F-35 Lightning II. 5 th Generation True Stealth for Korea From 2016 and Beyond

Size: px
Start display at page:

Download "F-35 Lightning II. 5 th Generation True Stealth for Korea From 2016 and Beyond"

Transcription

1 F-35 Lightning II 5 th Generation True Stealth for Korea From 2016 and Beyond A B_1

2 The Evolving Threat... SA-10 SA-12 SA-20 HQ-9 Shipborne SAM Double Digit Surface-to-Air Missiles SD-10/PL-12 AA-11 ARCHER Meteor Air-to-Air Missiles AA-12 ADDER MIG-35 Su-30 J-10 Fighter Aircraft PAK-FA J-20 5 th Generation Aircraft Are Required To Survive in This Environment A B_2

3 F-35: Strategic, Proactive Deterrence For Korea Osan Kunsan Misawa Atsugi Iwakuni Kadena CVN CVN Hickam Singapore Tindal Amberly Williamtown The U.S. and Regional Allies Are Moving to 5 th Generation Fighter Forces USAF Only Acquiring 5 th Gen Fighters A Critical Force Structure Decision for Korea Affecting the Next 40 Years A B_3

4 VLO Stealth Must Be Designed In Large Capacity Internal Fuel Tanks CTOL STOVL CV 18,500 lbs 14,000 lbs 20,000 lbs Reduced Signature Nozzle Curved Diverterless Inlets, Buried Engine Aircraft Shaping and Edge Alignment Low Observable Seams, RAM Seals Low-Emission Radar and Avionics Weapons Carried Internally Embedded / Internal Antennas and Sensors Fundamental 5 th Gen Design Features Can Not Be Retrofitted A B_4

5 The F-35 Redefines Multirole Aircraft Air-to-Air 4 th Gen A B_5

6 The F-35 Redefines Multirole Aircraft Air-to-Air 5 th Gen A B_6

7 The F-35 Redefines Multirole Aircraft Air-to-Ground 4th Gen A B_7

8 The F-35 Redefines Multirole Aircraft Air-to-Ground 5th Gen A B_8

9 The F-35 Redefines Multirole Aircraft Intelligence, Surveillance, Reconnaissance Traditional Stand Off Assets A B_9

10 The F-35 Redefines Multirole Aircraft Intelligence, Surveillance, Reconnaissance Traditional Stand Off Assets with F-35 A B_10

11 Multirole Capability Air-to-Air F-35C Air-to-Surface F-35A Very Low Observable Stealth Fighter Performance Integrated Sensor Fusion Intelligence, Surveillance, Reconnaissance F-35B Electronic Attack Command and Control Net-Enabled Operations Advanced Sustainment F-35 Redefines Multirole Aircraft A B_11

12 Global Recapitalization/Force Multiplier CTOL CV STOVL Replace 7 Platforms Relevant Throughout Spectrum of Operations Perform New Missions A B_12

13 Targets Reached With No Exposure Relative Track Depth Relative Procurement Relative Loss/Exchange Ratio Relative Capability Relative Kills F-35 Combat Effectiveness Air-to-Air SEAD/DEAD Strike >6 Better >8 Better >8 Better th Gen F-35 4 th Gen F-35 4 th Gen F-35 IADS Survivability Better ISR Better Cost Same Price >4 > th Gen F-35 4 th Gen F-35 4 th Gen F-35 A B_13

14 Radar Cross-Section Testing Progress Highly Successful Ground Test Confirmed Accuracy of Signature Predictions Flight Test AF-3 Completed Required Compliance Testing VLO Signature Meeting or Exceeding Requirements A B_14

15 Overall Cumulative Flights Flight Test Update Planned Actuals 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2011 Exceeded 2010 Cumulative Plan Ahead of 2011 Plan A B_15

16 F-35 Master Schedule CY System Development and Demonstration CATB CTOL STOVL CV First Flights DT Flight Test CTOL STOVL CV Low-Rate Initial Production and Multiyear Procurement LRIP 1 (2) LRIP 2 (12) LRIP 3 (17) LRIP 4 (32) Planned Production Air Force 1,763 CTOL Dept of Navy 680 CV/STOVL International 800-1,500 LL LRIP 5 (32) Korea FX-III LRIP 6 (38) LRIP 7 (70) LRIP 8 (110) LRIP 9 (154) LRIP 10 (194) LRIP 11 (218) EOQ MULTI YEAR 1 F-35 Production Is Ideally Aligned With FX-III A B_16

