1 : Ulaanbaatar Urban Services and Ger Areas Development Investment Program Project 1 Improved Urban Planning and Subcenter Development Consulting Services Package OUTLINE TERMS OF REFERENCE 1. The Government of Mongolia intends to procure the consulting services of an international firm to provide services to provide urban planning and subcenter development services for project 1 of the Ulaanbaatar Urban Services and Ger Areas Development Investment Program (the program). 2. The Municipality of Ulaanbaatar (MUB) is the executive agency for the program and project 1. The MUB s Urban Development and Investment Office will be responsible for managing program implementation. A program management office (PMO) has been established under supervision of the vice mayor in charge of urban development and investment. The program will be implemented from December 2013 to December Implementation of project 1 has started in December 2013 and will be completed by December The services will provide support to the MUB to perform (i) the preparation and adoption of Integrated and Participatory Local Development Plans for two subcenters in Ulaanbaatar; (ii) the preparation and adoption of transparent mechanisms to regulate land redevelopment, and (iii) capacity development of relevant MUB offices and other stakeholders in integrated urban development planning and land redevelopment processes and approaches; and other activities, as appropriate. 4. The international firm should have adequate international expertise and experience in urban development, urban planning, and urban land management and re-developement. Specific experience is required in the areas of redevelopment/upgrading of poor urban areas (preferably in Mongolia). A. Program Rationale and Description 5. The Ulaanbaatar Urban Services and Ger Areas Development Investment Program will support the Ulaanbaatar City master plan in upgrading priority service and economic hubs (subcenters) in ger areas. The investment program will be implemented over 9 years and will comprise three tranches. Combining spatial and sector approaches, it proposes an integrated solution to respond to the growing demand for basic urban services and develop subcenters as catalyst for growth in the ger areas. The program involves financing core urban infrastructure and basic services in priority road sections, investments in socioeconomic facilities based on communities needs, and improvement of service providers operation management. The program will also support (i) community participation, awareness, and empowerment; (ii) urban planning and subcenter development; (iii) extensive on-the-job training in project management and implementation; and (iv) sector reform initiatives necessary to support the program road map and policy framework. 6. In 2012, Ulaanbaatar had a population of 1.3 million. Since the 1990s, it has had limited formal extension of its core, which largely comprises apartment blocks with comprehensive utility services, including dedicated heating, water, and sanitation. However, successive waves of in-migration with ger tents have reshaped the city s geography, with (i) little upgrading or extension of basic urban services; and (ii) government policy, since 2003, to

2 give each citizen about 700 square meters of land. 1 A vast, low-density, peri-urban area, named ger areas, now extends around the city core characterized by unplanned settlement of low- and medium-income households with land ownership, 2 unserviced plots, unpaved roads, and poor facilities. The ger area population is estimated at 800,000, representing 60% of Ulaanbaatar or 30% of the country population. Despite their size, ger areas have until recently been considered temporary settlements. However, their official integration in the 2013 city master plan provides the necessary provision to plan the redevelopment of a formal periurban area. 7. Living conditions in ger areas are difficult. Poor sanitation households almost exclusively rely on open pit latrines and poor waste collection have created highly unsanitary living conditions. Air pollution is among the most severe in the world, particularly during winter because of inadequate household heating systems 3 and unpaved roads. Access to water, supplied by kiosks operated by the Ulaanbaatar Water Supply and Sewerage Authority (USUG), is limited. 4 In 2011, most of the 40,000 people migrating to Ulaanbaatar settled in ger areas; by 2022, the population is estimated to grow by 400,000 from in-migration and natural growth. Under current situation, the forecasted population increase is a serious threat to the city environment and population s health if the situation is not improved. 8. Lack of long-term planning, infrastructure investment, and land use regulation in ger areas have resulted in haphazard development, limited availability of space for public facilities, poor access to socioeconomic services, reduced livelihood opportunities, and unsecure neighborhoods. The lack of basic urban infrastructure is preventing rational and dynamic urban development, increasing the costs of doing business and accessing services. The city core, where jobs and services are concentrated now, has unprecedented congestion. The service gap between the city core and ger areas means ger residents are poorly integrated in the urban economy; it is one of the most urgent and difficult development challenges. While various government and development partner initiatives have significantly improved living conditions in ger areas, approaches have generally focused on specific sectors, failing to design a sustainable vision and provide integrated solutions for the problems of peri-urban development. 9. Subcenter upgrading. High construction cost, 5 lack of urban planning, and inadequate infrastructure constrain the upgrading of ger areas. These areas are predominantly residential with pockets of activity nodes, called subcenters, providing commercial and administrative services. The influence area of a subcenter varies from 30,000 to 100,000 people. Despite the critical function of subcenters in overall spatial and local development, urban services have not been substantially improved. The lack of basic infrastructure limits economic growth and increases negative environmental impacts. 10. The program approach aims to initiate a redevelopment process in ger areas. Improving infrastructure within the ger area subcenters and connectivity with the city core center is critical for inclusiveness and important to facilitate the movement of people and goods, develop urban corridors, and create clusters of subcenters. Better urban planning combined with a network of infrastructure along priority roads will initiate a structural change of subcenter urban fabric. This will (i) improve residents access to basic urban services, public space, and socioeconomic facilities; (ii) support local economic development; (iii) allow 1 Large-scale in-migration, started in 1991 during the economic transition, has been exacerbated by recent severe winters (dzud). During , the population of ger areas increased by about 400, Most ger residents have two types of land ownership: right of possession or right of use. Rights of possession are gradually converted into rights of ownership subject to an administrative procedure and a small fee. 3 Most households rely on unimproved individual coal stoves. 4 Water consumption in ger areas is low at about 10 liters per capita per day (half the recommended minimum by the World Health Organization in similar context). Residents pay 2 10 times more than non-ger area residents. 5 Partly due to cold climate conditions and outdated construction standards. 2

3 residents and businesses to take advantage of urban economies; and (iv) provide better housing options. 6 The changes in land use and higher urban density will improve water, sanitation, and heating services delivery. 11. Road map. The program s road map is based on the government and Municipality of Ulaanbaatar s (MUB) priorities to redevelop ger areas. This will support the MUB in establishing a network of well-developed subcenters to provide jobs, housing, and economic opportunities with reduced soil and air pollution. It comprises sequenced investments, municipal reforms, and capacity building (policy, planning, and monitoring), with four strategic objectives: (i) expand roads and basic urban services (water, sewerage, and heating) within subcenters and improve connectivity to initiate land use transformation; (ii) increase economic and public services through investments in socioeconomic facilities to meet population needs, increase urban functions, and encourage job creation; (iii) increase service provider efficiency by improving water supply, sewerage, and heating service operations; and (iv) strengthen institutions and capacity by improving urban planning and subcenter development, community awareness, participation and empowerment, service provider operations and management, and program implementation capacity. 12. Strategic context and sector policy. In February 2013, the Parliament approved the Adjustments to the Ulaanbaatar City Urban Development Master Plan 2020 and Development Directions The master plan produced two important outcomes: (i) integration of ger area development into the city master plan, and (ii) acknowledgement of the value and function of ger area subcenters as key elements of future city growth. The MUB is developing the Ger Area Development Program and established a Ger Area Development Agency (GADA), supervised by the vice mayor in charge of urban development and investment. On 30 May 2013, the city council resolution No.10/38 endorsed the program, subcenter locations under project 1, and coordination of the investment program with the city master plan. The MUB proposed a special purpose development vehicle (subcenter redevelopment authority) to facilitate, supervise, and coordinate the redevelopment process of the selected subcenters. In addition, the Ministry of Economic Development s Street Project is to improve road conditions in Ulaanbaatar and includes a ger area component. The National Development Strategy and the New Reconstruction Midterm Program ( ) constitute the national framework for program implementation. The program is consistent with the Asian Development Bank (ADB) country partnership strategy, for Mongolia; 7 ADB s Strategy priorities, including environmental sustainability and private sector development; as well as the core themes of green, competitive, and inclusive cities of ADB s Urban Operational Plan Policy dialogue and capacity development. To supplement the strong policy framework, policy dialogue and capacity development will focus (i) in communities, on community participation, awareness, and empowerment, 10 including design and implementation of the social and gender action plan; and establishment of community development councils and small- and medium-sized enterprise development councils (SDCs); (ii) in subcenters, on subcenter upgrading, including technical guidance for preparing and implementing local development plans, urban zoning regulation and construction standards, and a development framework with a transparent mechanism to regulate land redevelopment ensuring current residents are integrated in the redevelopment plan; and (iii) in the city, on the master plan through ongoing ADB technical assistance to strengthen urban planning 6 Up to 60% of subcenter households may consider exchanging their land for fully serviced apartment units. 7 ADB Country Partnership Strategy: Mongolia, Manila. 8 ADB Strategy 2020: The Long-Term Strategic Framework of the Asian Development Bank, Manila. 9 ADB Urban Operational Plan, Manila. 10 The consultative and participatory approach to ger area redevelopment, introduced by the United Nations Human Settlements Programme (UN-Habitat) during program preparation, was introduced for the project 1 subcenters. 3

