1 Citizens Advisory Committee May 23, 2012 Citizens Advisory Committee Maria Lombardo Chief Deputy Director for Policy and Programming OneBayArea Grant Program Strategy, Schedule and Prioritization Criteria On May 17, 2012, the Metropolitan Transportation Commission (MTC) adopted the OneBayArea Program (OBAG) as the second part (Cycle 2) of its framework for programming funds anticipated under the yet-to-be developed federal surface transportation act. The policy impetus behind OBAG is an effort to better integrate the region s federal transportation program with California s climate law (Senate Bill 375, Steinberg, 2008) and the Sustainable Communities Strategy (SCS). This integration is being accomplished by using transportation dollars to reward jurisdictions that accept housing allocations through the Regional Housing Need Allocation (RHNA) process and that have historically produced housing, by supporting the SCS for the Bay Area by promoting transportation investments in Priority Development Areas (PDAs), and by providing a higher proportion of funding to local agencies and additional investment flexibility by eliminating required program targets. MTC used a formula that considered population, planned housing, and past housing production to distribute funds to CMAs. San Francisco s estimated share of OBAG funds is $38.8 million, with funds available primarily in Fiscal Years 2013/14 to 2015/16. MTC is supporting the SCS by requiring that 70% of the OBAG funds be spent in or support PDAs. CMAs may fund projects eligible under any of the following OBAG programs at whatever funding level best meets the county s needs: Transportation for Livable Communities, Local Streets and Roads Preservation, Regional Bicycle Program, and Safe Routes to School, as well as any pedestrian and bicycle improvements. OBAG also provides annual funds for CMA planning activities, previously provided by MTC to CMAs through a separate agreement. In May, we will brief the Citizens Advisory Committee (CAC) on our proposed schedule, strategy and screening/prioritization criteria for OBAG, returning in June for approval. We are seeking input and guidance from the CAC. This is an information item. On May 17, 2012, the Metropolitan Transportation Commission (MTC) adopted the OneBayArea Program (OBAG) as the second part (Cycle 2) of its framework for programming funds anticipated under the yet-to-be developed federal surface transportation act. The first funding cycle (Cycle 1) covered Fiscal Years 2009/ /12. Cycle 2 will cover Fiscal Year 2012/13 to Fiscal Year 2015/16. Cycle 1 included several grant programs managed by the respective county Congestion Management Agency (CMAs), such as the Authority in San Francisco. One of those programs was the CMA Block Grant program, which included three fund programs: county share Transportation for Livable Communities (TLC), the Regional Bicycle Program, and the Local Streets and Roads program with designated funding levels assigned by MTC. OBAG is an expansion of the CMA Block Grant program. It includes all of the programs mentioned above along with Safe Routes to School (SR2S) and a broadened eligibility for bicycle and pedestrian improvements that subsumed the Regional Bicycle Program. Further, OBAG does not establish funding targets for the various OBAG programs, but gives CMAs the flexibility to prioritize projects for the OBAG programs at any level to ensure that the investments meet local needs. Lastly, OBAG includes funds for CMA planning activities, which previously had primarily been distributed to CMAs by separate inter-agency agreements with MTC. These funds also received an additional increment from Cycle 1 of the CMA Block Grant program

2 which preceded OBAG. As we have noted during prior briefings on OBAG to the Citizens Advisory Committee (CAC), the primary driver behind this new flexible funding approach is an effort to better integrate the region s federal transportation program with California s climate law (Senate Bill 375, Steinberg, 2008) and the Sustainable Communities Strategy (SCS). This integration is being accomplished by using transportation dollars to reward jurisdictions that accept housing allocations through the Regional Housing Need Allocation (RHNA) process and that have historically produced housing, and by supporting the SCS for the Bay Area by promoting transportation investments in Priority Development Areas (PDAs). The OBAG program rewards jurisdictions that accept housing allocations through the RHNA process and that have historically produced housing by using a fund distribution formula that targeted those items. The distribution formula breakdown is shown below with distributions derived from each jurisdiction s proportionate share of the regional total for the factor: OBAG Fund Distribution Factors Factor Weighting Percentage Population 50.0% RHNA (total housing units) % RHNA (low/very low income housing units) 12.5% Housing Production 2 (total housing units) 12.5% Housing Production (low/very low income housing units) 12.5% 1 RHNA Housing Production Report San Francisco s share of OBAG funds is estimated at $38.8 million. MTC is supporting the SCS by requiring that 70% of the OBAG funds be spent in PDAs. A project lying outside the limits of a PDA may count towards the minimum provided that it directly connects to or provides proximate access to a PDA. CMAs make the determination for projects to count toward the PDA minimum that are not otherwise geographically located within a PDA. See Attachment 1 for a map of PDAs in San Francisco. As the CMA for San Francisco, the Authority will be issuing a call for projects for OBAG. The purpose of this memorandum is to present the proposed call for projects strategy, schedule, and screening/prioritization criteria for OBAG and to seek input and guidance from the CAC. For a jurisdiction to be eligible for OBAG funds it must work with the CMA to accomplish the following items: Address complete streets policies at the local level through the adoption of a complete streets policy resolution no later than January 31, Have its general plan housing element adopted and certified by the California Department of Housing and Community Development for RHNA prior to January 31, San Francisco has already satisfied both of these requirements. The CMA is also responsible for

3 creating a PDA Investment & Growth Strategy by May 1, MTC has stated that this includes an analysis of progress of local jurisdictions in implementing their housing element objectives and identifying current local housing policies that encourage affordable housing production and/or community stabilization. Starting in January 2014 and for subsequent updates, PDA Investment & Growth Strategies will assess performance in producing sufficient housing for all income levels through the RHNA process and, where appropriate, assist local jurisdictions in implementing local policy changes to facilitate achieving these goals. The Authority is committed to working with the Planning Department to complete this analysis by the assigned due dates, and we continue to seek clarification from MTC as to what is expected. Pursuant to direction provided by MTC and the Association of Bay Area Governments (ABAG) at their joint May 17 meeting, the Authority will work with other CMAs and MTC on the work plan for the growth and investment strategy and potentially some of the responsibility could shift back to MTC and ABAG for this work. The estimated $ million in Cycle 2 OBAG funds will include three different federal fund sources: Surface Transportation Program (STP), Congestion Mitigation and Air Quality Improvement (CMAQ) program, and Transportation Enhancements (TE) program funds. The latter are programmed by the California Transportation Commission (CTC) through the State Transportation Improvement Program. We are waiting for MTC to make the final breakdown of funds available to us. This is an important factor in programming projects as each federal fund source has slightly different eligibility, allocation, and local match requirements. Our current understanding of local match requirements is that STP and CMAQ require an 11.47% local match and TE funds require the same percentage, however TE match is expected to be provided by the State through the CTC. OBAG funds are available for programming between Fiscal Year 2012/13 and Fiscal Year 2015/16. However, in light of significant challenges in project delivery region-wide, MTC has asked that CMAs program projects between Fiscal Year 2013/14 and 2015/16 and MTC will front load regional, readyto-go projects in Fiscal Year 2012/13. Half of the OBAG funds, including all funds programmed for the preliminary engineering and design phases, must be obligated by March 31, All remaining OBAG funds must be obligated by March 31, The bullets below provide a high-level summary of the types of projects eligible for funding through each of the various OBAG programs: Transportation for Livable Communities (TLC): The TLC program is intended to fund projects that support multimodal travel, more livable neighborhoods and the development of jobs and housing in existing town centers. Examples of eligible projects funded in previous TLC funding cycles include the Folsom Streetscape and the Broadway Streetscape Improvements projects, and the 24 th Street BART Plaza Improvements. TLC projects often include, but are not limited to, corner bulb-outs, sidewalk extensions and widening, roadway restriping, mid-block crossings, new street trees, bicycle facilities, bicycle parking and public art. Local Streets & Roads Preservation: MTC has maintained this program for many, many years with very consistent guidelines. The focus of the program is pavement rehabilitation. For a project to be eligible it must be on the federal-aid system (e.g. an arterial or a collector) and extend the service life of the facility by more than 5 years. Safe Routes to School (SR2S): This program funds infrastructure projects like pedestrian facilities, traffic calming measures, installation of traffic control devices, construction of bicycle facilities, transit station enhancements, and transit access improvement for school age children. SR2S funds may also be used for certain non-infrastructure activities like public education and

