1 Agenda No. 8(c) Enclosure No. 11 BUSINESS CONTINUITY PLANNING POLICY REFERENCE CODE (Man.) (For Corporate Key Documents, Reference code will be allocated by the Policy Co-ordinator e.g. <(HHT) PR.07> upon receipt of the approved document. For other Key Documents assign an appropriate Departmental Reference code) IF THIS DOCUMENT HAS BEEN PRINTED, IT SHOULD NOT BE ASSUMED TO BE THE LATEST VERSION. Document Description: Business Continuity Planning Policy Audience.Organisation(s): Hereford Hospital NHS Trust (Man.) Audience.Department(s): All staff in the organisation (Man. if applicable) Audience.Staff categories: All staff in the organisation (Man. if applicable) Date operational: 12/2008 Date expiry: 12/2009

2 CONTENTS BUSINESS CONTINUITY PLANNING POLICY 2-4 APPENDIX 1- Business Impact Analysis 5-10 APPENDIX 2- Example Plan APPENDIX 3- Audit Checklist

3 BUSINESS CONTINUITY PLANNING POLICY INTRODUCTION This Trust delivers a wide range of services to its local communities. Failure to deliver these services could have a detrimental impact on the health of the public and the viability of our business. Business Continuity Management (as defined by the Business Continuity Institute 2001) is: A holistic management process that identifies potential impacts that threaten an organisation and provides a framework for building resilience with the capability for an effective response that safeguards the interests of its key stakeholders, reputation, brand and value-creating activities. Business Continuity Management is concerned with managing risk to ensure that, at all times, the organisation can continue operating to, at least, a pre-determined minimum level, in the event of a major disruption. These risks can be from the external environment e.g. power failures, severe weather, or from within the organisation e.g. system failures, loss of key staff. BUSINESS CONTINUITY Within the Civil Contingencies Act 2004, all acute Trusts have responsibilities as a category one responder. Category one responders are required to take up their civil protection duties and be able to perform their functions so far as necessary or desirable to respond to an emergency. Part of this responsibility is to produce Business Continuity Plans. In addition to its own internal performance management the Trust is also subject to rigorous external review and monitoring of it performance against national and local targets. The Standards for Better Health and compliance regime for Foundation Trusts (MONITOR) require that the Trust produces and regularly reviews its Business Continuity Plans. Business Continuity Management is an integral part of Corporate and Clinical Governance. BUSINESS CONTINUITY PLANNING POLICY This Trust s Continuity Planning Policy is to have in place effective arrangements to maintain the most critical services and to ensure that these arrangements are regularly reviewed and practised. This policy sets out how this can be achieved, and whose responsibility it is to ensure that plans are in place. This policy should also be read in conjunction with the Major Civil Incident Plan and the Flu Pandemic Plan. There are 4 key stages of Business Continuity Management. These are: Programme Management Understanding the organisation Determining BCM strategy and developing and implementing a BCM response Exercising, maintaining and reviewing PROGRAMME MANAGEMENT This ensures that responsibilities are assigned within the organisation so that all staff are aware of their duties. The Director of Nursing and Quality leads on behalf of the Chief 2

4 Executive and the Trust Board for Business Continuity Planning. The lead manager supporting this function is the Trust s Risk Manager. Business Unit Managers, Heads of Nursing and Business Unit Directors are responsible for the successful production and implementation of Business Continuity Management for the critical and essential services within their areas of responsibility. UNDERSTANDING THE ORGANISATION The aim of this policy is to build into the culture, that business continuity is embedded within the organisation, rather than fire-fighting any emergency so that business-asusual is achieved in the quickest possible time. This will increase confidence in the organisation and the reputation of the Trust. Understanding the organisation is a key element to Business Continuity Management and consists of 2 stages: Business Impact Analysis: This identifies the key services within the organisation and assesses how long the Trust can manage without these services. A list of the Trusts services and their Business Impact Analysis is in Appendix 1. Following this, the critical activities for each service must be identified, alongside the resources that are required for the service to run effectively. Typical examples of resources required are people, premises, technology, information and supplies & partners Risk Assessment: This helps to assess the risk to the organisation if the above resources were lost and helps with staff identifying how they can mitigate this risk. High risk areas must have effective business continuity plans in place. DETERMINING BCM STRATEGY AND DEVELOPING AND IMPLEMENTING A BCM RESPONSE This stage of the process determines how the organisation will recover each critical activity and the resources required to do this effectively. This is essentially what is included in the Business Continuity Plans, which have been developed by the heads of departments and are available on the Trust s Intranet, under Emergency Planning. A hard copy must also be kept with the Business Unit Managers and within the Risk Management Department. Numbered versions and controlled distribution is essential and so therefore hard copies must be kept to a minimum so staff can ensure they are following the correct plans. Plans will be subject to change and it is the Business Unit Manager s responsibility to ensure any changes are agreed with Risk Management, who in turn will inform the Director of Nursing and Quality. The most recent document will therefore be made available on the intranet by Risk Management and hard copies redistributed as necessary. All plans must be signed off by the Director of Nursing and Quality. A template copy of a Business Continuity Plan is in Appendix 2, which provides future guidance for staff who need to produce or update their plans. Implementation of the plans are essential and those who hold positions that are named in the plan must be made aware of their role and have the appropriate training to enable them to fulfil their duties and responsibility. 3

5 EXERCISING, MAINTAINING AND REVIEWING It is essential that plans are exercised once completed so that systems can be tested, plans can be exercised and people can be rehearsed. This will ensure important lessons are learned and changes made before a real event. Exercising also helps to build confidence in team members by clarifying roles and responsibilities. The Trust s Emergency Planning Group can assist staff in testing their plans. It is ultimately the Business Unit Manager s responsibility to test their plans, and to sign off any changes and actions to be taken. These must be communicated to the Risk Manager. It is important that Business Continuity Plans are kept up to date and any changes must be implemented by the Business Unit and communicated to the risk management department who will ensure the most recent plans are available on the intranet. Business Unit Managers must also review their plans annually and identify whether there are any new key services which need to be included in the overall Business Continuity Planning. Self assessment of plans is a useful way to audit this process and this is available in Appendix 3. CONCLUSION The completion of Business Continuity Plans will ensure that the Trust can continue to provide essential clinical services during times of disruption. The process will contribute significantly to the Trust s Risk Management Strategy and meet the requirements of the Civil Contingencies legislation 4

6 APPENDIX 1- BUSINESS IMPACT ANALYSIS What are your key products or services? to 24 hours to 1 week to 2 weeks MEDICAL SERVICES Gastroenterology H H H 12 HOURS Palliative Medicine L M H 5 DAYS Cardiology H H H 12 HOURS Stroke H H H 12 HOURS Cath Lab M H H 24 HOURS Diabetes M H H 24 HOURS Neurology H H H 12 HOURS Dermatology M H H 24 HOURS Renal M H H 24 HOURS Rheumatology M M H 24 HOURS Respiratory H H H 12 HOURS Haematology M H H 24 HOURS Geriatric Medicine M H H 24 HOURS A&E H H H ZERO CCU H H H 12 HOURS What is the maximum length of time you can mange a disruption to this service without it threatening the organisation? 5