4 capacity. 11 Capacity development for water and wastewater utilities will target (i) improving the MUB and USUG management contract, (ii) defining a clearer tariff road map, and (iii) providing technical support to the Water and Sewerage Regulatory Commission. For heating, the focus will be to ensure financial sustainability and capacity of new and existing heating facilities operators in the selected subcenters and to strengthen provisions in management contracts. 14. Financing modality. The financing modality is multitranche financing facility (MFF) to promote a long-term partnership between ADB, the government, and the MUB to facilitate the development of sustainable, inclusive, and livable ger areas. The MFF will support the policy framework for the redevelopment of ger areas, and provide opportunities for constructive dialogue and capacity development on city planning, policy reforms, and physical and nonphysical investments. It will generate critical mass, predictability, and continuity for basic urban services provision in ger areas, and enable ADB to better respond to MUB needs. B. Program Impact and Outcome 15. The impact of the program is improved living conditions in Ulaanbaatar and the outcome is a network of livable, competitive, and inclusive subcenters in Ulaanbaatar s ger areas. 16. The program has four outputs: (i) roads and urban services including water supply, sewerage and district heating are expanded within priority subcenters, and connectivity between them is improved; (ii) economic and public services in targeted areas are improved; (iii) service providers become more efficient; and (iv) institutions and capacity for urban development, program management, and service delivery are strengthened. The program will be implemented over three tranches. 17. Project 1. The first tranche of the MFF will support the city master plan in developing the Selbe and Bayankhoshuu subcenters. 12 The two priority areas are planned to become the main centers in the northern mid-ger area, aiming to deliver urban and socioeconomic services to a current combined population of over 200,000 people. The main components to be financed are: (i) Water supply and sewerage network comprising 18.6 kilometer (km) of water distribution network, two 500 cubic meter reservoirs, bulk flow meters and customer water meters, 20 km of internal sewerage network and extension from the nearest terminals of the existing city sewerage system consisting of: (a) 3.5 km collector main for Bayankhoshuu and 2.6 km for Selbe; (b) sewerage pumping station along with 2 km of sewer pipe extension and 0.9 km of sewer pressure pipe in Selbe; and (c) connection to the public facilities located along the road corridor and within each subcenter. (ii) District heating services consisting of delivery and installation of five heating facilities using most suitable state-of-the-art environmentally friendly technologies; construction of 21 km of distribution pipes and f service pipes; connection to the public facilities located along the road corridor and within each subcenter. (iii) Road and urban services. Combined priority roads of 15 km, sidewalks, bridge (1 km), drainage, flood protection embankments (2 km), culvert (0.8 km), lighting, and urban furniture. 11 ADB Technical Assistance to Mongolia for Ulaanbaatar Urban Planning Capacity Improvement. Manila. Financed by the Japan Fund for Poverty Reduction. 12 Bayankhoshuu subcenter: Songino Khairkan district Khoroo 9; Selbe subcenter: Sukhbaatar district Khoroo 14 and 17. 4

5 (iv) (v) (vi) Social and economic facilities. Two kindergartens, 8 9 hectares of green areas and small squares, and two business incubator centers associated with two vocational training centers. Multi-interventions in the Ulaanbaatar Water Supply and Sewerage Authority to improve the performance of the central wastewater treatment plant and the monitoring of drinking water supply network, through: (a) enhanced local control of flow, pressure and central operational control systems (SCADA); (b) improved energy saving water pumping system; (c) implementing a domestic and industrial water metering program; and (d) installation of remote controlled flow-meters for nonrevenue water management. Institutional strengthening and capacity development for (a) detailed design and construction supervision for the water supply and wastewater collection systems, municipal infrastructure, and heating services; (b) community participation, awareness, and empowerment, and small- and medium-sized enterprise development; (c) capacity building and institutional strengthening for urban planning and subcenter development; (d) PMO to strengthen program implementation capacities; and (e) service provider institutional and regulatory reforms. 18. Projects 2 and 3. The projects will (i) expand coverage of similar investments in project 1 subcenters, and in other subcenters in the northern and eastern ger areas; and (ii) improve road connections between targeted subcenters. Khaniin Material and Market Area subcenters are tentatively targeted for project 2, and Ulyastai and Amgalan subcenters for project 3. Other subcenters may be considered. Heating solutions developed under tranches 2 and 3 will prioritize gas-fired, state-of-the-art, and environmentally friendly technology subject to satisfactory due diligence. C. Outline Terms of Reference 19. The present call for expression of interest refers to improved subcenter planning and development services to be provided for the implementation of tranche 1/project 1 of the program. It will focus on the two subcenter areas where the project 1 infrastructure will be implemented. This represents a total population of around 20,000 persons. 1. Scope of Work 20. Based on the work carried out under ADB TA 7970-MON, the scope of work of the consulting services comprises three inter-related broad blocks of work: (i) support for the preparation and adoption of Integrated and Participatory Local Development Plans for the two subcenters; (ii) support for the preparation and adoption of (an) appropriate subcenter redevelopment mechanism(s) and projects; and (iii) support for capacity development of GADA/MUB and other stakeholders in integrated urban development planning and land redevelopment processes and approaches. 21. These tasks will be undertaken in a highly participatory manner in coordination with community engagement package, with consultants predominantly playing a professional and analytical role, essentially to facilitate the development process driven by the stakeholders. The specific scope elements of each block are described below: a) Integrated and Participatory Local Development Plans 22. Under this role, the consultants will 5

