Draft for approval by TCC on 8/8; TAQC on 8/14 and ARC on 8/27/14

Size: px
Start display at page:

Download "Draft for approval by TCC on 8/8; TAQC on 8/14 and ARC on 8/27/14"

Transcription

1 Draft for approval by TCC on 8/8; TAQC on 8/14 and ARC on 8/27/14 DATE: August 27, 2014 ISSUE SUMMARY: PLAN 2040 RTP/TIP Amendment #1 FROM: Tom Worthan, Transportation & Air Quality Committee IMPORTANCE: On March 26, 2014, ARC adopted a major update to the PLAN 2040 Regional Transportation Plan (RTP), including a FY Transportation Improvement Program (TIP), for the 18-county transportation planning area. This Plan was developed pursuant to federal requirements, including a Conformity Determination Report. On April 30, 2014, USDOT in consultation with USEPA made a conformity determination for both the 15-county Atlanta ozone and 22-county Atlanta pm 2.5 nonattainment areas. This Amendment #1 to the PLAN 2040 RTP and FY Transportation Improvement Program was developed to: 1) incorporate programmatic changes to regional high priority projects, 2) adjust other cost estimate and programmatic changes that are of a time sensitive nature or cannot be handled administratively, 3) address regional travel demand model clean up adjustments and, 4) modify regional travel demand model to include modeling for projects expected to be open to traffic by (For additional information on the amendment to Regarding the required conformity determination for the TIP amendment: 1. ARC determined that the changes reflected in Amendment #1 require a new technical evaluation for conformity. ARC provided this information to the adjacent Gainesville- Hall MPO, also in the Atlanta Nonattainment Area, who will amend their TIP during the same timeframe and adopt in August. 2. Prior to the formal public comment period, ARC received concurrence as required through the Interagency Consultation process that the conformity determination for Amendment #1 does necessitate a new regional emissions analysis. ARC will incorporate GHMPO changes into the technical evaluation. 3. Following ARC adoption, a federal conformity determination will be requested from USDOT in consultation with EPA. Signed copies of both the ARC and GHMPO adopting resolutions will accompany this request. Pursuant to the ARC Community Engagement Plan, a 30 day public comment period was conducted, July 3 to August 1, 2014, and the results provided to TCC, TAQC and the ARC Board. ACTION REQUIRED: ARC approval

2 Draft for approval by TCC on 8/8; TAQC on 8/14 and ARC on 8/27/14 A RESOLUTION ADOPTING AMENDMENT #1 PLAN 2040 RTP AND TIP WHEREAS, the Atlanta Regional Commission is the designated Metropolitan Planning Organization (MPO) for transportation planning in Atlanta Metropolitan Transportation Planning Area which includes all or parts of eighteen counties; and WHEREAS, Moving Ahead for Progress in the 21 st Century (MAP-21) and the Clean Air Act (CAA) Amendments of 1990 require the MPO to develop and adopt a long-range regional transportation plan (RTP) and short-range transportation improvement program (TIP) that conforms with the applicable State Implementation Plan (SIP) for air quality; and WHEREAS, in March 2014, ARC adopted a major update to PLAN 2040 RTP, incorporating updated planning assumptions, and an FY Transportation Improvement Program (TIP) for the eighteen county area; and WHEREAS, a conformity determination was made on the PLAN 2040 RTP/TIP on April 30, 2014, by the US Department of Transportation in consultation with the US Environmental Protection Agency, which determined based on the PLAN 2040 Conformity Determination Report, that the PLAN 2040 RTP and TIP conform to the requirements of the Clean Air Act under 40 CFR Part 93 for the 8 hour ozone 2008 standards (15 county nonattainment area) and particulate matter 2.5 standard (22 county nonattainment area); and WHEREAS, ARC did perform an MPO conformity assessment and determined that TIP Amendment #1 consists of changes that require a new technical evaluation for conformity; and WHEREAS, ARC did notify the Gainesville-Hall MPO, also in the Atlanta Nonattainment Area, that such a technical evaluation would be performed for the entire Atlanta Nonattainment Area; and WHEREAS, the Gainesville-Hall MPO did choose to also amend their TIP on the same schedule with their changes to be reflected in the ARC technical evaluation for conformity; and WHEREAS, prior to releasing the amendment for a formal public comment period, ARC received concurrence through the Interagency Consultation process that Amendment #1 consists of changes that necessitate a new technical evaluation for conformity, and

3 Draft for approval by TCC on 8/8; TAQC on 8/14 and ARC on 8/27/14 WHEREAS, Amendment #1 to the PLAN 2040 RTP/FY TIP was developed consistently with the requirements of 23 CFR and in adherence with the participation processes and guidelines outlined in ARC Community Engagement Plan, 2014 Update as follows: Notice of such an amendment was published in a legal organ for a 30 day public comment period on July 3 to August 1, 2014; Interested parties were provided the opportunity to comment on the amendment through the ARC website. Results of this public comment period were provided to the Transportation Coordinating Committee, the Transportation & Air Quality Committee and the ARC Board for consideration. NOW, THEREFORE, BE IT RESOLVED that the Atlanta Regional Commission adopts Amendment #1 to the PLAN 2040 RTP/TIP, as defined above; and BE IT FURTHER RESOLVED that the Commission authorizes staff, with approval of the Chair of the Atlanta Regional Commission, to make non-substantive technical corrections to the final documents as necessary; and BE IT FURTHER RESOLVED that the Commission directs the staff to continue the regular reporting on PLAN 2040 management and implementation.

