1 Owner s Meeting Minutes 234 Attendees: L. Spink L. McKenzie M. Bishop L. Heimgartner C. Jackson J. Smith M. Schoeppner A. Patterson A. Tomlinson B. Englert B. Young C. Muldoon B. McNeel Child Development Center PinnacleOne will verify that all systems are functional at the Interim CDC site and will notify Karen Crummer. Proposed groundbreaking ceremony to take place the week of July 7 th. A large scale rendering will be required. A date for the groundbreaking ceremony needs to be determined. A Patterson will discuss the summer session schedule with the CDC director and a decision will be made next week. Humanities Modernization Scope Issues PinnacleOne will verify that the shelving in the Scene Storage room is complete. An inventory of the temporary storage containers is required. A new group of FF&E requirements will be forwarded soon. Moving services for the Scene Shop and miscellaneous furniture will be scheduled for Wednesday, June 4 th, starting at 8:00 a.m. DSA has agreed that the Theatrical and Exterior projects may be treated as a design revision rather than new submissions. Build-LACCD is working on scheduling a review meeting with the Architect and the Structural Engineer at DSA on 5/23. The projects can be bid after DSA approves the revisions. 1

2 PinnacleOne will follow up on status of delivery of the appliances for the Drama/ Speech Bldg. PinnacleOne will research shop tool service and repair options for the Scene Shop equipment. Issues and Complaints J. Smith inquired about shelving above the desks in Student Services and about whether bookcases would be provided. 04/08/08 The small lot west of the Baseball Field has been donated to the Collage. 03/18/08 It was noted that a bench is needed at the bus stop north of the new Student Services building. Facilities will look at moving a bench to the area. The roof repair contract for the Admin. Building will be advertised on 3/24. A meeting was held to discuss space assignments for the Admin. Building once the new Student Services Building is occupied. Final assignments were agreed to. 03/04/08 Broken up pavement in the parking area near the Tech Bldg. site entrance will be repaired. Taisei will be requested to install lights along the temporary fencing at the north boundary of the site. Bronze plaques to be installed at the dedication of new projects are to be ordered through Build-LACCD and will contain the names of the campus administrators serving at the time of the project s dedication. Approximately six weeks are required for fabrication after approval of the design by the college. Funds for the plaques will be from the project. Central Plant 03/04/08 A briefing to discuss the Sequence of Operations with the Facilities staff will be held on 3/6. 02/26/08 Approval to operate the Broad chiller has been received from the AQMD. 2

3 11/27/07 Dr. Spink inquired about educational signage for the Central Plant equipment and the sundial proposed by the architect during their design proposal. M. Schoeppner stated that the contract does not include educational signage but he would follow up with the Designer. 10/23/07 Dr. Spink asked whether there will be any educational signage mounted on the equipment in the Central Plant. Tech. Building A proposal has been received from the Business Dept. to add Business to the building name. The Smith Group will make a presentation to the Core on Thursday, June 12 th. The presentation will include furniture fabric information as well as ground cover options. Permanent power is being energized today. Glazing at the curtain walls is being installed in advance of the DSA final approval. Grand Opening options were discussed. The Core requested a presentation of the IT plan. Verified that Len Glover does not require 480V. Shop furniture options are being reviewed with PinnacleOne. NEA/SS Directional signage has been finalized. Round tables will be supplied for the exterior furniture with knockouts for umbrellas included. Bonnie Easley will determine how many tables can be purchased via donations to the Foundation. A. Tomlinson will also be purchasing some. Nine individuals have been removed from the project during the month of May for safety violations. The number of mail boxes available can be increased by approximately 45 by breaking open some already constructed walls. PinnacleOne to determine the cost and present it to Core. 3

4 Design for providing television service will be completed and priced. Contract dispute settlement issues are being discussed with Malcraft along with a final agreed upon completion date. The Architect of Record is on site 16 hours per week until the project is substantially complete. The question of when the northeast entrance to the Music Building will be reopened was asked. PinnacleOne will report back. Computer requirements were discussed at length. I. Clark emphasized that there are many late model computers in use currently which can be brought over to the new building thereby reducing the need for new units. The survey conducted over the past week will be reviewed and discussed at next weeks meeting. The FF&E budget will be updated. This will dictate if we can order additional computers. Two refrigerators need to be purchased for the staff lounges in the Student Services Building. The room numbers are 123 and 227. The mailbox submittal has been rejected. The Campus would like combo locks entertained in lieu of the keyed cylinders if there isn't a big price difference. The Campus is concerned with the green paint color and wants confirmation that it matches what was approved. The design was to include cable television. PinnacleOne will research design meeting records for an explanation as to why it was not included. Steinberg is to provide a retrofit design and an estimate for the actual installation work. TV is to be run to all of the classrooms and to the President's and Vice-President's offices. Final directional and directory signage changes will be passed along to Core via . The most recent SS/NEA room name and numbering matrix was sent out for review and comment last week. It has been approved with the exception of the 209F/209G typo correction and a name change to room #140 in NEA. This room should now read: SOC / BEH SCIENCES CONFERENCE ROOM. Parking Attorneys for Recreation & Parks and the District are discussion options for leasing of a portion of the parking lot north of the campus. Dr. Spink has requested a review of various parking options be made to include use of the tennis courts when the ICV is vacated. Another meeting with Recreation & Parks has been scheduled for next week. Parking structure locations will be on the agenda for the next College Planning Council. 4

5 04/22/08 The proposed meeting with Recreation & Parks was cancelled. Dr. Spink will work to reschedule. Taisei has placed some fencing along the west side of the site that is blocking some parking spaces. The work is expected to continue through next week by P1 will attempt to mitigate the impact. 04/15/08 Possible sites for the proposed parking structures were discussed. A meeting with the College Planning Council will be scheduled to review and decide on options. 03/08/08 Dr. Spink and A. Tomlinson will meet with Janice Hahn s office and Recreation & Parks to discuss lease of the parking area north of the Campus. Pinnacle One was requested to report on the number of parking spaces that will be lost because of construction of CDC and PE & Wellness starting this summer. Subsequent to the meeting, it was determined that 31 spaces will be lost at Lot 2, 60 spaces at Lot 3 and 72 spaces at the CDC Lot. When NEA is complete, 38 spaces will be gained. 02/26/08 PinnacleOne will continue to assess the amount of culpability that can be assigned to Ford for damage to Parking Lot 8. M. Schoeppner noted that the parking area outside of the Sheriff s office would be impacted by the upcoming construction of the PE & Wellness Center. The parking area between the CDC and Student Services will be lost when the new CDC begins construction. The new parking at NEA will not be available until August based upon the current schedule. Connectivity Project 04/06/08 Funds have been identified and the project will be advertized for bid. FMO Building The Contractor has door hardware issues to address. Contractor has additional work to complete. Some punchlist items are still being worked on. 5