17 F-35: 3 U.S. Services + 8 Partner Nations Canada (65) United States (2,443) United Kingdom (138) Australia (100) Netherlands (85) Turkey (100) Italy (69 CTOL 62 STOVL) Norway (56) Denmark (30)... and Growing With FMS Acquisitions A B_17

18 Summary Korea Is Faced With a Vast Array of Growing Threats Only 5th Gen Aircraft Can Provide the Capability Required The F-35 Program Is Re-Baselined and Ahead of Schedule F-35 Production Is Ideally Aligned With FX-III 5th Gen F-35A Lighting II Available, Affordable, True Stealth From 2016 A B_18

F-35 Weapon System Overview

F-35 Weapon System Overview F-35 Weapon System Overview Doug Hayward Deputy Director F-35 Vehicle Systems Lockheed Martin Aeronautics 2010 Lockheed Martin Aeronautics Company DISTRIBUTION STATEMENT A: A. Approved for public release;

More information

F-35 Lightning II A New Generation of Fighter

F-35 Lightning II A New Generation of Fighter F-35 Lightning II A New Generation of Fighter 1 The Next Generation in Fighter Aircraft A Quantum Leap in Capability LO Treatments Advanced Avionics Guided Weapons First Jets Supersonic First Radar Multirole

More information

Dr. Don Kinard, LM Senior Fellow North Carolina Aerospace Suppliers and Advanced Manufacturing Conference 7 August 2014

Dr. Don Kinard, LM Senior Fellow North Carolina Aerospace Suppliers and Advanced Manufacturing Conference 7 August 2014 F-35 Lightning II The Centerpiece for 21 st Century Global Security Dr. Don Kinard, LM Senior Fellow North Carolina Aerospace Suppliers and Advanced Manufacturing Conference 7 August 2014 2014 Lockheed

More information

Advanced Manufacturing and the F-35 Lightning II

Advanced Manufacturing and the F-35 Lightning II F-35 Lightning II The Centerpiece for 21 st Century Global Security Advanced Manufacturing and the F-35 Lightning II Dr. Don Kinard, LM Senior Fellow A&D Forum November 2016 2015 Lockheed Martin Corporation

More information

Air Armament Symposium. 5 October 2011 Col Tim Morris, USAF Director of Development F-35 Lightning II Program

Air Armament Symposium. 5 October 2011 Col Tim Morris, USAF Director of Development F-35 Lightning II Program Air Armament Symposium 5 October 2011 Col Tim Morris, USAF Director of Development F-35 Lightning II Program FOR OFFICIAL USE DISTRIBUTION ONLY // REL TO USA, STATEMENT GBR MOD, A. ITA Approved MOD, NLD

More information

ATEC Conference Dr. Don A. Kinard Lockheed Martin Aeronautics F-35 Production Operations

ATEC Conference Dr. Don A. Kinard Lockheed Martin Aeronautics F-35 Production Operations 2016 Lockheed Martin Corporation ATEC Conference Dr. Don A. Kinard Lockheed Martin Aeronautics F-35 Production Operations Use or disclosure of the information contained herein is subject to the restrictions

More information

Terma and F-35 Global supplier to the Joint Strike Fighter program

Terma and F-35 Global supplier to the Joint Strike Fighter program Terma and F-35 Global supplier to the Joint Strike Fighter program The world s largest defense industrial project The F-35 project is headed by Lockheed Martin, with Northrop Grumman and BAE Systems as

More information

Company presentation Who is AIM Group?

Company presentation Who is AIM Group? Company presentation Who is AIM Group? This presentation contains no technical data subject to EAR or ITAR; F-35 Program. Releasable to US Gov, NO MoD Revenue 2016 USD 130 m Employees 530 Ownership 100

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0207581F PE TITLE: JOINT STARS Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0207581F JOINT STARS Cost ($ in Millions) FY

More information

Spectrum contest: RAAF boosts electronic warfare capabilities

Spectrum contest: RAAF boosts electronic warfare capabilities Spectrum contest: RAAF boosts electronic warfare capabilities Jane's Defence Industry As the Royal Australian Air Force (RAAF) begins to beef up its capabilities in the electronic warfare spectrum, Charles

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 0.000 35.533

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) PE NUMBER: 0604256F PE TITLE: Threat Simulator Development RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) COST ($ In Thousands) FY 1998 Actual FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 27448F PE TITLE: C2ISR Tactical Data Link Exhibit R-2, RDT&E Budget Item Justification 27448F C2ISR Tactical Data Link 23 24 25 26 27 28 29 Total Actual Complete Total Program Element (PE) Cost