4 Table 1 Programming and Model Changes PROPOSED Project Title Project Title Programming Changes Programming Notes Model Coding Notes AR REVIVE 285 I 285 INTERCHANGE RECONSTRUCTION AND MANAGED LANE SYSTEM AT SR 400 Add FY 2006 PE M001 > $151,568 FEDERAL/$37,892 STATE; Change FY 2014 PE M001 > AUTH; Add FY 2015 PE M001 > $19,598,049 FEDERAL/$4,899,512 STATE; Remove FY 2016 PE M001; Change FY 2016 PE LY10 > FY 2015 PE LY10; Change LR ROW > FY 2015 ROW M001; Change FY 2015 ROW M001 > $20,000,000 FEDERAL/$5,000,000 STATE; Add FY 2016 ROW M001 > $40,000,000 FEDERAL/$10,000,000 STATE; Add FY 2017 ROW M001 > Advancement of phases and cost estimate $34,472,643 FEDERAL/$15,527,357 STATE; Remove LR UTL; Add FY adjustments CST M001 > $6,376,160 FEDERAL/$19,053,840 STATE; Add FY 2017 CST PPP > $390,650,000 OTHER/LOCAL; Add FY 2017 CST STATE > $12,750,000 STATE; Add FY 2018 CST M001 > $51,425,579 FEDERAL/$21,594,421 STATE; Add FY 2019 CST M001 > $41,258,478 FEDERAL/$14,791,522 STATE/$10,000,000 LOCAL; Change LR CST > $400,000 FEDERAL/$100,000 STATE; Add LR P3REPAY M001 > $212,520,000 FEDERAL/$178,130,000 STATE Network year adjusted from 2030 to AR ML I 285 NORTH MANAGED LANES AND COLLECTOR/DISTRIBUTOR LANE IMPROVEMENTS FROM I 75 NORTH TO I 85 NORTH Add FY 2015 PE M001N > $4,500,000 FEDERAL/$500,000 STATE; Add FY 2016 PE M001N >$1,350,000 FEDERAL/$150,000 STATE; Add FY 2017 PE M001N > Addition of PE phases within TIP period. $1,350,000 FEDERAL/$150,000 STATE; Change LR ALL > $799,452,000 FEDERAL/$88,828,000 STATE; Change status > Programmed AR ML AR ML I 85 NORTH MANAGED LANES INCLUDING SOUTHBOUND AUXILIARY LANE FROM SR 20 TO SR 317 AND NORTHBOUND AUXILIARY LANE FROM SR 20 TO SR 324 (GRAVEL SPRINGS ROAD) FROM OLD PEACHTREE ROAD TO HAMILTON MILL ROAD Add FY 2015 PE M001 > $4,000,000 FEDERAL/$1,000,000 STATE; Change FY 2015 CST M001 > $52,000,000 FEDERAL/$13,000,000 STATE; Add FY 2016 CST M001 > $12,800,000 FEDERAL/$3,200,000 STATE Addition of phases and adjustment to existing CST phase. NORTHWEST CORRIDOR (I 75 AND I 575) MANAGED LANES FROM AKERS MILL ROAD TO HICKORY GROVE ROAD ON I 75 AND FROM I 75 TO SIXES ROAD ON I Remove FY 2017 CST GRV phase. Removal of phase. 575 AT SR 42 SPUR (MCDONOUGH BOULEVARD) BRIDGE REPLACEMENT AT NORFOLK SOUTHERN RR Change FY 2015 ROW M240 > $1,028,976 FEDERAL/$257,244 STATE (currently $332,928 FEDERAL/$82,232 STATE) ; Change FY 2017 UTL M240 > $212,242 FEDERAL/$53,060 STATE (currently $43,297 FEDERAL/$10,824 STATE) ; Change FY Federal fund increase more than 20% CST M240 > $2,819,181 FEDERAL/$704,795 STATE (currently $1,731,891 FEDERAL/$432,973 STATE) AT SR 9/US 19 (PEACHTREE ROAD) FROM DEERING ROAD TO PHARR ROAD Program new project. Add FY 2015 PE MS30 > $180,000 FEDERAL/$20,000 STATE; Add FY 2016 CST MS30 > $936,000 FEDERAL/$104,000 STATE Add project to 2020 model network year. 6 existing lanes/4 proposed lanes. BA SR 316 NEW INTERCHANGE AT SR 81 Change FY 2016 ROW M001 > FY 2015 ROW M001; Change FY 2015 ROW M001 Advancement of ROW phase from FY 2016 to FY > $1,969,824 FEDERAL/$492,456 STATE No conformity impacts. CL 063 MOUNT ZION ROAD WIDENING FROM RICHARDSON PARKWAY TO SR 138 Change FY 2015 ROW LOCAL > FY 2018 ROW LOCAL; Change FY 2017 CST LOCAL Fiscal year shift for ROW and CST phases. Change model network year from 2020 to > LR LOCAL CO CO 450 CO 450A TBD CO 450 CO 450B TBD CO SR 92 (DALLAS ACWORTH HIGHWAY) WIDENING FROM PAULDING COUNTY LINE TO US 41 (NORTH COBB PARKWAY) BARRETT PARKWAY RELIEVER: PHASES 2 AND 3 NEW ALIGNMENT FROM INTERSECTION OF BARRETT LAKES BOULEVARD AND SHILOH PARKWAY TO INTERSECTION OF BARRETT PARKWAY AND ROBERTS COURT BARRETT PARKWAY RELIEVER: PHASES 2 AND 3 NEW ALIGNMENT FROM INTERSECTION OF BARRETT LAKES BOULEVARD AND SHILOH PARKWAY TO INTERSECTION OF BARRETT PARKWAY AND ROBERTS COURT I 75 NORTH DIVERGING DIAMOND INTERCHANGE AT WINDY HILL ROAD BARRETT PARKWAY RELIEVER: PHASE 2 AT BARRETT LAKES BOULEVARD AND SHILOH VALLEY ROAD BARRETT PARKWAY RELIEVER: PHASE 3 NEW ALIGNMENT FROM BARRETT LAKES BOULEVARD TO ROBERTS COURT Change FY 2017 ROW M240 > FY 2016 ROW M240; Change FY 2016 ROW M240 Advancement of ROW phase and federal fund > $2,816,571 FEDERAL/$704,143 STATE (currently $1,555,906 increase more than 20%. FEDERAL/$388,977 STATE) Add FY 2014 PE LOCAL > $431,000 LOCAL; Add FY 2015 ROW LOCAL > $973,000 LOCAL; Add FY 2016 UTL LOCAL > $146,000 LOCAL; Add FY 2016 CST LOCAL > $1,712,000 LOCAL; Add FY 2016 CST GTIB > $1,200,000 STATE Remove ALL LR phase. Add FY 2015 PE LOCAL > $1,350,000 LOCAL; Add FY 2017 ROW LOCAL > $3,410,000 LOCAL; Add FY 2018 UTL LOCAL > $581,000 LOCAL; Add FY 2018 CST LOCAL > $13,297,000 LOCAL Change FY 2016 CST M400 > $6,000,000 FEDERAL/$0 LOCAL; Add FY 2016 CST GTIB > $2,400,000 STATE Change model network year from 2030 to Split from current CO 450 which consists of Phases 2 Model coding change not required. Limits remain and 3. This line item will be Phase 2 only. the same from original CO 450. Split from current CO 450 which consists of Phases 2 Model coding change not required. Limits remain and 3. This line item will be Phase 3 only. the same from original CO 450. Addition of GTIB award funding and will serve as the local match for the CST phase. See Table 1A. CO 451 SPRING ROAD WIDENING FROM US 41 (COBB PARKWAY) TO BELL DRIVE Program new project. Add FY 2014 PE LOCAL > $300,000 LOCAL; Add FY 2015 ROW LOCAL > $300,000 LOCAL; Add FY 2015 UTL LOCAL > $200,000 LOCAL; Add FY 2016 CST LOCAL > $2,200,000 LOCAL Addition of an additional westbound through lane on Spring Road, from Cobb Parkway/US 41 to Bell Drive, to accommodate need for an additional northbound left turn lane on Cobb Parkway/US 41 at Spring Road. Model network year > 2020 CO 456 CUMBERLAND BOULEVARD WIDENING FROM AKERS MILL ROAD TO CUMBERLAND PARKWAY Program new project. Add FY 2015 PE LOCAL > $500,000 LOCAL; Add FY 2015 ROW LOCAL > $650,000 LOCAL; Add FY 2016 UTL LOCAL > $350,000 LOCAL; Add FY 2017 CST > $4,500,000 LOCAL Addition of an additional westbound through lane on Cumberland Boulevard, from Akers Mill Road to Cumberland Parkway. This new lane further improves intersection operation and traffic signal efficiency. Restriping and elimination of existing splitphase traffic signal timing at Cumberland Parkway and Akers Mill Road/Stillhouse Road. Model network year > 2020 Page 1 of 2