4 outreach on transportation demand management activities and promotion of new and existing services. Bicycle and Pedestrian Improvements: In the previous funding cycles pedestrian and bicycle projects were limited to streetscape projects in designated PDAs, SR2S projects, and bicycle projects located on the regional bicycle network. OBAG gives greater flexibility by allowing all bicycle and pedestrian projects to be funded either as stand-alone projects or as part of a larger project. Eligible projects include Class I, II and III bicycle facilities, bicycle education, outreach, sharing and parking, sidewalks, ramps, pathways and pedestrian bridges, user safety and supporting facilities, and traffic signal actuation. Attachment 2 shows our proposed high-level breakdown of San Francisco s OBAG funding including the amount proposed for four years of CMA planning activities ($3.6 million) based on the Authority s adopted Fiscal Year 2012/13 budget and assuming 4% annual escalation as well a proposed minimum target of $2.5 million for SR2S projects. CMA planning activities include, but are not limited to, countybased planning efforts for development of the Regional Transportation Plan and the SCS, including the San Francisco Transportation Plan and other Authority planning efforts; development of PDA growth and investment strategies; establishing land use and travel forecasting process and procedures consistent with MTC and ABAG requirements; delivery support and oversight of San Francisco federal-aid projects; and undertaking calls for projects, programming and prioritization of OBAG, Lifeline Transportation Program and other state and federal fund sources. We are also taking advantage of OBAG s flexibility to create a minimum target of $2.5 million for the SR2S program within OBAG to augment the regional SR2S program. The latter will be developed through a separate call for projects, will have more of a focus on non-infrastructure projects, and will have funds available in Fiscal Year 2012/13, if projects are ready. The OBAG funded SR2S program will focus on infrastructure projects though we will maintain the flexibility to fund non-infrastructure projects if they cannot be accommodated within the regional SR2S program. The intent of establishing the SR2S fund target is to incentivize sponsors to address the growing pipeline of SR2S projects and needs that have been identified by the San Francisco Safe Routes to School Coalition and the San Francisco Municipal Transportation Agency. The target was set based on the historical average cost of SR2S infrastructure projects (average cost of ~$800,000) and an assumption of three projects over the four-year OBAG programming cycle. The Authority intends to do a two-part call for projects to enable us to work with sponsors to identify a set of OBAG projects for which we will have a high level of confidence that they will be able to meet the timely-use-of-funds deadlines associated with the federal OBAG funds. Part One The purpose of the first part of the call is to solicit candidate projects and develop a prioritized pool of OBAG projects for approval by the Authority Board in the fall. All eligible public agencies will be able to submit projects applications. Authority staff will review the applications based on the prioritization criteria described later in this memo. The Authority Board will then adopt an initial OBAG project list that over programs San Francisco s OBAG target by a yet-to-be-determined amount. Following establishment of this initial project list is a 5-month period during which project sponsors can further develop their projects. Work during this period must include all of the following activities: At least one community meeting to gather input on the specific project. Further community input will also be required throughout the OBAG funded design and construction phases on the project. Further conceptual and/or preliminary engineering that focuses on identifying possible issues

5 with federal environmental clearance (e.g. impact on historic properties, archaeological impacts, traffic and parking impacts, etc.), updated cost estimates that must be signed off at a conceptual level by all affected agencies, and coordination with other ongoing infrastructure projects. Multi-agency agreements, if relevant, on project management strategies and identification of a project lead and project team. At least one meeting with the Pedestrian Safety Advisory Committee and the Bicycle Advisory Committee. We will work with sponsors to identify and support Prop K allocations for the above project development work if other fund sources are not available for this purpose. We also anticipate that Prop K and Prop AA would provide much of the required local match for OBAG grants. Part Two All projects sponsors will submit updated applications with revised scope, schedule, and budget detail and Authority staff will reevaluate the project applications based on the prioritization criteria described below. This will allow for adjustments in cost and scope or may result in certain projects dropping out of consideration if they haven t advanced sufficiently to be able to meet timelyuse-of-fund deadlines. The Authority Board will adopt the final OBAG program for submittal to MTC. See Attachment 3 for a detailed schedule for the OBAG call for projects. This schedule reflects the programming strategy outlined above. We reviewed the two part call approach and the proposed schedule with the Authority s Technical Working Group and it was well received. Attachment 4 includes the draft screening and prioritization criteria that we will use to evaluate projects for OBAG funding. Only projects that satisfy all of the applicable screening criteria will be prioritized for potential OBAG funding. As noted in the attachment, MTC s OBAG guidelines, as well as the need to meet eligibility requirements of the various OBAG fund sources dictate most of the screening and prioritization criteria. We have flagged San Francisco-specific criteria in Attachment 4 using highlighted text. For instance, for SR2S projects we propose prioritizing projects that come from documented walking audits with school officials and community members. Given the challenge of meeting the timely use of funds requirements and the consequences of failing to meet the requirements (e.g. loss of funds to the project and San Francisco), project readiness will be given strong consideration. As is customary, we will work closely with project sponsors to clarify scope, schedule and budget; and modify programming recommendations as needed to help optimize the project s ability to meet timely use of funds requirements. We are seeking input and guidance from the CAC. This is an information item. Not applicable This is an information item. Not applicable This is an information item. Not applicable This is an information item.

6 Attachments: 1. Map of San Francisco Priority Development Areas 2. Draft OneBayArea Grant Fund Programming 3. Draft OneBayArea Call for Projects Schedule 4. Draft OneBayArea Screening and Prioritization Criteria

7 Marin County Attachment 1 San Francisco Bay IÆ!"c$ Alameda County Pacific Ocean?Ô San Francisco Future Priority Development Area Place Type Regional Center Transit Town Center Urban Neighborhood Transit Neighborhood Mixed-Use Corridor %&j( IÆ San Francisco Bay Priority Conservation Area Within Urban Footprint Within Urban Growth Limits Protected Open Space Source: Street Base Map 2006 TeleAtlas, Inc. All rights reserved. Protected areas data from California Protected Areas Database ( ABAG GIS/February 2012 Sc a le: Miles Kilometers %&j( San Mateo County IÆ Future Place Type for Priority Development Areas in San Francisco

8 Attachment 2 Draft OneBayArea Grant Fund Programming 1 (millions $) CMA Planning Activities $ Priority Development Area Projects (Minimum) 2 $ Safe Routes to School (Target) $ Non-Priority Development Area Projects (Target) $ TOTAL $ Amounts are estimates and subject to change based on adoption of a new federal surface transportation act and/or extensions of the current bill. 2 Per MTC guidelines a minimum of 70% of San Francisco's OBAG funds must be programmed to projects in Priority Development Areas (PDAs). Amounts in the table above credit the CMA Planning Activities funds towards the 70% PDA target as allowed by MTC. A project lying outside the limits of a PDA may count towards the minimum provided that it directly connects to or provides proximate access to a PDA. CMAs make the determination for projects to count toward the PDA minimum that are not otherwise geographically located within a PDA. 3 The Safe Routes to School/Transit target is not required by MTC, but rather proposed by Authority staff to encourage sponsors to submit these types of projects for OBAG funding. M:\CAC\Meetings\Memo to CAC\2012\05-May 2012\OBAG Attachments\DRAFT OBAG Fund Programming Breakdown Page 1 of 1

