UNCLASSIFIED R-1 ITEM NOMENCLATURE

Similar documents
UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Weapons and Munitions - Eng Dev

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 21 R-1 Line #102

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Counter Narcotics Technology Program Office

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Biometrics Enabled Intelligence FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. Cost To Complete Total Program Element : Hard Target Void Sensing Fuze.

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. Cost To Complete Total Program Element ED8: Paladin Integrated Management (PIM)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: 468

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #44

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. Cost To Complete Total Program Element JA6: Joint Air-To-Ground Missile (JAGM)

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 11 R-1 Line #92

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: FIREFINDER FY 2012 OCO

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 8 R-1 Line #124

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Surface Ship Torpedo Defense FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Multi-Platform Electronics

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Landmine Warfare/Barrier - Eng Dev FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Combat Identification FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Soldier Systems - Warrior Dem/Val

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: ARMY INTEGRATED AIR AND MISSILE DEFENSE (AIAMD) FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Joint Air-to-Ground Missile (JAGM) FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: National Security Space Office

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / NAVSTAR Global Positioning System (User Equipment) (SPACE) Prior Years FY 2013 FY 2014

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Indirect Fire Protection Capability Increment 2-Intercept (IFPC2)

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Army Integ Military Human Resources Sys (A-IMRS)

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #47

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Combat Survivor Evader Locator. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: JOINT PERSONNEL RECOVERY AGENCY (JPRA)

UNCLASSIFIED. Cost To Complete Total Program Element S750: Mission Training and Preparation Systems FY 2015

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: 493

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: NUCLEAR WEAPON MODERNIZATION FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 R-1 Line #208

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #79

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. R-1 Program Element (Number/Name) PE BB / SOF Visual Augmentation, Lasers and Sensor Systems. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Integrated Personnel and Pay System-Army (IPPS-A) Prior Years FY 2013 FY 2014 FY 2015

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 R-1 Line #174

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 20 R-1 Line #37

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED UNCLASSIFIED

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 8 R-1 Line #77

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: SOF Underwater Systems

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Transcription:

Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 Total FY 214 FY 215 FY 216 FY 217 To Complete Total Total Program Element 25.99 13.815 14.581-14.581 18.943 14.38 14.522 14.767 Continuing Continuing AS5: Artillery Munitions Engineering elopment 1.3 - - - - - - - - Continuing Continuing 14.799 13.815 14.581-14.581 18.943 14.38 14.522 14.767 Continuing Continuing Note FY 211: $9. million Congressional decrement. $1.3 million increase from FY11-25PA reprogramming action. A. Mission Description and Budget Item Justification This program element funds engineering development of precision guidance systems applicable to Indirect Fire artillery weapon systems. The Precision Guidance Kit (PGK) is a Global Positioning Guidance Kit with fuzing functions. PGK will improve the accuracy of existing artillery ammunition by correcting the trajectory of projectiles to their designated target location. Precision guidance systems will effectively reduce target delivery error, reducing the number of rounds required to conduct a fire mission. B. Program Change Summary ($ in Millions) FY 211 FY 212 Total Previous President's Budget 24.345 13.828 14.424-14.424 Current President's Budget 25.99 13.815 14.581-14.581 Total Adjustments.754 -.13.157 -.157 Congressional General Reductions - - Congressional Directed Reductions - - Congressional Rescissions - - Congressional Adds - - Congressional Directed Transfers - - Reprogrammings 1.3 - SBIR/STTR Transfer -.456 - Adjustments to Budget Years - -.13.157 -.157 Other Adjustments 1-9. - - - - Other Adjustments 2 -.9 - - - - Army Page 1 of 1 R-1 Line #19