5 Table 1 Programming and Model Changes PROPOSED Project Title Project Title Programming Changes Programming Notes Model Coding Notes Program new project. Add FY 2014 PE LOCAL > $150,000 LOCAL; Add FY 2015 CO 457 COBB PARKWAY AT I 285 WESTBOUND RAMP ROW LOCAL > $50,000 LOCAL; Add FY 2016 UTL LOCAL > $300,000 LOCAL; Add FY 2016 CST LOCAL > $1,500,000 LOCAL CO 458 CO 459 DK AR FN FN FN FN I 285 SOUTH INTERCHANGE IMPROVEMENTS AT BOULDERCREST ROAD JOHNSON FERRY ROAD OPERATIONAL IMPROVEMENTS FROM US 19 (ROSWELL ROAD) TO HUNTING CREEK ROAD ENCORE PARKWAY BICYCLE AND PEDESTRIAN IMPROVEMENTS FROM WESTSIDE PARKWAY TO NORTH POINT PARKWAY SANDY SPRINGS CIRCLE COMPLETE STREET PHASE II FROM HAMMOND DRIVE TO MOUNT VERNON HIGHWAY WINDWARD PARKWAY WESTBOUND AUXILIARY LANE FROM SR 400 TO DEERFIELD PARKWAY INTERSTATE NORTH PARKWAY REALIGNMENT AT INTERSTATE NORTH CIRCLE I 285 PEDESTRIAN AND TRANSIT BRIDGE FROM GALLERIA DRIVE TO CIRCLE 75 Program new project. Add FY 2014 PE LOCAL > $350,000 LOCAL; Add FY 2015 ROW LOCAL > $750,000 LOCAL; Add FY 2016 UTL LOCAL > $150,000 LOCAL; Add FY 2016 CST LOCAL > $2,750,000 LOCAL Program new project. Add FY 2015 PE LOCAL > $500,000 LOCAL; Add FY 2015 CST 5307/5309 > $4,500,000 FEDERAL/$4,000,000 LOCAL Need to remove the transit component from project. Change network year > 2030 Data entry error and cleanup. Change FY 2015 ROW M230 > FY 2016 ROW M230; Change FY 2015 ROW H170 > FY 2016 ROW H170; Change FY 2016 ROW M230 > $6,315,250 Federal fund increase more than 20%. FEDERAL/$789,407 STATE/789,406 LOCAL (Currently $5,078,400 FEDERAL/$1,854,667 STATE/$960,996 LOCAL) Change FY 2016 CST M230 > $4,000,000 FEDERAL/$4,750,000 LOCAL; Change FY 2016 UTL LOCAL > FY 2015 UTL LOCAL; Change FY 2016 CST M230 > FY 2015 Advancement of phases. CST M230 Change FY 2015 ROW M230 > FY 2016 ROW M230; Change FY 2016 ROW M230 > $2,408,920 FEDERAL/$602,230 LOCAL (Currently $300,000 Federal fund increase more than 20%. See Table 1A. FEDERAL/$2,570,000 STATE) ; Change FY 2017 CST M230 > $2,284,245 FEDERAL/$571,061 LOCAL Add FY 2016 ROW LOCAL > $196,000 LOCAL; Add FY 2016 ROW GTIB > $754,000 STATE; Change FY 2015 CST M240 > FY 2017 CST M240; Change FY 2017 CST M240 > $1,096,000 FEDERAL/$274,000 STATE/$0 LOCAL; Add FY 2017 CST GTIB > $2,029,000 STATE Addition of GTIB award funding. Construction of an additional westbound right turn lane on the ramp and an additional northbound receiving lane on Cobb Parkway/US 41 to allow freeflow right turns from this ramp to Circle 75 Parkway. The new lane will be channelized to separate it from other northbound lanes on Cobb Parkway/US 41. Includes overhead lane designation guide signs on the ramp to guide motorists onto the appropriate lanes on Cobb Parkway/US 41. Model network year > 2020 Realign Interstate North Parkway and Cumberland Parkway (at Interstate North Circle) to connect Cumberland Boulevard directly with Windy Ridge Parkway (via Interstate North Circle). Includes improvements to Interstate North Circle between Cumberland Boulevard and Windy Ridge Parkway. Allows for creation of a pedestrian corridor along Interstate North Parkway south of Windy Ridge Parkway. Southbound left turn signal phasing to be adjusted at Interstate North Parkway and Windy Ridge Parkway to permissive only. Model network year > 2020 Addition of pedestrian/transit bridge over I 285 from Galleria Drive to Circle 75. Model network year > 2020 FN AR 100A SR 400 COLLECTOR/DISTRIBUTOR LANES FROM VICINITY OF HAMMOND DRIVE AND ABERNATHY ROAD TO NORTH OF SPALDING DRIVE Change FY 2014 PE M001 > AUTH; Add FY 1993 PE M001 > $445,547 FEDERAL/$111,384 STATE; Change FY 1993 PE M001 > AUTH; Add FY 1998 ROW M001 > $40,794,320 FEDERAL/$10,198,580 STATE; Change FY 1998 ROW M001 > AUTH; Add FY 2015 PE M001 > $6,424,000 FEDERAL/$1,606,000 STATE; Remove FY 2016 ROW M001; Remove FY 2017 ROW M001; Add FY 2016 CST M001 > $11,192,000 FEDERAL/$2,798,000 STATE; Add FY 2017 CST PPP > Cost estimate adjustments. $210,350,000 OTHER/LOCAL; Add FY 2017 CST M001 > $5,528,000 FEDERAL/$1,382,000 STATE; Change FY 2018 CST M001 > $31,408,000 FEDERAL/$7,852,000 STATE; Add FY 2019 CST M001 > $10,560,000 FEDERAL/$25,050,000 STATE; Add LR CST > $240,000 FEDERAL/$60,000 STATE; Add LR P3REPAY M001 > $168,280,000 FEDERAL/$42,070,000 STATE Model coding change not required. FT 038 GW 078C GW CASTLEBERRY ROAD WIDENING FROM BETHELVIEW ROAD TO HUTCHINSON ROAD US 78 (MAIN STREET IN CITY OF SNELLVILLE) CONTINUOUS FLOW INTERSECTION AT SR 124 (SCENIC HIGHWAY) US 23 (BUFORD HIGHWAY) MEDIANS FROM SR 140 (JIMMY CARTER BOULEVARD) TO SR 378 (BEAVER RUIN ROAD) Change LR > FY 2015 CST LOCAL; Change FY 2015 CST LOCAL > $13,000,000 LOCAL Advancement of CST phase. Conformity impact. Change model network year from 2040 to Add FY 2015 ROW M001 > $10,730,400 FEDERAL/$2,682,600 STATE Addition of federally funded ROW phase. Change FY 2016 CST M230 > FY 2015 CST M230 Advancement of CST phase. No conformity impact. GW 393 TBD SR 141 SOUTHBOUND IMPROVEMENTS FROM HOLCOMB BRIDGE ROAD TO I 285 Program new project. Add FY 2015 PE LOCAL > $500,000 LOCAL; Add FY 2016 ROW LOCAL > $500,000 LOCAL; Add FY 2017 CST LOCAL > $4,000,000 LOCAL Add project to 2020 model network year. 3 existing lanes/4 proposed lanes. GW AR PA 092C HOSPITAL DRIVE CONNECTOR ROAD NEW ALIGNMENT FROM INTERSECTION OF WEST LAWRENCEVILLE STREET AND MCCLURE BRIDGE ROAD TO SR 120 (ABBOTTS BRIDGE ROAD) SR 92 (HIRAM ACWORTH HIGHWAY) WIDENING FROM SR 120 (MARIETTA HIGHWAY) TO CEDARCREST ROAD Change FY 2019 CST M230 > FY 2016 CST M230 Advancement of CST phase. Conformity impact. Change model network year from 2030 to SR 92 (HIRAM ACWORTH HIGHWAY) FROM JUST NORTH OF EAST PAULDING MIDDLE SCHOOL TO OLD BURNT HICKORY ROAD Change FY 2017 ROW M240 > FY 2018 ROW M240 Shift ROW fiscal year. Adjustment to project limits. Page 2 of 2

6 Table 1A Programming Corrections PROPOSED Project Title PROPOSED Programming Changes FINAL Programming Changes Public Comment Correction CO I 75 NORTH DIVERGING DIAMOND INTERCHANGE AT WINDY HILL ROAD Add FY 2016 CST GTIB > $2,400,000 STATE Change FY 2016 CST M400 > $6,000,000 FEDERAL/$0 LOCAL; Add FY 2016 CST GTIB > $2,400,000 STATE Correction to clarify programming. GTIB award intended to be used as the local match for the CST phase. Local share for existing CST phase removed. FN SANDY SPRINGS CIRCLE COMPLETE STREET PHASE II FROM HAMMOND DRIVE TO MOUNT VERNON HIGHWAY Change FY 2015 ROW M230 > FY 2016 ROW M230; Change FY 2016 ROW M230 > $2,296,000 FEDERAL/$574,000 LOCAL (Currently $300,000 FEDERAL/$2,570,000 STATE) ; Change FY 2017 CST M230 > $2,098,400 FEDERAL/$524,600 LOCAL Change FY 2015 ROW M230 > FY 2016 ROW M230; Change FY 2016 ROW M230 > $2,408,920 FEDERAL/$602,230 LOCAL (Currently $300,000 FEDERAL/$2,570,000 STATE) ; Change FY 2017 CST M230 > $2,284,245 FEDERAL/$571,061 LOCAL Correction to update cost estimate. Received from project sponsor prior to start of July 3rd public comment period but latest cost estimate was not reflected in proposed list. Page 1 of 1

