REQUEST FOR PROPOSALS. West Santa Ana Branch Transit Corridor Preliminary Assessment Report of Rail Maintenance Yard Sites

Similar documents
REQUEST FOR PROPOSAL TO PROVIDE AS-NEEDED ENGINEERING SERVICES FOR THE IMPLEMENTATION OF

City of Lynwood MODIFIED REQUEST FOR PROPOSALS FOR

CITY OF HAWAIIAN GARDENS COMMUNITY DEVELOPMENT DEPARTMENT

May 17, To: From: Subject: Program continues to. Overview. Step Two. fixed-guideway. Program. for. Background

Campus Events Field Modular Buildings

PUBLIC-PRIVATE PARTNERSHIP PROGRAM, HIGH DESERT CORRIDOR

Long Range Transportation Plan

Request for Proposals. Housing Study Consulting Services. Proposals DUE: January 6, City of Grandview. Economic Development Department

REQUEST FOR QUALIFICATIONS (RFQ) FOR BUILDING INSPECTION SERVICES RFQ #17-030

To: From: Subject: Program continues to. Overview. the City of. Background. began the. As part of with both

CALL TO ARTISTS Request for Qualifications

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS TO UPDATE THE DISTRICT S HAZARD MITIGATION PLAN

REQUEST FOR PROPOSALS FOR TOWING SERVICES

REQUEST FOR PROPOSAL FOR POLICE OPERATIONS STUDY. Police Department CITY OF LA PALMA

CITY OF LOMPOC REQUEST FOR PROPOSALS DEVELOPMENT IMPACT FEE UPDATE STUDY

EL DORADO HILLS COMMUNITY SERVICES DISTRICT

REQUEST FOR PROPOSAL FOR LEGAL SERVICES

CITY OF INGLEWOOD Residential Sound Insulation Program

Fayette County Housing Market Demand Study

REQUEST FOR PROPOSAL (RFP) Posey County Long Range Transportation Plan

SUBJECT: RESOLUTION NO. - ZERO EMISSIONS CONTAINER MOVER SYSTEM REQUEST FOR CONCEPTS & SOLUTIONS: COST SHARING AGREEMENT WITH PORT OF LONG BEACH

Met r 0 Met"'fKK'ibn Transportation Authority

Re: Comments on the Draft Guidelines for the Low-Carbon Transit Operations Program

CITY OF PORT HUENEME COMMUNITY DEVELOPMENT DEPARTMENT REQUEST FOR PROPOSAL FOR BUILDING & SAFETY SERVICES

A. Must be a student member of AAa/e. (apply online at and click on Membership )

3. Award and execute contract modifications for up to $1,200,000.

Chabot-Las Positas Community College District

WAYFINDING SYSTEM DESIGN & BRANDING INITIATIVE

GRANT WRITING ASSISTANCE FOR THE HIGHWAY SAFETY IMPROVEMENT PROGRAM CYCLE 9

City of Rapid City. Request for Proposal Consultant Services Downtown Parking Study and Strategic Plan. RFP Deadline: May 9, 2017 at 4:00PM

COUNTY OF SANTA BARBARA

REQUEST FOR PROPOSALS FOR ARCHITECTURAL AND ENGINEERING EVALUATION SERVICES FOR THE PUBLIC SAFETY BUILDING CITY OF OWOSSO, MICHIGAN

Housing Authority of the City of Santa Ana Project Based Vouchers Program Request for Proposals

Wolf River Conservancy in partnership with The City of Memphis Division of Park Services. Request for Proposals

City of Puyallup City-Owned Fiber Infrastructure Evaluation Project

CITY OF MADISON, ALABAMA

Appendix H Invitation Letters

REQUEST FOR PROPOSALS

ORANGE & ROCKLAND UTILITIES, INC. REQUEST FOR INFORMATION FOR ENTITIES WISHING TO SUBMIT DISTRIBUTED GENERATION PROPOSALS February 2003

SACRAMENTO COUNTY REQUEST FOR PROPOSAL OPERATIONAL REVIEW Voter Registration and Elections DEPARTMENT

REQUEST FOR PROPOSAL

Downtown Santa Monica, Inc. Request For Proposals Media Relations Program

Cal Poly Pomona Request for Clarification for Lanterman Development Center Land Development Consultant RFC

