Building Repair Grants Scheme

Similar documents
HERITAGE LOTTERY FUND GRANTS FOR PLACES OF WORSHIP APPOINTING PROFESSIONALS

DUBLINE DEVELOPMENT FUND. Application Guidelines. Connecting places, peoples and pasts

STRATFORD-UPON-AVON HISTORIC SPINE SHOP FRONT GRANT SCHEME

Heritage Grants - Receiving a grant. Mentoring and monitoring; Permission to Start; and Grant payment

Business Frontage Improvement Grant Scheme. Application Form

distinction as to race, religion, age or disability, and in compliance with relevant legislation.

CLARE COUNTY COUNCIL

SUSTAINABLE TRAVEL GRANT SCHEME GUIDANCE NOTES. For. Matched Funded Grants Maximum 2,000

Your Club, Your Vision 2 Project Start Up and Planning 2

CULTURAL PROTECTION FUND APPLICATION GUIDANCE SMALL GRANTS

Regulatory Incident Management Policy

Northern Cultural Regeneration Fund

Policy for Special Rate/Charge Schemes in Retail/Commercial Precincts or Centres April 2014

Royal Irish Academy Standing Committee for Archaeology

NHS WOLVERHAMPTON CLINICAL COMMISSIONING GROUP CONSTITUTION

Leeds City Council Right-To-Buy Capital Grants Funding Initiative For Purchase & Repair Of Properties

Grants Financial Procedures (Post-Award) v. 2.0

HUD Q&A. This is a compilation of Q&A provided by HUD regarding relevant issues affecting TCAP and the Tax Credit Exchange Program.

Health programme Call New ways for supporting your plans

GUIDANCE ON MANAGING CHURCH BUILDING PROJECTS

Nevada Volunteers AmeriCorps Program Closeout Checklist and Certification

Project Development Grants Guidance Notes

Application for Financial Assistance Lancashire Business Growth Fund

Home Energy Saving (HES) scheme - Homeowner Application Form Version 10.0

Municipality of North Grenville Rideau-Sanders Community Improvement Plan (CIP) Financial Incentive Program

Guidance Notes for Applicants

Revitalising Redesdale Community Heritage Fund Guidance Notes for Grant Applicants

SEALED PROPOSAL REQUEST FOR PROPOSAL. Professional Archaelogical Services

Incentive Guidelines Research and Development - Tax Credits INDUSTRIAL RESEARCH PROJECTS; EXPERIMENTAL DEVELOPMENT PROJECTS; INTELLECTUAL PROPERTY

2018 Terms and Conditions for Support of Grant Awards Revised 7 th June 2018

August All of the information listed above will be made available to the chosen consultant and should be used to inform the final study.

Application Guidelines National Lottery Capital Small Grants (Artists Work in Public Places)

RURAL DEVELOPMENT PROGRAMME LEADER GRANT APPLICATION FORM

THE FOOD ACADEMY START PROGRAMME (Dublin Region) 2017 Local Enterprise Offices: Dublin City, Dun Laoghaire-Rathdown, Fingal, South Dublin

Enhanced service specification. Avoiding unplanned admissions: proactive case finding and patient review for vulnerable people

13. CLINICAL ACADEMIC CONSULTANTS (Note: To be read with the guidance associated with Section 13 issued as Annex C to NHS Circular PCS(DD)2004/2)

MAIN STREET AREA FAÇADE IMPROVEMENT PROGRAM (FIP)

Uniform Bid Process and Contractor Relations

SPORT FACILITIES FUND GUIDANCE PAGE 1

Client name:... Billing name:... Address:... address:... ABN/ACN:... Contact name:... Phone number:... Cost register (office use):...

Oregon Department of Fish and Wildlife Wildlife Division 3406 Cherry Avenue NE Salem, Oregon 97303

manual Training Bursary for academic year 2011/12 Training Bursary

Annual application deadlines First working day of February and September

United Kingdom-Sheffield: Urban planning and landscape architectural services 2016/S Contract notice. Services

Breaking New Ground Community Grant Fund

Please Return TERMS OF BUSINESS FOR SUPPLYING TEMPORARY STAFF SERVICES 1. DEFINITIONS. 1.1 In these Terms of Business the following definitions apply:

Early Years Capital 2015 Frequently Asked Questions (FAQs)

Meath County Council. Burial Ground Grant Scheme Application Form 2017

Feed-In Tariff (FIT) Statement of Terms

1. daa plc, whose principal address is at Old Central Terminal Building, Dublin Airport, Co Dublin (Funder)

Heritage Incentives Scheme Operating Guidelines

GRANT AGREEMENT. between POLICE AND CRIME COMMISSIONER FOR THAMES VALLEY. and. XXXXXXX (Council) COMMUNITY SAFETY FUND GRANT AGREEMENT.

terms of business Client Details Client name:... Billing name:... Address:... address:... NZBN/NZCN:... Contact name:... Phone number:...