7 Table 2 Model Changes Only (No Programming Adjustments) PROPOSED AR 958 TBD AR TBD AR TBD BA 005B Project Title Project Title Model Coding Changes REVIVE 285 I 285 / I 85 NORTH INTERCHANGE IMPROVEMENTS AT I 285 EASTBOUND TO I 85 NORTHBOUND DIRECTION (IN VICINITY OF PLEASANTDALE ROAD EXIT) REVIVE 285 I 75 NORTH / I 285 INTERCHANGE IMPROVEMENTS AT I 75 NORTHBOUND TO I 285 WESTBOUND FLYOVER RAMP REVIVE 285 I 75 NORTH / I 285 INTERCHANGE IMPROVEMENTS AT I 75 SOUTHBOUND TO I 285 WESTBOUND FLYOVER RAMP Model change. NETWORK YEAR = 2024 Model change. NETWORK YEAR = 2024 Model change. NETWORK YEAR = 2024 WINDER WEST BYPASS: PHASE 2 NEW ALIGNMENT FROM FROM MATTHEWS SCHOOL ROAD TO SR 316 Model change. NETWORK YEAR = 2024 BA 005C WINDER WEST BYPASS: PHASE 3 NEW INTERCHANGE AT SR 316 Model change. NETWORK YEAR = 2024 BA SR 316 NEW INTERCHANGE AT SR 53 Model change. NETWORK YEAR = 2024 CO SR 92 (LAKE ACWORTH DRIVE / COWAN ROAD) WIDENING FROM SR 3/US 41 (NORTH COBB PARKWAY) TO GLADE ROAD Model change. NETWORK YEAR = 2024 FN SR 120 (KIMBALL BRIDGE ROAD) WIDENING FROM Model change. NETWORK YEAR = 2024 FROM STATE BRIDGE ROAD TO JONES BRIDGE ROAD FN FN FN FN AR FT FT 062C PA SR 120 (ABBOTTS BRIDGE ROAD / DULUTH HIGHWAY) WIDENING FROM PARSONS ROAD TO SR 141 (MEDLOCK BRIDGE ROAD) SR 120 (ABBOTTS BRIDGE ROAD / DULUTH HIGHWAY) WIDENING FROM PEACHTREE INDUSTRIAL BOULEVARD TO SR 141 (MEDLOCK BRIDGE ROAD) Adjustment to project limits only. SR 9 (ATLANTA STREET) REVERSIBLE LANE REMOVAL AND WIDENING FROM MARIETTA HIGHWAY TO RIVERSIDE ROAD/AZALEA DRIVE Model change. NETWORK YEAR = 2024 BIG CREEK PARKWAY NEW ALIGNMENT FROM HOLCOMB BRIDGE ROAD AT WARSAW ROAD TO HOLCOMB BRIDGE ROAD AT HOLCOMB WOODS Lane adjustment from 0 to 2 lanes. PARKWAY REVIVE 285 I 285 NORTH AUXILIARY LANE IN WESTBOUND DIRECTION FROM US 19 (ROSWELL ROAD) TO RIVERSIDE DRIVE (INCLUDES BRIDGE Model change. NETWORK YEAR = 2024 REPLACEMENT AND RAMP INTERSECTION IMPROVEMENTS) SR 369 (BROWNS BRIDGE ROAD) BRIDGE SR 369 (BROWNS BRIDGE ROAD) BRIDGE REPLACEMENT AND WIDENING AT SIX MILE CREEK / REPLACEMENT AT SIX MILE CREEK / LAKE LAKE LANIER LANIER SR 369 (BROWNS BRIDGE ROAD) BRIDGE REPLACEMENT AND WIDENING AT TWO MILE CREEK / LAKE LANIER PAULDING COUNTY BUSINESS AND TECHNOLOGY PARK ROADWAY NEW ALIGNMENT FROM END OF EXISTING AIRPORT PARKWAY ON NEW LOCATION TO A CUL DE SAC SR 369 (BROWNS BRIDGE ROAD) BRIDGE REPLACEMENT AT TWO MILE CREEK / LAKE LANIER Change project type > Roadway / Bridge Upgrade; Change lanes = 2 > 2; Remove from 2020 model network. Change project type > Roadway / Bridge Upgrade; Change lanes = 2 > 2; Remove from 2020 model network. Add to model only. No programming changes. Page 1 of 2

8 Table 2 Model Changes Only (No Programming Adjustments) PROPOSED PA 092E Project Title Project Title Model Coding Changes SR 92 (DALLAS ACWORTH HIGHWAY) WIDENING FROM CEDARCREST ROAD TO COBB COUNTY LINE NORTH OF OLD STILESBORO ROAD DESIGN PHASE WILL INCLUDE ACCESS MANAGEMENT PLAN Model change. NETWORK YEAR = 2024 Page 2 of 2

9 Table 3 Model Changes Outside MPO Boundary PROPOSED Project Title Project Title Jurisdiction Programming Changes DOUTHIT FERRY ROAD WIDENING FROM OLD ALABAMA ROAD TO SR 61/SR 113 Bartow County Add to model in 2024 network year. 2 lanes existing with 4 lanes proposed. Length = 2.42 miles SR 20 WIDENING FROM I 75 TO I 575 Bartow County Add to model in 2040 network year. 2 lanes existing with 4 lanes proposed. Length = miles SR 140 BRIDGE WIDENING FROM OOTHKALOOGA CREEK AND CSX RAILROAD Bartow County Add to model in 2020 network year. 2 lanes existing with 5 lanes proposed. Length = 0.80 miles Page 1 of 1

PLAN 2040 RTP UPDATE FY TIP List of Changes Resulting from Public Comment Period (January 11, 2014 to February 21, 2014)

PLAN 2040 RTP UPDATE FY TIP List of Changes Resulting from Public Comment Period (January 11, 2014 to February 21, 2014) constraint of the plan. Changes generally fall into six categories: 1) minor cost updates, 2) adjustments to the schedule of a project phase, 3) adding a number, 4) authorizing project phases which AR

More information

The Atlanta Region s Plan RTP/ FY TIP Amendment #4. Transportation Coordinating Committee January 5, 2018

The Atlanta Region s Plan RTP/ FY TIP Amendment #4. Transportation Coordinating Committee January 5, 2018 The Atlanta Region s Plan RTP/ FY 2018-2023 TIP Amendment #4 Transportation Coordinating Committee January 5, 2018 What s in Amendment #4? 2017 TIP Project Solicitation Funding Commitments Exempt projects

More information

FY16 Annual Report WHAT IS GTIB? WHO ADMINSTERS GTIB? Summary of GTIB Funding Through FY16

FY16 Annual Report WHAT IS GTIB? WHO ADMINSTERS GTIB? Summary of GTIB Funding Through FY16 FY16 Annual Report PROVIDING FUNDS TO IMPROVE MOBILITY, SUSTAIN DEVELOPMENT AND ENHANCE COMMUNITIES THROUGHOUT GEORGIA WHAT IS GTIB? The Georgia Transportation Infrastructure Bank (GTIB) provides financial

More information

Georgia Transportation Infrastructure Bank (GTIB)

Georgia Transportation Infrastructure Bank (GTIB) STATE ROAD AND TOLLWAY AUTHORITY Georgia Transportation Infrastructure Bank (GTIB) Bert Brantley Deputy Executive Director State Road and Tollway Authority JUNE 2013 Established by House Bill 1019 in April

More information

ACTION TRANSMITTAL No

ACTION TRANSMITTAL No Transportation Advisory Board of the Metropolitan Council of the Twin Cities DATE: March 6, 2017 TO: FROM: ACTION TRANSMITTAL No. 2017-08 Transportation Advisory Board Technical Advisory Committee PREPARED

More information

RESOLUTION FOR APPROVAL OF AMENDMENTS TO THE TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP)

RESOLUTION FOR APPROVAL OF AMENDMENTS TO THE TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP) TPC Agenda Item 6A Mailout 10/20/16 RESOLUTION FOR APPROVAL OF AMENDMENTS TO THE 2017-2020 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION PLAN (RTP) Amendment Summary Amendment

More information

Planning Phase (Route Study and Pond Siting Analysis & Report) Determines Preferred Alignment Public Workshop and Board Approval Required Completion:

Planning Phase (Route Study and Pond Siting Analysis & Report) Determines Preferred Alignment Public Workshop and Board Approval Required Completion: 2 Planning Phase (Route Study and Pond Siting Analysis & Report) Determines Preferred Alignment Public Workshop and Board Approval Required Completion: 270 Days Design/Permitting Phase Engineering Plans

More information

CALVERT - ST. MARY S METROPOLITAN PLANNING ORGANIZATION

CALVERT - ST. MARY S METROPOLITAN PLANNING ORGANIZATION CALVERT - ST. MARY S METROPOLITAN PLANNING ORGANIZATION TRANSPORTATION IMPROVEMENT PROGRAM FISCAL YEARS 2015-2018 Calvert County Planning Commission St. Mary s County Department of County Services Plaza

More information

Amendments to FY Transportation Improvement Program of the Coastal Region Metropolitan Planning Organization (CORE MPO) October 2017

Amendments to FY Transportation Improvement Program of the Coastal Region Metropolitan Planning Organization (CORE MPO) October 2017 Amendments to FY 2018-2021 Transportation Improvement of the Coastal Region Metropolitan Planning Organization (CORE MPO) October 2017 The Transportation Improvement (TIP) is the MPO s short-range programming

More information

FY Transportation Improvement Program

FY Transportation Improvement Program (CHATS) Metropolitan Planning Organization 2010-2015 June 8, 2009 1 Amendment Adopted: _September 24, 2009_ Amendment Adopted: _February 5, 2010 Amendment Adopted: May 17, 2010 Amendment Adopted: June

More information

Lake Norman Regional Transportation Commission AGENDA March 8, 2017

Lake Norman Regional Transportation Commission AGENDA March 8, 2017 Lake Norman Regional Transportation Commission AGENDA March 8, 2017 I Call to Order Review of the Agenda Adoption of the February 8, 2017 Meeting Summary. II Roadway Projects Update Bill Thunberg (30 minutes)

