UNCLASSIFIED. R-1 Program Element (Number/Name) PE N / (U)SMALL (LEVEL 0) TACTICAL UAS (STUASL0) Prior Years FY 2013 FY 2014 FY 2015

Similar documents
UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 R-1 Line #208

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 8 R-1 Line #77

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 Program Element (Number/Name) PE M / (U)Ground/Air Task Oriented Radar (G/ATOR) Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #211

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED FY This program develops and demonstrates advanced technologies, including Electromagnetic (EM) Rail Gun for naval weapon systems.

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #44

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Counter Narcotics Technology Program Office

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #123

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 R-1 Line #120

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 8 R-1 Line #124

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 6 R-1 Line #231

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing EF4: Integrated Broadcast System

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7

UNCLASSIFIED. Cost To Complete Total Program Element S750: Mission Training and Preparation Systems FY 2015

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #94

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 6 R-1 Line #162

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Indirect Fire Protection Capability Increment 2-Intercept (IFPC2)

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 P-1 Line #58

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 R-1 Line #174

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #146

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 8 R-1 Line #152

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Distributed Common Ground/Surface Systems. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Multi-Platform Electronics

OVERSEAS CONTINGENCY OPERATIONS (OCO)

UNCLASSIFIED. R-1 Program Element (Number/Name) PE BB / SOF Visual Augmentation, Lasers and Sensor Systems. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #213

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #169

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2007 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7

UNCLASSIFIED. Cost To Complete Total Program Element JA6: Joint Air-To-Ground Missile (JAGM)

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : OC-135 Open Skies Sensors

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #142

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 10 R-1 Line #98

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 5 R-1 Line #138

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Unmanned Combat Air Veh(UCAV) Adv Cp/Proto Dev. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Joint Strike Fighter Squadrons

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #199

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: NUCLEAR WEAPON MODERNIZATION FY 2012 OCO

KC-46A Tanker DoD Budget FY2013-FY2017. RDT&E U.S. Air Force

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 15 R-1 Line #140

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 R-1 Line #19

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #90

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Evolved Expendable Launch Vehicle Program (SPACE) - EMD

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Advanced Medium Range Air-to-Air Missile (AMRAAM) Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. FY 2017 Base FY 2017 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: Project MDAP/MAIS Code(s): N42

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED FY Quantity of RDT&E Articles

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Joint Air-to-Ground Missile (JAGM) FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 8 R-1 Line #163

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. Cost To Complete Total Program Element 1, , : Evolved Expendable Launch Vehicle

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Depot Maintenance (NON-IF) FY 2011 Total Estimate. FY 2011 OCO Estimate

Exhibit R-2, RDT&E Budget Item Justification February 2008

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / ADVANCED TANK ARMAMENT SYSTEM (ATAS)

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

Transcription:

Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 7: Operational Systems Development COST ($ in Millions) Prior Years FY 2013 FY 2014 R1 Program Element (Number/Name) OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Complete Total Program Element 50.272 9.204 5.013 4.813 4.813 4.992 5.123 5.174 5.287 Continuing Continuing 3192: RQ21A BLACKJACK 50.272 9.204 5.013 4.813 4.813 4.992 5.123 5.174 5.287 Continuing Continuing # The OCO Request will be submitted at a later date. A. Mission Description and Budget Item Justification Small Tactical Unmanned Aircraft System (STUAS) is a nonlethal joint tactical Unmanned Aerial Vehicle systems for Department of Defense to provide Persistent Intelligence, Surveillance and Reconnaissance (ISR)/Target Acquisition, which will fill the capability gap in ISR services available to Fleet and Marine forces. This program is funded under OPERATIONAL SYSTEMS DEVELOPMENT because it includes development efforts to upgrade systems that have been fielded or have received approval for fullrate production and anticipate funding in the current or subsequent fiscal year. B. Program Change Summary ($ in Millions) FY 2013 FY 2014 OCO Total Previous President's Budget 9.734 5.013 5.114 5.114 Current President's Budget 9.204 5.013 4.813 4.813 Total Adjustments 0.530 0.301 0.301 Congressional General Reductions Congressional Directed Reductions Congressional Rescissions Congressional Adds Congressional Directed Transfers Reprogrammings SBIR/STTR Transfer Program Adjustments 0.119 0.119 Rate/Misc Adjustments 0.182 0.182 Congressional General Reductions Adjustments 0.530 Change Summary Explanation Financial: Decrease in FY2013 from PB14 represents sequestration reduction. Schedule: APN4 $9.593M marked by the Subcommittee on Defense (SACD) Public Law Report (112196) causing the elimination of APN4 Low Rate Initial Production (LRIP) contract award and LRIP Delivery. Technical: N/A Total Cost Navy Page 1 of 5 R1 Line #222