First-time Buyer: Home Renovation Grant

Match Funding your Heritage Lottery Fund Our Heritage Grant With a National Churches Trust Repair or Community Grant

WHEELCHAIR ACCESSIBLE VEHICLE GRANT SCHEME 2018 (WAV18)

Heritage Incentives Scheme Operating Guidelines

2018 HOUSE GRANTS PROGRAM GUIDELINES & CONDITIONS

ERDF-WI-8-001Claims Work Instruction for Grant Recipients ERDF-GN MCIS Claim Editor User Guide

BALTIMORE CITY PUBLIC SCHOOLS MINORITY AND WOMEN BUSINESS ENTERPRISE PROGRAM AND PROCEDURES MANUAL FOR STATE FUNDED PROJECTS

Department of Construction and Procurement Services

Wayne County Lateral Connection and Well/Septic Repair Assistance Program. Program Guidelines. Prepared by:

MINORITY BUSINESS ENTERPRISE PROCEDURES FOR STATE FUNDED PUBLIC SCHOOL CONSTRUCTION PROJECTS Revised JUNE 2008

Match Funding your Heritage Lottery Fund Heritage Grant With a National Churches Trust Repair Grant

A Wiradjuri Learning Resource FOR. Local students and teachers

APRIL 2009 COMMUNITY DEVELOPMENT BLOCK GRANTS/STATE S PROGRAM NORTH CAROLINA SMALL CITIES CDBG AND NEIGHBORHOOD STABILIZATION PROGRAM

Home Energy Saving scheme. Application Guide Version 1.1

Partnership Grants Programme Guidance Notes for Applicants in Northern Ireland

St Anne's Community Services Staff Manual

GUIDANCE NOTES FOR THE EMPLOYMENT OF SENIOR ACADEMIC GPs (ENGLAND) August 2005

Model terms and conditions of service for a salaried general practitioner employed by a GMS practice ( Practice )

NHS PCA (P) (2015) 17. Dear Colleague

Career Development Fellowships 2018 Guidelines for Applicants. Applications close 12 noon 05 April 2018

Procedures for Local Public Agency Project Administration (Revised 5/2014)

2014 Construction Management Project Achievement Awards

Customer Tailored Energy Efficiency Pilot Program FY18 PROGRAM GUIDE

Southern California Chapter 2017 Project Achievement Awards

Guide to. Grant Aid Agreement Document. Section 39 Health Act, 2004 Section 10 Child Care Act, 1991 National Lottery

POLICY 6800 PROCUREMENT

APPLICANTS LEADER GENERAL GUIDANCE FOR

PROPERTY IMPROVEMENT PROGRAM

FUNDING AGREEMENT FOR SECTION 5317 NEW FREEDOM PROGRAM GRANT FUNDS

DATED [2015] (1) NORTH YORKSHIRE COUNTY COUNCIL (2) [INSERT NAME OF GRANT RECIPIENT] FUNDING AGREEMENT - GRANT [INSERT PROJECT TITLE]

Erosion Control and Water Management Policy

Teacher training incentives in Wales PGCE (FE) 2010/11

Client name:... Billing name:... Address:... address:... ABN/ACN:... Contact name:... Phone number:... Cost register (office use):...

Heritage Grants. Application guidance. March Grants over 100,000

Facilities Strategy Award

Federal Financial Report Instructions

Heritage Revealed : Accessing Dartington s Historic Landscape Brief for the Project Delivery Coordinator THE DARTINGTON HALL TRUST

DRAFT USE ONLY. Disclaimer

Farm Energy and Agri-Processing Program Terms and Conditions

Research Equipment Grants 2018 Scheme 2018 Guidelines for Applicants Open to members of Translational Cancer Research Centres

STANDARD CONDITIONS OF GRANT. Victims Support Programme and PEACE IV PROGRAMME Shared Spaces and Services Victims and Survivors

Administrative Regulation SANGER UNIFIED SCHOOL DISTRICT. Business and Noninstructional Operations FEDERAL GRANT FUNDS

REQUEST FOR PROPOSALS

Dorset Housing Assistance Policy Introduction

The Dublin City Community Enhancement Programme Guidelines 2018

REQUEST FOR PROPOSALS For Design Services for New Fire Station

Closing Date for EOI: 4pm, Monday 19 March Introduction and purpose. 2. Eligibility

Transcription:

Historic Environment Grants Building Repair Grants Scheme Notes for the Guidance of the Professional Adviser

