Embedded Generation Program Information Package

Similar documents
AUSTIN ENERGY REQUEST FOR PROPOSALS (RFP) FOR THE PURCHASE OF RENEWABLE CAPACITY & ENERGY FROM RENEWABLE ENERGY RESOURCES

Energy Efficiency Alberta Residential and Commercial Solar Program Guidebook

MCE Feed-In Tariff for Distributed Renewable Generation

Energy Efficiency Alberta Residential and Commercial Solar Program Terms and Conditions

If any queries arise ESB Networks DAC can be contacted at or

FIT 5 Contract Offer Summary

Rhode Island Renewable Distributed Generation Standard Contract Enrollment Application and Enrollment Process Rules

ATTACHMENT B. 1. Intent to Bid/Bidder Contact Information Form. 2. Executive Summary. 3. Proposal Characteristics and Term Sheet

The Narragansett Electric Company d/b/a National Grid

First Nations Energy Education Exchange Workshop

Energy. Request For Proposals for Renewable Power Supply Resources

Production Device Registration

FEED-IN TARIFF LICENSEE TRANSFER

Request for Proposals and Specifications for a Community Solar Project

Commercial Scale. Direct Ownership-Application. Renewable Energy Projects over 10kW. Commercial Block program details can be found at:

PacifiCorp 2017S SOLAR Request for Proposals. Bidder s Conference Portland November 21, 2017

THE CITY OF SEATTLE CITY LIGHT DEPARTMENT 2012 REQUEST FOR PROPOSALS. Long-Term Renewable Resources And/or Renewable Energy Certificates

Rules and Procedures for the Non-Resident Moose Licence Draw for Qualifying Outfitters and Guides

Generator Interconnection System Impact Study Report Carteret County, NC MW Queue #297 Original Submittal Revision 1

Refer to section 2.C. for more information on the evaluation criteria.

The Narragansett Electric Company d/b/a National Grid

CONSUMERS ENERGY COMPANY REQUEST FOR PROPOSALS SOLAR GENERATION PROJECTS. Bids Due: July 28, :00 noon EPT (Jackson, MI) Issued.

May 25, Request for Proposals No Offsite Virtual Net Metering

Feed-in Tariff Scheme: Guidance for Licensed Electricity Suppliers

microfit FAQ Version 4.1

CENTRAL MUNICIPAL POWER AGENCY/SERVICES

REQUEST FOR PROPOSALS MONTANA COMMUNITY RENEWABLE ENERGY PROJECTS. Issued June 13, Proposals Due July 14, 2014

Generator Interconnection Facilities Study Report Franklin County, NC 50.0 MW Solar Farm Queue #384

The State of Interconnection in NYS:

Project Application Webinar

FEED-IN TARIFF POLICY APPLICATION AND IMPLEMENTATION GUIDELINES

Community Solar Garden Program Form

PART 1 - Rules and Regulations for the Renewable Energy Development Fund Programs

Southern California Edison Original Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Cal. PUC Sheet No.

New Jersey Edison Innovation Clean Energy Manufacturing Fund. Eligibility Intake Form and Instructions. Intake Form Accepted on a Rolling Basis

AMSP Guidebook. February 2017

ADVERTISEMENT OF PUBLIC NOTICE

WIND AND SOLAR SPP SOLICITATION 2015 REQUEST FOR QUALIFICATION (RFQ) COMMERCIAL OPERATION OF WIND AND SOLAR SMALL POWER PROJECTS OCTOBER 2015 FOR

SOUTH CAROLINA ELECTRIC & GAS COMPANY REQUEST FOR PROPOSALS FOR SOLAR PHOTOVOLTAIC DISTRIBUTED ENERGY RESOURCES AT TWO DESIGNATED SITES

Georgia Power s Renewable Portfolio. Kings Bay Naval Solar Project. Potential Future Military Projects

October 31, Customer Onsite Renewable Energy Program. Market Manager Operations Manual. New Jersey s Clean Energy Program CORE Operations Manual

Standard Development Timeline

Generator Interconnection Impact Study Report Bladen County, NC 75.0 MW Solar Farm Queue #377

July 1, 2006 Revision 2

Illinois Power Agency Long-Term Renewable Resources Procurement Plan. What s Next?

