1 Governance Structure HfL Major Trauma Project
2 1. HfL Major Trauma Project Structure The governance arrangements for the Major Trauma project within the overall HfL Programme is illustrated below: London Commissioning Group Clinical Advisory Group HfL Programme Executive Group Major Trauma Commissioning & Finance Panel Major Trauma Project Board Major Trauma Clinical Expert Panel Accountable Reporting Advising Major Trauma Project Team Major Trauma Patient Panel 2
3 2.1 Major Trauma Project Board Members Chairman (SRO) Clinical Director Clinical Expert - Trauma Clinical Expert - Rehabilitation Project Manager Designation Lead Policy & Stakeholder Management Lead Simon Robbins Professor Matt Thompson Mike Walsh Lesley Johnson Shaun Danielli Tracy Parr Vacant Meeting Frequency Location Duration Monthly NHS London 1.5 hours The Project Board s role and responsibilities are as follows: Provides overall direction and management of the project Takes major decisions for the project and make recommendations for approval for PEG and LCG Accountable to the LCG for the success of the project Identifies and manages risks to project delivery and escalates issues to the Programme Executive Group as necessary Provides progress reports to the Programme Executive Group and LCG 3
4 2.2 Roles and responsibilities of the Project Board members Senior Responsible Officer Clinical Director Experts Oversees the development of the Project Initiation Documents Accountable to LCG for delivery and success of project Maintains communications with wider stakeholder community Provides monthly updates to LCG on progress of the project and escalates issues where necessary Ensures that there is a coherent organisational structure and robust project plan Monitors and controls progress of project including managing issues and risks and escalating to programme level if necessary Accountable to the CAG and LCG for the clinical safety and efficacy of the project Provides clinical leadership and advice for the project Acts as clinical advocate for the project Facilitates identifying other clinical representation within the project as necessary Engages with or develops pan-london professional networks established by the CAG Provides monthly updates to the CAG on the progress of the project Provide expert advice and support to the Project Manager Act as first point of contact for expert issues relating to the project Acts as advocates for the project Support the Clinical Director in engaging with pan-london professional networks established by the CAG Support the Project Manager in arranging and facilitating expert panels and multi-disciplinary workshops as necessary Support the Clinical Director in identifying appropriate clinical representation within the project as necessary 4
5 3.1 Major Trauma Clinical Expert Panel Members Expert Area Name Trust/PCT Region Clinical Director (Chair) Matt Thompson St Georges SWL Clinical Expert - Trauma Mike Walsh Royal London NEL Clinical Expert - Rehabilitation Lesley Johnson Therapies Advisor to DH DH Project Manager Shaun Danielli Healthcare for London London Public Health Shahed Ahmad NHS London London London Ambulance Service Fiona Moore LAS London HEMS Gareth Davies HEMS London A&E Andy Parfitt / Ben Teasdale Guys / Homerton SEL /NEL Paediatrics Ian Maconochie Imperial NWL Orthopaedic Surgeon Martin Bircher St Georges SW General Surgeon Karim Brohi Royal London NE L Cardiothoracic surgeon Andrew Cohen Brighton Brighton Neurosurgery Christos Tolias Kings SEL Anaesthetics David Ziederman Imperial NWL ICU Peter Shirley Royal London NEL Ward Nurse James Youngman UCLH NCL A&E Nurse Iain Taylor Imperial NWL Rehabilitation physician Clarence Liu Homerton NEL Rehabilitation OT/ Physio Beth Cordrey TH PCT NEL Social Services John Drew LB Redbridge Redbridge Max-Fax Surgeon Robert Bentley Kings SEL Blood Transfusion Shuhba Allard Royal London NEL GP Gary Marlowe Islington PCT NCL Plastic Surgeon Peter Dziewulski Mid Essex Essex Radiology Rob Morgan St Georges SWL Psychiatric/psychology Simon Fleminger South London & the Maudsley SEL Major Incident Planning Nursing Emergency Department Andy Wapling Tricia Fitzgerald NHS London Kings SHA SEL 5
6 3.1 Major Trauma Clinical Expert Panel Meeting Frequency Location Duration Monthly NHS London 1.5 hours The Clinical Expert Panel s role and responsibilities are as follows: Provides clinical input to the project from the wide range of clinical areas involved in Major Trauma Approves the clinical aspects of the project s deliverables Feeds in views and insights between the project and the CAG Acts as clinical advocates for the project Provide endorsement to deliverables produced by the projects Each member of the Clinical Expert Panel is responsible for representing the opinions and needs of their specialist clinical area to ensure that the project achieves the best clinical outcome for patients. 6
