Integrated Performance & Quality Report

Size: px
Start display at page:

Download "Integrated Performance & Quality Report"

Transcription

1 Integrated Performance & Quality Report March 2015 (Month 12) FINAL

2 Introduction The Central London Integrated Performance & Quality Report is aimed at providing a monthly update on the performance of the based on the latest performance information available, and reporting on actions being taken to address any performance issues with progress. The contents of the report are defined by the s priorities which are informed by nationally defined objectives for commissioners - the NHS Constitution and Everyone Counts Guidance for (operating framework). The report is split into 3 sections. Section 1 of the report provides an update on and related providers operational performance against national standards. This includes 18 weeks RTT, cancer waits, A&E waits and ambulance handover times. Detailed information on underachieving indicators including trends and action log are also provided. Quality and Safety issues are covered in section 2 of the report. The key areas highlighted in this section are Serious Incidents, Never Events, SHMI, maternity services, complaints and patient experience. These are presented in trend charts and tables with commentary and actions for areas of concern. Section 3 provides an update on Mental Health Serious Incidents. 1

3 Section 1: Performance Exception Report

4 Performance Overview Access Threshold Prev. Month Month 12 YTD Other Measures Threshold Prev. Month Month 12 YTD Community Services Threshold CLA - Review Health Assessments (RHA) conducted weeks RTT - Admitted Pathway 90% 82.3% 83.3% 84.7% NEWL2_M 4.1 Cancelled Ops - 28 Day Guarantee breaches 0 CC2 6.1 within 6 wks (incl late notifications) weeks RTT - Non-admitted Pathway 95% 94.1% 93.9% 94.6% 4.2 Urgent Cancellations for the 2nd time 0 CC311 Referrals responded to during the day, twilight or 6.2 night service periods within 24 hrs weeks RTT - Incomplete Pathway 92% 90.7% 92.3% 89.6% CB_B17_n 4.3 Mixed Sex Accommodation Breaches (MSA) CC52 Number of Rapid Response referrals responded to 6.3 with 2 hrs week RTT Waiters - Incomplete pathway HQU HCAI - MRSA CC81 Palliative care patients achieving preferred place of 6.4 death Weeks Diagnostics 1% 1.8% 1.8% 1.6% HQU HCAI - CDIFF CC6 Prev. Month Month 12 YTD 90% 100.0% 100.0% 98.8% 95% 96.2% 96.5% 98.0% 98% 100.0% 100.0% 99.9% 80% 100.0% 100.0% 97.1% Section Venous leg ulcers healed within 12 weeks 2 60% 75.0% 80.0% 63.6% CC5 6.5 Pre-booked appointments DNA or UTA rate 4% 2.6% 1.4% 2.7% Cancer Waits Threshold Prev. Month Month 12 YTD Mental Health* Threshold weeks of an urgent GP referral 93% 95.9% 91.3% 93.8% 5.1 IAPT - Access 0.9% 0.8% 1.1% 7.7% Out of Hospital Services Threshold weeks of an urgent referral for breast symptoms 93% 92.8% 93.1% 90.7% 5.2 IAPT - Recovery (YTD) 50% 42.2% 43.5% 41.4% 7.1 LAS Cat A Red 1 responses within 8min 67.1% 67.2% Prev. Month Month 12 YTD Prev. Month Month 12 YTD Day - 1st definitive treatment 96% 97.6% 96.4% 89.1% 5.3 CPA Reviews with 12 months 95% 95.2% 94.9% 95.6% 7.2 LAS Cat A Red 2 responses within 8min 58.7% 59.1% Day Subsequent treatment (Surgery) 94% 100.0% 100.0% 96.7% 5.4 Outcomes Data Completeness - CPA Patients 50% 61.9% 92.7% 67.2% 7.3 LAS - Cat A 19 transportation within 19min 91.9% 92.3% Day Subsequent treatment (Drugs) 98% 100.0% 100.0% 99.6% 5.5 CPA Follow-Ups within 7 days 95% 100.0% 92.3% 98.3% 7.4 NHS % calls answered in 60 secs 97.6% 96.7% Day Subsequent treatment (Radiotherapy) 94% 100.0% 95.0% 98.7% 5.6 Inpatient gates kept by CRHT Teams 95% 100.0% 100.0% 99.3% 7.5 NHS % calls abandoned in 30secs 0.1% 0.2% Day - 1st definitive treatment (Urgent GP Referral) 85% 68.8% 81.0% 87.2% 5.7 New psychosis cases served by EIS (YTD) 95% 133.3% 200.0% 114.3% 7.6 NHS % calls where call back was offered 6.4% 6.7% Day - 1st definitive treatment (Screening Service) 90% 100.0% 100.0% 96.8% 5.8 Delayed Transfers of Care <7.5% 1.6% 1.8% 3.9% 7.7 GP Out of Hours Day - 1st definitive treatment (Cons. Upgrade) 85% 80.0% 100.0% 96.9% 5.9 DNA - 1st Appointments <15% 7.5% 7.7% 8.8% A&E / LAS Threshold Prev. Month 5.10 DNA - Follow-Ups Appointments <15% 9.2% 10.5% 9.0% Month 12 YTD 5.11 Carers offered assessment 55% 89.3% 93.3% 71.7% 3.1 Total time spent in A & E < 4 hours (all activity types) 95% 5.12 HoNOSCA Completion rates on acceptance 80% 100.0% 93.3% 92.4% 3.2 Trolley Waits in A&E HoNOSCA Completion rates on discharge 80% 100.0% 93.3% 94.8% 3.3 No. of LAS arrival to handover > 30mins CAMHS - 1st Appt. DNA Rates <15% 13.0% 16.0% 14.3% 3.4 No. of LAS arrival to handover >60mins CAMHS -FU Appt. DNA Rates <15% 7.1% 6.1% 9.3% RAG rated cells without data indicate under performance at one or more of s key providers - ICHT,CW,RBH. * CNWL except IAPT which is for all providers 3

5 1.1 & 1.2) Exception Report 18 Weeks RTT 18 Weeks admitted RTT performance was largely driven by Imperial College Healthcare Trust (ICHT) and to a lesser extent Chelsea and Westminster (CW) and University College London (UCL ). The is meeting the incomplete target overall with performance at 92.3% in M12. There has been an improvement in the incomplete RTT backlog (patients waiting > 18 weeks) from 949 in M11 to 772 in M11. In total the proportion of number of the backlog comprises of 62.05% at ICHT, 15.28% at CW, 13.86% at UCL and 8.81% at other organisations. ICHT: obligations agreed under 14/15 18 week RTT Query Notice which have not been delivered have been translated into the 15/16 agreed contract schedules and continue to remain in force. ICHT has agreed RTT incomplete improvement trajectory to reduce the overall backlog to 4000 by the end of April ICHT: Backlog for the has decreased from 658 in M11 to 479 in M12. However, their backlog remains at an unsustainable level. Performance due to data quality issues leading data quality issues leading to the inability to forecast and manage demand. CW: Backlog for the has stayed constant from 118 in M11 to 118 in M12 and close to meeting the national best practice level. Trust is close to meeting RTT standards overall. ICHT have nearly met RTT incomplete improvement trajectory to reduce the overall backlog to 5000 by the end of March 2015 achieving Backlog reduction plan for challenged specialities completed. ICHT: RTT incomplete backlog has not improved within weekly reporting and the number reported is higher than month end position. This indicates that the validation processes post month end are removing over 3000 incorrect pathways each month. On-going data quality issues on the incomplete waiting list. This leads to the inability to accurately assess demand and can lead to a capacity imbalance and further deterioration in performance. Lack of a robust admitted RTT delivery plan and the inability to deliver a capacity boost in Q1 2015/16. Detailed demand & capacity assessments within challenged specialties have not been completed. 4

6 1.1 & 1.2) Exception Report 18 Weeks RTT Issue Action Action M12 RTT performance not met ICHT Develop detailed activity planning assumptions for 2015/16 to be followed-up with IST demand and capacity plans for most challenged specialties. Open Yes EY NG No 30/04/15 29/05/15 14/15 query - 5

7 1.4) Exception Report 18 Weeks RTT 18 Weeks RTT 52 week breach One case in ENT at Imperial College Healthcare Trust (ICHT) ICHT - Action plan to resolve data quality issues with a trajectory to reduce RTT backlog to 4000 by the end of April. ICHT - The Trust reported a total of fifteen breaches overall for all s. Trust has confirmed: 11 cases have been treated 2 with treatment dates in May patient who was identified through validation has a diagnostic booked in May data quality issue. Continued 52 week breaches at ICHT in Q4. On-going data quality issues at ICHT resulting in difficulties to manage RTT waiting lists. Issue Action RTT standards not met due to: Performance reporting issues following PAS implementation. Demand and capacity imbalance. ICHT Trust provide details of breaches and actions to improve pathways Action Closed Yes EY NG Yes 12/05/15 N/A query in place

8 1.5) Exception Report Diagnostic Waits Majority of breaches were reported by UCLH (25) and ICHT (20) out of a total of 50 breaches in total. ICHT breaches due to capacity and equipment issues within cystoscopy. UCLH Trust has reported an increase in demand within MRI, lack of capacity and staff vacancies as the root causes for breaches. ICHT Reduced breaches in other modalities other than cystoscopy. UCLH - Reduced breaches for Central London in M12 but this is not replicated across NW London s ICHT Trust reported that an internal business case to increase cystoscopy equipment has been approved. UCLH query in place and remedial action plan agreed. Trust trajectory to meet performance from July 2015 ICHT Cystoscopy breaches will not be reduced until additional equipment has been purchased. Trust report a staffing issue in radiology has led to diagnostic breaches in M1. On-going data quality issues following Cerner implementation UCLH current achievement against RAP and trajectory is unknown. Issue Action Action Diagnostic breaches to the 6 week standard ICHT Update on improvement actions at CQC. Open Yes JC KH Yes 28/05/15 N/A No contract action N/A Diagnostic breaches UCLH Trust update to RAP and trajectory Open Yes JP NELCSU Yes 29/05/15 N/A N/A N/A 7

9 2.1) Exception Report Cancer Waits CL did not achieve the two-week wait breast symptomatic standard (91.3%) in M12. This was as a result of 30 patient breaches. The breach reason were patient choice (27) and administrative errors (3). Patients were referred to: ICHT (19), CW (4), UCLH (3), RMH (2), GSTT (1) and LNWHT (1) All NWL provides achieving standard, therefore no action required currently CL achieving the standard for 2014/15. All NWL providers consistently achieving standard. No identified gaps in assurance. Issue Action Action Two-week wait standard (93%) All NWL providers achieving the standard. No action required. 8