Eligibility Eligibility is restricted to private sector organizations operating in Nunavut as defined in the Inuit Language Protection Act.

ENGIE FEED IN TARIFF APPLICATION FORM. Version ENGIE FIT Application P a g e 0

Attention: Suncorp Solar Potential Investors and Shareholders SMALL IPP PROGRAM SOUTH AFRICA RENEWABLE ENERGY MARKET

Memo of Understanding - Evergreen Options Grant Award

PPT Presentation delivered on Pre-bid Conference II on RESCO tender for Rooftop Solar PV Projects in the State of Madhya Pradesh

Solar Electricity For Community Buildings Pilot Program. Workbook

2012 Request for Proposals Solar On-site Renewable Energy Credits (REC)

Feed in Tariff Application Form

1.4 On 19 May 2011 the WA State Government announced a reduction in the Subsidy rate from 40c/kWh to 20c/kWh effective from 1 July 2011.

1. Research Customer Research the various types of renewable energy systems available and decide which system best fits your consumption needs.

INDUSTRIAL ENERGY OPTIMIZATION PROGRAM

Application for Distributed Solar Solutions

Generator Interconnection Impact Study Report Wayne County, NC 20.0 MW Solar Farm Queue #364

First Nations Clean Energy Business Fund. Guidelines for Funding

Northline Solar Project

COUNTY OF SANTA BARBARA

REVISOR RSI/BR RSI-ENERGY

DRAFT PROPOSAL REQUIREMENTS

May 6, 2002 Revision 2

REQUEST FOR PROPOSALS MONTANA COMMUNITY RENEWABLE ENERGY PROJECTS. Issued May 17 th, Proposals Due June 28 th, 2017

Renewable Energy Subsidy Delivery Mechanism, 2013

PROGRAM OPPORTUNITY NOTICE EFFICIENCY MAINE TRUST CUSTOM INCENTIVE PROGRAM FOR DISTRIBUTED GENERATION PROJECTS PON EM

State of Qatar. Kahramaa Solar PV. Independent Power Project. Pre-Qualification Questionnaire ( PQQ ) for Applicant

Financing Clean Energy Projects Under the Reinvestment Act of 2009

DER Pilot Program. Brian Yung Market Design Specialist Business Issues Committee. August 9, 2017, 10 Krey Blvd, Rensselaer, NY 12144

Efficiency Maine Commercial and Industrial (C&I) Custom Program. Distributed Generation Projects

Pilot Program Framework Proposal

Solar Development Incentive Program. Handbook

Guide for New Food Primary (Restaurant) Application

2017 Solar*Rewards Large Request for Proposals Solar On-site Renewable Energy Credits (REC)

Feed in Tariffs (FIT) Generator Application Form

DRAFT PROPOSAL REQUIREMENTS

2018 RENEWABLE ENERGY GROWTH PROGRAM

j. Billing procedure k. Periodical Inspections Page 1

Solar Homes and Communities Plan Residential application for pre-approval

Implementation Plan Set Two of Phase III & IV Reliability Standards

LICENCE APPLICATION FORM

EFFICIENCY MAINE TRUST REQUEST FOR PROPOSALS FOR RENEWABLE ENERGY COMMUNITY DEMONSTRATION PROJECTS IN AFFORDABLE HOUSING RFP EM

Newsroom 2013 Feed in Tariff Program Independent Electricity System Operator

BUSINESS. New Construction. Save money on qualified construction projects. Read about rebates for your home and business at mid.