7 4.1 Major Trauma Commissioning & Finance Panel Meeting Frequency Location Duration Monthly NHS London 1.5 hours Membership Membership is made up of commissioning and finance representatives from PCTs situated within and bordering London. Collaborative Commissioning Group leads on the panel will be representing commissioning leads from PCTs within their CCG area. The Chair of the Major Trauma Commissioning Expert Panel will represent the panel as Chair of the Major Trauma Project Board. Terms of Reference The panel will: Consider and develop proposals on how London trauma services could be commissioned, Provide guidance to the Major Trauma Project from a commissioning perspective, Provide advice on how trauma services are currently commissioned to help support decision making and possible implementation of the project, Provide feedback on project papers and materials, Wherever appropriate, disseminate the work of the Major Trauma Project back to PCTs. 7
8 5.1 Major Trauma Patient Panel Meeting Frequency Location Duration Monthly NHS London 1.5 hours Membership Membership is made up of: People who have suffered major trauma, Family/carers of people who have suffered major trauma, Representatives from organisations who provide support and advice to families/carers and people with major trauma injuries, and Organisations who promote prevention, treatment and care of people affected by major trauma. The Chair of the Major Trauma Patient Panel will represent the panel as a member on the Major Trauma Clinical Expert Panel. Terms of reference The panel will: Provide London-wide guidance to the Major Trauma Project from the perspective of the patient or family/carer, Provide advice on the quality and provision of services to help support decision making and possible implementation of the project, Provide feedback on project papers and materials, Wherever appropriate, disseminate the work of the Major Trauma Project back to the member s organisation and/or the wider community. 8
9 6.1 Major Trauma Project Team Structure for Aug Jan 2009 Policy & Designation Advisor Project Manager Finance Lead Finance Support Project Administrator Designation Lead Rehabilitation Policy and Stakeholder Lead Designation Advisor Designation Stakeholder Management Finance Analyst Aug 08 Nov 08 Policy Prevention, Consultation & Bus Case Senior Analyst Designation Policy Designation Analysis Policy Commissioning & Performance Analyst Designation Finance & Analysis Paediatrics 9
10 6.2 Major Trauma Project Team Structure for Jan Jul 2009 Project Manager Finance Lead Project Administrator Designation Lead Policy and Stakeholder Lead Stakeholder Management Finance Analyst Policy Designation Analysis Finance & Analysis 10
11 7.1 Reporting responsibilities Report Purpose Responsible Timing LCG Dashboard Provides commentary on activities and milestones completed in previous month and planned for following month Provides commentary on key issues and risks and how these are being managed. Enables issues to be escalated to LCG for decision Provides a RAG status on overall position of project in terms of project progress, stakeholder management, resources and status of major issues or risks Policy & Stakeholder Management Lead On Tuesdays prior to LCG 4 Week look ahead Provides overview of key activities and milestones for project for the next four weeks. Policy & Stakeholder Management Lead On Tuesdays prior to PEG 6 month milestone plan Provides overview of key milestones for project or enabling strategy lead in next six months. Policy & Stakeholder Management Lead TBC 11
12 7.2 Reporting and Meeting Calendar MEETINGS & ACTIVITIES PEG report to PO PEG Clinical Director briefed for CAG CAG PEG report to PO PEG June rd June 05 th June 16 th June 20 th June 17 th June 19 th June July st July 03 July 14 th July 18 th July 22 nd July 24 th July August th Aug 07 th Aug no meeting no meeting 19 th Aug 21 st Aug September nd Sep 04 th Sep 22 nd Sep 26 th Sep 23 rd Sep 25 th Sep October th Oct 09 th Oct 13 th Oct 17 th Oct 21 st Oct 23 rd Oct November th Nov 06 th Nov 17 th Nov 21 st Nov 18 th Nov 20 th Nov December nd Dec 04 th Dec 15 th Dec 19 th Dec January th Jan 16 th Jan February rd Feb 27 th Feb March 09 tbc 23 rd Mar 27 th Mar tbc Reports/Briefings Meetings 12
13 7.3 Board Calendar MEETINGS & ACTIVITIES Report to LCG LCG Commissioning Expert Panel Patient Panel Clinical Expert Panel Major Trauma Board June th May 03 rd June 17 th June Did not meet 19 th June 27 th June July th June 01 st July 15 th July 22 nd July 24 th July 28 th July August th July 05 th Aug 19 th Aug 20 th Aug 21 st Aug 29 th Aug September th Aug 02 nd Sep 16 th Sep 16 th Sep 18 th Sep 24 th Sep October th Sep 07 th Oct 21 st Oct 21 st Oct 23th Oct 27 th Oct November th Oct 04 th Nov 18 th Nov 18 th Nov 20 th Nov 24 th Nov December th Nov 02 nd Dec 9 th Dec 9 th Dec 11 th Dec 29 th Dec January th Dec 06 th Jan 20 th Jan 20 th Jan 15 th Jan 26 th Jan February th Jan 03 rd Feb 17 th Feb 17 th Feb 19 th Feb 23 rd Feb March th Feb 03 rd Mar 17 th Mar 17 th Mar 19 th Mar 23 rd Mar Reports/Briefings Meetings 13