9 Attachment 3 Draft OneBayArea Call for Projects Schedule May 17, 2012 Authority Technical Working Group - INFORMATION OBAG guidelines and prioritization criteria May 23, 2012 June 12, 2012 June 15, 2012 June 21, 2012 June 27, 2012 July 10, 2012 July 24, 2012 August 17, 2012 September 2012 September 2012 September 2012 October 2012 October 2012 November 2012 Early March 2013 Citizens Advisory Committee Meeting INFORMATION OBAG guidelines and prioritization criteria Plans and Programs Committee Meeting INFORMATION OBAG guidelines and prioritization criteria Authority Releases Initial OBAG Call for Projects Authority Technical Working Group - Application Workshop Citizens Advisory Committee Meeting ACTION OBAG guidelines and prioritization criteria Plans and Programs Committee Meeting ACTION OBAG guidelines and prioritization criteria Authority Board Meeting ACTION OBAG guidelines and prioritization criteria Initial OBAG Applications Due to Authority Authority Releases Staff Recommendation on OBAG Projects Authority Technical Working Group Staff recommendation on OBAG projects and project development strategy Citizens Advisory Committee Meeting ACTION Staff recommendation on OBAG projects and project development strategy Plans and Programs Committee Meeting ACTION Staff recommendation on OBAG projects and project development strategy Authority Board Meeting ACTION Staff recommendation on OBAG projects and project development strategy Project sponsors further develop OBAG projects and seek public input M:\CAC\Meetings\Memo to CAC\2012\05-May 2012\OBAG Attachments\DRAFT OBAG Call for Projects Schedule.docx Page 1 of 2

10 Attachment 3 End of March 2013 April 2013 April 2013 April 2013 May 2013 May 2013 May 1, 2013 June 2013 Final OBAG Applications Due to Authority Authority Releases Final Staff Recommendation on OBAG Projects Authority Technical Working Group Final staff recommendation on OBAG project priorities Citizens Advisory Committee Meeting ACTION Final staff recommendation on OBAG project priorities Plans and Programs Committee Meeting ACTION Final staff recommendation on OBAG project priorities Authority Board Meeting ACTION Final staff recommendation on OBAG project priorities PDA Growth & Investment Strategy Completed OBAG Recommendations Due to MTC M:\CAC\Meetings\Memo to CAC\2012\05-May 2012\OBAG Attachments\DRAFT OBAG Call for Projects Schedule.docx Page 2 of 2

11 Attachment 4 Draft OneBayArea Grant Screening and Prioritization Criteria The Authority will prioritize projects based on screening criteria within each individual program and prioritization criteria for the OBAG program as a whole. MTC s OBAG guidelines largely dictate the screening and evaluation criteria that the Authority will use. In the sections below italicized text indicates new or modified screening and prioritization criteria proposed by Authority staff. OBAG SCREENING CRITERIA Projects must meet all screening criteria in order to be considered further for OBAG funding. The screening criteria will focus on meeting the eligibility requirements for OBAG funds and include, but are not limited to the following factors: Project is a fully funded, stand-alone capital project. Project must be eligible for funding from one or more of the fund programs incorporated into OBAG: Local Streets and Roads Preservation, Bicycle and Pedestrian Improvements, Transportation for Livable Communities, and Safe Routes to School (SR2S) 1. Project sponsor is an eligible public agency per MTC s OBAG guidelines. Project sponsor is requesting a minimum of $500,000 in OBAG funds 2. Project is consistent with the adopted Regional Transportation Plan and the San Francisco Countywide Transportation Plan. Project must have the required 11.47% local match in committed or programmed funds. The need for local match only applies to projects funded with federal Surface Transportation Program (STP) and Congestion Mitigation and Air Quality Improvement (CMAQ) funds. Our current understanding is that projects funded with Transportation Enhancements (TE) funds and not transferred to the Federal Transit Administration will not have to have to provide local match as it is already funded by the State. Local Streets and Roads Preservation Additional Screening Criteria: Project selection must be based on the analysis results from San Francisco s certified Pavement Management System. Pavement rehabilitation projects must have a PCI score of 70 or below. Preventative maintenance projects must extend the useful life of the facility by at least 5 years. Project is not a capacity expansion project, right-of-way purchase, channelization, routine maintenance, spot application, seismic retrofit, or structural repair on bridges. Project is not a non-pavement enhancement, such as streetscape projects and/or new traffic calming features. Non-pavement projects/activities that replace features currently existing on the roadway are eligible as follows: minor structures (e.g. headwalls, retaining walls, slide repair and slope protection), ADA compliance components, NPDES/Permits, traffic safety 1 This lists excludes Priority Conservation Areas as an eligible project type as they are not applicable to San Francisco as the intent is to ameliorate outward development and expansion and maintain rural character. 2 MTC s guidelines establish a minimum federal grant amount of $250,000 for counties with populations less than one million like San Francisco. In recognition of the delivery challenges posed by federal funds, we recommend a minimum federal grant request of $500,000, but will consider a lower amount on a case by case basis consistent with MTC guidelines. M:\CAC\Meetings\Memo to CAC\2012\05-May 2012\OBAG Attachments\DRAFT OBAG Screening and Prioritization Process.docx Page 1 of 4

12 Attachment 4 components (e.g. striping, signs, signals), bike paths (Class II/III only), and sidewalks. SR2S - Additional Screening Criteria: Projects must be coordinated with San Francisco SR2S Coalition (Coalition), i.e., either having been prioritized by the Coalition or having a letter of support from the Coalition. The goal is to coordinate capital improvements with education and outreach opportunities throughout the city. Project must have a signed letter of support from a school administrator (e.g. Principal, Vice-Principal)at the selected school. OBAG Prioritization Criteria: Projects that meet all of the OBAG screening criteria and the screening criteria for the individual program will be prioritized for OBAG funding based on, but not limited to the factors listed below. The Authority reserves the right to modify or add to the prioritization criteria in response to additional guidance and if necessary to prioritize a very competitive list of eligible projects that exceed available programming capacity and to enable matching of recommended projects with eligibility requirements of available fund sources.. Located within or provides proximate access to PDA: OBAG establishes a 70% minimum requirement that all funds be used on projects that are located within or provide proximate access to a PDA. Projects that are geographically outside of a PDA, but are determined to be eligible by the CMA because they provide proximate access to a PDA, must be mapped and given policy justifications for why and how they support a given PDA. Project Readiness: Projects that can clearly demonstrate an ability to meet timely use of funds requirements. Projects should have completed conceptual designs at a minimum and ideally completed survey work (e.g. at or near 30% design). This enables project benefits to be realized sooner and supports the regions strategy to obligate STP,CMAQ, and TE funds as early as possible. Within this criterion, the Authority will prioritize projects that can demonstrate state environmental clearance (CEQA) and a potential federal categorical exclusion (NEPA) and/or existing federal environmental clearance. Complete Streets/Multi-modal: Projects that directly benefit multiple system users (e.g. pedestrians, cyclists, transit passengers, motorists) will be prioritized. Community Support: Projects with clear and diverse (e.g. broad) community support will receive a higher priority. This can be shown through letters of support, specific reference and community meetings regarding the project. This includes a preference for projects that are included in adopted plans (e.g. area plans, traffic calming plans, neighborhood transportation plans). SR2S projects that come from documented walking audits with school officials and community members also will be prioritized. Multiple Project Coordination: Projects that are coordinated with non-obag funded, but related improvements, such as making pedestrian safety upgrades on a street or road that is scheduled to undergo repaving, will receive higher priority. Project sponsors must clearly identify related improvement projects, describe the scope, estimate cost, and provide a timeline for major milestones for coordination (e.g. start and end of design and construction phases). Safety: Projects that address high risk and high activity pedestrian corridors or locations (e.g. as identified in the WalkFirst effort) and/or high bicycle collision corridors or locations will be given higher priority. Project sponsors must clearly define the safety issue that is being addressed and how the project will improve M:\CAC\Meetings\Memo to CAC\2012\05-May 2012\OBAG Attachments\DRAFT OBAG Screening and Prioritization Process.docx Page 2 of 4