7 What are your key products or services? to 24 hours to 1 week to 2 weeks SURGICAL SERVICES Trauma H H H 4 HOURS Orthopedics L L M 14 DAYS Breast L M H 7 DAYS Urology L M H 7 DAYS General Surgery and Upper H H H 4 HOURS GI Plastics L M H 7 DAYS Vascular Surgery L L L 18 WEEKS Theatres H H H 1 HOUR ITU H H H ZERO Pre op L L L 18 WEEKS Head and Neck L L M 18 WEEKS ENT L L M 18 WEEKS Opthalmology L L M 18 WEEKS Maxilo Facial L L M 18 WEEKS Day Case L L M 18 WEEKS Anaesthetics H H H 1 HOUR What is the maximum length of time you can mange a disruption to this service without it threatening the organisation? 6

8 What are your key products or services? to 24 hours to 1 week to 2 weeks DIAGNOSTIC & THERAPEUTICS Pathology H H H LESS THAN 1 DAY Radiology H H H LESS THAN 1 DAY MRU L L M 2 WEEKS OPD (EIGN/ Oxford Suite) M H H 24 HOURS Pharmacy H H H LESS THAN 1 DAY Endoscopy H H H 8 HOURS Audiology L M H 2 WEEKS Neurophysioology L M H 2 WEEKS Therapies L H H 1 WEEK Vascular Lab M H H HOURS Fred Bulmer Medical Unit M H H 24 HOURS (including departure lounge) Fred Bulmer Outpatients L M H 72 Hours What is the maximum length of time you can mange a disruption to this service without it threatening the organisation? 7

9 What are your key products or services? to 24 hours to 1 week to 2 weeks WOMEN AND CHILDREN'S Maternity M H H 24 HOURS Delivery Suite H H H 12 HOURS Community Midwives M H H 24 HOURS Women's Health M H H 24 HOURS Paediatrics H H H 12 HOURS Special Care Baby Unit L M H 5 DAYS What is the maximum length of time you can mange a disruption to this service without it threatening the organisation? What are your key products or services? to 24 hours to 1 week to 2 weeks WARDS 1 Ward out of action L L L 3 WEEKS 2 Wards out of action L M M 3 WEEKS 3 Wards out of action M H H 2 WEEKS 4 Wards out of action H H H 2 WEEKS 5 Wards out of action H H H 1 WEEK 6 + Wards out of action H H H 2 DAYS What is the maximum length of time you can mange a disruption to this service without it threatening the organisation? 8

10 What are your key products or services? to 24 hours to 1 week to 2 weeks What is the maximum length of time you can manage a disruption to this service without it threatening the organisation? SODEXO Portering Services M H H 24 hours Domestic Services M H H 24 hours Linen & Laundry M H H 24 hours Sterile Services H H H 12 hours Staff Catering L M L The organisation could function without a staff restaurant Patient Catering L H H 24 hours Go Shop L L L The organisation could function without a shop Pest Control L L L 3 weeks Window Cleaning L L L The organisation could function without window cleaning Car Parking L L L The organisation could function without a car park ATKINS Switchboard H H H Zero Estates Management M H H 48 hours (Reactive and preventative planned maintenance/ helpdesk) Receipt & Distribution L M M 2 weeks Accommodation L L L The organisation could function without accommodation Site Management L L L 2 weeks Transport L M M 2 weeks Waste Disposal L M H 1 week 9

11 What are your key products or services? Impact up to 24 hours Impact up to 1 week Impact up to 2 weeks What is the maximum length of time you can mange a disruption to this service without it threatening the organisation? OTHER IT M H H < 24 hours if no IT in Trust- longer if single IT systems fail Mortuary L M H 72 hours Professional L L L 1 month Development Centre Finance L M H 72 hours Payroll M H H Up to 24 hrs depends on the day of the week concerned as service loss impact on the ability to run weekly payroll. Occupational L L M 3 weeks Health NHSP L M H 48 hours Human Resources L M H 1/2 day Medical Engineers L M H One month. Health Records L H H 24 hours Clinical Governance L M M 2 weeks 10

12 Appendix 2: Example Business Continuity Plan 1. What is the aim and objective of the service? State what the main aim(s) of the service are What are the Strategic Objectives The aim and objective of the Business Continuity Plan is to safeguard (the service) ability to operate efficiently should it suffer a disruptive event, and to provide a platform from which a recovery can be initiated and managed. 2. Who are the Service s customers and stakeholders? Stakeholders For Example: Hereford Hospitals NHS Trust, Herefordshire Primary Care Trust, and West Midlands Strategic Health Authority Customers - For Example: Patients Clinicians Nursing staff Wards A&E Theatres Tertiary centres Critical care network (reciprocal arrangements) 3. What are the critical activities and functions of the service? List these in bullet points. These critical activities are used throughout the whole planning cycle 4. Provide detailed Service Locations and staff numbers working at each location Where is the service based? What is the establishment of the service? Break the establishment down into staff type 5. What are the Legal, regulatory or contractual constraints under which the service operates? 6. Taking each critical activity (as in point 3) the service provides in turn and utilising the Trust s Risk Matrix, score each activity by each impact criteria. Impact Criteria means assessing the impact on the following: Buildings and Environment Clinical Issues

13 Information Technology Staff Supplies Other These should be listed in Appendix 1 7. List services and clients and clients that have either a dependency on the service or for which this service is dependent For Example: Do you provide services to anywhere else in the organisation? Do you have specific suppliers for your area? Which clients use your service? Which services are you dependent on? These should be listed in Appendix 2 and Business Continuity Arrangements considered 8. List critical suppliers that have business continuity arrangements in place These should be listed in Appendix 2 and Business Continuity Arrangements considered 9. List critical resources on which the service relies For Example: Telecommunications I.T. (software, hardware) Stationary Files Data (hardcopy and electronically based) Clinical/or other equipment. Water Electricity These should be listed in Appendix 2 and Business Continuity Arrangements considered 10. Detail the number of staff required to deliver critical activities at a minimum level. List each of your Critical Activities from point 3, and consider how many staff are required to deliver these. These should be listed in Appendix Highlight any key personnel or specialist groups without which the service would be severely compromised. These should be listed in Appendix Detail normal staffing levels and numbers of staff that are able to work from home Refer to point 4 for normal staffing levels Consider whether staff can work from home, and if so- state which staff can do what from home

14 13. Detail a Level of Business Continuity (LBC) appropriate for the service. The service should outline the minimum level of continued output of service which is acceptable. It is fundamental to review any regulatory requirements when defining this service level. For Example: Can certain elective work be postponed for the time being? This should be listed in Appendix State Recovery Point Objective (RPO): Within what timescale does the service need to recover critical activities to the predefined Level of Business Continuity? (E.g. the exchange must operate at full capacity within 24hrs, all patient services should be resumed within four hours). This should be listed in Appendix What are the single points of failure for the service? For Example: Medical gases Total absence of staff Medical Equipment Supplies not delivered 16. Does the service have any specific roles in response as part of the Trust s response to an emergency? List this here

15 - 14 -

16 App 1 (State Department) Business Continuity Risk Register Agenda No. 8(c) Enclosure No. 11 The Business Continuity Risk Register for Hereford Hospitals NHS Trust State Department Table 1 - Buildings & Environment E.G. Department damaged through fire/ flood. Loss of heating/ overheating Loss of water Table 2 Clinical Table 3 - Information Technology E.G. Failure of telephone system, failure of IT system, does your dept use any specific IT packages

17 Table 4 Staff E.G. Industrial action, staff shortage from illness Table 5 Suppliers E.G. Goods unable to be delivered, service withdrawn, pharmacy supplies restricted Table 6 Other E.G. Total loss of power supply, severe weather