6 (i) (ii) (iii) (iv) (v) (vi) (vii) (viii) (ix) (x) review the outline development plans for the two subcenters prepared under TA 7970-MON. More specifically, review subcenter development priorities, needs, strategic objectives and vision of a multisectoral development planning approach covering all socioeconomic aspects including requirements of/demand for public services, education, health care, physical planning, transportation, infrastructure, housing, business and entrepreneurship, natural resources, and environmental protection; develop appropriate urban planning, land use and design guidelines and regulations for the subcenter development plans in consonance with the broader urban planning legal and regulatory framework; refine earlier estimates of impacts on demographic trends, employment, consumption levels, skills and educational levels, informal economic activities, housing, community social fabric, public health and mobility; assess residents willingness to be involved in the redevelopment process and participate in the process of exchanging their land for housing, and preliminary interest of private developers and/or individuals to support this and be involved in medium-rise housing development in support of densification, changes in land use and spatial organisation of the subcenters; on the basis of the above, support the actual formulation of the detailed local development plans in both subcenters, leading to an agreement on the subcenter redevelopment concept and plan through a participatory planning process, involving the resident communities, the private sector, GADA/MUB and other involved government agencies and other stakeholders as applicable; define all stakeholders roles and responsibilities in the planning process; facilitate the community and private development and financing entities consultations and discussions for this purpose; the plans should minimally include: definition of development zones and their urban function development (in terms of housing, enterprise development, commercial use, public facilities) over time; zone-by-zone envisaged land use, density targets, and infrastructure and housing requirements and related land acquisition requirements; estimated capital costs and multi-stakeholders resource requirements for plan implementation; assessment of internal and external risks and obstacles, and risk mitigation measures; with additional inputs from the consultants team contracted for the parallel assignment on community engagement and small- and medium enterprise (SME) development as may be required, ensure that the local development plans identify and conceptualize concrete and location-specific options for at least two priority pilot ger area redevelopment projects in each subcenter, with locational priority i.e. based on proximity to the trunk infrastructure developed under project 1, as well as on willingness of area residents to work together and engage in voluntary land pooling/re-adjustment, and exchanging land for housing; identify and review any potential legal or regulatory conflicts, and propose ways and means (including possible additional regulations or modifications to the existing legal framework) to resolve those; assist GADA/MUB in the development of a comprehensive multimedia communication program in support of the planning process; assist GADA/MUB to take the draft local development plans through the proper steps in the formal planning approval process; if expedient, assist in developing special planning rules and regulations as needed for GADA/MUB to obtain government priority status and expeditious approval for the development plans and their area development projects; closely monitor the planning and re-development process to ensure the full and meaningful participation of the current residents into the subcenter redevelopment plans; and 6

7 (xi) provide inputs on further subcenter development in formulating the project two feasibility study. b) Subcenter Redevelopment Mechanism(s) and Area Redevelopment Project Preparation 23. The consultants will (i) based on the options for this already developed under ADB TA 7970-MON (and with additional inputs from the consultants team contracted for the parallel assignment on community engagement and SME development as may be required), fine-tune and agree specific policy approaches, tools, and methods to facilitate formulation of and communication about the ger areas redevelopment projects; (ii) as the core approach, agree with area stakeholders (including the resident community, interested private developers, and GADA) for the above identified specific areas in the subcenters, the specifics of the most appropriate land re development mechanisms, involving the principles of self-financing, land readjustment, enhancing land values and land use through smart plot re blocking, redevelopment and rehousing, based on community consensus, private sector interest, and ensuring shared benefits for all property holders; (iii) in that context, identify and review any potential legal or regulatory conflicts, and propose ways and means (including possible additional regulations or modifications to the existing legal framework) to resolve those; (iv) support stakeholders in the selected areas in formulating their ger area redevelopment project to a level of detail, which identifies: a) specific assigned land-uses; b) additional area infrastructure requirements and rights of way (beyond trunk infrastructure development already supported separately under project 1); c) envisaged land and property value increments and ownership rights of the re-blocked land and/or new apartments; d) details of land swap processes and compensations enshrining the principle that all people will benefit (i.e. that no community member will be worse off than before the project); e) detailed project capital- and operational costs; f) project revenue streams and financing plan; g) project viability estimates in terms of financial and economic internal rate of return specific agreements for the exchange of a land plot for a served housing unit between resident community members and housing developers, and a monitoring arrangement for compliance; h) proposed implementation responsibilities/arrangements, including those for procurement of civil works, goods and services, and a project implementation schedule; (v) support GADA/MUB in the process of obtaining government approval of the formulated redevelopment project, preferably on the basis of approval criteria for a government priority status activity (as indicated in Block a), para (ix) above); (vi) support GADA/MUB, the local community and other stakeholders in piloting the implementation of at least one ger area redevelopment project prepared along the above lines in each sub-center; and (vii) document the lessons learnt in the formulation and implementation of the ger area redevelopment projects, and provide inputs on additional ger area redevelopment projects in formulating the project 2 feasibility study. 7

8 c) Capacity Development in Urban Planning and Land Redevelopment 24. Technical support for capacity development will be targeted at GADA and other stakeholders in the sub-center redevelopment process. This includes community processes and mechanisms which strengthen the sub-center planning and implementation itself. At the same time, this consultancy assignment will also assist in strengthening the institutional arrangements within GADA to assist it to play its assigned role fully as time goes by. The consultants will engage with, facilitate and prepare GADA and other agencies to readily take up their new roles. 25. Initial capacity-building of individuals will take place through hand-holding of assigned GADA and other stakeholders staff in learning-by-doing in the planning and project development activities identified in the above work blocks a) and b). As experience with these approaches grows and evolves, the scope for more formal, but case study practice-based training will increase. 26. More specifically, the consultants will (i) provide on-the-job training through the above-noted stakeholders staff in learning-by-doing in the processes and activities identified in the above work blocks a) and b); (ii) support the MUB in the establishment, orientation and training of the staff involved in the subcenter planning and area redevelopment processes, particularly, but not exclusively the GADA staff involved; (iii) design and conduct short operational workshops and training courses for stakeholders staff, including GADA and PMO staff on selected operational elements of urban planning, land redevelopment and management; priorities for such training courses will be set in close consultation with GADA; it is anticipated that a short course on land pooling and redevelopment will have high priority; (iv) with additional inputs from the consultants team contracted for the parallel assignment on community engagement and SME development as may be required, support the local community in the zones in which apartment buildings as part of ger area redevelopment projects are planned and implemented in the formation of viable homeowners associations; (v) dialogue with GADA/MUB to review GADA s evolving institutional role and help enhance its institutional capability to carry out this role; and (vi) provide inputs on additional capacity development requirements in formulating the project 2 feasibility study. 27. Another ADB capacity development technical assistance (CDTA) called Ulaanbaatar Urban Planning Improvement is under implementation. 13 Coordination with this CDTA is important. While the CDTA will focus on the overall urban planning policies and processes in the city, the present consultancy assignment will focus on the relationship and linkages of overall improvements in the urban planning system and processes introduced by the CDTA as they impact on ger areas. The consultants should also work closely with consultants hired under project 1 to strengthen the PMO and (as noted above) those for Community engagement and SME development. 2. Finance 13 ADB, 2013: Technical Assistance to Mongolia for Ulaanbaatar Urban Planning Improvement, TA 8467-MON; consultants recruited under this TA commenced services from late March 2014 for a two-year period. 8