6 PinnacleOne will investigate again whether Ford can been forced to repair the parking lot. Easement for Outflow Drainage Maintenance 2/20/07 Mr. Bishop to follow up with Mr. McBearny. Physical Science Building A meeting was held with Steinberg last week to discuss their work on the design criteria. The design criteria will be set so that the future Life Sciences Bldg. can be constructed to form an integrated complex with Physical Sciences. Four firms have been shortlisted and will be preparing design submittals for evaluation. Steinberg will be preparing the design criteria. Alternative Energy 04/15/08 Chevron s energy proposal presentation to Core has been rescheduled to 4/29. 04/08/08 A meeting will be held on 4/17 to preview Chevron s proposals prior to them being presented to the Core on 4/22. PE Building A construction notice will be issued to notify the Campus of the upcoming parking lot closures. Bid Opening held on 5/20. Ford EC was low bidder at approximately $14 million. A meeting with held on 5/23 during which their bid was reviewed and they confirmed that all contract requirements were covered. A Notice of Intent to Award has been issued by Build-LACCD. The request to award will be forwarded to LACCD for submission to the State. 04/22/08 6

7 The Sheriff Dept. has requested an additional exit be provided and some changes to the door locations. 01/29/08 A meeting with the IBEW is scheduled for Monday, 2/4, to discuss their donation of scope boards for the new gymnasium. 12/04/07 M. Schoeppner informed the Group that the concession room is too small for equipment required to prepare food. He will review records of the design discussions to verify intent. ADA Transition Plan An ADA compliance meeting needs to be scheduled. 04/22/08 The Transition Plan is complete and copies are to be distributed. Library Presentation to the Infrastructure Committee is scheduled for June 11 th. B. Englert will discuss the raised floor options with WWCOT. The DWP easement through the proposed construction site needs to be vacated. District legal will be contacted. A meeting to review the Design Development is scheduled for 1:00 p.m. on May 29 th. 04/22/08 The Program is complete and has been submitted to the State. 03/18/08 Design meetings are continuing. Two meetings per week are planned over the next six weeks. 03/04/08 WWCOT has been selected as the architect for the new Library Building. A tour of various libraries will be conducted on Thursday, 3/6. 7

8 Nursing There is concern whether DSA s review will be completed in time. We intend to proceed with the bid prior to approval if necessary. DSA has stated that reviews would be complete within 4 weeks. C. Jackson has proposed going out to bid without DSA approval if necessary. 02/26/08 The DSA has indicated during preliminary reviews that over the counter approval is possible. 12/18/07 The contract has been released to the architect who is anxious to proceed. 12/11/07 Added to weekly minutes. Work limited to under $189,000; work to be done during summer. Neiman Group architects have appraised work at $328,689. Rescoping the project is required. Architect approved by the Board on December 12, Extension of grant received for November 30. Contract in the process. Tentative meeting on December 27th. Administration Roof Abatement work is scheduled to start on Friday, 6/6. A Construction Notice will be issued to notify building occupants of the upcoming demolition work. 8

Downtown Waukesha Façade, Sign and Awning Matching Grant Program

Downtown Waukesha Façade, Sign and Awning Matching Grant Program Downtown Waukesha Façade, Sign and Awning Matching Grant Program City of Waukesha Community Development Department - 201 Delafield Street, Suite 200, Waukesha, WI 53188 262-524-3750 Program Highlights

More information

SYSTEM OF HIGHER EDUCATION PROCEDURES AND GUIDELINES MANUAL CHAPTER 1 CAMPUS DEVELOPMENT

SYSTEM OF HIGHER EDUCATION PROCEDURES AND GUIDELINES MANUAL CHAPTER 1 CAMPUS DEVELOPMENT SYSTEM OF HIGHER EDUCATION PROCEDURES AND GUIDELINES MANUAL CHAPTER 1 CAMPUS DEVELOPMENT Section 1. Campus Development... 2 Section 2. Property... 2 Section 3. New Campus and Branch Campus Instructional

More information

CITY COLLEGE OF SAN FRANCISCO

CITY COLLEGE OF SAN FRANCISCO CITY COLLEGE OF SAN FRANCISCO 50 PHELAN AVENUE BOX E200 SAN FRANCISCO, CA 94112 415. 239.3000 NOTICE OF REGULAR MEETING OF THE FACILITIES, INFRASTRUCTURE AND TECHNOLOGY COMMITTEE OF THE BOARD OF TRUSTEES

More information

16.01 FACILITIES SERVICES POLICY Cabinet Approval: 09/25/03 CHAPTER 2 Board of Trustees Approval: 10/08/03 POLICY 16.01

16.01 FACILITIES SERVICES POLICY Cabinet Approval: 09/25/03 CHAPTER 2 Board of Trustees Approval: 10/08/03 POLICY 16.01 16.01 FACILITIES SERVICES POLICY Cabinet Approval: 09/25/03 Board of Trustees Approval: 10/08/03 POLICY 16.01 I. PURPOSE To describe the Facilities Services functions and responsibilities and define services

More information

Present: Dr. Thomas Baynum, Leslie Anderson, Chanda Dowell, Doug Hoenig, Dr. Bettie Truitt, Karen Mowers

Present: Dr. Thomas Baynum, Leslie Anderson, Chanda Dowell, Doug Hoenig, Dr. Bettie Truitt, Karen Mowers MINUTES CAPITAL COMMITTEE February 3, 2014 Black Hawk Room 2:00 p.m. Present: Dr. Thomas Baynum, Leslie Anderson, Chanda Dowell, Doug Hoenig, Dr. Bettie Truitt, Karen Mowers 1. Core Value: Responsibility

More information

FACADE IMPROVEMENTS INCENTIVE PROGRAM for EXISTING COMMERICAL BUILDINGS

FACADE IMPROVEMENTS INCENTIVE PROGRAM for EXISTING COMMERICAL BUILDINGS GAINESVILLE COMMUNITY REDEVELOPMENT AGENCY DOWNTOWN COMMUNITY REDEVELOPMENT AREA FACADE IMPROVEMENTS INCENTIVE PROGRAM for EXISTING COMMERICAL BUILDINGS 802 NW 5th Avenue Suite 200 Gainesville, FL 32601