10 2.7) Exception Report Cancer Waits CL did not achieve the 62 day standard (81%) in M12. This was as a result of four patient breaches, due to delay in workup (2) administrative delay (1) and patient choice (1). Two patient were treated at UCLH, one at ICHT and one shared breach between CW/RMH. One patient waited over 100 days (UCLH). CW will submit individual breach and exception reports. NWL action plan to improve inter provider pathways progress on actions. Cancer focus at May CWHHE Performance Committee CL is achieving the 62 day standard for 2014/15 ICHT is achieving the 62 day standard for 2014/15 ICHT did not achieve Q4 - ICHT have provided assurance on future performance UCLH are not achieving the 62 day standard. UCLH contract is held outside of NWL, via NCL CSU. Issue Action Action 62 day standard (85%) CW Trust to submit breach and exception reports Open Yes CH AK Yes 18/05/ day standard (85%) All NWL Cancer discussion at May CWHHE Performance Committee Open Yes JE All provider COO Yes 21/05/

11 ) Exception Report A&E & LAS (ICHT) A&E (all types) national standard analysis at St Marys (Nov 2014) indicates: increase in A&E attendances by 10%, higher acuity levels and 33% increase in Category A conveyances compared to previous year. 48% ED breaches were with patients ultimately discharged. Breaches peak in the evening (32% breaches occur 4-9 p.m.) increase in patients from W10 and NW10 using St Mary s Hospital A&E. increase in non-elective admissions (6-8 per day). Bed flow impacted as patients with LOS >14 days has increased by 22% and discharges happening late in the day. The trust-wide actions focus on: A&E: Targeting first hour with improvements in Registration/ streaming; and speciality team responsiveness. Updating escalation triggers and actions to improve grip on A&E processes. Discharge: 8 a.m. board round, criteria led discharge Bed flow: Role of bed manager (from July 2015 hours increased to 8-8 ), communicating bed availability; effective use of discharge lounge Internal processes: delays in diagnostics, Cath labs; streamline transfers Capacity changes: 6 extra consultants; new acute medical model; extended ambulatory care. On-going focus on delayed transfer of care with TriBorough s and social services. M12 improved with 1.2% delayed bed days compared to 1.5% in M11. Improving specialist review processes query issued on the 8 th May Issue Action M12 performance improved when compared to the previous two months. Action Performance has not recovered in March 2015 and therefore the Trust has not met the agreed improvement trajectory. 2014/15 performance (93.72%) is a deterioration from (96.12%). ICHT had 292 x 30 min handover breaches (deterioration from M11). LAS handover performance deteriorated when compared to i.e x 30min breaches compared to 872 in On Track Not meeting A&E all type national standard ICHT Based on non achievement of the Trust s action plan, contract query notice has been issued and contract management meeting to be arranged. Open Partly EY NG Yes 22/05/15 N/A CQN issued None 292 breaches of the LAS >30mins handover waits 0 breaches of the LAS >60mins handover waits ICHT penalties of 200 per 30 minute breach and 1000 per 60 minute breach being applied. Close d Trust audit in place EY NG Yes 30/04/15 N/A Review at next CQG 200 / 1000 per case 10

12 ) Exception Report A&E & LAS (ChelWest) CW reported 50 LAS handover waits over 30 minutes and 2 cases over one hour. A deterioration when compared to M11. A&E attendances were higher in M12 when compared to the previous year. Bed capacity was impacted by higher than predicted admissions and with beds closed due to infection control issues at the end March. Trust escalation processes in place. Winter beds (Annie Lunz) remained open into April 15 as contingency for the beds impacted by infection control issues. CW is achieving national A&E standard YTD 96.36%. On-going breaches against this standard Ambulance handover deteriorated in as compared to i.e. 776 x 30 min breaches and 28 x 60 min breaches compared to 318 and 1 respectively the previous year. Issue Action Action 50 breaches of the LAS >30mins handover waits 2 breaches of the LAS >60mins handover waits CW penalties of 200 per 30 minute breach and 1000 per 60 minute breach being applied. Closed No, other than escalation plans LP LG N/A 30/04/15 N/A Review at next CQG 200 / 1000 per case 11

13 4.1) Exception Report Cancelled Operations (CW) CW reported one patient breach for a patient cancelled on the day of planned procedure. This procedure was booked on a Saturday and where the diagnostic scan was not available. Patient procedure has been rebooked. Low levels of cancellations (0.4%) in 2014/15 overall. Six breaches to this standard in 2014/15. Low level of breaches to this standard in 2014/15. Issue Action Action to date Cancelled operation standards not met ICHT Trust requested to provide an assessment of current issues and actions in place. Closed Yes CB KM No trajectory 12/05/15 N/A Review at next CQG Cost of procedure not charged 12

14 4.3) Exception Report MSA Two breaches were reported by UCLH. Root cause not yet known UCLH to provide an assessment of their issues and actions. UCLH Low level of breaches in 2014/15. UCLH current drivers for performance unknown. Issue Action Action MSA breaches UCLH Trust requested to confirm issues and action Open No JP NELCSU Yes 22/05/15 N/A N/A N/A 13

15 4.5) Exception Report HCAI 7 C.Diff cases in M12 with 3 apportioned to acute Trusts, UCLH (2) and Royal Marsden (1). Central London has met 2014/15 standard with 37 cases against a trajectory of 39. Dedicated infection control resource within CWHHE that support on-going review of infection control and anti microbial prescribing across CWHHE providers. Continuous system to review GP prescribing. Training provided to 161 care home staff from Q2 2014/15. Dedicated infection control support in CWHHE not replicated across London. Low level of cases within community and mental health providers. Joint review of C.Diff cases at ICHT has provided assurances that robust processes are in place. Prescribing analysis demonstrates good antimicrobial prescribing practice within primary care. Issue Action Action Improvement infection control and prescribing practice All providers in CWHHE On-going review of infection control and anti microbial prescribing. Open Yes JB All Yes 31/03/15 N/A N/A N/A 14

16 5.1) Exception Report IAPT Description IAPT Access: % of people with common mental illness (CMI) receiving psychological therapy Recovery rate IAPT: % of people who complete treatment and are moving to recovery Threshold Annual Target NHS CENTRAL LONDON CNWL In mth YTD In mth YTD In mth YTD In mth YTD In mth YTD 12.9% 8.7% LES COUNSELLORS PRIMARY CARE COUNSELLORS In mth/ YTD Target 1.3% 12.9% 0.9% 8.4% MIND Actual 1.3% 10.4% 1.1% 7.7% 0.07% 1.21% 0.12% 1.50% 0.01% 0.16% Local Target 50.0% 50.0% 50.0% 50.0% Actual 42.4% 41.4% 43.5% 41.4% 40.7% 30.8% 37.0% 43.8% 100.0% 38.1% Referral levels have been identified as a key contributor affecting under performance for IAPT Access. Recovery rates are affected by complex caseloads and transient populations. CNWL is working closely with CL to improve appropriate referral rates into the service, specifically focusing on increasing appropriate referrals for older adults, carers and hard to reach groups. An extensive programme of direct contact with other health professionals and 3rd sector groups is underway. Contacts have been made with universities, community LTC providers, older adult charities and many others. Joint action plan in place between trust and monitored via monthly IAPT meetings. Performance continues to improve since November. M12 target achieved. Quarter 4 target not achieved for IAPT Access. Under performance against IAPT Recovery target at year. Significant improvement required in performance to achieve IAPT Access and Recovery targets in Issue Action Action On Track to date A detailed action plan has been agreed with CL with joint actions. meetings are taking place to ensure actions are completed. Closed Yes KC/ER DM Yes 31/03/15 30/04/15 N/A N/A Under performance against IAPT Access and IAPT Recovery targets at year. CNWL Meetings held with local residents group to raise awareness on service and increase referrals. There was interest in running workshops. Closed Yes KC/ER DM Yes 30/04/15 N/A N/A N/A IAPT Workshops being run in Westminster, Imperial and Kings Universities to increase access and will continue. Open Yes KC/ER DM Yes 31/05/2015 N/A N/A N/A 15

17 5.2) Exception Report IAPT (continued) Issue Action CNWL On-going postnatal groups being held within children's centres to publicise the service. Update: On-going postnatal groups being held within children's centres. Good recovery rates for first group held. Action On Track to date Open Yes KC/ER DM Yes 31/03/15 30/04/15 N/A N/A Under performance against IAPT Access and IAPT Recovery targets at year. CNWL CNWL Increase in number of group sessions undertaken in February and March to increase access numbers. Impact expected in M12 data submission. IAPT training to be held in May for Mindfulness Group for people with LTCs to increase referrals rates. Closed Yes KC/ER DM Yes 17/04/15 N/A N/A N/A Open Yes KC/ER DM Yes 31/05/15 N/A N/A N/A CNWL Programme of work to increase referrals from Older Adults and people with long term conditions including IAPT meeting held with Westminster Community Rehab Team, liaison work with falls service. Plans to run another stress and worry group for older adults at Victoria Medical Centre. Open Yes KC/ER DM Yes 31/05/15 N/A N/A N/A 16

18 Exception Report CPA reviews/careplans sent to GPs in 2 weeks The trust have reported that under performance against this indicator is reflected in a number of teams, primarily the Recovery Team. The contributing factors have been data quality issues with incorrect data entry and staff changes. Data Quality issues have been raised in the teams and the team managers are engaging with individual clinicians to ensure that care plans. are sent in a timely manner. M9 was the first time this KPI was reported this year as agreed with the DQIP. On-going Monitoring via FIG and CQG. Performance is below target however this is the fourth month of reporting in line with DQIP. Issue Action Action CNWL The Trusts Business and Transformation manager is meeting with all team managers to standardise review processes and a monthly meeting has been set up with all team managers to review performance Open Yes ER TW Yes 30/04/ /05/2015 N/A N/A Underperformance on the CPA reviews/care plans sent to GPs within 2 weeks target CNWL Weekly reports are to be used by Team manager as part of the individual clinical supervision and reinforce the importance of recording it consistently on Jade system Open Yes ER TW Yes 31/05/2015 N/A N/A N/A CNWL Administrators to run BI tool reports minimum twice a week to identify any gaps or recording errors. Open Yes ER TW Yes 31/05/2015 N/A N/A N/A 17

19 5.3) Exception Report CPA reviews within 12 months In month breach relates to Older Adults service. Reason for breach within service is unclear however the older adults service has consistently met this target in previous months. Work is underway with teams to ensure that mechanisms are in place to review performance. The trust has achieved the year end 95.0% target with performance of 98.3% at M12 YTD. None. Issue Action Action CPA Reviews within 12 weeks CNWL The individual breaches will be raised with the Older Adults team and addressed to ensure there are no further breaches. Open Yes ER TW Yes 31/05/2015 N/A N/A N/A 18