13 Attachment 4 or alleviate the issue. Located within High Impact Project Areas: Factors used to determine high impact project areas include: o Housing Area is expected to take on significant growth in the Sustainable Communities Strategy and Regional Housing Needs Allocation. o Jobs in proximity to housing and transit o Improved transportation choices for all income levels (reduces VMT, connectivity, transit access, etc.) o Consistency with regional TLC design guideline or design that encourages multimodal access o Project areas with parking management and pricing policies Located within a Community of Concern (COC): Projects located within a COC will be given higher priority. Located within Air District CARE Community: Projects located in areas with highest exposure to particulate matter and Toxic Air Contaminates, and employ best management practices to mitigate exposure, will receive a higher priority 3 Project Sponsor Priority: For project sponsors that submit multiple OBAG applications, we will consider the project sponsor s relative priority for its applications. Program Diversity: The variety of project types will be considered looking at the entire list of San Francisco projects. Geographic Equity: This factor will be considered looking at the entire list of San Francisco projects, as well as considering other current fund programming opportunities (e.g. Prop AA, Prop K). Eligibility for CMAQ Funds: If needed to match projects with the various fund sources assigned to the Authority through OBAG, after applying the above criteria the Authority may need to prioritize projects that are eligible for CMAQ funds, which is anticipated to be the largest OBAG fund source. For example, for bike and pedestrian projects, to comply with CMAQ eligibility requirements, facilities must not be exclusively recreational and they must reduce vehicle trips resulting in air pollution reductions. Similarly, for Safe Routes to School projects, walking audits and planning activities, crossing guards, vehicle speed feedback devices and traffic control that is primarily oriented to vehicular traffic rather than bicyclists and pedestrians are ineligible for CMAQ funds. Given the challenge of meeting the timely use of funds requirements and the consequences of failing to meet the requirements (e.g. loss of funds to the project and San Francisco), project readiness will be given strong consideration. As is customary, we will work closely with project sponsors clarify scope, schedule and budget; and modify programming recommendations as needed to help optimize the project s ability to meet timely use of funds requirements. If the amount of OBAG funds requested exceeds available funding we reserve the right to negotiate with project sponsors on items such as scope and budget changes that would allow us to 3 Information regarding Air District CARE Communities can be found online: ( M:\CAC\Meetings\Memo to CAC\2012\05-May 2012\OBAG Attachments\DRAFT OBAG Screening and Prioritization Process.docx Page 3 of 4

14 Attachment 4 develop a recommended OBAG project list that best satisfies all of the aforementioned prioritization criteria. M:\CAC\Meetings\Memo to CAC\2012\05-May 2012\OBAG Attachments\DRAFT OBAG Screening and Prioritization Process.docx Page 4 of 4

Appendix E: Grant Funding Sources

Appendix E: Grant Funding Sources Appendix E: Grant Funding Sources Federal Programs The majority of public funds for bicycle, pedestrian, and trails projects are derived through a core group of federal and state programs. Federal funding

More information

Memorandum. Date: RE: Plans and Programs Committee

Memorandum. Date: RE: Plans and Programs Committee Memorandum Date: 02.05.09 RE: Plans and Programs Committee February 10, 2009 To: From: Through: Subject: Summary Plans and Programs Committee: Commissioners Chu (Chair), Campos (Vice Chair), Chiu, Elsbernd,

More information

One Bay Area Grant (OBAG): Local Program Development - Criteria ACTION ITEM

One Bay Area Grant (OBAG): Local Program Development - Criteria ACTION ITEM 8.1 Date: September 26, 2012 Current Meeting: October 4, 2012 Board Meeting: October 4, 2012 BOARD MEMORANDUM TO: THROUGH: FROM: SUBJECT: Santa Clara Valley Transportation Authority Board of Directors

More information

REPORT TO MAYOR AND COUNCIL

REPORT TO MAYOR AND COUNCIL AGENDA ITEM NO..d REPORT TO MAYOR AND COUNCIL TO THE HONORABLE MAYOR AND COUNCIL: DATE: July, SUBJECT: ADOPT RESOLUTION NOS. -, -, -, - AND -0 OF LOCAL SUPPORT AUTHORIZING THE FILING OF APPLICATIONS FOR

More information

Capital District September 26, 2017 Transportation Committee. The Community and Transportation Linkage Planning Program for

Capital District September 26, 2017 Transportation Committee. The Community and Transportation Linkage Planning Program for Capital District September 26, 2017 Transportation Committee The Community and Transportation Linkage Planning Program for 2018-19 Introduction The Community and Transportation Linkage Planning Program

More information

Memorandum. Date: To: Prospective Project Sponsors From: Aprile Smith Senior Transportation Planner Through: Subject:

Memorandum. Date: To: Prospective Project Sponsors From: Aprile Smith Senior Transportation Planner Through: Subject: Memorandum Date: 02.14.18 To: Prospective Project Sponsors From: Aprile Smith Senior Transportation Planner Through: Subject: Amber Crabbe Assistant Deputy Director for Policy and Programming Cycle 5 Lifeline

More information

2018 Regional Solicitation for Transportation Projects

2018 Regional Solicitation for Transportation Projects 2018 Regional Solicitation for Transportation Projects Regional Solicitation Workshop April 17 2018 Regional Solicitation Purpose To distribute federal Surface Transportation Block Grant Program (STBGP)

More information

Memorandum. P:\Lifeline Program\2014 Lifeline Program\Call for Projects\LTP Cycle 4 Call - Memo.doc Page 1 of 7

Memorandum. P:\Lifeline Program\2014 Lifeline Program\Call for Projects\LTP Cycle 4 Call - Memo.doc Page 1 of 7 Memorandum Date: 10.29.14 To: Prospective Project Sponsors From: Seon Joo Kim Senior Transportation Planner Through: Amber Crabbe Assistant Deputy Director Subject: Cycle 4 Lifeline Transportation Program

More information

Date: To: From: Subject: Guidelines. Summary BACKGROUND. and equity public and. blueprint. The Transportation. tailored. sources.

Date: To: From: Subject: Guidelines. Summary BACKGROUND. and equity public and. blueprint. The Transportation. tailored. sources. Memorandum Date: To: From: Subject: 08.28.14 Citizens Advisory Committee Maria Lombardo Chief Deputy Director David Uniman Deputy Director for Planningg RE: Citizens Advisory Committee September 3, 2014

More information

2018 Regional Project Evaluation Criteria For PSRC s FHWA Funds

2018 Regional Project Evaluation Criteria For PSRC s FHWA Funds 2018 Regional Project Evaluation Criteria For PSRC s FHWA Funds INTRODUCTION As described in the adopted 2018 Policy Framework for PSRC s Federal Funds, the policy focus for the 2018 project selection

More information

TECHNICAL ADVISORY COMMITTEE MEETING NOTICE & AGENDA

TECHNICAL ADVISORY COMMITTEE MEETING NOTICE & AGENDA El Cerrito Hercules TECHNICAL ADVISORY COMMITTEE MEETING NOTICE & AGENDA Pinole Richmond San Pablo DATE & TIME: Thursday, September 8, 2016 9:00 AM 11:00 AM LOCATION: WCCTAC Offices 6333 Potrero Ave. at

More information

2018 STP & CMAQ Project Selection Process

2018 STP & CMAQ Project Selection Process 2018 STP & CMAQ Project Selection Process Available Funding: (In Millions) CMAQ STP Preservation TOTAL 2021 2022 2021 2022 2021 2022 Regional $14.27 (project cap)$7.13 Countywide $2.41 (project cap)$1.2

More information

2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS

2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS 2018 POLICY FRAMEWORK FOR PSRC S FEDERAL FUNDS TABLE OF CONTENTS Section 1: Background... 3 A. Policy Framework... 3 B. Development of the 2019-2022 Regional Transportation Improvement Program (TIP)..

More information

SUBJECT: SEE BELOW DATE: May 26, 2016

SUBJECT: SEE BELOW DATE: May 26, 2016 COUNCIL AGENDA: 06-07-16 ITEM: A. CI CITY OF C: 3- SAN JOSE CAPITAL OF SILICON VALLEY TO: HONORABLE MAYOR AND CITY COUNCIL Memorandum FROM: Barry Ng SUBJECT: SEE BELOW DATE: Approved IL2_PS^ Date 5 ^ lip

More information

LIFELINE TRANSPORTATION PROGRAM CALL FOR PROJECTS

LIFELINE TRANSPORTATION PROGRAM CALL FOR PROJECTS DECEMBER 19, 2014 LIFELINE TRANSPORTATION PROGRAM CALL FOR PROJECTS The Contra Costa Transportation Authority (CCTA or the Authority ) is issuing a Call for Projects for the Lifeline Transportation Program.