More information

PROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD)

PROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD) EXHIBIT R-2, FY 2001 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0305206N PROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD) (U) COST: (Dollars in

More information

F-35 Lightning II Program Status and Fast Facts January 30, 2017

F-35 Lightning II Program Status and Fast Facts January 30, 2017 F-35 Lightning II Program Status and Fast Facts January 30, 2017 Highlights of the Last Three Months o USN receives its first F-35Cs at NAS Lemoore, California. Reinstated VFA-125 Rough Raiders become

More information

Fixed Wing Targeting Lockheed Martin Missiles and Fire Control 2015 Supplier Summit

Fixed Wing Targeting Lockheed Martin Missiles and Fire Control 2015 Supplier Summit Fixed Wing Targeting Lockheed Martin Missiles and Fire Control 2015 Supplier Summit CLEARED PENDING FOR PUBLIC RELEASE TM1409-0107-1 Fixed Wing Programs Passive Attack and Survivability Programs Infrared

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0207134F PE TITLE: F-15E SQUADRONS Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0207134F F-15E SQUADRONS Cost ($ in Millions)

More information

THAAD Overview. DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. THAAD Program Overview_1

THAAD Overview. DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. THAAD Program Overview_1 THAAD Overview DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. THAAD Program Overview_1 Today s Ballistic Missile Defense System SENSORS Satellite Surveillance Forward-Based

More information

AFCEA/GMU Symposium "Critical Issues in C4I"

AFCEA/GMU Symposium Critical Issues in C4I AFCEA/GMU Symposium "Critical Issues in C4I" Lt Gen (Ret) Robert Elder System Architectures Lab () May 22, 2012 1 OEF/OIF Timeline OEF Campaign Start: 7 Oct 2001 Initial SOF Entry AFG: 19 Oct 2001 Mazar-e-Sharif

More information

F-35 Lightning II Program Status June 2017

F-35 Lightning II Program Status June 2017 F-35 Lightning II Program Status June 2017 The F-35 Program is a global effort. The U.S. works with eight partner nations to design and develop the F-35. Each partner nation has contributed funding to

More information

From: Commanding Officer, Strike Fighter Squadron FIFTEEN To: Director, Naval Aviation History and Publication Division, Naval Historical Center

From: Commanding Officer, Strike Fighter Squadron FIFTEEN To: Director, Naval Aviation History and Publication Division, Naval Historical Center DEPARTMENT OF THE NAVY STRIKE FIGHTER SQUADRON IS FPO AA 340B-201 PI REPLY REFER TO: 5750 Ser 10/050 24 Feb 97 From: Commanding Officer, Strike Fighter Squadron FIFTEEN To: Director, Naval Aviation History

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force Date: February 2015 3600: Research,, Test & Evaluation, Air Force / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2014

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete

More information

F/A-18 E/F SUPER HORNET

F/A-18 E/F SUPER HORNET F/A-18 E/F SUPER HORNET Navy ACAT IC Program Total Number of Systems: Total Program Cost (TY$): Average Unit Cost (TY$): Full-rate production: 12 LRIP-1 20 LRIP-2 548 Production $47.0B $49.9M 3QFY00 Prime

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

5750 Ser 00/ SEX) 00. From: Commanding Officer, Strike Fighter Squadron 25 To: Director of Naval History (N09BH)

5750 Ser 00/ SEX) 00. From: Commanding Officer, Strike Fighter Squadron 25 To: Director of Naval History (N09BH) DEPARTMENT OF THE NAVY STRIKE FIGHTER SQUADRON 25 FPO AP 96601-6203 From: Commanding Officer, Strike Fighter Squadron 25 To: Director of Naval History (N09BH) Subj: ANNUAL COMMAND HISTORY FOR CY 1999 Ref:

More information

Enlisted Professional Military Education FY 18 Academic Calendar. Table of Contents COLLEGE OF DISTANCE EDUCATION AND TRAINING (CDET):

Enlisted Professional Military Education FY 18 Academic Calendar. Table of Contents COLLEGE OF DISTANCE EDUCATION AND TRAINING (CDET): Enlisted Professional Military Education FY 18 Academic Calendar Table of Contents STAFF NON-COMMISSIONED OFFICER ACADEMIES: SNCO Academy Quantico SNCO Academy Camp Pendleton SNCO Academy Camp Lejeune

More information

F-35 Lightning II EOTS Lockheed Martin Missiles and Fire Control 2015 Supplier Summit TM