20 5.5) Exception Report CPA follow up The under performance relates to 2 patients. In one of the cases the follow up contact had taken place but had been recorded incorrectly. The second case was not follow up in time. The breaches have been raised with the matrons and ward managers. All the wards have been reminded of the guidance for recording 7 day follow up contacts. Meeting held with the inpatient senior managers to review the performance indicators for the teams. The trust has achieved the 95.0% target every month this year and achieved 98.3% at year to date. None. Issue Action Action CPA follow up within 7 days CNWL Weekly reporting protocols put in place with the ward staff. Open Yes ER TW Yes 31/05/2015 N/A N/A N/A 19

21 Exception Report Safe Discharge Protocol Breach in Q4 relates to the Westminster South Community Recovery Team where one Discharge summary was not sent. Trust will monitor compliance with the protocol through appropriate local assurance measure to avoid breaches. On going monitoring performance via CQG. This is only the second quarter of reporting in line with the DQIP. Deterioration from Q3 performance. Improvements in awareness and adherence of Safe Discharge Protocol required. Issue Action Action CNWL May CQG to include review of Safe discharge Policy Open Yes ER TW Yes 31/05/2015 N/A N/A N/A % of patients discharged from secondary to primary care according to the Safe Discharge Protocol CNWL CNWL The trust will re-circulate the Safe Discharge Protocol to all applicable teams, to ensure that they are aware of the processes and actions required of them. Trust will disseminate the results of the Safe Discharge Protocol audit with the local teams and ensure that they are aware of their current performance. Open Yes ER TW Yes 30/06/2015 N/A N/A N/A Open Yes ER TW Yes 30/06/2015 N/A N/A N/A 20

22 Exception Report Mental Health Tariff The trust has reported that the breaches (data inputting) are reflected in a range of teams but represent very small numbers of individual cases in each of the teams. Better monitoring of compliance by administrative and team/ward manager. Regular reports and reminders to review their clustering validity breaches The individual breaches have been sent to the teams for review and action. Limited assurance, as trust has not met the 95% target in any month this year. Clustering and data quality issues are not being addressed adequately by the trust. The trust has not met the MH Tariff targets this year. Issue Action Action Underperformance on the MH tariff timeliness and cluster review KPIs CNWL New weekly review processes have been put in place with the teams and a monthly performance review meeting has been established The trust Business and transformation manager is working with all teams to review the processes in place to ensure clustering validity Closed Yes ER TW Yes 30/04/15 N/A N/A N/A Open Yes ER TW Yes 30/04/15 31/05/2015 N/A N/A 21

23 5.14) Exception Report CAMHS - 1st Appt DNA Rates 3 identified recording errors were not rectified to reflect accurate DNA rates Trust Business Support team is supporting teams by identifying possible recording errors not rectified in timely manner by clinical staff and therefore impacting on DNA data. The trust have achieved the 15.0% target with performance of 14.3% at year-to-date in M12. DNA Rates starting to increase since January. Issue Action Action CAMHS 1 st Appointment DNA Rates CNWL Team Manager has discussed data accuracy with staff and will be raising again at next Business Meeting Open Yes LR TW Yes 31/05/2015 N/A N/A N/A 22

24 Exception Report Patients 65yrs and over assessed for dementia Manual reporting system has led to poor data quality and under reporting. Data capture and reporting issues resulting in delayed reporting and late start in reporting for Automated data collection is being developed as part of SystmOne deployment across the trust for Query in Place and monitored via CQG. Action plan to resolve reporting issues required from trust. Issue Action Action Dementia Screening Patients 65yrs and Over. CLCH Action Plan requested from trust as part of Query Open No LC TS Yes 31/05/2015 N/A Query in Place N/A 23

25 ) Exception Report LAS Description Threshold In Month YTD (31 st March) Cat A Red 1 responses within 8 mins 75% 62.7 % 67.2 % Cat A Red 2 responses within 8 mins 75% 59.1% 59.7% Cat A 19 transportation within 19 mins 95% 92.3% 92.0% Cat A 8:45 Performance In Month 65.9%% Central London (Cat A 8 Performance) 75% 67.1% (Month) 68.2% (YTD) Root Causes: Paramedic levels under established levels LAS unable to meet required levels of shift cover Ambulance utilisation rates high, meaning LAS are unable to cope with surges in demand in the system. Whilst activity is broadly in line with plan, the acuity of cases has increased Weekly assurance meetings between LAS and Commissioners, TDA and NHS England Daily and weekly performance updates showing progress against plan LAS have provided recovery trajectory and have developed a sustainable improvement plan to address medium and longer term solutions. Bespoke OT/incentive scheme introduced over Bank Holidays & weekends. O/T has been positive and is increasing over identified high risk days. National & International Recruitment Continues with 221 new frontline staff expected to start by end March LAS have received special Home Office dispensation to bring International paramedics across earlier. Increased use of the Hear & Treat model Drive to reduce multiple attendance ratio Trajectory based on unsustainable recovery methods. Year end position will need to be constantly reevaluated based on most recent performance. New staff are less experienced and therefore have less confidence in making decisions. s have been asked to raise the profile around wider system pressure but there are no mechanisms to monitor this. Issue Action Action New EAC staff recruited Green Yes Yes 28/2/15 (Cohort 1) N/A LAS unable to meet established staffing levels LAS National Paramedic recruitment International Paramedic recruitment Staff retention difficult LAS Create new senior paramedic role to aid retention Rob Elizabeth Paul Amber Yes Yes 31/03/15 Larkman Ogunoye Woodrow (Cohort 1) Amber Yes Yes 31/03/15 N/A Green Yes Rob Larkman Elizabeth Ogunoye Paul Woodrow N/A Signed None (Applied at year end for ambulance) Yes 31/03/2015 N/A Signed None (Applied at year end for ambulance) 24

26 ) Exception Report LAS Issue Action Action LAS offering incentive payments & double time to incentivise uptake Amber Yes Rob Larkman Elizabeth Ogunoye Paul Woodrow No Ongoing Ongoing Signed None (Applied at year end for ambulance) LAS unable to fill shifts to required levels Demand on LAS increasing LAS LAS LAS increasing PAS usage to fill shifts LAS to use taxis for low priority HCP journeys LAS increasing use of Hear & Treat LAS expanding operation hours of METDG Amber Yes Rob Larkman Amber Yes Rob Larkman Green Yes Rob Larkman Green Yes Rob Larkman Elizabeth Ogunoye Elizabeth Ogunoye Elizabeth Ogunoye Elizabeth Ogunoye Paul Woodrow Paul Woodrow Paul Woodrow Paul Woodrow No Ongoing Ongoing Signed None (Applied at year end for ambulance) Yes Ongoing Ongoing Signed None (Applied at year end for ambulance) Yes 19/10/14 N/A Signed None (Applied at year end for ambulance) Yes Ongoing N/A Signed None (Applied at year end for ambulance) 25

27 ) Exception Report NHS 111 March 2015 INWL Call standards No. calls % Number of calls offered N/A Rate of call back above target due to ringfencing of clinical resource to reassess green ambulance disposition calls. Ongoing queue management to ensure highest priority calls are dealt with first. Reporting of call backs which breach 1 hour. Number of calls answered N/A Calls answered in 60 secs % Calls abandoned in 30 secs % Calls triaged % Bi-monthly contract monitoring meetings Weekly sitrep submission None Calls where a call back was offered % Call backs within 10 minutes % Led to ambulance dispatches % Recommended to attend A&E % Recommended to attend primary/community care Recommended to attend other services % % Did not recommend to attend other service % * Central London, West London, Hammersmith & Fulham Data source: UNIFY2 Issue Action Action N/A 26

28 7.7) Exception Report GP Out of Hours National Quality Requirements Target Central/ West London & H&F s No exceptions reported for March N/A % calls triaged within 20 minutes (urgent) 95% 99% % calls triaged within 60 minutes (routine) 95% 97% % walk-ins triage complete within 20 minutes (urgent) 95% 100% % walk-ins triage complete within 60 minutes (routine) 95% 95% GP cons available at all times & places 100% 100% % emergencies consulted within 1 hour 95% 100% % urgent consulted within 2 hours 95% 100% % routines consulted within 6 hours 95% 95% % emergencies visited within 1 hour 95% 100% % urgent visited within 2 hours 95% 100% % routines visited within 6 hours 95% 99% Patient communication - special needs met 95% 100% reporting Quarterly contract meetings None Issue Action Action CSU N/A 27

29 Exception Report Chelsea & Westminster UCC Expected activity KPI Description Result Percentage of patients seen, treated and discharged or redirected by UCC 60.4% A&E 4 hour wait Percentage of patients treated and discharged from UCC within 4 hours 99.2% Clinical Assessment Percentage of all patients streamed within 20 minutes 50.0% Assessment time Percentage of adult patients attending with minor injuries assessed and examined within 2 hours 90.3% reporting 50% of patients streamed within 20 minutes; data appears to be inaccurate and has been queried by the commissioner. None at present; awaiting confirmation from provider of correct figure for clinical assessment within 20 minutes. Assessment time Assessment time Percentage of child patients attending with minor illnesses assessed and examined within 2 hours Percentage of patients in GP Priority stream assessed and given final treatment within 2 hours 88.5% 86.0% KPI reporting. Quarterly contract meetings. None Issue Action Action CSU to date N/A 28