North Pinellas County Solar Co-op RFP

Addendum to ESAH Version 3 Supply Application

OVERVIEW OF THE CFP PROCESS Co-Financing Grants for Commercial Renewable Energy Projects in Indonesia. Jakarta, 3 rd February 2015

Request for Proposals ( RFP ) Under the SREC-Based Financing ( SREC-II ) Program

Request for Proposals and Specifications for a Distributed Generation Solar Project entitled The Freeman Coliseum Solar Project

Request for Proposal

Federal and State Incentives for Wind Development

Multifamily Affordable Solar Housing. Semi Annual Progress Report. July 30, 2012

Renewable Energy Incentive Program. Guidebook

SCE s CALIFORNIA RENEWABLE ENERGY SMALL TARIFF (CREST) PROGRAM

WarmWise Business Custom Rebates Program Manual

2017 All Source Request for Proposals for Electric Power Supply and Load Management Resources. Pre-Bid Meeting

Feed-in Tariff: Guidance for renewable installations (Version 5)

ISABELLA COUNTY REQUEST FOR PROPOSALS COMMISSION ON AGING CATV AND HEADEND EQUIPMENT

Executive Council approves CLP Power s Five-Year Development Plan New Tariff and Monthly Fuel Cost Adjustment Come into Effect on 1 October

Transcription:

Embedded Generation Program Information Package

Table of Contents Purpose...Page 3 LORESS. Page 3 Embedded Generation Program...Page 3 Local Ownership...Page 4 Sources. Page 4 Development of Project..Page 4 Available Distributed Generation Capacity on Distribution System. Page 5 Confirmation of available Capacity. Page 5 Embedded Generation Interconnection Application..Page 6 Interconnection Specifications...Page 6 Power Purchase Agreement.Page 7 Final Approval for Interconnection..Page 7 Operating Agreement Page 7 Payment for Generator Output..Page 7 Possible Generation Export to the Transmission System.Page 7 Appendices Appendix A Project Proponent Checklist...Page 8 Appendix B General Capacity Assessment Request Form...Page 9 Appendix C Embedded Generation Interconnection Application Form...Page 10 Appendix D Weblinks. Page 12 Page 2 Rev 2016/04/25

Purpose This document s purpose is to orient project applicants on the requirements to participate in NB Power s Embedded Generation Program. You can also find information on our website at: https://www.nbpower.com/en/products-services/embedded-generation/ *** It is important to note that any conflicting information between this document and the regulation will result in the regulation being the prevailing authority.*** LORESS The Provincial Regulation to which this program adheres to is called Locally Owned Renewable Energy Projects that are Small Scale hereinafter called LORESS. The regulation can be on the Provincial government website: http://laws.gnb.ca/en/showpdf/cr/2015-60.pdf The LORESS regulation is comprised of three components: 1. Distributed Generation (Component -3- in the regulation) This component is reserved for all projects that are interconnected through the Net Metering and Embedded Generation programs. These projects are assessed on a case by case basis. The remainder of this document refers to the interconnection of Embedded Generation Projects only. 2. Aboriginal Businesses (Component -1- in the regulation) This component is reserved for Aboriginal Businesses who wish to interconnect renewable energy projects. These projects will be approved by a procurement process. 3. Local Entities (Component -2- in the regulation) This component is reserved for Local Entities who wish to interconnect renewable energy projects. These projects will be approved by a procurement process. Embedded Generation Program The Embedded Generation Program allows locally owned renewable sourced electricity generation to be interconnected to NB Power s distribution system. This energy is to be sold back to NB Power. To qualify for this program, applicants must meet the following criteria for local ownership and renewable resources: Local Ownership A local entity, Page 3 Rev 2016/04/25