More information

Bond Issue Update. Board of Education Meeting June 5, 2014 Thomas Wiseman Assistant Superintendent Business & Operations

Bond Issue Update. Board of Education Meeting June 5, 2014 Thomas Wiseman Assistant Superintendent Business & Operations Bond Issue Update Board of Education Meeting June 5, 2014 Thomas Wiseman Assistant Superintendent Business & Operations 1 2003 Bond History June 9, 2003 Waterford School District voters approved a $100

More information

Request for Qualifications Architectural Analysis Programming and Planning for the Clear Creek County Courts Wing Remodel Project Georgetown, Colorado

Request for Qualifications Architectural Analysis Programming and Planning for the Clear Creek County Courts Wing Remodel Project Georgetown, Colorado Request for Qualifications Architectural Analysis Programming and Planning for the Clear Creek County Courts Wing Remodel Project Georgetown, Colorado PURPOSE The Clear Creek Board of County Commissioners

More information

City of Provo, Utah Parks and Recreation Department. Request for Proposal (RFP) Architectural Services for a New Community Recreation Center

City of Provo, Utah Parks and Recreation Department. Request for Proposal (RFP) Architectural Services for a New Community Recreation Center City of Provo, Utah Parks and Recreation Department Request for Proposal (RFP) Architectural Services for a New Community Recreation Center RFP No. 14065 I. GENERAL OVERVIEW AND DESCRIPTION OF PROJECT

More information

Downtown Mural Grant Program Guidelines

Downtown Mural Grant Program Guidelines Downtown Mural Grant Program Guidelines A Program of: El Paso Downtown Management District (DMD) Effective January 1, 2017 DMD - Program Administrator Contact Information: El Paso Downtown Management District

More information

Bond Projects Update A. R. Rucker Middle

Bond Projects Update A. R. Rucker Middle Bond Projects Update A. R. Rucker Middle Sound system added in gym Doors & locks 10/28/16 Facilities being assessed for needs & sizes, developing replacement schedule for interior hardware & doors & for

More information

Right to Refuse The City of Coralville reserves the right to reject any and all quotes.

Right to Refuse The City of Coralville reserves the right to reject any and all quotes. City of Coralville Coralville Parks & Recreation Invitation to Submit Proposals Coralville Center for the Performing Arts Donor Signage and Office/Auxiliary Space Signage The Coralville Parks & Recreation

More information

H A C S A M E M O R A N D U M

H A C S A M E M O R A N D U M H A C S A M E M O R A N D U M TO: PRESENTED BY: AGENDA ITEM TITLE: HACSA Board of Commissioners Jacob Fox, Executive Director ORDER In the Matter of In the Matter of Adopting the Significant Amendment

More information

LACCD BOND PROGRAM UPDATE AND PATHWAY TO THE FUTURE

LACCD BOND PROGRAM UPDATE AND PATHWAY TO THE FUTURE LACCD BOND PROGRAM UPDATE AND PATHWAY TO THE FUTURE Presented to DBIA Western Pacific Region James D. O Reilly Chief Facilities Executive, LACCD Terri Mestas Program Director, PMO - AECOM June 3, 2014

More information

REQUEST FOR QUALIFICATIONS AND REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES CROMWELL BELDEN PUBLIC LIBRARY TOWN OF CROMWELL, CONNECTICUT

REQUEST FOR QUALIFICATIONS AND REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES CROMWELL BELDEN PUBLIC LIBRARY TOWN OF CROMWELL, CONNECTICUT REQUEST FOR QUALIFICATIONS AND REQUEST FOR PROPOSALS FOR ARCHITECTURAL SERVICES CROMWELL BELDEN PUBLIC LIBRARY TOWN OF CROMWELL, CONNECTICUT The Town of Cromwell is seeking written responses to a Request

More information

YPSILANTI DDA BUILDING REHABILITATION AND FAÇADE PROGRAM

YPSILANTI DDA BUILDING REHABILITATION AND FAÇADE PROGRAM YPSILANTI DDA BUILDING REHABILITATION AND FAÇADE PROGRAM Application Checklist Please provide information for the following items. Refer to Application Packet for description of requested materials. 1.

More information

FACADE IMPROVEMENTS INCENTIVE PROGRAM for EXISTING COMMERICAL BUILDINGS

FACADE IMPROVEMENTS INCENTIVE PROGRAM for EXISTING COMMERICAL BUILDINGS GAINESVILLE COMMUNITY REDEVELOPMENT AGENCY COLLEGE PARK/UNIVERSITY HEIGHTS COMMUNITY REDEVELOPMENT AREA FACADE IMPROVEMENTS INCENTIVE PROGRAM for EXISTING COMMERICAL BUILDINGS 802 NW 5th Avenue Suite 200

More information

DATE IS ACTUALLY FRIDAY - MARCH 2); contact information included in RFP

DATE IS ACTUALLY FRIDAY - MARCH 2); contact information included in RFP Attendees: reference sign-in sheet. Tom Brown, Coordinator Design & Construction, opened meeting at 9:30 AM. Welcomed attendees Meeting recorded; mandatory meeting, sign-in required; leave business cards

More information

ELEVATE GRANTS DOWNTOWN FACADE GRANT PROGRAM

ELEVATE GRANTS DOWNTOWN FACADE GRANT PROGRAM ELEVATE GRANTS DOWNTOWN FACADE GRANT PROGRAM Elevate Goals: The mission of this façade restoration program is to provide grants and low interest loans to downtown property owners for revitalizing the exteriors

More information

Waterford School District 2003 Bond Update

Waterford School District 2003 Bond Update Waterford School District 2003 Bond Update Presented by: Thomas W. Wiseman, C.P.A. Assistant Superintendent Business and Operations William Holbrook, C.P.A. Director of Business Services January 17, 2013

More information

REQUEST FOR PROPOSAL (RFP) for Feasibility Study Borough of Kennett Square New Municipal Office and Police Station Joint Facility

REQUEST FOR PROPOSAL (RFP) for Feasibility Study Borough of Kennett Square New Municipal Office and Police Station Joint Facility REQUEST FOR PROPOSAL (RFP) for Feasibility Study Borough of Kennett Square New Municipal Office and Police Station Joint Facility 1 Borough of Kennett Square Request for Proposals (RFP) Feasibility Study

More information

Boulder Housing Partners Request for Qualifications: RFQ # Architectural Services for Canyon Pointe and Glen Willow Renovation Projects

