1 Appendix Borders NHS Board MANAGEMENT OF WAITING TIMES Aim This paper aims to provide the Board with a clear picture of how Waiting Lists are managed within NHS Borders. Background NHS Borders have always regularly monitored Waiting Times against national targets using appropriate national guidance, however recently there has been additional focus on this nationally. Summary Waiting Times within NHS Borders are managed in a way that is in keeping with the letter and spirit of the national guidance, and where these are unclear there is a local procedure manual in place. Operationally any issues which emerge during the year or revisions to national guidance are dealt with by the Access Management Group in the first instance. Recommendation The Board is asked to note this report Policy/Strategy Implications Consultation Consultation with Professional Committees Risk Assessment Compliance with Board Policy requirements on Equality and Diversity Resource/Staffing Implications Review of Waiting Times management processes 1

2 Appendix Approved by Name Designation Name Designation Jane Davidson Chief Operating Rachel Bacon General Manager - Officer Acute Author(s) Name Designation Name Designation Steven Litster Waiting Times Coordinator 2

3 Management of Waiting Times Aim This paper sets out the current position of NHS Borders Waiting Times and gives an overview of the processes which are in place to manage these. Background There are a number of individual targets currently in operation however this report comments exclusively on Stage of Treatment, 18 Weeks Referral to Treatment and Cancer Waiting Times. Stage of Treatment Targets The national Stage of Treatment (SOT) targets are that all outpatients should be seen within 12 weeks of referral, and patients listed for inpatient / day case surgery should receive this within 9 weeks of being added to the waiting list. At 31 st March 2012 NHS Borders achieved these targets, with the exception of two inpatient / day cases and one outpatient (one of these patients declined treatment prior to 31 st March, one was medically unfit to receive treatment and one instance was due to an administrative error). This level of performance positions NHS Borders in a positive position when benchmarked nationally. The tables below have been extracted from the national publication of the end March position, with April performance also shown, although the information is not yet published: Inpatients Jan-12 Feb-12 Mar-12 Apr-12 Number on List Number Waiting >9 Weeks Outpatients Jan-12 Feb-12 Mar-12 Apr-12 Number on List 4,241 3,868 3,740 4,212 Number Waiting >12 Weeks The current forecast position for 31 st May shows that stage of treatment targets will continue to be successfully met. 18 Weeks / Referral to Treatment Target The 18 Week / Referral to Treatment standard came into effect from December The target states that 90% of patients should receive first treatment within 18 weeks of referral. The table below shows NHS Borders performance during the first three months of 2012: Percentage Achievement of Target Jan-12 Feb-12 Mar-12 Apr-12 (provisional) Non-Admitted 93.2% 93.9% 94.7% 95.4% Pathways Admitted 76.4% 77.8% 79.8% 75.2% Pathways Overall 90.2% 91.5% 92.1% 92.2% This new target was successfully achieved during the first three months of 2012, although there is room for improvement around admitted pathways (i.e. those patients for whom first treatment would be an operation) and plans are being put in place to achieve this over the next few months. Cancer Waiting Times ~ 1 ~

4 The national cancer waiting times target is that all patients referred with suspicion of cancer should receive first treatment within 62 days of referral, and all patients diagnosed with cancer should receive first treatment within 31 days of decision to treat. Percentage Achievement of Target Jan-12 Feb-12 Mar Day Patients 100% 95% 100% 31-Day Patients 100% 100% 100% Year End Position NHS Borders ended the financial year broadly delivering agreed waiting times targets, and this is expected to continue into There are particular challenges around capacity in Dermatology and ENT which are being addressed through our Demand and Capacity work, and Orthopaedics which is the focus of a separate project around the recruitment of an additional consultant and team of middle grade doctors. Approach to Delivery of Targets During During there was a distinct change of emphasis, moving away from delivering Stage of Treatment targets using short term waiting list initiatives towards measuring waiting times across an overall patient journey, using Demand and Capacity modelling to identify sustainable longer term solutions. The decline in Stage of Treatment performance reported during July December 2011 can be partially attributed to the challenges involved in implementing this work, and this had a significant knock-on effect in the volume of additional activity that was required during the first three months of During this year NHS Borders also moved toward an improved position on how it commission ed waiting list initiative work, began to place greater emphasis on measuring patients overall waits (in addition to the waiting times as measured according to national guidance) and strengthened the procedures around offering patients the opportunity of treatment at external locations (such as Golden Jubilee). Historically there have been some cases where NHS Borders has carried significant backlogs due to capacity shortages, particularly around ENT and Orthopaedic inpatients where on occasions waiting times for treatment locally have reached 9 12 months. In these instances patients were offered the opportunity of treatment at an alternative location within their stage of treatment target at an alternative provider, usually Golden Jubilee, Glasgow Nuffield or Woodlands Hospital in Darlington. Where this option was declined, as per national guidance this would record the patient as unavailable until an appropriate appointment was available locally. Although this would result in no detriment to the patient when being offered an appointment locally, where there were lengthy waiting times this could result in the period of unavailability being amended. Following recent initiatives, principally employment of a full time Orthopaedic locum and ENT locums on a part-time basis, significant inroads have been made into these backlogs, so that now the targets are broadly being met within local capacity, and recently only a small number of patients have been offered treatment externally. Where patients choose to wait for treatment locally this is now considered as declining a reasonable offer of an appointment and the patient s waiting times clock is reset. Rather than always sending these patients back to start again, where patients express a positive desire to wait for treatment locally, and if we have future capacity, we do try to accommodate this where there is an appointment available, even if just beyond the guarantee date. This is done by recording unavailability (in accordance with national guidelines). The lessons learned during this period will be invaluable as we seek to balance putting in place solutions which are sustainable in the long term whilst continuing the achieve targets in the short term. How We Manage Waiting Times ~ 2 ~