18 App 2- (State Department) Business Continuity Plan Suppliers and critical resources List services and clients and clients that have either a dependency on the service or for which this service is dependent For Example: Do you provide services to anywhere else in the organisation? Do you have specific suppliers for your area? Which clients use your service? Which services are you dependent on? Critical Service Provider Name and contact details Service overview Business Continuity Arrangement For Example: Critical Resource Telecommunications I.T. (software, hardware) Stationary Files Data (hardcopy and electronically based) Clinical/or other equipment. Water Electricity Business Continuity Arrangement

19 App 3 (State Department) Business Continuity Plan Minimum staffing requirements/ Level of BC and Recovery Point Objective Critical Activity These are listed in point 3 of the introduction Minimum Staffing requirement Contingency Plan to meet minimum staffing requirement Level of Business Continuity Recovery Point Objective

20 Appendix 3 Audit Checklist for Business Continuity Management Stages Key Issues Example Evidence Rating BCM Programme Responsibility for BCM issues is clearly defined within the organisation at the corporate management level. Named executive director accountable for BCM policy and implementation Reports to senior management groups Understanding the Organisation BCM Manager or Co-ordinator appointed BCM is formalized through the organisations policy and procedures Responsibility for business continuity issues is well embedded within individual services or management units Responsibility for business continuity issues is well embedded within the organisation. Assurance of organisation s BCM capability Identification of the organisation s objectives, stakeholder obligations, statutory duties and environment in which the organisation operates Key services and products delivered by and on behalf of the organisation have been identified and have been agreed by the executive board Critical functions, processes and supporting resources, within and without the organisation, that are needed to delivery the key services and products have been identified. Risk assessment has been used on the critical activities and supporting resources to focus effort on the areas of greatest need Countermeasures exist to minimise risks that have been identified, including measures to combat potential loss of information. Identification of the impact over time on the organisation and its stakeholders of the loss of any Named individual in post responsible for implementing and maintaining the BCM programme A BCM policy exists The BCM policy is published internally and externally BCM is included in job descriptions and skill sets of service and support managers. BCM responsibilities enforced by inclusion in organisation s appraisal, reward and recognition policies. There is a programme in place raising awareness throughout the organisation and its key stakeholders. Feedback mechanisms exist whereby functional managers and staff can flag up BCM issues Evidenced through minutes of meetings and reports. Induction programmes include awareness of BCM. KPIs set for BCM implementation and maintenance. BCM responsibilities reviewed by the organisations audit process. Analysis of stakeholder obligations and expectations. Listing of statutory duties Documented procedures for identifying and reviewing key services and products. Executive board minutes confirming key services and products. Documentation detailing critical functions, processes and supporting resources. Mapping of critical suppliers and partners Documented procedures to review and rank risk. Identification of single points of failure Documented evidence of risk mitigation covering people, systems, information, premises and equipment and suppliers.. A structured business impact analysis (BIA) process exists for the organisation that prioritises key services and products

21 Determining BC Strategies Developing and Implementing a BCM Response key service or product Development of appropriate strategies to limit, over time, the impact of the loss of key services and products on the organisation and its stakeholders Development of strategies to minimise supplier disruption. Generic business continuity plans (BCPs) are developed which are flexible enough to maintain continuity of key services and products through a range of disruptive events A clear procedure exists for invoking the BCPs and delivering the response BCPs have cleared ownership and are signed off at the appropriate level. Appointment of a BCM team that is trained to deliver the BCPs A clear procedure exists that ensures internal and external stakeholders are aware of what actions the organisation s will take if BCPs are activated Ensuring communications with stakeholders at the time of disruption to key services and products Ensuring latest BCPs and supporting materials are always available. BCPs linked to other event plans within and without the organisation. A documented BIA that covers the key services and products of the organisation. Executive board minutes confirming BIA. Documented strategies to support each key service and product. Strategies cover: people, premises, technology, information, supplies and stakeholders. Strategies take account of other Category 1 responder s actions, including those undertaken in an emergency situation. Executive board minutes confirming strategy selection and their required resource allocations. Procurement policies for key supplies that require BCM to be incorporated into supply contracts. Evidence of BCM included in supply contracts. Alternative suppliers identified. Structure and procedures for developing BCM plans. Reports. Meeting minutes Plans are clear, unambiguous and easy to use. Documented evidence of consultation with relevant staff in functional units and incorporation of feedback during plan development. BCM plans identify objectives, personnel involved, and command and control arrangements BCPs contain references to other sources of relevant information, advice and other documentation. Documented invocation and response procedures Key staff are identified in plans. Call out lists for BCM team members. It is clear who is responsible for ensuring that each section/department or site has a BCP. All BCPs are signed off by plan owners. Details of BCM team members. Training programme for BCM team members. Training record for BCM team members. A communications policy document. Letters, s, circulars, meeting minutes, internet and intranet pages which raise awareness of BCPs. BCPs contain arrangements for communicating with clients, customers, staff, stakeholders, partners, and the media. BCPs linked to Communication plans. Copies of plans and essential equipment/ documents (in electronic or hard copy) are easily available on and off- site. All plans are subject to document and version control processes. Links to emergency, recovery, major incident, communication plans, etc. are documented

22 Exercising Ensuring there is a balanced programme of exercise types which validates the full range of BCM capabilities Exercise programmes have clear objectives Records of regularly tested contact arrangements and exercises Planned exercises /test schedules. Exercise scenarios Maintaining Reviewing Ensuring there is a documented process for capturing and taking forward the lessons identified Ensuring that the BCPs are kept up to date Ensuring that when major changes to the organisation, the environment in which it operates or threat levels change the organisation s BCPs are reviewed and modified if appropriate. A clear mechanism is in place for measuring the effectiveness of BCM arrangements Ensuring that the review process drives improvement by identifying lessons, and appropriate action is taken Notes of exercise debriefs, lessons learnt reports. Exercise review report to relevant management team. Action plans. Review of actions at plan preparation/review meetings. Evidence that the lessons learnt from exercises have been incorporated into BCPs. There is an established and documented BCP review process. BCP review is built into the business planning cycle. Notes from review meetings. Issue of version controlled updates and acknowledgement systems for recipients There is a mechanism to identified trigger BCP review points. Notes from review meetings. Actions plans Review of actions at plan preparation/review meetings BCM review programme Self assessment reports Internal audit reports Benchmarking against standards (e.g. BS25999) and guidelines External reviews by peers from other services, partner authorities, etc. Review reports to relevant management team. Action plans. Review of actions at BCM review meetings. Evidence that the lessons learnt from reviews have been incorporated into the organisations BCM processes

23 Document group: Document has part: (Man. If applicable. Delete this field if not applicable.) Document Category: (For Corporate documents. Delete this field if not applicable. Man. If applicable) Document keywords: Document type: (Man.) Originating Dept/Working Group(s): (Man.) Author. Last name, first name: (Man.) Author. Job title: (Man.) Author. (Man.) Contributor(s). Job title and name/ and/or Contributor(s). Organization: Sponsoring Director. Last name, first name: (Man. where applicable) Sponsoring Director. Job title: (Man. where applicable) Approving body: (Man.) Date approved: Corporate Key Document Business Impact Analysis Business Continuity Example template Audit Checklist Clinical/Patient Related Health and Safety Business Continuity, Risk Assessment, Business Impact Analysis Policy Clinical Governance, Risk Management Department Leach, Katherine Acting Risk Manager Peter Gorin- Associate Director Clinical Governance Sue Hardy- Director of Nursing and Quality Hardy, Sue Director of Nursing and Quality Executive Management Team The date on which the policy was approved by the relevant approving body (Executive Management Team, Trust Board, or Department or Specialty meeting). This section will be completed by the Policy Coordinator on receipt of the document from the approving body. Documents sent to the Policy Co-ordinator for publication must be accompanied by the date on which they were approved. Dates should be entered in the format day-month-year, e.g