30 Quality Premium funding achievement will be based on year-end performance against the pre-qualifying criteria, national and local measures with adjustments for constitutional gateway measures breaches. Please note IAPT performance is measured against plans submitted to NHSE. Financial Gateway Operate in a manner consistent with Managing Public Money in 2014/15 Not Incur Unplanned deficit in 2014/15, or require financial support to avoid unplanned deficit Not incur a qualified audit report in respect of 2014/15 Quality Premium Measures Reducing Potential Years of Life Lost (PYLL) through causes considered amenable to healthcare and including addressing locally agreed priorities for reducing premature mortality 2014/15 Target YTD/Qtrly Targets 1743 (per 100k population) 1743 (per 100k population) YTD M12/Qtrly Performance Available in summer 2015 Maximum Available Potential Deductions Reporting Frequency 145,108 Annual Improving Access to Psychological Therapies (IAPT) (Quarterly Performance - Q4) 12.89% 3.95% 3.31% 145,108 Quarterly National measures Reducing avoidable emergency admissions (Composite Measure) Improving Patient Experience: (i) Supporting roll-out of Friends and Family Test (FFT) by local providers (ii) Improvement in 'Patient Experience of Hospital Care' 1735 (admissions per 100k pop.) 1735 (admissions per 100k pop.) Available in summer 2015 Evidence of engagement Evidence of engagement tbc Improvement on 2013/14 score of 72.1 Improvement on 2013/14 score of 72.1 Available in summer ,846 Annual 145,108 Annual Central London Local Measure Total Improving the reporting of medication-related safety incidents Number of new health and social care related plans (as defined by NHS Choices) created in year Total Maximum Funding Available Local s Target Local s Target tbc 145, tbc 145,108 tbc 967, ,385 Gateway measures (Penalty) Constitutional Measures 18 Week RTT (Incomplete Pathway) A&E waits ( mapped from HES provider data) Cancer waits - 14 days (Urgent GP referral for Suspected Cancer) Cat A red 1 ambulance calls (LAS performance) Potential Year End Achievement (after Gateway Measures Performance Adjustments) Target YTD Target YTD M12 Performance Potential % Adjustment to Funding Potential Adjustment to Funding Reporting Frequency 92% 92% 89.6% 25% -241,846 95% 95% 95.5% - 93% 93% 93.8% - 75% 75% 62.7% 25% -241, ,693 29

31 Section 2: Quality & Safety Exception Report

32 Quality and Safety Overview Acute s Community - CLCH Mental Health - CNWL Serious Incidents ICHT CW RBH Serious Incidents reported within 48 hours of identification 100% 93% 50% Serious Incident Root Cause Analysis Reports submitted within deadline 100% 50% NA Maternity ICHT CW RBH Breast feeding 84.2% 88.6% 12 Weeks assessment 93.3% 94.1% Smoking at delivery 2.4% 1% Homebirths 0.8% 0.5% Elective C-Sections 11.1% 12.8% Non-Elective C-Sections 13.8% 18.1% 3rd degree tear 1.5% 1.2% Post Partum Haemorrhaging 0% 1.7% 1:1 midwife care in established labour NR 100% Midwife to birth ratio Obstetric Consultant Ward Coverage (hours) 1:33 SMH 1:33 QCCH 98 SMH 98 QCCH 1:30 Pregnant women with a named midwife/team NR NR Quality ICHT CW RBH HASU thrombolysis treatment within 45 mins 100% N/A 90% time on stroke ward 92.5% 100% TIA treated within 24 hours 100% 57.1% N/A TB access within 2 weeks 100% 100% VTE Risk Assessments 97.5% 95.8% 95.7% NRLS uploads Yes Yes Yes Overdue safety alerts Friends and Family Test ICHT CW RBH Inpatient Response Rate 46.3% 40.2% 36.7% A&E Response Rate 16.9% 27.6% Mat Response Rate 28.9% 23.2% N/A Complaints ICHT CW RBH Acknowledged in 3 days 93% 100% 100% Responded to within agreed timescales 59% 77% 82% 110 N/A Serious Incidents All s Serious Incidents reported within 48 hours of identification Serious Incident Root Cause Analysis Reports submitted within deadline Complaints Safeguarding Training - All s Falls M12 67% 75% M12 Acknowledged in 3 days 100% Responded to within agreed timescales NA YTD Adult Safeguarding 89.9% Children Safeguarding 91.3% M12 Falls per 1000 bed days 0.1% Clinical Effectiveness Patients with venous ulcers healed within 12 weeks Key M12 80% Serious Incidents - All s Serious Incidents reported within 48 hours of identification Serious Incident Root Cause Analysis Reports submitted within deadline Complaints M12 63% 100% M12 Acknowledged in 3 days 100% Responded to within agreed timescales 100% Safety Under 18s admitted to adult psychiatric wards Patients feeling safe on an inpatient unit (quarterly) Safeguarding Training In month/quarter performance within threshold/ target met In month/ quarter performance close to threshold / target In month/quarter performance outside of threshold/ target met Data for indicator was not submitted/ reported in month/quarter There were no instances in month/quarter of the numerator/denominator which the indicator measures Indicator is not applicable to provider Adult and Children Safeguarding Training M % Q4 89% No data (NR) No activity (NA) N/A 31

33 Maternity Dashboard 1 ICHT NWLHT EHT THH WMUH ChelWest Target Mar YTD Target Mar YTD Target Mar YTD Target Mar YTD Target Mar YTD Target Mar YTD % of first booking maternity apps 12 weeks + 6 days as % of apps (exc. late referrals) 95% 93.3% 90.8% 95% 96.3% 96.8% 95% 82.7% 95.4% 90% 97.7% 97.1% 95% 98.9% 98.1% 95% 94.1% 94.8% 90% 84.2% 85% 90% 85.1% 91.4% 90% 86.1% 90.3% 83% 83.5% 84.1% 95% 85.9% 91.1% 90% 88.6% 91.2% Breastfeeding initiation rate 1.35% 0.8% 0.4% TBC 0% 0.2% 1% 1.7% 1.4% 2.1% 2% 2.4% 2% 0.5% 1% Home Births N/A Percentage of women smoking at the time of delivery 10% 2.4% 3.1% 10% 6.3% 5.5% 10% 6.4% 4.7% 10% 7.9% 7.4% 10% 4% 3.2% 10% 1% 1.5% Percentage of women experiencing 3rd degree tear 5% 1.5% 1.6% 5% 3.4% 3.1% 5% NR 5% 2.3% 2.5% 5% 3.4% 3.8% 5% 1.2% 1.6% Not Reported 32

34 Maternity Dashboard 2 Percentage of women that have elective caesarean sections ICHT NWLHT EHT THH WMUH ChelWest Target Mar YTD Target Mar YTD Target Mar YTD Target Mar YTD Target Mar YTD Target Mar YTD TBC 11.1% 11.7% 10% 8.9% 11.3% 12% 10.4% 10.7% 27% 35.1% 26.7% 12% 10.7% 10.4% 15% 12.8% 13% Percentage of women that have elective /non elective caesarean sections combined (THH only) Percentage of women that have nonelective caesarean sections 15% 13.8% 15.7% 15% 22.5% 18.4% 15% 17.3% 19.0% 12% 16.9% 14.6% 15% 18.1% 17.1% 2.4% 0% 0.3% 2.4% 2.1% 1.2% 2.4% 2.3% 0.7% 2.4% 0.6% 0.9% 2.4% 1.7% 1.9% 2.4% 1.7% 1.7% Post Partum Haemorrhage 2 litres and above 1:1 midwife care in established labour NA NR NR 100% NR 100% 90% NR 95% 95.4% 95.6% 95% 83.3% NR 98% 100% NR Not Reported Not Reported Midwife to birth ratio - ICHT Target: 1:30 SMH in month: 1:33 QCCH in month: 1:33 1:30 1:24 NA 1:30 1:30 NA 1:30 1:29 NA 1:30 1:36 NA 1:30 1:30 NA Consultant ward coverage hours per week ICHT Target: 168 hrs SMH in month: 98 hrs QCCH in month: 98 hrs NA NA NA NA NA 33

35 Exception Report: CLCH Serious Incidents Head of SI team has left the trust. Trust is aware of the decrease in reporting SIs and submitting RCA reports and is looking at change in systems. Fall in performance again in March. Trust has been 100% compliant for the previous two months. NB: Breaches in March are due to 26 (of 27) SIs were reported within 48hrs and 11 (of 14) RCA reports were submitted within timeframe. Issue Action Action SI reporting and investigating process CLCH LW and Nicola Clarke to meet with the trust to discuss the systems in place to support the SI and RCA process. Open Yes Lizzie Wallman TBA TBA 30/04/15 31/05/15 Ongoing Nil 34

36 Exception Report: ICHT Safeguarding Training There is currently a capacity issue within the team at Imperial College as they had a safeguarding vacancy which is being recruited to, this will hopefully resolve this issue. The current mitigating actions are that they are actively recruiting to their safeguarding post, however if this proves difficult some additional actions around safeguarding training may need to be considered. NB: 7040 (of 8381) eligible staff have received children s safeguarding training by March. Children safeguarding training has seen significant improvement over the last four months. Adults safeguarding training is currently at 86% (surpassing 85% target). The trust will need to indicate how it can access safeguarding children s training to support staff. Issue Action Action On Track Lower level of safeguarding children training being achieved. ICHT To recruit a new member of staff to ensure there is sufficient capacity within Being achieved Yes there is a plan that is being implemented Nicky Brownjohn ICHT Yes 28/02/ /05/15 On-going Nil 35

37 Exception Report: ICHT First booking maternity appointments Possible Cerner data quality issue. Trust does not report this as below threshold so we should be able to see some improvements made. There trust has employed additional staff to assist with the data quality issues data to be resubmitted. New midwifery staff appointed by the trust to reach the 1:30 ratio required. NB: Breach in March is due to 48 (of 713) patients not having their appointments completed by 12 weeks. Figures approaching target levels. Expected improvements have not materialised. The trust has previously given assurance that this would resolve. The trust has been requested to provide a trajectory for recruitment of new midwives to increase capacity information is awaited. Issue Action Action On Track to date Attributed to Cerner data issue ICHT Trust reviewing clinic capacity and numbers of women being referred from Ealing. Open Yes Mary Mullix Pippa Nightingale No 31/12/14 30/06/2015 On-going Nil 36

38 Exception Report: ICHT Breastfeeding initiation rate NB: Breach in March is due to 114 (of 720) patients not initiating breastfeeding missing target of 648. The trust has indicated that due to it s demographic profile and women s choice they have been unable to reach the target of 90% breast feeding initiation. Figures reflect the pre-cerner implementation levels. The trust has been requested to investigate and report on the reasons why the 114 women did not initiate breast feeding whether this is due to choice, cultural norms, condition of mother or baby at birth. The trust was able to provide information in April in relation to women s choices. Figures are unchanged over the past few months. Issue Action Action On Track Levels of breast feeding initiation are below expected rates. ICHT Further exploration of demographic data required from the trust Open In development Mary Mullix Pippa Nightingale No 31/12/14 30/06/15 On-going Nil 37

39 Exception Report: ICHT Home births London wide issue. Part of SaHF strategy to increase home births. The maternity network has reviewed the key performance indicator in light of the proposed changes and have suggested a lower threshold whilst the changes are taking place in relation to Ealing maternity services and the staffing to support changes is reviewed. Month 12 shows a slight improvement. NB: Breach in March is due to 6 (of 720) patients having home births, missing target of 10. Any actions to address the decline in home births. Issue Action Action Low occurrence of home-births ICHT Continue to monitor Open Yes Mary Mullix Jacqueline Dunkley- Bent No 31/12/14 30/06/15 On-going Nil 38