14 8 Change Control Deliverables approval hierarchy Project Plan Change & new activities Other Changes LCG Programme Executive Group Project Team Project Manager Change to plan does not affect deliverable delivery dates Change will affect delivery date of an activity but not of a deliverable Project Managers have identified in their Project Initiation Document (PID) the initial resource and budget requirements for their team. This may change over time and they should keep the PID updated accordingly. Any significant resource changes will need to be approved by the HfL Finance Director and, if necessary, the LCG. Project Board SRO & PEG Change will affect deliverable delivery date but not delay delivery of the overall project Scope change Expert Panel LCG Change will affect delivery of the overall project Scope change Project Team Project Office Related 14
Corporate Services Employment Report: January Employment by Staff Group. Jan 2018 (Jan 2017 figure: 1,462) Overall 1,
Corporate Services Employment Report: January Employment by Staff Group Jan (Jan 20 figure: 1,462) Jan % Overall 1,520 +58 +4.0% 8 Management (VIII+) 403 +52 4.8% Clerical & Supervisory (III to VII) 907
More informationWorkflow. Optimisation. hereweare.org.uk. hereweare.org.uk
Workflow Optimisation Dr. Paul Deffley & Jaivir Pall Clinical Lead & Commercial Lead About Here Not-for-profit social enterprise Membership organisation (our members are local GPs, Practice Managers, Practice
More informationService Transformation Report. Resource and Performance
SUMMARY REPORT Meeting Date: 31 May 2018 Agenda Item: 9.1 Enclosure Number: 9 Meeting: Trust Board (Part 1) Title: Author: Accountable Director: Other meetings presented to or previously agreed at: Service
More informationSutton Homes of Care Vanguard Programme
Sutton Homes of Care Vanguard Programme An Innovative End of Life Care model for care homes Kings Fund Conference 6 th December 2016 Corinne Campion, Clinical Nurse Specialist, Supportive Care Home Team
More informationUCLH CANCER COLLABORATIVE VANGUARD BOARD TERMS OF REFERENCE
UCLH CANCER COLLABORATIVE VANGUARD BOARD TERMS OF REFERENCE 1. PURPOSE & SCOPE Picking up the challenge and aspirations of the five year forward view and the Taskforce, the UCLH Collaborative provides
More informationWorking in partnership to improve the identification and treatment of sepsis
Identifying and Tackling Sepsis in Healthcare Tuesday 25 th April 2017 Working in partnership to improve the identification and treatment of sepsis Tracy Broom Associate Director Wessex Patient Safety
More informationSheffield Teaching Hospitals NHS Foundation Trust
Sheffield Teaching Hospitals NHS Foundation Trust @seamlesssurgery Seamless Surgery Team Sheffield Teaching Hospitals NHS Foundation Trust July 2017 PROUD TO MAKE A DIFFERENCE PROUD TO MAKE A DIFFERENCE
More informationLondon Mental Health Payments and Outcomes. Programme Overview 17/18
London Mental Health Payments and Outcomes Overview 17/18 National Policy and Guidance Context Five Year Forward View Reform payment and incentives to move away from unaccountable block contracts. It recommends
More informationEmergency Department Waiting Times
Publication Report Emergency Department Waiting Times (formerly Accident & Emergency Waiting Times) Quarter ending 30 June 2011 Publication date 30 August 2011 A National Statistics Publication for Scotland
More informationSTATISTICAL PRESS NOTICE MONTHLY CRITICAL CARE BEDS AND CANCELLED URGENT OPERATIONS DATA, ENGLAND March 2018
STATISTICAL PRESS NOTICE MONTHLY CRITICAL CARE BEDS AND CANCELLED URGENT OPERATIONS DATA, ENGLAND March 2018 Main Findings March 2018: Critical Care Beds There were 4,064 adult critical care beds available
More informationUCLP Primary care development programme General Practice Nursing event
UCLP Primary care development programme General Practice Nursing event Jane Clegg Director of Nursing and Deputy Regional Chief Nurse NHS England, London Region The future is here it s just not evenly
More informationNHS Electronic Referrals Service. Paper Switch Off an update Digital Health Webinar 4 May 2018
NHS Electronic Referrals Service Paper Switch Off an update Digital Health Webinar 4 May 2018 Aims of Session Introductions and refresh of Paper Switch Off Sharon Wilson Implementation manager NHS Digital
More informationIain Patterson. Associate Workforce Director Homerton University Hospital NHS Foundation Trust
Iain Patterson Associate Workforce Director Homerton University Hospital NHS Foundation Trust Who we are? Who we are? North East London Sector 3,800 staff spread across Hackney and beyond c. 3,000 acute
More informationTherefore to accommodate these conflicting issues, the following contracting arrangements are proposed:
Appendix: 3.3b North Central London CCGs Collaboration Arrangements for Contracting 22-1-13 Introduction Across the 5 CCGs in North Central London, the total value of all contracts excluding non clinical
More informationNHS North West London
NHS North West London Shaping a Healthier Future Pre-Consultation Business Case Volume 6 Appendices A1 & A2 Edition: 1 20 June 2012 Page 1 of 29 APPENDIX A1 Programme Governance A.1.1 Key governance principles
More informationThis paper explains the way in which part of the system is changing to become clearer and more accessible, beginning with NHS 111.