Renewable Sources Embedded Generation Program Information Package An Aboriginal Business, An individual who is a resident of the Province, A sole proprietorship, the proprietor of which is a resident of the province A corporation as defined in the Business Corporations Act and in which a majority of the voting shares is beneficially owned or controlled, directly or indirectly, by one or more individuals who are residents of the Province. Solar Wind Hydro Ocean Biogas Biomass Landfill Gas NB Power re-established the capacity limit for the program in 2016 to a total of 20MW of embedded generation. Development of Project Applicants may choose to develop their project alone, or in partnership as long as they adhere to the provincial regulation criteria for local ownership and renewable sources. Applicants will be responsible to build all infrastructure required to connect to NB Power s distribution system in addition to any costs associated with the development of this project. NB Power will require landline phone service at the site to collect the production data for electricity produced by the project. The costs of providing the phone line will be the responsibility of the applicant. The applicant should budget a minimum of approximately $30,000 for the interconnection of the generator. However, if there is a need to complete extra work in order to interconnect the project, the applicant will be responsible to cover these costs. The project must meet NB Power s Technical Specification for Independent Power Producers. This Specification is available here: https://www.nbpower.com/en/products-services/embeddedgeneration/additional-resources/ Page 4 Rev 2016/04/25

Available Distributed Generation Capacity on the Distribution System NB Power s distribution system is a dynamic model that frequently changes to ensure efficient and safe operation. Some high level information on substation distributed generation (DG) capacities is available on our website and will be refreshed from time to time. Please be advised that the values found at the following link are determined at the substation. The interconnection capacity will be impacted as the interconnection point is moved downstream on the distribution line. Confirmation of available capacity NB Power will provide a general capacity assessment of a specific location for a project proponent. This assessment will help applicants identify the best sites to develop their project. Please note, distributed generation (DG) capacities for specific locations is unkown. Applicants will be required to pay a fee of $500 for this assessment. Interconnection cost estimates, and confirmation of project provisional approval are only made after the Embedded Generation Interconnection Application has been completed in the next section of this document. A developer may request a general capacity assessment by filling out this form: https://www.nbpower.com/media/206162/embedded-generation-general-capacity-assessment-may- 2016.pdf NB Power will send a letter to confirm the outcome of the assessment. Fees paid for this assessment are not refundable. See page 10, Appendix B for an example of this form and the fees associated with completing the General Capacity Assessment. Embedded Generation Interconnection Application Once the applicant has confirmed the project can interconnect to the distribution system at the location proposed, they can complete an Embedded Generation Interconnection Application form in order to make a formal application for interconnection. NB Power will complete an in depth system impact study to ensure the generator can be interconnected at the mutually agreed interconnection point. Page 5 Rev 2016/04/25

NB Power will confirm by letter the outcome of the study. The applicant will have 30 days from the date of the letter to notify NB Power in writing of their intention to move forward with the project. The applicant will then have 60 days to complete the requirements to execute a Power Purchase Agreement (PPA). NB Power will not reserve capacity on the distribution system until all PPA requirements are met and the PPA is signed by both parties. It s important to note that while the PPA is signed by both parties, it is not a final approval to interconnect and operate. Technical details may not be finalized when the PPA is signed, therefore final approval will be given by NB Power Distribution Engineering and Distribution Operations. If the applicant misses deadlines, the project may be removed from the project list at NB Power s discretion and re-application will be necessary. NB Power will appoint an Administrator to the applicant s project. The Administrator will be the main point of contact during the enrollment and operational phases of the project. The fees paid for the Interconnection Application are not refundable. Please see Page 11 Appendix C for an example of the form and the fees associated to complete the Interconnection Application System Impact Assessment. Interconnection Specifications Once the project is approved, the applicant s project will require meeting the NB Power Technical Specification for Independent Power Producers. This specification can be found here: https://www.nbpower.com/en/products-services/embedded-generation/additional-resources/ The project will also have to meet the New Brunswick Department of Public Safety Technical Inspection Services requirements. The applicant s electrical contractor should inquire as to what is needed before starting the project. Power Purchase Agreement The project applicant and NB Power will execute an Embedded Generation Power Purchase Agreement. The objective is to have a long term agreement between 20 and 25 years. NB Power has predefined the terms and rates for the Power Purchase Agreement. A draft Power Purchase Agreement will be shared with the project applicant once a project receives provisional approval. Final Approval for Interconnection Page 6 Rev 2016/04/25