40 Exception Report: ICHT Consultant Ward Coverage Difference in data reported to performance team and trust reported data. Trust reports currently at 98 hours however should be reporting 168 hours from month 7. Discussed with Director of Children s and Women s Services who advised that the increase in consultant hours is linked to Ealing closure. Advised to develop trajectory for delivery of additional consultant hours. Discussed with Director of Children s and Women s Services and actions will now be identified. No firm trajectory business case suggests that 130 hours will be achieved within 2015/16. No trajectory for achieving the 130 hours shared with. Issue Action Action Consultant obstetric labour ward cover ICHT Plan or business case to achieve 168 hours cover Open No Mary Mullix Pippa Nightingale Mandish Dhanjal No 31/03/15 30/06/15 On-going Nil 39

41 Exception Report: ICHT Midwife to birth ratio Challenge of recruiting to vacant midwifery posts. Requirement to recruit additional midwives and additional midwives will be recruited and was reported via the CQG in January. Use of agency and bank midwifery to address shortfall until such a time that new staff have been recruited into post. Trajectory for recruitment received in May 2015 to be monitored monthly linked to performance data submitted The trust has been asked to produce the trajectory for staff coming into post and the impact on the midwife to birth ratio. Issue Action Action On Track Midwife to birth ratio above expected threshold ICHT The trust was asked to produce a trajectory for recruitment of staff this was received in May 2015 and will be updated each month Open Yes Mary Mullix Pippa Nightingale TBC 31/12/14 30/06/15 On-going Nil 40

42 Exception Report: ICHT Complaints The low level of complaint responses is below the national target. This was discussed at the January 2015 CQG and the Trust wish to move to one single point of contact for complaints the trust internal systems are in the process of change and alongside changes within the complaints team can occur. Complaints were discussed as part of the CQG in January and questions were asked of the provider for further assurances to the commissioners on response times. The Trust would like to move to a single point of access for complaints which they believe will help in future in meeting the targets as laid down. This process needs to be embedded within the organisation and a sustainable improvement in complaint response times demonstrated. Awaiting further information from the trust on timescales for the outcome of the single point of access. Issue Action Action Low level of complaint responses within timeframes. ICHT There needs to be a robust action plan to address the issue of achievement of the target. Some actions have been planned no timescales on achievement as yet Open No Mary Mullix Guy Young No 28/02/14 31/05/15 On-going Nil 41

43 Exception Report: CW Percentage of people referred with a suspected TIA, who are at high risk of stroke, who are assessed and treated within 24 hours To be determined. NB: Breach in March is due to 3 (of 7) patients not being assessed and treated within 24 hours. Understanding of issues impacting on these 3 cases and what has been put into place to prevent this re-occurring. Issue Action Action to date Failure to refer patients suspected of TIA within timescales CW Continue to monitor. Open TBA TBA Lizzie Wallman TBA 31/05/15 TBA On-going Nil 42

44 Exception Report: CW Serious Incidents Retaining trained RCA investigators. The organisation recognises that its clinical governance and associated reporting structures can be significantly improved. The Trust is still using a paper based reporting system which contributes to delays in externally reporting incidents. External audit of clinical governance processes commissioned at the Trust and a plan is in place to restructure the governance team and to update the reporting to an electronic system. Raised at March meeting. CW represented at RCA training hosted by in March. The Trust has an action plan in place, as part of their CQC response and as part of a longer term plan to improve their internal processes. The CQC also identified gaps in the assurance processes regarding reporting and governance at the Trust. NB: Breaches in March are due to 1 (of 14) SIs and 4 (of 8) RCA reports not submitted within deadline. Issue Action Action Serious incident reporting processes CW Continue to monitor. Open Yes Lizzie Wallman LM TBA 31/01/14 31/05/15 Ongoing Nil 43

45 Exception Report: CW Overdue patient safety alerts Late reporting. Alert relates to risk of severe harm and death from unintentional interruption of non-invasive ventilation. NB: Breach in March is due to NHS/PSA/W/2015/003 being closed off after deadline. Action were completed and alert closed off four days (2 working days) after deadline. Issue Action Action Patient safety alert not closed off within deadline. CW All actions possible in relation to the alert have been achieved. Closed N/A Lizzie Wallman TBA N/A N/A N/A On-going Nil 44

46 Exception Report: CW First booking maternity appointments Unknown cause. NB: Breach in March is due to 21 (of 356) patients not having their appointments completed by 12 weeks. YTD performance is at 94.8% Issue Action Action to date First booking maternity appointments CW Continue to monitor. Open TBA TBA Lizzie Wallman TBA N/A TBA On-going Nil 45

47 Exception Report: CW Breastfeeding Initiation Rate NB: Breach in March is due to 47 (of 414) babies not having breastfeeding initiated missing target of 373). YTD performance is at 91.2% which is above the 90% target. Further detail from the trust on the numbers of women who chose to artificially feed or babies admitted to special care or neonatal intensive care Issue Action Action to date Breastfeeding initiation rate CW Continue to monitor. Seek further details from the trust on women s choices, women and babies admitted to intensive care as a proportion of the number of babies considered. Open TBA TBA Lizzie Wallman TBA N/A TBA On-going Nil 46

48 Exception Report: CW Home Births London wide issue. Part of SaHF strategy to increase home births. To be monitored and raised with Trust at April CQG meeting. NB: Breach in March is due to 2 (of 414) patients having home births, missing target of 9. Metric to be reviewed as part of Quality Schedule Discussions. Continually below target throughout the financial year. YTD performance is at 1% which is below the 2% target. Issue Action Action Low occurrence of home-births CW Continue to monitor Open Yes Lizzie Wallman TBA No 31/12/14 31/05/15 On-going Nil 47

Integrated Performance & Quality Report

Integrated Performance & Quality Report Integrated Performance & Quality Report October 2014 (Month 7) Introduction The Hounslow Integrated Performance & Quality Report is aimed at providing a monthly update on the performance of the based on

More information

Operational Focus: Performance

Operational Focus: Performance Operational Focus: Performance Sandra Iskander Changes for 2015/16 Change of focus of 18-weeks and A&E 4-hour wait targets as recommended by Sir Bruce Keogh, Medical Director, NHS England. 18-weeks to

More information

WEST HAMPSHIRE PERFORMANCE REPORT. Based on performance data available as at 11 th January 2018

WEST HAMPSHIRE PERFORMANCE REPORT. Based on performance data available as at 11 th January 2018 WEST HAMPSHIRE PERFORMANCE REPORT Based on performance data available as at 11 th January 2018 1 CCG Quality and Performance Executive Summary Introduction: The purpose of this report is to provide an

More information

NHS England London Southside 4th Floor 105 Victoria Street London SW1E 6QT. 24 th July Dear Daniel, Fiona and Louise. Re: CCG Annual Assurance

NHS England London Southside 4th Floor 105 Victoria Street London SW1E 6QT. 24 th July Dear Daniel, Fiona and Louise. Re: CCG Annual Assurance NHS England London Southside 4th Floor 105 Victoria Street London SW1E 6QT 24 th July 2014 Dear Daniel, Fiona and Louise Re: CCG Annual Assurance Many thanks for meeting with us on 6 th June 2014 to discuss

More information

Newham Borough Summary report

Newham Borough Summary report Newham Borough Summary report Item K1 September 2013 Prepared on 30/09/2013 by Support team GREEN Finance and Activity Millions AMBER RED Headlines M5 Financial position M4 activity data The QIPP net savings

More information

Newham Borough Summary report

Newham Borough Summary report Newham Borough Summary report April 2013 Prepared on 17/04/13 by Commissioning Support team Apr-11 Jun-11 Aug-11 Oct-11 Dec-11 Feb-12 Apr-12 Jun-12 Aug-12 Oct-12 Dec-12 Feb-13 GREE N Finance and Activity

More information

BSUH INTEGRATED PERFORMANCE REPORT. 1) Responsive Domain 2) Safe Domain 3) Effective Domain 4) Caring Domain 5) Well Led Domain

BSUH INTEGRATED PERFORMANCE REPORT. 1) Responsive Domain 2) Safe Domain 3) Effective Domain 4) Caring Domain 5) Well Led Domain BSUH INTEGRATED PERFORMANCE REPORT 1) Responsive Domain 2) Safe Domain 3) Effective Domain 4) Caring Domain 5) Well ed Domain RESPONSIVE DOMAIN RESPONSIVE DOMAIN Metric Defined by Standard Apr-16 May-16

More information

Performance and Quality Report Sean Morgan Director of Performance and Delivery Mary Hopper Director of Quality Dino Pardhanani, Clinical Director

Performance and Quality Report Sean Morgan Director of Performance and Delivery Mary Hopper Director of Quality Dino Pardhanani, Clinical Director Sutton CCG Clinical Commissioning Group Governing Body Date Thursday, 06 September 2018 Document Title Lead Director (Name and Role) Clinical Sponsor (Name and Role) Performance and Quality Report Sean

More information

Integrated Performance Report

Integrated Performance Report Integrated Performance Report M06 September 2014 Presented by: Paul Bostock (Chief Operating Officer) Des Holden (Medical Director) Fiona Allsop (Chief Nurse) Paul Simpson (Chief Financial Officer) An

More information

Performance and Delivery/ Chief Nurse

Performance and Delivery/ Chief Nurse Governing Body 26th May 2017 Quality and Performance Report 22nd May 2017 Author: Other contributors: Executive Lead Audience Eileen Clark - Acting Director of Clinical Performance and Delivery/ Chief

More information

NHS Fylde and Wyre CCG Performance Dashboard

NHS Fylde and Wyre CCG Performance Dashboard Governing Body January 2016 NHS Fylde and Wyre CCG Performance Dashboard October 2015 (Month 7) Governing Body This report provides a high level summary of performance and activity and across Fylde and

More information

SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPs

SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPs SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPs December 2012 SUPPORTING PLANNING 2013/14 FOR CLINICAL COMMISSIONING GROUPS First published: 21 December 2012 2 Contents 1. INTRODUCTION...