REQUEST FOR PROPOSALS FOR. Jed Smith Pipeline Replacement Project

SUBJECT: REGIONAL RAlL PLANNING AND ENGINEERING BENCH AND REGIONAL RAlL UPDATE. INITIATE PROCESS TO ESTABLISH A REGIONAL RAlL BENCH

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES GRANT WRITING ASSISTANCE FOR THE ACTIVE TRANSPORTATION PROGRAM

FINANCIAL AUDITING SERVICES. July 10, :00 PM

Request for Proposals. On-Call General Engineering Services. Public Works Department City of San Mateo 330 West 20th Avenue San Mateo, CA 94403

Ogden City Request for Proposals to Provide Market Study and Site Assessment Services

Santa Ana Arts and Culture Master Plan

REQUEST FOR PROPOSALS (RFP) AND STATEMENT OF QUALIFICATIONS

REQUEST FOR PROPOSALS. for. Machine construction of mountain bike trails on Summit County landfill and adjacent Open Space

Request for Qualifications (RFQ) Environmental and Permitting Services

SECTION II. Collection and Analysis of Metro Contract Data

RFP # Request for Proposal Grant Writing Services. Date: May 11, Proposals must be submitted by 3:00 PM: June 10, 2016

~BEVE~Y AGENDA REPORT

PUBLIC WORKS DEPARTMENT 22 E. Weber Avenue, Room 301 Stockton, CA (209) REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE

EFFICIENCY MAINE TRUST REQUEST FOR QUALIFICATIONS FOR VIDEO SERVICES EM Date Issued: August 31, Closing Date: September 30, 2016

Morgan Hill Unified School District

Request for Proposals City of Oberlin, Ohio Branding and Cultural Wayfinding Signage Plan

Metro. Board Report. File #: , File Type:Informational Report

REQUEST FOR PROPOSALS BIG DARBY ACCORD. Proposals Due by October 25, 2004

4444 East Ave., Livermore, CA General Manager (925) Timothy J. Barry

REQUEST FOR PROPOSALDevelopment of a Local

Diridon Station Joint Policy Advisory Board MINUTES

Southern California Chapter 2017 Project Achievement Awards

REQUEST FOR PROPOSAL MARKETING PLAN FOR THE ROXBURY CULTURAL DISTRICT ISSUED: 11/29/2017 DEADLINE: 12/29/2017

ADVERTISEMENT FOR THE CITY OF WAUPACA REQUEST FOR PROPASAL (RFP) RETAIL MARKET ANALYSIS AND DEVELOPMENT PLAN

REQUEST FOR PROPOSALS FOR A CONSULTANT

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR THE BRIDGE REHABILITATION PROJECT. Issued by:

REQUEST FOR PROPOSAL NEW MARKET TAX CREDIT CONSULTANT SERVICES

REQUEST FOR PROPOSALS

The University of North Carolina at Charlotte Facilities Management 9201 University City Blvd. Charlotte, N.C TEL: 704/

SUBJECT: Request for Proposals (RFP) Emergency Operations Plan

Request for Qualifications (CM at Risk Contract) State of Ohio Standard Forms and Documents

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES FOR INSTALLATION & UPGRADE OF BICYCLE FACILITIES (CLASS II & CLASS III) Issued by:

Request for Proposals September Review and Evaluate the Azusa Light & Water Meter Replacement Project RFP

REQUEST FOR PROPOSAL (RFP) # CONSULTANT SERVICES FOR DEVELOPMENT OF A DISTRICT SUSTAINABILITY PLAN

REQUEST FOR PROPOSALS

TOLEDO METROPOLITAN AREA COUNCIL OF GOVERNMENTS

REQUEST FOR PROPOSALS For Design Services for New Fire Station

REQUEST FOR QUALIFICATIONS (RFQ)

REQUEST FOR PROPOSAL. RE: Organization and support for Spotlight Awards on Friday March 22, Vendors who support individually driven activities

Borough of Glassboro, New Jersey. Request for Proposals. Getting Around Glassboro Transportation and Transit Study

Paths Forward: The San Gabriel Valley Greenway Network

2016 Request for Proposal LGBT Community Needs Assessment

REQUEST FOR PROPOSAL (RFP) SOAP MINE ROAD GROUNDWATER CLEAN-UP DESIGN BUILD PROJECT. RFP RELEASE DATE January 17, 2014

Public and Agency Involvement. 8.1 Scoping Meetings and Noticing. Chapter 8

TOWN OF GROVELAND REQUEST FOR PROPOSALS ENGINEER DESIGN SUPPORT FOR THE GROVELAND COMMUNITY TRAIL, A PROPOSED 3.25 MILES SHARED-USE PATH PROPOSAL DUE:

Chabot-Las Positas Community College District

Request for Proposals (RFP) For Restaurant Consulting Services 1657 Ocean Avenue

Request for Proposals Evaluation of the Respite Partnership Collaborative

STUDY AND ARCHITECTURAL DESIGN SERVICES

Public-Private Partnership Program May 2015 Transit Coalition Update

Etna Riverfront Park and Trail: Design and Engineering RFP

City of Malibu Request for Proposal

2014 Construction Management Project Achievement Awards

CITY OF ROCK HILL, SOUTH CAROLINA SOLICITATION OF QUALIFICATIONS FOR TRANSIT CONSULTANT SERVICES

Transcription:

16401 Paramount Blvd Paramount, California 90723 January 6, 2017 REQUEST FOR PROPOSALS West Santa Ana Branch Transit Corridor Preliminary Assessment Report of Rail Maintenance Yard Sites INTRODUCTION Eco-Rapid Transit (also known as the Orangeline Development Authority) invites all qualified firms or teams to respond to this Request for Proposals (RFP) to prepare a Preliminary Assessment Report of alternative sites for a Rail Maintenance Yard along the West Santa Ana Branch (WSAB) Rail Transit Project. Eco-Rapid Transit is seeking a consultant team that is well versed in rail operations and the requirements for Rail Maintenance Yards. The Consultant shall evaluate alternative sites for the Rail Maintenance Yard and prepare a Technical Report on the Preliminary Assessment of the proposed alternative Rail Maintenance Sites with the goal to identify the Maintenance Yard alternative to be included in the EIR/EIS. Eco-Rapid Transit is a formal participant of the WSAB rapid transit project and a member of the technical review panel. Metro has delegated the task of managing the Preliminary Assessment of Sites for the Maintenance Yard to Eco-Rapid Transit. Eco-Rapid Transit anticipates that the scope of work will take 2 months to be completed. To coordinate with other planning efforts overseen by Metro, the consultant must complete the studies by March 31, 2017. BACKGROUND The Los Angeles County Transportation Authority (Metro) is in the process of preparing an Environmental Impact Report and Environmental Impact Statement (EIR/EIS) for a future light rail rapid transit service, which will connect 13 cities (between Artesia and Downtown Los Angeles). The viability of the rail project has been identified in a 2013 Alternatives Analysis, conducted by SCAG, and in a subsequent Technical Refinement Study, conducted by the Los Angeles County Metropolitan Transportation Authority (Metro). The current definition of the proposed service is a light-rail train service mostly along the old West Santa Ana Branch (WSAB) rail corridor that served these communities during the days of the abandoned Pacific Electric Rail system of the early 20 th Century. Metro has allocated 1

funds to pursue further development of the proposed new rail service and will take the lead agency roll for an EIR/EIS. The transit project, as currently proposed, is an independent stand-alone line; therefore an independent Maintenance Yard will be needed. The location and operational characteristics of such a facility must be outlined prior to the initiation of the scoping meetings for the EIR/EIS. A report recommending the Maintenance Yard site(s) to be evaluated in the EIR/EIS must be completed by March 31, 2017. The West Santa Ana Branch (WSAB) Transit Corridor is one of twelve (12) transit projects funded by the voters approval of Measure R in November 2008. In March 2010, Southern California Association of Governments (SCAG) initiated the Pacific Electric Right-of-Way/West Santa Ana Branch (PEROW/WSAB) Alternative Analysis (AA) Study in coordination with the affected cities, Eco-Rapid Transit, the Gateway Cities Council of Governments (COG), Metro, the Orange County Transportation Authority (OCTA) and the owners of the right-of-way. The AA Study was completed in February 2013 and made several recommendations and identified five (5) issues that required additional study. The five issues were: Access to Los Angeles Union Station Northern Terminus; Northern Alignment Options; Huntington Park Alignment Options and Station Locations; New Green Line Station; and Southern Terminus Change from Cerritos to Artesia. In September 2015, Metro completed the Technical Refinement Study that determined that these issues could be resolved and the WSAB project moved towards environmental review. In September 2016, Metro approved a contract with Parsons Brinckerhoff, Inc. (PB), as the lead consultant for an EIR/EIS. PROJECT OBJECTIVES The goal of this effort is to identify several preliminary sites for a Rail Maintenance Yard to be analyzed in the EIR/EIS. The consultant team role will be to work with the project team to identify potential candidate Rail Maintenance Yard sites along the rail corridor, then to prepare a Technical Report on the Preliminary Assessment of the proposed alternative sites. The report will document appropriate criteria to evaluate potential sites and then report the application of those criteria to assist the project team in selecting the top candidate locations for alternative Maintenance Yard alternatives to be included in the EIR/EIS. This effort will be directed by Eco-Rapid Transit s staff and will be reviewed by Metro s Senior Director of Sub-Regional Planning with input from the City Working Group comprised of WSAB Transit Corridor Cities. These three groups form the Project Team. 2