F-35 Lightning II EOTS Lockheed Martin Missiles and Fire Control 2015 Supplier Summit TM F-35 Lightning II EOTS Lockheed Martin Missiles and Fire Control 2015 Supplier Summit LOCKHEED CLEARED MARTIN FOR PROPRIETARY PUBLIC RELEASE INFORMATION TM1409-0107-1 F-35 Lightning II Electro-Optical

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Joint Strike Fighter Squadrons

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Joint Strike Fighter Squadrons Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element - 217.561 47.841-47.841 132.495 131.844

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #232

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #232 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) # FY

More information

Corporate Services Employment Report: January Employment by Staff Group. Jan 2018 (Jan 2017 figure: 1,462) Overall 1,

Corporate Services Employment Report: January Employment by Staff Group. Jan 2018 (Jan 2017 figure: 1,462) Overall 1, Corporate Services Employment Report: January Employment by Staff Group Jan (Jan 20 figure: 1,462) Jan % Overall 1,520 +58 +4.0% 8 Management (VIII+) 403 +52 4.8% Clerical & Supervisory (III to VII) 907

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 16.397 1.975 1.971-1.971 1.990 1.989 2.023

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element 92.713 23.188 31.064 46.007-46.007

More information

RE: Alarm from an Industry Professional over Australia s Procurement of the F-35 Lightning II Joint Strike Fighter.

RE: Alarm from an Industry Professional over Australia s Procurement of the F-35 Lightning II Joint Strike Fighter. Danny Nowlan 9 Harriet St Marrickville NSW 2204 Australia BSc, BE (Aero), Masters (Aero) (USyd) 5 th May 2014 RE: Alarm from an Industry Professional over Australia s Procurement of the F-35 Lightning

More information

ARCHIVED REPORT. For data and forecasts on current programs please visit or call

ARCHIVED REPORT. For data and forecasts on current programs please visit  or call Electronic Warfare Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 APR-48A - Archived 4/2006 Outlook DF cueing for

More information

Complex Systems Integration A Defence Science & Technology Perspective

Complex Systems Integration A Defence Science & Technology Perspective Complex Systems Integration A Defence Science & Technology Perspective Dr Ken Anderson Chief Aerospace Division Krakow, Poland August 2015 1 DST Group at a glance Approved for Public Release Budget 2015-16

More information

DEPARTMENT OF DEFENSE PRESENTATION TO THE SENATE ARMED SERVICES COMMITTEE UNITED STATES SENATE

DEPARTMENT OF DEFENSE PRESENTATION TO THE SENATE ARMED SERVICES COMMITTEE UNITED STATES SENATE NOT FOR PUBLICATION UNTIL RELEASED BY SENATE ARMED SERVICES COMMITTEE UNITED STATES SENATE DEPARTMENT OF DEFENSE PRESENTATION TO THE SENATE ARMED SERVICES COMMITTEE UNITED STATES SENATE SUBJECT: Joint

More information

Precision Strike Winter Roundtable

Precision Strike Winter Roundtable Create and Deliver Superior Products Through Innovative Minds Precision Strike Winter Roundtable Long Range Strike Weapons Frank Cappuccio, February 1, 2007 An Industry Perspective 1. What LRS Capabilities

More information

Proposed U.S. Arms Export Agreements From January 1, 2012 to December 31, 2012 Published on Arms Control Association (

Proposed U.S. Arms Export Agreements From January 1, 2012 to December 31, 2012 Published on Arms Control Association ( Proposed U.S. Arms Export Agreements From January 1, 20 to December 31, 20 Fact Sheets & Briefs Contact: Jeff Abramson, Non-Resident Senior Fellow for Arms Control and Conventional Arms Transfers, jeff@armscontrol.org

More information

More Data From Desert

More Data From Desert USAF has released additional information about the Persian Gulf War, which opened five years ago this month. More Data From Desert PERATION Desert Storm Obegan on January 17, 1991, led off by a ferocious

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) Prior Years FY 2018 FY 2019 FY 2020 FY 2021 To Complete Program Element - 130.376 166.297 132.795 0.000

More information

DATE: FY 2016 President's Budget February 2015 PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY

DATE: FY 2016 President's Budget February 2015 PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY APPROPRIATION/BUDGET ACTIVITY /BA 2 Other Warships BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: P-1 LINE ITEM NOMENCLATURE LITTORAL COMBAT SHIP () BLI: 2127 / SUBHEAD NO. (Dollars in Millions) PRIOR YR