More information

Newham Borough Summary report

Newham Borough Summary report Newham Borough Summary report March 2013 Prepared on 18/03/13 by Commissioning Support team Finance and Activity Millions Apr-11 Jun-11 Aug-11 Oct-11 Dec-11 Newham Headlines March 2013 Feb-12 Apr-12 Jun-12

More information

Integrated Performance Report

Integrated Performance Report ENC Bi Integrated Performance Report M1 2014/15 26 June 2014 Contents 1. Structure of the Document... 3 2. Southwark CCG and Providers Performance Summary Dashboard... 4 3. Southwark CCG Dashboard... 5

More information

Integrated Performance Report

Integrated Performance Report Integrated Performance Report M12 March 2015 Presented by: Paul Bostock (Chief Operating Officer) Des Holden (Medical Director) Fiona Alsop (Chief Nurse) Paul Simpson (Chief Financial Officer) An Associated

More information

Item E1 - Bart s Health Quality Indicators

Item E1 - Bart s Health Quality Indicators Item E1 - Bart s Health Quality Indicators 1.0 Purpose 1.1 The purpose of this report is to provide the CCG Board with an update on quality matters across pertaining to our main local Provider organisations.

More information

North West London Accident and Emergency Performance Report for the winter of 2016/17. North West London Joint Health Overview and Scrutiny Committee

North West London Accident and Emergency Performance Report for the winter of 2016/17. North West London Joint Health Overview and Scrutiny Committee North West London Accident and Emergency Performance Report for the winter of 2016/17 North West London Joint Health Overview and Scrutiny Committee 20 April 2017 1 This paper will summarise the performance

More information

RTT Recovery Planning and Trajectory Development: A Cambridge Tale

RTT Recovery Planning and Trajectory Development: A Cambridge Tale RTT Recovery Planning and Trajectory Development: A Cambridge Tale Linda Clarke Head of Operational Performance Addenbrooke s Hospital I Rosie Hospital Apr 2014 May 2014 Jun 2014 Jul 2014 Aug 2014 Sep

More information

Minutes: Quality and Safety Committee (QSC) Date Wednesday 20 May 2015 Time 10:00-13:00 Venue. 5.3, 15 Marylebone Road, London, NW1 5JD

Minutes: Quality and Safety Committee (QSC) Date Wednesday 20 May 2015 Time 10:00-13:00 Venue. 5.3, 15 Marylebone Road, London, NW1 5JD Minutes: Quality and Safety Committee (QSC) Date Wednesday 20 May 2015 Time 10:00-13:00 Venue 5.3, 15 Marylebone Road, London, NW1 5JD Present Dr Neville Purssell NP GP, CLCCG and Governing Body Member

More information

Paper 5.0 SHAPING A HEALTHIER FUTURE PAEDIATRIC TRANSITION: ANTICIPATED BENEFITS OF THE TRANSITION AND PROPOSED MODEL OF CARE.

Paper 5.0 SHAPING A HEALTHIER FUTURE PAEDIATRIC TRANSITION: ANTICIPATED BENEFITS OF THE TRANSITION AND PROPOSED MODEL OF CARE. SHAPING A HEALTHIER FUTURE PAEDIATRIC TRANSITION: ANTICIPATED BENEFITS OF THE TRANSITION AND PROPOSED MODEL OF CARE December 2015 Version 2.2 Paper 5.0 1 Purpose This document sets out the proposed new

More information

NHS Ashford Clinical Commissioning Group. Integrated Performance Report. November 2013

NHS Ashford Clinical Commissioning Group. Integrated Performance Report. November 2013 NHS Ashford Clinical Commissioning Group Integrated Performance Report November 2013 Page 1 Contents Executive Summary... 6 Assurance Framework Overview... 10 Are local people getting good quality care?...

More information

Performance, Quality and Outcomes Report: Position Statement

Performance, Quality and Outcomes Report: Position Statement Performance, Quality and Outcomes Report: Position Statement Update to Governing Body 5 April 2018 Item 1 Author(s) Sponsor Directors Purpose of Paper Jane Howcroft Programme and Performance Assurance

More information

Governing Body. TITLE OF REPORT: Performance Report for period ending 31st December 2012

Governing Body. TITLE OF REPORT: Performance Report for period ending 31st December 2012 - Governing Body DATE OF MEETING: TITLE OF REPORT: Performance Report for period ending 31st December 2012 KEY MESSAGES: We are responsible for securing improvements in the quality of care and health outcomes.

More information

SHEFFIELD TEACHING HOSPITALS NHS FOUNDATION TRUST EXECUTIVE SUMMARY REPORT TO THE TRUST BOARD HELD ON 18 NOVEMBER 2015

SHEFFIELD TEACHING HOSPITALS NHS FOUNDATION TRUST EXECUTIVE SUMMARY REPORT TO THE TRUST BOARD HELD ON 18 NOVEMBER 2015 SHEFFIELD TEACHING HOSPITALS NHS FOUNDATION TRUST EXECUTIVE SUMMARY REPORT TO THE TRUST BOARD HELD ON 18 NOVEMBER 2015 Subject: Supporting TEG Member: Authors: Status 1 Data Quality Baseline Assessment

More information

NHS Milton Keynes CCG Board Meeting

NHS Milton Keynes CCG Board Meeting Subject: Meeting: Quality & Performance Report NHS Milton Keynes CCG Board Meeting Date of Meeting: Tuesday 28 th November 2017 Report of: Neve Patel Head of Performance Is this document: Commercially

More information

NHS performance statistics

NHS performance statistics NHS performance statistics Published: 8 th February 218 Geography: England Official Statistics This monthly release aims to provide users with an overview of NHS performance statistics in key areas. Official

More information

Integrated Quality and Performance Report

Integrated Quality and Performance Report Item 6 Integrated Quality and Performance Report Herts Valleys CCG Board 1 st August 2013 Period of {MONTH HERE} 1 Introduction to the Integrated Performance Report 1. Purpose of this Report 1.1 This report

More information

21 March NHS Providers ON THE DAY BRIEFING Page 1

21 March NHS Providers ON THE DAY BRIEFING Page 1 21 March 2018 NHS Providers ON THE DAY BRIEFING Page 1 2016-17 (Revised) 2017-18 (Revised) 2018-19 2019-20 (Indicative budget) 2020-21 (Indicative budget) Total revenue budget ( m) 106,528 110,002 114,269

More information

NHS Performance Statistics

NHS Performance Statistics NHS Performance Statistics Published: 8 th March 218 Geography: England Official Statistics This monthly release aims to provide users with an overview of NHS performance statistics in key areas. Official

More information

DRAFT CWHHE CLINICAL COMMISSIONING GROUPS COLLABORATIVE

DRAFT CWHHE CLINICAL COMMISSIONING GROUPS COLLABORATIVE DRAFT CWHHE CLINICAL COMMISSIONING GROUPS COLLABORATIVE Members in attendance Ben Westmancott (BW) John Riordan (JR) Jonathan Webster () Michael Morton (MMo) Mohini Parmar (MP) Nicola Burbidge (NB) Trish

More information

Strategic Risk Report 12 September 2016

Strategic Risk Report 12 September 2016 Strategic Report September 20 Haringey CCG Register Introduction The Strategic Report (historically known as the Board Assurance Framework) evidences Haringey Clinical Commissioning Group s control over

More information

RTT Assurance Paper. 1. Introduction. 2. Background. 3. Waiting List Management for Elective Care. a. Planning

RTT Assurance Paper. 1. Introduction. 2. Background. 3. Waiting List Management for Elective Care. a. Planning RTT Assurance Paper 1. Introduction The purpose of this paper is to provide assurance to Trust Board in relation to the robust management of waiting lists and timely delivery of elective patient care within

More information

Quality Improvement Scorecard June 2017

Quality Improvement Scorecard June 2017 Mortality: HSMR Nat NB: Each month is a 12 month rolling value. I.e. Mar-16 reports the monthly average of Apr-15 to Mar-16. Performance remained below target in February. Mortality: HSMR (weekday) vs.

More information

NHS BOLTON CLINICAL COMMISSIONING GROUP Public Board Meeting AGENDA ITEM NO: 10. Date of Meeting:.24 th March 2017.

NHS BOLTON CLINICAL COMMISSIONING GROUP Public Board Meeting AGENDA ITEM NO: 10. Date of Meeting:.24 th March 2017. NHS BOLTON CLINICAL COMMISSIONING GROUP Public Board Meeting AGENDA ITEM NO: 10 Date of Meeting:.24 th March 2017. TITLE OF REPORT: CCG Corporate Performance Report AUTHOR: Melissa Laskey Director of Service

More information

Quality Improvement Scorecard December 2017

Quality Improvement Scorecard December 2017 Mortality: HSMR Performance improved in August Nat NB: Each month is a 12 month rolling value. I.e. Mar-16 reports the monthly average of Apr-15 to Mar-16. Mortality: HSMR (weekday) vs. HSMR (weekend)

More information

Quality Improvement Scorecard March 2018

Quality Improvement Scorecard March 2018 Mortality: HSMR Nat NB: Each month is a 12 month rolling value. I.e. Mar-16 reports the monthly average of Apr-15 to Mar-16. Performance further improved in October. November data not yet available. Mortality:

More information

Appendix 1: Croydon Clinical Commissioning Group Risk Register and Board Assurance Framework - 9th April 2013

Appendix 1: Croydon Clinical Commissioning Group Risk Register and Board Assurance Framework - 9th April 2013 Appendix 1: Croydon Clinical Register and Board Assurance Framework - 9th April 2013 Principal to Delivery Key Assurance on we have in in our are 1. To achieve financial sustainability in three years (2013-2014

More information

Integrated Performance Dashboard: Published February Contents

Integrated Performance Dashboard: Published February Contents Integrated Performance Dashboard: Published February 214 Contents No. Section Page No. 1 Key Messages 2 2 Performance Dashboard 3 3 Analytics 4 4 Mental Health 5 5 Quality & Safety 6 6 Glossary 8 The Month

More information

NHS performance statistics

NHS performance statistics NHS performance statistics Published: 14 th December 217 Geography: England Official Statistics This monthly release aims to provide users with an overview of NHS performance statistics in key areas. Official

More information

Richard Wilson, Quality Insight and Intelligence Director

Richard Wilson, Quality Insight and Intelligence Director To: Board For meeting: 24 May 2018 Agenda item: 8 Report by: Richard Wilson, Quality Insight and Intelligence Director Report on: Quality Dashboard Purpose 1. This paper highlights the key observations

More information

Month 12 Budget Update

Month 12 Budget Update North West London Month 12 Budget Update SaHF & NWL Strategy and Transformation Programmes April 2016 1 Summary This paper provides the month 12 budget update for NWLwide financial strategy/ SaHF including

More information

Haringey CCG MDT Integrated Contract Monitoring Report July 2015

Haringey CCG MDT Integrated Contract Monitoring Report July 2015 Haringey CCG MDT Integrated Contract Monitoring Report July 2015 Executive Summary 2 Executive Summary Contents Title page Executive Summary: Finance 4 Executive Summary: Performance 9 Executive Summary:

More information

Report. Integrated Performance and Quality Report Report Author Presented By Responsible Director Carol Davies Head of Performance

Report. Integrated Performance and Quality Report Report Author Presented By Responsible Director Carol Davies Head of Performance Governing Body Meeting held in public Report Agenda Item: 10.0 Date of Meeting: 6 th September 2018 Report Title Integrated Performance and Quality Report Report Author Presented By Responsible Director

More information

Executive Summary: This report focuses on month 10 data of the 2017/18 financial year, January 2018, unless otherwise indicated.