Exhibit R-2A, RDT&E Project Justification: PB 213 Army DATE: February 212 COST ($ in Millions) AS5: Artillery Munitions Engineering elopment Quantity of RDT&E Articles Note Not applicable for this item. FY 211 FY 212 A. Mission Description and Budget Item Justification This program in FY11 funds the following as a result of FY11-25PA: Army Page 2 of 1 R-1 Line #19 AS5: Artillery Munitions Engineering elopment Total FY 214 FY 215 FY 216 FY 217 To Complete Total 1.3 - - - - - - - - Continuing Continuing $1. million to develop an efficient way to safely destroy buried Insensitive High Explosive (IHE) munitions. With the increasing deployment of Insensitive Munitions (IM) explosives there is an immediate need to develop an efficient and reliable method of IM neutralization. Current procedures are expensive and expose the soldier to unnecessary risk as the amount of C4 used for disposal does not always succeed at neutralizing its target. The improved 66MM shaped charge will be designed to penetrate munitions walls and dispose of the IM explosive fill utilizing minimal C4. This is funding. This is an acceleration of an FY 212 requirement. $9.3 million to accelerate the development of prototypes, in-house testing, development engineering support, verification of hardware and software, and conduct warfighter demonstrations. This effort specifically includes Molecular Imprinted Polymers (MIPs) for explosive compound and explosive precursor detection, which are being used by Insurgents to make Homemade Explosives (HME), and Picatinny Optics Detection System (PODS). This is in direct support of JUONs CC-325 and CC-416 respectively. This is an acceleration of an FY 212 requirement. This is funding. B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) FY 211 FY 212 Title: Picatinny Optical Detection System (PODS 2.1) Articles: Description: "Picatinny Optical Detection System (PODS 2.1)" for $7.1M - Deliverables include: five surrogate systems for software development, environmental testing, user training, and ATEC safety evaluation; and approximately 5 prototypes ready for in-theatre operational assessment. FY 211 Accomplishments: "Picatinny Optical Detection System (PODS 2.1)" for $7.1M - Deliverables include: five surrogate systems for software development, environmental testing, user training, and ATEC safety evaluation; and approximately 5 prototypes ready for intheatre operational assessment. 7.1 - - Title: Molecularly Imprinted Polymers (MIPs) 2.2 - -

Exhibit R-2A, RDT&E Project Justification: PB 213 Army DATE: February 212 AS5: Artillery Munitions Engineering elopment B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) FY 211 FY 212 Articles: Description: "Molecularly Imprinted Polymers (MIPs) Army FY12 RDTE" for $2.2M - Deliverables include: formulation samples; formulation demonstrations; polymer acceptance test plan; polymer product specifications; prototypes for wipes, sprays, trace collection wipes for each polymeric solution developed; and testing of prototypes at NAVEOD. FY 211 Accomplishments: "Molecularly Imprinted Polymers (MIPs) Army FY12 RDTE" for $2.2M - Deliverables include: formulation samples; formulation demonstrations; polymer acceptance test plan; polymer product specifications; prototypes for wipes, sprays, trace collection wipes for each polymeric solution developed; and testing of prototypes at NAVEOD. Title: 66mm Hand-Packable Shape Charge for EOD Applications Articles: Description: "66mm Hand-Packable Shape Charge for EOD Applications" for $1.M- Deliverables include: modeling and simulation results for 4 IHE lumpy liner designs; verification Test Report of the final lumpy design against M17 projectiles; and 4 physical Prototypes of the counter-im lumpy liner shaped charge. 1. - - FY 211 Accomplishments: "66mm Hand-Packable Shape Charge for EOD Applications" for $1.M- Deliverables include: modeling and simulation results for 4 IHE lumpy liner designs; verification Test Report of the final lumpy design against M17 projectiles; and 4 physical Prototypes of the counter-im lumpy liner shaped charge. C. Other Program Funding Summary ($ in Millions) N/A D. Acquisition Strategy Not applicable for this item. Accomplishments/Planned Programs Subtotals 1.3 - - E. Performance Metrics Performance metrics used in the preparation of this justification material may be found in the FY 21 Army Performance Budget Justification Book, dated May 21. Army Page 3 of 1 R-1 Line #19