More information

SMALL CITY PROGRAM. ocuments/forms/allitems.

SMALL CITY PROGRAM.  ocuments/forms/allitems. SMALL CITY PROGRAM The Small City Program provides Federal funds to small cities with populations from 5,000 to 24,999 that are NOT located within Metropolitan Planning Organizations' boundaries. Currently

More information

The goal of the program is to enable transit-oriented housing and employment growth in Santa Clara County s Priority Development Areas (PDAs).

The goal of the program is to enable transit-oriented housing and employment growth in Santa Clara County s Priority Development Areas (PDAs). PDA PLANNING GRANTS PROGRAM The Santa Clara Valley Transportation Authority (VTA) has created a planning grant program for Santa Clara County jurisdictions that will provide significant support for Priority

More information

Transportation Alternatives Program Application For projects in the Tulsa Urbanized Area

Transportation Alternatives Program Application For projects in the Tulsa Urbanized Area FFY 2015-2016 Transportation Alternatives Program Application For projects in the Tulsa Urbanized Area A Grant Program of Moving Ahead for Progress in the 21st Century (MAP-21) U.S. Department of Transportation

More information

FUNDING SOURCES. Appendix I. Funding Sources

FUNDING SOURCES. Appendix I. Funding Sources Appendix I. Funding Sources FUNDING SOURCES planning and related efforts can be funded through a variety of local, state, and federal sources. However, these revenues have many guidelines in terms of how

More information

APPENDIX 5. Funding Plan

APPENDIX 5. Funding Plan STUDY: FINAL REPORT APPENDIX 5 Funding Plan May 2015 V:\2073\active\2073009060\report\DRAFT Final Report\rpt_MalPCH_DRAFTFinalReport-20150515.docx Pacific Coast Highway Safety Study: Funding Plan City

More information

Planning Committee STAFF REPORT October 7, 2015 Page 2 of 6 Changes from Committee Background MTC began preparing its 2017 RTP Update earlier this yea

Planning Committee STAFF REPORT October 7, 2015 Page 2 of 6 Changes from Committee Background MTC began preparing its 2017 RTP Update earlier this yea Planning Committee STAFF REPORT Meeting Date: October 7, 2015 Subject Summary of Issues Approval of Resolution 15-4-G and Transmittal of Recommended Project Lists to the Metropolitan Transportation Commission

More information

Authority Board March 26, 2013

Authority Board March 26, 2013 Memorandum 03.26.13 Authority Board March 26, 2013 Authority Board: Commissioners Avalos (Chair), Wiener (Vice Chair), Breed, Campos, Chiu, Cohen, Farrell, Kim, Mar, Tang and Yee Maria Lombardo Interim

More information

Major in FY2013/2014 (By and ing Source) Municipal Building Acquisition and Operations Balance $1,984, Contributions from Real Estate

Major in FY2013/2014 (By and ing Source) Municipal Building Acquisition and Operations Balance $1,984, Contributions from Real Estate Major in FY2013/2014 (By and ing Source) Environmental Services Solid Waste 4200 4200 06CON 4200 SWM01 Balance $13,753,504.00 Balance $4,631,754.00 Balance $2,738,918.00 ing Source Total: $21,124,176.00

More information

Peninsula Corridor Joint Powers Board Legislative Program

Peninsula Corridor Joint Powers Board Legislative Program Peninsula Corridor Joint Powers Board 2018 Legislative Program Purpose Legislative and regulatory actions have the potential to significantly benefit Peninsula Corridor Joint Powers Board (JPB) programs

More information

MAP-21 and Its Effects on Transportation Enhancements

MAP-21 and Its Effects on Transportation Enhancements Date: July 13, 2012 Subject: MAP-21 and Its Effects on Transportation Enhancements The recently enacted Moving Ahead for Progress in the 21 st Century (MAP-21) includes a number of substantial changes

More information

PRESENTER: Chris Blunk, Deputy Public Works Director/City Engineer

PRESENTER: Chris Blunk, Deputy Public Works Director/City Engineer G-7 STAFF REPORT MEETING DATE: September 26, 2017 TO: City Council FROM: Chris Blunk, Deputy Public Works Director/City Engineer PRESENTER: Chris Blunk, Deputy Public Works Director/City Engineer 922 Machin

More information

ATTACHMENT A PDA PLANNING GRANT PROGRAM Information and Evaluation Criteria

ATTACHMENT A PDA PLANNING GRANT PROGRAM Information and Evaluation Criteria PDA PLANNING GRANT PROGRAM The Santa Clara Valley Transportation Authority (VTA) has created a planning grant program for Santa Clara County jurisdictions that will provide significant support for Priority

More information

San Francisco County Transportation Authority Proposition K Sales Tax Program Allocation Request Form

San Francisco County Transportation Authority Proposition K Sales Tax Program Allocation Request Form San Francisco County Transportation Authority Proposition K Sales Tax Program Allocation Request Form FY 2004/05 Project Name: Implementing Agency: Illinois Street Inter-modal Bridge over Islais Creek

More information

chapter 5 Action Plan

chapter 5 Action Plan 5 Action Plan Critical to the CBTP process is bridging the gap between planning and action. Implementation of the CBTP relies on multiple jurisdictions and agencies, each responsible for different strategies

More information

TRANSPORTATION AND LAND USE COORDINATION

TRANSPORTATION AND LAND USE COORDINATION Item 7 Enclosure P Transportation Authority Board July 22, 2014 DRAFT 2014 PROPOSITION K 5YEAR PRIORITIZATION PROGRAM 1 TRANSPORTATION AND LAND USE COORDINATION Approved: [DATE] Prepared for the San Francisco

More information

Climate Initiatives Program. Competitive Grants Guidelines METROPOLITAN TRANSPORTATION COMMISSION

Climate Initiatives Program. Competitive Grants Guidelines METROPOLITAN TRANSPORTATION COMMISSION Climate Initiatives Program Competitive Grants Guidelines METROPOLITAN TRANSPORTATION COMMISSION Climate Change: A Serious Issue for the Bay Area Climate change refers to changes in the Earth s weather

More information

2018 Transportation Alternatives (TA) Program Overview Palm Beach Transportation Planning Agency

2018 Transportation Alternatives (TA) Program Overview Palm Beach Transportation Planning Agency The purpose of the s (TPA) Transportation Alternatives (TA) program is to help fund connected infrastructure for non-motorized users. Construction funding is typically provided three years out. Funding

More information

2. Transportation Alternatives Program Activities Regulations and Guidelines... 4, 5 & Eligible and Ineligible Items...

2. Transportation Alternatives Program Activities Regulations and Guidelines... 4, 5 & Eligible and Ineligible Items... FY 2018 TRANSPORTATION ALTERNATIVES PROGRAM INSTRUCTIONS, GUIDELINES AND APPLICATION TABLE OF CONTENTS Page(s) 1. Instructions for Submitting a Transportation Alternatives Program Application.. 1 2. Transportation

More information

Measure A Strategic Plan Update Citizens Advisory Committee July 1, 2014

Measure A Strategic Plan Update Citizens Advisory Committee July 1, 2014 Measure A Strategic Plan Update 2014-2018 Citizens Advisory Committee July 1, 2014 Presentation Outline Review Program Elements & Past Performance Discuss County Demographics and Travel Trends Review Program

More information

Purpose. Funding. Eligible Projects

Purpose. Funding. Eligible Projects SMART SCALE is a statewide program that distributes funding based on a transparent and objective evaluation of projects that will determine how effectively they help the state achieve its transportation

More information

TRANSPORTATION FUNDING PROGRAMS

TRANSPORTATION FUNDING PROGRAMS APPENDIX A Note: Not yet edited by DCPD. TRANSPORTATION FUNDING PROGRAMS 6 Transportation Funding Programs The following provides a brief description of transportation related funding programs that are