9 28. The total investment requirement for project 1 is estimated at $ million. ADB will finance $53.7 million of which $27.5 million will be financed from OCR, $22.5 million from ADF, and $3.7 million as a grant from the Urban Environmental Infrastructure Fund under the Urban Financing Partnership Facility. The European Investment Bank will provide parallel financing for water supply and sanitation up to $28.38 million. The MUB will provide counterpart funding for $22.4 of the project 1 cost to finance taxes and duties, land acquisition, resettlement, and other miscellaneous costs. 3. Project Implementation Arrangements 29. The MUB will be the executing agency of the program. The MUB s Urban Development and Investment Office will be responsible for coordinating program implementation. A PMO has been established under the vice mayor in charge of urban development and investment. A program steering committee, chaired by the mayor of Ulaanbaatar and comprising government officials, has been established to provide strategic and policy guidance. The program will be implemented from December 2013 to December Project 1 implementation will start in December 2013 and be completed by December The PMO will be staffed with (i) a program director; (ii) chief engineer, (iii) procurement expert, (iv) environmental/safeguards expert, (v) program accountant/financial expert, (vi) four design and construction supervisors specialized in the fields of water supply and sewerage, district heating, and urban infrastructure development, (vii) office manager, and (viii) translator. The PMO will be in charge of the overall implementation of the project and will be supported by consultants. 4. Consulting Services 31. An international consulting firm will be recruited by the PMO in accordance with the ADB Guidelines on the Use of Consultants by the Asian development Bank and its Borrowers (2013 as amended from time to time) using the quality and cost-based selection (QCBS, 90:10) method and based on full technical proposal. 32. A consultants team will be fielded to implement the assistance. It is estimated some 70 person months of consultants 20 person-months of international, 50 person-months of national consultants, and advisers will be required. The consultants will have expertise in urban development planning and finance, poor urban areas redevelopment/upgrading, land pooling/land redevelopment, community and private sector partnership for housing development. The total cost of the consulting services package is estimated at $0.8 million over a 2.5-year period from 2014 to The requirements in person-months are detailed hereafter. International Positions Person-months National Positions Person-months Team leader/urban 8.0 Deputy team leader/architectplanner 20.0 development finance specialist Urban planner/architect 4.0 Urban land management specialist 13.0 Land management 4.0 Legal specialist 5.0 specialist Real estate market 2.0 Financial analyst/accountant 3.0 analyst Community participation specialist 2.0 Urban economist 3.0 Housing finance specialist 3.0 Civil/structural engineer 3.0 Monitoring analyst 2.0 Total Person-Months 20.0 Total Person-Months

10 34. The consulting firm will work under the PMO in cooperation and coordination with all the related agencies and departments from the Municipality and the government. Under the supervision and the leadership of the PMO, the consulting firm will also work closely and coordinate with the following loan consulting service packages to support the preparation of local development plans, land redevelopment mechanisms and regulations and area redevelopment projects: (i) detailed design and supervision; (ii) program implementation management support; (iii) community engagement and SME development; and (iv) improved operation and management of service providers. Especially tight communication and cooperation will have to be establish taking into consideration the community participation and the local development plans D. Contacts and Links Responsible ADB Officer: Arnaud Heckmann Responsible ADB Department: East Asia Regional Department Responsible ADB Division: Urban and Social Sectors Division (EASS) Executing Agency: Municipality of Ulaanbaatar Queries: Bayarsaikhan Tsend

Ulaanbaatar Urban Services and Ger Areas Development Investment Program

Ulaanbaatar Urban Services and Ger Areas Development Investment Program Ulaanbaatar Urban Services and Ger Areas Development Investment Program 2016, 2 nd Quarter EA Progress Report Project Number: 45007-003 Loan: 3099-MON Period covered: April - June 2016 Ulaanbaatar Urban

More information

Pacific Urban Development Investment Planning and Capacity Development Facility

Pacific Urban Development Investment Planning and Capacity Development Facility Technical Assistance Report Project Number: 51175-001 Transaction Technical Assistance Facility (F-TRTA) July 2017 Pacific Urban Development Investment Planning and Capacity Development Facility This document

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE 12 Appendix 5 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The project preparatory technical assistance (PPTA) is needed for preparing the investment program and conducting technical, economic,

More information

Regional: Supporting the Cities Development Initiative for Asia

Regional: Supporting the Cities Development Initiative for Asia Technical Assistance Report Project Number: 47285 Regional Capacity Development Technical Assistance (R-CDTA) November 2013 Regional: Supporting the Cities Development Initiative for Asia (Cofinanced by

More information

People s Republic of China: Strategy for Inclusive and Green Development of Small Cities, Towns, and Villages in Jiangxi Province

People s Republic of China: Strategy for Inclusive and Green Development of Small Cities, Towns, and Villages in Jiangxi Province Technical Assistance Report Project Number: 49024-001 Policy and Advisory Technical Assistance (PATA) December 2015 People s Republic of China: Strategy for Inclusive and Green Development of Small Cities,

More information

TA: TRANSIT-ORIENTED DEVELOPMENT AND IMPROVED TRAFFIC MANAGEMENT IN GCC

TA: TRANSIT-ORIENTED DEVELOPMENT AND IMPROVED TRAFFIC MANAGEMENT IN GCC Greater Dhaka Sustainable Urban Transport Project (RRP BAN 42169) TA: TRANSIT-ORIENTED DEVELOPMENT AND IMPROVED TRAFFIC MANAGEMENT IN GCC A. TA Description 1. The Government of Bangladesh has requested

More information

Nepal: Small Towns Water Supply and Sanitation Sector Project

Nepal: Small Towns Water Supply and Sanitation Sector Project Validation Report Reference Number: PVR 193 Project Number: 31402 Loan Number: 1755(SF) November 2012 Nepal: Small Towns Water Supply and Sanitation Sector Project Independent Evaluation Department ABBREVIATIONS

More information

(Financed by the Japan Fund for Poverty Reduction)

(Financed by the Japan Fund for Poverty Reduction) Technical Assistance Report Project Number: 49276-001 Capacity Development Technical Assistance (CDTA) December 2015 India: Supporting Rajasthan s Productive Clusters in the Delhi Mumbai Industrial Corridor

More information

Papua New Guinea: Implementation of the Electricity Industry Policy

Papua New Guinea: Implementation of the Electricity Industry Policy Technical Assistance Report Project Number: 46012 December 2012 Papua New Guinea: Implementation of the Electricity Industry Policy The views expressed herein are those of the consultant and do not necessarily

More information

FRAMEWORK FINANCING AGREEMENT. (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN.

FRAMEWORK FINANCING AGREEMENT. (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN. FRAMEWORK FINANCING AGREEMENT (National Highway Development Sector Investment Program Project 1) between ISLAMIC REPUBLIC OF PAKISTAN and ASIAN DEVELOPMENT BANK DATED 29 October 2005 FRAMEWORK FINANCING

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 3 11 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The government has identified the priority areas to be covered under the ensuing project. A PPTA is necessary to provide sound

More information

SECOND MEETING GMS. Urban Development Working Group. 4 5 July 2018 Manila, Philippines

SECOND MEETING GMS. Urban Development Working Group. 4 5 July 2018 Manila, Philippines GMS 4 5 July 2018 Manila, Philippines Working Group Section 2: Review of Concept and Approach to the Ongoing and Planned ipsum GMS que Corridor moluptam Towns sum Development que moluptam Projects sum

More information

Rajasthan Urban Sector Development Program

Rajasthan Urban Sector Development Program India: Rajasthan Urban Sector Development Program Project Name Rajasthan Urban Sector Development Program Project Number 42267-026 Country Project Status Project Type / Modality of Assistance Source of

More information

Republic of Indonesia: Water Supply and Sanitation Sector Development Project

Republic of Indonesia: Water Supply and Sanitation Sector Development Project Technical Assistance Report Project Number: 43304-022 Capacity Development Technical Assistance (CDTA) November 2011 Republic of Indonesia: Water Supply and Sanitation Sector Development Project (Financed

More information

Case study: System of households water use subsidies in Chile.

Case study: System of households water use subsidies in Chile. Case study: System of households water use subsidies in Chile. 1. Description In Chile the privatization of public water companies during the 70 s and 80 s resulted in increased tariffs. As a consequence,

More information

Papua New Guinea: Support for Water and Sanitation Sector Management

Papua New Guinea: Support for Water and Sanitation Sector Management Technical Assistance Report Project Number: 49454-001 Capacity Development Technical Assistance (CDTA) February 2017 Papua New Guinea: Support for Water and Sanitation Sector Management This document is

More information

Mongolia: Managing Soil Pollution in Ger Areas through Improved On-site Sanitation Project

Mongolia: Managing Soil Pollution in Ger Areas through Improved On-site Sanitation Project Trust Fund Project Administration Manual Project Number: 49113 Grant Numbers: GXXXX October 2016 Mongolia: Managing Soil Pollution in Ger Areas through Improved On-site Sanitation Project (Financed by

More information

Call for Investment Proposals for the Inclusive and Equitable Local Development (IELD) Programme in Tanzania Mainland.