Exhibit R-2A, RDT&E Project Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 Total FY 214 FY 215 FY 216 FY 217 To Complete Total 14.799 13.815 14.581-14.581 18.943 14.38 14.522 14.767 Continuing Continuing Quantity of RDT&E Articles A. Mission Description and Budget Item Justification This program funds engineering development of precision guidance systems applicable to Indirect Fire artillery weapon systems. The Precision Guidance Kit (PGK) is a Global Positioning System Guidance Kit with fuzing functions. PGK will improve the accuracy of existing artillery ammunition by correcting the trajectory of projectiles to their designated target location. Precision guidance systems will effectively reduce target delivery error reducing the number of rounds required to conduct a fire mission. B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) FY 211 FY 212 Title: or Engineering and Manufacturing elopment Description: or Engineering and Manufacturing elopment Articles: 1.35 6.934 5.415 FY 211 Accomplishments: or Engineering and Manufacturing elopment FY 212 Plans: or Engineering and Manufacturing elopment Plans: Engineering and Manufacturing elopment Title: Government Engineering Support Articles: 3.483 4.643 4.526 Description: Continue Engineering Support FY 211 Accomplishments: Continue Engineering Support FY 212 Plans: Continue Engineering Support Plans: Army Page 4 of 1 R-1 Line #19

Exhibit R-2A, RDT&E Project Justification: PB 213 Army DATE: February 212 B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) FY 211 FY 212 Continue Engineering Support Title: Continue elopment/operational Testing Description: Continue elopment/operational Test Articles:.966 2.238 4.64 FY 211 Accomplishments: Continue elopment/operational Test FY 212 Plans: Continue elopment/operational Test Plans: Continue elopment/operational Test Accomplishments/Planned Programs Subtotals 14.799 13.815 14.581 C. Other Program Funding Summary ($ in Millions) Line Item FY 211 FY 212 Total FY 214 FY 215 FY 216 FY 217 To Complete Total E9925: Procurement of Ammunition Army: Precision Guidance Kit (PGK) E9925.47 37.952 37.952 69.176 7.8 55.796 Continuing Continuing D. Acquisition Strategy The Precision Guidance Kit (PGK) program is using an incremental development approach to provide a combat capability to the Soldier as quickly as possible, and to deliver advanced capabilities at lower costs as technology matures. The Acquisition Strategy/Acquisition Plan for the PGK Increment 1 program was approved by the Milestone Decision Authority (MDA) on 2 October 25, subsequently revised and approved on 5 March 29. Alliant Techsystems (ATK) was competitively awarded the Engineering and Manufacturing elopment (EMD) phase in May 27 following a Technology elopment Demonstration. Approval to initiate the procurement of First Article/Production Verification Test (FAT/PVT) hardware occurred at Milestone C In-Process Review (IPR) 3Q FY 29. The FAT/PVT hardware was procured in 3Q FY 21. However, Milestone C/Type Classification Limited Procurement was delayed due to reliability growth challenges that required failure and root cause analysis that led to the restructure of the PGK Engineering and Manufacturing elopment program and subsequent implementation of a reliability design improvement corrective action plan. As a result, Milestone C is planned for 2Q and Initial Operational Capability (IOC) of Increment 1 is scheduled for 3Q FY 214. Following the Increment 1 Milestone C decision, a follow-on development effort is planned to make PGK compatible with future high explosive projectiles that contain a high explosive Insensitive Munition fill. Army Page 5 of 1 R-1 Line #19

Exhibit R-2A, RDT&E Project Justification: PB 213 Army DATE: February 212 E. Performance Metrics Performance metrics used in the preparation of this justification material may be found in the FY 21 Army Performance Budget Justification Book, dated May 21. Army Page 6 of 1 R-1 Line #19