Boulder Housing Partners Request for Qualifications: RFQ # Architectural Services for Canyon Pointe and Glen Willow Renovation Projects 4800 N. Broadway, Boulder, CO 80304 Phone: 720-564-4610 Fax: 303-939-9569 www.boulderhousing.org Hearing Assistance: 1-800-659-3656 Boulder Housing Partners Request for Qualifications: RFQ #4-2017 Architectural

More information

Relocatable Classroom Process Division of Construction, MCPS

Relocatable Classroom Process Division of Construction, MCPS Relocatable Classroom Process Division of Construction, MCPS START TEACHERS AND STUDENTS OCCUPY 28 1 INCLUDE ESTIMATED BUDGET IN CIP HOLD INSPECTIONS AND CLEAN UNITS FOR OCCUPANCY 27 MONITOR CONSTRUCTION

More information

AD HOC COMMITTEE ON CONCESSIONS AT ONE MILE RECRATION AREA MEETING

AD HOC COMMITTEE ON CONCESSIONS AT ONE MILE RECRATION AREA MEETING Copies of this Agenda City Park Division Agenda Prepared: 10/16/2009 Available from: 965 Fir Street Agenda Posted: 10/16/2009 Telephone: (530) 896-7800 Prior to: 5:00 p.m. BIDWELL PARK AND PLAYGROUND COMMISSION

More information

Customer Guide. Colorado Historic Preservation Income Tax Credit

Customer Guide. Colorado Historic Preservation Income Tax Credit Colorado Historic Preservation Income Tax Credit Overview of Residential Program (CRS 39-22-514.5 of 2014, as amended) Colorado offers a state income tax credit for preservation and rehabilitation work

More information

Commercial Grants Guidelines NE 8 Avenue North Miami, FL Phone: (305) Fax: (305)

Commercial Grants Guidelines NE 8 Avenue North Miami, FL Phone: (305) Fax: (305) Commercial Grants Guidelines 12340 NE 8 Avenue North Miami, FL 33161 Phone: (305) 895-9839 Fax: (305) 895-9822 www.northmiamicra.org 1 North Miami CRA Commercial Grants Guidelines One of the primary objectives

More information

SALADO INDEPENDENT SCHOOL DISTRICT

SALADO INDEPENDENT SCHOOL DISTRICT SALADO INDEPENDENT SCHOOL DISTRICT Request for Qualifications The Salado Independent School District ( District ) is seeking Submissions in response to this Request for Qualifications ( RFQ ) for architectural

More information

CASSELBERRY NEIGHBORHOOD IMPROVEMENT GRANT PROGRAM FY APPLICATION

CASSELBERRY NEIGHBORHOOD IMPROVEMENT GRANT PROGRAM FY APPLICATION CASSELBERRY NEIGHBORHOOD IMPROVEMENT GRANT PROGRAM FY 2016-2017 APPLICATION A. Program Description 3 B. Who can apply for which grant 3 C. Eligibility 3 D. Grant Calendar 4 E. Grant Action and Maintenance

More information

Green Building Incentive Guidelines

Green Building Incentive Guidelines Green Building Incentive Guidelines A program of Andersonville Special Service Area #22 Administered by Andersonville Development Corporation 5314 N. Clark St., 2 nd Fl. Chicago, Illinois 60640 Phone:

More information

Tacony Community Development Corporation Façade Improvement Program Guidelines and Application Form

Tacony Community Development Corporation Façade Improvement Program Guidelines and Application Form Tacony Community Development Corporation Façade Improvement Program Guidelines and Application Form I. Introduction & Objectives The Tacony Community Development Corporation (TCDC) Façade Improvement Program

More information

A Guide to. Starting a Business. Auburn, GA

A Guide to. Starting a Business. Auburn, GA A Guide to Starting a Business in Auburn, GA Welcome to Auburn! We are glad you are considering the City of Auburn as the location for your business. We strive to make the experience of starting your business

More information

REQUEST FOR QUALIFICATIONS PROJECT AND CONSTRUCTION MANAGEMENT CONSULTANT

REQUEST FOR QUALIFICATIONS PROJECT AND CONSTRUCTION MANAGEMENT CONSULTANT REQUEST FOR QUALIFICATIONS PROJECT AND CONSTRUCTION MANAGEMENT CONSULTANT DUE: May 4, 2018 4:00 P.M. Walla Walla Public Schools 364 S. Park Street Walla Walla, WA 99362 District Representative/Contact:

More information

Original Revision Total Project Budget: $14,530,000 $47,700,000 $62,230,000 District Funding Commitment Anticipated State Match: $14,530,000 $N/A

Original Revision Total Project Budget: $14,530,000 $47,700,000 $62,230,000 District Funding Commitment Anticipated State Match: $14,530,000 $N/A Page 1 of 14 FACILITIES PLAN STATUS REPORT December 11, 2017 CAPITAL IMPROVEMENT PLANNING The decision to design and construct capital improvement projects begins with the Education and Facilities Master

More information

Centralia Downtown Association Facade Improvement Grant Program

Centralia Downtown Association Facade Improvement Grant Program Centralia Downtown Association Facade Improvement Grant Program 1 P age Centralia Downtown Association Facade Improvement Grant Program INTRODUCTION & INSTRUCTIONS The Downtown Facade Grant is offered

More information

Wilmington Downtown Incorporated. Facade Improvement Program POLICIES AND PROCEDURES Updated 8/30/17

Wilmington Downtown Incorporated. Facade Improvement Program POLICIES AND PROCEDURES Updated 8/30/17 Wilmington Downtown Incorporated Facade Improvement Program POLICIES AND PROCEDURES Updated 8/30/17 Wilmington Downtown Incorporated (WDI) has designed a pilot Facade Improvement Program to stimulate new

More information

Green Building Incentive Program Guidelines & Procedures

Green Building Incentive Program Guidelines & Procedures Green Building Incentive Program Guidelines & Procedures A program of Andersonville Special Service Area #22 Administered by Andersonville Development Corporation 5153 N. Clark St., Suite 204 Chicago,

More information

NCRC Special Event Guidelines

NCRC Special Event Guidelines NCRC Special Event Guidelines INTRODUCTION The North Campus Research Complex (NCRC) has space available for scheduling/renting by University and University-sponsored groups. These guidelines apply to the

More information

Mandatory Site Visit: Thursday, July 13, :00 PM (Pierson Library, Shelburne, VT)

Mandatory Site Visit: Thursday, July 13, :00 PM (Pierson Library, Shelburne, VT) Request for Proposal for Construction Management (CM) Services for the Shelburne Community Center and Public Library Shelburne, Vermont. Request for Proposal Issued: Friday, Mandatory Site Visit: Thursday,