Executive Summary: This report focuses on month 10 data of the 2017/18 financial year, January 2018, unless otherwise indicated. Agenda item: 3.1 Paper No: 8 Committee: Venue: Governing Body The Boardroom, Dominion House : 27/03/2018 Status: FOR REVIEW AND DISCUSSION Title of Report Performance Report: Month 10, January 2018 Presented

More information

INTEGRATED PERFORMANCE REPORT. BOARD OF DIRECTORS 20 September 2017

INTEGRATED PERFORMANCE REPORT. BOARD OF DIRECTORS 20 September 2017 INTEGRATED PERFORMANCE REPORT BOARD OF DIRECTORS 20 September 2017 1 S Section Page Executive Summary 4 Trust Performance Overview 7 Trust Performance Report by Exception 9 MSSA Bacteraemia - Actual numbers

More information

November NHS Rushcliffe CCG Assurance Framework

November NHS Rushcliffe CCG Assurance Framework November 2015 NHS Rushcliffe CCG Assurance Framework ASSURANCE FRAMEWORK SUMMARY No. Lead & Sub Committee Date placed on Assurance Framework narrative Residual rating score L I rating in 19 March 2015

More information

Integrated Performance Committee Assurance Reports, January 2016 and December 2015 Crishni Waring, Chair, IPC Committee

Integrated Performance Committee Assurance Reports, January 2016 and December 2015 Crishni Waring, Chair, IPC Committee EPB53/825 Title of Report: Prepared By: Sponsor: Action Required: Integrated Performance Committee Assurance Reports, January 2016 and December 2015 Crishni Waring, Chair, IPC Committee Gale Hart, Director

More information

Haringey CCG Performance and Quality Summary March 2017

Haringey CCG Performance and Quality Summary March 2017 Haringey CCG Performance and Quality Summary March 2017 Contents Item Haringey CCG Quality and Performance Dashboard Haringey CCG Performance Summary North Middlesex University Hospital Performance Dashboard

More information

Utilisation Management

Utilisation Management Utilisation Management The Utilisation Management team has developed a reputation over a number of years as an authentic and clinically credible support team assisting providers and commissioners in generating

More information

NHS Wales Delivery Framework 2011/12 1

NHS Wales Delivery Framework 2011/12 1 1. Introduction NHS Wales Delivery Framework for 2011/12 NHS Wales has made significant improvements in targeted performance areas over recent years. This must continue and be associated with a greater

More information

Strategic Risk Report 4 July 2016

Strategic Risk Report 4 July 2016 Strategic Report 4 July 20 Haringey CCG Register Introduction The Strategic Report (historically known as the Board Assurance Framework) evidences Haringey Clinical Group s control over the delivery of

More information

Investment Committee: Extended Hours Business Case (Revised)

Investment Committee: Extended Hours Business Case (Revised) PAPER 06 Investment Committee: Extended Hours Business Case (Revised) OVERALL STRATEGY 1. SaHF Care Closer to Home This Extended Hours Business Case is developed within the context of Shaping a Healthier

More information

Governing Body meeting on 13th September 2018

Governing Body meeting on 13th September 2018 Governing Body meeting on 13th September 2018 Report from the Chair of the Integrated Governance Committee (IGC) Date of Meetings Reported: 9 th August 2018 Key achievements Author: Martin Wilkinson, Chair

More information

Integrated Performance Report

Integrated Performance Report Integrated Performance Report M04 July 2016 Presented by: Angela Stevenson (Chief Operating Officer) Des Holden (Medical Director) Fiona Allsop (Chief Nurse) Paul Simpson (Chief Financial Officer) An Associated

More information

Section 1 - Key Performance Indicators

Section 1 - Key Performance Indicators Clinical Quality Report Month 6 2016/17 period ending 30th September 2016 Section 1 - Key Performance Indicators 1.1 NHS Improvement; Risk Assessment Framework Clostridium difficile Indicator M6 2 YTD

More information

Quality Improvement Scorecard November 2017

Quality Improvement Scorecard November 2017 Mortality: HSMR Performance remained below target in July Nat NB: Each month is a 12 month rolling value. I.e. Mar-16 reports the monthly average of Apr-15 to Mar-16. Mortality: HSMR (weekday) vs. HSMR

More information

Avon & Wiltshire Mental Health Partnership NHS Trust. Extract from NHS STANDARD MULTILATERAL MENTAL HEALTH AND LEARNING DISABILITY SERVICES CONTRACT

Avon & Wiltshire Mental Health Partnership NHS Trust. Extract from NHS STANDARD MULTILATERAL MENTAL HEALTH AND LEARNING DISABILITY SERVICES CONTRACT SCHEDULE 4 QUALITY PERFORMANCE INCENTIVE SCHEMES 2011/12 Schedule 4 Part 1: Nationally Mandated Incentive Schemes Schedule 4 Part 2: National Incentive Framework for Commissioning for Quality and Innovation

More information

Quality & Performance Report. Public Board

Quality & Performance Report. Public Board Agenda Item 12.1 Quality & Performance Report Public Board 27 th November 2014 Presented for: Presented by: Author: Previous Committees: Governance Professor Suzanne Hinchliffe CBE Chief Nurse / Interim

More information

Chief Officer s Report March and April 2018

Chief Officer s Report March and April 2018 Purpose This paper provides a summary of the key areas of business led by the Chief Officer in the CWHHE Clinical Commissioning Groups. CWHHE comprises NHS Central London, NHS West London, NHS Hammersmith

More information

18 Weeks Referral to Treatment (RTT) Standard Recovery Planning and Assurance Framework

18 Weeks Referral to Treatment (RTT) Standard Recovery Planning and Assurance Framework 18 Weeks Referral to Treatment (RTT) Standard Recovery Planning and Assurance Framework Vicky Scott Head of Delivery & Development (North West London) NHS Trust Development Authority Lyndsay Pendegrass

More information

Quality Improvement Scorecard December 2016

Quality Improvement Scorecard December 2016 Mortality: HSMR Nat The improvement in performance has been maintained in year. NB: Each month is a 12 month rolling value. I.e. Mar-16 reports the average of Apr-15 to Mar-16. Mortality: HSMR (weekday)

More information

The Royal Wolverhampton NHS Trust

The Royal Wolverhampton NHS Trust The Royal Wolverhampton NHS Trust Meeting Date: 3 th June 214 Trust Board Report Title: Executive Summary: Action Requested: Report of: Author: Contact Details: Resource Implications: Public or Private:

More information

Integrated Performance Report

Integrated Performance Report ENC Bi Integrated Performance Report M6 2013/14 28 November 2013 Contents 1. Structure of the Document... 3 2. Southwark CCG and Providers Performance Summary Dashboard... 4 3. Southwark CCG Dashboard...

More information

DRAFT BUSINESS PLAN AND CORPORATE OBJECTIVES 2017/8

DRAFT BUSINESS PLAN AND CORPORATE OBJECTIVES 2017/8 DRAFT BUSINESS PLAN AND CORPORATE OBJECTIVES 2017/8 West London Clinical Commissioning Group This document sets out a clear set of plans and priorities for 2017/18 reflecting West London CCGs ambition

More information

Appendix 1. Quality Update Report for Salford CCG Open Board. Salford Royal, Oaklands and other providers of clinical services November 2013

Appendix 1. Quality Update Report for Salford CCG Open Board. Salford Royal, Oaklands and other providers of clinical services November 2013 Appendix 1 Quality Update Report for Salford CCG Open Board. Salford Royal, Oaklands and other providers of clinical services November 201 Contents Purpose of Paper... Ошибка! Закладка не определена. Greater

More information

Quality Improvement Scorecard February 2017

Quality Improvement Scorecard February 2017 Mortality: HSMR Nat Performance continued to improve into Q3 2016/17. NB: Each month is a 12 month rolling value. I.e. Mar-16 reports the monthly average of Apr-15 to Mar-16. Mortality: HSMR (weekday)

More information

NHSi June 2016)and integrated business plan completed (submitted to TDA in February 2014) NHSi Plan submitted 2016.

NHSi June 2016)and integrated business plan completed (submitted to TDA in February 2014) NHSi Plan submitted 2016. 1604 Executive 18/06/2014 1603 Executive 18/06/2014 Finance - Fin. Management 1491 Responsiveness 29/08/2013 ED - Adult Involvement of Service Users 11//2017 Failure to maintain Emergency Department performance

More information

Summary two year operating plan 2017/18

Summary two year operating plan 2017/18 One Trust - serving our local communities Summary two year operating plan 2017/18 & 2018/19 www.lewishamandgreenwich.nhs.uk Summary two year operating plan: 2017/18 and 2018/19 1. Introduction This summary

More information

Update on NHS Central London CCG QIPP schemes

Update on NHS Central London CCG QIPP schemes Update on NHS Central London CCG QIPP schemes NHS Central London CCG has identified circa 11m for QIPP during 2013/14. Commissioning Intentions approved by the governing body included transformational

More information

Quality and Leadership: Improving outcomes

Quality and Leadership: Improving outcomes Quality and Leadership: Improving outcomes Podiatry Managers/Allied Health Managers and Leaders 5 March 2014 Shelagh Morris OBE Acting Chief Allied Health Professions Officer 2 http://www.nhsemployers.org/aboutus/latest-news/pages/the-new-nhs-in-2013-infographic.aspx

More information

Ayrshire and Arran NHS Board

Ayrshire and Arran NHS Board Paper 12 Ayrshire and Arran NHS Board Monday 9 October 2017 Planned Care Performance Report Author: Fraser Doris, Performance Information Analyst Sponsoring Director: Liz Moore, Director for Acute Services

More information

Sheet. Discussion. For: Decision. Noting. title: Author: Lead Director. Quality t Office. Director: and - 1 -

Sheet. Discussion. For: Decision. Noting. title: Author: Lead Director. Quality t Office. Director: and - 1 - Governing Body Paper Summary Sheet Date of Meeting: 23 April 2013 For: Decision Discussion Noting Agenda item and title: Author: GOV/13/04b/08 Operational Targets 2013/14 John Dudgeon Head of Information