Exhibit R-3, RDT&E Project Analysis: PB 213 Army DATE: February 212 Management Services ($ in Millions) Category Item Management Support Miscellaneous Support Analysis Support Method & Type Various Various Product elopment ($ in Millions) Category Item PGK TD Method & Type C/CPIF Performing Activity & Location Camber:Mt Arlington, NJ MITRE Corporation:Fort Monmouth, NJ Command and Control Directorate:Ft Monmouth, NJ Performing Activity & Location Alliant Techsystems (ATK):Plymouth, MN Total Prior Years FY 212 Total To Complete Total Target Value of 1.597.243.61 -.61. 1.91 1.91.6 - - - -..6.6.3 - - - -..3.3 Subtotal 2.497.243.61 -.61. 2.81 2.81 Total Prior Years FY 212 Total To Complete Total Target Value of 5.279 - - - -. 5.279 5.279 PGK TD C/CPIF BAE:Minneapolis, MN 3.13 - - - -. 3.13 3.13 Soft Recovery Modules M17 Metal Parts PGK EMD & Phase 1-2 (Reliability Failure/Root Cause Analysis) PGK EMD - Phase 3a to 5 C/CPAF C/FFP SubSystems Technology:Rosslyn, VA US ARMY Field Support Command:Rock Island, IL Alliant Techsystems (ATK):Plymouth, MN Alliant Techsystems (ATK):Plymouth, MN.116 - - - -..116.116.79 - - - -..79.79 53.947 - - - -. 53.947 53.947 14.9 6.934 1.16-1.16. 22.184 22.184 PGK Insensitive Munitions C/FFP TBD:TBD - - 4.255-4.255 18.857 23.112 23.112 Subtotal 76.614 6.934 5.415-5.415 18.857 17.82 17.82 Army Page 7 of 1 R-1 Line #19

Exhibit R-3, RDT&E Project Analysis: PB 213 Army DATE: February 212 Support ($ in Millions) Category Item Method & Type Performing Activity & Location Total Prior Years FY 212 Total To Complete Total PM Office PO PM CAS:Picatinny, NJ 7.995.725.735 -.735 1.51 1.965 1.965 Government Engineering Support Test and Evaluation ($ in Millions) Category Item Component Air Gun/Railgun Testing Target Value of PO ARDEC:Picatinny, NJ 21.99 3.675 3.73-3.73 5.16 34.555 34.555 Method & Type Performing Activity & Location Subtotal 29.985 4.4 4.465-4.465 6.67 45.52 45.52 Total Prior Years FY 212 Total To Complete Total Target Value of PO ARDEC:Picatinny, NJ.317 - - - -..317.317 Other elopment Testing Various Various:Various 1.359 - - - -. 1.359 1.359 System elopment Testing Increment 1 Initial Operational Test & Evaluation - Increment 1 Qualification Testing for Insensitive Munitions Cold Region Testing - Increment 1 Remarks Yuma Proving Ground:Yuma, AZ Yuma Proving Ground:Yuma, AZ Yuma Proving Ground:Yuma, AZ Cold Region Test Center:Ft Greely, AK 7.784 2.238.69 -.69 3.68 13.78 13.78 - - 3.5-3.5. 3.5 3.5 - - - - - 3.95 3.95 3.95 - -.45 -.45..45.45 Subtotal 9.46 2.238 4.64-4.64 7.18 23.356 23.356 Total Prior Years FY 212 Total To Complete Total Target Value of Project Totals 118.556 13.815 14.581-14.581 32.545 179.497 179.497 Army Page 8 of 1 R-1 Line #19

Exhibit R-4, RDT&E Schedule Profile: PB 213 Army DATE: February 212 Insensitive Munitions elopment Milestone C - Type Classification Limited Procurement First Article Test (FAT) Initial Operational Test and Evaluation (IOT&E) Type Classification Standard / Full Materiel Release IOC FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 Army Page 9 of 1 R-1 Line #19

Exhibit R-4A, RDT&E Schedule Details: PB 213 Army DATE: February 212 Schedule Details Start End Events Quarter Year Quarter Year Insensitive Munitions elopment 3 213 4 215 Milestone C - Type Classification Limited Procurement 2 213 2 213 First Article Test (FAT) 2 213 2 213 Initial Operational Test and Evaluation (IOT&E) 4 213 4 213 Type Classification Standard / Full Materiel Release 3 214 3 214 IOC 3 214 3 214 Army Page 1 of 1 R-1 Line #19