5 Acute Waiting Times within NHS Borders are primarily managed by the Waiting Times team within Borders General Hospital. There are regular weekly and monthly meetings where operational and capacity issues are discussed with the General Manager Acute, and Service Managers. A monthly meeting of the Access Management Group chaired by the Chief Operating Officer to provide strategic overview. Audit of Waiting Times Management Following coverage in the national press the Scottish Government has requested an in depth assessment of waiting times management processes across Scotland. The outcome of the last NHS Borders Internal Audit two years ago was a satisfactory rating, with the only particular area of concern being around monitoring of 18 week pathways. Reviewing the content of the PWC report into NHS Lothian Waiting Times highlights a number of issues, and whilst there is no suggestion that similar practices are being followed in NHS Borders, some processes have been identified as requiring improvement. The particular areas of concern highlighted in the PWC report related to: 1. Use of Periods of Unavailability PWC found that in NHS Lothian significant periods of unavailability were being applied retrospectively to prevent patients being reported as breaches with no evidence to support these changes. In Borders there are some issues relating to the application of unavailability, discussed earlier in this report, where information on the computer system isn t always kept up to date, leading to unavailability being applied retrospectively, but there is no suggestion that this is being done inappropriately. A review is currently underway of practices to ascertain whether some patients are being listed inappropriately for surgery, for example where they are known to be medically unfit for surgery or wish to defer treatment for extended periods. 2. Reporting In NHS Lothian information supplied to Senior Managers and through reporting lines to the Board was inconsistent with that available to Service Managers. In NHS Borders all information reported internally is extracted directly from Trak, although there are a small number of amendments made due to locked records on Trak. This is due to a particular problem with Trak, which will be resolved through the next system upgrade. 3. Culture and Governance In NHS Lothian the report states that there was a culture of no bad news, and clerical and lower level management staff were pressurised to find tactical solutions to waiting list problems. In NHS Borders there are regular meetings with General Manager and Service Managers to discuss and identify solutions to Waiting Times issues. During the year revised processes were put in place to ensure appropriate authorisation and review through the management lines to the Chief Operating Officer, of Waiting Times issues and outturns. Greater emphasis on Demand and Capacity work will ensure that all potential capacity problems will be openly identify and highlighted at the earliest possible opportunity. 4. Trak System Controls ~ 3 ~

6 NHS Lothian Senior Management had limited access to information available through Trak reports, giving little oversight that reports were amended between management levels. There are reports available through Business Objects which are available to senior managers within NHS Borders. However at present there are some issues with data quality on these reports, relating to the data items mentioned in (3). This is currently under review. 5. Working Practices and Guidance NHS Lothian had no finalised Waiting List Management Policy which reflected the implementation of New Ways guidance in NHS Borders put in place a revised Waiting Times Management Protocol to reflect the implementation of New Ways in 2007, and this was most recently revised in January As stated earlier in the report, action has already been taken to revise the processes which are used when patients decline the opportunity of treatment outwith NHS Borders (the main area of criticism in the PWC report), with further work ongoing around how patients who are unavailable for treatment are managed (through the scheduling projects) and some system configuration issues. The terms of reference for the Internal Audit to be held in August 2012 centre around ensuring that information held on the Patient Administration System is consistent with that held in the patient s casenotes and that there are processes in place to manage waiting times appropriately, including checking that information available to all levels of management (from operational staff to Scottish Government) is consistent. A second audit will also be carried out by Audit Scotland, which will focus on retrospective application of unavailability, although the full scope and methodology of this audit has yet to be developed. Anticipated Outcome for NHS Borders There are three main areas of concern that are likely to be highlighted locally as a result of the Audits that will be undertaken during These are: 1. Retrospective application of unavailability There are issues locally around retrospective unavailability as a significant amount of patient scheduling is carried out using paper based systems which are then replicated on the computer system, rather than the computer system being the primary system. Whilst there is no suggestion that unavailability is being applied incorrectly, it is often applied retrospectively in batches. Historically this often also happened where patients were offered and declined the opportunity of treatment at another hospital. To ensure that there was no detriment to the patient being offered an appointment locally as a result of declining treatment at another location, an appropriate period of unavailability would be applied after the patient had accepted a local appointment to ensure that this would not be reported as a breach. This was in accordance with national guidance and alternatively could have been recorded as a clock reset, but would be reported as unavailability being applied retrospectively. There are also issues around the degree flexibility offered when managing patients who either make themselves socially unavailable for periods of time or who are medically unavailable for lengthy periods. A review is underway of the process around both these groups of patients, as it is felt that these could be significantly improved. 2. Unknown Waits of 18 Week Pathway Patients Measurement of waiting times against 18 week pathways is carried out retrospectively (as this target is based on patients being treated rather than seen), however at present there are only limited processes in place to manage these patients prospectively. As a result of this, there are a number of patients where waiting times cannot be measured (this is a problem nationally, not just in NHS Borders) and it is essential that we put in place systems to achieve this. ~ 4 ~

7 In the longer term this functionality will be available through the Trak PMS (currently anticipated for March 2013), but it is essential that we put in place some processes before this date. Work is ongoing around this, concentrating initially on measuring overall waits for those patients on admitted pathways. 3. NHS Borders patients treated in Lothian There are particular issues around NHS Borders patients who receive treatment in NHS Lothian as part of an 18 week pathway. Where patients are initially seen within NHS Borders and referred on to Lothian, for example to receive a more specialist assessment of a condition, responsibility for treating the patient timeously remains with NHS Borders (the opposite would be true for Stage of Treatment waits where responsibility for the patients would rest with NHS Lothian). At present we are dependant upon NHS Lothian to monitor that they are treated within reasonable timescales. Addressing this will also become part of the solution to item (2) above. Summary & Next Steps Overall NHS Borders Waiting Times are reporting a good position with plans in place to improve these further. This will centre around four key pieces of work: 1. Local Waiting Times The Waiting Times targets that have been agreed by NHS Borders Access Management Group and we will work to during are: a. No inpatients / day cases waiting longer than 12 weeks for admission (the new national Treatment Time Guarantee) b. 95% achievement against 18 weeks target. c. 95% of cancer patients starting treatment within 31/62 days. d. No outpatients waiting longer than 12 weeks at month end. e. No inpatients waiting longer than 9 weeks at month end. We will aim to achieve 1, 3, 4 and 5 from 1 st April, with performance against the 18 weeks target currently sitting at 90% 95%. To support this work is ongoing to put in place systems to prospectively manage patients against 18 week pathways, particularly for those patients on admitted pathways. 2. Implementation of detailed Demand and Capacity monitoring Processes are currently being put in place to ensure that all services (beginning initially with consultant led services) have a Capacity Model which will show projected demand on the service and a plan of how this will be met. Services will then be monitored against these plans to ensure that these are delivered successfully. The aim is that each service will have a completed and agreed Capacity Model by end September Implementation of prospective monitoring of 18 week patient pathways Measurement of 18 week pathways is currently performed retrospectively, making it almost impossible to accurately predict and improve future performance. There is a module available within Trakcare to support prospective management of patients against an 18 week pathway, but this is not currently anticipated to be available until March In the interim work is underway to attempt to monitor some of these patients prospectively outwith Trak. Initially this will be focussed towards those patients on admitted pathways as this is where performance requires most improvement. ~ 5 ~