24 Date of creation: (Man.) Date of next review: (Man.) Retention period: (Man.) PFI involvement. Project liaison completed: (Man.) Date Impact Assessment completed (Man.) Refers to the following Trust policies: (Man. if applicable) December Years Yes To be completed Major Civil Incident Policy Flu Pandemic Policy

Meeting of Governing Body

Meeting of Governing Body Meeting of Governing Body Date: 7 August 2018 Time: 1.30pm Location: Clevedon Hall, Elton Rd, Clevedon, North Somerset, BS21 7RQ Agenda number: 10.3 Report title: Business Continuity Policy Report Author:

More information

GUIDANCE DOCUMENT FOR COMPLETION OF RESIDENTIAL CARE ESTABLISHMENTS BUSINESS CONTINUITY PLAN TEMPLATE WEST MIDLANDS

GUIDANCE DOCUMENT FOR COMPLETION OF RESIDENTIAL CARE ESTABLISHMENTS BUSINESS CONTINUITY PLAN TEMPLATE WEST MIDLANDS GUIDANCE DOCUMENT FOR COMPLETION OF RESIDENTIAL CARE ESTABLISHMENTS BUSINESS CONTINUITY PLAN TEMPLATE WEST MIDLANDS 1 st EDITION Page 1 of 1 INTRODUCTION This document is to be used in conjunction with

More information

Statement of Purpose. June Northampton General Hospital NHS Trust

Statement of Purpose. June Northampton General Hospital NHS Trust Statement of Purpose June 2016 Northampton General Hospital NHS Trust The statement of purpose is made in compliance with Care Quality Commission (Registration) Regulations 2009: Regulation 12 and Schedule

More information

Trust Management Structure July 2016

Trust Management Structure July 2016 Chief Executive Clare Panniker Managing Director Lisa Hunt Chief Medical Chief Nursing Chief Operating Chief Finance Trust Secretary Director of Strategy and Corporate Services Director of Human Resources

More information

Strategy for resilience and business continuity

Strategy for resilience and business continuity Strategy for Resilience and Business Continuity Date: 13 th August 2014 Version number: 2.0 Author: Dr Sarah Taylor, Director of Public Health Review Date: August 2017 If you would like this document in

More information

UCL MAJOR INCIDENT TEAM MAJOR INCIDENT PLAN. Managing and Recovering from Major Incidents

UCL MAJOR INCIDENT TEAM MAJOR INCIDENT PLAN. Managing and Recovering from Major Incidents UCL MAJOR INCIDENT TEAM MAJOR INCIDENT PLAN Managing and Recovering from Major Incidents June 2017 MAJOR INCIDENT PLAN - June 2017 Title Primary author (name and title) UCL Major Incident Plan (public

More information

BUSINESS CONTINUITY MANAGEMENT POLICY

BUSINESS CONTINUITY MANAGEMENT POLICY BUSINESS CONTINUITY MANAGEMENT POLICY UNIQUE REFERENCE NUMBER: AC/XX/068/V1.1 DOCUMENT STATUS: Approved by Audit & Gov Committee - 20 July 2017 DATE ISSUED: August 2017 DATE TO BE REVIEWED: August 2020

More information

Business Continuity Plan

Business Continuity Plan Business Continuity Plan March 2014 Version: 1.1 Ratified by: Quality Group Date ratified: Name of originator/author: Name of responsible committee/ individual: Julie Killingbeck NHS North Lincolnshire

More information

STATEMENT OF PURPOSE August Provided to the Care Quality Commission to comply with The Health & Social Care Act (2008)

STATEMENT OF PURPOSE August Provided to the Care Quality Commission to comply with The Health & Social Care Act (2008) 1. Trust Profile STATEMENT OF PURPOSE August 2015 Provided to the Care Quality Commission to comply with The Health & Social Care Act (2008) 1.1 Worcestershire Acute Hospitals NHS Trust was formed on 1

More information

Burton Hospitals NHS Foundation Trust

Burton Hospitals NHS Foundation Trust Statement of purpose Health and Social Care Act 2008 Statement of Purpose Health and Social Care Act 2008 Version : 10 Date : July 2017 Date of Next Review : 12 months Service Provider Full name: Address:

More information

Board of Directors Meeting

Board of Directors Meeting Board of Directors Meeting Date: 30 July 2008 Agenda item: 10.2, Part 1 Title: Prepared by: Presented by: Action required: Elaine Hobson, Director of Operations Elaine Hobson, Director of Operations The

More information

BUSINESS CONTINUITY PLAN

BUSINESS CONTINUITY PLAN Appendix 1. Official BUSINESS CONTINUITY PLAN Enter Department / Directorate Name Enter Section name Force Critical Functions The Force has 8 Critical Functions which must be maintained: To maintain effective

More information

DELIVERING THE LONDON QUALITY STANDARDS AND 7 DAY SERVICES

DELIVERING THE LONDON QUALITY STANDARDS AND 7 DAY SERVICES Enclosure I DELIVERING THE LONDON QUALITY STANDARDS AND 7 DAY SERVICES Trust Board Meeting Item: 13 Date: 25 th May 2016 Purpose of the Report: Enclosure: I To update the Board on the Trust s current performance

More information

CAMBRIDGESHIRE COMMUNITY SERVICES NHS TRUST BUSINESS CONTINUITY PLAN VERSION 7.0

CAMBRIDGESHIRE COMMUNITY SERVICES NHS TRUST BUSINESS CONTINUITY PLAN VERSION 7.0 CAMBRIDGESHIRE COMMUNITY SERVICES NHS TRUST BUSINESS CONTINUITY PLAN VERSION 7.0 Page 1 of 39 DOCUMENT PROCESS AND CONTROL Title: Synopsis: Who is it for: Cambridgeshire Community Services NHS Trust Business

More information

Information for patients

Information for patients Information for patients 18-Weeks Maximum Waiting Time from Referral to Treatment (RTT): What does this mean for you? Your rights under the NHS Constitution You have the right to access NHS services within

More information

Question 1 a) What is the Annual net expenditure on the NHS from 1997/98 to 2007/08 in Scotland? b) Per head of population

Question 1 a) What is the Annual net expenditure on the NHS from 1997/98 to 2007/08 in Scotland? b) Per head of population NHS SPENDING - SCOTLAND Question 1 a) What is the Annual net expenditure on the NHS from 1997/98 to 2007/08 in Scotland? b) Per head of population Question 2 a) Annual real (GDP deflated) increase in net

More information

Business Continuity Plan

Business Continuity Plan Business Continuity Plan Doc Ref: Sitt.149963 1 Contents 1. Executive Summary... 3 2. Objective of the Plan... 7 Definitions... 7 4. Scope of the Plan... 8 5. Stages of Activation of Business Continuity

More information

Candidate Information Pack. Clinical Lead Plastic Surgery & Burns

Candidate Information Pack. Clinical Lead Plastic Surgery & Burns Candidate Information Pack Clinical Lead Plastic Surgery & Burns Welcome from Professor Tim Briggs, National Director of Clinical Quality & Efficiency and Clinical Chair of the GIRFT Programme The original

