UPDATE: TRANSFORMING USACE DREDGING

Similar documents
BIG RIVER COALITION LOUISIANA DEPARTMENT OF TRANSPORTATION AND DEVELOPMENT DRIVING THE ECONOMY

Hopper Dredge Recapitalization

U.S. ARMY CORPS OF ENGINEERS REPORT TO CONGRESS HOPPER DREDGES

U.S. Army Corps of Engineers Navigation Program Update

U.S. Army Corps of Engineers Navigation Program Update

NATIONAL WATERWAYS CONFERENCE, WASHINGTON, D.C. MARCH 5-7, 2018

ARMY CORPS OF ENGINEERS. Action Needed to Ensure the Quality of Maintenance Dredging Contract Cost Data

Update on USACE Civil Works Program Authorities, Policies, and Guidance

NOAA Fisheries Update

Red River Valley Association

Dave (Sanford) always good to see you again. Ladies & Gentlemen, I m glad to be here

Is a dry-dock and internal structural exam required prior to the Coast Guard issuing the initial Certificate of Inspection?

Implementing the Water Resources Development Act of 2007

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION NOAA ADMINISTRATIVE ORDER SERIES TABLE OF CONTENTS. as of December 8, 2008

Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues

Water Resources Reform and Development Act (WRRDA) of Section Vertical Integration and Acceleration of Studies. Interim Report to Congress

2. The EPA provided the following information regarding EPA s activities in Newark Bay during the meeting:

USN Arctic Roadmap SCICEX SAC meeting. CDR Nick Vincent 21 May 2014

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 P-1 Line #18

e-navigation Projects

U.S. Army Corps of Engineers FY 16 Workplan and FY 17 Budget Navigation Program Update

3A.1 LOCKS AND DAMS UPDATE

Sustainment, Restoration and Modernization (SRM) Overview 2017 World Wide Energy Conference

US ARMY CORPS OF ENGINEERS PERMITTING ARTIFICIAL REEFS

Civil Works Process Overview

PUBLIC NOTICE Application for Permit

2016 Major Automated Information System Annual Report

SENATE APPROPRIATIONS COMMITTEE FY16 HOMELAND SECURITY APPROPRIATIONS U.S. COAST GUARD As of June 22, 2015

Navy ManTech Program. ManTech Update. Tom Hite CTC 15 October 2014

BRAC 2005 Issues. Briefing to the Infrastructure Steering Group. December 12, 2003

TEXAS MARITIME UPDATE

DEPARTMENT OF THE ARMY NEW ORLEANS DISTRICT, CORPS OF ENGINEERS P. O. BOX NEW ORLEANS, LOUISIANA August 25, 2014 PUBLIC NOTICE

Corporate Services Employment Report: January Employment by Staff Group. Jan 2018 (Jan 2017 figure: 1,462) Overall 1,

Enlisted Professional Military Education FY 18 Academic Calendar. Table of Contents COLLEGE OF DISTANCE EDUCATION AND TRAINING (CDET):

PONCE DE LEON INLET MANAGEMENT STUDY IMPLEMENTATION PLAN CERTIFICATE OF ADOPTION

UNCLASSIFIED. UNCLASSIFIED Navy Page 5 of 10 P-1 Line #11

U.S. Army Corps of Engineers Navigation Program Update

CESAM-RD-M May 2, 2013 PUBLIC NOTICE U.S. ARMY CORPS OF ENGINEERS MOBILE DISTRICT

Compliance Division Staff Report

Seawall Earthquake Safety + Disaster Prevention Program Community Meeting June 21, 2018

Georgia Environmental Conference

REQUEST FOR PROPOSAL CITY OF PORT ARANSAS GAS DEPARTMENT FOR NATURAL GAS SUPPLY. RFP # Gas

MILPERSMAN OPNAV N130) Phone: DSN COM FAX

Navigation Sub-Committee Report

JANUARY 2018 (21 work days) FEBRUARY 2018 (19 work days)

Increasing the Complexity of Emergency Preparedness Exercises to Satisfy Regulatory Requirements

HARBOR INFRASTRUCTURE INVENTORIES Calumet Harbor, Illinois and Indiana

DOD Leases of Foreign-Built Ships: Background for Congress

2016 Major Automated Information System Annual Report

JOINT PUBLIC NOTICE. July 16, Leake Avenue Post Office Box 4313 New Orleans, Louisiana Baton Rouge, Louisiana

SOUTHEAST TEXAS WATERWAYS ADVISORY COUNCIL. Meeting Minutes

BY ORDER OF THE AIR FORCE POLICY DIRECTIVE SECRETARY OF THE AIR FORCE 20 JULY 1994

PERFORMANCE MANAGEMENT MEETING. Health Department:

Alteration of Bridges

United States Coast Guard Marine Transportation Systems Management

Avoiding the Cap Trap What Every Hospice Needs to Know. Matthew Gordon, CPA Principal Consultant / Founder Cap Doctor Associates, Inc.