8 In parallel work will be carried out to analyse why those patients who breach do so, to identify where efforts should be targeted to improve performance at a whole system level. 4. Improvement of scheduling processes to maximise available capacity. Two significant projects are currently underway looking at our processes for scheduling patients for surgery and for outpatient appointments, to ensure that appointments are allocated appropriately and that clinical capacity is fully utilised. As part of this review we will also be looking at patient unavailability. ~ 6 ~

AUDIT SCOTLAND REPORT MANAGEMENT OF PATIENTS ON WAITING LISTS, FEBRUARY 2013 AND USE OF UNAVAILABILITY WITHIN NHS HIGHLAND.

AUDIT SCOTLAND REPORT MANAGEMENT OF PATIENTS ON WAITING LISTS, FEBRUARY 2013 AND USE OF UNAVAILABILITY WITHIN NHS HIGHLAND. Highland NHS Board 9 April 2013 Item 5.5 AUDIT SCOTLAND REPORT MANAGEMENT OF PATIENTS ON WAITING LISTS, FEBRUARY 2013 AND USE OF UNAVAILABILITY WITHIN NHS HIGHLAND. Report by Margaret Brown, Head of Service

More information

62 days from referral with urgent suspected cancer to initiation of treatment

62 days from referral with urgent suspected cancer to initiation of treatment Appendix-2012-87 Borders NHS Board PATIENT ACCESS POLICY Aim In preparation for the introduction of the Patients Rights (Scotland) Act 2011, NHS Borders has produced a Patient Access Policy governing the

More information

NHS BORDERS PATIENT ACCESS POLICY

NHS BORDERS PATIENT ACCESS POLICY NHS BORDERS PATIENT ACCESS POLICY 1. BACKGROUND NHS Borders is required by Scottish Government to deliver a consistent, safe, equitable and patient centred service to Borders patients within national waiting

More information

Report to NHS Greater Glasgow & Clyde

Report to NHS Greater Glasgow & Clyde www.pwc.co.uk Report to NHS Greater Glasgow & Clyde Internal Audit Report Waiting Times November 2012 FINAL REPORT Contents This report has been prepared solely for NHSGGC in accordance with the terms

More information

WAITING TIMES AND ACCESS TARGETS

WAITING TIMES AND ACCESS TARGETS NHS Board Meeting Tuesday 17 December 2013 Lead Director (Acute Services Division) Board Paper No 13/60 Recommendation: WAITING TIMES AND ACCESS TARGETS The NHS Board is asked to note progress against

More information

PATIENT RIGHTS ACT (SCOTLAND) 2011 ACCESS POLICY FOR TREATMENT TIME GUARANTEE

PATIENT RIGHTS ACT (SCOTLAND) 2011 ACCESS POLICY FOR TREATMENT TIME GUARANTEE NHS Board Meeting Tuesday 16 October 2012 Chief Operating Officer (Acute Services Division) Board Paper No. 12/45 PATIENT RIGHTS ACT (SCOTLAND) 2011 ACCESS POLICY FOR TREATMENT TIME GUARANTEE Recommendation:

More information

NHS LANARKSHIRE PATIENT ACCESS POLICY

NHS LANARKSHIRE PATIENT ACCESS POLICY NHS LANARKSHIRE PATIENT ACCESS POLICY 1. BACKGROUND NHS Lanarkshire is required by Scottish Government to deliver a consistent, safe, equitable and patient centred service to Lanarkshire patients within

More information

Report by Margaret Brown, Head of Service Planning & Donna Smith, Divisional General Manager, Patient Services, Raigmore

Report by Margaret Brown, Head of Service Planning & Donna Smith, Divisional General Manager, Patient Services, Raigmore Highland NHS Board 4 June 2013 Item 5.4 NHS HIGHLAND REVISED LOCAL ACCESS POLICY Report by Margaret Brown, Head of Service Planning & Donna Smith, Divisional General Manager, Patient Services, Raigmore

More information

NHS Highland Internal Audit Report Waiting Times November 2012

NHS Highland Internal Audit Report Waiting Times November 2012 Internal Audit Report Waiting Times November 2012 Internal Audit Report Waiting Times November 2012 1 Introduction... 1 2 Background... 1 3 Audit Approach... 2 4 Summary of Findings... 3 5 Executive Summary...

More information

WAITING TIMES 1. PURPOSE

WAITING TIMES 1. PURPOSE Agenda Item Meeting of Lanarkshire NHS Board 28 April 2010 Lanarkshire NHS board 14 Beckford Street Hamilton ML3 0TA Telephone 01698 281313 Fax 01698 423134 www.nhslanarkshire.org.uk WAITING TIMES 1. PURPOSE

More information

Ayrshire and Arran NHS Board

Ayrshire and Arran NHS Board Paper 12 Ayrshire and Arran NHS Board Monday 9 October 2017 Planned Care Performance Report Author: Fraser Doris, Performance Information Analyst Sponsoring Director: Liz Moore, Director for Acute Services

More information

WAITING TIMES AND ACCESS TARGETS

WAITING TIMES AND ACCESS TARGETS NHS Board Meeting Tuesday 17 February 2015 Chief Officer (Acute Services) Board Paper No.15/08 WAITING TIMES AND ACCESS TARGETS Recommendation: The NHS Board is asked to note progress against the national

More information

Reducing Elective Waits: Delivering 18 week pathways for patients. Programme Director NHS Elect Caroline Dove.

