The Role of the U.S. Army Corps of Engineers in Brownfield Redevelopment

DEPARTMENT OF THE ARMY ER U.S. Army Corps of Engineers CECW-P Washington, DC Regulation No February 2016

FY 2018 Watershed-Based Funding Pilot Program Policy

Pawleys Island Nourishment Project

DEPARTMENT OF THE ARMY OFFICE OF THE ASSISTANT SECRETARY CIVIL WORKS 108 ARMY PENTAGON WASHINGTON DC

jobs program earmark ban

Submitted by: Toby Baker, Commissioner Texas Commission on Environmental Quality

CITY OF LAREDO Environmental Services Department

AUG JOINT PUBLIC NOTICE Savannah District/State of Georgia

ADVANCED PLANNING BRIEF FOR INDUSTRY ABERDEEN PROVING GROUND, MD

PASPGP-5 REPORTING CRITERIA CHECKLIST

US Army Corps of Engineers Periodic Inspection Report 9 Update. Dallas City Council June 3, 2009

TOWN OF GREENWICH Annual Department Operational Plan (FY )

Restoration of the Mississippi River Delta in a Post-BP Oil Spill Environment

Navigation Approach to 408 Guidance

Programmatic General Permit (18-PGP-01) Effective Date: XXXXXX Expiration Date: XXXXXXX

Panel Decision & Report. SRP MAPC Plymouth County, MA

PUBLIC NOTICE.

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 1590 ADAMSON PARKWAY, SUITE 200 MORROW, GEORGIA FEB O

1. Introduction..3 a. Purpose of This Procedural Review Plan...3 b. Description and Information...3 c. References...3

DEPARTMENT OF THE ARMY PERMIT

Implementing the Water Resources Development Act of 2007

BALTIMORE DISTRICT PROGRAM OVERVIEW

STATE ENVIRONMENTAL REVIEW PROCESS FOR PENNSYLVANIA WASTEWATER PROJECTS. Clean Water State Revolving Fund Program

Project Engineering Peer Review Within The U.S. Army Corps Of Engineers

Jacksonville Harbor Deepening

New Orleans Hurricane and Storm Damage Risk Reduction System Update

LAKE ST. CATHERINE POULTNEY & WELLS, VERMONT

Submitted by: Toby Baker, Commissioner Texas Commission on Environmental Quality

Department of Army Permit Evaluation Process

Maximizing Hazard Mitigation Grant Funds for Post Irma Recovery. Florida Hospital Association. Thursday, February 22, 2018 WELCOME!

Alabama Coastal Area Management Program Strategic Plan

CHACON CREEK LAREDO, TEXAS Project Review Plan Independent Technical Review

DEPARTMENT OF THE ARMY US ARMY CORPS OF ENGINEERS SOUTH ATLANTIC DIVISION 60 FORSYTH STREET SW, ROOM 10M15 ATLANTA, GA

July 5, JOINT PUBLIC NOTICE Savannah District/State of Georgia

Engineer Circular Requests to Alter USACE Projects

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

U.S. ARMY CORPS OF ENGINEERS

Prepared for CITY OF STAGECOACH Boot Hill Road Stagecoach, Texas 77355

Beach Segment III Coastal Dune Restoration Grant Program

INDIAN RIVER LAGOON NATIONAL ESUARY PROGRAM FY WORK PLAN REQUEST FOR PROPOSAL

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA September 21, 2018

PUBLIC NOTICE Application for Permit

Public Notice NOTICE ANNOUNCING MINOR MODIFICATIONS TO THE LETTER OF PERMISSION AUTHORIZING TRANSPORATION PROJECTS

What is MITIGATION? An action that reduces or eliminates long-term risk to people and property from natural hazards and their effects.

