INTRODUCTION SOLUTION IMPLEMENTATION BENEFITS SUCCESS FACTORS LESSONS LEARNED LANCASHIRE PATIENT RECORD EXCHANGE SERVICES LANCASHIRE

Similar documents
INTRODUCTION SOLUTION IMPLEMENTATION BENEFITS SUCCESS FACTORS LESSONS LEARNED

INTRODUCTION SOLUTION IMPLEMENTATION BENEFITS SUCCESS FACTORS LESSONS LEARNED. First phase of NEHR launched, with 15 care organisations

INTRODUCTION SOLUTION IMPLEMENTATION BENEFITS SUCCESS FACTORS LESSONS LEARNED. Implemented the ehealthscope Tool to provide information to GPs

Lancashire Person Record Exchange Service (LPRES) & The Medical Interoperability Gateway (MIG) Sharing data for effective care event

Economic Evaluation of the Implementation of an Electronic Palliative Care Coordination System (EPaCCS) in Lincolnshire using My RightCare

Approve Ratify For Discussion For Information

Aire Logic and Leeds Teaching Hospitals Trust: Taking on the Interoperability Challenge

CarePlus Child Health. An all-embracing interactive child health record, from child to adult

Acute Care Solutions. A range of modern, intuitive and marketleading solutions for the next generation of hospital IT

Trust Board Meeting 05 May 2016

Camden Integrated Digital Record. Dr Neel Gupta Hasib Aftab

Information Technology (IT) Strategy

Plans for urgent care in west Kent:

The National Programme for IT in the NHS: an update on the delivery of detailed care records systems

Making the PMO the beating heart of the NHS Change Agenda:

A patient experience

It s time for change Get ready, get involved.

Transforming Care in the NHS through Digital Technology

Arrendale Digital Dictation at Royal Derby Hospital

Lorenzo for clinical outcomes transformation? Ben Bridgewater

1. EXECUTIVE SUMMARY Plan on a page CONTEXT... 7

Delivering the Five Year Forward View Personalised Health and Care 2020

Urgent and Emergency Care Summit. 21 March 2017

Integration learning to support responding to the Parliamentary Review of Health and Social Care in Wales and the delivery of new models of care

integrated Doncaster Care Record (idcr)

Bristol CCG North Somerset CGG South Gloucestershire CCG. Draft Commissioning Intentions for 2017/2018 and 2018/2019

Transfer of Care Initiative. Keith Naylor Head of Implementation Transfer of Care, HSCIC

Connecting Care Across the Continuum

21 March NHS Providers ON THE DAY BRIEFING Page 1

EPaCCS in Greater Manchester

Optimizing Patient Care Transitions

integrated Doncaster Care Record (idcr)

Reducing emergency admissions

Delivering a paperless system between primary and secondary care. Jan Hoogewerf Health Informatics Unit 1 st October 2013

LEARNING FROM THE VANGUARDS:

CGI e-carelogic. enhancing care across the health economy. Connected healthcare from CGI

Using information and technology to transform health and care

NHS Bradford Districts CCG Commissioning Intentions 2016/17

Numerator. Denominator Rationale for inclusion

Introducing the care.data programme

The Northern Ireland Electronic Care Record

Digital Strategy

Integrated Care theme / Long Term Conditions priority

Strategy sets the direction Technology makes the journey possible. NHS-HE Forum. A clinical system deployment journey

Prepared Statement. Vice Admiral Raquel Bono, M.D. Director, Defense Health Agency REGARDING ELECTRONIC HEALTH RECORD MANAGEMENT BEFORE THE

Patient Unified Lookup System for Emergencies (PULSE) System Requirements

Universal Public Health Node (UPHN): HIE and the Opportunities for Health Information Management

Your Care, Your Future

healthcare Providing technology to enhance the patient experience

Background and progress

Missouri Health Connection. One Connection For A Healthier Missouri

Local Digital Roadmap. NHS North West London January NHS NW London Local Digital Roadmap Page 1