More information

Navy ManTech Program. ManTech Update. Tom Hite CTC 15 October 2014

Navy ManTech Program. ManTech Update. Tom Hite CTC 15 October 2014 Navy ManTech Program ManTech Update Tom Hite CTC 15 October 2014 Navy ManTech Overview Agenda CNST Recompete Update Navy ManTech Support Recompete FY16 Investment Strategy Affordability Assessment Update

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 P-1 Line #18

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 P-1 Line #18 Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1611N: Shipbuilding and Conversion, Navy / BA 03: Amphibious Ships / BSA 1: Amphibious Ships ID Code (A=Service Ready, B=Not

More information

A Call to the Future

A Call to the Future A Call to the Future The New Air Force Strategic Framework America s Airmen are amazing. Even after more than two decades of nonstop combat operations, they continue to rise to every challenge put before

More information

Anti-Access/Area Denial Challenges

Anti-Access/Area Denial Challenges Headquarters U.S. Air Force Anti-Access/Area Denial Challenges Maj Gen Dave Scott AF/A5R 6 Oct 10 1 Flight Path What is A2/AD? Requirements and Challenges Munitions Investment Strategy Planning for Future

More information

DATE: FY 2013 President's Budget February 2012 PRIOR YR FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 TO COMP TOTAL PROG QUANTITY

DATE: FY 2013 President's Budget February 2012 PRIOR YR FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 TO COMP TOTAL PROG QUANTITY BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: APPROPRIATION/BUDGET ACTIVITY P-1 LINE ITEM NOMENCLATURE /BA 2 Other Warships LITTORAL COMBAT SHIP () BLI: 2127 / SUBHEAD NO. (Dollars in Millions) PRIOR YR

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 Total FY 214 FY 215 FY 216 FY 217 To Complete Total Total Program Element - 75.7 122.481-122.481

More information

F-35 Lightning II Program Status and Fast Facts June 8, 2017

F-35 Lightning II Program Status and Fast Facts June 8, 2017 F-35 Lightning II Program Status and Fast Facts June 8, 2017 Highlights of the Last Three Months o AX-5, the first F-35A assembled in Japan, rolls out of the Nagoya FACO. (June 5) o USAF announces F-35A

More information

Tina Nelson, MBA, BSN Lisa Stepp, BSN, RN Rebecca Fyffe, BSN, RN Jessica Coughenour, LPN

Tina Nelson, MBA, BSN Lisa Stepp, BSN, RN Rebecca Fyffe, BSN, RN Jessica Coughenour, LPN Establishing a Conservative Approach to the Prevention of Pressure Ulcers with the Utilization of Data Analytics to Monitor Effectiveness of Quality Efforts and Best Practice Models Tina Nelson, MBA, BSN

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) Years FY 2018 FY 2019 FY 2020 FY 2021 To Program Element 966.537 66.374 29.083 54.838 0.000 54.838 47.369

More information

Fighter/ Attack Inventory

Fighter/ Attack Inventory Fighter/ Attack Fighter/ Attack A-0A: 30 Grounded 208 27.3 8,386 979 984 A-0C: 5 Grounded 48 27. 9,274 979 984 F-5A: 39 Restricted 39 30.7 6,66 975 98 F-5B: 5 Restricted 5 30.9 7,054 976 978 F-5C: 7 Grounded,

More information

New Directions for Defense Programs Pacific Overview

New Directions for Defense Programs Pacific Overview New Directions for Defense Programs Pacific Overview Mr. Jeffrey Bloom Japan Program Director, Pacific Armaments Cooperation Office of International Cooperation, OUSD (AT&L) The Future of the Asia- Pacific

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

Joint Strike Fighter (JSF) Sustainment for Europe SCOTT ODGEN. Director Business Development, Global Sustainment. Lockheed Martin Aeronautics Company

Joint Strike Fighter (JSF) Sustainment for Europe SCOTT ODGEN. Director Business Development, Global Sustainment. Lockheed Martin Aeronautics Company Joint Strike Fighter (JSF) Sustainment for Europe SCOTT ODGEN Director Business Development, Global Sustainment Lockheed Martin Aeronautics Company Scott Ogden Director, F-35 Global Sustainment Customer

More information

AGI Technology for EW and AD Dominance

AGI Technology for EW and AD Dominance AGI Technology for EW and AD Dominance Singapore 2015 Content Overview of Air Defense Overview of Electronic Warfare A practical example Value proposition Summary AMD - a multidisciplinary challenge Geography