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, PORTLAND DISTRICT P.O. BOX 2946 PORTLAND, OREGON August 9, 2016

Georgia Environmental Conference

5/25/2017 FUNDING STORMWATER PROJECTS OVERVIEW PROJECT FUNDING BRIDGE KNOWN PROBLEMS KNOWN SOLUTIONS

DEPARTMENT OF THE ARMY NEW ORLEANS DISTRICT, CORPS OF ENGINEERS P. O. BOX NEW ORLEANS, LOUISIANA August 25, 2014 PUBLIC NOTICE

Determining Residual Flood Risk Associated with a

WATER SUPPLY CHALLENGES: THE ACF CASE

BOROUGH OF STONE HARBOR CRS ACTIVITY 510. Progress Report on Hazard Mitigation Initiatives

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 1590 ADAMSON PARKWAY, SUITE 200 MORROW, GEORGIA FEB-f

DELAWARE COUNTY COMPREHENSIVE EMERGENCY MANAGEMENT PLAN RISK REDUCTION

San Jacinto River Authority. Board of Directors Meeting June 28, 2018

REVIEW PLAN SAIPAN LAGOON AQUATIC ECOSYSTEM RESTORATION STUDY SAIPAN, COMMONWEALTH OF THE NORTHERN MARIANA ISLANDS (CNMI)

est.pdf

DEPARTMENT OF THE ARMY U.S. ARMY ENGINEER DIVISION, GREAT LAKES AND OHIO RIVER CORPS OF ENGINEERS 550 MAIN STREET CINCINNATI, OH

The purpose of the presentation is to provide an overview of the changes that occurred between the Pennsylvania State Programmatic General Permit-4

NATIONAL WATERWAYS CONFERENCE, WASHINGTON, D.C. MARCH 5-7, 2018

DAM AND LEVEE SAFETY

Distribution Restriction Statement Approved for public release; distribution is unlimited.

How to Plan a Water Resources Project With the US Army Corps of Engineers: A Guide for Tribal Governments

DEPARTMENT OF THE ARMY SAVANNAH DISTRICT, CORPS OF ENGINEERS 100 WEST OGLETHORPE AVENUE SAVANNAH, GEORGIA

November 20, 2017 PUBLIC NOTICE

DEPARTMENT OF THE ARMY CORPS OF ENGINEERS, NEW ORLEANS DISTRICT 7400 LEAKE AVE NEW ORLEANS LA September 17, 2018 PUBLIC NOTICE

DEPARTMENT OF THE ARMY U.S. ARMY CORPS OF ENGINEERS, SAVANNAH DISTRICT 100 W. OGLETHORPE AVENUE SAVANNAH, GEORGIA September 21, 2018

CHICAGO AREA WATERWAY SYSTEM (CAWS) DREDGED MATERIAL MANAGEMENT PLAN

PENNSYLVANIA STATE PROGRAMMATIC GENERAL PERMIT-4 STANDARD OPERATING PROCEDURES. June 5, 2014

University of North Texas Libraries

Transcription:

OPPORTUNITIES IN THE CONTINUING AUTHORITIES PROGRAM AND PLANNING 237 217 200 80 252 237 217 200 119 174 ASSISTANCE 237 217 TO 200 STATES 27 PROGRAM.59 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 102 56 48 130 120 111 1 Presenter: Andrew Weber, PE SWG Winter 2018 Stakeholder Partnering Forum February 27, 2018 The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.

PURPOSE 2 To inform current partners & stakeholders of opportunities to partner with USACE through the Continuing Authorities Program or Planning Assistance to States Program Program outreach

PRESENTATION OUTLINE 3 The Continuing Authorities Program What is it? How does it work? Past examples Planning Assistance to States What is it? How does it work? Past example Questions

CONTINUING AUTHORITIES PROGRAM (CAP) DEFINITION AND PURPOSE 4 The Continuing Authorities Program establishes a process by which the Corps of Engineers can respond to a variety of water resource problems without specific Congressional authorization for each project. These Projects: Have limited scope and complexity Have established Federal Costs limits Are implemented quickly Do not compete with GI for prioritization Federal funding limits range from $500,000 to $10 million. Funds administered at USACE HQ. Projects are cost shared with the Non-federal Sponsor File Name