More information

PAULY ELEMENTARY SCHOOL RELOCATABLES P1-P5 & R23-R26

PAULY ELEMENTARY SCHOOL RELOCATABLES P1-P5 & R23-R26 IBI Group Architecture Planning 4119 Broad Street, Suite 210 San Luis Obispo, CA 93401 ADDENDUM PAULY ELEMENTARY SCHOOL RELOCATABLES P1-P5 & R23-R26 ADDENDUM NO. One (1) DATE: December 11, 2017 CLIENT

More information

School Board of Brevard County, Florida Half-Cent Sales Surtax Internal Audit Fiscal Year

School Board of Brevard County, Florida Half-Cent Sales Surtax Internal Audit Fiscal Year School Board of Brevard County, Florida Half-Cent Sales Surtax Internal Audit Fiscal Year 2015-16 Prepared By: Internal Auditors April 12, 2016 Table of Contents Transmittal Letter... 1 Overview... 2-6

More information

REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR ARCHITECT/ENGINEER (A/E)

REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR ARCHITECT/ENGINEER (A/E) REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR ARCHITECT/ENGINEER (A/E) Hinsdale County School District RE-1 PO Box 39 614 N. Silver St. Lake City, CO 81235 (970) 944-2314 PROPOSAL DUE DATE/DELIVERY REQUIREMENTS-

More information

RANCHO PALOS VERDES CITY COUNCIL MEETING DATE: 12/05/2017 AGENDA HEADING: Consent Calendar

RANCHO PALOS VERDES CITY COUNCIL MEETING DATE: 12/05/2017 AGENDA HEADING: Consent Calendar RANCHO PALOS VERDES CITY COUNCIL MEETING DATE: 12/05/2017 AGENDA REPORT AGENDA HEADING: Consent Calendar AGENDA DESCRIPTION: Consideration and possible action to approve the proposed FY18-19 Community

More information

Outside of Deadwood Grant Fund

Outside of Deadwood Grant Fund GRANT FUND SITES OUTSIDE OF DEADWOOD FOR OFFICE USE ONLY Application # Date Received / / Date of Hearing / / Outside of Deadwood Grant Fund DEADWOOD HISTORIC PRESERVATION COMMISSION GRANT FUND Application

More information

NEW HAVEN UNIFIED SCHOOL DISTRICT REQUEST FOR BID

NEW HAVEN UNIFIED SCHOOL DISTRICT REQUEST FOR BID For DSA PROJECT INSPECTOR (CLASS 1) Itliong Vera Cruz Middle School 21 st Century Classroom Building RFP # 779 DSA PROJECT INSPECTOR (CLASS 1) Itliong Vera Cruz Middle School 21 st Century Classroom Building

More information

FAÇADE IMPROVEMENT PROGRAM

FAÇADE IMPROVEMENT PROGRAM FAÇADE IMPROVEMENT PROGRAM PROGRAM OVERVIEW AND PARTICIPANT INTEREST SURVEY Interest Survey Period is Monday, October 30, 2017 Friday, November 17, 2017 As part of JEDCO s continuous economic development

More information

Commercial Grants Guidelines NE 8 Avenue North Miami, FL Phone: (305) Fax: (305)

Commercial Grants Guidelines NE 8 Avenue North Miami, FL Phone: (305) Fax: (305) Commercial Grants Guidelines 12340 NE 8 Avenue North Miami, FL 33161 Phone: (305) 895-9839 Fax: (305) 895-9822 www.northmiamicra.org 1 North Miami CRA Commercial Grants Guidelines One of the primary objectives

More information

City of Titusville Community Redevelopment Agency

City of Titusville Community Redevelopment Agency City of Titusville Community Redevelopment Agency Downtown Commercial beautification S Program Policies and Procedures 2018 1 USection 1 Program Purpose and Benefits The City of Titusville s Community

More information

Hawthorne Community Redevelopment Agency Facade Beautification Grant Program 2012

Hawthorne Community Redevelopment Agency Facade Beautification Grant Program 2012 Hawthorne Community Redevelopment Agency Facade Beautification Grant Program 2012 I. Purpose The Hawthorne Community Redevelopment Agency (CRA) is offering a grant program as an incentive to owners of

More information

Canby Façade Improvement Program

Canby Façade Improvement Program Canby Façade Improvement Program Grant Program Manual (January 2017) A Project of Canby Urban Renewal Agency Managed By: Downtown Canby Main Street Program Jamie Stickel, Main Street Manager 222 NE 2nd

More information

HENRICO COUNTY NOTICE OF SPECIAL MEETING BOARD OF SUPERVISORS

HENRICO COUNTY NOTICE OF SPECIAL MEETING BOARD OF SUPERVISORS HENRICO COUNTY NOTICE OF SPECIAL MEETING BOARD OF SUPERVISORS Please take notice that a special meeting of the Board of Supervisors will be held on Tuesday, May 22, 2012 at 4:30 p.m. in the County Manager's

More information

Invitation for Expression of Interest

Invitation for Expression of Interest Invitation for Expression of Interest for Construction of a 14 Storey Office Building in Male Reference: BML/PROPERTIES:2018/011 15 January 2018 Closing date for submissions: 31 st January 2018 at 14:00

More information

TORNILLO ISD REQUEST FOR STATEMENTS OF QUALIFICATION FOR ARCHITECTURAL SERVICES FOR 2016 BOND PROJECTS RFQ NO

TORNILLO ISD REQUEST FOR STATEMENTS OF QUALIFICATION FOR ARCHITECTURAL SERVICES FOR 2016 BOND PROJECTS RFQ NO TORNILLO ISD REQUEST FOR STATEMENTS OF QUALIFICATION FOR ARCHITECTURAL SERVICES FOR 2016 BOND PROJECTS The Board of Trustees of the Tornillo ISD is requesting Statements of Qualification from architectural

More information

Plan of Development Review Process County of Henrico, Virginia

Plan of Development Review Process County of Henrico, Virginia Plan of Development Review Process County of Henrico, Virginia October 27, 2000 (Revised January 8, 2007, December 7, 2007) (Revised September 11, 2015, effective September 14, 2015) POF011 TABLE OF CONTENTS

More information

Oxford Downtown Development Authority Façade Grant Improvement Program

Oxford Downtown Development Authority Façade Grant Improvement Program Oxford Downtown Development Authority Façade Grant Improvement Program The grant program has been developed to encourage property and business owners to improve the appearance of Oxford s commercial and

More information

-??"""1 ;t:-f~-.- <...

