ADVANCE CARGO INFORMATION (ACI)

Similar documents
2008/SOM3/SCCP/002attB Agenda Item: 3(i)

Standard Operating Procedure (SOP) 1 for Chapter 105 Dam Safety Program Review of Chapter 105 New Dam Permit November 2, 2012

Enrolled Copy S.B. 58 REPEAL OF NURSING FACILITIES ASSESSMENT. Sponsor: Peter C. Knudson

Wayne State University. Student Handbooks linear feet. 5 manuscript boxes.

Option Description & Impacts First Full Year Cost Option 1

ITAR and the Supply Chain: Getting Stuck in the Middle

University of Auckland Doctoral Scholarships

Annex 3 Information and Communication Requirements EEA and Norway Grants

You need to complete all sections and do not create your OWN attachments or alter this form, expect for budget

Attachment F STC Compliance

JOB ADVERTISEMENT. Eastern and Southern Africa Higher Education Centers of Excellence Project (ACE II) 1. Project Background

CHIEF ELECTRIC PLANT OPERATOR, 5237 ELECTRIC PLANT SUPERINTENDENT, 5264

V Valor: Courage and bravery; Strength of mind and spirit that enables one to encounter danger with firmness

The Management and Control of Hospital Acquired Infection in Acute NHS Trusts in England

Animal Welfare Fund Grant Support Scheme

Lessons Learned. Grant Management

APPLICATION GUIDELINES FOR PIONEER STATUS INCENTIVE

The Internet and Sustainable Development

Memorandum of Understanding between the Higher Education Authority and Quality and Qualifications Ireland

FSB NI response to the Review of NITB and wider Tourism Structures.

Enhanced service specification. Avoiding unplanned admissions: proactive case finding and patient review for vulnerable people

COMMISSION IMPLEMENTING DECISION. of

PLEASE READ INSTRUCTIONS AND REMOVE BEFORE TYPING INSTRUCTIONS FOR DSP-94

Checklist of requirements for licensing under Section 31 of the Trade Regulation Code (GewO)

Technical Charter (the Charter ) for. OpenDaylight Project a Series of LF Projects, LLC

Health & Safety Policy DCP 017

5.3 Report of the Committee on Tourism and Competitiveness (CTC)

COMPANY CONSULTING Terms of Reference Development of an Open Innovation Portal for UTFSM FSM1402 Science-Based Innovation FSM1402AT8 I.

Export Controls: What s the Difference?

FIRE AND DISASTER MANAGEMENT ORGANIZATION ACT

Abu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) Mechanisms

UNIVERSITY PHYSICIANS OF BROOKLYN POLICY AND PROCEDURE

Terms of Reference Approved 30 April 2015/ Revised 29 September 2016

Intertek Health, Environmental & Regulatory Services

REQUEST FOR QUALIFICATIONS (RFQ) FOR PROFESSIONAL DESIGN SERVICES FOR THE EAGLE RIVER PARK PROJECT

Terms of Reference Executive Research Education & Training Committee

NATIONAL COUNCIL OF NURSES AND MIDWIVES STANDARDS FOR APPROVAL OF NURSING AND MIDWIFERY PROGRAMMES

CDBG Owner-Occupied Housing Rehabilitation Administration Plan Requirements

REPORT OF CORPORATE DIRECTOR RESOURCES AGENDA ITEM: 4

Executive Summary 56,173 Purpose and Coverage of the Rule 56,173 Summary of the Major Provisions of the Rule 56,173 Costs and Benefits 56,175

Policy for Grant Financing: Implementing Procedures

Enhanced service specification. Avoiding unplanned admissions: proactive case finding and patient review for vulnerable people 2016/17

MINIMUM CRITERIA FOR REACH AND CLP INSPECTIONS 1

AMERICAN LINE BUILDERS AREA JOINT APPRENTICESHIP AND TRAINING COMMITTEE GENERAL POLICY STATEMENT AND APPRENTICE RULES AND REGULATIONS FOR LINEMEN

NACC Member Value Survey November 15, Discoveries

Evidence suggests that investing in literacy will benefit individuals, communities, and the country as a whole. What are we waiting for?