Unscheduled care in Haringey 1. Introduction There have been many changes to urgent, unscheduled and unplanned care over recent years. To begin with Casualty departments became Accident and Emergency departments,
More informationEnlisted Professional Military Education FY 18 Academic Calendar. Table of Contents COLLEGE OF DISTANCE EDUCATION AND TRAINING (CDET):
Enlisted Professional Military Education FY 18 Academic Calendar Table of Contents STAFF NON-COMMISSIONED OFFICER ACADEMIES: SNCO Academy Quantico SNCO Academy Camp Pendleton SNCO Academy Camp Lejeune
More informationAyrshire and Arran NHS Board
Paper 12 Ayrshire and Arran NHS Board Monday 9 October 2017 Planned Care Performance Report Author: Fraser Doris, Performance Information Analyst Sponsoring Director: Liz Moore, Director for Acute Services
More informationIslington CCG Commissioning Statement in relation to the commissioning of health services for children and young people 0-18 years
Islington CCG Commissioning Statement in relation to the commissioning of health services for children and young people 0-18 years Introduction 1. Islington CCG funds a range of health services for children
More informationRedesign of Front Door
Redesign of Front Door Transforming Acute and Urgent Care Strategic Background and Context Our Change and Improvement Programme What have we achieved and how? What did we learn? Ian Aitken, General Manager
More informationSafety in Mental Health Collaborative
NHS Tayside Safety in Mental Health Collaborative Improving Safety in Mental Health Programme Aims supported by an Improvement Advisor: Dr Noeleen Devaney Support 4 UK organisations to: reduce harm improving
More informationReport to Patients. A summary of NHS Norwich Clinical Commissioning Group s Annual Report for 2014/15. Healthy Norwich. Patient
Report to Patients A summary of NHS Norwich Clinical Commissioning Group s Annual Report for 2014/15 Healthy Norwich GP Care Patient Quality YourNorwich The work of the CCG, what it has achieved for patients,
More informationUNIVERSITY OF DAYTON DAYTON OH ACADEMIC CALENDAR FALL Incoming First Year students move into UD Housing
UNIVERSITY OF DAYTON DAYTON OH 2018-2019 ACADEMIC CALENDAR FALL 2018 Mon. Aug 6 TBD Thu, Aug 16 Fri, Aug 17 Sat, Aug 18-21 Sun, Aug 19 Tue, Aug 21 Tue, Aug 21 Wed, Aug 22 Tue, Aug 28 Mon, Sep 3 Fri, Sep
More informationStandardising Acute and Specialised Care Theme 3 Governance and Approach to Hospital Based Services Strategy Overview 28 th July 2017
Standardising Acute and Specialised Care Theme 3 Governance and Approach to Hospital Based Services Strategy Overview 28 th July 2017 Background Theme 3 builds upon previous key strategic commissioning
More informationKingston Clinical Commissioning Group. NHS 111 Service Specification
Kingston Clinical Commissioning Group NHS 111 Service Specification 1 Contents 1. Introduction 2. Local Overview 3. Directory of Services 4. GP Out of Hours 5. Governance 6. NHS 111 Service Specification
More informationHealthy London Partnership Children & Young People s Programme Launch Event
Healthy London Partnership Children & Young People s Programme Launch Event 1 01 Healthy London Partnership: Transforming services for Children and Young People across London Martin Wilkinson Senior Responsible
More information2016/17 Activity Report April August/September 2016
Due to a change in national hospital data flows (SUS) and also a delay in processing September 2016 Practice-level finance data, the latest information on hospital activity and spend is still up to August
More informationQuality Management Report 2017 Q2
Quality Management Report 2017 Q2 Quality Management Program CMS STAR Ratings Member Satisfaction (CAHPS & HOS) HEDIS Risk Adjustment DHS Member Incident Reporting Member Satisfaction Surveys Pay for Performance
More informationDiagnostic Waiting Times
Publication Report Diagnostic Waiting Times Quarter Ending 31 December 2015 Publication date 23 February 2016 A National Statistics Publication for Scotland Contents Introduction... 2 Key points... 3 Results
More informationSOUTHAMPTON UNIVERSITY HOSPITALS NHS TRUST Trust Key Performance Indicators May Regular report to Trust Board
SOUTHAMPTON UNIVERSITY HOSPITALS NHS TRUST Trust Key Performance Indicators May 20 Report to: Trust Board July 20 Report from: Sponsoring Executive: Aim of Report/Principle Topic: Review History to date:
More informationMid and South Essex Success Regime Overview and next steps. Andy Vowles, Programme Director. 18 April 2016
Mid and South Essex Success Regime Overview and next steps Andy Vowles, Programme Director 18 April 2016 What s in this briefing Part 1 overview Background to the Success Regime Action to date The challenge
More informationNational Council on Radiation Protection and Measurements Homeland Security Recommendations Related to Nuclear and Radiological Terrorism
National Council on Radiation Protection and Measurements Homeland Security Recommendations Related to Nuclear and Radiological Terrorism DHS Standards Program Review August 29, 2006 Name - DA Schauer
More informationMental Health Liaison Workshop
Mental Health Liaison Workshop UEC Improvement Collaborative Event The Kia Oval, 07 December 2017 Neil Brimblecombe - Chair (co MH Clinical Lead UECC) Barbara Cleaver - Consultant in Emergency Medicine
More informationHaringey and Islington
Haringey and Islington Wellbeing Partnership Who we are Thoughts on system leadership and on leading within complex systems Observations from our experience Recognising where we are seeing and showing
More informationHaringey CCG Governing Body 9 November STP 6 month progress report
Haringey CCG Governing Body 9 November 2017 STP 6 month progress report Helen Pettersen Accountable Officer & STP Convenor Will Huxter Director of Strategy North Central London CCGs Ambition of the STP
More informationReducing Elective Waits: Delivering 18 week pathways for patients. Programme Director NHS Elect Caroline Dove.