Streamlining care processes with a data-driven approach

Urgent and Emergency Care - the new offer

HIE Data: Value Proposition for Payers and Providers

Telehealth. Putting the patient at the heart of the journey

HL7 capabilities for working with GS1

YOUR HEALTH INFORMATION EXCHANGE

Report to the Board of Directors 2016/17

Information Governance, Electronic Patient Records and Patient Online Access

2. This year the LDP has three elements, which are underpinned by finance and workforce planning.

NHS Digital Academy Experience and Advice from Cohort 1

The PCT Guide to Applying the 10 High Impact Changes

PORTAL TECHNOLOGY SUPPORTING EPR: TARTAN FLAVOUR. Graham Gault, General Manager ICT Dumfries & Galloway

SWLCC Update. Update December 2015

Scarborough and Ryedale Clinical Commissioning Group. IMT Strategy. (April 2015 March 2018) Final Version 1.2. Author: Angela Wood,

systems in healthcare: a toolkit for

SPOK MESSENGER. Improving Staff Efficiency and Patient Care With Timely Communications and Critical Connectivity

Congenital Heart Disease Services

THE JOINT STAFF Research, Development, Test and Evaluation (RDT&E), Defense-Wide Fiscal Year (FY) 2009 Budget Estimates

Innovating for Improvement

Briefing: NIB Priority Domains

A Regional Approach to HIE

The Forward View Into Action: Paper-free at the Point of Care Guidance for Developing Local Digital Roadmaps

NHS. Top tips to overcome the challenge of commissioning diagnostic services. NHS Improvement - Diagnostics. NHS Improvement Diagnostics CANCER

Learnings from the Implementation of an NHS 111 Integrated Digital App in the West Midlands

Cheshire & Merseyside Sustainability and Transformation Plan. People and Services Fit for the Future

North West London Sustainability and Transformation Plan Summary

Southwest Texas Regional Advisory Council

Sussex Integrated Urgent Care Transformation. Autumn 2017

13 th March Ruth Pitman- Jones - Val Rhodes -

Delivering the Five Year Forward View. through Business Intelligence

4 Year Patient and Public Involvement Strategy

Leeds Teaching Hospitals Informatics EPR Programme PPM+ v Release Notes

Oxfordshire Clinical Commissioning Group: Annual Public meeting

BUSINESS CONTINUITY MANAGEMENT POLICY

Delivering Local Health Care

NHS e-referral Service (e-rs) Frequently Asked Questions for Referrers

Seamless Clinical Data Integration

Integrated Health and Care in Ipswich and East Suffolk and West Suffolk. Service Model Version 1.0

Information Technology Strategy Kevin Fitzgerald, Director of IM&T

National Programme for IT. Ken Lunn Head of Comms and Messaging OMG/HL7 workshop October 2005

Briefing for Health & Well Being Boards Yorkshire & Humber Local Health and Care Record Exemplar bid One Vision One Voice

Market Trends and Practical Examples

ICT in Northern Ireland. Dr Jimmy Courtney NIGPC

Strategic overview: NHS system

Personalised Health and Care 2020: Next steps

Overview. Dr Stephen Gulliford & AKI Specialist Nurse Suzanne Wilson Page 1

Redesign of Front Door

Norfolk and Waveney STP. Meeting with East Suffolk Partnership 27 September 2017

Transcription:

LANCASHIRE PATIENT RECORD EXCHANGE SERVICES LANCASHIRE INTRODUCTION The Lancashire Person Record Exchange Services () allows sites to share patient documents with participating sites. also developed an online information governance tool for managing information sharing agreements between sites. The solution deployed is a HIE Tiani Spirit Exchange platform and it connects 9 sites and 228 GPs. SCALE M COMPLEXITY M ACUTE CARE PRIMARY CARE MENTAL HEALTH CARE COMMUNITY CARE SOCIAL CARE TIMELINE Scale: S = < 5 organisations M = 5-10 organisations L = 10+ organisations Complexity: L = Healthcare (HC) only M = HC + community or social care H = HC + community + social care 2012 2012 2015 2016 Plan for 2017+ Proof of concept to share discharge letters directly between 3 Health Care Organization and GPs INVESTMENT OBJECTIVES 1m allocated from the Tech Fund to roll out the platform Solution roll out : Discharge letters shared between Lancashire Teaching Hospital and GPs; Clinic outpatient letters between East Lancashire Hospitals and GPs Start the WEL Personal Health Programme, which includes a patient portal PUTTING THE CITIZEN AT THE HEART OF CARE PROVISION. SUPPORTING INCREASED EFFICIENCY BY EMPOWERING STAFF WITH ACCURATE, REAL-TIME INFORMATION. IMPROVING PATIENT OUTCOMES THROUGH BETTER, SAFER AND MORE JOINED UP CARE. 9 healthcare organisations Approx. 3500 documents shared every day Approx. 1.8 million population