Call for Investment Proposals for the Inclusive and Equitable Local Development (IELD) Programme in Tanzania Mainland. Call for Investment Proposals for the Inclusive and Equitable Local Development (IELD) Programme in Tanzania Mainland. About UNCDF UNCDF makes public and private finance work for the poor in the world

More information

Project Administration Instructions

Project Administration Instructions Project Administration Instructions PAI 1.01 Page 1 of 5 INITIAL PROJECT ADMINISTRATION ACTIVITIES A. Introduction 1. The Project Administration Instructions (PAIs) outline ADB s policies and procedures

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE Appendix 9 A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. There is an urgent need to support the government in the development of the urban water supply and sanitation sector in Cambodia

More information

PROJECT PREPARATORY TECHNICAL ASSISTANCE

PROJECT PREPARATORY TECHNICAL ASSISTANCE A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. A project preparatory technical assistance (PPTA) is required to support the Ministry of New and Renewable Energy (MNRE) and Solar Energy Corporation

More information

Enhancing regional integration of landlocked developing countries in North and Central Asia through infrastructure connectivity 6 and 7 September

Enhancing regional integration of landlocked developing countries in North and Central Asia through infrastructure connectivity 6 and 7 September Enhancing regional integration of landlocked developing countries in North and Central Asia through infrastructure connectivity 6 and 7 September 2017 Issyk-Kul, Kyrgyzstan What is CAREC? What is CAREC?

More information

WORK REPORT FOR 2007 WORK PLAN FOR 2008

WORK REPORT FOR 2007 WORK PLAN FOR 2008 SECOND ULAANBAATAR SERVICES IMPROVEMENT PROJECT WORK REPORT FOR 2007 WORK PLAN FOR 2008 ULAANBAATAR CONTENTS 1. IMPLEMENTATION OF INTERNATIONAL DEVELOPMENT ASSOCIATION (IDA) CREDIT PROCEEDS... 3 PROJECT

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB7052

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB7052 Project Name Region Country Sector(s) Lending Instrument Project ID Borrower(s) Implementing Agency Environmental Category Date PID Prepared Estimated Date of Appraisal Completion Estimated Date of Board

More information

WATER AND SANITATION MARKET ASSESSMENT: POTENTIAL REGIONAL VIABILITY OF WATERCREDIT & MICROFINANCE SOLUTIONS IN COLOMBIA.

WATER AND SANITATION MARKET ASSESSMENT: POTENTIAL REGIONAL VIABILITY OF WATERCREDIT & MICROFINANCE SOLUTIONS IN COLOMBIA. WATER AND SANITATION MARKET ASSESSMENT: POTENTIAL REGIONAL VIABILITY OF WATERCREDIT & MICROFINANCE SOLUTIONS IN COLOMBIA Executive Summary This report was developed by Water.org to assess the market for

More information

TERMS OF REFERENCE FEASIBILITY STUDY AND PREPARATION OF A CONCEPT NOTE TO ESTABLISH A CENTER OF EXCELLENCE ON GENDER AND WOMEN EMPOWERMENT

TERMS OF REFERENCE FEASIBILITY STUDY AND PREPARATION OF A CONCEPT NOTE TO ESTABLISH A CENTER OF EXCELLENCE ON GENDER AND WOMEN EMPOWERMENT TERMS OF REFERENCE FEASIBILITY STUDY AND PREPARATION OF A CONCEPT NOTE TO ESTABLISH A CENTER OF EXCELLENCE ON GENDER AND WOMEN EMPOWERMENT 1. Introduction The National Gender Machinery (NGM) is a national

More information

Promoting South Asian Regional Economic Cooperation II

Promoting South Asian Regional Economic Cooperation II Technical Assistance Report Project Number: 40371-01 Regional Capacity Development Technical Assistance (R-CDTA) December 2008 Promoting South Asian Regional Economic Cooperation II The views expressed

More information

Ministerial declaration of the high-level segment submitted by the President of the Council

Ministerial declaration of the high-level segment submitted by the President of the Council Ministerial declaration of the high-level segment submitted by the President of the Council Development and international cooperation in the twenty-first century: the role of information technology in

More information

PPIAF Assistance in Nepal

PPIAF Assistance in Nepal Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PPIAF Assistance in Nepal June 2012 The Federal Democratic Republic of Nepal (Nepal)

More information

WORK REPORT FOR 2006 WORK PLAN FOR 2007

WORK REPORT FOR 2006 WORK PLAN FOR 2007 Work Report for 2006 SECOND ULAANBAATAR SERVICES IMPROVEMENT PROJECT WORK REPORT FOR 2006 WORK PLAN FOR 2007 ULAANBAATAR CONTENTS 1. INTERNATIONAL DEVELOPMENT ASSOCIATION (IDA) CREDIT... 4 PROJECT NAME...

More information

With the Global Green Growth Institute (GGGI) for Mongolia. 05 June 2017 Strategic Frameworks

With the Global Green Growth Institute (GGGI) for Mongolia. 05 June 2017 Strategic Frameworks With the Global Green Growth Institute (GGGI) for Mongolia 05 June 2017 Strategic Frameworks PAGE 1 OF 18 ver. 13 February 2017 Readiness and Preparatory Support Proposal How to complete this document?

More information

CORPORATE SOCIAL RESPONSIBILITY POLICY March, 2017 Version 1.2

CORPORATE SOCIAL RESPONSIBILITY POLICY March, 2017 Version 1.2 CORPORATE SOCIAL RESPONSIBILITY POLICY March, 2017 Version 1.2 Name of document Corporate Social Responsibility Policy Policy Version 1.2 Issued by CSR Committee Amendment date 22.03.2017 Effective Date

More information

Viet Nam: Second Small and Medium-Sized Enterprises Development Program

Viet Nam: Second Small and Medium-Sized Enterprises Development Program Validation Report December 2017 Viet Nam: Second Small and Medium-Sized Enterprises Development Program Reference Number: PVR-544 Program Numbers: 41360-013 and 41360-014 Loan Numbers: 2680 and 3050 ABBREVIATIONS

More information

Digital Economy.How Are Developing Countries Performing? The Case of Egypt

Digital Economy.How Are Developing Countries Performing? The Case of Egypt Digital Economy.How Are Developing Countries Performing? The Case of Egypt by Nagwa ElShenawi (PhD) MCIT, Egypt Produced for DIODE Network, 217 Introduction According to the OECD some of the most important

More information

TERMS OF REFERENCE FOR CONSULTANTS

TERMS OF REFERENCE FOR CONSULTANTS TERMS OF REFERENCE FOR CONSULTANTS A. Consulting Firm The Asian Development Bank (ADB) will engage a consulting firm in accordance with its Guidelines on the Use of Consultants (2013, as amended from time

More information

Comprehensive Planning Grant. Comprehensive Plan Checklist

Comprehensive Planning Grant. Comprehensive Plan Checklist Comprehensive Planning Grant Comprehensive Plan Checklist This form was updated April 2010 Comprehensive Planning Grant Program Department of Administration Division of Intergovernmental Relations 101

More information

The C40 Cities Finance Facility Information pack for cities

The C40 Cities Finance Facility Information pack for cities The C40 Cities Finance Facility 2018-2020 Information pack for cities 17.01.2018 TABLE OF CONTENTS ABOUT THE C40 CITIES FINANCE FACILITY... 3 About us... 3 Our donors... 3 Implementation... 3 Our objectives...