Reducing Elective Waits: Delivering 18 week pathways for patients Programme Director NHS Elect Caroline Dove What I will cover 1. Why 18 Weeks is different 2. Where are we now 3. New models of delivery
More informationMERTON CLINICAL COMMISSIONING GROUP GOVERNING BODY
MERTON CLINICAL COMMISSIONING GROUP GOVERNING BODY Date of Meeting: 25 th January 2018 Agenda No: 7.2 Attachment: 7 Title of Document: Acute Sustainability at Epsom & St Helier University Hospitals NHS
More informationIntegrated Care Co-Ordination Model. Healthier Together. Project Initiation Document
Appendix A Integrated Care Co-Ordination Model Healthier Together Project Initiation Document Contents 1. Purpose... 2 1.1 Key Deliverable... 2 1.2 Approach... 2 2. Introduction... 3 3. Programme Vision...
More informationPublic Trust Board Meeting 22 November 2011
Public Trust Board Meeting 22 November 2011 Title Lessons Learned Report Paper Ref 12 PURPOSE (X) Information Strategic Aim Business Plan Objective Approval Decision X 1.2, 3 Assurance X Discussion Purpose
More informationPerformance Improvement Bulletin
SPECIAL DELIVERY UNIT/ NATIONAL TREATMENT PURCHASE FUND Issue No.1 08/12 Performance Improvement Bulletin Featured Work underway - Maximum Waiting Time Targets 2 Case Study No. 1 Galway & Roscommon University
More informationSPSP Medicines. Prepared by: NHS Ayrshire and Arran
SPSP Medicines Prepared by: NHS Ayrshire and Arran Medication Reconciliation: Story so far MR happening in primary care, acute adult, paediatrics and mental health Started in acute then mental health,
More informationUrgent and Emergency Care Programme Board Wednesday 25 November 2015
Urgent and Emergency Care Programme Board Wednesday 25 November 2015 Title: DRAFT U&EC Event Report Agenda item: 3 Paper: 3 Action requested: Executive summary: Endorse Following the U&EC event Implementing
More informationPaediatric Assessment Unit (PAU) Workshop
Healthy London Partnership Children & Young People s Programme Paediatric Assessment Unit (PAU) Workshop 4 th March 2016 01 Professor Russell Viner Clinical Director Healthy London Partnership Children
More informationOverview of a new study to assess the impact of hospice led interventions on acute use. Jonathan Ellis, Director of Policy & Advocacy
Overview of a new study to assess the impact of hospice led interventions on acute use Jonathan Ellis, Director of Policy & Advocacy The problem Almost 600,000 people die each year Half will die in a hospital
More informationCompliance Division Staff Report
Compliance Division Staff Report Polygraph Advisory Board Meeting Tuesday, September 26, 2017 Public Outreach Compliance Division routinely attends annual industry meetings held by TALEPI (Texas Association
More informationAppendix 1: South Lanarkshire H&SCP Improvement Plan 2017/18.
Appendix 1: South Lanarkshire H&SCP Improvement Plan 2017/18. South Lanarkshire - Whole System Pathway Indicators identified capture key data across the whole H&SC system, primarily based around supporting
More informationSurrey Downs Clinical Commissioning Group Governing Body Part 1 Paper Acute Sustainability at Epsom & St Helier University Hospitals NHS Trust
Surrey Downs Clinical Commissioning Group Governing Body Part 1 Paper Acute Sustainability at Epsom & St Helier University Hospitals NHS Trust 1. Strategic Context 1.1. It has long been recognised that
More informationEmergency Care Data Set Stakeholder Engagement Group (SEG) Terms of Reference
Emergency Care Data Set Stakeholder Engagement Group (SEG) Terms of Reference Project Title: Emergency Care Data Set Project Date: 12/10/2015 Author: Aaron Haile, Project Manager Release: Final Owner:
More informationUrgent and Emergency Care Strategy 2013/ /17. Delivering High Quality Urgent and Emergency Care
Urgent and Emergency Care Strategy 2013/14 2016/17 Delivering High Quality Urgent and Emergency Care Working together to deliver sustainable high quality, safe, efficient and patient centred Urgent and
More informationEALING URGENT CARE NETWORK BOARD TERMS OF REFERENCE
EALING URGENT CARE NETWORK BOARD TERMS OF REFERENCE PURPOSE, SCOPE AND FUNCTION The purpose of the Ealing Urgent Care Network Board is to: To support and ensure the delivery of high quality urgent and
More informationNovember NHS Rushcliffe CCG Assurance Framework
November 2015 NHS Rushcliffe CCG Assurance Framework ASSURANCE FRAMEWORK SUMMARY No. Lead & Sub Committee Date placed on Assurance Framework narrative Residual rating score L I rating in 19 March 2015
More informationCommissioning Arrangements in North Central London
Commissioning Arrangements in North Central London 1 Summary The NHS 5 Year Forward View sets out the direction for the NHS In response, 44 areas across England have been developing Sustainability and