Reducing Elective Waits: Delivering 18 week pathways for patients. Programme Director NHS Elect Caroline Dove. Reducing Elective Waits: Delivering 18 week pathways for patients Programme Director NHS Elect Caroline Dove What I will cover 1. Why 18 Weeks is different 2. Where are we now 3. New models of delivery

More information

Inpatient, Day case and Outpatient Stage of Treatment Waiting Times

Inpatient, Day case and Outpatient Stage of Treatment Waiting Times Publication Report Inpatient, Day case and Outpatient Stage of Treatment Waiting Times Monthly and quarterly data to 31 December 2016 Publication date 28 February 2017 A National Statistics Publication

More information

~50 ~-~ (-) Duncan McNeil MSP Convener Health and Sport Committee The Scottish Parliament EDINBURGH EH991SP. \. January 2012

~50 ~-~ (-) Duncan McNeil MSP Convener Health and Sport Committee The Scottish Parliament EDINBURGH EH991SP. \. January 2012 Deputy First Minister and Cabinet Secretary for Health, Wellbeing and Cities Strategy Nicola Sturgeon MSP T: 0845 7741741 E: scottish.ministers@scotland.gslgov.uk ~ The Scottish Government Duncan McNeil

More information

Inpatient, Day case and Outpatient Stage of Treatment Waiting Times

Inpatient, Day case and Outpatient Stage of Treatment Waiting Times Publication Report Inpatient, Day case and Outpatient Stage of Treatment Waiting Times Monthly and quarterly data to 30 June 2017 Publication date 29 August 2017 A National Statistics Publication for Scotland

More information

Internal Audit. Waiting Times. August 2016

Internal Audit. Waiting Times. August 2016 August 2016 Report Assessment G G G This report has been prepared solely for internal use as part of NHS Lothian s internal audit service. No part of this report should be made available, quoted or copied

More information

Policy for Patient Access

Policy for Patient Access Policy for Patient Access DOCUMENT CONTROL Revision Date Old Version 10/12/2014 1.0 01/07/2016 1.1 30/04/17 1.2 Amendment General Management Review General Management Review General Management Review Authored

More information

NEW WAYS of defining and measuring waiting times

NEW WAYS of defining and measuring waiting times NEW WAYS of defining and measuring waiting times Applying the Scottish Executive Health Department guidance Version 3.0 December 2007 NHS National Services Scotland / Crown Copyright 2007 Version 3.0 published

More information

Committee is requested to action as follows: Richard Walker. Dylan Williams

Committee is requested to action as follows: Richard Walker. Dylan Williams BetsiCadwaladrUniversityHealthBoard Committee Paper 17.11.14 Item IG14_60 NameofCommittee: Subject: Summary or IssuesofSignificance StrategicTheme/Priority / Valuesaddressedbythispaper Information Governance

More information

Review of Follow-up Outpatient Appointments Hywel Dda University Health Board. Audit year: Issued: October 2015 Document reference: 491A2015

Review of Follow-up Outpatient Appointments Hywel Dda University Health Board. Audit year: Issued: October 2015 Document reference: 491A2015 Review of Follow-up Outpatient Appointments Hywel Dda University Health Board Audit year: 2014-15 Issued: October 2015 Document reference: 491A2015 Status of report This document has been prepared as part

More information

NHS FORTH VALLEY. Access Policy Version 2.9

NHS FORTH VALLEY. Access Policy Version 2.9 NHS FORTH VALLEY Access Policy Version 2.9 Date of First Issue 01/06/2012 Approved 01/09/2012 Current Issue Date 01/04/2017 Review Date 01/04/2019 Version 2.9 EQIA Yes 16/01/2013 Author / Contact Roslyn

More information

National Waiting List Management Protocol

National Waiting List Management Protocol National Waiting List Management Protocol A standardised approach to managing scheduled care treatment for in-patient, day case and planned procedures January 2014 an ciste náisiúnta um cheannach cóireála

More information

Inpatient, Day case and Outpatient Stage of Treatment Waiting Times

Inpatient, Day case and Outpatient Stage of Treatment Waiting Times Publication Report Inpatient, Day case and Outpatient Stage of Treatment Waiting Times Monthly and quarterly data to 30 June 2016 Publication date 30 August 2016 A National Statistics Publication for Scotland

More information

Author: Kelvin Grabham, Associate Director of Performance & Information

Author: Kelvin Grabham, Associate Director of Performance & Information Trust Policy Title: Access Policy Author: Kelvin Grabham, Associate Director of Performance & Information Document Lead: Kelvin Grabham, Associate Director of Performance & Information Accepted by: RTT

More information

Patient Access and Waiting Times Management. NHS Tayside Access Policy

Patient Access and Waiting Times Management. NHS Tayside Access Policy Tayside NHS Board Report 25 th October 2012 APPENDIX 1 Patient Access and Waiting Times Management NHS Tayside Access Policy Policy Manager Kerry Wilson Policy Group Policy Established September 2012 Policy

More information

Volunteering in NHS Scotland Developing Volunteering Toolkit Summary of Pilot

Volunteering in NHS Scotland Developing Volunteering Toolkit Summary of Pilot Volunteering in NHS Scotland Developing Volunteering Toolkit Summary of Pilot NG09-06a Introduction Direct volunteering has been evolving within the NHS for some time. For more than a decade a strong emphasis

More information

Referral to Treatment Pathways for Surgical Carpal Tunnel Syndrome Patients

Referral to Treatment Pathways for Surgical Carpal Tunnel Syndrome Patients Referral to Treatment Pathways for Surgical Carpal Tunnel Syndrome Patients A Report from the Musculoskeletal Audit on behalf of the Scottish Government The information in this report is intended to be

More information

Quality Indicator Local Use of Data

Quality Indicator Local Use of Data Quality Indicator Local Use of Data The clinical audit lead for each contributing site was contacted and asked to answer the following questions (in their own words) about the use of STAG data. In general,

More information

Waiting Times Recording Manual Version 5.1 published March 2016

Waiting Times Recording Manual Version 5.1 published March 2016 Waiting Times Recording Manual published March 2016 Title: Waiting Times Recording Manual Date Published: March 2016 Version: V5.1 Document status: Final Author: Martin McCoy Owner: Service Access Waiting

More information

Borders NHS Board. Appendix NHS BORDERS 2012/13 WINTER PERIOD REPORT. Aim

Borders NHS Board. Appendix NHS BORDERS 2012/13 WINTER PERIOD REPORT. Aim Borders NHS Board NHS BORDERS 2012/13 WINTER PERIOD REPORT Aim To update the Board on key activity relating to the 2012/13 winter period, specifically focussing on the festive period from 17 December to

More information

Annual Complaints Report 2014/15

Annual Complaints Report 2014/15 Annual Complaints Report 2014/15 1.0 Introduction This report provides information in regard to complaints and concerns received by The Rotherham NHS Foundation Trust between 01/04/2014 and 31/03/2015.