More information

TRANSPORTATION ALTERNATIVES (TA) SET ASIDE PROGRAM July 2016

TRANSPORTATION ALTERNATIVES (TA) SET ASIDE PROGRAM July 2016 Regional Transportation Commission TRANSPORTATION ALTERNATIVES (TA) SET ASIDE PROGRAM July 2016 Contents 1.0 Purpose and Eligibility... 2 2.0 Process... 5 3.0 Implementation of Funded Projects... 5 Attachment

More information

SMART SCALE Policy Guide

SMART SCALE Policy Guide What is SMART SCALE? Virginia s SMART SCALE ( 33.2 21.4) is about picking the right transportation projects for funding and ensuring the best use of limited tax dollars. It is the method of scoring planned

More information

Regional Sustainable Infrastructure Planning Grant Program Cycle 1. FINAL Draft

Regional Sustainable Infrastructure Planning Grant Program Cycle 1. FINAL Draft Regional Sustainable Infrastructure Planning Grant Program Cycle 1 FINAL Draft Fresno Council of Governments January 2018 1 Introduction Fresno Council of Governments is simultaneously soliciting Regional

More information

2015 call for projects draft application package

2015 call for projects draft application package BIKE BIKE Los Angeles County Metropolitan Transportation Authority 2015 call for projects draft application package 183 93 BIKE BIKE BIKE working document Call for Projects Applicant Workshop Experts

More information

15 1. John Yehall Chin Elementary Safe Routes to School Project;

15 1. John Yehall Chin Elementary Safe Routes to School Project; FILE NO. 180269 RESOLUTION NO. 137-18 1 [Apply for, Accept, and Expend Grant - Metropolitan Transportation Commission - OneBayArea Grant - $19,346,000] 2 3 Resolution authorizing the filing of an application

More information

Shaping Investments for San Francisco s Transportation Future The 2017 San Francisco Transportation Plan (SFTP) Update

Shaping Investments for San Francisco s Transportation Future The 2017 San Francisco Transportation Plan (SFTP) Update SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY Shaping Investments for San Francisco s Transportation Future The 2017 San Francisco Transportation Plan (SFTP) Update Provide world-class infrastructure and

More information

San Francisco Transportation Task Force 2045

San Francisco Transportation Task Force 2045 San Francisco Transportation Task Force 2045 June 5, 2017 Meeting Welcome from the Chairs Welcome and thank you for joining this effort Why we are here Process outline and role of task force members Summary

More information

INTRODUCTION. RTPO Model Program Guide February 27, 2007 Page 1

INTRODUCTION. RTPO Model Program Guide February 27, 2007 Page 1 TABLE OF CONTENTS INTRODUCTION... 1 HOW TO USE THIS GUIDE... 2 SECTION I: LAND USE AND TRANSPORTATION CONTEXT... 3 SECTION II: MINIMUM CRITERIA FOR GROWTH AND TRANSPORTATION EFFICIENCY CENTERS... 5 SECTION

More information

San Francisco Transportation Plan (SFTP) and Early Action Plan

San Francisco Transportation Plan (SFTP) and Early Action Plan San Francisco Transportation Plan (SFTP) and Early Action Plan October 2013 SAN FRANCISCO COUNTY TRANSPORTATION AUTHORITY Purpose of the San Francisco Transportation Plan (SFTP) Regional Transportation

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS Community Development Department Planning & Zoning Division REQUEST FOR PROPOSALS COMBINED ACTIVE TRANSPORTATION/ SAFE ROUTES TO SCHOOL PLAN State Project No. ATPL-5169 (048) RELEASE DATE: SEPTEMBER 23,

More information

Date: To: From: Subject: ACTION Summary

Date: To: From: Subject: ACTION Summary Memorandum Date: To: From: Subject: 01.23.15 Citizens Advisory Committee RE: C Amber Crabbe Assistant Deputy Director forr Policy and Programming Citizens Advisory Committee January 28, 2015 ACTION Adopt

More information

Fiscal Year 2014 TRANSPORTATION ALTERNATIVES PROGRAM (TAP) INSTRUCTIONS AND GUIDELINES

Fiscal Year 2014 TRANSPORTATION ALTERNATIVES PROGRAM (TAP) INSTRUCTIONS AND GUIDELINES Fiscal Year 2014 TRANSPORTATION ALTERNATIVES PROGRAM (TAP) INSTRUCTIONS AND GUIDELINES TABLE OF CONTENTS Pages 1. Instructions for Submitting a Transportation Alternatives Program Application. 1 2. Transportation

More information

2018 Project Selection Process. Transportation Policy Board January 11, 2018

2018 Project Selection Process. Transportation Policy Board January 11, 2018 2018 Project Selection Process Transportation Policy Board January 11, 2018 Presentation Overview Overview of the Project Selection Task Force Background on PSRC Funds and Project Selection Task Force

More information

KYOVA Interstate Planning Commission

KYOVA Interstate Planning Commission KYOVA Interstate Planning Commission Sub-allocated Funding Process and Application Package This packet includes information and guidance about the process used by KYOVA Interstate Planning Commission to

More information

Overview of the Regional Transportation Improvement Program

Overview of the Regional Transportation Improvement Program Overview of the 2017-2020 Regional Transportation Improvement Program Table of Contents What is the Puget Sound Regional Council (PSRC)?... 1 What is the Transportation Improvement Program (TIP)?... 1

More information

J:\2006\Memo Items\7 - July 2006\Lifeline Transportation Program FY0607.doc Page 2 of 5

J:\2006\Memo Items\7 - July 2006\Lifeline Transportation Program FY0607.doc Page 2 of 5 address gaps or barriers identified through community-based transportation plans, welfare-towork plans, or other community-based documentation of need; and improve a range of transportation choices for

More information

Summary of Regional Smart Growth Incentive Programs

Summary of Regional Smart Growth Incentive Programs Summary of Regional Smart Growth Incentive Programs 1) The Atlanta Regional Commission s Livable Centers Initiative" Program Summary The Atlanta Regional Commission (ARC) Board adopted policies in the

More information

MEMORANDUM. July 7, 2016

MEMORANDUM. July 7, 2016 MEMORANDUM July 7, 2016 TO: FROM: MEMBERS, PORT COMMISSION Hon. Willie Adams, President Hon. Kimberly Brandon, Vice President Hon. Leslie Katz Hon. Eleni Kounalakis Hon. Doreen Woo Ho Elaine Forbes Interim

More information

Transportation Alternatives Program Guidance & Application Packet Call for Projects: April 5 th, 2018 May 11 th, 2018

Transportation Alternatives Program Guidance & Application Packet Call for Projects: April 5 th, 2018 May 11 th, 2018 Transportation Alternatives Program Guidance & Application Packet Call for Projects: April 5 th, 2018 May 11 th, 2018 Introduction The Region 1 Planning Council, in its capacity as the Metropolitan Planning

More information

NAPA COUNTY GRAND JURY

NAPA COUNTY GRAND JURY NAPA COUNTY GRAND JURY 2016-2017 June 22, 2017 FINAL REPORT NAPA VALLEY TRANSPORTATION AGENCY VISION 2040 PLAN County Traffic Problems Need a Comprehensive Plan with Measurable Results 2 NAPA VALLEY TRANSPORTATION

More information

Caltrans Sustainable Transportation Planning Grant Program

Caltrans Sustainable Transportation Planning Grant Program Caltrans Sustainable Transportation Planning Grant Program FY 2017-18 Strategic Partnerships & Sustainable Communities Presented by California Department of Transportation (Caltrans) FY 2017-18 Update

More information

ADMINISTRATIVE CODE BOARD OF COUNTY COMMISSIONERS

ADMINISTRATIVE CODE BOARD OF COUNTY COMMISSIONERS ADMINISTRATIVE CODE BOARD OF COUNTY COMMISSIONERS CATEGORY: DEVELOPMENT/PLANNING/ZONING TITLE: TRANSPORTATION PROPORTIONATE SHARE CALCULATIONS FOR NEW DEVELOPMENT PROJECTS CODE NUMBER: AC-13-16 ADOPTED:

More information

RESOLUTION ADOPTINGPRINCIPLES AND APPROVING A LIST OF CANDIDATE PROJECTS AND FUNDING REQUESTS FOR REGIONAL MEASURE 3

RESOLUTION ADOPTINGPRINCIPLES AND APPROVING A LIST OF CANDIDATE PROJECTS AND FUNDING REQUESTS FOR REGIONAL MEASURE 3 BD050917 RESOLUTION NO. 17-XX RESOLUTION ADOPTINGPRINCIPLES AND APPROVING A LIST OF CANDIDATE PROJECTS AND FUNDING REQUESTS FOR REGIONAL MEASURE 3 WHEREAS, The Transportation Authority annually approves

More information

Summary of. Overview. existing law. to coal ash. billion in FY. funding in FY 2013 FY 2014

Summary of. Overview. existing law. to coal ash. billion in FY. funding in FY 2013 FY 2014 H.R. 4348, THE MOVING AHEAD FOR PROGRESS IN THE 21ST CENTURY ACT CONFERENCE REPORT Summary of Key Highway and Research Provisions The following summary is intended to highlight thee highway and research

More information

Martin Pastucha, Director of Public Works David Martin, Director of Planning and Community Development

Martin Pastucha, Director of Public Works David Martin, Director of Planning and Community Development Information Item To: Mayor and City Council Date: November 13, 2013 From: Subject: Martin Pastucha, Director of Public Works David Martin, Director of Planning and Community Development 2013 Call For Projects

More information

LPA Programs How They Work

LPA Programs How They Work LPA Programs How They Work Ann Wills, P.E. Transportation Engineering Conference 2018 www.dotd.la.gov Requirements For ALL LPA Projects 1. Risk Assessment 2. Entity-State Agreement 3. Responsible Charge

More information

The next steps outlined at the end of this section are the key requirements as we can best envision them at this stage.

The next steps outlined at the end of this section are the key requirements as we can best envision them at this stage. 5 Implementation 5.1 Anticipated Caltrans Review Process... 2 5.1.1 Project Initiation Document and Project Report... 2 5.1.2 Environmental Review Process... 4 5.1.3 Right of Way Acquisition Process...

More information

Transportation Improvement Program. Mid-America Regional Council Transportation Department

Transportation Improvement Program. Mid-America Regional Council Transportation Department Transportation Improvement Program 2018 2022 Mid-America Regional Council Transportation Department 2 Transportation Improvement Program 2018 2022 Mid-America Regional Council 3 4 Transportation Improvement

More information

CHAPTER 8 CAPITAL IMPROVEMENT PROGRAM. Key Topics: Legislative Requirements. 2. Legislative Intent and Application to San Francisco

CHAPTER 8 CAPITAL IMPROVEMENT PROGRAM. Key Topics: Legislative Requirements. 2. Legislative Intent and Application to San Francisco CHAPTER 8 CAPITAL IMPROVEMENT PROGRAM Key Topics: Legislative Requirements Legislative Intent and Application to San Francisco Transportation Investment and System Performance CIP Components Relationship

More information

Lancaster County Smart Growth Transportation Program (Updated March 2017)

Lancaster County Smart Growth Transportation Program (Updated March 2017) Lancaster County Smart Growth Transportation Program (Updated March 2017) Program Description The Smart Growth Transportation (SGT) program was established offered by the Lancaster County Transportation

More information

CITY OF LA CENTER PUBLIC WORKS

CITY OF LA CENTER PUBLIC WORKS CITY OF LA CENTER PUBLIC WORKS TRAFFIC CALMING PROGRAM APPROVED PER RESOLUTION 08-304 ON DECEMBER 10, 2008 TABLE OF CONTENTS PAGE Summary... 1 Procedures... 2 Project Eligibility... 2 Project Funding &

More information

RESOLUTION NO. 18-XX RESOLUTION AUTHORIZING THE EXECUTIVE DIRECTOR TO EXECUTE COOPERATIVE AGREEMENT NO WITH THE CALIFORNIA DEPARTMENT OF

RESOLUTION NO. 18-XX RESOLUTION AUTHORIZING THE EXECUTIVE DIRECTOR TO EXECUTE COOPERATIVE AGREEMENT NO WITH THE CALIFORNIA DEPARTMENT OF BD041018 RESOLUTION NO. 18-XX RESOLUTION AUTHORIZING THE EXECUTIVE DIRECTOR TO EXECUTE COOPERATIVE AGREEMENT NO. 04-2647 WITH THE CALIFORNIA DEPARTMENT OF TRANSPORTATION FOR THE U.S. 101/I-280 MANAGED

More information

Subject: Lifeline Cycle 4 Grant Funding

Subject: Lifeline Cycle 4 Grant Funding Agenda Item # 4.b. To: Board of Directors Date: May 11, 2015 From: Laramie Bowron, Manager of Planning Reviewed by: Subject: Lifeline Cycle 4 Grant Funding Summary: As part of County Connection s Lifeline

More information

INDIAN RIVER COUNTY METROPOLITAN PLANNING ORGANIZATION

INDIAN RIVER COUNTY METROPOLITAN PLANNING ORGANIZATION 2016 PRIORITY PROJECTS REPORT INDIAN RIVER COUNTY METROPOLITAN PLANNING ORGANIZATION This document was produced in cooperation with the Florida Department of Transportation and the Federal Highway Administration

More information

Transportation Alternatives Program Guidance

Transportation Alternatives Program Guidance Transportation Alternatives Program Guidance The Transportation Alternatives Program (TAP): The South Carolina Department of Transportation (SCDOT) partners with the Federal Highway Administration (FHWA)

More information

The City of San Rafael is issuing this Request for Proposals (RFP) to solicit proposals from qualified consultants to provide:

The City of San Rafael is issuing this Request for Proposals (RFP) to solicit proposals from qualified consultants to provide: REQUEST FOR PROPOSALS (RFP) CITY OF SAN RAFAEL GENERAL PLAN 2040 TECHNICAL SUPPORT AND DOWNTOWN PRECISE PLAN Environmental Review Transportation Infrastructure Economics Community Design Meeting Facilitation,

More information

South Dakota Transportation Alternatives

South Dakota Transportation Alternatives South Dakota Transportation Alternatives Program Summary and Application Guide Updated March 2018 Connecting South Dakota and the Nation 1 Transportation Alternatives (TA) Summary 1. Overview Transportation

More information

2007 Annual List of Obligated Projects

2007 Annual List of Obligated Projects This document is available in accessible formats when requested five days in advance. This document was prepared and published by the Memphis Metropolitan Planning Organization and is prepared in cooperation

More information

SAFETEA-LU. Overview. Background

SAFETEA-LU. Overview. Background SAFETEA-LU This document provides information related to the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) that was previously posted on the Center for

More information

.?-& Approved as to Fonn. R. ZIEGLER, County Counsel THE BOARD OF SUPERVISORS OF THE COUNTY OF ALAMD~, STATE OF CALIFORNIA RESOLUTION NUMBER:

.?-& Approved as to Fonn. R. ZIEGLER, County Counsel THE BOARD OF SUPERVISORS OF THE COUNTY OF ALAMD~, STATE OF CALIFORNIA RESOLUTION NUMBER: \ \ Approved as to Fonn DONNA -r R. ZIEGLER, County Counsel.?-& By: Deputy THE BOARD OF SUPERVISORS OF THE COUNTY OF ALAMD~, STATE OF CALIFORNIA RESOLUTION NUMBER: R- 201 6'-25 AUTHORIZE THE FILING OF

More information

PUBLIC FACILITIES FINANCING

PUBLIC FACILITIES FINANCING 9. Public Facilities Financing Brisbane Baylands Specific Plan 257 9 PUBLIC FACILITIES FINANCING 9.1 PURPOSE The Baylands is planned to accommodate a variety of uses including retail at a range of types

More information

Greetings from the San Francisco Bay Area

Greetings from the San Francisco Bay Area 0 Greetings from the San Francisco Bay Area Fostering Transit-Oriented Development in the San Francisco Bay Area presented by Valerie Knepper, MTC for Rail~Volution National Conference Nov 2, 2009 SF Bay