CAP AUTHORITIES Program Authority Description Federal Limit Per Project Section 14 Emergency stream bank and shoreline protection for public facilities, such as roads, bridges, hospitals, schools, and water & sewage treatment plants, that are in imminent danger of failing. $5M Protection of public and private properties and facilities against damages caused by storm driven Section 103 waves and currents by the construction of revetments, groins, and jetties and may also include periodic sand replenishment. $5M Section 107 Improvements to navigation including dredging of channels and widening of turning basins. $10M Section 111 Prevention of mitigation of erosion damages to public or privately owned shores along the coastline when the damages are a result of a Federal navigation project. $10M Section 204 Regional Sediment Management and beneficial uses of dredged material from new or existing Federal projects for ecosystem restoration, FRM or HSDR purpose. $10M Local protection form flooding by non-structural measures such as flood warning systems, or flood Section 205 proofing; or by structural flood damage reduction features such as levees. Diversion channels, or impoundments. $10M Section 206 Aquatic ecosystem restoration. $10M Section 208 Local protection from flooding by channel clearing and excavation, with limited embankment construction by uses of materials from the clearing operation only. $500K Modification of USACE constructed water resources projects to improve the quality of the Section 1135 environment. Also, restoration projects at locations where an existing Corps project contributed to the degradation. $10M 5 File Name

6 CAP PROCESS Feasibility Phase Formulate alternatives Initially federally funded up to $100,000. Remaining feasibility phase costs shared 50/50 with non- Federal sponsor. Design and Implementation Phase. Detailed design & construction Cost Shared. Varies. (Typical: 65% Federal / 35% Non-Federal) Where applicable, the NFS provides all necessary lands, easements, rights-of-way, access routes and relocation of utilities. Costs associated with these items may be creditable towards the non-federal cash contribution for the project. Operations and Maintenance 100% Non-federal (except section 107) File Name

STANDARD USACE PROJECT PROCESS 7 Congressional Authorization New Start Congressional Authorization (e.g. WRRDA) Non-Federal Responsibility STUDY DESIGN BUILD MAINTAIN Local or State Cost Sharing Sponsor Congressional Appropriations Typical Study Parameters: -Cost: $3M (50/50 split with local sponsor) -Schedule: 3 Years

CAP PROJECT PROCESS 8 CORDINATION PHASE (100% FEDERAL) Receive Letter of Intent Initial Site Visits/Data Collection (5 Days) CAP Federal Interest Determination (6 Weeks) Project management Plan (SOW) (4-6 Weeks) FEASIBILITY PHASE (FEAS>$100K 50/50 COST SHARE) Feasibility Cost Share Agreement (90-120 Days) FEAS Scoping Meeting (FSM) (60-90 days after FCSA) FEAS Checkpoint Meeting MSC Decision Milestone/Alternative Formulation Briefing (AFB) (90 Days) Approval of Final CAP Decision Document (90 days after AFB) Project Partnership Agreement (PPA) Execution (90-150 Days) Total Project Delivery: 3-5 Years DESIGN & IMPLEMENTAION PHASE (65/35 Cost Share) Plans & Specs Development (150 Days) Reviews of P&S (60 Days) Advertise Contract (30 Days) Award Contract (60 days after Advertise Contract) Supervision & Aministration (Contract Duration) Project CLose Out (90 Days) File Name

9 CAP: GETTING STARTED Non-Federal Sponsor: -Must be a public agency -State or local government, or division thereof, ex. port, utility district, etc -For Environmental Restoration, can be non-profit organization Letter of Intent Official request for assistance. Includes: Specific Authority -- Statement of understanding of financial requirement Describes the proposed project Non-binding Federal Actions Site Visit Request for funding NO NEW STARTS WHILE UNDER CONTINUING RESOLUTION File Name

