ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

Similar documents
UNCLASSIFIED FY 2016 OCO. FY 2016 Base

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 R-1 Line #208

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing EF4: Integrated Broadcast System

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. Cost To Complete Total Program Element : DIGITAL BATTLEFLD COMM.

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Tactical Electronic Surveillance System - Adv Dev. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: JOINT PERSONNEL RECOVERY AGENCY (JPRA)

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #156

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Distributed Common Ground/Surface Systems. Prior Years FY 2013 FY 2014 FY 2015

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Integrated Broadcast Service (DEM/VAL) FY 2012 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. Cost To Complete Total Program Element : TECH SURVEIL COUNTER MEAS EQPT. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 8 R-1 Line #77

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Counter Narcotics Technology Program Office

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED. Cost To Complete Total Program Element : TECH SURVEIL COUNTER MEAS EQPT. FY 2016 Base FY 2016 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Multi-Platform Electronics

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Exhibit R-2, RDT&E Budget Item Justification

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #222

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: JOINT PERSONNEL RECOVERY AGENCY (JPRA) FY 2011 OCO Estimate. FY 2011 Total Estimate

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #94

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 5 R-1 Line #138

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Distributive Interactive Simulations (DIS) - Eng Dev FY 2013 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

Exhibit R-2, RDT&E Budget Item Justification

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 R-1 Line #201

UNCLASSIFIED R-1 ITEM NOMENCLATURE

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: NUCLEAR WEAPON MODERNIZATION FY 2012 OCO

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED. Cost To Complete Total Program Element S750: Mission Training and Preparation Systems FY 2015

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED R-1 ITEM NOMENCLATURE

Exhibit R-2, RDT&E Budget Item Justification

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: National Security Space Office

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: RADAR DEVELOPMENT

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Human, Social and Culture Behavior (HSCB) Modeling Advanced Development FY 2011 OCO Estimate

Transcription:

BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) PE NUMBER AND TITLE COST (In Thousands) FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Cost to Total Cost Actual Estimate Estimate Estimate Estimate Estimate Estimate Complete Total Program Element (PE) Cost 43673 16818 42869 33576 24750 23195 22380 Continuing Continuing 361 INTELLIGENCE SIMULATION SYSTEMS 7028 2251 1192 1227 1024 1246 1270 Continuing Continuing 362 WARFIGHTER SIMULATION 36645 14567 41677 32349 23726 21949 21110 Continuing Continuing A. Mission Description and Budget Item Justification:This program element funds the development of constructive and wargame simulations used to realistically train commanders and their battlestaffs on today's complex battlefield conditions. Project 361 funds the development of the Intelligence Electronic Warfare Tactical Proficiency Trainer (IEWTPT) that provides Warfighting Commanders at all echelons the ability to train with Intelligence, Surveillance, and Reconnaissance (ISR) product based on realistic ISR assets, people (maneuver commander, G-2, G-3, collection managers analyst/operator) and processes. IEWTPT provides embedded training capability for Future Combat Systems (FCS) ISR systems. IEWTPT will interface/stimulate ISR systems including Tactical Unmanned Aerial Vehicle (TUAV), Joint Surveillance Target Attack Radar System- Common Ground Station (JSTARS-CGS), Aerial Common Sensor(ACS), Tactical Exploitation System/Distributed Tactical Exploitation System (TES/DTES), Guardrail, Counter Intelligence/Human Intelligence Management Systems (CHIMS), Prophet and Distributed Common Ground Station-Army (DCGS-A). IEWTPT is the only Army Simulation System supporting ISR training from the Warfighter to the Military ISR Analyst/System Operator. The FY05 funding completes initial development and continues product improvements of the Intelligence Electronic Warfare Tactical Proficiency Trainer (IEWTPT). Project 362, Warfighters' Simulation (WARSIM) develops the Army's premier wargame simulation for training leaders and battlestaffs at Brigade, Division, Corps, and echelons above Corps. WARSIM will provide functionality not currently available (digital operations, stability and support operations, information ops), link to unit organizational Command, Control, Communications, Computers and Integration (C4I) equipment, improve exercise generation and after-action reporting. WARSIM will interoperate with OneSAF and other simulation as an integral part of Army Constructive Training Federation (ACTF), so that a warfighter training exercise can represent in simulation all Army echelons and in a Joint environment. ACTF pulls together current constructive simulation systems and future constructive simulations and uses a comprehensive strategy to ensure interoperability among all of those systems. This strategy will allow ACTF to meet current and future user needs. ACTF leverages the best pieces of current systems to meet current training needs and evolves to meet the training needs of the future force. 0604742A Item No. 104 Page 1 of 15 Exhibit R-2 CONSTRUCTIVE SIMULATION SYSTEMS 747 Budget Item Justification

BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) PE NUMBER AND TITLE B. Program Change Summary FY 2003 FY 2004 FY 2005 Previous President's Budget (FY 2004) 43813 16994 1155 Current Budget (FY 2005 PB) 43673 16818 42869 Total Adjustments -140-176 41714 Congressional program reductions -159 Congressional rescissions Congressional increases Reprogrammings -140-17 SBIR/STTR Transfer Adjustments to Budget Years 41714 Army restored funding to the WARSIM Program to support constructive simulation development. 0604742A Item No. 104 Page 2 of 15 Exhibit R-2 CONSTRUCTIVE SIMULATION SYSTEMS 748 Budget Item Justification

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2A Exhibit) 5 - System Development and Demonstration 0604742A - CONSTRUCTIVE SIMULATION SYSTEMS 361 COST (In Thousands) FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Cost to Total Cost Actual Estimate Estimate Estimate Estimate Estimate Estimate Complete 361 INTELLIGENCE SIMULATION SYSTEMS 7028 2251 1192 1227 1024 1246 1270 Continuing Continuing A. Mission Description and Budget Item Justification:Intelligence Electronic Warfare Tactical Proficiency Trainer (IEWTPT)provides Warfighting Commanders at all echelons the ability to train with Intelligence, Surveillance, and Reconnaissance (ISR) product based on realistic ISR assets, people (maneuver commander, G-2, G-3, collection managers analyst/operator) and processes. IEWTPT provides embedded training capability for Future Combat Systems (FCS) ISR systems. IEWTPT will interface/stimulate ISR systems including Tactical Unmanned Aerial Vehicle (TUAV), Joint Surveillance Target Attack Radar System- Common Ground Station (JSTARS-CGS), Aerial Common Sensor(ACS), Tactical Exploitation System/Distributed Tactical Exploitation System (TES/DTES), Guardrail, Counter Intelligence/Human Intelligence Management Systems (CHIMS), Prophet and Distributed Common Ground Station-Army (DCGS-A). IEWTPT is the only Army Simulation System supporting ISR training from the Warfighter to the Military ISR Analyst/System Operator. The FY05 funding completes initial development and continues product improvements of the Intelligence Electronic Warfare Tactical Proficiency Trainer (IEWTPT). This system supports the Future transition path of the Transformation Campaign Plan (TCP). Accomplishments/Planned Program FY 2003 FY 2004 FY 2005 Continued product improvement with interoperability testing with system Target Signature Arrays (TSA) of IEWTPT. 5754 770 357 Continues IEWTPT Program Management support 226 233 130 Continues IEWTPT Test planning and execution. 307 421 213 Continues IEWTPT Systems engineering, documentation, and Security accreditation and certification. IEWTPT Engineering Change Proposals. 741 776 492 SBIR/STTR 0 51 0 Totals 7028 2251 1192 0604742A (361) Item No. 104 Page 3 of 15 Exhibit R-2A INTELLIGENCE SIMULATION SYSTEMS 749 Budget Item Justification

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2A Exhibit) 5 - System Development and Demonstration 0604742A - CONSTRUCTIVE SIMULATION SYSTEMS 361 B. Other Program Funding Summary FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Compl Total Cost OPA3, Appropriation NA0100, Training Devices, Nonsystem 156811 311963 241946 197566 226341 171085 209303 Continuing Continuing C. Acquisition Strategy:Competitive development based on performance specifications. 0604742A (361) Item No. 104 Page 4 of 15 Exhibit R-2A INTELLIGENCE SIMULATION SYSTEMS 750 Budget Item Justification

ARMY RDT&E COST ANALYSIS(R3) I. Product Development Contract Performing Activity & Total FY 2003 FY 2003 FY 2004 FY 2004 FY 2005 FY 2005 Cost To Total Target a. IEWTPT System Dev & Demo CPIF Gen Dynamics Decision Systems, Orlando, FL 6983 5754 1-3Q 770 1-3Q 357 1-3Q Continue Continue Continue 361 6983 5754 770 357 Continue Continue Continue II. Support Cost Contract Performing Activity & Total FY 2003 FY 2003 FY 2004 FY 2004 FY 2005 FY 2005 Cost To Total Target a. IEWTPT Engineering & Technical Support Multiple Various 587 741 1-4Q 827 1-4Q 492 1-4Q Continue 2647 Continue 587 741 827 492 Continue 2647 Continue 0604742A (361) Item No. 104 Page 5 of 15 Exhibit R-3 INTELLIGENCE SIMULATION SYSTEMS 751 Cost Analysis