More information

Audiology Waiting Times

Audiology Waiting Times Publication Report Audiology Waiting Times Quarter ending 30 June 2012 Publication date 28 August 2012 Contents Contents... 1 Introduction... 2 Key points... 3 Results and Commentary... 4 Current waiting

More information

RTT Assurance Paper. 1. Introduction. 2. Background. 3. Waiting List Management for Elective Care. a. Planning

RTT Assurance Paper. 1. Introduction. 2. Background. 3. Waiting List Management for Elective Care. a. Planning RTT Assurance Paper 1. Introduction The purpose of this paper is to provide assurance to Trust Board in relation to the robust management of waiting lists and timely delivery of elective patient care within

More information

Child and Adolescent Mental Health Services Waiting Times in NHSScotland

Child and Adolescent Mental Health Services Waiting Times in NHSScotland Publication Report Child and Adolescent Mental Health Services Waiting Times in NHSScotland Quarter ending 30 September 2016 Publication date 6 December 2016 An Official Statistics Publication for Scotland

More information

SHEFFIELD TEACHING HOSPITALS NHS FOUNDATION TRUST EXECUTIVE SUMMARY REPORT TO THE TRUST BOARD HELD ON 18 NOVEMBER 2015

SHEFFIELD TEACHING HOSPITALS NHS FOUNDATION TRUST EXECUTIVE SUMMARY REPORT TO THE TRUST BOARD HELD ON 18 NOVEMBER 2015 SHEFFIELD TEACHING HOSPITALS NHS FOUNDATION TRUST EXECUTIVE SUMMARY REPORT TO THE TRUST BOARD HELD ON 18 NOVEMBER 2015 Subject: Supporting TEG Member: Authors: Status 1 Data Quality Baseline Assessment

More information

Key Objectives To communicate business continuity planning over this period that is in line with Board continuity plans and enables the Board:

Key Objectives To communicate business continuity planning over this period that is in line with Board continuity plans and enables the Board: Golden Jubilee Foundation Winter Plan 2016/2017 Introduction This plan outlines the proposed action that would be taken to deliver our key business objectives supported by contingency planning. This plan

More information

WAITING TIMES AND ACCESS TARGETS

WAITING TIMES AND ACCESS TARGETS NHS Board Meeting Tuesday 21 April 2015 Chief Officer (Acute Services) Board Paper No.15/17 WAITING TIMES AND ACCESS TARGETS Recommendation: The NHS Board is asked to note progress against the national

More information

18 Weeks Referral to Treatment (RTT) Standard Recovery Planning and Assurance Framework

18 Weeks Referral to Treatment (RTT) Standard Recovery Planning and Assurance Framework 18 Weeks Referral to Treatment (RTT) Standard Recovery Planning and Assurance Framework Vicky Scott Head of Delivery & Development (North West London) NHS Trust Development Authority Lyndsay Pendegrass

More information

Emergency Department Waiting Times

Emergency Department Waiting Times Publication Report Emergency Department Waiting Times (formerly Accident & Emergency Waiting Times) Quarter ending 30 June 2011 Publication date 30 August 2011 A National Statistics Publication for Scotland

More information

NHS performance statistics

NHS performance statistics NHS performance statistics Published: 8 th February 218 Geography: England Official Statistics This monthly release aims to provide users with an overview of NHS performance statistics in key areas. Official

More information

The aim of this report is to provide the Borders NHS Board with an overview of progress in the areas of Safe, Effective and Person Centred Care.

The aim of this report is to provide the Borders NHS Board with an overview of progress in the areas of Safe, Effective and Person Centred Care. Borders NHS Board CLINICAL GOVERNANCE AND QUALITY REPORT Aim The aim of this report is to provide the Borders NHS Board with an overview of progress in the areas of Safe, Effective and Person Centred Care.

More information

Diagnostic Waiting Times

Diagnostic Waiting Times Publication Report Diagnostic Waiting Times Quarter Ending 31 December 2015 Publication date 23 February 2016 A National Statistics Publication for Scotland Contents Introduction... 2 Key points... 3 Results

More information

The impact of a flu or norovirus outbreak could have a significant impact on health and social services and could involve:

The impact of a flu or norovirus outbreak could have a significant impact on health and social services and could involve: NHS National Waiting Times Centre Winter Plan 2010/11 Introduction This plan outlines the proposed action that would be taken to deliver our key business objectives supported by contingency planning. This

More information

TOPIC 9 - THE SPECIALIST PALLIATIVE CARE TEAM (MDT)

TOPIC 9 - THE SPECIALIST PALLIATIVE CARE TEAM (MDT) TOPIC 9 - THE SPECIALIST PALLIATIVE CARE TEAM (MDT) Introduction The National Institute for Clinical Excellence has developed Guidance on Supportive and Palliative Care for patients with cancer. The standards

More information

NHS performance statistics

NHS performance statistics NHS performance statistics Published: 14 th December 217 Geography: England Official Statistics This monthly release aims to provide users with an overview of NHS performance statistics in key areas. Official

More information

Clinical Governance report prepared for NHS Lanarkshire Board Report title Clinical Governance Corporate Report - October 2015

Clinical Governance report prepared for NHS Lanarkshire Board Report title Clinical Governance Corporate Report - October 2015 Page 1 of 22 Print :15/1/215 Page 2 of 22 Print :15/1/215 Quality Ambition: Safe NHS Lanarkshire aims to be the safest health and care system in Scotland with no avoidable deaths, reduction in avoidable

More information

NOTTINGHAM UNIVERSITY HOSPITAL NHS TRUST. PATIENT ACCESS MANAGEMENT POLICY (Previously known as Waiting List Management Policy) Documentation Control

NOTTINGHAM UNIVERSITY HOSPITAL NHS TRUST. PATIENT ACCESS MANAGEMENT POLICY (Previously known as Waiting List Management Policy) Documentation Control NOTTINGHAM UNIVERSITY HOSPITAL NHS TRUST PATIENT ACCESS MANAGEMENT POLICY (Previously known as Waiting List Management Policy) Documentation Control Reference CL/CGP/026 Approving Body Senior Management

More information

NHS Performance Statistics

NHS Performance Statistics NHS Performance Statistics Published: 8 th March 218 Geography: England Official Statistics This monthly release aims to provide users with an overview of NHS performance statistics in key areas. Official