Emergency Preparedness

2016 Call for the la Caixa - Severo Ochoa International PhD Programme (ref.01/16/flc)

REQUEST FOR PROPOSAL (RFP) FOR. Consultant. Return Qualifications to:

CATALOGUE OF TRAINING COURSES PROPOSED BY EFCA 21/01/2016 version CATALOGUE OF TRAINING COURSES PROPOSED BY EFCA (2016)

TERMS OF REFERENCE FOR CONSULTANTS

Republic of Indonesia: Water Supply and Sanitation Sector Development Project

Role of DIC, SISI, EDII, NIESBUD, NEDB.

Ministerial Ordinance on Good Laboratory Practice for Nonclinical Safety Studies of Drugs

2014 to 2020 European Structural and Investment Funds Growth Programme. Call for Proposals European Social Fund. Priority Axis 2 : Skills for Growth

Rights and Responsibilities of Patients and Family Members

Preamble. The Czech Republic and the United States of America (hereafter referred to as the Parties ):

SUNY DOWNSTATE MEDICAL CENTER POLICY AND PROCEDURE

FOR THE IMPLEMENTATION OF CISCO IDENTITY SERVICE ENGINE (ISE) FOR NNPC

Western Australian Industry Participation Strategy (WAIPS)

FACTORS THAT AFFECT THEORY-PRACTICE INTEGRATION OF STUDENT NURSES AT A SELECTED CAMPUS OF A NURSING COLLEGE IN THE LIMPOPO PROVINCE

FC CALL FOR PROPOSALS 2014

TREATY BETWEEN THE UNITED STATES OF AMERICA AND THE UNION OF SOVIET SOCIALIST REPUBLICS ON THE LIMITATION OF ANTI-BALLISTIC MISSILE SYSTEMS

General Administration Office Structure Effective Date: Supersedes: References: P&P-O-100; CRS, P&P L-100

INFORMATION BULLETIN No. 70

CATALOGUE OF TRAINING COURSES PROPOSED BY EFCA 2017 version CATALOGUE OF TRAINING COURSES PROPOSED BY EFCA (2017)

MARKET PROCEDURE: FACILITY REGISTRATION, DE-REGISTRATION AND TRANSFER

``PART A--SAFE AND DRUG-FREE SCHOOLS AND COMMUNITIES. ``This part may be cited as the `Safe and Drug-Free Schools and Communities Act'.

CLP Regulation Recent implementation and issues. Workshop "Product Stewardship and PROCESS SAFETY 30/11/2017 Dr. Blanca Serrano

Food Service Management Company (FSMC) Monitoring Form Contracting Entities (CEs) use this form to monitor the FSMC s operation of the program.

MPCA Strategic Plan

Floyd County Public Schools 140 Harris Hart Road NE Floyd, VA 24091

Schedule C1. Community Pharmacy Anti-Coagulation Management Services

ACI AIRPORT SERVICE QUALITY (ASQ) SURVEY SERVICES

CARELESS: How the Pennsylvania Department of Health has Risked the Lives of Elderly and Disabled Nursing Home Residents

DRAFT 10/08/2010 VERSION

Terms of Reference for Resource Mobilization Support to IPPF Member Association in Nepal, (Family Planning Association of Nepal-FPAN)

Belmont Forum Collaborative Research Action:

PUBLIC BEACH & COASTAL WATERFRONT ACCESS PROGRAM. NC Department of Environmental Quality Division of Coastal Management

CALL FOR APPOINTMENT OF NATIONAL COORDINATOR FOR IRELAND

BOARD OF DIRECTOR'S MEETING 2nd LOCATION AGENDA

A CRITICAL EVALUATION OF PRE- AND POST LARGE-SCALE DEVELOPMENT PROGRAMMES FOCUS ON EMPLOYMENT CREATION. Wellington Didibhuku Thwala

Initial Proposal Approval Process, Including the Criteria for Programme and Project Funding (Progress Report)

The University of Tennessee REQUEST FOR QUALIFICATIONS (RFQ)

1. Basic Data Project Name: Improved Sanitary and Phytosanitary (SPS) Handling in Greater Mekong Subregion (GMS) Trade Project

POLICY AND ADMINISTRATIVE PROCEDURE Manual of Policies and Procedures

INQAAHE Guidelines of Good Practice

United Nations Development Programme. Terms of Reference

TESTING TIMES TO COME? AN EVALUATION OF PATHOLOGY CAPACITY IN ENGLAND NOVEMBER 2016

Workforce Development Learning Center Course Outline. Haz-mat Level I FIP 3351

The telecommuting option is not an employee benefit it is a management option that provides an alternative means to fulfill work requirements.