ARMY RDT&E COST ANALYSIS(R3) III. Test and Evaluation Contract Performing Activity & Total FY 2003 FY 2003 FY 2004 FY 2004 FY 2005 FY 2005 Cost To Total Target a. IEWTPT TEMP Support Various Multiple 90 104 1-2Q 125 1-4Q 50 1-2Q Continue Continue Continue b. IEWTPT Operational Test Event Support Various Multiple 87 103 1-3Q 236 1-3Q 98 1-2Q 0 524 0 361 c. Test Engineer Support MIPR NAVAIR Orlando (was NAWC-TSD) 84 100 1-4Q 60 1-4Q 65 0 309 0 261 307 421 213 Continue Continue Continue IV. Management Services Contract Performing Activity & Total FY 2003 FY 2003 FY 2004 FY 2004 FY 2005 FY 2005 Cost To Total Target a. IEWTPT Program Management Various Multiple 413 226 1-4Q 233 1-4Q 130 1-4Q Continue Continue Continue 413 226 233 130 Continue Continue Continue Project Total Cost: 8244 7028 2251 1192 Continue Continue Continue 0604742A (361) Item No. 104 Page 6 of 15 Exhibit R-3 INTELLIGENCE SIMULATION SYSTEMS 752 Cost Analysis

Event Name FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 TCC Development /Integration Annual Security Accreditation Operational Test Event Schedule Profile (R4 Exhibit) 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 361 (1) MS C 1 MR/IOC Ft. Huachuca Annual Security Accreditation Annual Test event Production Contract Award Annual Security Accreditation Annual Test Event Annual Security Accreditation Annual Test Event Annual Security Accreditation Annual Test Event FOC Annual Security Accreditation 0604742A (361) Item No. 104 Page 7 of 15 Exhibit R-4 INTELLIGENCE SIMULATION SYSTEMS 753 Budget Item Justification

Schedule Detail (R4a Exhibit) 361 Schedule Detail FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 IEWTPT CONTRACT AWARD IEWTPT Operational Test IEWTPT Milestone C IEWTPT Material Release 1-2Q 1-2Q 1-2Q 1-2Q 1-2Q 1-2Q 1-2Q 1Q 4Q 1Q 0604742A (361) Item No. 104 Page 8 of 15 Exhibit R-4a INTELLIGENCE SIMULATION SYSTEMS 754 Budget Item Justification

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2A Exhibit) 5 - System Development and Demonstration 0604742A - CONSTRUCTIVE SIMULATION SYSTEMS 362 COST (In Thousands) FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Cost to Total Cost Actual Estimate Estimate Estimate Estimate Estimate Estimate Complete 362 WARFIGHTER SIMULATION 36645 14567 41677 32349 23726 21949 21110 Continuing Continuing A. Mission Description and Budget Item Justification:This Project funds the development of Warfighter Simulation (WARSIM), the Army's premier wargaming simulation for training leaders and battlestaffs at Division, Corps, and echelons above Corps. WARSIM will interoperate with OneSAF and other simulations as an integral part of Army Constructive Training Federation (ACTF), so that a warfighter training exercise can represent in simulation all Army echelons and in a joint environment. WARSIM will provide functionality not currently available (digital operations, stability and support operations, information ops), link to unit organic C4I equipment, improve exercise generation and after-action reporting. The FY05 funding continues the development of the Army training system, integration and system evaluation. ACTF leverages the best pieces of current systems to meet current training needs and evolves to meet the training needs of the future force. This system supports the Future transition path of the Transformation Campaign Plan (TCP). Accomplishments/Planned Program FY 2003 FY 2004 FY 2005 Completed the software development and integration of WARSIM to provide Joint training capability for JSIMS Version 1.0 and support of JSIMS user demonstration. 10855 0 0 Completed software development and integration of Joint Tactical Intelligence Model (JTIM) within JSIMS. 5382 0 0 Verify and Validate WARSIM software models 823 1178 3632 Develop and integrate JSIMS Common Component Work Station (CCWS) and system Technical Control improvements. 1544 0 0 Continue the software development of WARSIM and integration of ACTF components for interoperability. 13554 8607 23518 Develop user interface enhancements for Army training applications. 2450 2706 9079 Develop and evaluate system performance and conduct system test events 2037 1766 5448 Small Business Innovative Research/Small Business Technology Transfer Programs 0 310 0 Totals 36645 14567 41677 0604742A (362) Item No. 104 Page 9 of 15 Exhibit R-2A WARFIGHTER SIMULATION 755 Budget Item Justification