More information

Internal Audit. Cardiac Perfusion Services. August 2015

Internal Audit. Cardiac Perfusion Services. August 2015 August 2015 Report Assessment A A R A This report has been prepared solely for internal use as part of NHS Lothian s internal audit service. No part of this report should be made available, quoted or copied

More information

REVIEW October A Report on NHS Greater Glasgow and Clyde s Consultation on Clyde Inpatient Physical Disability Services

REVIEW October A Report on NHS Greater Glasgow and Clyde s Consultation on Clyde Inpatient Physical Disability Services REVIEW October 2008 A Report on NHS Greater Glasgow and Clyde s Consultation on Clyde Inpatient Physical Disability Services Table of Contents 1. Summary 1 2. How NHS Greater Glasgow and Clyde conducted

More information

Audiology Waiting Times

Audiology Waiting Times Publication Report Audiology Waiting Times Quarter ending 30 September 2012 Publication date 27 November 2012 An Official Statistics Publication for Scotland Contents Introduction... 2 Key points... 3

More information

Inpatient and Community Mental Health Patient Surveys Report written by:

Inpatient and Community Mental Health Patient Surveys Report written by: 2.2 Report to: Board of Directors Date of Meeting: 30 September 2014 Section: Patient Experience and Quality Report title: Inpatient and Community Mental Health Patient Surveys Report written by: Jane

More information

Commissioning Policy

Commissioning Policy Commissioning Policy Consultant to Consultant Referrals Version 6.0 December 2017 Name of Responsible Board / Committee for Ratification: North Staffordshire CCG Stoke on Trent CCG Date Issued: November

More information

DRAFT 2. Specialised Paediatric Services in Scotland. 1 Specialised Services Definition

DRAFT 2. Specialised Paediatric Services in Scotland. 1 Specialised Services Definition Specialised Paediatric Services in Scotland 1 Specialised Services Definition Services provided for low numbers of patients. They require a critical mass of staff, facilities and equipment and are delivered

More information

GOVERNING BODY MEETING in Public 27 September 2017 Agenda Item 5.2

GOVERNING BODY MEETING in Public 27 September 2017 Agenda Item 5.2 GOVERNING BODY MEETING in Public 27 September 2017 Paper Title Report Author Neil Evans Turnaround Director Referral Management s Contributors John Griffiths Date report submitted 20 September 2017 Dean

More information

CLINICAL STRATEGY IMPLEMENTATION - HEALTH IN YOUR HANDS

CLINICAL STRATEGY IMPLEMENTATION - HEALTH IN YOUR HANDS CLINICAL STRATEGY IMPLEMENTATION - HEALTH IN YOUR HANDS Background People across the UK are living longer and life expectancy in the Borders is the longest in Scotland. The fact of having an increasing

More information

Pathway Resource Centre Care Home Service Children and Young People Meadow Mill Tranent EH33 1DT Telephone:

Pathway Resource Centre Care Home Service Children and Young People Meadow Mill Tranent EH33 1DT Telephone: Pathway Resource Centre Care Home Service Children and Young People Meadow Mill Tranent EH33 1DT Telephone: 01875 610794 Inspected by: Iain Lamb Type of inspection: Unannounced Inspection completed on:

More information

3.3 Overarching Steering Group Transforming Nursing and Midwifery Roles

3.3 Overarching Steering Group Transforming Nursing and Midwifery Roles TRANSFORMING NURSING AND MIDWIFERY ROLES Aim 1.1 To highlight to Committee the ongoing work the Scottish Government Chief Nursing Officer (CNO) office and Scottish Executive Nurse Directors (SEND) are

More information

Referral-to-Treatment for Knee Arthroscopies

Referral-to-Treatment for Knee Arthroscopies Referral-to-Treatment for Knee Arthroscopies A Report from the Musculoskeletal Audit Interpretive text from Colin Howie (Consultant Orthopaedic Surgeon, Royal Infirmary Edinburgh; Chairman, Scottish Committee

More information

Findings from the Balance of Care / NHS Continuing Health Care Census

Findings from the Balance of Care / NHS Continuing Health Care Census Publication Report Findings from the Balance of Care / NHS Continuing Health Care Census Census held 31 Publication date 23 June 2015 A National Statistics Publication for Scotland Contents Findings from

More information

Mental Health (Wales) Measure Implementing the Mental Health (Wales) Measure Guidance for Local Health Boards and Local Authorities

Mental Health (Wales) Measure Implementing the Mental Health (Wales) Measure Guidance for Local Health Boards and Local Authorities Mental Health (Wales) Measure 2010 Implementing the Mental Health (Wales) Measure 2010 Guidance for Local Health Boards and Local Authorities Januar y 2011 Crown copyright 2011 WAG 10-11316 F6651011 Implementing

More information

UNIVERSITY HOSPITALS OF MORECAMBE BAY NHS FOUNDATION TRUST BOARD OF DIRECTORS. Emergency Department Progress Report

UNIVERSITY HOSPITALS OF MORECAMBE BAY NHS FOUNDATION TRUST BOARD OF DIRECTORS. Emergency Department Progress Report UNIVERSITY HOSPITALS OF MORECAMBE BAY NHS FOUNDATION TRUST Date of meeting: 27 June Title / Subject: Status Purpose: Report of: Prepared by: BOARD OF DIRECTORS Public To update the Board of actions being

More information

Major Trauma Review Implications

Major Trauma Review Implications Meeting: NoSPG Date: 19 th February 2014 Item: 09/14 (a) NORTH OF SCOTLAND PLANNING GROUP Major Trauma Review Implications Introduction The National Planning Forum Major Trauma Sub Group developed a quality

More information

Integrated Performance Report Executive Summary (for NHS Fife Board Meeting) Produced in February 2018

Integrated Performance Report Executive Summary (for NHS Fife Board Meeting) Produced in February 2018 6b Integrated Performance Report Executive Summary (for NHS Fife Board Meeting) Produced in February 2018 2 Contents Integrated Performance Report: Executive Summary 5 Clinical Governance: Chair and Committee

More information

Access Management Policy

Access Management Policy Access Management Policy Document Type: Policy Version: 3.1 Date of Issue: April 2014 Review Date: April 2016 Lead Director: Post Responsible for Update: Ratifying Committee: Ratified by them in the minutes