More information

STATEMENT OF PURPOSE

STATEMENT OF PURPOSE STATEMENT OF PURPOSE This is the Statement of Purpose for Hull and East Yorkshire Hospitals NHS Trust as required by the Health and Social Care Act 2008 (regulated Activities) Regulations 2014 Schedule

More information

BUSINESS CONTINUITY MANAGEMENT POLICY

BUSINESS CONTINUITY MANAGEMENT POLICY BUSINESS CONTINUITY MANAGEMENT POLICY A GUIDE TO BUSINESS CONTINUITY AND SERVICE RECOVERY PLANNING Version 1.2 Ratified by BHR CCGs Governing Bodies Date ratified September 2016 Name of Director Lead Marie

More information

Business Continuity and Emergency Management. Policy Statement

Business Continuity and Emergency Management. Policy Statement Business Continuity and Emergency Management Policy Statement Owner DATE Amendments S. Rowe 29/09/2016 Policy Update P. Mould Draft Incident & BC Policy v-01 1. Introduction 1.2 Business Continuity Management

More information

Guidance notes on the role and function of Organic Old Age Psychiatry wards (NHS Lanarkshire)

Guidance notes on the role and function of Organic Old Age Psychiatry wards (NHS Lanarkshire) Guidance notes on the role and function of Organic Old Age Psychiatry wards (NHS Lanarkshire) Author: Dr Adam Daly, Consultant in Old Age Psychiatry, Clinical Director Old Age Psychiatry November 2014

More information

BUSINESS CONTINUITY PLANNING

BUSINESS CONTINUITY PLANNING BUSINESS CONTINUITY PLANNING May 2015 1 Version Version 1 Ratified By Date Ratified April 2013 Author(s) Responsible Committee / Officers Senior Management Team Date Issue April 2013 Review Date April

More information

Digital Dictation Project

Digital Dictation Project Digital Dictation Project Pam Green Data Quality Manager Business Case Improve the quality and efficiency of clinical correspondence to benefit patient care Digital dictation is a key enabler to support

More information

Job Planning Driving Improvement Ensuring success for consultants, the service and for improved patient care

Job Planning Driving Improvement Ensuring success for consultants, the service and for improved patient care Job Planning Driving Improvement Ensuring success for consultants, the service and for improved patient care Dr Jeremy Cashman Associate Medical Director Delivering successful job planning The 2003 contract

More information

JOB DESCRIPTION. Specialist Practitioner of Transfusion for Shrewsbury, Telford and surrounding community hospitals. Grade:- Band 7 Line Manager:-

JOB DESCRIPTION. Specialist Practitioner of Transfusion for Shrewsbury, Telford and surrounding community hospitals. Grade:- Band 7 Line Manager:- JOB DESCRIPTION Job Title:- Specialist Practitioner of for Shrewsbury, Telford and surrounding community hospitals. Grade:- Band 7 Line Manager:- Associate Director of Patient Safety Professionally Accountability

More information

Isle of Wight NHS Primary Care Trust:

Isle of Wight NHS Primary Care Trust: WESSEX FOUNDATION SCHOOL TRUST PROFILES Isle of Wight NHS Primary Care Trust Address Website The Trust and Hospital St Mary s Hospital Newport Isle of Wight PO30 5TG Tel: 01983 534 231 Fax: 01983 521 963

More information

Corporate Business Continuity Plan. Alison Whitehead, Head of Resilience. Fiona Noden, Director of Operations and Performance

Corporate Business Continuity Plan. Alison Whitehead, Head of Resilience. Fiona Noden, Director of Operations and Performance Trust Board Agenda Item 12. Date: 25.06.14 Title of Report Purpose of the report and the key issues for consideration/decision Corporate Business Continuity Plan The Corporate Business Continuity Plan

More information

Barnet Health Overview and Scrutiny Committee 6 October 2016

Barnet Health Overview and Scrutiny Committee 6 October 2016 Barnet Health Overview and Scrutiny Committee 6 October 2016 Title Health Tourism Report of Wards Status Urgent Key Enclosures Officer Contact Details Barnet Clinical Commissioning Group All Public No

More information

Agenda item 8.5. Meeting date: Meeting / committee: Board of Directors. 24 th June Title: Emergency Preparedness Annual Report 2013/14.

Agenda item 8.5. Meeting date: Meeting / committee: Board of Directors. 24 th June Title: Emergency Preparedness Annual Report 2013/14. Agenda item 8.5 Meeting / committee: Board of Directors Meeting date: 24 th June 2014 Title: Preparedness Annual Report 2013/14 Purpose: This report outlines and summarises the activities and actions undertaken

More information

Pharmacy Department PRE-REGISTRATION TRAINEE PHARMACIST INFORMATION PACK

Pharmacy Department PRE-REGISTRATION TRAINEE PHARMACIST INFORMATION PACK Pharmacy Department PRE-REGISTRATION TRAINEE PHARMACIST INFORMATION PACK 2 INDEX 1. Chelsea and Westminster Hospital 3 2. The Pharmacy 3 3. Services 3 4. Education and Training 5 5. Miscellaneous 5.1 Social

More information

Summarise the Impact of the Health Board Report Equality and diversity

Summarise the Impact of the Health Board Report Equality and diversity AGENDA ITEM 4.1 Health Board Report INTEGRATED PERFORMANCE DASHBOARD Executive Lead: Director of Planning and Performance Author: Assistant Director of Performance and Information Contact Details for further

More information

Policy Summary. Policy Title: Policy and Procedure for Clinical Coding

Policy Summary. Policy Title: Policy and Procedure for Clinical Coding Policy Title: Policy and Procedure for Clinical Coding Reference and Version No: IG7 Version 6 Author and Job Title: Caroline Griffin Clinical Coding Manager Executive Lead - Chief Information and Technology

More information

Hospital Generated Inter-Speciality Referral Policy Supporting people in Dorset to lead healthier lives

Hospital Generated Inter-Speciality Referral Policy Supporting people in Dorset to lead healthier lives NHS Dorset Clinical Commissioning Group Hospital Generated Inter-Speciality Referral Policy Supporting people in Dorset to lead healthier lives PREFACE This Document outlines the CCG s policy in respect

More information

Ambulatory Care Model

Ambulatory Care Model Ambulatory Care Model Hong Kong May 2013 Andrew Stripp Deputy Chief Executive & Chief Operating Officer Outline What is the Alfred Centre? How does it fit into Alfred Health service model Key aspects of

More information

Statement of Purpose Kerry General Hospital 2013

Statement of Purpose Kerry General Hospital 2013 Statement of Purpose Kerry General Hospital 2013 Table of Contents Introduction...3 Description of Services Provided...3 Kerry General Hospital Services...4 Models of service delivery and aligned resources

More information

NHS ST HELENS CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY PLAN AND INCIDENT RESPONSE PLAN VERSION 6

NHS ST HELENS CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY PLAN AND INCIDENT RESPONSE PLAN VERSION 6 NHS ST HELENS CLINICAL COMMISSIONING GROUP BUSINESS CONTINUITY PLAN AND INCIDENT RESPONSE PLAN VERSION 6 1 Type of document Target audience Policy All CCG Staff CCG Lead Author and contact number Document

More information

Statement of Purpose

Statement of Purpose Statement of Purpose Contents as set out in Schedule 3, The Care Quality Commission (Registration) Regulations 2009. Guy's and St Thomas' NHS Foundation Trust provides integrated hospital and community