ELEMENTS OF REQUEST FOR MARITIME SECURITY TRAINING COURSE APPROVAL

PROFESSIONAL STAFF BY-LAWS GRAND RIVER HOSPITAL CORPORATION KITCHENER, ONTARIO. September 28, 2016

EUCERD RECOMMENDATIONS on RARE DISEASE EUROPEAN REFERENCE NETWORKS (RD ERNS)

I. Asbestos Abatement Grant Program Summary

Government of India Department of Social Welfare

Green Industry Innovation Programme Poland. Call for Project Proposals

Effective date of issue: March 1, 2004 (Revised September 1, 2009) Page 1 of 7 STATE OF MARYLAND JUDICIARY. Policy on Telework

University of Colorado Denver

The 911 Implementation Act runs 280 pages over nine titles. Following is an outline that explains the most important provisions of each title.

Transcription:

ADVANCE CARGO INFORMATION (ACI) IMPLEMENTATION GUIDANCE World Customs Organization June 2018 Copyright 2018 World Customs Organization. All rights reserved. Requests and inquiries concerning translation, reproduction and adaptation rights should be addressed to copyright@wcoomd.org

TABLE OF CONTENTS ADVANCE CARGO INFORMATION (ACI) IMPLEMENTATION GUIDANCE... 2 1. Advance Cargo Information... 2 2. Benefits of implementing a successful Advance Cargo Information programme... 2 3. Enablers to successfully introduce ACI programme:... 3 4. Process to implement Advance Cargo Information... 3 5. Elements for the evaluation of an ACI Programme... 7 Annex I... 9 Annex II... 12 1.

ADVANCE CARGO INFORMATION (ACI) IMPLEMENTATION GUIDANCE 1 1. Advance Cargo Information In accordance with the WCO SAFE Framework of Standards to Secure and Facilitate Global Trade (hereafter referred to as the WCO SAFE), electronic Advance Cargo Information (ACI) are data sets 2 of information to identify high-risk cargo prior to loading and/or arrival by WCO Members. In this regard the WCO SAFE harmonizes the ACI information requirements for inbound, outbound and transit shipments. The global data sets laid down for ACI in the WCO SAFE are the result of extensive discussions between the WCO, Customs administrations and Business and are subject to periodic review, to take account of new or emerging threats, in order to ensure that the data sets remain fit for purpose and relevant. WCO Members that have signed a letter of intent to implement the WCO SAFE standards should consider implementing ACI programmes to contribute to strengthening supply chain security and mitigate potential security threats. Implementing ACI, combined with processing through appropriate Customs risk management systems, allows Customs administrations to protect their territory and supply chains from security threats. ACI also allows WCO Members additional time to scrutinise consignments prior to their arrival in a territory and take appropriate steps. NOTE: These guidelines do not seek to directly support Pre-arrival Processing of import Customs declarations as foreseen in the WTO Trade Facilitation Agreement and the WCO Revised Kyoto Convention though some of the principles could be applied. 2. Benefits of implementing a successful Advance Cargo Information programme Setting up ACI programmes is, undoubtedly, a costly process for Customs, border agencies, Businesses and other stakeholders; however, there are associated benefits for governments and businesses. ACI allows Customs administrations to mitigate security risks prior to loading, or prior to arrival (dependent on the mode and procedure applied) of cargo into a territory. Through the appropriate application of risk management on ACI, Customs is able to separate cargo shipments into different categories and match resources to those minority shipments that require the maximum intervention, whilst facilitating the clearance of low risk consignments. This should lead, in time, to more informed decisions on interdiction of goods at the borders, 1 Advance Cargo Information is a generic term covering the provision of pre-loading or pre-arrival electronic information as set down in the WCO SAFE Framework 2 The data sets can be found in Annex II - http://www.wcoomd.org/-/media/wco/public/global/pdf/topics/facilitation/instruments-andtools/tools/safe-package/safe2015_e_final.pdf?la=en 2.