More information

Child and Adolescent Mental Health Services Waiting Times in NHSScotland

Child and Adolescent Mental Health Services Waiting Times in NHSScotland Publication Report Child and Adolescent Mental Health Services Waiting Times in NHSScotland Quarter ending 30 June 2017 Publication date 5 September 2017 A National Statistics Publication for Scotland

More information

3. ORGANISATIONAL POSITION

3. ORGANISATIONAL POSITION JOB DESCRIPTION 1. JOB DETAILS Job Title: Responsible to: Appointment Co-ordinator, Days and Evenings Team Supervisor - Operational Department & Base: Job Reference Number: IM&T Health Information Management

More information

ISD Scotland Data Quality Assurance. Study on the Quality of Waiting Times Information

ISD Scotland Data Quality Assurance. Study on the Quality of Waiting Times Information ISD Scotland Data Quality Assurance Study on the Quality of Waiting Times Information January 2006 EXECUTIVE SUMMARY Introduction ISD Scotland undertook a national quality assurance study of data on waiting

More information

Intensive Psychiatric Care Units

Intensive Psychiatric Care Units NHS Greater Glasgow and Clyde Leverndale Hospital, Glasgow Intensive Psychiatric Care Units Service Profile Exercise ~ November 2009 NHS Quality Improvement Scotland (NHS QIS) is committed to equality

More information

Evaluation of NHS111 pilot sites. Second Interim Report

Evaluation of NHS111 pilot sites. Second Interim Report Evaluation of NHS111 pilot sites Second Interim Report Janette Turner Claire Ginn Emma Knowles Alicia O Cathain Craig Irwin Lindsey Blank Joanne Coster October 2011 This is an independent report commissioned

More information

Operational Focus: Performance

Operational Focus: Performance Operational Focus: Performance Sandra Iskander Changes for 2015/16 Change of focus of 18-weeks and A&E 4-hour wait targets as recommended by Sir Bruce Keogh, Medical Director, NHS England. 18-weeks to

More information

SCOTTISH BORDERS HEALTH & SOCIAL CARE INTEGRATED JOINT BOARD UPDATE ON THE DRAFT COMMISSIONING & IMPLEMENTATION PLAN

SCOTTISH BORDERS HEALTH & SOCIAL CARE INTEGRATED JOINT BOARD UPDATE ON THE DRAFT COMMISSIONING & IMPLEMENTATION PLAN Appendix-2016-59 Borders NHS Board SCOTTISH BORDERS HEALTH & SOCIAL CARE INTEGRATED JOINT BOARD UPDATE ON THE DRAFT COMMISSIONING & IMPLEMENTATION PLAN Aim To bring to the Board s attention the Scottish

More information

NHS Borders. Intensive Psychiatric Care Units

NHS Borders. Intensive Psychiatric Care Units NHS Borders Intensive Psychiatric Care Units Service Profile Exercise ~ November 2009 NHS Quality Improvement Scotland (NHS QIS) is committed to equality and diversity. We have assessed the performance

More information

Health Services. in Scotland

Health Services. in Scotland FINAL DRAFT DRAFT FOR CONSULTATION 20 June 19 August 2005 Resolving Clinical Conflicts Between Forensic Mental Health Services in Scotland Resolving Clinical Conflicts Page 1 of 10 CONTENTS: Page 1 Introduction

More information

Quality and Efficiency Support Team (QuEST) Directorate for Health Workforce and Performance

Quality and Efficiency Support Team (QuEST) Directorate for Health Workforce and Performance Quality and Efficiency Support Team (QuEST) Directorate for Health Workforce and Performance A Whole System Approach to Patient Flow for Scotland Our Quality Improvement Approach Jane Murkin Programme

More information

Integrated Performance Report

Integrated Performance Report Integrated Performance Report M06 September 2014 Presented by: Paul Bostock (Chief Operating Officer) Des Holden (Medical Director) Fiona Allsop (Chief Nurse) Paul Simpson (Chief Financial Officer) An

More information

Child and Adolescent Mental Health Services Waiting Times in NHSScotland

Child and Adolescent Mental Health Services Waiting Times in NHSScotland Publication Report Child and Adolescent Mental Health Services Waiting Times in NHSScotland Quarter ending 30 September 2017 Publication date 12 December 2017 A National Statistics Publication for Scotland

More information

Utilisation Management

Utilisation Management Utilisation Management The Utilisation Management team has developed a reputation over a number of years as an authentic and clinically credible support team assisting providers and commissioners in generating

More information

Summary of PLICS costing methodology used in IRF mapping. Detailed example of current methodology using acute inpatients

Summary of PLICS costing methodology used in IRF mapping. Detailed example of current methodology using acute inpatients Summary of PLICS costing methodology used in IRF mapping High level summary The patient level costing method (PLICS) was developed by NHS Highland to allow hospital costs to be attributed to patient activity

More information

Ayrshire and Arran NHS Board

Ayrshire and Arran NHS Board Paper 12 Ayrshire and Arran NHS Board Monday 26 March 2018 Financial Management Report for the 11 months to 28 February 2018 Author: Bob Brown, Assistant Director of Finance Governance and Shared Services

More information

Item No. 9. Meeting Date Wednesday 6 th December Glasgow City Integration Joint Board Finance and Audit Committee

Item No. 9. Meeting Date Wednesday 6 th December Glasgow City Integration Joint Board Finance and Audit Committee Item No. 9 Meeting Date Wednesday 6 th December 2017 Glasgow City Integration Joint Board Finance and Audit Committee Report By: Contact: Sharon Wearing, Chief Officer, Finance and Resources Allison Eccles,

More information

Findings from the 6 th Balance of Care / Continuing Care Census

Findings from the 6 th Balance of Care / Continuing Care Census Publication Report Findings from the 6 th Balance of Care / Continuing Care Census Census held 31 March Publication date 28 June A National Statistics Publication for Scotland Contents Contents... 1 About

More information

abcdefghijklm abcde abc a Health Department NHS HDL (2002)70 3 October 2002 Dear Colleague, THE MANAGEMENT OF WAITING LISTS IN NHSSCOTLAND Summary

abcdefghijklm abcde abc a Health Department NHS HDL (2002)70 3 October 2002 Dear Colleague, THE MANAGEMENT OF WAITING LISTS IN NHSSCOTLAND Summary NHS HDL (2002)70 abcdefghijklm Health Department St Andrew s House Regent Road Edinburgh EH1 3DG Dear Colleague, THE MANAGEMENT OF WAITING LISTS IN NHSSCOTLAND Summary 1. This HDL sets out an action plan