More information

RTT Recovery Planning and Trajectory Development: A Cambridge Tale

RTT Recovery Planning and Trajectory Development: A Cambridge Tale RTT Recovery Planning and Trajectory Development: A Cambridge Tale Linda Clarke Head of Operational Performance Addenbrooke s Hospital I Rosie Hospital Apr 2014 May 2014 Jun 2014 Jul 2014 Aug 2014 Sep

More information

TRUST BOARD SAFETY AND QUALITY MONTHLY REPORT SEPTEMBER 2013

TRUST BOARD SAFETY AND QUALITY MONTHLY REPORT SEPTEMBER 2013 TRUST BOARD SAFETY AND QUALITY MONTHLY REPORT SEPTEMBER 2013 1. EXECUTIVE SUMMARY As reported to the Board last month, the reporting on safety and quality to the Trust Board has changed. Each month a summary

More information

Board of Directors. Approval Discussion Information Assurance

Board of Directors. Approval Discussion Information Assurance Report Title: Executive/NED Lead: Report author(s): Previously considered by: Board of Directors Tuesday, 31 October 17 Board Assurance Framework & Corporate Risk Register Ann Alderton, Company Secretary

More information

Key Objectives To communicate business continuity planning over this period that is in line with Board continuity plans and enables the Board:

Key Objectives To communicate business continuity planning over this period that is in line with Board continuity plans and enables the Board: Golden Jubilee Foundation Winter Plan 2016/2017 Introduction This plan outlines the proposed action that would be taken to deliver our key business objectives supported by contingency planning. This plan

More information

CLINICAL AND CARE GOVERNANCE STRATEGY

CLINICAL AND CARE GOVERNANCE STRATEGY CLINICAL AND CARE GOVERNANCE STRATEGY Clinical and Care Governance is the corporate responsibility for the quality of care Date: April 2016 2020 Next Formal Review: April 2020 Draft version: April 2016

More information

Trust Board Meeting: Wednesday 13 May 2015 TB

Trust Board Meeting: Wednesday 13 May 2015 TB Trust Board Meeting: Wednesday 13 May 2015 Title Update on Quality Governance Framework Status History For information, discussion and decision This paper has been presented to Quality Committee in April

More information

Incident Management Plan

Incident Management Plan Incident Management Plan Document Control Version 2 Name of Document NHS Guildford and Waverley CCG Incident Management Plan Version Date 1st October 2016 Owner Director of Governance and Compliance [Accountable

More information

Agenda Item. NHS Cumbria CCG Governing Body. 4 February Business Continuity Plan. Purpose of Report:

Agenda Item. NHS Cumbria CCG Governing Body. 4 February Business Continuity Plan. Purpose of Report: NHS Cumbria CCG Governing Body Agenda Item 4 February 2015 9 Business Continuity Plan Purpose of Report: Under the Civil Contingencies Act, Clinical Commissioning Groups have a duty to put in place business

More information

MISSION IMMEDIATE ACTIONS RESPONSIBILITIES. Triage of patients in Emergency Centre according to protocol

MISSION IMMEDIATE ACTIONS RESPONSIBILITIES. Triage of patients in Emergency Centre according to protocol TRIAGE OFFICER Triage of patients in Emergency Centre according to protocol Get briefing from Emergency Centre Medical Commander Triage patients as they arrive, according to protocol Preparation of areas

More information

Central Adelaide Local Health Network Clinical Directorate Structures

Central Adelaide Local Health Network Clinical Directorate Structures Central Adelaide Local Health Network Clinical Directorate Structures Consultation Paper February 2014 Version 2 Document Information and Revision History 1. Version 2. Date 3. Comment 1.0 12 February

More information

Briefing on the first stage of the Acute Services Review the clinical recommendations

Briefing on the first stage of the Acute Services Review the clinical recommendations Briefing on the first stage of the Acute Services Review the clinical recommendations Introduction Over 100 clinicians from our four main hospitals, GPs, NHS managers and patient representatives have been

More information

Greenwich CCG Business Continuity Plan. Interim Governance Consultant

Greenwich CCG Business Continuity Plan. Interim Governance Consultant Author(s) Interim Governance Consultant Version 1.1 Approval Date October 2016 Approving Body Greenwich Executive Group Review Date October 2017 Policy Category Operational Policy Reference Number 019

More information

NHS Waltham Forest Clinical Commissioning Group. Emergency Preparedness, Resilience and Response (EPRR) Policy

NHS Waltham Forest Clinical Commissioning Group. Emergency Preparedness, Resilience and Response (EPRR) Policy Waltham Forest CCG Emergency Preparedness, Resilience and Response (EPRR) policy NHS Waltham Forest Clinical Commissioning Group Emergency Preparedness, Resilience and Response (EPRR) Policy Authors: Nyasha

More information

Road Fuel Supply Disruption: Strategic Guidance for NHS Boards in Scotland. NHSScotland Resilience. Scottish Government

Road Fuel Supply Disruption: Strategic Guidance for NHS Boards in Scotland. NHSScotland Resilience. Scottish Government 1 Document Control Document Title Road Fuel Supply Disruption: Strategic Guidance for NHS Boards in Scotland Owner & contact details Scottish Government Sponsor Area Publication Date Future Review Date

More information

OP Action Plan Acute Hospital Outpatient Services. Outpatient Services Performance Improvement Programme

OP Action Plan Acute Hospital Outpatient Services. Outpatient Services Performance Improvement Programme OP Action Plan 2017 Acute Hospital Outpatient Services Outpatient Services Performance Improvement Programme 5 th May 2017 1. Introduction This action plan sets out the approach to outpatient waiting list

More information

MATERNITY SERVICES RISK MANAGEMENT STRATEGY

MATERNITY SERVICES RISK MANAGEMENT STRATEGY Trust Board Agenda Item 8.3 Enc 10 Appendix 1 January 2012 MATERNITY SERVICES NORTH CUMBRIA MATERNITY SERVICES RISK MANAGEMENT STRATEGY 2011-13 DOCUMENT CONTROL Author/Contact Head Of Midwifery / Clinical

More information

RTT Assurance Paper. 1. Introduction. 2. Background. 3. Waiting List Management for Elective Care. a. Planning

RTT Assurance Paper. 1. Introduction. 2. Background. 3. Waiting List Management for Elective Care. a. Planning RTT Assurance Paper 1. Introduction The purpose of this paper is to provide assurance to Trust Board in relation to the robust management of waiting lists and timely delivery of elective patient care within

More information

University Hospitals Bristol NHS Foundation Trust Organisation Structure

University Hospitals Bristol NHS Foundation Trust Organisation Structure University Hospitals Bristol NHS Foundation Trust Organisation Structure Chairman Chief Executive Non-Executive Directors: Executive Directors: Divisions: Women s & Children s Medicine Surgery, Head &

More information

Ref No 001/18. Incremental credit will be awarded in accordance with experience and qualifications.