More information

NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD 777 North Capitol Street, N.E. Washington, D.C

NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD 777 North Capitol Street, N.E. Washington, D.C NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD 777 North Capitol Street, N.E. Washington, D.C. 20002 TPB SR22-2017 May 5, 2017 RESOLUTION ON AN AMENDMENT TO THE FY 2017-2022 TRANSPORTATION IMPROVEMENT

More information

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER

NASHVILLE AREA MPO FY TIP - ADOPTED DECEMBER WILSON NASHVILLE AREA MPO FY -2017 TIP - ADOPTED DECEMBER 11, 2013 Beckwith Road/Eastern Connector TIP # 2008-71-038 New Road Mt. Juliet Wilson Length 5.00 Regional Plan ID 1072-132 Air Quality Status

More information

Amendments to FY Transportation Improvement Program of the Coastal Region Metropolitan Planning Organization (CORE MPO) August 2016

Amendments to FY Transportation Improvement Program of the Coastal Region Metropolitan Planning Organization (CORE MPO) August 2016 Amendments to FY 2015-2018 Transportation Improvement Program of the Coastal Region Metropolitan Planning Organization (CORE MPO) August 2016 The Transportation Improvement Program (TIP) is the MPO s short-range

More information

Mark A. Doctor, PE CAREER PATH

Mark A. Doctor, PE CAREER PATH Mark A. Doctor, PE Professional Profile A career of over 27 years with the Federal Highway Administration in various transportation engineering positions with diverse experiences and accomplishments in

More information

Georgia s Operational Improvement Program. Paul DeNard, P.E., PTOE State Traffic Operations Manager

Georgia s Operational Improvement Program. Paul DeNard, P.E., PTOE State Traffic Operations Manager Georgia s Operational Improvement Program Paul DeNard, P.E., PTOE State Traffic Operations Manager How do you address Capacity? We can t build our way out of the congestion problem Widening projects cost

More information

Transportation Improvement Program

Transportation Improvement Program Transportation Improvement Program Transportation Conformity Check List The Transportation Improvement Program (TIP) and all amendments must include a conformity report. The conformity report must address

More information

The Charlotte Regional Transportation Planning Organization adopted the amendment to the Program on April 16, 2014.

The Charlotte Regional Transportation Planning Organization adopted the amendment to the Program on April 16, 2014. 600 East Fourth Street Charlotte, NC 28202 704-336-2205 www.crtpo.org April 17, 2014 Secretary Tony Tata North Carolina Department of Transportation Attention: Mike Bruff, PE 1554 Mail Service Center Raleigh,

More information

Implementation. Implementation through Programs and Services. Capital Improvements within Cambria County

Implementation. Implementation through Programs and Services. Capital Improvements within Cambria County The transportation system serves Cambria County communities because people make decisions and take action toward the stated goals of the long-range transportation plan. Locally, these people include officials

More information

Community Development Agency Capital Improvement Program TIM Fee Program Cash Proforma (by Revenue Grouping)

Community Development Agency Capital Improvement Program TIM Fee Program Cash Proforma (by Revenue Grouping) Community Development Agency Prior* 16/17 17/18 18/19 19/2 2/21 21/22-25/26 26/27-35/36 El Dorado Hills TIM Zone 8 Cash 14,38,412 5,952,818 19,991,23 Revenue 3,511,925 2,196,826 2,151,276 2,445,139 2,445,139

More information

RESOLUTION OF THE BOARD OF DIRECTORS OF THE OHIO KENTUCKY INDIANA REGIONAL COUNCIL OF GOVERNMENTS

RESOLUTION OF THE BOARD OF DIRECTORS OF THE OHIO KENTUCKY INDIANA REGIONAL COUNCIL OF GOVERNMENTS OKI 2015 RESOLUTION OF THE BOARD OF DIRECTORS OF THE OHIO KENTUCKY INDIANA REGIONAL COUNCIL OF GOVERNMENTS CONCERNING AMENDMENT #1 OF THE FISCAL YEARS 2016 2019 TRANSPORTATION IMPROVEMENT PROGRAM WHEREAS,

More information

Staff Approve Resolution R to amend the FY TIP.

Staff Approve Resolution R to amend the FY TIP. ITEM 11 Action April 19, 2017 Approval to Amend the FY 2017-2022 (TIP) to add nine New Projects to the FY 2017-2022 TIP, As Requested By the Virginia Department of Transportation (VDOT) Staff Recommendation:

More information

RESOLUTION. No. O!5-2.C( Resolution approving the Fiscal Year Transportation Improvement Program.

RESOLUTION. No. O!5-2.C( Resolution approving the Fiscal Year Transportation Improvement Program. RESOLUTION No. O!5-2.C( Resolution approving the Fiscal Year 2006-2008 Transportation Improvement Program. WHEREAS, the Cumberland Area Metropolitan Planning Organization was established to manage and

More information

Amendments to FY Transportation Improvement Program of the Coastal Region Metropolitan Planning Organization (CORE MPO) August 2017

Amendments to FY Transportation Improvement Program of the Coastal Region Metropolitan Planning Organization (CORE MPO) August 2017 Amendments to FY 2015-2018 Transportation Improvement Program of the Coastal Region Metropolitan Planning Organization (CORE MPO) August 2017 The Transportation Improvement Program (TIP) is the MPO s short-range

More information

TRANSPORTATION IMPROVEMENT PROGRAM FY 2013

TRANSPORTATION IMPROVEMENT PROGRAM FY 2013 Kankakee Metropolitan Planning Organization Policy Committee Paul Schore, Chairman Mayor Village of Bourbonnais Nina Epstein, Vice-Chairman Mayor City of Kankakee Bruce Adams, Mayor Village of Bradley

More information

Roadway Closures / Limited Access Marine Corps Marathon Sunday, October 26th, 2014

Roadway Closures / Limited Access Marine Corps Marathon Sunday, October 26th, 2014 Roadway Closures / Limited Access arine Corps arathon Sunday, October 26th, 2014 ultiple Road Closures in Crystal City Please be aware that numerous road closures will be in place on Sunday, October 26th

More information

INDIAN RIVER COUNTY METROPOLITAN PLANNING ORGANIZATION

INDIAN RIVER COUNTY METROPOLITAN PLANNING ORGANIZATION 2016 PRIORITY PROJECTS REPORT INDIAN RIVER COUNTY METROPOLITAN PLANNING ORGANIZATION This document was produced in cooperation with the Florida Department of Transportation and the Federal Highway Administration

More information

FFY Transportation Improvement Program

FFY Transportation Improvement Program Lawton Metropolitan Planning Organization DRAFT FFY 2018-2021 Transportation Improvement Program Approved, 2017 The Federal Fiscal Years (FFY) 2018-2021 Transportation Improvement Program (TIP) is updated

More information

SCOTT COUNTY COMMUNITY SERVICES DIVISION

SCOTT COUNTY COMMUNITY SERVICES DIVISION SCOTT COUNTY COMMUNITY SERVICES DIVISION PHYSICAL DEVELOPMENT 600 COUNTRY TRAIL EAST JORDAN, MN 55352-9339 (952) 496-8346 Fax: (952) 496-8365 www.co.scott.mn.us MITCHELL J. RASMUSSEN, P.E. COUNTY ENGINEER

More information

MAP-21: Overview of Project Delivery Provisions

MAP-21: Overview of Project Delivery Provisions MAP-21: Overview of Project Delivery Provisions This paper provides an overview of the project delivery provisions in the Moving Ahead for Progress in the 21st Century Act (MAP-21). It also briefly summarizes

More information

Overview of the Regional Transportation Improvement Program

Overview of the Regional Transportation Improvement Program Overview of the 2017-2020 Regional Transportation Improvement Program Table of Contents What is the Puget Sound Regional Council (PSRC)?... 1 What is the Transportation Improvement Program (TIP)?... 1

More information

Route 58 PPTA Project Finance Plan Annual Update Hillsville to Stuart Corridor. Submitted By:

Route 58 PPTA Project Finance Plan Annual Update Hillsville to Stuart Corridor. Submitted By: Route 58 PPTA Project Finance Plan Annual Update Hillsville to Stuart Corridor Submitted By: Robert P. Williams District Construction Engineer Salem District Virginia Department of Transportation Submitted

More information

Staff Recommendation:

Staff Recommendation: ITEM 14 Action March 29, 2017 Approval to Amend the FY 2017-2022 Transportation Improvement Program (TIP) for the Washington Metropolitan Area Transit Authority (WMATA) Staff Recommendation: Issues: Background:

More information

Long Range Transportation Plan

Long Range Transportation Plan Summary of Policy Governor in 2000. The baseline can The purpose of the Long Range also be considered as the scenario in Transportation Plan (LRTP) is to which no new transportation projects provide decision

More information

KYOVA Interstate Planning Commission

KYOVA Interstate Planning Commission KYOVA Interstate Planning Commission Sub-allocated Funding Process and Application Package This packet includes information and guidance about the process used by KYOVA Interstate Planning Commission to

More information

South Fulton Comprehensive Transportation Plan of Fulton County Transportation Coordinating Committee August 08, 2014

South Fulton Comprehensive Transportation Plan of Fulton County Transportation Coordinating Committee August 08, 2014 South Fulton Comprehensive Transportation Plan of Fulton County Transportation Coordinating Committee August 08, 2014 www.southfultonctp.org 1 What is a Comprehensive Transportation Plan (CTP)? Guiding

More information

2018 Regional Transportation Improvement Program

2018 Regional Transportation Improvement Program 2018 Regional Transportation Improvement Program Fiscal Years 2018/19 through 2022/2023 Adopted November 15, 2017 Stanislaus Council of Governments 1111 I Street Suite 308 Modesto, CA 95354 www.stancog.org

More information

Approved Capital Budget and Program

Approved Capital Budget and Program Approved F I S C A L Y E A R Steve Schuh County Executive 2 0 1 6 Project Title Page AACC B&A Connector 119 ADA ROW Compliance 122 Arundel Mills LDC Roads 121 Brock Bridge/MD 198 112 Cap St Claire Rd

More information

Puget Sound Gateway Program

Puget Sound Gateway Program Puget Sound Gateway Program SR 509 Completion Project PSRC FAST Committee October 11, 2017 MIKE RIGSBY, PE ANDREY CHEPEL, PE DEPUTY PROGRAM ADMINISTRATOR SR 509 PROJECT ENGINEER 1 Puget Sound Gateway Program

More information

APPENDIX A PROGRAMMATIC AGREEMENT FOR MINOR TRANSPORTATION PROJECTS

APPENDIX A PROGRAMMATIC AGREEMENT FOR MINOR TRANSPORTATION PROJECTS APPENDIX A PROGRAMMATIC AGREEMENT FOR MINOR TRANSPORTATION PROJECTS PROGRAMMATIC AGREEMENT AMONG THE FEDERAL HIGHWAY ADMINISTRATION THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION, THE PENNSYLVANIA STATE

More information

I-15/Tropicana Interchange Feasibility Study in Clark County, NV. Comments are due October 16, 2015, 5 p.m.

I-15/Tropicana Interchange Feasibility Study in Clark County, NV. Comments are due October 16, 2015, 5 p.m. Welcome Nevada Department of Transportation Public Meeting I-15/Tropicana Interchange Feasibility Study in Clark County, NV Ways to Comment Tonight Comment during public meeting Court reporter Comment

More information

2007 Annual List of Obligated Projects

2007 Annual List of Obligated Projects This document is available in accessible formats when requested five days in advance. This document was prepared and published by the Memphis Metropolitan Planning Organization and is prepared in cooperation

More information

Turnpike Mitigation Program Application

Turnpike Mitigation Program Application Ohio Department of Transportation - Ohio Turnpike Infrastructure Commission Turnpike Mitigation Program Application The application has been improved to enable project sponsors to save the application

More information

Florida Job Growth Grant Fund Public Infrastructure Grant Proposal

Florida Job Growth Grant Fund Public Infrastructure Grant Proposal Florida Job Growth Grant Fund Public Infrastructure Grant Proposal Proposal Instructions: The Florida Job Growth Grant Fund Proposal (this document) must be completed by the governmental entity applying

More information

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM

BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM Date of Meeting: July 3, 2018 # 5 BOARD OF SUPERVISORS BUSINESS MEETING ACTION ITEM SUBJECT: ELECTION DISTRICT(S): Smart Scale Project Selection for the Commonwealth Transportation Board Six Year Improvement

More information

Guidance. Historical Studies Review Procedures

Guidance. Historical Studies Review Procedures Guidance Historical Studies Review Procedures This guidance document provides instructional material regarding how to review and process project activities in accordance with TxDOT s Section 106 of the

More information

A RESOLUTION ADOPTING THE LADY S ISLAND CORRIDOR STUDY

A RESOLUTION ADOPTING THE LADY S ISLAND CORRIDOR STUDY A RESOLUTION ADOPTING THE LADY S ISLAND CORRIDOR STUDY WHEREAS, Beaufort County, in conjunction with the City of Beaufort, had a corridor study prepared for the Sea Island Parkway corridor on Lady s Island;

More information

2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS

2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS 2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS TABLE OF CONTENTS Section 1: Background... 3 A. Policy Framework... 3 B. Development of the 2019-2022 Regional Transportation Improvement Program (TIP)..

More information

Transportation Alternatives Program Guidance

Transportation Alternatives Program Guidance Transportation Alternatives Program Guidance The Transportation Alternatives Program (TAP): The South Carolina Department of Transportation (SCDOT) partners with the Federal Highway Administration (FHWA)

More information

DESIGN BID BUILD IS ALIVE & WELL 2007 Texas Transportation Forum. Doug Pitcock, P.E. President and CEO Williams Brothers Construction Co., Inc.

DESIGN BID BUILD IS ALIVE & WELL 2007 Texas Transportation Forum. Doug Pitcock, P.E. President and CEO Williams Brothers Construction Co., Inc. DESIGN BID BUILD IS ALIVE & WELL 2007 Texas Transportation Forum Doug Pitcock, P.E. President and CEO Williams Brothers Construction Co., Inc. I. WHAT IS THE KATY FREEWAY PROJECT? Regional Map Bush Intercontinental

More information

2018 Transportation Alternatives (TA) Program Overview Palm Beach Transportation Planning Agency

2018 Transportation Alternatives (TA) Program Overview Palm Beach Transportation Planning Agency The purpose of the s (TPA) Transportation Alternatives (TA) program is to help fund connected infrastructure for non-motorized users. Construction funding is typically provided three years out. Funding

More information

Perimeter CIDs Public-Private Partnerships That Improve The Market

Perimeter CIDs Public-Private Partnerships That Improve The Market Perimeter CIDs Public-Private Partnerships That Improve The Market PCIDs Standard Template; Updated: Oct 03, 2013 What is a CID? CIDs in Georgia are created by the state legislature and adopted by local

More information

National Capital Region Transportation Planning Board

National Capital Region Transportation Planning Board National Capital Region Transportation Planning Board 777 North Capitol Street, N.E., Suite 300, Washington, D.C. 20002-4290 (202) 962-3310 Fax: (202) 962-3202 Item #5 MEMORANDUM January 8, 2010 To: From:

More information

TAC Agenda Item 5A Mailout - 04/13/16

TAC Agenda Item 5A Mailout - 04/13/16 TAC Agenda Item 5A Mailout - 04/13/16 RECOMMENDATION FOR TRANSPORTATION POLICY COUNCIL (TPC) APPROVAL OF AMENDMENTS TO THE 2015-2018 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) AND 2040 REGIONAL TRANSPORTATION

More information

Mississippi Gulf Coast Metropolitan Planning Organization. Transportation Improvement Program FY

Mississippi Gulf Coast Metropolitan Planning Organization. Transportation Improvement Program FY Mississippi Gulf Coast Metropolitan Planning Organization Transportation Improvement Program FY 2015-2019 November 2015 The Metropolitan Planning Organization (MPO) is a federally mandated planning body

More information

I-95 Southbound Collector-Distributor (CD) Lanes - Rappahannock River Crossing From Exit 130 (Route 3) To Exit 133 (Route 17)

I-95 Southbound Collector-Distributor (CD) Lanes - Rappahannock River Crossing From Exit 130 (Route 3) To Exit 133 (Route 17) I-95 Southbound Collector-Distributor (CD) Lanes - Rappahannock River Crossing From Exit 130 (Route 3) To Exit 133 (Route 17) Initial Financial Plan January 31, 2017 State Project Number(s): 0095-111-259,

More information

THE 411 ON FEDERAL & STATE TRANSPORTATION FUNDING - FHWA

THE 411 ON FEDERAL & STATE TRANSPORTATION FUNDING - FHWA THE 411 ON FEDERAL & STATE TRANSPORTATION FUNDING - FHWA Catherine McCreight, MBA Senior Transportation Planner Texas Department of Transportation - Houston District Houston-Galveston Area Council Bringing

More information

KANKAKEE AREA TRANSPORTATION STUDY TRANSPORTATION IMPROVEMENT PROGRAM FY Public. Adopted by the Policy Committee June 24, 2009

KANKAKEE AREA TRANSPORTATION STUDY TRANSPORTATION IMPROVEMENT PROGRAM FY Public. Adopted by the Policy Committee June 24, 2009 Kankakee Metropolitan Planning Organization Policy Committee Paul Schore, Chairman Mayor Village of Bourbonnais Nina Epstein, Vice-Chairman Mayor City of Kankakee Bruce Adams, Mayor Village of Bradley

More information

2014 TRAC Funding Application. Cost ODOT greater than $12 million dollars Increase roadway capacity or reduce congestion.