NB Power will only grant Final Approval for interconnection once all technical and administrative requirements have been met as deemed by the NB Power Engineer and Administrator. This approval must be given in writing, and NB Power must be a witness to the first attempt to interconnect. Operating Agreement An Operating Agreement will be signed by both parties once the Final Approval for Interconnection is complete. This agreement outlines the processes and procedures to take place during start-up, operation and shutdown of the applicant s generator. Payment for Generator Output Payment for Generator Output, measurement of output, frequency for the collection of billing determinants and payment will be as outlined in the Power Purchase Agreement. Possible Generation Export to the Transmission System It is possible that the project will export production to the transmission system during the life of the project. If this happens, the proponent will be responsible for: Project metering upgrades. Distribution system upgrades. Substation metering upgrades. Possible communication and telemetry upgrades (SCADA.) Other related materials and labor costs to accommodate generator for export to transmission system. Once export to the transmission system is anticipated, no additional embedded generation projects will be allowed on the affected substation. NB Power does not guarantee that loads on the substation will not change (up or down.) This may relate to customer changes or to system reliability and maintenance. Payment for export to the transmission system will be based on 90% of NB Power s avoided cost, which varies hourly and is dependent on both pricing of fuel and the electricity market. Annual average rates of 5 cents/kwh or less should be anticipated. Appendix A - Project Proponent Checklist Page 7 Rev 2016/04/25

Local Ownership Local Ownership requirements are met as per the LORESS Regulation. Source Source of energy is renewable meets the requirements of the LORESS Regulation. Project Project meets municipal, provincial, and federal regulations. Capacity Assessment has been completed by NB Power (optional step). Assure Project will meet all technical specifications as per NB Power requirements. Interconnection Application has been submitted to NB Power. Interconnection Application has been approved by NB Power. Within 30 days of above step Sent written notice of intent to move forward. Upon NB Power sharing a Power Purchase Agreement Executed Embedded Generation Power Purchase Agreement with NB Power. Project Building, Commissioning, and Execution Meet all requirements and milestones as required in Power Purchase Agreement. First connection and synchronization must be witnessed by NB Power Engineer. Operating Agreement. Page 8 Rev 2016/04/25

Appendix B - General Capacity Assessment Request Embedded Generation General Capacity Assessment Request Project Developer Information Mailing Address Company Name: Primary Contact: Address: City: Postal Code: Applicant Project Daytime Phone: Fax: E-Mail: Project Information Developer: Contractor: Site Location (fill out known information) Civic Address: Latitude: Longitude: PID#: NB Pow er Pole #: Engineering Consultant: Generator Information 1. Generating Source: Wind Biogas Solar Biomass Hydro Other If other Please specify: 2. Number of Generating Units: 3. Generator Size: Watts kw MW 4. Total Project Capacity: kw MW Inverter Information (if applicable) 1. 2. 3. 4. Rated Capacity/Unit: Watts kw Manufacturer: Model: Output Voltage (V): # Units: Total Capacity: kw Generator Inverter Additional Submission Additional Information (Please enclose a copy of the following items with your application) 1. SITE LOCATION MAP including topographical details and proximity to NB Pow er's distribution system, 2. PAYMENT: Cheque in the amount of $500 (Non Refundable). Mailing Address: NB Pow er, Renew able Energy Specialist, PO Box 2000, 515 King Street, Fredericton NB, E3B 4X1 Applicant Signature Applicant Signature Date The proponent provides this statement to NB Pow er know ing that NB Pow er w ill rely on this information. All statements are true or believed to be true and are not intentionally misleading. In signing this form the proponent understands that the assessment is for assessing capacity of generation interconnection. The outcome of this assessment does not imply approval is granted. (rev 2015/11/30) Assessment Details: Internal Use Only 1. Point of Interconnection: Line Section: Pole: Internal Use Only 2. 3. 4. 5. 6. Capacity allow ed: kw MW Distribution System Upgrades Required: Yes No Distribution Planning Consulted: Yes No Distribution Planning Feedback: Letter Sent to Proponent: Yes No 7. Cheque Deposited: Yes No Page 9 Rev 2016/04/25