More informationJANUARY 2018 (21 work days) FEBRUARY 2018 (19 work days)
AND CORRESPONDING DATES FOR JANUARY AND FEBRUARY 2018 JANUARY 2018 ( work days) Deadline* 12-27 12-28 12-29 1-2 1-3 1-4 1-5 1-8 1-9 1-10 Benefit Hold ** 12-28 12-29 1-2 1-3 1-4 1-5 1-8 1-9 1-10 1-11 Mailing
More informationSussex Integrated Urgent Care Transformation Soft Market Testing Wednesday 26 th July 2017
Sussex Integrated Urgent Care Transformation Soft Market Testing Wednesday 26 th July 2017 Welcome Agenda Welcome Purpose and programme for the day Sussex NHS 111Transformation The Context, Scope and Vision;
More informationSouth West London & Surrey Downs Healthcare. Proposed Governance V1.1
South West London & Surrey Downs Healthcare Partnership South West London & Surrey Downs Healthcare Partnership Proposed Governance V1.1 1. EXECUTIVE SUMMARY The NHS in South West London is working on
More informationA meeting of the Governing Body of NHS Bromley Clinical Commissioning Group 26 November 2015
South East London Sector A meeting of the Governing Body of NHS Bromley Clinical Commissioning Group 26 November 2015 ENCLOSURE 6 HEALTHY LONDON PARTNERSHIP SUMMARY: The enclosed is a paper from the interim
More informationA&E Clinical Quality Indicators
A&E Clinical Quality Indicators Overview This dashboard presents a comprehensive and balanced view of the care delivered by our A&E department, and reflects the experience and safety of our patients and
More informationNational Trends Winter 2016
National Trends Winter 216 About the National Trends data This report presents a unique and real-time view of trends within temporary nursing including bank and agency usage. The data used has been drawn
More informationPERSPECTIVES. High Performing Emergency Pathways PERFORMANCE IMPROVEMENT
PERFORMANCE IMPROVEMENT High Performing Emergency Pathways In Spring 2013, as many hospitals emergency departments buckled under the strain of an extended winter, 2020 Delivery began exploring the causes
More informationNHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP COMMISSIONING SAFEGUARDING CHILDREN POLICY
NHS ISLE OF WIGHT CLINICAL COMMISSIONING GROUP COMMISSIONING SAFEGUARDING CHILDREN POLICY AUTHOR/ APPROVAL DETAILS Document Author Written By: Human Resources Authorised Signature Authorised By: Helen
More informationKingston Clinical Commissioning Group Report Summary
Kingston Clinical Commissioning Group Report Summary Meeting Title Governing Body in public Date 6 th March 2018 Report Title Integrated Governance Report Agenda Item 11 Attachment F Purpose (please indicate
More informationWelcome. Annual Members Meeting 7 September Excellence in specialist and community healthcare
Welcome Annual Members Meeting 7 September 2017 Excellence in specialist and community healthcare Gillian Norton, Chairman Introduction Excellence in specialist and community healthcare Louise Peters,
More informationPatient safety in the NHS in England and the development of the Healthcare Safety Investigation Branch (HSIB)
Patient safety in the NHS in England and the development of the Healthcare Safety Investigation Branch (HSIB) Dr Mike Durkin NHS National Director of Patient Safety 11 May 2016 The NHS is big! Great potential
More informationWOLVERHAMPTON CLINICAL COMMISSIONING GROUP. Corporate Parenting Board. Date of Meeting: 23 rd Feb Agenda item: ( 7 )
WOLVERHAMPTON CLINICAL COMMISSIONING GROUP Corporate Parenting Board Agenda Item No. 7 Health Services for Looked After Children Annual Report September 2014 -August 2015 Date of Meeting: 23 rd Feb 2016.
More informationChair: Anne Rainsberry, Regional Director (London Region), NHS England (AR)
COMMISSIONER MEETING IN COMMON SPECIALIST CANCER AND CARDIOVASCULAR SERVICES FOR NORTH AND EAST LONDON AND WEST ESSEX Minutes of the meeting held on Friday 9 May 2014 14.00-16.00 Portland House, Bressenden
More informationNorthern Health - Acute Services. Evidence Based Practice Venous Thromboembolism Prevention
Northern Health - Acute Services Evidence Based Practice Venous Thromboembolism Prevention (VTE) Jeannette Kamar Christine Lamotte, Liam Carter Improving Patient Safety Preventing and Managing Venous Thromboembolism
More informationAppendix 1: Croydon Clinical Commissioning Group Risk Register and Board Assurance Framework - 9th April 2013
Appendix 1: Croydon Clinical Register and Board Assurance Framework - 9th April 2013 Principal to Delivery Key Assurance on we have in in our are 1. To achieve financial sustainability in three years (2013-2014
More informationNottingham University Hospitals Emergency Department Quality Issues Related to Performance
RCCG/GB/14/123 Nottingham University Hospitals Emergency Department Quality Issues Related to Performance Introduction NUH have failed to meet the 95% 4 hour wait standard for a number of consecutive months.