2014 TRAC Funding Application. Cost ODOT greater than $12 million dollars Increase roadway capacity or reduce congestion. 2014 TRAC Funding Application TRAC is responsible for committing development and construction funding towards projects that meet the criteria the of Major New Capacity Program. TRAC Policy defines Major

More information

Apologies Michael, but lets work off of the attached update version. James Bass came back with a few additional minor tweaks to the language.

Apologies Michael, but lets work off of the attached update version. James Bass came back with a few additional minor tweaks to the language. REFERENCE ITEM 3.16 RTC Handout March 8, 2018 From: To: Cc: Subject: Date: Attachments: Marc Williams Michael Morris Bill Hale; Kelly Selman; Mo Bur; Brian Barth RE: Recommended RTC Action for LBJ/IH 635

More information

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY AMARILLO DISTRICT. AUGUST FY 2009 Quarterly Revisions

STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY AMARILLO DISTRICT. AUGUST FY 2009 Quarterly Revisions STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FY 2008-2011 AMARILLO DISTRICT AUGUST FY 2009 Quarterly Revisions 8-01-2009 MINUTES AMARILLO METROPOLITAN PLANNING ORGANIZATION POLICY ADVISORY COMMITTEE MEETING

More information

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY

NORTHERN VIRGINIA TRANSPORTATION AUTHORITY V NORTHERN VIRGINIA TRANSPORTATION AUTHORITY M E M O R A N D U M FOR: FROM: Members, Northern Virginia Transportation Authority Chairman Martin E. Nohe, Planning and Programming Committee DATE: September

More information

WESTERN SLOPE CIP AND TIM FEE UPDATE

WESTERN SLOPE CIP AND TIM FEE UPDATE WESTERN SLOPE CIP AND TIM FEE UPDATE 12/6/16 BOARD OF SUPERVISORS STUDY SESSION B O A R D S T U D Y S E S S I O N # 8 2015 14-0245 Revised 22M 1 of 53 AGENDA 1. Background 2. Programmatic EIR 3. General

More information

Newton County. Impact Fee Annual Update FY2011

Newton County. Impact Fee Annual Update FY2011 Newton County Impact Fee Annual Update FY2011 Newton County STWP Update 2011-2015 PLAN ELEMENT ITEM (ED, NOR OR ) General General DESCRIPTION Implement a Capital Improvement Plan Develop a comprehensive

More information

Work Session Agenda Tuesday, November 28, :00 AM

Work Session Agenda Tuesday, November 28, :00 AM I. Call To Order II. Approval of Agenda 1. Multiple Departments 2017-5350 Approval to renew BL002-17, on-call electrical repair, maintenance and installation services on an annual contract (January 04,

More information

High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey

High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey High Country Rural Planning Organization (RPO) Municipalities and Counties of Alleghany, Ashe, Avery, Mitchell, Watauga, Wilkes, and Yancey Serving North Carolina s High Country with Continuing, Cooperative,

More information

Amendment 3 of Horizon 2030 Metropolitan Transportation Plan Amendment 3 of FY 2011 FY 2015 Transportation Improvement Program.

Amendment 3 of Horizon 2030 Metropolitan Transportation Plan Amendment 3 of FY 2011 FY 2015 Transportation Improvement Program. Amendment 3 of Horizon 2030 Metropolitan Transportation Plan Amendment 3 of FY 2011 FY 2015 Transportation Improvement Program November 2011 KIPDA ID State ID Project Name Project Description Project Sponsor

More information

REPORT TO MAYOR AND COUNCIL

REPORT TO MAYOR AND COUNCIL AGENDA ITEM NO..d REPORT TO MAYOR AND COUNCIL TO THE HONORABLE MAYOR AND COUNCIL: DATE: July, SUBJECT: ADOPT RESOLUTION NOS. -, -, -, - AND -0 OF LOCAL SUPPORT AUTHORIZING THE FILING OF APPLICATIONS FOR

More information

By Rmhermen at en.wikipedia (photo by rmhermen) [GFDL (http://www.gnu.org/copyleft/fdl.html) or CC-BY-SA-3.0

By Rmhermen at en.wikipedia (photo by rmhermen) [GFDL (http://www.gnu.org/copyleft/fdl.html) or CC-BY-SA-3.0 Public Participation Plan By Rmhermen at en.wikipedia (photo by rmhermen) [GFDL (http://www.gnu.org/copyleft/fdl.html) or CC-BY-SA-3.0 (http://creativecommons.org/licenses/by-sa/3.0/)], from Wikimedia

More information

TRANSPORTATION ALTERNATIVES (TA) SET ASIDE PROGRAM July 2016

TRANSPORTATION ALTERNATIVES (TA) SET ASIDE PROGRAM July 2016 Regional Transportation Commission TRANSPORTATION ALTERNATIVES (TA) SET ASIDE PROGRAM July 2016 Contents 1.0 Purpose and Eligibility... 2 2.0 Process... 5 3.0 Implementation of Funded Projects... 5 Attachment

More information

Modernization & Expansion Projects Statewide Totals

Modernization & Expansion Projects Statewide Totals odernization & xpansion Projects Statewide Totals 37 total construction projects totaling $1.8 billion 6 preliminary engineering projects 253 miles will be completed $10 billion estimated economic impact

More information

FAIRFIELD AVENUE, EWING STREET, SUPERIOR STREET, AND WELLS STREET PRELIMINARY FEASIBILITY STUDY

FAIRFIELD AVENUE, EWING STREET, SUPERIOR STREET, AND WELLS STREET PRELIMINARY FEASIBILITY STUDY FAIRFIELD AVENUE, EWING STREET, SUPERIOR STREET, AND WELLS STREET PRELIMINARY FEASIBILITY STUDY Prepared for: City of Fort Wayne, Indiana Prepared by: American Structurepoint, Inc. 116 E. Berry Street

More information

Transportation Improvement Program

Transportation Improvement Program FFY 2015 2018 Transportation Improvement Program For the Tulsa Transportation Management Area Approved by the Transportation Technical Committee on July 16, 2014 Approved by the Transportation Policy Committee

More information

Memphis MPO Contact Information: 125 North Main St., Suite # 450 Memphis, TN Ph. (901) Fax. (901)

Memphis MPO Contact Information: 125 North Main St., Suite # 450 Memphis, TN Ph. (901) Fax. (901) Adjusted 09.14.2018 Memphis MPO Contact Information: 125 North Main St., Suite # 450 Memphis, TN 38103 Ph. (901) 576-7190 Fax. (901) 576-7272 This document is available in accessible formats when requested

More information

Presentation to Roseville City Council April 15, 2015

Presentation to Roseville City Council April 15, 2015 Regional Transportation Projects in South Placer County Presentation to Roseville City Council April 15, 2015 Completed Regional Transportation Projects Lincoln Bypass 2014 SR 65/Ferrari Ranch Rd 2012

More information

Roads & Bridges. Project Title

Roads & Bridges. Project Title Project Title Page AACC B&A Connector 134 ADA ROW Compliance 137 Alley Reconstruction 146 Arundel Mills LDC Roads 136 Brock Brdg/LTL Patuxent Bank 145 Brock Bridge/MD 198 128 Cap St Claire Rd Wide 109

More information

Chris Bridges CYMPO Administrator

Chris Bridges CYMPO Administrator Chris Bridges CYMPO Administrator What is CYMPO? Why do we have an MPO? Federal law requires Urbanized Areas over 50,000 people to have an MPO in order to receive federal funds 2003 the Governor of Arizona

More information

Performance and Production Review of the Florida Department of Transportation FY 2016/17

Performance and Production Review of the Florida Department of Transportation FY 2016/17 Performance and Production Review of the Florida Department of Transportation FY 2016/17 FLORIDA TRANSPORTATION COMMISSION DECEMBER 7, 2017 Introduction How we got here History behind the measures Conclusion