resulting in more efficient and secure supply chains as well as enhanced trade facilitation and, over time, economic growth. A harmonized and standardized approach is a win-win for all parties and support smarter border controls resulting in reductions in redundant inspections, storage and time delay related costs. Critical to any savings is the ability to provide quality data from Business entities to Customs. In this regard all stakeholders in the supply chain must take this responsibility seriously in order to enhance data quality that would minimize unnecessary interdictions or delays by Customs at borders. In addition, trading partner countries implementing ACI may strengthen trust between themselves, benefitting the trade. 3. Enablers to successfully introduce ACI programme: a. Political will b. Compliance with the SAFE Framework of Standards including the application of the data elements/sets foreseen in Annex III c. Legislation in place to support the provision of ACI d. Adequate funding and resources e. Communication and coordination with all stakeholders f. Consideration of lessons learned from other WCO Members g. Messaging standards aligned with the WCO Data Model h. ACI requirements are transparent and widely published i. Reasonable timeline for implementation accommodating all stakeholders j. Ability to process ACI through a risk management system 4. Process to implement Advance Cargo Information Following a State s decision to implement ACI the following steps are recommended: I. Ensure that there is political will and resources for the development of an ACI programme This requires the Customs administration to convince the decision makers, including obtaining the support and cooperation of appropriate government agencies, of the need to introduce ACI by creating a business case setting down the background and compiling reasons why ACI should be introduced. This includes improvements in the targeting of high risk consignments 3.

and the facilitation of cargo and mail deemed to be low risk. Critical to this discussion will be how the introduction of ACI will allow better market access and support economic growth. II. Sufficient funding exists to support the programme The implementation of ACI, like any new Customs procedure, will come at a cost to both Customs and the Business sector. In this regard Customs and the Business stakeholders should work together to conduct a cost analysis of implementation using such tools as impact assessments, business surveys and dialogue with similar WCO Members whom have already introduced such a programme. III. gaps Ensure that capacity and training needs are met and steps taken to meet identified This is a critical component to the successful creation of an ACI programme. Early consideration should be given to assessing whether existing physical infrastructure and IT needs are sufficient to support the introduction of ACI. Likewise, ensuring that adequate training needs are met by both Customs and the Business sector will save time, delays and additional costs in the early stages of the ACI programme. Once more calling on the experience of other WCO Members could be useful. IV. Ensure that a project team is put in place with the right mix of skills and knowledge Due to the complexity of ACI programmes, it is important to have in place a project team that has a mixture of skills including expertise in the WCO SAFE, the SAFE package, national regulations, IT, operational procedures and international trade. In this regard requesting participation or regular dialogue with the business sector is strongly recommended. This includes personnel with competent skills (e.g. IT, statistics, mathematical, analytical, risk management) are in place, either within the Customs administration and industry or through other entities to support ACI implementation and ongoing management. V. Working groups for different aspects of ACI To support the project team, different topic specific working groups should be established with defined objectives and deliverables linked to a roadmap and work programmes mentioned in VI hereafter. VI. A phased implementation for ACI should be foreseen A roadmap and work programmes with clear benchmarks should be established allowing for adequate initial, consultation, testing, informed compliance and implementation stages. VII. Commence cooperation and coordination for consultation and implementation with all impacted as well as other interested parties Early discussions should take place between Customs and the Business sector during the initial consideration phase. VIII. Workshops and conferences To organize workshops and conference so that all stakeholders are aware that an ACI programme is being created and what the likely requirements will be. Customs should invite 4.