SOLUTION The solution enables document sharing between different organisations, on request. Health and Care workers access these documents via a one-click button search feature embedded within their native systems. Documents can contain test results, discharge summary or patient information and they are published in PDF Format. The solution currently supports read-only access to these documents. Currently documents are shared between 9 organisations in the region: 5 acute hospitals 1 mental health trust 1 ambulance trust 1 commissioning support unit 2 county councils 228 GPs On average 3500 documents are exchanged per day. An Information Sharing Governance Tool is used to manage the flow of documents. BUSINESS CAPABILITIES RECORDS ACCESS programme enables health and care professionals to access information stored across the systems of other care organisations on the programme. The record includes access to: o Hospital attendance o Diagnoses o Immunisations o Allergies o Social care information o Mental health contacts o Community health information o Test results TRANSFERS OF CARE All types of documents, clinic letters, outpatient letters and other clinical documents are delivered directly into the GP workflow for GP practice staff to manage. INFORMATION SHARING CONSENT The Information Sharing Gateway (ISG) is a programme-wide governance tool designed for the. Online tool for member organisations to track data flows by registering the type of data they want to share and request details about the type of data they want to access. Allows easy auditing for organisations to demonstrate compliance with legislations. Patients give consent before any data can be shared at the point of care.

TECHNICAL SOLUTION SOLUTIONFEATURES IN USE FEDERATED REGISTRY MODEL The project uses a federated registry model to share information and is based on the Tiani Spirit Health Information Exchange. On request, the Tiani Spirit retrieves information from other organisations within the network. Organisations store data within their own systems and control what data they share. s are deployed at each organisation to control access and publish and consume data. User access roles are stored in an active directory, the largest NHS directory of its kind in the country. 5 organisations and GPs share documents. Additional organisations can view these. FEATURE Coded data Free text data Bi-directional Real time Role-based access Clinical Portal Analytics Write access Notifications/Alerts Patient Portal IN USE HEALTH AND CARE IT SYSTEMS IN THE REGION SITE Lancashire Teaching Hospitals Lancashire Care NHS Foundation Trust Blackpool Teaching Hospitals East Lancashire Hospitals Southport and Ormskirk Hospital University Hospitals of Morecambe Bay GP Practices Lancashire County Council OPEN STANDARDS STANDARD HL7 v2, v.3, FHIR, GS1, IHE XDS IT SYSTEM Harris Quadramed Servelec Rio IMS CSC Continuum System C Medway CSC Lorenzo EMIS Liquid Logic COMPLIANT HIGH LEVEL TECHNICAL ARCHITECTURE DIAGRAM GP SURGERIES LANCASHIRE TEACHING HOSPITALS NHS FOUNDATION TRUST TIANI SPIRIT HEALTH INFORMATION EXCHANGE LANCASHIRE CARE NHS TRUST LANCASHIRE COUNTY COUNCIL Note: this diagram does not show all sites that are sharing information

IMPLEMENTATION The project consisted of 2 phases: the pilot phase and the expansion phase. Each site deployment was carried out by Tiani and the local IT team and included: Installation and deployment of a node in an organisation. Integration with the services. Deployment of a portal on local machines [if required]. Timelines for each deployment vary depending on the documentation and organisations. The implementation of the discharge letters from LTH to 80 GPs took 3 months. PROGRAMME SPONSOR Lancashire Digital Health Board PRIMARY FUNDERS NHS England Tech Fund, Innovation Agency, 5 Lancashire providers and local authorities DELIVERY APPROACH Two-phased project over the span of 3 years GOVERNANCE Lancashire Digital Health Board GOVERNANCE The project reports into the Lancashire Digital Health Board. The project team works with local IT Committees. FUTURE AMBITIONS In the future there are specific milestones and plans to: The project plans to deploy the solution to all Local Digital Roadmap partners by the end of 2017. This includes adapting the solution for local police, fire rescue and borough councils as part of the Lancashire Transforming Lives programme. WEL Personal Health Programme, which includes a patient portal for patients to share personal health information with health and care professionals. Enable local authorities to see parts of a person s GP record [September 2017] Enable South Manchester Hospital to share information with Blackpool Hospital regarding Cystic Fibrosis patients. [September 2017]

