Methodology for Implementation of Grid Connected Rooftop Solar Projects in the state of Maharashtra

Similar documents
Open Category Applicants

New and Renewable Energy Department Government of Madhya Pradesh

Request for Empanelment (RFE) of. Facilitators

PPT Presentation delivered on Pre-bid Conference II on RESCO tender for Rooftop Solar PV Projects in the State of Madhya Pradesh

Solar Energy Corporation of India Limited New Delhi

j. Billing procedure k. Periodical Inspections Page 1

Consumer User Manual for Unified Solar Rooftop Transaction Portal for the State of Andhra Pradesh

NOTICE FOR THE EXPRESSION OF INTEREST (EOI) : (REVISED)

EXPRESSION OF INTEREST

ENTREPRENEURSHIP DEVELOPMENT PROGRAM ON SOLAR ENERGY

Energy Efficiency Alberta Residential and Commercial Solar Program Guidebook

ENGIE FEED IN TARIFF APPLICATION FORM. Version ENGIE FIT Application P a g e 0

FEED-IN TARIFF LICENSEE TRANSFER

RULES FOR PROVIDING FINANCIAL ASSISTANCE TO LATEX CENTRIFUGING FACTORIES UNDER PROCESSING, QUALITY UPGRADATION AND PRODUCT DIVERSIFICATION SCHEME

Skill Development Training for Scheduled Caste

NATIONAL ZOOLOGICAL PARK MATHURA ROAD, NEW DELHI

POLICY FOR DEVELOPMENT OF SOLAR PARKS IN THE STATE OF MADHYA PRADESH

FAQs on Accreditation Criteria for Government and Private Industrial Training Institutes

No. 5 /3 / /ST Government of India Ministry of New and Renewable Energy

NATIONAL ZOOLOGICAL PARK MATHURA ROAD, NEW DELHI

NCC Infrastructure Holdings Limited

ENTREPRENEURSHIP DEVELOPMENT PROGRAM ON SOLAR ENERGY

NHPC FELLOWSHIP SCHEME FOR ASSAM 2016

SCHEME FOR SETTING UP OF PLASTIC PARKS

Feed in Tariffs (FIT) Generator Application Form

Institute of Leadership Development

Government of Haryana Industries and Commerce Department

NATIONAL RESEARCH DEVELOPMENT CORPORATION TECHNO-COMMERCIAL SUPPORT FOR PROMISING INVENTIONS / INNOVATIONS GUIDELINES

1.4 On 19 May 2011 the WA State Government announced a reduction in the Subsidy rate from 40c/kWh to 20c/kWh effective from 1 July 2011.

ENTREPRENEURSHIP DEVELOPMENT PROGRAMME ON SOLAR ENERGY

Indian Institute of Information Technology, Design and Manufacturing, Kurnool (IIITDM Kancheepuram Campus) Chennai Tender Document.

I. CATEGORISATION REVISED NOTIFICATION FOR REGISTRATION OF NEW CONTRACTORS (FIRMS) FOR CIVIL WORKS

STATE BANK OF INDIA PREMISES & ESTATE DEPARTMENT 3 RD FLOOR, LOCAL HEAD OFFICE BHADRA, AHMEDABAD PH : (079)

Expression of Interest (EOI) For LEARNING MANAGEMENT SYSTEM

Promotion of Renewable Energy Sources in the Domestic Sector PV Grant Scheme 2016/PV/ERDF - Application Part A

REQEUEST FOR EXPRESSION OF INTEREST (REOI) FOR OIL, CENTRE OF EXCELLENCE FOR ENERGY STUDIES (COEES) BUILDING AT GUWAHATI IN ASSAM

Empanelment of Consultancy Firms

PR P E R SE S NTAT A IO I N ON MAH A A H R A A R S A H S T H RA R A TEXT X IL I E L PO P LI L C I Y Y

All India Women Entrepreneurs Award 2018 Award Nomination Form

SURYAMITRA TRAINING PROSPECTUS

SURAT SMART CITY DEVELOPMENT LTD.

Feed in Tariff Application Form

Promotion of Renewable Energy Sources in the Domestic Sector PV Grant Scheme

Home Energy Saving (HES) scheme - Homeowner Application Form Version 1.0

Jammu & Kashmir State Power Development Corporation Limited

Ease Of Doing Business

Technology Business Incubator (TBI)

microfit FAQ Version 4.1

Feed-in Tariff Scheme: Guidance for Licensed Electricity Suppliers

PROCEDURE AND CHECKLIST FOR APPROVAL OF BUILDING PLANS AND REGISTRATION/RENEWAL OF LICENCE OF FACTORY UNDER FACTORIES ACT, 1948

Working Procedure for Organic Certification Assistance

SCIENCE & TECHNOLOGY ENTREPRENEURSHIP DEVELOPMENT (STED) PROJECT

Central Council for Research in Yoga & Naturopathy Janakpuri, New Delhi

GOVERNMENT OF INDIA MINISTRY OF AYUSH. Guidelines for organizing of Yoga Fests / Utsavs in States/UTs.