Smithsonian Institution

Fourth Quarter 2006 Results 5 Jun (Listing Date) to 30 Sep 06 Analyst and Media Briefing. 16 October 2006

REVIEW OF DECISION DOCUMENTS

Standardising Acute and Specialised Care Theme 3 Governance and Approach to Hospital Based Services Strategy Overview 28 th July 2017

SUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 January Q. New Year s Day Holiday CTC Term 3 On-Site College Classes Begins

Tactical Wheeled Vehicle Sustainment

Gulf Intracoastal Waterway

DATE: FY 2016 President's Budget February 2015 PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY

United States of America Country Report to the

Contingency Planning, Emergency Management & Marine Transportation Policy Leader

Executive Director s Report: Customer Experience Update

CURRENT AND FUTURE STUDIES

Defense Industrial Base Predictive Analysis System

NHS Ayrshire & Arran Adverse Event Management: Review of Documentation Supplementary Information Requested by NHS Ayrshire & Arran

Friday, June 21, 13. Building better communities through the arts

New Hope Crushed Stone. Monthly Update Solebury Communications Group November 2017

DoD Mentor Protégé Program. Shannon C. Jackson, Program Manager DoD Office of Small Business Programs

Icebreaking Program Update from Headquarters

ALBERTA TRANSPORTATION North Central Region Edson Area Instrumentation Monitoring Results

Chairman Farenthold, Ranking Member Plaskett, and Members of the Subcommittee:

USACE: An Overview of Alternate Permitting Procedures

New Orleans Hurricane and Storm Damage Risk Reduction System Update

Acquisition Insights & Transformation. CG 9 RADM Gary T. Blore 31 October, 2007

2016 Major Automated Information System Annual Report

Water Conservation Industrial,Commercial,Institutional (ICI) Audit and Rebate Program. City of Dallas Water Utilities February 13, 2012

DOD Leases of Foreign-Built Ships: Background for Congress

National Council on Radiation Protection and Measurements Homeland Security Recommendations Related to Nuclear and Radiological Terrorism

National Deep Draft Navigation Planning Center of Expertise (DDNPCX) Update

USACE South Pacific Division CMANC

USCG Roles Before, During & After a CSZ Event

Attachment A SCOPE OF WORK FOR THE CITIZEN SCRAP TIRE DROP-OFF DAY PROJECT

NATIONAL DEFENSE BUDGET ESTIMATES FOR FY 2005

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

NATIONAL DEFENSE BUDGET ESTIMATES - FY 2004

Big Data & Effective Utility Programs

PUBLIC NOTICE. Attn: Mr. Christopher Layton 1200 Duck Road Duck, North Carolina CB&I 4038 Masonboro Loop Road Wilmington, North Carolina 28409

G-003 Clarify grandfathering as it applies to towing vessels covered by Subchapter M of Chapter I of 46 CFR.

STATISTICAL PRESS NOTICE MONTHLY CRITICAL CARE BEDS AND CANCELLED URGENT OPERATIONS DATA, ENGLAND March 2018

November 20, 2017 PUBLIC NOTICE

DATE: FY 2013 President's Budget February 2012 PRIOR YR FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 TO COMP TOTAL PROG QUANTITY

NAVFAC Hawaii Construction Outlook

NAVAL CIVIL ENGINEER CORPS OFFICERS SCHOOL COURSE SCHEDULE

CAMDEN CLARK MEDICAL CENTER:

Quality Management Report 2017 Q2

Transcription:

UPDATE: TRANSFORMING USACE DREDGING 21

22 CHALLENGES TO NAVIGATION DREDGING Millions 1,500 1,400 1,300 1,200 1,100 1,000 900 800 700 600 500 400 300 200 100 0 LONG-TERM CONTINUING ANALYSIS OF DREDGING DATA U.S. ARMY CORPS OF ENGINEERS DREDGING PROGRAM Cubic Yards (in millions) Dollars (in millions) 1963 1964 1965 1966 1967 1968 1969 1970 1971 1972 1973 1974 1975 1976 1977 1978 1979 1980 1981 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 Fiscal Year (1963-2017) Growing dredging requirements and increasing cost present strategic risk

23 USACE DREDGING Focus is delivering the enterprise navigation dredging mission. Enterprise dredging program coordination is necessary and critical. USACE must be world class leaders in dredging: technical expertise, contracting, program execution, implementation of new technology. Safety is a mission and we will lead and partner to sustain and improve.