More information

Economic and Social Council

Economic and Social Council United Nations Economic and Social Council Distr.: General 10 December 2001 E/CN.3/2002/19 Original: English Statistical Commission Thirty-third session 5-8 March 2002 Item 6 of the provisional agenda*

More information

Republic of Tajikistan Dushanbe-Uzbekistan Border Road Improvement Project

Republic of Tajikistan Dushanbe-Uzbekistan Border Road Improvement Project PD 0002-TJK June 6, 2016 PROJECT DOCUMENT Republic of Tajikistan Dushanbe-Uzbekistan Border Road Improvement Project This document has a restricted distribution and may be used by recipients only in performance

More information

United Nations Development Programme. Country: Armenia PROJECT DOCUMENT

United Nations Development Programme. Country: Armenia PROJECT DOCUMENT United Nations Development Programme Country: Armenia PROJECT DOCUMENT Project Title: De-Risking and Scaling-up Investment in Energy Efficient Building Retrofits Brief Description The project objective

More information

Key development issues and rationale for Bank involvement

Key development issues and rationale for Bank involvement PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB424 Project Name E-Lanka Development Region SOUTH ASIA Sector Information technology (70%);General industry and trade sector (30%) Project

More information

Proposed Grant Assistance Republic of the Union of Myanmar: Pro-Poor Community Infrastructure and Basic Services

Proposed Grant Assistance Republic of the Union of Myanmar: Pro-Poor Community Infrastructure and Basic Services Grant Assistance Report Project Number: 47187-001 February 2014 Proposed Grant Assistance Republic of the Union of Myanmar: Pro-Poor Community Infrastructure and Basic Services (Financed by the Japan Fund

More information

Chapter Two STATE FUNCTIONS FOR ENERGY EFFICIENCY PROMOTION Section I Governing Bodies

Chapter Two STATE FUNCTIONS FOR ENERGY EFFICIENCY PROMOTION Section I Governing Bodies Energy Efficiency Act Promulgated, SG No. 98/14.11.2008, effective 14.11.2008, supplemented, SG No. 6/23.01.2009, effective 1.05.2009, amended, SG No. 19/13.03.2009, effective 10.04.2009, supplemented,

More information

Support for Applied Research in Smart Specialisation Growth Areas. Chapter 1 General Provisions

Support for Applied Research in Smart Specialisation Growth Areas. Chapter 1 General Provisions Issuer: Minister of Education and Research Type of act: regulation Type of text: original text, consolidated text In force from: 29.08.2015 In force until: Currently in force Publication citation: RT I,

More information

North Lombok District, Indonesia

North Lombok District, Indonesia North Lombok District, Indonesia Local progress report on the implementation of the 10 Essentials for Making Cities Resilient (2013-2014) Mayor: H. Djohan Sjamsu, SH Name of focal point: Mustakim Mustakim

More information

Madhya Pradesh Integrated Urban Sanitation Programme Guidelines, 2009

Madhya Pradesh Integrated Urban Sanitation Programme Guidelines, 2009 Madhya Pradesh Integrated Urban Sanitation Programme Guidelines, 2009 This document is available at ielrc.org/content/e0925.pdf Note: This document is put online by the International Environmental Law

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Adaptable Program Loan P F-Financial Intermediary Assessment 08-May Nov-2012

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE. Adaptable Program Loan P F-Financial Intermediary Assessment 08-May Nov-2012 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Country PROJECT INFORMATION DOCUMENT (PID) (P128748) OTHER World

More information

SCHEME FOR SETTING UP OF PLASTIC PARKS

SCHEME FOR SETTING UP OF PLASTIC PARKS SCHEME FOR SETTING UP OF PLASTIC PARKS I. Preamble The share of India in world trade of plastics is very low. The Indian Plastics industry is large but highly fragmented with dominance of tiny, small and

More information

Tamil Nadu Sustainable Urban Development Project (TNSUDP) Environmental and Social Management Framework (ESMF) EXECUTIVE SUMMARY

Tamil Nadu Sustainable Urban Development Project (TNSUDP) Environmental and Social Management Framework (ESMF) EXECUTIVE SUMMARY Tamil Nadu Sustainable Urban Development Project (TNSUDP) Environmental and Social Management Framework (ESMF) EXECUTIVE SUMMARY BACKGROUND TNSUDP: 1.0 The World Bank has had a long partnership with the

More information

Resettlement Planning Document

Resettlement Planning Document Resettlement Planning Document Resettlement Framework Document Stage: Final Project Number: 40247 May 2008 Republic of Indonesia: Rural Infrastructure Support for PNPM Mandiri Prepared by Directorate General

More information

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized North East Local Services Improvement [Project TABLE OF CONTENTS NORTH EAST LOCAL SERVICES

More information

UPC. An Overview. The Urban Projects Concept. Financial support for improved access to water and sanitation

UPC. An Overview. The Urban Projects Concept. Financial support for improved access to water and sanitation WATER SERVICES TRUST FUND An Overview Financial support for improved access to water and sanitation WATER SERVICES TRUST FUND Water Ser vices Trust Fund [ Urban ] The booklet was prepared by the Water

More information

Saugata Dasgupta Urban Specialist India Resident Mission

Saugata Dasgupta Urban Specialist India Resident Mission Saugata Dasgupta Urban Specialist India Resident Mission Context Smart cities development Cities will be locus and engine of economic growth Making cities competitive, livable, sustainable & bankable Make

More information

Output-based Aid: extending water and sanitation services to the poor in periurban

Output-based Aid: extending water and sanitation services to the poor in periurban Output-based Aid: extending water and sanitation services to the poor in periurban Morocco Xavier Chauvot de BeauchĂȘne, World Bank Type of tool: Output-Based Aid Issue: cities Location: Casablanca, Tangier

More information

People s Republic of China: Strengthening the Role of E-Commerce in Poverty Reduction in Southwestern Mountainous Areas in Chongqing

People s Republic of China: Strengthening the Role of E-Commerce in Poverty Reduction in Southwestern Mountainous Areas in Chongqing Technical Assistance Report Project Number: 51022-001 Knowledge and Support Technical Assistance (KSTA) December 2017 People s Republic of China: Strengthening the Role of E-Commerce in Poverty Reduction

More information

Summary of Terminal Evaluation

Summary of Terminal Evaluation Summary of Terminal Evaluation I. Outline of the Project Country: Islamic Republic of Afghanistan Issue/Sector: Infrastructure Division in Charge: Infrastructure and Peacebuilding Department Period of

More information

Case Study 24X7 WATER SUPPLY IN 3 CITIES OF KARNATAKA. Water Supply

Case Study 24X7 WATER SUPPLY IN 3 CITIES OF KARNATAKA. Water Supply Case Study 24X7 WATER SUPPLY IN 3 CITIES OF KARNATAKA Water Supply 1 CASE OVERVIEW Country: India Centre/State/ULB: 29 select wards in three pilot cities of Gulbarga, Belgaum and Hubli-Dharwad, Karnataka

More information

PART I: PROJECT INFORMATION 1. PROJECT LINKAGE TO NATIONAL PRIORITIES, ACTION PLANS AND PROGRAMS

PART I: PROJECT INFORMATION 1. PROJECT LINKAGE TO NATIONAL PRIORITIES, ACTION PLANS AND PROGRAMS PART I: PROJECT INFORMATION 1. PROJECT LINKAGE TO NATIONAL PRIORITIES, ACTION PLANS AND PROGRAMS The GEF initial support on the implementation of the Stockholm Convention focuses on assisting Vietnam to

More information

CASE STUDY Making Resettlement Work through Partnerships

CASE STUDY Making Resettlement Work through Partnerships CASE STUDY Making Resettlement Work through Partnerships Aerial view of Southville 7. Photo credit: ABS-CBN Lingkod Kapamilya Foundation. The Southville 7 community in the Philippines shows how different