India is a developing country with a per capita GDP (nominal) of around USD 1408 per annum.

SITC of RFID Car Parking System including Manpower support and CAMC भ रत य वम नपत तन प र धकरण AIRPORTS AUTHORITY OF INDIA CHENNAI AIRPORT, CHENNAI

Home Energy Saving (HES) scheme - Homeowner Application Form Version 10.0

AMSP Guidebook. February 2017

Directorate, Medical Education and Research, Mumbai -1. EOI Notice

Frequently Asked Questions

Renewable Energy Initiatives by Infrastructure Development Company Ltd. (IDCOL)

ph armexcil FEE FOR MEMBERSHIP Membership fees for various categories of members is as follows : S. No. Category of Member

: 2018_AAI_9051_1) NOTICE INVITING

2016 Call. Operational Programme I European Structural and Investment Funds

Carbon Neutral Adelaide

Product(s) Installed Capacity Existing Proposed Existing Proposed

M P STATE ELECTRONICS DEVELOPMENT CORPORATION LTD (A Govt. of M.P Undertaking) Tender No: MPSEDC/TRIBAL/VC/DCGM/2018/374 Dated

POLICY ON CORPORATE SOCIAL RESPONSIBILITY (CSR) AND SUSTAINABILITY. Indian Renewable Energy Development Agency Limited, New Delhi

Energy Efficiency Alberta Residential and Commercial Solar Program Terms and Conditions

scheme linked to the centrally sponsored TUFS scheme.

Department of Industries and Commerce

ENGINEERING PROJECTS (INDIA) LIMITED (A GOVERNMENT OF INDIA ENTERPRISE) CORE 3, SCOPE COMPLEX, 7 LODHI ROAD NEW DELHI

Presentation for BFSI Group on Maharashtra Package Scheme of Incentives CA. Sandeep Chitnis

Notice Inviting Expression of Interest (EOI) for Empanelment of Consultants for Engineering & Allied Services

REVISED SCHEME FOR EXTERNAL MARKET DEVELOPMENT ASSISTANCE

Apparel Incubation Center at Gwalior, MP

West Bengal State University

Guidelines for implementing Research Projects SCIENCE AND ENGINEERING RESEARCH COUNCIL

Utility Warehouse. Feed-In Tariff scheme. Application form

Diploma In Hospital Management

Refer to section 2.C. for more information on the evaluation criteria.

Directorate of AYUSH Government of Chhattisgarh Old Nurses Hostel, Near D.K.S Bhawan, Old Mantralaya Parisar Raipur

INCUBATION OPPORTUNITY FOR NEW ENTREPRENEURS

Corporate Social Responsibility Policy *********

DY CHIEF ENGINEER POWER

Applications are invited for the implementation of Skill Development Programme under Seekho aur Kamao Scheme

APPLICATION FORM FOR GRANT OF PERMISSION FOR SETTING UP COMMUNITY RADIO STATION (FM) (To be submitted in Quadruplicate)

PRE-QUALIFICATION NOTICE FOR EMPANELMENT OF ARCHITECTS/CONSULTANTS

Telecommunications Consultants India Ltd. (A Government of India Enterprise)

Wind Project Development

[Case No. 10 of 2016]

The Narragansett Electric Company d/b/a National Grid

CONSUMER SERVICES GROUP APPLICATION FORM FOR

SCHEME FOR INFRASTRUCTURE DEVELOPMENT PRIVATE AIDED/UNAIDED MINORITY INSTITUTES (IDMI) (ELEMENTARY SECONDARY/ SENIOR SECONDARY SCHOOLS)

Feed-in Tariff: Draft guidance for renewable installations (Version 5)

Guidelines / Standard Operating Procedure for implementation of Central Sector Schemes during XII Plan Period ( )

Directorate, Urban Administration and Development. Government of Madhya Pradesh. Madhya Pradesh Urban Infrastructure Investment Programme (MPUIIP)

AIRPORTS AUTHORITY OF INDIA. NIT No. : AAI/AT/AGM(EE)/e-NIT-07/ Dt. 14/09/2017 NOTICE INVITING e-tender (3 Covers Open Tender)

E-IN-C BRANCH - MILITARY ENGINEER SERVICES CE SWC AND CE (AF) GANDHINAGAR - MES Tender Reference Number

M.P.PASCHIM KSHETRA VIDYUT VITARAN CO. LTD GPH CAMPUS, POLOGROUND: INDORE Phone No

Transcription:

Methodology for Implementation of Grid Connected Rooftop Solar Projects in the state of Maharashtra The benchmark cost for the Maharashtra is as follows: Type Category Benchmark Cost Per kw 30% CFA Amount (Rs.) Grid connected rooftop Upto 10 kwp 47000/- 14100.00 solar PV system >10-100 kwp 44500/- 13350.00 (Rs/Wp) >100-500kWp 44000/- 13200.00 The CFA is 30% of benchmark cost or project cost whichever is less. Minimum Capacity of project is 1 kwp and Maximum Capacity of project is 500 kwp for availing CFA at single beneficiary location. Only indigenously manufactured PV modules and Balance of System (BOS) as per MNRE specification and standards will be allowed for availing capital subsidy. Sector wise / Category wise eligibility for availing CFA of grid connected roof-top solar power plant are as following:- Sr. Central Financial Category Coverage of building No. Assistance 1. Residential All type of residential buildings CFA upto 30% of benchmark cost or project cost whichever is minimum. 2. Institutional Schools, health institutions including medical college & CFA upto 30% of hospitals, universities, educational institutions etc. benchmark cost or [including those registered under the Societies Registration Act 1860 and the Indian Trust Act 1882.] project cost whichever is minimum. 3. Social sector Community centres, welfare homes, old age homes, CFA upto 30% of orphanages, common service centres, common workshops benchmark cost or for artisans or craftsman, facilities for use of community. Trusts / NGOs / Voluntary organizations / Training project cost whichever is minimum. institutions, any other establishments for common public use etc. [including those registered under the Societies

Sr. No. Category Coverage of building Central Financial Assistance Registration Act under the societies Registration act 1860 and the Indian Trust Act 1882] Note: - No CFA is applicable for all types of Govt. buildings, Govt. institutions/govt. Organizations including PSUs. As per the sanction and guidelines of MNRE, GoI dated on 15 th February, 2018; we had called for Expression of Interest (EoI) for implementation of 50 MW through project developers and finalized the category wise rate of system per kwp. The list of empanelled project developers is given in Annexure - 1.

Procedure for online submission of Proposal for availing CFA for MNRE, GoI :- 1. For availing CFA the project proposals must be submitted in prescribed online format through GCRT software which is available on MEDA www.mahaurja.com website along with requisite documents mentioned in format. 2. Empanelled project developers have to submit the online proposals through GCRT software along with scanned copies of the documents. Refer to Annexure-2 for check list. MEDA prefers to release subsidy directly to the concerned beneficiary. Therefore, submit Bank details of Beneficiary as per Annexure-5. 3. Online submitted proposals will be scrutinized by MEDA Divisional Offices. After scrutiny the proposals will be either accepted for in-principle approval or shortfall if any will be notified on the GCRT portal only. If shortfall is not complied within the existence of scheme, then the application will be cancelled. 4. The projects having capacity upto 100 kw, In-principle sanction of those projects will be issued by MEDA Divisional Offices and the projects having capacity above 100 kw, Inprinciple sanction of those projects will be issued by MEDA Head Office. 5. The empanelled project developers will have to submit a scanned copy of net metering / feed in tariff / separate import export meter / gross metering for grid connectivity application made to the utility company. In-principal sanction will be issued to start the work on the basis of this application. However, CFA will be released on the basis of net metering sanctioned load by utility company or actual installed capacity of the system whichever is less. 6. It is the responsibility of Empanelled project developers to follow the technical specifications / standards of Grid-Connected Rooftop Solar power plant mentioned in MNRE policy dated 26 th June, 2014 and amendments time to time for installation & commissioning of rooftop systems. 7. Empanelled project developers have to follow the guidelines of net metering / feed in tariff / separate import export meter / gross metering and safety auto interlocks of concerned

DISCOM. In this context, if any issue arises, the sole responsibility of it lies with the project installer/concerned beneficiary. 8. After commissioning of Grid-Connected Rooftop Solar power plant Empanelled project developers should update online status for physical joint inspection of installed & commissioned systems. Concern MEDA Division Office will inspect the system. After submission of documents as per Annexure 7 by project developer the claims will be processed for release of CFA. Then MEDA will release the CFA to the concerned beneficiary as per availability of fund from MNRE, GoI. 9. If the EoI holder has completed sanction work in all respect then if they want, the EoI holder will be eligible for the next category. However, after completion of work and submission of all requisite documents including commissioning certificate for availing subsidy will be considering as an eligibility of his upgradation. EoI holder must submit the applicable fees of Rs.5,900/- including 18% GST for category upgradation. for example: If a EoI holder registered under 'upto 10 kw' category and installed and commissioned more than aggregate 100kW capacity projects then the EoI holder will be eligible for the next category i.e. '>10-100 kwp' category after completion of work and submission of all documents along with fees for availing subsidy. This procedure will be same for '>10-100 kwp' category registered EoI holder. 10. Any changes in CFA pattern by MNRE will be applicable to all project developers. 11. System installer should provide a manual for operational maintenance in two languages i.e. English and Marathi to the beneficiary. 12. Concerned installer will be responsible for commissioning of the entire system and carrying out comprehensive maintenance of the system for the five years after successful commissioning of the system. Also installer will be responsible for submission of documents online for In-principle sanction on GCRT portal and hard copy documents to MEDA after inspection as per Annexure 7.