ADMISSION DOCUMENT SHARING INTRODUCTION SOLUTION IMPLEMENTATION BENEFITS SUCCESS FACTORS LESSONS LEARNED SOLUTION BENEFITS identified the following potential direct and indirect benefits of the information sharing solution: DESCRIPTION PATIENT CLINICAN OPERATIONAL Patient information can be shared in digital form. Documents now arrive in hours, compared to the previous wait of 6 weeks. Experience improves as they can be treated sooner Saves time waiting for important patient information Increases care organisation productivity; reduction in postage costs, courier fees Clinicians have access to critical patient information when patient is admitted to A&E, including patient allergies, diagnosis and medical history. Experience improves as they may spend less time in hospital Saves time chasing information Frees up bed spaces, increases care organisation productivity Note: These benefits are assumption based and there are no supporting data or metrics to quantify the benefits described.

SUCCESS FACTORS GOVERNANCE SMALL, INDEPENDENT TEAM TO LEAD PROGRAMME The central team was funded by all of the organisations in the programme, but did not belong to any of them. This structure helped prevent disputes over project ownership. By keeping the team small and focused, they could prioritise and respond to new challenges quickly. CO-OPERATION LEARN FROM OTHER SITES There are exemplar sites across the country and the world which can provide valuable support. The team learned from the Lower Austria Health Organisation who also use the Tiani Spirit Platform. They took technical developers and interface specialists to visit this site and provided them with a better understanding of the programme and the benefits it can bring. DELIVERY APPROACH PROJECT PROOF OF CONCEPT The team created a proof of concept model before starting work on the programme, this helped them identify possible issues and mitigate risk. In the proof of concept, the programme implemented the Discharge Summary Exchange (DSe) and the Care Plan Exchange (CPe). OBTAIN CLINICIAN BUY-IN The programme leadership built partnerships with local care organisations to progress the information sharing agenda. By having the future users of the system championing the interoperability programme, the programme was adopted with minimum resistance. ENGAGEMENT

LESSONS LEARNED ENGAGEMENT Challenge: Maintaining pace and stakeholder engagement was challenging as progress was slow. This was a concern because adequate funding and support was key to the success of the project. Approach: The central team learned to maintain stakeholder engagement by providing reassurance about the progress of the project. The team continually set expectations about the length and effort required to adapt new technologies. ENGAGEMENT Challenge: The proof of concept initially set out to deliver a Core Health Profile solution but this proved challenging, resulting in decreased end-user interest. Approach: The project team revised the focus of the proof of concept to address the end-user s highest priority challenge: discharge summary exchange. As the programme now meets the needs of the user base, support for the project was revitalized. TECHNOLOGY ASSESSMENT Challenge: An up to date and accurate view of the existing technology system architecture across the Lancashire sites did not exist. This initially caused challenges in design and implementation. Approach: The team carried out a technology assessment. This helped them document an up to date view of the architecture, which helped the design and implementation planning of the solution. LEGACY ARCHITECTURE Challenge: 5 major sites on the programme were using different EPR systems with different architectures and connectivity. Implementing interfaces was challenging as they could not be deployed as off-the-shelf solutions. Approach: The project team overcame the problem by implementing an affinity domain in each individual organisation i.e., a set of virtual servers with Health Integration Engine technology. This allows the respective organisations to publish data to the affinity domain regardless of the interface engine type. FURTHER INFORMATION INFORMATION CORRECT AS OF 06/04/2017 CONTACT TONY SCHAFFEL Head of Produced in collaboration with NECS and Accenture REFERENCES Lancashire Local Digital Roadmap Website Project Documents