More information

Economic Development Strategic Plan Executive Summary Delta County, CO. Prepared By:

Economic Development Strategic Plan Executive Summary Delta County, CO. Prepared By: Economic Development Strategic Plan Executive Summary Delta County, CO Prepared By: 1 Introduction In 2015, Region 10, a 501(c)(3) Economic Development District that services six counties in western Colorado,

More information

STDF MEDIUM-TERM STRATEGY ( )

STDF MEDIUM-TERM STRATEGY ( ) STDF MEDIUM-TERM STRATEGY (2012-2016) 1. This Medium-Term Strategy sets outs the principles and strategic priorities that will guide the work of the Standards and Trade Development Facility (STDF) and

More information

GRANT AGREEMENT (ADB Strategic Climate Fund) (Greater Mekong Subregion Biodiversity Conservation Corridors Project Additional Financing)

GRANT AGREEMENT (ADB Strategic Climate Fund) (Greater Mekong Subregion Biodiversity Conservation Corridors Project Additional Financing) GRANT NUMBER 0426-CAM (SCF) GRANT AGREEMENT (ADB Strategic Climate Fund) (Greater Mekong Subregion Biodiversity Conservation Corridors Project Additional Financing) (Cambodia Component) between KINGDOM

More information

STATUS OF PROJECTS IN EXECUTION FY10 SOPE EUROPE AND CENTRAL ASIA REGION. Armenia. Public Disclosure Authorized. Public Disclosure Authorized

STATUS OF PROJECTS IN EXECUTION FY10 SOPE EUROPE AND CENTRAL ASIA REGION. Armenia. Public Disclosure Authorized. Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized STATUS OF PROJECTS IN EXECUTION FY10 SOPE Armenia Operations Policy and Country Services

More information

CONNECTED CITY FREQUENTLY ASKED QUESTIONS

CONNECTED CITY FREQUENTLY ASKED QUESTIONS 1) What is the Connected City project? CONNECTED CITY FREQUENTLY ASKED QUESTIONS The Connected City Corridor is a State-initiated pilot program that is unique to Pasco County, and will be the first planned

More information

ASIAN DEVELOPMENT BANK

ASIAN DEVELOPMENT BANK ASIAN DEVELOPMENT BANK TAR: OTH 38459 TECHNICAL ASSISTANCE FOR PROMOTING SOUTH ASIAN REGIONAL ECONOMIC COOPERATION September 2004 2 ABBREVIATIONS ADB Asian Development Bank ASEAN Association of Southeast

More information

AID FOR TRADE EXPERT DIALOGUE BANGKOK, 18 th Nov Case study: Bangladesh Presented by: Mohammad Farhad Bangladesh Foreign Trade Institute

AID FOR TRADE EXPERT DIALOGUE BANGKOK, 18 th Nov Case study: Bangladesh Presented by: Mohammad Farhad Bangladesh Foreign Trade Institute AID FOR TRADE EXPERT DIALOGUE BANGKOK, 18 th Nov. 2013 Case study: Bangladesh Presented by: Mohammad Farhad Bangladesh Foreign Trade Institute Outline of presentation Preparation Stage Implementation Stage

More information

Republic of Indonesia: Improving Access to Finance in Aceh and North Sumatra

Republic of Indonesia: Improving Access to Finance in Aceh and North Sumatra Technical Assistance Report Project Number: 45266 Capacity Development Technical Assistance (CDTA) November 2012 Republic of Indonesia: Improving Access to Finance in Aceh and North Sumatra (Financed by

More information

This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011.

This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011. Technical Assistance Report Project Number: 51336-001 Knowledge and Support Technical Assistance (KSTA) February 2018 Capacity Building Support for Asia-Pacific Economic Cooperation Financial Regulators

More information

Country Operations Business Plan. Samoa October 2016

Country Operations Business Plan. Samoa October 2016 Country Operations Business Plan October 2016 Samoa 2017 2019 This document is being disclosed to the public in accordance with ADB's Public Communications Policy 2011. CURRENCY EQUIVALENTS (As of 26

More information

Project Design Advance. Nauru: Port Development Project. Project Number: December 2015

Project Design Advance. Nauru: Port Development Project. Project Number: December 2015 Project Design Advance Project Number: 48480-002 December 2015 Nauru: Port Development Project This document is being disclosed to the public in accordance with ADB s Public Communications Policy 2011.

More information

Myanmar Country Partnership Framework (CPF) Background Material

Myanmar Country Partnership Framework (CPF) Background Material Myanmar Country Partnership Framework (CPF) Background Material June 2014 The World Bank Group What is the World Bank Group? The World Bank is a vital source of financial and technical assistance to developing

More information

SCOPE OF WORK AND APPLICATION GUIDELINES. Investment Promotion Advisor. Tanzania Investment Center

SCOPE OF WORK AND APPLICATION GUIDELINES. Investment Promotion Advisor. Tanzania Investment Center SCOPE OF WORK AND APPLICATION GUIDELINES Investment Promotion Advisor Tanzania Investment Center 1). Background The East Africa Trade and Investment Hub (the Hub) is the U.S. Government s flagship project

More information

Governance of Corporate Social Responsibility

Governance of Corporate Social Responsibility Governance of Corporate Social Responsibility Group Strategic Marketing & Communications Version India Last Updated: 27 November 2014 1 Sign-off List Name Designation Signature Date Prepared by: Zarestin

More information

Enhancing Competitiveness in Small Island Development States A UNIDO-Competitive Industries Partnership

Enhancing Competitiveness in Small Island Development States A UNIDO-Competitive Industries Partnership Enhancing Competitiveness in Small Island Development States A UNIDO-Competitive Industries Partnership Ivan Rossignol Chief Technical Specialist Competitive Industries Global Practice Washington, DC,

More information

GUIDELINES FOR STATE INITIATIVES FOR MICRO & SMALL ENTERPRISES CLUSTER DEVELOPMENT

GUIDELINES FOR STATE INITIATIVES FOR MICRO & SMALL ENTERPRISES CLUSTER DEVELOPMENT GUIDELINES FOR STATE INITIATIVES FOR MICRO & SMALL ENTERPRISES CLUSTER DEVELOPMENT * * * * * 1. Short Title: Operational Guidelines for activities under State Initiatives for Micro & Small Enterprises

More information

PROSPEROUS INCLUSIVE RESILIENT SUSTAINABLE ASIA AND THE PACIFIC

PROSPEROUS INCLUSIVE RESILIENT SUSTAINABLE ASIA AND THE PACIFIC PROSPEROUS INCLUSIVE RESILIENT SUSTAINABLE ASIA AND THE PACIFIC WHY A NEW STRATEGY FOR ADB? Asia and the Pacific has made great strides in poverty reduction and economic growth in the last 50 years, but

More information

GLOBAL INFRASTRUCTURE FACILITY OPERATING GUIDELINES

GLOBAL INFRASTRUCTURE FACILITY OPERATING GUIDELINES GLOBAL INFRASTRUCTURE FACILITY OPERATING GUIDELINES As Adopted by the GIF Governing Council on 20 April, 2015 And Revised on 16 June, 2016 A. INTRODUCTION 1. The Global Infrastructure Facility ( GIF )

More information

Speech by United Nations Development Programme

Speech by United Nations Development Programme 2015/SOM3/IEG/DIA/004 Session: 1 Speech by United Nations Development Programme Submitted by: United Nations Development Programme Public Private Dialogue on Inclusive Business Cebu, Philippines 27 August

More information

Kyrgyz Republic: Investment Climate Improvement Program

Kyrgyz Republic: Investment Climate Improvement Program Validation Report Reference Number: PVR-423 Project Numbers: 41544-022, 41544-082, 41544-084 Grant Numbers: 0120, 0319, and 0393 October 2015 Kyrgyz Republic: Investment Climate Improvement Program Independent

More information

CCCM Cluster Somalia Terms of Reference

CCCM Cluster Somalia Terms of Reference I. Background Due to significantly below average rains, severe drought conditions and the underlying security risks and conflicts have forced more than 600,000 people to leave their homes across Somalia

More information

1. INTRODUCTION TO CEDS

1. INTRODUCTION TO CEDS 1. INTRODUCTION TO CEDS TABLE OF CONTENTS INTRODUCTION... 1 CEDS STRATEGY COMMITTEE... 2 CEDS COMPONENTS... 2 Community Profiles... 2 Strategic Planning... 2 Bottom up Economic Development Strategies...