More information

BOROUGH OF ROSELLE PUBLIC NOTICE ANNUAL NOTICE OF CALENDAR YEAR 2018 WORKSHOP SESSIONS, PRE-AGENDA MEETINGS AND REGULAR MEETINGS

BOROUGH OF ROSELLE PUBLIC NOTICE ANNUAL NOTICE OF CALENDAR YEAR 2018 WORKSHOP SESSIONS, PRE-AGENDA MEETINGS AND REGULAR MEETINGS BOROUGH OF ROSELLE PUBLIC NOTICE ANNUAL NOTICE OF CALENDAR YEAR 2018 WORKSHOP SESSIONS, PRE-AGENDA MEETINGS AND REGULAR MEETINGS BE IT RESOLVED, by the Mayor and Borough Council of the Borough of Roselle,

More information

Saab Press Briefing CANSEC May John Belanger V.P. Communications Saab North America

Saab Press Briefing CANSEC May John Belanger V.P. Communications Saab North America Saab Press Briefing CANSEC 2018 30 May 2018 John Belanger V.P. Communications Saab North America 2 IN 1937 WE TOOK OFF A history from the 17th century through Alfred Nobel (Bofors) and the shipyard in

More information

Public Affairs Guidance

Public Affairs Guidance For Official Use Only Not for Public Release Public Affairs Guidance F-35A 1. PURPOSE: Provide guidance to Airmen on the F-35A in order to: 1) Articulate the capabilities of the aircraft and explain it

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 25.229.872.863 7.6 8.463.874.876.891.96

More information

Detect, Deny, Disrupt, Degrade and Evade Lethal Threats. Advanced Survivability Suite Solutions for Mission Success

Detect, Deny, Disrupt, Degrade and Evade Lethal Threats. Advanced Survivability Suite Solutions for Mission Success Detect, Deny, Disrupt, Degrade and Evade Lethal Threats Advanced Survivability Suite Solutions for Mission Success Countering Smart and Adaptive Threats Military pilots and aircrews must be prepared to

More information

United States Government Benefits as a Result of Foreign Military Sales Programs

United States Government Benefits as a Result of Foreign Military Sales Programs United States Government Benefits as a Result of Foreign Military Sales Programs By Al Teeney Senior Engineer at the System Planning Corporation United States fighter aviators are keenly aware that other

More information

PARLIAMENTARY RESEARCH BRANCH DIRECTION DE LA RECHERCHE PARLEMENTAIRE

PARLIAMENTARY RESEARCH BRANCH DIRECTION DE LA RECHERCHE PARLEMENTAIRE PRB 02-07E THE JOINT STRIKE FIGHTER PROJECT Michel Rossignol Political and Social Affairs Division 15 July 2002 Revised 19 February 2003 PARLIAMENTARY RESEARCH BRANCH DIRECTION DE LA RECHERCHE PARLEMENTAIRE

More information

F-16 Fighting Falcon The Most Technologically Advanced 4th Generation Fighter in the World

F-16 Fighting Falcon The Most Technologically Advanced 4th Generation Fighter in the World F-16 Fighting Falcon The Most Technologically Advanced 4th Generation Fighter in the World Any Mission, Any Time... the F-16 Defines Multirole The enemies of world peace are changing. The threats are smaller,

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Specialized Undergraduate Pilot Training. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Specialized Undergraduate Pilot Training. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 11.801 10.862

More information

F-35 JOINT STRIKE FIGHTER. Development Is Nearly Complete, but Deficiencies Found in Testing Need to Be Resolved

F-35 JOINT STRIKE FIGHTER. Development Is Nearly Complete, but Deficiencies Found in Testing Need to Be Resolved United States Government Accountability Office Report to Congressional Committees June 2018 F-35 JOINT STRIKE FIGHTER Development Is Nearly Complete, but Deficiencies Found in Testing Need to Be Resolved

More information

The Joint Strike Fighter An International Enterprise

The Joint Strike Fighter An International Enterprise Paul Metz 1 Lockheed Martin Boulevard Mail Zone 1289 Fort Worth, Texas 76108 paul.metz@lmco.com INTRODUCTION From the beginnings of flight to the present, there have been international aircraft programs

More information

Strong. Secure. Engaged: Canada s New Defence Policy

Strong. Secure. Engaged: Canada s New Defence Policy Strong. Secure. Engaged: Canada s New Defence Policy Putting People First Long-term Capability Investments Spending Growth and Financial Transparency Bold New Vision 2 Putting People First People are the

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 109.887 133.105 148.297-148.297

More information

UNCLASSIFIED. UNCLASSIFIED Page 1 of 23. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5