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2A Exhibit) 5 - System Development and Demonstration 0604742A - CONSTRUCTIVE SIMULATION SYSTEMS 362 B. Other Program Funding Summary FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 To Compl Total Cost Other Procurement, Army, NSTD Command & Control (NA0103) 0 0 10788 57429 51156 1871 18441 Continuing Continuing C. Acquisition Strategy:Competitive development based on performance specifications. 0604742A (362) Item No. 104 Page 10 of 15 Exhibit R-2A WARFIGHTER SIMULATION 756 Budget Item Justification

ARMY RDT&E COST ANALYSIS(R3) I. Product Development Contract Performing Activity & Total FY 2003 FY 2003 FY 2004 FY 2004 FY 2005 FY 2005 Cost To Total Target a. JSIMS Land Component Systems Development b. JTIM Systems Development C/CPAF C/CPAF Lockheed Martin Info Sys, Orlando FL Veridian Sys Solutions, Orlando FL 35668 8920 1-3Q 0 0 0 44588 0 6723 5696 1-3Q 0 0 0 12419 0 362 c. JSIMS CCWS and Tech Control C/CPAF Lockheed Martin Info Sys, Orlando 7338 1256 1Q 0 0 0 8594 0 d. WARSIM Development of Army Training System C/CPAF Lockheed Martin Info Sys, Orlando FL 0 9320 2-3Q 10267 1-3Q 21093 1-3Q Continue Continue Continue e. Integration of ACTF C/CPAF TBD 0 0 0 7976 1Q Continue Continue Continue 49729 25192 10267 29069 Continue Continue Continue 0604742A (362) Item No. 104 Page 11 of 15 Exhibit R-3 WARFIGHTER SIMULATION 757 Cost Analysis

ARMY RDT&E COST ANALYSIS(R3) II. Support Cost Contract Performing Activity & Total FY 2003 FY 2003 FY 2004 FY 2004 FY 2005 FY 2005 Cost To Total Target a. Engineering & Tech Spt Multiple Various 2394 2714 1-4Q 1110 1-4Q 2580 1-4Q Continue Continue Continue 362 2394 2714 1110 2580 Continue Continue Continue III. Test and Evaluation Contract Performing Activity & Total FY 2003 FY 2003 FY 2004 FY 2004 FY 2005 FY 2005 Cost To Total Target a. Verification, Validation and Accreditation Multiple Various 928 991 1-3Q 309 1-3Q 3082 1-3Q Continue Continue Continue b. WARSIM System Evaluation and Test Multiple Various 2606 3472 1-2Q 189 1-3Q 1795 1-3Q Continue Continue Continue 3534 4463 498 4877 Continue Continue Continue 0604742A (362) Item No. 104 Page 12 of 15 Exhibit R-3 WARFIGHTER SIMULATION 758 Cost Analysis

ARMY RDT&E COST ANALYSIS(R3) IV. Management Services Contract Performing Activity & Total FY 2003 FY 2003 FY 2004 FY 2004 FY 2005 FY 2005 Cost To Total Target a. Program Management Multiple Various 4308 4032 1Q 2613 1-2Q 4957 1-2Q Continue Continue Continue 362 b. Cost Analysis Support T&M Northrup Grumman- TASC, Orlando FL 170 244 2-3Q 79 2-3Q 194 2-3Q Continue Continue Continue 4478 4276 2692 5151 Continue Continue Continue Project Total Cost: 60135 36645 14567 41677 Continue Continue Continue 0604742A (362) Item No. 104 Page 13 of 15 Exhibit R-3 WARFIGHTER SIMULATION 759 Cost Analysis

JSIMS VRM 1.0 Event Name FY 02 FY 03 FY 04 FY 05 FY 06 FY 07 FY 08 FY 09 JSIMS Block 1 completion Army AoA decision New Army Approach to Readiness Training Requirements Schedule Profile (R4 Exhibit) 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 362 (1) Army Constructive Training Federation (ACTF) V1 1 (2) WARSIM ACTF Proof of Principle 2 (3) WARSIM integrated into ACTF Version 3 3 (4) WARSIM Block 1 4 0604742A (362) Item No. 104 Page 14 of 15 Exhibit R-4 WARFIGHTER SIMULATION 760 Budget Item Justification

Schedule Detail (R4a Exhibit) 362 Schedule Detail FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Award WARSIM System Development Contract JSIMS Version 1.0 Release Closeout JTIM Contract 1-3Q 1-3Q 1-3Q 1-3Q 1-3Q 1-3Q 1-3Q 1Q 4Q 0604742A (362) Item No. 104 Page 15 of 15 Exhibit R-4a WARFIGHTER SIMULATION 761 Budget Item Justification