Appendix C - Embedded Generation Interconnection Application Embedded Generation Interconnection Application Applicant Information Mailing Address Company Name: Address: Applicant Project Primary Contact: Daytime Phone: Fax: E-Mail: Project Information Electrical Contractor: Primary Contact: Local Ownership Declaration City: Postal Code: Developer Information (Project Partner) if applicable Company Name Primary Contact: Daytime Phone: Engineering Consultant: Proposed In-Service Date: This application is made and entered into this day of, 20 by, for the locally owned entity called (hereinafter called 'The Proponent'). The Proponent declares that it is a local entity with the intent to install and interconnect a generator to the NB Power distribution system. The proponent proposing the project is: (Check which one applies) Local Entity An Aboriginal Business Local Ownership An individual who is a resident of the province of New-Brunswick A sole proprietorship, the proprietor of which is a resident of the province of New-Brunswick A corporation as defined in the Business Corporations Act and in which a majority of the voting shares is beneficially owned or controlled, directly or indirectly by one or more individuals wo are residents of the province of New-Brunswick Applicant Signature Date Fee for Application Fee Statement The Proponent will include a non refundable payment of $10,000 to cover the costs of completing the system impact assessment, engineering design work and administrative costs. This payment will not be covering any distribution system upgrades, interconnection material and labor costs for connecting the generator to the distribution system. Page 10 Rev 2016/04/25

Generator Information 1. 2. 3. 4. Rated KVA: Nameplate Capacity (kw): Rated Power Factor: Rated Voltage at Generator (V): 5. Generator Connection: Delta Wye Grounded Wye 6. Generator Type Synchronous Induction Other If other please explain: 7. 8. 9. Synchronizing Method: Automatic Manufacturer: Model: Manual 10. Energy Source: Biogas Biomass Solar Wind Hydro Other If other please explain: Inverter Information (if applicable) 1. 2. 3. Rated Capacity (kw): Manufacturer: Model: Additional Information Generator Inverter Additional Embedded Generation Interconnection Application Please enclose a copy of the following information with your application: 1. One-Line Diagram: Show ing protection equipment, breakers/fuses, transformers, generators, and load equipment 2. Site Location Map: Including topographical details, buildings, and proximity to NB Pow er's overhead and 3. underground conductors, and utility easements. Manufacturer's Technical Specifications for: Generator Impedance Inverter (Inverter Type, Output Voltage) Unit Transformer (Rated KVA, Winding Config (Delta, Wye)) Generator Protection Interconnection Protection Submission Information Submission Internal Use Only Applicant Signature Date The customer provides this statement to NB Pow er know ing that NB Pow er w ill rely on this information. All statements are true or believed to be true and are not intentionally misleading. Connection cannot be made until agreement betw een parties is signed and all terms and conditions of the contract are met. Assessment Details: Internal Use Only 1. Point of Interconnection assessed: Line Section: Pole: 2. Capacity allow ed: kw MW 3. Distribution System Upgrades Required: Yes No 4. Distribution Planning Consulted: Yes No 5. Distribution Planning Feedback: 6. Letter Sent to Proponent: Yes No 7. Payment Deposited: Yes No Page 11 Rev 2016/04/25

Appendix D Weblinks Embedded Generation Program Information Package NB Power s Embedded Generation Program www.nbpower.com/embeddedgeneration Locally Owned Renewable Energy Projects that are Small Scale http://laws.gnb.ca/en/showpdf/cr/2015-60.pdf New Brunswick Developer s Guide to Renewable Energy http://www2.gnb.ca/content/dam/gnb/departments/en/pdf/publications/developerguider enewableenergy.pdf New Brunswick Renewable Energy Resource Maps http://www2.gnb.ca/content/gnb/en/departments/energy/resource_maps.html Page 12 Rev 2016/04/25