These notes should be read in conjunction with the Guide for Applicants. They provide the professional adviser with an outline of the procedure to be followed in managing a grant-aided project. Please read this guide carefully. 2 Historic Environment Grants Building Repair Grants Scheme

1. It is a condition of our Historic Environment Grants Scheme that the lead professional adviser is suitably accredited in building conservation before we will make a grant award. 2. If an application passes our initial assessment tests, we will inform the person who submitted the application. Once a need for grant has been confirmed, the project will be assessed in comparison with the other grant applications that we have been received in the batching period. This is a competitive process. We aim to tell the applicant our decision on whether the application is to be considered further for grant within 2 months from the batch closing date (although complex and large-scale projects may take longer). 3. You are advised not to prepare a detailed repair specification for the project until Historic Scotland has made a decision on the application. This is because we will need to agree the technical details of the project with you before your proposals are finalised. 4. Historic Scotland s Advisory Report (ARCH 1) is prepared as an outline schedule of the recommended eligible works which are required by Historic Scotland to be carried out. The report is not intended to be used for pricing the work or as a contract document. It should be developed by you to provide full specifications, schedules of works, etc as part of the normal contract documentation of the project. Details of the manner in which repairs should be carried out and what is eligible for assistance as part of the grants scheme can be found on our website www. historic-scotland.gov.uk 5. Once a scheme of repair has been drawn up and agreed with us an application may be given: a. An INDICATIVE APPROVAL at scheme design stage (see Appendix 1). A firm offer may then be made by Historic Scotland on receipt of acceptable tender costs against an agreed scheme incorporating the recommendations in the ARCH1 and any other information Historic Scotland may have requested. Significant variations between estimated costs and tender costs will result in the scheme being re-considered for grant. or b. A FIRM OFFER at tender stage, where the offer will be made against acceptable tender costs on a detailed scheme agreed with Historic Scotland incorporating their recommendations in the ARCH1 (see Appendix 2). 6. Following an indicative approval, firm proposals, contract documents (normally specifications, bills of quantities or schedules of work), a report on tender prices and a cost analysis identifying eligible elements of the work will be required to be agreed with Historic Scotland before a grant offer can be confirmed and permission given to start work. Scheme proposals should be worked up to a level appropriate to the scale and complexity of the project, including large scale working drawing details where necessary to fully describe the proposals. For example, drawings, full specification notes and schedules of works; or drawings, specifications and Historic Environment Grants Building Repair Grants Scheme 3

bills of quantities. These should be submitted by an agreed date, normally not later than 6 months following the indicative approval letter. 7. It should be noted that a detailed scheme of repair must be drawn up and agreed with Historic Scotland before tenders are invited. 8. The information provided in the form described in Appendix 1 should be expanded and updated as necessary and tender prices provided for the eligible (and other) works items, with figures for the related VAT and fees. Historic Scotland will require confirmation that VAT is payable and not recoverable, either in whole or in part. 9. If scheme details are acceptable and there are no significant variations between indicative and tender prices, the grant offer will be confirmed as a firm offer and clearance given to start work. This will be subject to any other information Historic Scotland may have requested having been provided and the acceptance of the grant offer by the applicant. 10. Any finds of archaeological or historic interest, unforeseen problems or additional works deemed essential, must be notified to Historic Scotland at the earliest possible opportunity. Agreement in writing must be obtained for any additional works before they can be included in the scheme. 11. It is the responsibility of the owner to maintain adequate insurance on the building and the works during the period of repair. Failure to provide adequate insurance will be regarded as a breach of conditions of grant and could lead to the grant being recovered. It is also a standard condition of grant that adequate, continuing insurance cover for the building is maintained after its repair. 12. Grant will be paid on fees in relation to the value of the eligible works completed. Grant will be paid on non-recoverable VAT on eligible works, subject to the submission of the contractor s VAT invoices and, where appropriate, a copy of the confirmation in writing from HM Customs & Excise of the VAT liability. Grants of under 50,000 13. Where the grant award is less than 50,000 payment of the grant will be made in instalments over the period of the project under a Payment Plan agreed with the applicant. Normally there will be 4 payments:- n 50% at the start of the contract and when Historic Scotland has issued its authority to start work; n 20% at an agreed mid-point in the contract; n 20% on submission of the Certificate of Practical Completion; and n 10% on submission of the final account. Historic Scotland reserve the right to change the percentage released depending on individual project circumstances. 14. The Historic Scotland architect may make site visits to confirm the quality and scope of the work that has been carried out. In the event of an unsatisfactory report, no further 4 Historic Environment Grants Building Repair Grants Scheme