-??1 ;t:-f~-.- <... HENRICO COUNTY NOTICE OF SPECIAL MEETING BOARD OF SUPERVISORS Please take notice that a special meeting of the Board of Supervisors will be held on Tuesday September 27, 2011 at 5:00 p.m. in the County

More information

This request for qualifications seeks the following type of service providers:

This request for qualifications seeks the following type of service providers: ANNOUNCEMENT REQUEST FOR STATEMENT OF QUALIFICATIONS NOTICE SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES DESIGN AND CONSTRUCTION ARCHITECTURAL SERVICES The San Francisco Unified School District, Facilities,

More information

tyuiopasdfghjklzxcvbnmqwertyuiopas dfghjklzxcvbnmqwertyuiopasdfghjklzx cvbnmqwertyuiopasdfghjklzxcvbnmq wertyuiopasdfghjklzxcvbnmqwertyuio

tyuiopasdfghjklzxcvbnmqwertyuiopas dfghjklzxcvbnmqwertyuiopasdfghjklzx cvbnmqwertyuiopasdfghjklzxcvbnmq wertyuiopasdfghjklzxcvbnmqwertyuio tyuiopasdfghjklzxcvbnmqwertyuiopas dfghjklzxcvbnmqwertyuiopasdfghjklzx cvbnmqwertyuiopasdfghjklzxcvbnmq wertyuiopasdfghjklzxcvbnmqwertyuio SAINT MARTIN S UNIVERSITY pasdfghjklzxcvbnmqwertyuiopasdfghj Student

More information

REQUEST FOR QUALIFICATIONS FOR DESIGN SERVICES ENGINEERING EDUCATION AND DESIGN CENTER. September 21, 2017

REQUEST FOR QUALIFICATIONS FOR DESIGN SERVICES ENGINEERING EDUCATION AND DESIGN CENTER. September 21, 2017 SECTION I: SUMMARY REQUEST FOR QUALIFICATIONS FOR DESIGN SERVICES ENGINEERING EDUCATION AND DESIGN CENTER September 21, 2017 The University of Maine (UMaine), located in Orono, Maine, desires to procure

More information

REQUEST FOR PROPOSAL (RFP)

REQUEST FOR PROPOSAL (RFP) 38 Liberty Street Concord, New Hampshire 03301 REQUEST FOR PROPOSAL (RFP) Flooring Replacement 2016 Broken Ground, Beaver Meadow, and Rundlett Middle School The Concord School District is looking to replace

More information

Request for Proposal. And Specifications For. Professional Design Services for. The New School of Business Administration WSU Project No.

Request for Proposal. And Specifications For. Professional Design Services for. The New School of Business Administration WSU Project No. Division of Finance and Business Operations Request for Proposal And Specifications For Professional Design Services for The New School of Business Administration WSU Project No. 999-270806 No part of

More information

Downtown Memphis Exterior Improvement Grant

Downtown Memphis Exterior Improvement Grant Downtown Memphis Exterior Improvement Grant Program Administered by: Center City Development Corporation 114 North Main Street Memphis, TN 38103 (901) 575-0540 www.downtownmemphiscommission.com Packet

More information

COALINGA REDEVELOPMENT AGENCY PARKING LOT IMPROVEMENT PROGRAM GUIDELINES INTRODUCTION

COALINGA REDEVELOPMENT AGENCY PARKING LOT IMPROVEMENT PROGRAM GUIDELINES INTRODUCTION COALINGA REDEVELOPMENT AGENCY PARKING LOT IMPROVEMENT PROGRAM GUIDELINES INTRODUCTION The Parking Lot Improvement Program (PIP) is designed to stimulate building improvements and upgrade the appearance

More information

Part B - Health Facility Briefing and Planning. PLANNING Functional Areas Functional Relationships

Part B - Health Facility Briefing and Planning. PLANNING Functional Areas Functional Relationships 545 INDEX PALLIATIVE CARE UNIT 545.1.00 Description INTRODUCTION Description PLANNING Functional Areas Functional Relationships COMPONENTS OF THE UNIT Introduction Standard Components Non-Standard Components

More information

A. General provisions and other electrical systems are specified in other Sections of Division 26.

A. General provisions and other electrical systems are specified in other Sections of Division 26. PART 1: GENERAL 1.01 DESCRIPTION: A. General provisions and other electrical systems are specified in other Sections of Division 26. B. Commissioning is an ongoing process and shall be performed throughout

More information

REQUEST FOR QUALIFICATIONS. Architectural/Engineering Design Services

REQUEST FOR QUALIFICATIONS. Architectural/Engineering Design Services REQUEST FOR QUALIFICATIONS Architectural/Engineering Design Services Logistics DISTRICT CONTACTS FOR QUESTIONS Jeff Collum Superintendent Phone: 903-668-5990 Email: jcollum@hisd.com REQUEST FOR STATEMENT

More information

Request for Proposals for Interior Renovations for the Aldrich Public Library June 25, 2018

Request for Proposals for Interior Renovations for the Aldrich Public Library June 25, 2018 Request for Proposals for Interior Renovations for the June 25, 2018 Reply to: Sarah Costa Library Consultant 6 Washington St. Barre, VT 05641 Schedule RFP Distribution: July 3, 2018 Site Visit and Pre-proposal

More information

GREENE COUNTY CSD PROPOSED BOND ISSUE Frequently Asked Questions Updated

GREENE COUNTY CSD PROPOSED BOND ISSUE Frequently Asked Questions Updated GREENE COUNTY CSD PROPOSED BOND ISSUE Frequently Asked Questions Updated 07.21.2015 1. Why is the Greene County School District considering a bond referendum? The Greene County School District is considering

More information

Physical Security Workshop TRENDS ACROSS MEMBER UNITS. Dave Hearn

Physical Security Workshop TRENDS ACROSS MEMBER UNITS. Dave Hearn Physical Security Workshop TRENDS ACROSS MEMBER UNITS Dave Hearn Firstly: Thank You We asked all delegates to send in 3 examples of serious incidents in which physical security has played a part 10 units

More information

Culpeper, VA. Virginia Department of Transportation

Culpeper, VA. Virginia Department of Transportation Culpeper, VA Virginia Department of Transportation October 2011 FORWARD Greetings from VDOT s Enhancement Program staff! The purpose of this manual is to guide local Sponsors through the project development