UNCLASSIFIED. UNCLASSIFIED Page 1 of 23. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5 EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5 R-1 ITEM NOMENCLATURE 0604800N, F-35 JOINT STRIKE FIGHTER (JSF) PROGRAM COST

More information

ALBERTA TRANSPORTATION North Central Region Edson Area Instrumentation Monitoring Results

ALBERTA TRANSPORTATION North Central Region Edson Area Instrumentation Monitoring Results ALBERTA TRANSPORTATION North Central Region Edson Area Instrumentation Monitoring Results Fall 1 Section D Data Presentation Site NC3: Hwy :3 Lazy S -15 -.5.5 15 LEGEND Initial 1 Sep 1 Sep -75-37.5 37.5

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

Global Vigilance, Global Reach, Global Power for America

Global Vigilance, Global Reach, Global Power for America Global Vigilance, Global Reach, Global Power for America The World s Greatest Air Force Powered by Airmen, Fueled by Innovation Gen Mark A. Welsh III, USAF The Air Force has been certainly among the most

More information

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. JSF17-702, F-35 Sustainment

DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. JSF17-702, F-35 Sustainment F-35 Sustainment 2017 Lockheed Martin Corporation A hard copy of this document may not be the document currently in effect. The current version is always the version on the Lockheed Martin network. THOMAS

More information

A d. e P. nc e. a A. M d. e G. - P h ase 2 - M e d. r the ADF

A d. e P. nc e. a A. M d. e G. - P h ase 2 - M e d. r the ADF AIR6500t Battle Management System sile Defe is M d n a ir A d e -Phase 1 - Join und-bas ro G e g n a R m iu - P h ase 2 - M e d sile Defence fo is M d n a ir A d te istent Integra rs e P d se a B d n a

More information

ARCHIVED REPORT. For data and forecasts on current programs please visit or call

ARCHIVED REPORT. For data and forecasts on current programs please visit  or call Airborne Electronics Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 Outlook The will soon leave production in favor

More information

Exhibit R-2, RDT&E Budget Item Justification February 2007

Exhibit R-2, RDT&E Budget Item Justification February 2007 PE NUMBER: 27133F PE TITLE: F-16 SQUADRONS Exhibit R-2, RDT&E Budget Item Justification February 27 7 Operational System Development 27133F F-16 SQUADRONS ($ in Millions) 2671 Total Program Element (PE)

More information

USAF Gunship Precision Engagement Operations: Special Operations in the Kill Chain

USAF Gunship Precision Engagement Operations: Special Operations in the Kill Chain USAF Gunship Precision Engagement Operations: Special Operations in the Kill Chain Lieutenant Colonel Brenda P. Cartier Commander, 4th Special Operations Squadron Hurlburt Field, Florida Overview AC130U

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #164

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #164 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

2018 Annual Missile Defense Small Business Programs Conference

2018 Annual Missile Defense Small Business Programs Conference 2018 Annual Missile Defense Small Business Programs Conference DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 15 May 2018 Mr. Joseph C. Keelon Program Executive for Advanced

More information

Agile Archer. The skies over Key West, Fla., fill with Eagles, Hornets, Tigers, and Fulcrums for a joint exercise. Photography by Erik Hildebrandt

Agile Archer. The skies over Key West, Fla., fill with Eagles, Hornets, Tigers, and Fulcrums for a joint exercise. Photography by Erik Hildebrandt The skies over Key West, Fla., fill with Eagles, Hornets, Tigers, and Fulcrums for a joint exercise. Agile Archer Photography by Erik Hildebrandt A German Luftwaffe MiG-29 leads a US Navy F/A-18C and an

More information

Exhibit R-2, RDT&E Budget Item Justification February 2008

Exhibit R-2, RDT&E Budget Item Justification February 2008 PE NUMBER: 41318F PE TITLE: CV-22 Exhibit R-2, RDT&E Budget Item Justification February 28 5 System Development and Demonstration (SDD) 41318F CV-22 ($ in Millions) 413 Total Program Element (PE) CV-22

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 125.44 31.649 4.876-4.876 25.655

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0207445F PE TITLE: FIGHTER TACTICAL DATA Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE Cost ($ in Millions) FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) Total Program Element - 9.967 8.117-8.117 50.084 104.866 132.174 229.912 Continuing Continuing 675346:

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2002

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2002 COST ($ in Thousands) Actual 4689 Global Access Architecture 8,430 8,887 7,200 7,311 7,447 7,730 8,019 Continuing TBD Quantity of RDT&E Articles 0 0 0 0 0 0 0 0 0 A. Mission Description Global Air Traffic