grant monies will be released until the problems have been resolved to the satisfaction of Historic Scotland. 15. If Historic Scotland is not satisfied that the eligible repairs have been completed in accordance with the approved scheme and to the necessary standard, the balance of grant will be withheld until remedial works are undertaken at the applicant s expense. Failure to carry out remedial works may result in the recovery of all, or part, of the grant already paid. Grants in excess of 50,000 16. For grants in excess of 50,000, you will be required to inspect the work on site as it proceeds and make claims for grant on form ARCH 5. Claims for grant should be submitted monthly and within 21 days of the valuation of eligible works being carried out. A valuation at 31 March will also be required. Failure to submit claims within the 21-day period may lead to grant not being paid. 17. A costed monthly profile of works for the contract period showing the expected grant drawdown must also be submitted to Historic Scotland. 18. Once a works contract has been let, a formal report on progress should be provided to Historic Scotland on a quarterly basis. This report should show cumulative expenditure on eligible work in progress; any adjustments that have been made, or are anticipated to the contract period; and the reason(s) for any variation in the pattern of expenditure from the costed profile. A form will be provided for this purpose. Where such a report is also required by the Heritage Lottery Fund, a copy of the report to the Fund shall suffice. Historic Scotland reserve the right to request progress reports at any time. 19. The Historic Scotland architect may make site visits to confirm the quality and scope of the work that has been carried out. In the event of an unsatisfactory report, no grant monies will be released until the problems have been resolved to the satisfaction of Historic Scotland. 20. Once the approved scheme is completed, you should prepare a Certificate of Practical Completion, or its equivalent, which should be copied to Historic Scotland who will then arrange for their architect to visit as soon as possible to carry out a final inspection. If the eligible repairs have been carried out satisfactorily in accordance with the agreed scheme, the retained portion of grant will be paid once final eligible costs can be assessed. These costs should comprise the final cost of the eligible repairs, VAT statements and final accounts for professional fees. 21. If Historic Scotland is not satisfied that the eligible repairs have been completed in accordance with the approved scheme and to the necessary standard, the balance of grant will be withheld until remedial works are undertaken at the applicant s expense. Failure to carry out remedial works may result in the recovery of all, or part, of the grant already paid. For further information Telephone: 0131-668 8801 Fax: 0131-668 8788 E-mail: hs.grants@scotland.gov.uk Historic Environment Grants Building Repair Grants Scheme 5

Appendix 1 Once the Advisory Report (ARCH 1) has been issued, the following information is required by Historic Scotland for further consideration of the project for INDICATIVE APPROVAL. a. Drawings Location and site plans. Key drawings of the building, identifying areas where works are required. b. Specifications Outline specification of eligible works, including information on materials to be used and standards of workmanship. c. Costs Estimated costs for each eligible element of work based on cost levels appropriate to the proposed tender date. An estimated costed profile of works showing the likely spend on eligible works. (see Appendix 4) Summary of other works included in the project which do not form part of the eligible scheme, including an overall estimate of cost. Estimated costs of VAT and professional fees. A note of the total project cost. 6 Historic Environment Grants Building Repair Grants Scheme

Appendix 2 Once ARCH1 has been issued, the following information is required by Historic Scotland for further consideration of the project for a FIRM OFFER of Grant a. Drawings Location and site plans. Key plans of the whole building, identifying areas where works are required. Annotated scale plans, sections and elevations describing in outline all proposed works and identifying the grant-eligible work. Large scale working details, where necessary, to describe the proposals fully. b. Specifications etc. Normally, either full specification notes (on drawings or as a separate document) and schedules of works; or Full specifications and bills of quantities, in support of drawings at b. above. c. Costs Tender costs for each eligible element of work as shown on the ARCH 1. Tender report on competitive tenders Summary of other works included in the project which do not form part of the eligible scheme, including costs. Assessment of cost of VAT and professional fees. A note of total project costs. Historic Environment Grants Building Repair Grants Scheme 7

Appendix 3 ARCH5 CLAIM FOR GRANT (To be completed and submitted with a copy of the Interim Certificate) Project HS Ref Phase Claim No Date of Claim Total Project Cost (including non-eligible costs) ARCH 1 Eligible Tender Cumulative Eligible Comments Element Heading Costs Expenditure (Please explain Gross any increase or decrease in costs) Totals Fees @ % sub total VAT on works VAT on fees Cumulative Total Inclusive of contract retentions I certify that the assessment of cumulative eligible expenditure is as shown above; and that the final eligible expenditure is not expected to exceed the total sum for which grant was approved. I confirm that any increase in eligible costs over the total approved will be notified immediately, in writing, to Historic Scotland. Signed: (Applicant s Professional Adviser) Name: Position: 8 Historic Environment Grants Building Repair Grants Scheme