Ref No 001/18. Incremental credit will be awarded in accordance with experience and qualifications. Post Title Consultant Oral and Maxillofacial Surgeon St. James s Hospital 15hrs / HSE Primary Care (Orthognathic) 16hrs / Our Lady s Children s Hospital Crumlin 8hrs. Ref No 001/18 Tenure Permanent This

More information

Getting started.. questions to consider when revising or developing your plans

Getting started.. questions to consider when revising or developing your plans Getting started.. questions to consider when revising or developing your plans DEFINING SERVICE / BUSINESS CONTINUITY Ensure the right people have the right information at the right time. 1. Understand

More information

BUSINESS CONTINUITY PLAN

BUSINESS CONTINUITY PLAN BUSINESS CONTINUITY PLAN Version 1.4 Name of Director Lead Marie Price Name of author Lisa Wood Date issued September 2016 Review date October 2017 Target audience All BHR CCGs Staff To be read in conjunction

More information

NHS Electronic Referrals Service. Paper Switch Off an update Digital Health Webinar 4 May 2018

NHS Electronic Referrals Service. Paper Switch Off an update Digital Health Webinar 4 May 2018 NHS Electronic Referrals Service Paper Switch Off an update Digital Health Webinar 4 May 2018 Aims of Session Introductions and refresh of Paper Switch Off Sharon Wilson Implementation manager NHS Digital

More information

NHS Wales Delivery Framework 2011/12 1

NHS Wales Delivery Framework 2011/12 1 1. Introduction NHS Wales Delivery Framework for 2011/12 NHS Wales has made significant improvements in targeted performance areas over recent years. This must continue and be associated with a greater

More information

Hygiene Services Assessment Scheme

Hygiene Services Assessment Scheme Hygiene Services Assessment Scheme Assessment Report October 2007 Mater Misericordiae University Hospital Table of Contents 1.0 Executive Summary... 3 1.1 Introduction... 3 1.2 Organisational Profile...

More information

The Royal Wolverhampton NHS Trust

The Royal Wolverhampton NHS Trust The Royal Wolverhampton NHS Trust Trust Board Report Meeting Date: 25 April 2016 Title: Executive Summary: Action Requested: Report of: Author: Contact Details: Resource Implications: Public or Private:

More information

Craigavon Area Hospital Profile

Craigavon Area Hospital Profile Craigavon Area Hospital Profile 2012 Craigavon Area Hospital Profile Craigavon Area Hospital is located in Craigavon, County Armagh and is an essential part of the hospital network provided by the Southern

More information

Number of Fixed Term Staff Band Non-Clinical Temporary Staff Band

Number of Fixed Term Staff Band Non-Clinical Temporary Staff Band October 2011 We are a National NHS Charity Network and would like to identify which trusts we can benefit the most with the following information: 1. How many temporary staff does the organisation currently

More information

Business Continuity Management System. Business Continuity Procedure

Business Continuity Management System. Business Continuity Procedure Business Continuity Management System Business Continuity Procedure Reference no: P_CoG_01 Version: 2 Ratified by: LCHS Trust Board Date ratified: 14 th November 2017 Name of originator/author Ali Biegaj

More information

Regulations and their potential for limiting clinical negligence. Stuart Whittaker

Regulations and their potential for limiting clinical negligence. Stuart Whittaker Regulations and their potential for limiting clinical negligence Stuart Whittaker Relationship between quality of service provision and reducing the probability of clinical negligence and / or medical

More information

Ayrshire and Arran NHS Board

Ayrshire and Arran NHS Board Paper 12 Ayrshire and Arran NHS Board Monday 9 October 2017 Planned Care Performance Report Author: Fraser Doris, Performance Information Analyst Sponsoring Director: Liz Moore, Director for Acute Services

More information

Job Description. CNS Clinical Lead

Job Description. CNS Clinical Lead Job Description CNS Clinical Lead POST: BASE: ACCOUNTABLE TO: REPORTS TO: RESPONSIBLE FOR: CNS Clinical Lead St John s Hospice Head of Nursing and Quality Head of Nursing and Quality Community Clinical

More information

Agenda Item No: 6.2 Enclosure: 4 17/1/02012 Intended Outcome:

Agenda Item No: 6.2 Enclosure: 4 17/1/02012 Intended Outcome: TRUST BOARD Date of Meeting: Agenda Item No: 6.2 Enclosure: 4 17/1/02012 Intended Outcome: For noting For information For decision Title of Report: Update on Clinical Strategy Aims: To brief Trust Board

More information

NHS England (South) Surge Management Framework

NHS England (South) Surge Management Framework NHS England (South) Surge Management Framework THIS PAGE HAS BEEN LEFT INTENTIONALLY BLANK 2 NHS England (South) Surge Management Framework Version number: 1.0 First published: August 2015 Prepared by:

More information

Stewart Mason, Emergency Planning and Resilience Officer Tom Jones, Clinical Programme Manager

Stewart Mason, Emergency Planning and Resilience Officer Tom Jones, Clinical Programme Manager Paper 8 Recommendation DECISION NOTE Reporting to: The Trust Board is asked to RECEIVE and APPROVE the Emergency Department Service Continuity Plan (Princess Royal Hospital site). Trust Board Date Thursday

More information

HEALTH AND SAFETY POLICY

HEALTH AND SAFETY POLICY NHS GREATER GLASGOW AND CLYDE HEALTH AND SAFETY POLICY November 2015 Lead Manager: K. Fleming Head of Health and Safety Responsible Director A. MacPherson Director of Human Resources and Organisational

More information

Health Facility Guidelines

Health Facility Guidelines Health Facility Guidelines Template - Role Delineation Matrix XYZ Hospital, Abu Dhabi Introduction: Role Delineation refers to a level of service that describes the complexity of the clinical activities

More information

NHS Commissioning Board Core Standards for Emergency Preparedness, Resilience and Response (EPRR)

NHS Commissioning Board Core Standards for Emergency Preparedness, Resilience and Response (EPRR) NHS Commissioning Board NHS Commissioning Board Core Standards for Emergency Core Standards for Emergency Preparedness, Resilience and Preparedness, Resilience and Response (EPRR) Response (EPRR) 1 P a

More information

Report to the Board of Directors 2015/16

Report to the Board of Directors 2015/16 Attachment 9 Report to the Board of Directors 2015/16 Date of meeting 18 Subject Report of Prepared by Seven Day Services Medical Director Ashling Rivá, Project Manager Previously considered by Transformation

More information

NAME SPECIALTY PLEASE NOTE THAT THE CONSULTANT SURGEONS RUN A 4 WEEK ROLLING ROTA OF ACTIVITY. (HENCE THE 'BUSY' JOB PLAN)

NAME SPECIALTY PLEASE NOTE THAT THE CONSULTANT SURGEONS RUN A 4 WEEK ROLLING ROTA OF ACTIVITY. (HENCE THE 'BUSY' JOB PLAN) CONSULTANT CONTRACT JOB PLAN NAME SPECIALTY PLEASE NOTE THIS IS INTENDED AS A GUIDE ONLY. AN FORMAL JOB PLAN WILL BE DEVISED WITH THE SUCCESFUL CANDIDATE TO TAKE ACCOUNT OF PERSONAL INTERESTS AND SPECIALTY

More information

Business Continuity Management Policy and Plan Contacts removed

Business Continuity Management Policy and Plan Contacts removed Business Continuity Management Policy and Plan Contacts removed VERSION CONTROL Version: 5.0 Ratified by: Governing Body Date ratified: 20 September 2017 Name of originator/author: Name of reviewers: Name

More information

Public Services Reform (Scotland) Bill. Scottish Independent Hospitals Association

Public Services Reform (Scotland) Bill. Scottish Independent Hospitals Association Public Services Reform (Scotland) Bill Scottish Independent Hospitals Association The following submission is presented to the Health and Sport Committee of the Scottish Government as an outline of the