More information

STATISTICAL PRESS NOTICE MONTHLY CRITICAL CARE BEDS AND CANCELLED URGENT OPERATIONS DATA, ENGLAND March 2018

STATISTICAL PRESS NOTICE MONTHLY CRITICAL CARE BEDS AND CANCELLED URGENT OPERATIONS DATA, ENGLAND March 2018 STATISTICAL PRESS NOTICE MONTHLY CRITICAL CARE BEDS AND CANCELLED URGENT OPERATIONS DATA, ENGLAND March 2018 Main Findings March 2018: Critical Care Beds There were 4,064 adult critical care beds available

More information

GLOBAL STRIKE THE INDISPENSABLE CAPABILITY FOR THE 21 ST CENTURY

GLOBAL STRIKE THE INDISPENSABLE CAPABILITY FOR THE 21 ST CENTURY GLOBAL STRIKE THE INDISPENSABLE CAPABILITY FOR THE 21 ST CENTURY Global Strike Global Strike the United States Air Force s unique ability to strike any target in the world at anytime. Global strike, when

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Joint Air-to-Surface Standoff Missile (JASSM) Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Joint Air-to-Surface Standoff Missile (JASSM) Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) # FY

More information

33 FIGHTER WING JSF INTEGRATED TRAINING CENTER. Fire From The Clouds

33 FIGHTER WING JSF INTEGRATED TRAINING CENTER. Fire From The Clouds 33 FIGHTER WING JSF INTEGRATED TRAINING CENTER 1 33 rd Fighter Wing Built Upon a Unique Joint Experience Training Joint and Coalition Pilots to Shape a 21 st Century Approach to Air Warfare Jointness is

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003 COST ($ in Thousands) FY 2002 Actual FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Cost to Total Cost 3956 F-117A Stealth Fighter 2,139 3,417 14,752 31,539 57,069 47,021 31,574 1,630 Continuing

More information

Air-Sea Battle: Concept and Implementation

Air-Sea Battle: Concept and Implementation Headquarters U.S. Air Force Air-Sea Battle: Concept and Implementation Maj Gen Holmes Assistant Deputy Chief of Staff for Operations, Plans and Requirements AF/A3/5 16 Oct 12 1 Guidance 28 July 09 GDF

More information

ARCHIVED REPORT. SSQ-72/108(V) (OUTBOARD/OUTBOARD II) - Archived 7/2002. Outlook. Orientation. Electronic Warfare Forecast

ARCHIVED REPORT. SSQ-72/108(V) (OUTBOARD/OUTBOARD II) - Archived 7/2002. Outlook. Orientation. Electronic Warfare Forecast Electronic Warfare Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 SSQ-72/108(V) (OUTBOARD/OUTBOARD II) - Archived

More information

STATEMENT OF GORDON R. ENGLAND SECRETARY OF THE NAVY BEFORE THE SENATE ARMED SERVICES COMMITTEE 10 JULY 2001

STATEMENT OF GORDON R. ENGLAND SECRETARY OF THE NAVY BEFORE THE SENATE ARMED SERVICES COMMITTEE 10 JULY 2001 NOT FOR PUBLICATION UNTIL RELEASED BY THE SENATE ARMED SERVICES COMMITTEE STATEMENT OF GORDON R. ENGLAND SECRETARY OF THE NAVY BEFORE THE SENATE ARMED SERVICES COMMITTEE 10 JULY 2001 NOT FOR PUBLICATION

More information

(111) VerDate Sep :55 Jun 27, 2017 Jkt PO Frm Fmt 6601 Sfmt 6601 E:\HR\OC\A910.XXX A910

(111) VerDate Sep :55 Jun 27, 2017 Jkt PO Frm Fmt 6601 Sfmt 6601 E:\HR\OC\A910.XXX A910 TITLE III PROCUREMENT The fiscal year 2018 Department of Defense procurement budget request totals $113,906,877,000. The Committee recommendation provides $132,501,445,000 for the procurement accounts.

More information

UNCLASSIFIED. LandWarNet Army Request for IT (ARFIT) Information Exchange Forum (IEF)

UNCLASSIFIED. LandWarNet Army Request for IT (ARFIT) Information Exchange Forum (IEF) LandWarNet 2011 Army Request for IT (ARFIT) Information Exchange Forum (IEF) CIO/G-6 Governance, Acquisitions and Chief Knowledge Officer (GA&CKO) Governance Division Strategic Goals Approach Objectives

More information