comments from Business partners to ensure the programme is realistic, workable and efficient. This approach will create the right environment to support the co-creation of the ACI programmes. This way forward should be maintained for the duration of the programme establishment and beyond in order to ensure it continues to meet its objectives. IX. Customs and Business exploit trade forums to inform trade sectors of impending ACI programmes and inform these sectors of their likely responsibilities This activity should be a collective responsibility between Customs and the Business sector. A clear plan should be established to maximise opportunities to reach out to all the stakeholders that are foreseen to have ACI responsibilities. X. Bulletins are created and distributed on a regular basis to inform stakeholders of ACI regime progress Bulletins should be considered as an additional strategy to ensure all stakeholders are aware of the ACI programme developments and impending benchmarks and deadlines. XI. Stakeholder groups are established for consultation processes From other ACI programme initiatives it is clear that different business and other stakeholders have individual challenges and requirements. Therefore, it is recommended that stakeholder groups are formed at the earliest opportunities to consider issues of importance and provide solutions to overcome obstacles. XII. Customs should establish a working group of all interested entities from both the public and private sector to manage implementation The above (XI) mentioned stakeholder groups should report into an overarching working group or steering committee that will provide advice, guidance, and strategic direction to the stakeholder groups and drive ACI implementation with an appropriate timeframe. XIII. Set a reasonable deadline for implementation To provide sufficient time for the timely communication of systems specifications, including message implementing guidelines, pilots, testing and informed compliance. These requirements should be set down in a roadmap or work programmes after consultation between Customs and Business stakeholders. The following key stages should be foreseen: i. Customs/Business consultation phase ii. Call for Business volunteers to test ACI iii. Commencement of testing phase (an adequate testing period - minimum of 6 months is recommended iv. Review of testing phase v. Implementation of lessons learnt vi. vii. Final testing phase to ensure the ACI system is robust and fit for purpose Entry into force of ACI regulations 5.

viii. Period of informed compliance (leniency period - minimum of 6 months is recommended) XIV. Customs and Business should use the ACI provisions, standards and data sets set down in the WCO SAFE to formulate their programme Customs and Business should utilise the ACI standards, procedures and guidance as set down in the WCO SAFE to ensure the provision of required security data for Customs and predictability for Business stakeholders. XV. Framework Data Element Maintenance Request (FDMR) If a case is established to support additional ACI data elements outside of those set down in the SAFE Framework of Standards or modification of existing data elements, a Framework Data Element Maintenance Request under the SAFE Data Element Maintenance Mechanism will be transmitted to the WCO and considered for adoption in the SAFE Working Group. XVI. WCO Data Model compliant messages (e.g. XML, EDIFACT) should be developed and utilised in coordination with Business partners 3 Both Customs and Business stakeholders should seek to ensure that electronic messages required to transmit ACI data sets are formulated and compliant with the WCO SAFE. This will ensure that Customs needs are met and international trade costs are minimised by the use of global harmonised data requirements. XVI. ACI messages should take into consideration normal business rules pertaining to different transport modes and business models ACI message requirements should be in accordance with the WCO SAFE including the mode specific timeframes as set down. XVII. Multiple data filing options Entities should be foreseen (e.g. carriers, freight forwarders, importers, exporters, brokers, postal operators) to file ACI based on their responsibility and ability to submit data. Time limits for ACI comply with the WCO SAFE, noting that the time limits vary dependent upon transport modes. XVIII. Amendments to ACI messages The ACI systems should accommodate amendments to ACI messages (including data) in certain circumstances. XIX. Live pilot testing with a limited number of volunteer Business partners should take place. This pilot should then be expanded, over a reasonable period of time, to include all identified parties Evidence from other ACI programmes has confirmed that a live testing stage is critical in order to permit sufficient time for ACI transmitting entities to adapt their systems to meet new ACI 3 The WCO Data Model Derived Information Package (DIP) for Advance Electronic Information (AEI) is the Information Package that should be used as the basis to develop ACI messages. The DIP is available on the WCO Members website (http://www.wcoomd.org/- /media/wco/public/global/pdf/topics/facilitation/instruments-and-tools/tools/safe-package/wco-dm- v3_6_0-dip-aei.pdf?la=en) 6.