More informationAction on sepsis: Publishing a cross-system action plan
Action on sepsis: Publishing a cross-system action plan Purpose 1. The profile of sepsis (caused by the body s immune response to a bacterial or fungal infection - a time-critical condition that can lead
More informationENCLOSURE: J. Date of Trust Board 29 February Pressure Ulcer Clinical Improvement Programme. Purpose of Report
ENCLOSURE: J Date of Trust Board 29 February 2012 Title of Report Purpose of Report Abstract Pressure Ulcer Clinical Improvement Programme This paper provides a progress report on our work in support of
More informationAyrshire and Arran NHS Board
Paper 12 Ayrshire and Arran NHS Board Monday 26 March 2018 Financial Management Report for the 11 months to 28 February 2018 Author: Bob Brown, Assistant Director of Finance Governance and Shared Services
More informationSupporting all NHS Trusts to achieve NHS Foundation Trust status by April 2014
TFA document Supporting all NHS Trusts to achieve NHS Foundation Trust status by April 2014 Tripartite Formal Agreement between: Hertfordshire Community NHS Trust NHS East of England Department of Health
More informationApproaches to reducing DNA and CNA
Quality and Efficiency Support Team (QuEST) Directorate for Health Workforce and Performance Approaches to reducing DNA and CNA Lesley White, National Improvement Advisor, QuEST Mike Henderson, Consultant
More informationGoverning Body. TITLE OF REPORT: Performance Report for period ending 31st December 2012
- Governing Body DATE OF MEETING: TITLE OF REPORT: Performance Report for period ending 31st December 2012 KEY MESSAGES: We are responsible for securing improvements in the quality of care and health outcomes.
More informationREGISTER OF INTERESTS 2018/2019
REGISTER OF INTERESTS 2018/2019 (Historic interests will be retained by the Joint Committee of Clinical Commissioning Groups for a minimum of 6 years after the date on which the interest expired. To submit
More informationBOARD OF DIRECTORS PAPER COVER SHEET. Meeting Date: 1 st December 2010
BOARD OF DIRECTORS PAPER COVER SHEET Meeting Date: 1 st December 2010 Agenda Item: 9 Paper No: E Title: Management of Pressure Ulcers Purpose: For Information Summary: This paper provides a report on the
More informationNHS GRAMPIAN. Local Delivery Plan - Mental Health and Learning Disability Services
NHS GRAMPIAN Board Meeting 01.06.17 Open Session Item 8 Local Delivery Plan - Mental Health and Learning Disability Services 1. Actions Recommended The Board is asked to: Note the context regarding the
More informationSafeguarding Children Annual Report
Trust Board Public Safeguarding Children Annual Report Agenda item: For: Summary: Information The annual report for safeguarding children enables the Board to review the activity across the Trust in relation
More informationUrgent & Emergency Care Strategy Update
RCCG/GB/17/144 Urgent & Emergency Care Strategy Update 1. Introduction The purpose of this paper is to provide assurance on the effective delivery to date of our urgent and emergency care strategy within
More informationNSL LINCOLNSHIRE HEALTHWATCH PRESENTATION Ambulance NHS Trust Provision of Non- Emergency Patient Transport
NSL LINCOLNSHIRE HEALTHWATCH PRESENTATION Ambulance NHS Trust Provision of Non- Emergency Patient Transport Agenda An introduction to NSL Lincolnshire Contractual Service KPI s & Current Performance Eligibility
More informationNewham Borough Summary report
Newham Borough Summary report April 2013 Prepared on 17/04/13 by Commissioning Support team Apr-11 Jun-11 Aug-11 Oct-11 Dec-11 Feb-12 Apr-12 Jun-12 Aug-12 Oct-12 Dec-12 Feb-13 GREE N Finance and Activity
More informationLuton Borough Council: Reducing DTOC rates attributable to Social Care
Briefing 17/20 May 2017 Insights into Social Care Practice Insights is a series of case studies, intended to promote and share the good practice among APSE member authorities in delivering adult social
More informationCCG authorisation Case Study Template NHS Croydon Clinical Commissioning Group. Urgent Care Redesign
CCG name: CCG authorisation Case Study Template NHS Croydon Clinical Commissioning Group Case study title: Urgent Care Redesign CCG case study number: (specify 1 to 5) Does the case study provide core
More informationSenior Leadership Development
Senior Leadership Development Prospectus 2017-18 The Staff College: Leadership in Healthcare Fleetbank House, 2-6 Salisbury Square, London, EC4Y 8JX Registered charity: 1169166 Registered company: 10316815
More informationKingston Governing Body Primary Care update