Exhibit R2A, RDT&E Project Justification: PB 2015 Navy Date: March 2014 COST ($ in Millions) Prior Years FY 2013 FY 2014 R1 Program Element (Number/Name) Navy Page 2 of 5 R1 Line #222 3192 / RQ21A BLACKJACK OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Complete 3192: RQ21A BLACKJACK 50.272 9.204 5.013 4.813 4.813 4.992 5.123 5.174 5.287 Continuing Continuing Quantity of RDT&E Articles 0.000 # The OCO Request will be submitted at a later date. A. Mission Description and Budget Item Justification The Small Tactical Unmanned Aircraft System (STUAS) is a combined United States Navy (USN) and United States Marine Corps (USMC) program that provides persistent maritime and landbased tactical Intelligence, Surveillance, and Reconnaissance/Target Acquisition (RSTA) support for tactical level maneuver decisions and unit level force defense/force protection for Naval amphibious assault ships (multiship classes) and Navy and Marine land forces. This system will support Naval Missions such as building the Recognized Maritime Picture, Maritime Security Operations, Maritime Interdiction Operations, and provide support for Naval Units operating from sea/shore in Overseas Contingency Operations. This submission is the USNs portion of the program and has been coordinated with the USMC budget submission PE 0305239M (RQ21A). A STUAS system (Landbased or Shipbased) consists of five (5) air vehicles, two (2) Ground Control Stations, multimission (plug and play) payloads, one (1) launcher, one (1) recovery system and associated support equipment. The STUAS system will continue to evolve and upgrade capabilities to satisfy capabilities shortfalls, new requirements, and reliability, maintainability and safety issues. Upgraded capabilities may include Navy Command and Control integration, Signals Intelligence and Synthetic Aperture Radar payloads, weapons integration, Heavy Fuel Engine, Laser Designator and Digital Common Data Link. RQ21A will also continue to expand its shipboard capability across new ship classes. B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) FY 2013 FY 2014 Title: Engineering and Technical Services Description: Provides for the Government Engineering Technical Support, Logistics Support, Test and Evaluation, other Government Support, Contractor Support Services, Program Management Support, Program related travel in support of the upgrade/payload efforts. Articles: FY 2013 Accomplishments: Provided Government Engineering Technical Support, Logistics Support, Test and Evaluation, other Government Support, Contractor Support Services, Program Management Support and program related travel. Completed all required documentation leading to a Milestone C decision, which was approved on May 16, 2013. Started Initial Operational Test and Evaluation (IOT&E) efforts. FY 2014 Plans: 9.204 3.513 Total Cost 3.613

Exhibit R2A, RDT&E Project Justification: PB 2015 Navy Date: March 2014 R1 Program Element (Number/Name) 3192 / RQ21A BLACKJACK B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) FY 2013 FY 2014 Provide for the Government Engineering Technical Support, Logistics Support, Test and Evaluation, other Government Support, Contractor Support Services, Program Management Support, Program related travel in support of the upgrade/payload efforts. Plans: Will provide support for Government Engineering Technical Support, Logistics Support, Test and Evaluation, other Government Support, Contractor Support Services, Program Management Support, and program related travel in support of upgrade/payload efforts. Small Tactical Unmanned Aircraft System will begin Class Ship integration and testing. Integration of mature payloads will be performed. Title: Upgrade/Payload Integration Description: Provide Upgrade/Payload Integration FY 2013 Accomplishments: N/A Articles: FY 2014 Plans: Prime System Contractor will be responsible for upgrade/payload integration as well as systems engineering, integrated logistics support and associated management activities. Plans: Small Tactical Unmanned Aircraft System will begin integration efforts on board Landing Helicopter Dock class ships. Integration of mature payloads will be performed. Prime System Contractor will be responsible for all system upgrades as well as systems engineering, integrated logistics support and associated management activities. Due to the modularity of the system, payload integration efforts will be the responsibility of the contracted party, which may include the Prime Contractor, Government Labs, or the payload manufacturer. 1.500 1.200 Accomplishments/Planned Programs Subtotals 9.204 5.013 4.813 C. Other Program Funding Summary ($ in Millions) Line Item FY 2013 FY 2014 OCO Total FY 2016 FY 2017 FY 2018 FY 2019 Complete Total Cost APN4/0444: RQ21A UAV (Blackjack) 25.936 45.224 73.446 Continuing Continuing APN6/0605: STUASL0 5.100 5.100 Continuing Continuing Navy Page 3 of 5 R1 Line #222

Exhibit R2A, RDT&E Project Justification: PB 2015 Navy Date: March 2014 R1 Program Element (Number/Name) 3192 / RQ21A BLACKJACK C. Other Program Funding Summary ($ in Millions) Line Item FY 2013 FY 2014 OCO Total FY 2016 FY 2017 FY 2018 FY 2019 Complete Total Cost RDTEN,/0305239M: 22.924 11.122 8.192 8.192 8.376 8.580 8.734 8.928 Continuing Continuing STUAS/RQ21A RDTEN,/0305242M: STUAS/ RQ21A UAS Payloads 2.000 2.000 2.000 2.000 2.000 2.000 Continuing Continuing PMC473700: STUAS/RQ21A 13.982 66.612 70.565 70.565 73.174 74.273 75.460 77.008 Continuing Continuing PMC/7000: STUAS/RQ21A 5.000 5.093 5.093 5.198 5.312 5.406 5.517 Continuing Continuing Spares and Repair Parts Remarks D. Acquisition Strategy The program office has utilized a competitive acquisition approach for award of the Engineering and Manufacturing Development effort to field a capability that meets threshold requirements. Low Rate Initial Production test article will be utilized to successfully complete Initial Operational Test and Evaluation and achieve Initial Operational Capability (IOC) leading to a FullRate Production Decision Review. The program office will use Sole Source acquisition approach for the remaining Research Development Test and Evaluation efforts except for the payloads. The payloads shall be competitively awarded or procured via Government Labs with Insitu, Inc. conducting integration efforts as required. E. Performance Metrics Attainment of Small Tactical Unmanned Aircraft System IOC in accordance with approved schedule. Navy Page 4 of 5 R1 Line #222

Exhibit R4, RDT&E Schedule Profile: PB 2015 Navy Date: March 2014 R1 Program Element (Number/Name) 3192 / RQ21A BLACKJACK Navy Page 5 of 5 R1 Line #222