BIPARTISAN BUDGET ACT OF 2018 10 not less than $10,425,000,000 shall be available for such projects within States and insular areas that were impacted by Hurricanes Harvey, Irma, and Maria up to $50,000,000 of the funds made available under this heading shall be used for continuing authorities projects to reduce the risk of flooding and storm damage That using funds provided under this heading, the non-federal cash contribution for projects eligible for funding pursuant to the first proviso shall be financed over a period of 30 years from the date of completion of the project

11 MCCORMICK WASTEWATER TREATMENT PLANT Section 14 Erosion Protection Status: Beginning Feasibility Erosion: Has compromised outfall pipe Continues to progress towards WWTP Total Project Cost: $??? Non-Federal Cost: $???

LYNCHBURG PUMP STATION HFPS 12 Section 205 Flood Risk Management Status: Complete New Hurricane Flood Protection System -955 feet of earthen levee -1139 feet of floodwall Total Project Cost: $7,264,000 Non-Federal Cost: $2,974,000

RESACAS BLVD BROWNSVILLE, TEXAS 13 Section 206 Aquatic Ecosystem Restoration Status: Ongoing Eradicate Invasive Species Limited civil earthwork Planting of Native Species Estimated Total Project Cost: $1,277,000 Estimated Non-Federal Cost: $484,000

UNIVERSITY OF TEXAS MARINE SCIENCE INSTITUTE 14 Section 206 Aquatic Ecosystem Restoration Status: Complete Wetland Restoration 2.6 acres 1600 LF of sand dunes Total Project Cost: $2,835,000 Non-Federal Cost: $955,124

BESSIE HEIGHTS MARSH RESTORATION 15 Section 204 Beneficial Use of Dredge Material Status: Complete 71 acres of estuarine marsh Total Project Cost: $1,148,000 Non-Federal Cost: $284,000

16 PLANNING ASSISTANCE TO STATES PROGAM (PAS) DEFINITION AND PURPOSE Corps assistance is authorized by Section 22 of the Water Resource Development Act of 1974 (P.L. 93-251), as amended, also referred to as Planning Assistance to States (PAS) program. Studies completed under this program include flood inundation mapping, dam safety and failure modeling, water supply and demand analysis, water quality assessments, environmental restoration concepts, flood damage reduction assessments, wetlands delineation and biological assessments. Studies under this program are cost shared. The sponsor has the option of providing its required 50 percent of study costs as cash or through work-in-kind. Typical study: $100K to $300K 1 Year File Name

17 PLANNING ASSISTANCE TO STATES (PAS), CONT. PAS Process Begins with letter requesting assistance under Section 22. Coordinate with USACE to develop SOW. Cost Sharing Letter agreement prepared and signed. Study commences, subject to availability of funding from both USACE and local sponsor. File Name

18 GALVESTON SAND MANAGEMENT STUDY PAS Study Status: Ongoing Scope Evaluate Sand Back-passing Technologies Recommend Erosion Control Measures Total Study Cost: $300,000 Non-Federal Cost: $50,000 Cash $100,000 WIK

BRAZOS RIVER EROSION MANAGEMENT STUDY 19 PAS Study Status: Complete Scope Hydraulic Modeling Sediment Transport Modeling Geomorphological Study Streambank Erosion Protection Alternatives Total Study Cost: $280,000 Non-Federal Cost: $140,000 WIK

PORT OF LIBERTY, LONG TERM DEVELOPMENT PLAN 20 PAS Study Status: Complete Scope Sedimentation Analysis Alternative Expansion Analysis Evaluate Potential Impacts to: Cultural Resource Environmental Resources Total Study Cost: $200,000 Non-Federal Cost: $100,000 WIK

21 QUESTIONS? Andrew Weber, P.E. Project Manager US Army Corps of Engineers Galveston District Andrew.weber@usace.army.mil 409-766-3118(o) 409-526-8879(m) File Name