CONSULTANT TEAM SCOPE OF WORK and BUDGET The Consultant will be expected to work with the Project Team. The Consultant is responsible for maintaining the mutually agreed upon schedule for completion of all tasks. The following tasks are expected for the completed submittal: TASK 1 Review the latest proposed alignment to develop an initial list of potential Rail Maintenance Yard sites; TASK 2 - Develop criteria for selecting a preferred Maintenance Yard site, working with various Metro departments, including Operations. Eco-Rapid Transit staff will coordinate the review; TASK 3 Conduct a field review of the proposed route and the initial list of Maintenance Yard sites; TASK 4 Evaluate the proposed alternative Maintenance Yard sites according to the criteria developed in Task 2; and TASK 5 - Prepare a Technical Report documenting the evaluation of the proposed Maintenance Yard sites. The Report will undergo one round of technical review by Metro staff before preparing the Final Technical Report. The Consultant shall provide the following: DELIVERABLES Draft and Final Technical Report documenting the Preliminary Evaluation of Alternative Rail Maintenance Yards. Proposals must include: SUBMITTAL REQUIREMENTS Cover Letter (no more than two pages) that provides the name, address, phone and e-mail addresses of the Consultant, the primary contact name and any sub consultants. An authorized principal of the Consulting firm should sign the letter. A summary of the firm's qualifications and experience to successfully perform the project tasks, including key personnel and support staff to be assigned to the project and their core responsibilities. Elaboration on the Scope of Services outlined above with additional detail on the approach that will be used to handle the project. Respondents are invited to submit variations and additional elements to the work scope that they feel will enhance project outcomes. A breakdown of costs by task and by all assigned staff for the project (including subcontractors) that includes hourly billable rates and provisions for reimbursable expenses. Please note that the funding agency does not reimburse for travel expenses within 50 miles of the Consultant's headquarters or closest branch office. 3

Up to three relevant reference projects completed in the last five years, including description of services, key personnel involved, core project outcomes, client name and a reference with current contact information. SELECTION PROCEDURE AND CRITERIA The Project Team will designate up to five members to form an RFP Selection Committee that will review each response to the RFP and may meet with some or all of the respondents. We may request a firm to clarify, supplement or modify some of the information submitted. Submittals shall be evaluated according to the following criteria: Completeness of the proposal and responsiveness to the RFP; Demonstrated professional skills and credentials of the firm and staff to be assigned to the project; Evidence that the respondent understands all aspects of the project, including coordination and communication with different entities involved; Experience and capacity to work collaboratively with a multi-disciplinary team; A clearly defined approach to performing the scope of work; and Relevant experience. SUBMISSION All submissions must be completed in 12 point font, 8.5" x 11" paper, with 1" margins and should be no more than six pages, not including the cover letter, cost estimate, relevant experience and references. No binders, folders, or coil binding. Five hard copies and one digital copy (PDF) of the complete proposal must be submitted by January 31, 2017 at 5:00 pm. Proposals are to be sent to the following address: Mr. Barry Kielsmeier, Eco-Rapid Transit, Business Development Director 16401 Paramount Boulevard, Paramount, CA 90723 Phone: (562)663-6850 Fax: (None) info@eco-rapid.org All inquiries and responses to this RFP must be submitted in writing via e-mail to the contact person listed above. E-mail inquiries shall be clearly identified in the subject line as: "Eco-Rapid Transit WSAB Alternative Rail Maintenance Yard Locations RFP." Eco-Rapid Transit reserves the right to reject all bids as non-responsive. Thank you in advance for your interest and participation in the RFP process. 4

ATTACHMENTS: Project Area Map http://www.eco-rapid.org/project/maps/wsab-study-area-base-map_alt2_scag%20aa-t o-artesia.jpg 5