More information

Referral Guidance DIRECT REFERRAL SERVICE FOR THE ELDERLY DEAF

Referral Guidance DIRECT REFERRAL SERVICE FOR THE ELDERLY DEAF Referral Guidance A & E GPs are strongly requested to contact the specialty teams DIRECTLY WHEN APPROPRIATE to avoid unnecessary delays for their patients in A & E. Relevant non-urgent conditions can be

More information

Community Nurses Module

Community Nurses Module Community Nurses Module Community nurses are registered health professionals who provide care in the community at people s homes, residential homes, schools, local surgeries and health centres. The Community

More information

Kingston CCG Emergency Preparedness, Resilience and Response (EPRR) Policy

Kingston CCG Emergency Preparedness, Resilience and Response (EPRR) Policy M7 Kingston CCG Emergency Preparedness, Resilience and Response (EPRR) Policy Author: Luke Lambert Senior Associate Business Resilience, South East CSU Document Control Review and Amendment History Version

More information

Community and Mental Health Services High Level Market Research PROSPECTUS

Community and Mental Health Services High Level Market Research PROSPECTUS and Mental Health Services High Level Market Research PROSPECTUS February 2014 Supporting people in Dorset to lead healthier lives NHS DORSET CLINICAL COMMISSIONING GROUP PROSPECTUS FOR COMMUNITY AND MENTAL

More information

corporate management plan

corporate management plan corporate management plan 2012-2013 2 Contents 1. Introduction 2. Overview of the Trust 3. Our purpose, values and core objectives 4. Safety & Quality Corporate Objectives 5. Modernisation Corporate Objectives

More information

TRUST BOARD SEPTEMBER Surgical Services Reconfiguration

TRUST BOARD SEPTEMBER Surgical Services Reconfiguration def Agenda item: 8 (i) TRUST BOARD SEPTEMBER 2011 Surgical Services Reconfiguration PURPOSE: PREVIOUSLY CONSIDERED BY: To provide the Trust Board with an update on plans to reconfigure the Trust s surgical

More information

Interpretation and Translation Services Policy

Interpretation and Translation Services Policy Interpretation and Translation Services Policy This is a new procedural document. Did you print this document yourself? The Trust discourages the retention of hard copies of policies and can only guarantee

More information

Unannounced Theatre Inspection Report

Unannounced Theatre Inspection Report Unannounced Theatre Inspection Report Perth Royal Infirmary NHS Tayside 12 13 July 2017 www.healthcareimprovementscotland.org The Healthcare Environment Inspectorate was established in April 2009 and is

More information

Premises Assurance Model

Premises Assurance Model Premises Assurance Model NHS PAM structure and content The NHS PAM has two distinct but complimentary parts: Self assessment questions (SAQs) supporting quality and safety compliance Metrics: supporting

More information

Hygiene Services Assessment Scheme. Assessment Report October Our Lady s Hospital for Sick Children, Crumlin

Hygiene Services Assessment Scheme. Assessment Report October Our Lady s Hospital for Sick Children, Crumlin Hygiene Services Assessment Scheme Assessment Report October 2007 Our Lady s Hospital for Sick Children, Crumlin 1 Table of Contents 1.0 Executive Summary...3 1.1 Introduction...3 1.2 Organisational Profile...7

More information

Diagnostic Imaging, Peterborough

Diagnostic Imaging, Peterborough Diagnostic Imaging, Peterborough TRUST & DEPARTMENTAL RUST & D STRATEGY.. To be a major provider in eastern England that is best for patients and great to work for. OUR STRATEGY HAS ASSOCIATED PILLARS

More information

Date ratified November Review Date November This Policy supersedes the following document which must now be destroyed:

Date ratified November Review Date November This Policy supersedes the following document which must now be destroyed: Document Title Reference Number Lead Officer Author(s) (name and designation) Ratified by Cleaning Policy NTW(O)71 James Duncan Deputy Chief Executive / Executive Director of Finance Steve Blackburn Deputy

More information

Appendix 1 MORTALITY GOVERNANCE POLICY

Appendix 1 MORTALITY GOVERNANCE POLICY Appendix 1 MORTALITY GOVERNANCE POLICY 1 Policy Title: Executive Summary: Mortality Governance Policy For many people death under the care of the NHS is an inevitable outcome and they experience excellent

More information

UNIVERSITY HOSPITALS OF MORECAMBE BAY NHS FOUNDATION TRUST TRUST BOARD

UNIVERSITY HOSPITALS OF MORECAMBE BAY NHS FOUNDATION TRUST TRUST BOARD UNIVERSITY HOSPITALS OF MORECAMBE BAY NHS FOUNDATION TRUST TRUST BOARD Date of meeting: 25 July 2012 Title / Subject: Vascular Services at UHMBFT; the Impact of Centralising Inpatient and Emergency Vascular

More information

Emergency Preparedness, Resilience and Response Annual Report 2015

Emergency Preparedness, Resilience and Response Annual Report 2015 TAUNTON & SOMERSET NHS FOUNDATON TRUST Emergency Preparedness, Resilience and Response Annual Report 2015 Report to: Trust Board on 27 January 2016 Purpose of the Report: (Please type in Bold) To provide

More information

Capacity Plan. incorporating the Resourcing Escalatory Action Plan. (copy for external circulation)

Capacity Plan. incorporating the Resourcing Escalatory Action Plan. (copy for external circulation) Capacity Plan incorporating the Resourcing Escalatory Action Plan (copy for external circulation) Index No: Capacity Plan (REAP) Page 1 of 8 1. BACKGROUND 1.1. For many years the London Ambulance Service

More information

Preceptorship (Multi-Professional) Policy

Preceptorship (Multi-Professional) Policy Trust Policy and Procedure Document Ref. No: PP (17) 231 Preceptorship (Multi-Professional) Policy For use in: For use by: For use for: Document owner: Status: Supporting all newly registered clinical

More information

Major Incident & Business Continuity Management System

Major Incident & Business Continuity Management System Major Incident & Business Continuity Management System And Roles and Responsibilities Guidance Version: 7.3 Executive Lead: Lead Author: Executive Director Quality & Safety Head of Facilities and Maintenance

More information

Diagnostic Testing Procedures in Neurophysiology V1.0

Diagnostic Testing Procedures in Neurophysiology V1.0 V1.0 10 September 2012 Table of Contents 1. Introduction... 3 2. Purpose of this Policy/Procedure... 3 3. Scope... 3 4. Definitions / Glossary... 3 5. Ownership and Responsibilities... 3 5.2. Role of the

More information

Standardising Acute and Specialised Care Theme 3 Governance and Approach to Hospital Based Services Strategy Overview 28 th July 2017

Standardising Acute and Specialised Care Theme 3 Governance and Approach to Hospital Based Services Strategy Overview 28 th July 2017 Standardising Acute and Specialised Care Theme 3 Governance and Approach to Hospital Based Services Strategy Overview 28 th July 2017 Background Theme 3 builds upon previous key strategic commissioning

More information

The Royal Wolverhampton NHS Trust & Wolverhampton CCG consultation on proposals to deliver planned care at Cannock Chase Hospital

The Royal Wolverhampton NHS Trust & Wolverhampton CCG consultation on proposals to deliver planned care at Cannock Chase Hospital The Royal Wolverhampton NHS Trust & Wolverhampton CCG consultation on proposals to deliver planned care at Cannock Chase Hospital Introduction Supplementary Briefing Paper This paper provides more detailed

More information