More information

2018 Call for Projects Guidebook

2018 Call for Projects Guidebook 2018 Call for Projects Guidebook Project Selection for the NFRMPO CMAQ, STBG, and TA Programs in FY2022 and FY2023 October 8, 2018 Table of Contents Introduction... 2 Section 1 - Call Overview... 2 1.1

More information

CASE # N OLYMPIC METAL - STREET NAME CHANGE BILL SKINNER, SENIOR PLANNER NOVEMBER 28, 2017

CASE # N OLYMPIC METAL - STREET NAME CHANGE BILL SKINNER, SENIOR PLANNER NOVEMBER 28, 2017 ARAPAHOE COUNTY PLANNING COMMISSION PUBLIC HEARING DECEMBER 5, 2017 6:30 P.M. CASE # N17-001 OLYMPIC METAL - STREET NAME CHANGE BILL SKINNER, SENIOR PLANNER NOVEMBER 28, 2017 VICINITY MAP The roadway proposed

More information

2018 Governor s Shape Honor Roll PLATINUM

2018 Governor s Shape Honor Roll PLATINUM PLATINUM Abbotts Hill - Fulton Avery - Cherokee Ball Ground - Cherokee Bascomb - Cherokee Bells Ferry - Cobb Blackwell - Cobb Brandon - APS Brookwood - Gwinnett Buford Academy - Buford City Chestnut Mountain

More information

REQUEST FOR CITY COUNCIL ACTION

REQUEST FOR CITY COUNCIL ACTION REQUEST FOR CITY COUNCIL ACTION MEETING DATE: MARCH 14, 2017 TITLE: SCOPING SESSION FOR A GENERAL PLAN AMENDMENT REQUEST REPRESENTING AN EXCHANGE OF NON RESIDENTIAL BUILDING SQUARE FOOTAGE FOR NEW RESIDENTIAL

More information

J o i n t T e c h n i c a l C o o r d i n a t i n g C o m m i t t e e a n d G o v e r n i n g B o a r d

J o i n t T e c h n i c a l C o o r d i n a t i n g C o m m i t t e e a n d G o v e r n i n g B o a r d J o i n t T e c h n i c a l C o o r d i n a t i n g C o m m i t t e e a n d G o v e r n i n g B o a r d November 17, 2016 12: Noon (*MPO Board Members to Join at 12:30), Asheville Area Chamber of Commerce

More information

Staff Report. Allocation of Congestion Management and Air Quality Improvement Program Funding

Staff Report. Allocation of Congestion Management and Air Quality Improvement Program Funding ITEM 7B Staff Report Subject: Contact: Allocation of Congestion Management and Air Quality Improvement Program Funding Eric Cowle, Transportation Program Manager (ecowle@cvag.org) Recommendation: Consider

More information

Transportation Funding Terms and Acronyms Unraveling the Jargon

Transportation Funding Terms and Acronyms Unraveling the Jargon Funding Terms and Acronyms Unraveling the Jargon Every profession has its own acronyms and jargon. The shorthand wording makes it easier and quicker for professionals in any given field to communicate

More information

2040 Transportation Policy Plan Update. Council Committee of the Whole December 6, 2017

2040 Transportation Policy Plan Update. Council Committee of the Whole December 6, 2017 2040 Transportation Policy Plan Update Council Committee of the Whole December 6, 2017 What is the Transportation Policy Plan (TPP)? Long-range transportation plan for the region Required under state and

More information

339 New Leicester Highway, Suite 140 Asheville. NC

339 New Leicester Highway, Suite 140 Asheville. NC WELCOME AND HOUSEKEEPING Chairman O Conner opened the meeting and introductions followed. CONSENT AGENDA Chairman O Conner indicated that the Consent Agenda included May minutes, the UPWP FY 2018- Amendment

More information

Amendments to the 2040 Total Mobility Plan of the Coastal Region Metropolitan Planning Organization

Amendments to the 2040 Total Mobility Plan of the Coastal Region Metropolitan Planning Organization Amendments to the 2040 Total Mobility Plan of the Coastal Region Metropolitan Planning Organization May 2018 The CORE MPO s current Metropolitan Transportation Plan (MTP), CORE Connections 2040 Total Mobility

More information

MiTIP APPLICATION PACKET

MiTIP APPLICATION PACKET SFY 2022-2023 Illustrative Projects 2018-2021 INDIANAPOLIS REGIONAL TRANSPORTATION IMPROVEMENT PROGRAM (IRTIP) MiTIP APPLICATION PACKET Indianapolis Metropolitan Planning Organization October 2017 This

More information

FINAL ACTIONS Planning Commission Meeting of January 22, 2013

FINAL ACTIONS Planning Commission Meeting of January 22, 2013 FINAL ACTIONS Planning Commission Meeting of January 22, 2013 AGENDA ITEM/ACTION FOLLOW-UP ACTION 1. Call to Order. Meeting was called to order at 6:00 p.m. by Mr. Morris, Chair. PC members present were

More information

NCDOT Planning Summary for NCTA Projects

NCDOT Planning Summary for NCTA Projects NCDOT Planning Summary for NCTA Projects Page 1 Triangle Expressway Southeast Extension Wake and Johnston Counties (STIP Projects R-2721, R-2828, and R-2829) The Triangle Expressway Southeast Extension

More information

City of Culver City. Staff Report

City of Culver City. Staff Report City of Culver City City Hall 9770 Culver Blvd. Culver City, CA 90232 (310) 253-5851 Staff Report File #: 18-0499, Version: 1 CC - Approval of Professional Services Agreement with Tetra Tech for the Design

More information

Coolidge - Florence Regional Transportation Plan

Coolidge - Florence Regional Transportation Plan Coolidge - Florence Regional Transportation Plan A Partnership Among the City of Coolidge, Town of Florence, and ADOT FINAL REPORT Kimley-Horn Kimley Kimley-Horn and and Associates, Associates, Inc. Inc.

More information

CITY OF SPOKANE VALLEY Request for Council Action

CITY OF SPOKANE VALLEY Request for Council Action CITY OF SPOKANE VALLEY Request for Council Action Meeting Date: March 29, 2016 Department Director Approval: Check all that apply: consent old business new business public hearing information admin. report

More information

CIRTPA Small Community Fund Application

CIRTPA Small Community Fund Application CIRTPA Small Community Fund Application November 2017 2 P a g e Schedule and Decision Making Process November 16, 2017 January 18, 2018 Application process approved by CIRTPA Policy Committee and posted

More information

MINUTES WINSTON-SALEM URBAN AREA TECHNICAL COORDINATING COMMITTEE (TCC) JUNE 18, :00 P.M. SECOND FLOOR, CONFERENCE ROOM, BRYCE A

MINUTES WINSTON-SALEM URBAN AREA TECHNICAL COORDINATING COMMITTEE (TCC) JUNE 18, :00 P.M. SECOND FLOOR, CONFERENCE ROOM, BRYCE A MINUTES WINSTON-SALEM URBAN AREA TECHNICAL COORDINATING COMMITTEE (TCC) JUNE 18, 2015 2:00 P.M. SECOND FLOOR, CONFERENCE ROOM, BRYCE A. STUART MUNICIPAL BUILDING MEMBERS PRESENT: Pat Ivey, Division 9 Engineer,

More information

Expected Roadway Project Crash Reductions for SMART SCALE Safety Factor Evaluation. September 2016

Expected Roadway Project Crash Reductions for SMART SCALE Safety Factor Evaluation. September 2016 Expected Roadway Project Crash Reductions for SMART SCALE Safety Factor Evaluation September 2016 SMART SCALE Safety Factors Evaluation 1. Using Crash Modification Factors for SMART SCALE Safety Evaluation

More information

Missoula Urban Transportation Planning Process Public Participation Plan Prepared by

Missoula Urban Transportation Planning Process Public Participation Plan Prepared by Missoula Urban Transportation Planning Process Public Participation Plan Prepared by Development Services Transportation Division Adopted: Revisions Approved by: In cooperation with City Of Missoula County

More information

APPENDIX 5. Funding Plan

APPENDIX 5. Funding Plan STUDY: FINAL REPORT APPENDIX 5 Funding Plan May 2015 V:\2073\active\2073009060\report\DRAFT Final Report\rpt_MalPCH_DRAFTFinalReport-20150515.docx Pacific Coast Highway Safety Study: Funding Plan City

More information

SAFETEA-LU. Overview. Background

SAFETEA-LU. Overview. Background SAFETEA-LU This document provides information related to the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) that was previously posted on the Center for

More information