More information

The PCT Guide to Applying the 10 High Impact Changes

The PCT Guide to Applying the 10 High Impact Changes The PCT Guide to Applying the 10 High Impact Changes This Guide has been produced by the NHS Modernisation Agency. For further information on the Agency or the 10 High Impact Changes please visit www.modern.nhs.uk

More information

NORTH EAST ESSEX CLINICAL COMMISSIONING GROUP CONSULTANT TO CONSULTANT REFERRAL POLICY

NORTH EAST ESSEX CLINICAL COMMISSIONING GROUP CONSULTANT TO CONSULTANT REFERRAL POLICY PLEASE NOTE POLICY IS UNDER REVIEW NORTH EAST ESSEX CLINICAL COMMISSIONING GROUP CONSULTANT TO CONSULTANT REFERRAL POLICY Target Audience Brief Description (max 50 words) Action Required Providers, Commissioners

More information

NHS Dumfries and Galloway Patient Access Policy

NHS Dumfries and Galloway Patient Access Policy NHS Dumfries and Galloway Patient Access Policy Printed copies must not be considered the definitive version DOCUMENT CONTROL POLICY NO. Policy Group Author Version no. 1.3 Reviewer Waiting Times Group

More information

13. CLINICAL ACADEMIC CONSULTANTS (Note: To be read with the guidance associated with Section 13 issued as Annex C to NHS Circular PCS(DD)2004/2)

13. CLINICAL ACADEMIC CONSULTANTS (Note: To be read with the guidance associated with Section 13 issued as Annex C to NHS Circular PCS(DD)2004/2) 13. CLINICAL ACADEMIC CONSULTANTS (Note: To be read with the guidance associated with Section 13 issued as Annex C to NHS Circular PCS(DD)2004/2) INTRODUCTION The terms and conditions set out in this Section

More information

BOARD CLINICAL GOVERNANCE & QUALITY UPDATE MARCH 2013

BOARD CLINICAL GOVERNANCE & QUALITY UPDATE MARCH 2013 Borders NHS Board BOARD CLINICAL GOVERNANCE & QUALITY UPDATE MARCH 2013 Aim The aim of this report is to provide the Board with an overview of progress in the areas of: Patient Safety Person Centred Health

More information

WEST HAMPSHIRE PERFORMANCE REPORT. Based on performance data available as at 11 th January 2018

WEST HAMPSHIRE PERFORMANCE REPORT. Based on performance data available as at 11 th January 2018 WEST HAMPSHIRE PERFORMANCE REPORT Based on performance data available as at 11 th January 2018 1 CCG Quality and Performance Executive Summary Introduction: The purpose of this report is to provide an

More information

Equality Objectives Completion report

Equality Objectives Completion report Equality Objectives 2016-17 Completion report 1 Equality Objectives 2016-17 Completion report The Trust s Equality Objectives 2016-17 were developed based on the information in our published equality monitoring

More information

Internal Audit. Public Dental Service Accounts Receivable. December 2015

Internal Audit. Public Dental Service Accounts Receivable. December 2015 December 2015 Report Assessment A A A A A This report has been prepared solely for internal use as part of NHS Lothian s internal audit service. No part of this report should be made available, quoted

More information

NHS Ayrshire & Arran Adverse Event Management: Review of Documentation Supplementary Information Requested by NHS Ayrshire & Arran

NHS Ayrshire & Arran Adverse Event Management: Review of Documentation Supplementary Information Requested by NHS Ayrshire & Arran NHS Ayrshire & Arran Adverse Event Management: Review of Documentation Supplementary Information Requested by NHS Ayrshire & Arran April 2013 Background In February 2012, the Scottish Information Commissioner

More information

Community Triage NHS Greater Glasgow and Clyde Crisis Out of Hours CPN (Community Psychiatric Nurse) Service

Community Triage NHS Greater Glasgow and Clyde Crisis Out of Hours CPN (Community Psychiatric Nurse) Service Community Triage NHS Greater Glasgow and Clyde Crisis Out of Hours CPN (Community Psychiatric Nurse) Service Pilot Evaluation Report Community Triage NHS Greater Glasgow and Clyde Crisis Out of Hours CPN

More information

Trust Operational Policy. Elective Access

Trust Operational Policy. Elective Access Trust Operational Policy Elective Access Document Control Author/Contact Jo Henshaw, General Manager and Divisional Head of Performance, Scheduled Care Division. Document Reference 2077 Impact Assessment

More information

Item No. 15. Meeting Date Wednesday 14 th June Glasgow City Integration Joint Board Finance and Audit Committee

Item No. 15. Meeting Date Wednesday 14 th June Glasgow City Integration Joint Board Finance and Audit Committee Item No. 15 Meeting Date Wednesday 14 th June 2017 Glasgow City Integration Joint Board Finance and Audit Committee Report By: Contact: David Williams, Chief Officer Jim Charlton, Principal Officer Rights

More information

Appendix 1: South Lanarkshire H&SCP Improvement Plan 2017/18.

Appendix 1: South Lanarkshire H&SCP Improvement Plan 2017/18. Appendix 1: South Lanarkshire H&SCP Improvement Plan 2017/18. South Lanarkshire - Whole System Pathway Indicators identified capture key data across the whole H&SC system, primarily based around supporting

More information

NHS Greater Glasgow and Clyde Alison Noonan

NHS Greater Glasgow and Clyde Alison Noonan NHS Board Contact Email NHS Greater Glasgow and Clyde Alison Noonan alison.noonan@ggc.scot.nhs.uk Title Category Background/ context Problem Effective Discharge Planning and the Introduction of Delegated

More information

Regulatory Incident Management Policy

Regulatory Incident Management Policy Regulatory Document POLICIES AND PROCEDURES Regulatory Incident Management Policy (16 May 2017) Version control This version (2) of Qualifications Wales Regulatory Incident Management policy was approved

More information

CHAPTER TWO: WAITING LISTS AND BOOKING

CHAPTER TWO: WAITING LISTS AND BOOKING TWO: INTRODUCTION Managing waiting lists 2.1 Sometimes it seems that the NHS is primarily about waiting lists. Public perception focuses on waiting lists. Waiting lists provide media headlines. For those

More information