More information

Belmar Business Partnership, Inc. Business Development Committee

Belmar Business Partnership, Inc. Business Development Committee Belmar Business Partnership, Inc. Business Development Committee Façade Improvement and Renovation Grant Program 2017 To encourage existing businesses to improve the appearance of their place of business,

More information

ERATE 470 FORM # REQUEST AND REQUEST FOR PROPOSAL (RFP) FOR: NETWORKING EQUIPMENT Stanton Community Schools

ERATE 470 FORM # REQUEST AND REQUEST FOR PROPOSAL (RFP) FOR: NETWORKING EQUIPMENT Stanton Community Schools ERATE 470 FORM # 180008995 REQUEST AND REQUEST FOR PROPOSAL (RFP) FOR: NETWORKING EQUIPMENT Stanton Community Schools STANTON COMMUNITY SCHOOLS (SCS) is seeking proposals for the upcoming Funding Year

More information

REQUEST FOR ARCHITECTURAL SERVICES ACTIVITY CENTER

REQUEST FOR ARCHITECTURAL SERVICES ACTIVITY CENTER REQUEST FOR ARCHITECTURAL SERVICES ACTIVITY CENTER Issued On: February 1, 2018 Date Due: February 23, 2018-2:00 pm CST At: 545 Academy Drive Northbrook, IL 60062 Northbrook Activity Center 180 Anets Drive

More information

Catholic Diocese of Sioux Falls

Catholic Diocese of Sioux Falls Catholic Diocese of Sioux Falls ADMINISTRATIVE POLICIES REGARDING PROPERTY Canon law requires the diocesan bishop to carefully supervise the administration of all goods which belong to the diocese and

More information

Information & Application

Information & Application City of Holly Hill Community Redevelopment Area Commercial Property Improvement Matching Grant Program Guidelines and Application adopted April 14, 2015 Information & Application Please note that applications

More information

City Manager Briefing Report

City Manager Briefing Report City Manager Briefing Report January 2010 Eric M. Soroka, ICMA-CM City Manager This report is prepared in order to inform the City Commission of the status of major projects and ongoing matters. If you

More information

ADDENDUM NO. 1. ATTENTION TO PLANHOLDERS OF RECORD is called to the following revisions of the contract documents:

ADDENDUM NO. 1. ATTENTION TO PLANHOLDERS OF RECORD is called to the following revisions of the contract documents: THIS DOCUMENT AND ATTACHMENT(S) ARE AVAILABLE FOR DOWNLOAD AT HTTPS://HOSTING.PORTSEATTLE.ORG/PRMS/. AN EMAIL NOTIFICATION WAS SENT TO REGISTERED PLANHOLDERS. FAILURE TO ACKNOWLEDGE RECEIPT ON THE BID

More information

2018 CDBG Application Workshop Downtown Revitalization Program. Program Overview CDBG Downtown Revitalization Program. Impactful Photo Examples (1)

2018 CDBG Application Workshop Downtown Revitalization Program. Program Overview CDBG Downtown Revitalization Program. Impactful Photo Examples (1) 2018 CDBG Application Workshop Downtown Revitalization Program Joe Bohlke, Project Manager Iowa Economic Development Authority Joseph.Bohlke@iowaeda.com 725-3011 Ed Basch, Project Manager Iowa Economic

More information

Request for Proposals for Construction Manager at Risk Watertown Community Center

Request for Proposals for Construction Manager at Risk Watertown Community Center Request for Proposals for Construction Manager at Risk Watertown Community Center October 29, 2014 City of Watertown, South Dakota Publish: Wednesday, October 29, 2014 Section 1 Advertisement for Proposals

More information

DoD Education Activity Military Construction, Defense-Wide FY 2007 Budget Estimates ($ in thousands)

DoD Education Activity Military Construction, Defense-Wide FY 2007 Budget Estimates ($ in thousands) DoD Education Activity Military Construction, Defense-Wide FY 2007 Budget Estimates ($ in thousands) New/ Authorization Approp. Current Page Request Request Mission No. Kentucky Fort Knox High School Replacement

More information

Building Users Group Meeting 12/04/2008

Building Users Group Meeting 12/04/2008 Building Users Group Meeting 12/04/2008 1. Prop A/AA/Measure J Where are we now? South Campus - Work is continuing on South Campus, with the expectancy of occupancy date of January 2010. South Campus FF&E

More information

Minnehaha County, South Dakota 415 N Dakota Avenue Sioux Falls, South Dakota 57104

Minnehaha County, South Dakota 415 N Dakota Avenue Sioux Falls, South Dakota 57104 Minnehaha County, South Dakota 415 N Dakota Avenue Sioux Falls, South Dakota 57104 NOTICE OF REQUEST FOR PROPOSALS: Jail Expansion Request for Proposals (RFP) for Architect/Engineer Services Minnehaha

More information

MINNESOTA STATE COLLEGES AND UNIVERSITIES

MINNESOTA STATE COLLEGES AND UNIVERSITIES MINNESOTA STATE COLLEGES AND UNIVERSITIES Minnesota State Community and Technical College Center for Student and Workforce Success REQUEST FOR PROPOSAL (RFP) FOR ARCHITECTURAL AND ENGINEERING DESIGN SPECIAL

More information

ADDENDUM NO. 1. Architectural Services for Orange Coast College Student Union Project. Coast Community College District Purchasing Department PROJECT:

ADDENDUM NO. 1. Architectural Services for Orange Coast College Student Union Project. Coast Community College District Purchasing Department PROJECT: ADDENDUM NO. 1 Coast Community College District Purchasing Department PROJECT: Architectural Services for Orange Coast College Student Union Project RFP NO: 2076 NOTICE TO PROPOSERS ON THE ABOVE PROJECT:

More information

NOTICE TO BIDDERS. Replacement of Overhead Doors at Public Works Roads Building Snow Hill, Worcester County, Maryland

NOTICE TO BIDDERS. Replacement of Overhead Doors at Public Works Roads Building Snow Hill, Worcester County, Maryland NOTICE TO BIDDERS Replacement of Overhead Doors at Public Works Roads Building Snow Hill, Worcester County, Maryland The Worcester County Commissioners are currently accepting bids for the replacement

More information

PRE-SUBMITTAL CONFERENCE REQUEST FOR QUALIFICATIONS (RFQ)

PRE-SUBMITTAL CONFERENCE REQUEST FOR QUALIFICATIONS (RFQ) PRE-SUBMITTAL CONFERENCE REQUEST FOR QUALIFICATIONS (RFQ) FAA HOT SPOTS ELIMINATING DESIGN SERVICES PROJECT NO. 770 SOLICITATION NO. HWC-HOUHSE-2017-025 Warren Ching Sr. Procurement Specialist Houston