13. It is responsibility of system installer to give the training to the beneficiary for operational maintenance of the system. 14. It will be sole responsibility of the beneficiary to get the work done from his selected empanelled project developers. The beneficiary has to monitor the system performance and get the system maintained for 5 years after successful commissioning of the system. The beneficiary may enter into an agreement with the concerned project developers for successful implementation and maintenance of the project of 5 years. 15. If MEDA received any complaint from beneficiary pertaining to the technical specification, performance, operation and maintenance, guarantee / warrantee, the complaint will be forwarded to the concerned project developer. The project developer should attend the complaint within 15 days and rectify the same. If he fails to sort out the complaint, then MEDA may en-cash his available Security deposit and MEDA reserves the right to conduct necessary enquiry of the matter and de-empanelment the project developer from the empanelment list. 16. MEDA may send 2% of installed systems of each manufacturer/installer for technical evaluation to any MNRE approved centres at their cost. 17. This scheme having target of 50 MW and complete applications will be accepted on 'First come first served' basis. 18. These guidelines are specific to this MNRE, GoI scheme. The Govt. / Semi Govt. / PSUs / Co-operative Departments should follow the guidelines of Govt. purchase policy for the installation and commissioning solar roof-top systems for their use. 19. Under this scheme the last date of completion of sanction projects is 15 th May, 2019. 20. The capacity of project and CFA mentioned in In-principle sanction letter are of tentative nature. The actual project capacity and eligible CFA will be finalized after submission of joint inspection report & work done. 21. Project Developers under Category D, have to register their names by paying Rs.29,500/- as one time registration fee. Also, they have submit the Demand Draft or Bank Guarantee of any

nationalized or scheduled bank of Rs.50,000/- till the validity of scheme (refer point no. 15 of this methodology) as a security deposit. 22. The print out of online registration application along with DD as a registration fee and security deposit in form of DD or BG in favour of MEDA, Pune payable at Pune should be submitted to MEDA Head office Pune for registration under category D. 23. After registration, Firstly D category project developers will get the sanction for project capacity up to 10 kwp and then they may upgrade their category as per above point no. 9. 24. It is mandatory to MEDA empanelled manufacturer / project developer / integrator to commission at least one project under this scheme, if he fails to fulfils this condition The DD/BG shall be forfeited/revoked. Note: For below enclosures please check download section in GCRT portal on MEDA website (www.mahaurja.com). Enclosed: - 1. Annexure 1: The list of Empanelled project developers. 2. Annexure 2: Checklist for proposal submission 3. Form B: - Project Proposals for Grid Connected Rooftop and Small SPV Power Plants (For the project from 1 kwp & upto 10 kwp). 4. Form C: - Detailed Project Report for Grid Connected Rooftop and Small SPV Power Plants (Capacity above 10 kwp to 500 kwp). 5. Annexure 3: Agreement / Consent / Certificate / Undertaking on Rs.100/- stamp paper regarding CFA from Beneficiary. 6. Annexure 4: Affidavit / Declaration Certificate / Undertaking on Rs.100/- stamp paper regarding specifications from Empanelled project developers. 7. Annexure 5: Bank details of Beneficiary. 8. Annexure 7: Hard copy documents to be submitted by Empanelled project developers for disbursement of CFA after Joint inspection.

9. Technical Specifications. 10. Grid Connected Solar Rooftop and small solar power plant Scheme of MNRE dtd 26/06/2014 11. Grid Connected Rooftop and Small Solar Power Plants Programme - Scaling up of budget from Rs.600 crore during the 12 th Five Year Plan to Rs.5000 crore for implementation over a period of five years upto 2019-20 under National Solar Mission (NSM) - 2nd amendment regarding of MNRE. dtd 2/09/2016 12. Guidelines of MNRE for smooth implementation of grid connected solar rooftop projects by SNAs/ Discoms dtd 8/09/2016 13. As per MNRE Sanction order of 50 MW capacity No. 318/20/2018-GCRT dtd. 15 th February, 2018. 14. General Guidelines for the consumers desiring connectivity of Roof-top Solar PV System from MSEDCL *For other utility kindly check respective DISCOM's website. 15. Joint Inspection Report