24 ESTABLISHING ENTERPRISE DREDGING PRINCIPLES OF DELIVERY Regional and Enterprise Coordination Acquisition Tools and Approaches Enterprise Schedule Coordination Communication and Transparency Contingency Planning

5-YEAR DREDGING SCHEDULE 25 FY19 & FY20 Anticipated Number of Projects 40 37 38 35 30 32 35 31 35 35 34 29 28 29 35 30 29 25 20 24 26 25 25 20 22 21 22 15 15 15 10 5 0 Oct-18 Nov-18 Dec-18 Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 Jul-19 Aug-19 Sep-19 Oct-19 Nov-19 Dec-19 Jan-20 Feb-20 Mar-20 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Hopper & Hopper/Mechanical Suction Cutterhead & Suction Cutterhead / Mechanical Suction Cutterhead / Hopper & All Types Total Initial schedule compiled and shared in July / August 2018 Resolution of schedule conflicts (October 2018)

DREDGE SCHEDULE CONFLICT - EXAMPLE 26 Projected schedule reflects all FY19 Planned work (hopper, large pipeline) Several periods where requirement exceeds capacity. Pursuing approaches to minimize challenge to maintenance, construction.

27 AUTOMATED TOOLS Dredge Project Selection Dredge Schedule Optimization Dredging Information System (DIS) Expanding use of Available Tools to Inform Decisions and Improve Program Performance

28 DREDGING PORTFOLIO OPTIMIZATION STRATEGIES 1. Dredging Project Selection Dredge more NAV projects by better aligning funding to actual dredging needs Recommends optimal maintained depth targets and requisite dredging quantities How? Compares cargo drafts to maintained depths and considers cargo shared across projects 2. Dredge Schedule Optimization Minimize mobilization costs dredge more NAV projects each year for same amount of funding Better align schedules with env. work windows and dredge plant capabilities Can be used in whole or in part (regions, big dredges vs. little dredges, big projects vs. little projects, etc.)

29 DREDGING INFORMATION SYSTEM (DIS) USACE s National Database for All Dredging Information. Platform to provide information on current and upcoming work to industry partners Accessible to Public Governed by EP 1130-2-520, Navigation and Dredging Operations and Maintenance Guidance and Procedures New product delivery team (PDT) formed (Kick-off September 2018)

30 CONTINGENCY PLANNING Southwest Pass (SWP) is the gateway to the 3 rd largest port system in the US, containing 4 of the top 15 ports (by tonnage) in the US Sections of SWP are prone to recurring high water events that result in critical dynamic shoaling with short notice between January and April each year USACE HQ is working to identify short- (FY19) and longterm strategies to ensure the capability to respond to urgent needs in SWP without adversely impacting other navigation projects

RED FLAG DELEGATION 31 Red Flag Authority for the Mississippi River Baton Rouge to Southwest Pass (Gulf of Mexico) Project delegated from the USACE Director of Civil Works to the MVD Commander (May 2018) under specified conditions Supports risk informed decision making and acknowledges long standing partnership with dredging industry Procedure and requirements for transparent communication with industry unchanged. Director Civil Works can suspend delegation when enterprise impacts are expected 31

PIPELINE OBSERVATION & VERIFICATION ENTERPRISE REPOSITORY (PLOVER) 32 Database designed to allow navigation managers to access recent regulatory permits related to utility crossings in federal channels Currently in use in New Orleans and Mobile Districts Project delivery team (PDT) working on guidelines and processes for enterprise wide implementation Limitations: unknown integrity of information provided by others, no process in place to include existing utility crossings, for internal USACE use only when developing plans and specifications Other publicly available sources of information include: #811/One-Call, Pipeline and Hazardous Materials Safety Administration (PHMSA), National Ocean Service / NOAA Nautical Charts, USCG Navigation Center for local Notices to Mariners, etc.