requirements. Furthermore this stage ensures that electronic interchange of ACI messages is stable, data quality is sufficiently robust and data volumes are manageable. XX. This live pilot testing and entry into force of the requirements is then followed by an informed compliance (leniency) period to allow for corrections in both the Customs and businesses systems before the requirements become enforceable XXI. A period of informed compliance allows both Customs and Business stakeholders to adjust to new ACI requirements and correct any administrative, operational or technical shortfalls. By undertaking this step all stakeholders are best placed to support a stable and fit for purpose ACI system. XXII. Regular Customs/Business review cycles should be established to ensure the stability, sustainability, and efficiency (effective performance) of the programme Review cycles with all stakeholders should be put in place to measure the performance and impact of the ACI programme (e.g., Time Release Study). XXIII. The impact of research and development initiatives should be considered in the context of ACI programmes As initiatives such as interoperable single windows, data pipelines, and data warehouses become more common place, opportunities should be exploited to share ACI data between Customs administrations and other border agencies in conformance with applicable data privacy and protection legislation. 5. Elements for the evaluation of an ACI Programme When evaluating the impact and effectiveness of ACI programmes, it is recommended that Customs, other government agencies and their business partners consider the following: For Customs and other government agencies: I. Does Customs receive reliable and good quality data in a timely manner? II. Has ACI improved the risk assessment process in allowing Customs to concentrate on high risk security shipments and faster clearance for low risk shipments? III. Is ACI assisting in the mitigation of security risks prior to arrival (and/or loading in the air and sea modes) of a means of transport? IV. Has ACI resulted in an increase in number of positive interventions? V. Has ACI resulted in a reduction in unsuccessful interventions? VI. Has there been a reduction of resource costs on anti-smuggling activities? VII. Has data been appropriately protected? For Business: I. Has there been a measurable improvement in clearance times? 7.

II. Has ACI contributed to improved predictability of delivery times and dates? III. Has there been a reduction of delays and costs due to unsuccessful interventions? IV. Has ACI resulted in overall net benefits through the achievement of points I to III above? Annexes: I. Checklist for ACI Introduction II. ACI diagrams 8.

Annex I I. Checklist for ACI Introduction Activity Progress Remarks Outstanding issues Status I. Ensure that there is political will for the development of an ACI programme, including financial support II. Sufficient funding exists to support the programme III. Capacity & training needs are met and steps taken to meet gaps IV. Ensure that a project team is put in place with the right mix of skills and knowledge V. Working groups for different aspects of ACI VI. A phased implementation for ACI should be foreseen by using of roadmap and work regime VII. Commence cooperation and coordination for consultation and implementation with all impacted parties 9.

VIII. Workshops and conferences take place so that all stakeholders are aware that an ACI programme is being created and what the likely requirements will be. Customs should invite comments from Business partners to ensure the programme is realistic, workable and efficient. IX. Customs and Business should use the ACI provisions and standards set down in WCO SAFE Framework to formulate their programme X. WCO data model compliant messages (e.g. XML, EDIFACT) should be developed and utilised in coordination with Business partners XI. ACI messages should take into consideration normal business rules pertaining to different transport modes and business models XII. Live pilot testing with a limited number of volunteer Business partners should take place. This pilot should then be expanded, over a reasonable period of time, to include all identified parties and to inform the pertaining regulations 10.

XIII. This pilot testing and subsequent implementation of regulations is then followed by an informed compliance (leniency) period to allow for corrections in both the Customs and business s systems before the requirements become enforceable XIV. Regular Customs/Business review cycles should be established to ensure the stability, sustainability, and efficiency (effective performance) of the programme XV. The impact of research and development initiatives should be considered in the context of ACI programmes 11.

Annex II II. ACI Diagrams Note: Steps 1 through 4 constitute the pre-loading (actually pre-handover) ACI model. Steps 5 bis through 7 constitute the pre-arrival phase, to allow authorities to locate a consignment in case of intelligence received after the initial risk assessment was completed, and conduct other customs risks assessment. Steps 5 and 6 are current processes, although additional elements need be added in the message for step 6. 12.

Express cargo flow chart 13.

General air cargo flow chart 14.

15.