More information

MONGOLIA AND THE WORLD BANK GROUP. Working for a World Free of Poverty

MONGOLIA AND THE WORLD BANK GROUP. Working for a World Free of Poverty MONGOLIA AND THE WORLD BANK GROUP Working for a World Free of Poverty Who we are The World Bank Group is the world s largest development institution offering financial assistance, policy advice, research,

More information

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5998 Project Name. Leveraging ICT for Governance, Growth and Employment Project Region

PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5998 Project Name. Leveraging ICT for Governance, Growth and Employment Project Region Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB5998 Project Name Leveraging

More information

Initial Proposal Approval Process, Including the Criteria for Programme and Project Funding (Progress Report)

Initial Proposal Approval Process, Including the Criteria for Programme and Project Funding (Progress Report) Initial Proposal Approval Process, Including the Criteria for Programme and Project Funding (Progress Report) GCF/B.06/08 11 February 2014 Meeting of the Board 19 21 February 2014 Bali, Indonesia Agenda

More information

Integra. International Corporate Capabilities th Street NW, Suite 555W, Washington, DC, Tel (202)

Integra. International Corporate Capabilities th Street NW, Suite 555W, Washington, DC, Tel (202) Integra International Corporate Capabilities 1030 15th Street NW, Suite 555W, Washington, DC, 20005 Tel (202) 898-4110 www.integrallc.com Integra is an international development firm with a fresh and modern

More information

( 30%) Special committee report, 1968, % MMDA %(1985), 40.2%(1988), 39.9%(1991), 35.5% (1994), 31.8% (1997), 33.

( 30%) Special committee report, 1968, % MMDA %(1985), 40.2%(1988), 39.9%(1991), 35.5% (1994), 31.8% (1997), 33. 2004/11/05 1902 1. 2. 1968 110 ( 30%) Special committee report, 1968, 1973 14.9% MMDA 1996 1970 415276(1992) NHA 2001 236(415)(Zonal improvement program) 1980 415,000 ( 37%), Ocampo, 1985 1990 30.6% MMDA

More information

Tajikistan: Central Asia Regional Economic Cooperation Corridor 3 (Dushanbe Uzbekistan Border) Improvement Project

Tajikistan: Central Asia Regional Economic Cooperation Corridor 3 (Dushanbe Uzbekistan Border) Improvement Project Completion Report Project Number: 42052-022 Grant Number: 0245 August 2017 Tajikistan: Central Asia Regional Economic Cooperation Corridor 3 (Dushanbe Uzbekistan Border) Improvement Project This document

More information

GUIDELINES FOR THE IMPLEMENTATION OF THE PUBLIC INVOLVEMENT POLICY

GUIDELINES FOR THE IMPLEMENTATION OF THE PUBLIC INVOLVEMENT POLICY GEF Council Meeting October 28 30, 2014 Washington, D.C. GEF/C.47/Inf.06 October 01, 2014 GUIDELINES FOR THE IMPLEMENTATION OF THE PUBLIC INVOLVEMENT POLICY TABLE OF CONTENTS Introduction... 1 Objectives

More information

Honduras has achieved a reasonable level of access

Honduras has achieved a reasonable level of access Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Output-Based Aid in Honduras: An OBA Facility for the Water and Sanitation Sector Honduras

More information

Vietnam Ireland Bilateral Education Exchange (VIBE) Programme

Vietnam Ireland Bilateral Education Exchange (VIBE) Programme Vietnam Ireland Bilateral Education Exchange (VIBE) Programme 1. Background Investment in human capacity development is a cornerstone of Vietnam s national development policy. Needs assessments of the

More information

Project Information Document/ Identification/Concept Stage (PID)

Project Information Document/ Identification/Concept Stage (PID) Public Disclosure Authorized The World Bank Public Disclosure Authorized Public Disclosure Authorized Project Information Document/ Identification/Concept Stage (PID) Concept Stage Date Prepared/Updated:

More information

Helping Karnataka s industries reach new heights

Helping Karnataka s industries reach new heights POLICY ADVISORY July, 2014 Helping Karnataka s industries reach new heights Industrial policy recommendations for 20141 PART 1: POLICY RECOMMENDATIONS 1. Solve land limitation problems by permitting multi-storey

More information

Completion Report. Pakistan: Balochistan Devolved Social Services Program

Completion Report. Pakistan: Balochistan Devolved Social Services Program Completion Report Project Number: 37218 Loan Numbers: 2202, 2203, and 2204 Grant Number: 0028 December 2011 Pakistan: Balochistan Devolved Social Services Program CURRENCY EQUIVALENTS Currency Unit Pakistan

More information

Procurement Plan. I. General. 1. Project Information Country: Malawi Project Name: Lilongwe Water and Sanitation Project Project ID: P163794

Procurement Plan. I. General. 1. Project Information Country: Malawi Project Name: Lilongwe Water and Sanitation Project Project ID: P163794 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized I. General Procurement Plan 1. Project Information Country: Malawi Project Name: Lilongwe

More information

Secretariat. United Nations ST/SGB/2006/10. Secretary-General s bulletin. Establishment and operation of the Central Emergency Response Fund

Secretariat. United Nations ST/SGB/2006/10. Secretary-General s bulletin. Establishment and operation of the Central Emergency Response Fund United Nations ST/SGB/2006/10 Secretariat 10 October 2006 Secretary-General s bulletin Establishment and operation of the Central Emergency Response Fund The Secretary-General, pursuant to section 3.2

More information

India: Madhya Pradesh State Roads Sector Project II

India: Madhya Pradesh State Roads Sector Project II Completion Report Project Number: 37328-013 Loan Number: 2330 September 2015 India: Madhya Pradesh State Roads Sector Project II This document is being disclosed to the public in accordance with ADB s

More information

UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION TERMS OF REFERENCE (TOR) FOR CONTRACTS FOR SERVICES AND WORK. 21 December 2016

UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION TERMS OF REFERENCE (TOR) FOR CONTRACTS FOR SERVICES AND WORK. 21 December 2016 RFX 7000002112 UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION TERMS OF REFERENCE (TOR) FOR CONTRACTS FOR SERVICES AND WORK 21 December 2016 Scope of work: Support the creation and growth of innovative

More information

1. Invitation. 2. Background

1. Invitation. 2. Background Critical Ecosystem Partnership Fund Call for Proposals Evaluation of Lessons Learned to Inform Reinvestment in the Caribbean Islands Biodiversity Hotspot Opening date: Friday, 8 December 2017 Closing date:

More information

ASEAN Strategic Action Plan for SME Development ( )

ASEAN Strategic Action Plan for SME Development ( ) 1. Introduction ASEAN Strategic Action Plan for SME Development ( 2015) At the 14 th ASEAN Summit, the AEC Council was tasked to develop an ASEAN Action Plan to enhance SMEs competitiveness and resilience.