Kingston Governing Body Primary Care update Kingston CCG Governing Body Tuesday 6 th March 2018 Kingston Medical Services Transformation programme covering Kingston primary care Kingston CCG has agreed
More informationPRIMARY CARE COMMISSIONING COMMITTEE
PRIMARY CARE COMMISSIONING COMMITTEE 1. Date of Meeting: 2. Title of Report: Western Avenue Medical Centre Personal Medical Services (PMS) Reinvestment Report 3. Key Messages: The Personal Medical Services
More informationBOROUGH OF ROSELLE PUBLIC NOTICE ANNUAL NOTICE OF CALENDAR YEAR 2018 WORKSHOP SESSIONS, PRE-AGENDA MEETINGS AND REGULAR MEETINGS
BOROUGH OF ROSELLE PUBLIC NOTICE ANNUAL NOTICE OF CALENDAR YEAR 2018 WORKSHOP SESSIONS, PRE-AGENDA MEETINGS AND REGULAR MEETINGS BE IT RESOLVED, by the Mayor and Borough Council of the Borough of Roselle,
More informationEAST KENT HOSPITALS UNIVERSITY NHS FOUNDATION TRUST
EAST KENT HOSPITALS UNIVERSITY NHS FOUNDATION TRUST REPORT TO: BOARD OF DIRECTORS MEETING DATE: 29 JANUARY 2015 SUBJECT: REPORT FROM: PURPOSE: CQC ACTION PLAN CHAIR OF IMPROVEMENT PLAN DELIVERY BOARD Discussion
More informationHealth and Social Care Information Centre (ENDPB) Board Meeting Public Session
Health and Social Care Information Centre (ENDPB) Board Meeting Public Session Title of Paper: CEO Report on business activity Board meeting date: 19 June 2013 Agenda Item No: Paper presented by: Paper
More informationSummarise the Impact of the Health Board Report Equality and diversity
AGENDA ITEM 4.1 Health Board Report INTEGRATED PERFORMANCE DASHBOARD Executive Lead: Director of Planning and Performance Author: Assistant Director of Performance and Information Contact Details for further
More informationROYAL NATIONAL ORTHOPAEDIC HOSPITAL NHS TRUST
ROYAL NATIONAL ORTHOPAEDIC HOSPITAL NHS TRUST OLYMPICS 2012 BUSINESS AS USUAL ASSURANCE ACTION PLAN - JULY 2012 No Area Assurance required by NHS London Current Progress Responsible 1 Major incident and
More informationPEER REVIEW VISIT REPORT (MULTI-DISCIPLINARY TEAM)
PEER REVIEW VISIT REPORT (MULTI-DISCIPLINARY TEAM) Regional Trauma Network Trauma Centre Trauma Service RMTN Network Organisation Measures (T13-1C-1) - 2013/14 Peer Review Visit Date 13th March 2014 Compliance
More informationSHEFFIELD TEACHING HOSPITALS NHS FOUNDATION TRUST CHIEF EXECUTIVE S REPORT. BOARD OF DIRECTORS 21 st March 2012
SHEFFIELD TEACHING HOSPITALS NHS FOUNDATION TRUST I CHIEF EXECUTIVE S REPORT BOARD OF DIRECTORS 21 st 212 1. PERFORMANCE In overall terms, the Trust continues to perform well against both regulatory and
More informationHighlights HEALTH SECTOR 59 WHO STAFF 70 HEALTH CLUSTER PARTNERS FUNDING REQUIREMENTS FOR 2018 $ 5 M WHO
WHO Special WHO Situation Special Report Situation Report occupied Palestinian Mosul Crisis, territory, Iraq Gaza December to Issue January No 12: 2018 26 March to 01 April 2017 2 MILLION PEOPLE AFFECTED
More informationHomeFirst. Most importantly, we patients prefer and hope to be at home not in hospital, so I think this service is the way of the future.
Most importantly, we patients prefer and hope to be at home not in hospital, so I think this service is the way of the future. HomeFirst I felt I was looked after at home much better than I would have
More informationPrime Contractor Model King s Fund Nick Boyle Consultant Surgeon 27 March 2014
Prime Contractor Model King s Fund Nick Boyle Consultant Surgeon 27 March 2014 Current Referral Route options - Information 1. Horizon Health Choices Horizon Musculoskeletal Triage & Treatment Chronic
More informationAppendix 1: Integrated Urgent Care Service Update. 1. Purpose
Appendix 1: Integrated Urgent Care Service Update 1. Purpose The purpose of this paper is to provide Governing Body members across the collaborative CCGs with an update on the progress of the Integrated
More informationMRSA: National developments, Progress, Challenges and Targets
MRSA: National developments, Progress, Challenges and Targets Professor Brian Duerden Inspector of Microbiology and Infection Control, Department of Health, London The MRSA challenge - 2007 Bacteraemia
More informationTele Stroke ( Telemedicine in Practice)
Tele Stroke ( Telemedicine in Practice) Site Royal Surrey County Hospital East Surrey Hospital Frimley Park Hospital NHS Foundation Trust Ashford and St Peter's Hospital NHS Trust Epsom Hospital Surrey
More information1. Introduction FOR SIGN OFF BY CCG CHAIRS - PENDING
DRAFT consultation document Improving planned orthopaedic care in south east London --- Tell us what you think and help us to shape the future of these services CONTENTS 1. Introduction 2. What is orthopaedic
More information