More information

2017/18 Trust Balanced Scorecard

2017/18 Trust Balanced Scorecard ITEM 8b ENC 9 2017/18 Trust Balanced Scorecard Author: Performance Management Team March 2017 The purpose of this paper is to provide an update on the development of the 2017/18 Balanced Scorecard for

More information

Quality Accounts: Corroborative Statements from Commissioning Groups. Nottingham NHS Treatment Centre - Corroborative Statement

Quality Accounts: Corroborative Statements from Commissioning Groups. Nottingham NHS Treatment Centre - Corroborative Statement Quality Accounts: Corroborative Statements from Commissioning Groups Quality Accounts are annual reports to the public from providers of NHS healthcare about the quality of services they deliver. The primary

More information

SOUTHAMPTON UNIVERSITY HOSPITALS NHS TRUST Trust Key Performance Indicators April Regular report to Trust Board

SOUTHAMPTON UNIVERSITY HOSPITALS NHS TRUST Trust Key Performance Indicators April Regular report to Trust Board SOUTHAMPTON UNIVERSITY HOSPITALS NHS TRUST Trust Key Indicators April 2011 Report to: Trust Board 24 May 2011 Report from: Sponsoring Executive: Aim of Report / Principle Topic: Review History to date:

More information

EAST KENT HOSPITALS UNIVERSITY NHS FOUNDATION TRUST

EAST KENT HOSPITALS UNIVERSITY NHS FOUNDATION TRUST EAST KENT HOSPITALS UNIVERSITY NHS FOUNDATION TRUST REPORT TO: BOARD OF DIRECTORS DATE: 28 NOVEMBER 2014 SUBJECT: REPORT FROM: PURPOSE: KEY NATIONAL PERFORMANCE TARGETS INTERIM DIRECTOR OF OPERATIONS Discussion

More information

COVENTRY AND RUGBY CLINICAL COMMISSIONING GROUP

COVENTRY AND RUGBY CLINICAL COMMISSIONING GROUP COVENTRY AND RUGBY CLINICAL COMMISSIONING GROUP Report To: Governing Body 11 September 2013 Report From: Title of Report: Purpose of the Report: Jacqueline Barnes, Executive Nurse The Nursing and Quality

More information

Bristol CCG North Somerset CGG South Gloucestershire CCG. Draft Commissioning Intentions for 2017/2018 and 2018/2019

Bristol CCG North Somerset CGG South Gloucestershire CCG. Draft Commissioning Intentions for 2017/2018 and 2018/2019 Bristol CCG North Somerset CGG South Gloucestershire CCG Draft Commissioning Intentions for 2017/2018 and 2018/2019 Programme Area Key intention Primary and community care Sustainable primary care Implement

More information

NHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY MEETING FINANCIAL POSITION AS AT 30TH NOVEMBER C Hickson, Head of Management Accounts

NHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY MEETING FINANCIAL POSITION AS AT 30TH NOVEMBER C Hickson, Head of Management Accounts NHS DORSET CLINICAL COMMISSIONING GROUP GOVERNING BODY MEETING FINANCIAL POSITION AS AT 30TH NOVEMBER 2013 Date of the meeting 15/01/2014 Author Sponsoring GB member Purpose of report Recommendation Resource

More information

Process and definitions for the daily situation report web form

Process and definitions for the daily situation report web form Process and definitions for the daily situation report web form November 2017 The daily situation report (sitrep) indicates where there are pressures on the NHS around the country in areas such as breaches

More information

Bristol, North Somerset and South Gloucestershire Clinical Commissioning Group Governing Body Meeting In-Common

Bristol, North Somerset and South Gloucestershire Clinical Commissioning Group Governing Body Meeting In-Common Bristol, North Somerset and South Gloucestershire Clinical Commissioning Group Governing Body Meeting In-Common Date: Tuesday 7 th November Time: 13.30 Location: Cleve Rugby Club, The Hayfields, Mangotsfield,

More information

NHS England (South) Surge Management Framework

NHS England (South) Surge Management Framework NHS England (South) Surge Management Framework THIS PAGE HAS BEEN LEFT INTENTIONALLY BLANK 2 NHS England (South) Surge Management Framework Version number: 1.0 First published: August 2015 Prepared by:

More information

Waiting Times Report Strategic. Thematic Goals

Waiting Times Report Strategic. Thematic Goals Strategic Improved Quality of Care Transformation - Prevention & Wellbeing Thematic Goals Waiting Times Report 2016-17 Transformation through Integration Improved Access to Services Improved Value This

More information

Report to the Board of Directors 2016/17

Report to the Board of Directors 2016/17 Attachment 8 Report to the Board of Directors 2016/17 Date of meeting 30 September 2016 Subject Report of Prepared by Purpose of report Previously considered by (Committee/Date) Local A&E Delivery Board

More information

Mental Health Crisis Pathway Analysis

Mental Health Crisis Pathway Analysis Mental Health Crisis Pathway Analysis Contents Data sources Executive summary Mental health benchmarking project (Provider) Access Referrals Caseload Activity Workforce Finance Quality Urgent care benchmarking

More information

EMERGENCY PRESSURES ESCALATION PROCEDURES

EMERGENCY PRESSURES ESCALATION PROCEDURES OP48 EMERGENCY PRESSURES ESCALATION PROCEDURES INITIATED BY: Director of Therapies & Health Sciences / Chief Operating Officer APPROVED BY: Executive Board DATE APPROVED: 21 September 2016 VERSION: 3 OPERATIONAL

More information

Clinical Strategy

Clinical Strategy Clinical Strategy 2012-2017 www.hacw.nhs.uk CLINICAL STRATEGY 2012-2017 Our Clinical Strategy describes how we are going to deliver high quality care in response to patient and carer feedback and commissioner

More information

SAFE STAFFING GUIDELINE

SAFE STAFFING GUIDELINE NATIONAL INSTITUTE FOR HEALTH AND CARE EXCELLENCE Guideline title SAFE STAFFING GUIDELINE SCOPE 1. Safe staffing for nursing in accident and emergency departments Background 2. The National Institute for

More information

Redesign of Front Door

Redesign of Front Door Redesign of Front Door Transforming Acute and Urgent Care Strategic Background and Context Our Change and Improvement Programme What have we achieved and how? What did we learn? Ian Aitken, General Manager

More information

Emergency Care Network Capacity Management and Escalation Plan Action Cards December 2009 December 2010

Emergency Care Network Capacity Management and Escalation Plan Action Cards December 2009 December 2010 Coventry and Warwickshire Emergency Care Network Emergency Care Network Capacity Management and Escalation Plan Action Cards December 2009 December 2010 This aim of this plan is to provide a high level

More information

WAITING TIMES AND ACCESS TARGETS

WAITING TIMES AND ACCESS TARGETS NHS Board Meeting Tuesday 17 December 2013 Lead Director (Acute Services Division) Board Paper No 13/60 Recommendation: WAITING TIMES AND ACCESS TARGETS The NHS Board is asked to note progress against

More information

Committee is requested to action as follows: Richard Walker. Dylan Williams

Committee is requested to action as follows: Richard Walker. Dylan Williams BetsiCadwaladrUniversityHealthBoard Committee Paper 17.11.14 Item IG14_60 NameofCommittee: Subject: Summary or IssuesofSignificance StrategicTheme/Priority / Valuesaddressedbythispaper Information Governance

More information

MERTON CLINICAL COMMISSIONING GROUP GOVERNING BODY

MERTON CLINICAL COMMISSIONING GROUP GOVERNING BODY MERTON CLINICAL COMMISSIONING GROUP GOVERNING BODY Date of Meeting: 23 rd March 2017 Agenda No: 9.3 Attachment: 15 Title of Document: CCG Governing Body Assurance Report & Scorecards: Month 9 Quality &

More information

Improve, Inspire, Innovate Quality Improvement Plan

Improve, Inspire, Innovate Quality Improvement Plan Improve, Inspire, Innovate Quality Improvement Plan 1 QIP Final version 20170706 Contents Background & Summary Page 3 Who is Responsible? Page 4 How will we communicate our progress to you? Page 4 Chair

More information

Report to the Merton Clinical Commissioning Group Governing Body

Report to the Merton Clinical Commissioning Group Governing Body MCCG GB 19.09.1 Pt1 Att 09 Report to the Merton Clinical oning Group Governing Body Date of Meeting: 16 th September 01 Agenda No: 8.1 Attachment: 09 Title of Document: Performance Framework and Balanced

More information

NHS ENGLAND BOARD PAPER

NHS ENGLAND BOARD PAPER NHS ENGLAND BOARD PAPER Paper: PB.28.09.2017/07 Title: Update on Winter resilience preparation 2017/18 Lead Director: Matthew Swindells, National Director: Operations and Information Purpose of Paper:

More information

Quality & Performance Report Author: John Adler Sponsor: Chief Executive Date: FIC, PPP + QAC 28 th September Executive Summary from CEO

Quality & Performance Report Author: John Adler Sponsor: Chief Executive Date: FIC, PPP + QAC 28 th September Executive Summary from CEO UNIVERSITY HOSPITALS OF LEICESTER NHS TRUST PAGE 1 OF 2 Quality & Performance Report Author: John Adler Sponsor: Chief Executive Date: FIC, PPP + QAC 28 th September 2017 Executive Summary from CEO Paper

More information

N/A N/A. 60% No data No data No data 40.0% 81.3% No data No data No data No data

N/A N/A. 60% No data No data No data 40.0% 81.3% No data No data No data No data Acute Quality and Performance Metrics For the period ending 31st May 2013 APPENDIX 1 Measures Target M1 M2 YTD Weston UHB NBT Exception RAG / DoT M1 M2 YTD RAG / DoT M1 M2 YTD RAG / DoT Reference RTT:

More information

Author: Kelvin Grabham, Associate Director of Performance & Information

Author: Kelvin Grabham, Associate Director of Performance & Information Trust Policy Title: Access Policy Author: Kelvin Grabham, Associate Director of Performance & Information Document Lead: Kelvin Grabham, Associate Director of Performance & Information Accepted by: RTT

More information

Overall rating for this trust Good. Inspection report. Ratings. Are services safe? Requires improvement. Are services effective?

Overall rating for this trust Good. Inspection report. Ratings. Are services safe? Requires improvement. Are services effective? Barnsley Hospital NHS Foundation Trust Inspection report Gawber Road Barnsley South Yorkshire S75 2EP Tel: 01226 730000 www.barnsleyhospital.nhs.uk Date of inspection visit: 17 to 19 October, 15 to 17

More information