USACE HOPPER DREDGE MINIMUM FLEET 33 ESSAYONS (NWP) Vessel Capacity CY Year Built Repowered McFARLAND (NAP) Potential Retirement MCFARLAND 3140 1967 * 2025 WHEELER 8256 1981 2013 2033 ESSAYONS 6000 1983 2009 2033** YAQUINA 1050 1981 2012 2040 YAQUINA (NWP) 33 Note: In addition to the four (4) hopper dredges, the USACE minimum fleet also includes three (3) special purpose dredges (SAW) and four (4) pipeline dredges (MVD) WHEELER (MVN)

USACE HOPPER DREDGE FLEET GOVERNING AUTHORITIES 34 Public Law 95-269 - April 26, 1978 The Secretary shall have dredging and related work done by contract if he determines private industry has the capability to do such work and it can be done at reasonable prices and in a timely manner To carry out emergency and national defense work the Secretary shall retain only the minimum federally owned fleet capable to perform such work and he may exempt from the provisions of this section such amount of work as he determines to be reasonably necessary to keep such fleet fully operational. The minimum federally owned fleet shall be maintained to technologically modern and efficient standards, including replacement as necessary. Subsequent Legislation WRDA 1993 - Requires Corps to bid at least 7.5 MCY of hopper dredge volume accomplished in 1992 by Gov t dredges Corps response limits all 4 dredges to 180 days of operation. WRDA 1996 - Placed the Wheeler in Ready Reserve status effective Oct. 1997; implement procedures to ensure private-industry hopper dredge capacity is available to meet routine and time-sensitive dredging needs. WRDA 2007 Placed the McFarland in Ready Reserve status between Oct. 2009 and Dec 2009; Removes operational restrictions from West Coast dredges, the Essayons and the Yaquina. Based on these authorities, USACE operates four hopper dredges: The YAQUINA and ESSAYONS (no operational restrictions) and the WHEELER and MCFARLAND (ready reserve fleet restrictions). 34

2016 HOPPER DREDGE RECAPITALIZATION ANALYSIS 35 The 2016-2017 Analysis Considered: Industry capability Historical hopper dredging mission analysis Forecasted hopper dredging needs Law (PL 95-269 and WRDA language) Financial considerations of maintenance and PRIP health Recommendation Areas: Size and location of the Hopper Dredge Fleet Whether or not to recapitalize the Dredge Fleet Opportunities for improvements in management Consultation: Industry/ DCA Stakeholders (e.g. AAPA) USACE Navigation Program Experts USACE Operations leadership Major Findings: Corps Dredges provide strategic economic and risk reduction benefits to the national defense, emergency, resiliency and recovery, and price control. Industry Capability meets the Routine Needs of the Corps, but the frequent activation of the Ready Reserve Fleet (WHEELER and MCFARLAND) demonstrates the need for the Ready Reserve Fleet for surge. The Corps dredges are experiencing age related maintenance and repair costs which are driving up ownership and operating costs. The Plant Replacement and Improvement Program (PRIP) will support scheduled replacements and replacing older dredges will reduce long-term costs to the CW program. 35

2016 HOPPER DREDGE RECAPITALIZATION ANALYSIS 36 Recommendations: Maintain Industry First Policy Replace 51 year old Hopper Dredge MCFARLAND. Plan for subsequent life cycle replacement of dredges WHEELER, ESSAYONS and YAQUINA. Retire dredges as replacements come on line. Life Cycle Asset Management - New Corps dredges to be maintained per life cycle asset management principles, shorter depreciation schedules, planned periodic investment for the replacement of some components, and a systematic evaluation of a hull and major system components. Financial Management -The assumptions used for Depreciation and Plant Replacement Increment calculations for each dredge should be reviewed and adjusted as necessary given economic and material cost changes, but not less often than at ten year intervals. 36