More information

FFY Transportation Improvement Program

FFY Transportation Improvement Program Lawton Metropolitan Planning Organization DRAFT FFY 2018-2021 Transportation Improvement Program Approved, 2017 The Federal Fiscal Years (FFY) 2018-2021 Transportation Improvement Program (TIP) is updated

More information

Transportation Alternatives Program (TAP) Recreational Trails Program (RTP)

Transportation Alternatives Program (TAP) Recreational Trails Program (RTP) Transportation Alternatives Program (TAP) Recreational Trails Program (RTP) www.fhwa.dot.gov/environment/transportation_alternatives/overview/presentation/ 1 Transportation Alternatives Program Authorized

More information

Planning Sustainable Places Program

Planning Sustainable Places Program Planning Sustainable Places Program ADVANCING A SUSTAINABLE REGION PLACE BY PLACE Pre-application Workshop May 17, 2016 Planning Sustainable Places Background Program to build on previous regional planning

More information

Arkansas Transportation Alternatives Program (TAP-2017) & Recreational Trails Program (RTP-2017) Application Seminars

Arkansas Transportation Alternatives Program (TAP-2017) & Recreational Trails Program (RTP-2017) Application Seminars Arkansas Transportation Alternatives Program (TAP-2017) & Recreational Trails Program (RTP-2017) Application Seminars Central Arkansas February 23, 2017 March 15, 2017 Northwest Arkansas March 30, 2017

More information

Appendix E Federal and State Funding Categories

Appendix E Federal and State Funding Categories Appendix E Federal and State Funding Categories This page left blank intentionally. Federal and State Funding Categories Appendix E E 3 Appendix E Federal and State Funding Categories Highway Programs

More information

FUNDING POLICY GUIDELINES

FUNDING POLICY GUIDELINES FUNDING POLICY GUIDELINES Revised and Approved May 25, 2017 Akron Metropolitan Area Transportation Study 806 CitiCenter 146 South High Street Akron, Ohio 44308 This document was prepared by the Akron Metropolitan

More information

Staff Report. Allocation of Congestion Management and Air Quality Improvement Program Funding

Staff Report. Allocation of Congestion Management and Air Quality Improvement Program Funding ITEM 7B Staff Report Subject: Contact: Allocation of Congestion Management and Air Quality Improvement Program Funding Eric Cowle, Transportation Program Manager (ecowle@cvag.org) Recommendation: Consider

More information

2018 Project Selection Process

2018 Project Selection Process 2018 Project Selection Process Workshop Agenda PSRC Funds Federal Requirements Overall Schedule Overview of Process Project Selection Details Project Evaluation Criteria Project Tracking and Delivery Requirements

More information

REQUEST FOR PROPOSALS. Uptown Main Street/US 25 Traffic Calming Analysis. Date Issued: June 5, 2018

REQUEST FOR PROPOSALS. Uptown Main Street/US 25 Traffic Calming Analysis. Date Issued: June 5, 2018 i REQUEST FOR PROPOSALS Uptown Main Street/US 25 Traffic Calming Analysis Date Issued: June 5, 2018 REQUEST FOR PROPOSALS (RFP) INSTRUCTIONS 1.1 Project Introduction The City of Greenwood (City) desires

More information

Exhibit B. Plumas County Non-Motorized Transportation Plan SCOPE OF WORK

Exhibit B. Plumas County Non-Motorized Transportation Plan SCOPE OF WORK Exhibit B Plumas County Non-Motorized Transportation Plan SCOPE OF WORK PROJECT INTRODUCTION: The proposed project is the development of a legally compliant Plumas County Non- Motorized Transportation

More information

AMERICA BIKES SIDE-BY-SIDE COMPARISON OF BICYCLE AND PEDESTRIAN PROGRAMS SAFETEA LU VS. MAP 21

AMERICA BIKES SIDE-BY-SIDE COMPARISON OF BICYCLE AND PEDESTRIAN PROGRAMS SAFETEA LU VS. MAP 21 AMERICA BIKES SIDE-BY-SIDE COMPARISON OF BICYCLE AND PEDESTRIAN PROGRAMS SAFETEA LU VS. MAP 21 SAFETEA LU PROGRAMS 2012 MAP-21 PROGRAMS ANALYSIS 3 Distinct programs with their own funding, and mechanics

More information

Beth Day Director, FTA Office of Project Planning RailVolution October 2011

Beth Day Director, FTA Office of Project Planning RailVolution October 2011 Beth Day Director, FTA Office of Project Planning RailVolution October 2011 What is a New or Small Start? New fixed guideways and extensions to existing systems Includes light rail, heavy rail, commuter

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS Town of Hope Mills Multi-Modal Congestion Management Plan September 19, 2016 Fayetteville Area Metropolitan Planning Organization Proposal Due Date: 3:00 PM Eastern Time, 28 th October,

More information

Washington State Department of Transportation

Washington State Department of Transportation Washington State Department of Transportation Executive Order 14-04 Washington Carbon Pollution Reduction and Clean Energy Action Review of state grant programs to identify and implement opportunities

More information

Order of Business. D. Approval of the Statement of Proceedings/Minutes for the meeting of January 24, 2018.

Order of Business. D. Approval of the Statement of Proceedings/Minutes for the meeting of January 24, 2018. COUNTY OF SAN DIEGO BOARD OF SUPERVISORS REGULAR MEETING MEETING AGENDA WEDNESDAY, FEBRUARY 14, 2018, 9:00 AM BOARD OF SUPERVISORS NORTH CHAMBER 1600 PACIFIC HIGHWAY, SAN DIEGO, CALIFORNIA Order of Business

More information

MiTIP APPLICATION PACKET

MiTIP APPLICATION PACKET SFY 2022-2023 Illustrative Projects 2018-2021 INDIANAPOLIS REGIONAL TRANSPORTATION IMPROVEMENT PROGRAM (IRTIP) MiTIP APPLICATION PACKET Indianapolis Metropolitan Planning Organization October 2017 This

More information

Livability Through Smart Transportation (SMART) Program Guidance

Livability Through Smart Transportation (SMART) Program Guidance Livability Through Smart Transportation (SMART) Program Guidance Two Chatham Center 112 Washington Place Pittsburgh, Pennsylvania 15219-3451 Voice: 412.391.5590 Fax: 412.391.9160 www.spcregion.org February,

More information

Lifeline Transportation Program Cycle 5 Guidelines

Lifeline Transportation Program Cycle 5 Guidelines Attachment 1. San Francisco Cycle 5 Lifeline Transportation Program Call for Projects Date: January 24, 2018 W.I.: 1310 Referred by: PAC Date: January 24, 2018 W.I.: 1310 Referred by: PAC Attachment A

More information

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY THIS PRINT COVERS CALENDAR ITEM NO. : 10.7 SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY DIVISION: Finance and Information Technology BRIEF DESCRIPTION: Resolution authorizing the San Francisco Municipal

More information

Finance Committee October 18, 2011

Finance Committee October 18, 2011 10.13.11 Finance Committee October 18, 2011 Finance Committee: Commissioners Mar (Chair), Elsbernd (Vice Chair), Cohen, Farrell, Kim and Mirkarimi (Ex Officio) Leroy Saage Deputy Director for Capital Projects

More information

MOVE LV. Show Us the $ + Transportation Funding May 25, 2016, 12 PM MOVE LEHIGH VALLEY

MOVE LV. Show Us the $ + Transportation Funding May 25, 2016, 12 PM MOVE LEHIGH VALLEY MOVE LV Show Us the $ + Transportation Funding May 25, 2016, 12 PM MOVE LEHIGH VALLEY Services PLANNING DATA + ANALYSIS EDUCATION PROJECTS + LAWS FUNDING Federal Government State Government Regional

More information

Cass County Rural Task Force Call for Projects Deadline: December 12, 2018

Cass County Rural Task Force Call for Projects Deadline: December 12, 2018 Cass County Rural Task Force 2020-2023 Call for Projects Deadline: December 12, 2018 The Southwest Michigan Planning Commission (SWMPC) is pleased to announce the Call for Projects for the Cass County

More information