More information

District Office Building Seismic Retrofit At Contra Costa Community College District 500 Court St. Martinez, CA March 21, 2016

District Office Building Seismic Retrofit At Contra Costa Community College District 500 Court St. Martinez, CA March 21, 2016 REQUEST FOR QUALIFICATIONS (RFQ) ARCHITECT/ENGINEER (A/E) PROFESSIONAL SERVICES For the At Contra Costa Community College District 500 Court St. Martinez, CA March 21, 2016 PART 1 GENERAL INTRODUCTION

More information

FAÇADE IMPROVEMENT MATCHING GRANT PROGRAM

FAÇADE IMPROVEMENT MATCHING GRANT PROGRAM FAÇADE IMPROVEMENT MATCHING GRANT PROGRAM Downtown NOLA Sponsored By: Downtown Development District DOWNTOWN DEVELOPMENT DISTRICT Façade Improvement Matching Grant Program Policies and Procedures Purpose

More information

Downtown Storefront Improvement Grant City of Olathe, Kansas

Downtown Storefront Improvement Grant City of Olathe, Kansas Downtown Storefront Improvement Grant City of Olathe, Kansas The City of Olathe is dedicated to preserving, protecting, and enhancing the businesses and services provided in the Downtown area. Downtown

More information

Program Community Development Block Grant (CDBG) Downtown Revitalization Program- Tier II

Program Community Development Block Grant (CDBG) Downtown Revitalization Program- Tier II Business/Building Owner 3/12/09 CDBG DT FY08 Program City of Celina / Poggemeyer Design Group Program Community Development Block Grant (CDBG) Downtown Revitalization Program- Tier II Federally funded

More information

Elementary School District office.

Elementary School District office. Lane Bates, Superintendent Part-Time Custodial and Maintenance Technician JOB ANNOUNCEMENT This institution is an Affirmative Action/Equal Opportunity provider and employer Flournoy is currently seeking

More information

Associated with the District s Measure A Bond Program and Facilities Improvement Projects

Associated with the District s Measure A Bond Program and Facilities Improvement Projects Request for Qualifications / Proposal (RFQ/P) for Hazardous Material Assessment, Abatement Plan, Cost Estimating, and Monitoring Services Associated with the District s Measure A Bond Program and Facilities

More information

Architectural/Design Services

Architectural/Design Services Architectural/Design Services Request for Proposal Number 10202017 [Responses Due November 6, 2017 by 3 pm ET] 1 P a g e M i c h i g a n V i r t u a l R F P # 1 0 202 0 1 7 I. INTRODUCTION The purpose

More information

FACILITIES MANAGEMENT

FACILITIES MANAGEMENT FACILITIES MANAGEMENT Design & Construction November 28, 2017 Re: Request for Proposals- Testing, Adjusting, and Balancing Services College of Nursing Building Building Modifications (UI# 0559501) University

More information

RFQ A-07 / FOR FF&E CONSULTING AND COORDINATION SERVICES FOR VARIOUS MEASURE B BOND PROJECTS

RFQ A-07 / FOR FF&E CONSULTING AND COORDINATION SERVICES FOR VARIOUS MEASURE B BOND PROJECTS REQUEST FOR QUALIFICATIONS FOR FURNITURE, FIXTURES, & EQUIPMENT (FF&E) CONSULTING AND COORDINATION SERVICES FOR VARIOUS MEASURE B BOND PROJECTS (Chabot College, Las Positas College, District-Wide) RE:

More information

FAÇADE & INFRASTRUCTURE IMPROVEMENT PROGRAM GRANT APPLICATION PACKET

FAÇADE & INFRASTRUCTURE IMPROVEMENT PROGRAM GRANT APPLICATION PACKET FAÇADE & INFRASTRUCTURE IMPROVEMENT PROGRAM GRANT APPLICATION PACKET Program description and rules Design guidelines Application forms and documents Balch Springs Economic Development Corporation 13503

More information

ENTRY FORM SUMMIT COUNTY BUILDERS ASSOCIATION 2017 PARADE OF HOMES

ENTRY FORM SUMMIT COUNTY BUILDERS ASSOCIATION 2017 PARADE OF HOMES Phone: 970-668-6013 Fax: 970-668-6014 E-mail: Info@summitcountybuilders.org ENTRY FORM SUMMIT COUNTY BUILDERS ASSOCIATION 2017 PARADE OF HOMES Dates of Parade: Saturday and Sunday, September 23 & 24 and

More information

2017 IHCA Convention & Trade Show INVITATION TO PARTICIPATE. Sponsorship Information. Trade Show. Advertising Information.

2017 IHCA Convention & Trade Show INVITATION TO PARTICIPATE. Sponsorship Information. Trade Show. Advertising Information. 2017 IHCA Convention & Trade Show INVITATION TO PARTICIPATE September 25-27, 2017 Marriott Hotel 700 Grand Ave. Des Moines, IA Trade Show Information Sponsorship Information Advertising Information Schedule

More information

MODEL PLAN for DISASTER PREPARATION AND RESPONSE for the CHURCHES OF CHARLESTON ATLANTIC PRESBYTERY

MODEL PLAN for DISASTER PREPARATION AND RESPONSE for the CHURCHES OF CHARLESTON ATLANTIC PRESBYTERY MODEL PLAN for DISASTER PREPARATION AND RESPONSE for the CHURCHES OF CHARLESTON ATLANTIC PRESBYTERY I. OVERVIEW In the event of a natural or other disaster, proper planning and preparation can reduce the

More information

North Dakota State University. Minard Hall Project Status Summary As of September 30, 2011

North Dakota State University. Minard Hall Project Status Summary As of September 30, 2011 North Dakota State University Minard Hall Project Status Summary As of September 30, 2011 Overview Minard Hall is the largest academic facility located in the historical district on NDSU s campus. The

More information

Request for Qualifications B Hazardous Material Surveying, Testing and On-Site Observation Firms. RFQ Due Date: October 1, :00 P.M.

Request for Qualifications B Hazardous Material Surveying, Testing and On-Site Observation Firms. RFQ Due Date: October 1, :00 P.M. Request for Qualifications B13.018 Hazardous Material Surveying, Testing and On-Site Observation Firms RFQ Due Date: October 1, 2013 2:00 P.M. Mr. Dale Switzer Senior Director of Facilities Planning, Development

More information