USACE READY RESERVE FLEET CALLOUT HISTORY 2010-2018 37 READY-RESERVE DREDGE FISCAL YEAR RED FLAG CALLOUT EVENTS READY-RESERVE EXERCISE DAYS RED-FLAG CALLOUT DAYS TOTAL DAYS 1 2 3 4 WHEELER 2010 SWP SWP SWP SWP 28 136 164 WHEELER 2011 SWP SWP 62 82 144 WHEELER 2012 SWP 70 59 129 WHEELER 2013 DRYDOCK - Repowering 70 0 70 WHEELER 2014 70 0 70 WHEELER 2015 SWP SWP SWP CORPUS 13 140 153 WHEELER 2016 SWP SWP 70 55 125 WHEELER 2017 SWP CALCS 70 49 119 WHEELER 2018 SWP 70 66 136 WHEELER Average 2010-2018 58 65 123 McFARLAND 2010 SWP SWP First year of Ready Reserve Status 74 96 170 McFARLAND 2011 70 0 70 McFARLAND 2012 MOREHEAD 70 30 100 McFARLAND 2013 MOREHEAD 70 24 94 McFARLAND 2014 SWP 70 0 70 McFARLAND 2015 SWP 70 62 132 McFARLAND 2016 SWP WILM HBR 70 59 129 McFARLAND 2017 70 0 70 McFARLAND 2018 MOREHEAD BROWNSVL 70 73 143 McFARLAND Average 2010-2018 70 38 108 Since Placing the MCFARLAND in Ready Reserve (2010), USACE Ready Reserve dredges annually operated an average of 123 days (WHEELER) and 108 days (MCFARLAND) in support of the USACE Navigation Mission* * Includes a max. of 70 readiness days per year. Corps Ready Reserve dredges are only deployed when industry capacity is insufficient to mission requirements.

BREAKOUT OF HOPPER DREDGE WEORK 38 O&M (MCY) (1) New Work (2) (MCY) Fed Work for OTH (MCY) Surge (3) (4) (MCY) Industry 360,626 72% 65,362 98% 10,283 87% 92,354 92% Corps 141,788 28% 1,104 2% 1,570 13% 8,155 8% Total 502,414 100% 66,466 100% 11,853 100% 100,509 100% 28% 2% 13% 8% 72% 98% 87% 92% Historical Program (2005-2015) Industry does the majority of Government s base O&M work, construction and non-routine work. (1) O&M: Routine navigation dredging (2) New Work: Channel widening/deepening (3) Fed Work Other: US Navy, Coast Guard (4) Surge: Emergency, storm response 38 Information sources: DIS (Dredging Info Sys), DQM (Dredging Quality Mgmt) and continuous analysis of dredging contracts

39 INCREASING DEMAND FOR HOPPER DREDGING Increased Funding from HMTF New Construction Requirements (increasing harbor depths) Increased O&M associated with increased harbor depths Beach Nourishment RSM, BOEM licenses Surge/emergency response and repair Private work USACE anticipates sustained pressure to deliver the dredging program using the full capacity of industry and the USACE reserve fleet. 39

HOPPER DREDGE RECAPITALIZATION MCFARLAND REPLACEMENT - CONCEPT 40 Design Parameters: Dredge will operate from Ready Reserve status Modern, efficient, environmentally and economically sustainable Maximize the applicability of existing commercial dredge designs o o o o o o o Length Overall: 320 feet or less. Beam: As best suits current designs. Air-draft: 110 ft. maximum Max Loaded Draft: 26 ft. Hopper capacity: 5,000-6,000 cubic yards (medium class) Dredging depth capability: 65 feet Power System: Diesel powered. USACE has not finalized an acquisition approach Acquisition Strategy: Envisioned as procuring the vessel under a best value trade off (BVT), Design-Build contract. Best Value Trade Off Approach will ensure that the vessel: Meets the requirements of the USACE minimum fleet Is economical to build and operate Is safe for the crew of the vessel Will be capable, operable, and maintainable for ready reserve operation, & Will meet applicable regulatory requirements Sec. 109 for Fiscal Year 2019, none of the funds provided in this Act are available in the revolving fund established by the Civil Functions Appropriations Act or 1954 (33 USC 576 (a)) may be obligated or expended on a new hopper dredge.

RECAPITALIZATION SUMMARY 41 Assessing impact of statutory language on Hopper Dredge Recapitalization plan The Corps manages the hopper dredge MCFARLAND consistent with mission responsibilities as directed by federal statute. The Corps manages its dredging program in partnership with industry, with a priority on industry contract dredging ( industry first ). The Corps ready reserve dredges MCFARLAND and WHEELER provide essential capability for emergencies, national security, and when industry is unable to meet the navigation dredging mission. USACE has no plans to change the operational employment, number or location of our reserve fleet No new funds are needed to replace the MCFARLAND. USACE welcomes industry investment in new and more efficient dredges. USACE does NOT complete with industry.

42 CLOSING THOUGHTS ASA CW Honorable Mr James and Chief of Engineers focus is on project and program delivery Chief of Engineers vision is to REVOLUTIONIZE USACE USACE Civil Works, USACE Operations and Regulatory, USACE Navigation are focused on delivery and being WORLD CLASS challenge us! Critical that We Not Lose Focus on Our Partners, Stakeholders, and Our Commitments