New Pacific Rim Aquarium Project (Phase 2)

Size: px
Start display at page:

Download "New Pacific Rim Aquarium Project (Phase 2)"

Transcription

1 Project (Phase 2) GC/CM Package No. #08 Request for Qualifications (RFQ) for Interpretive Exhibits & Graphics Subcontractor Responses Due: March 24, 2016, 2:00 p.m. PDT Metropolitan Park District of Tacoma (MPT) and Point Defiance Zoo and Aquarium (PDZA) as the Owner and Turner Construction Company acting as the General Contractor/Construction Manager (GC/CM) are pre determining bidder eligibility in compliance with RCW for the work described herein related to the Project. In accordance with RCW , a public hearing was held on February 26, 2016 pursuant to this intent. Any comments received that were deemed appropriate have been incorporated into this RFQ and a Notice of Final Determination was issued to interested parties on March 2, A copy of the comments and final determination can be provided upon request. A Pre Statement of Qualifications meeting will be held on March 14, 2016 at 2:00p.m. at Metro Parks Office 4702 S. 19th St., Tacoma WA Although not mandatory, it is highly encouraged that all interested firms attend this meeting. Firms submitting a response to the Request for Qualifications will be evaluated in accordance with the following criteria: Pass/Fail Requirements: A. Certification of Proposal (See Form A attached) Pass/Fail B. Bonding Capability Certification (See Form C attached) Pass/Fail Experience/Team/Project Approach A. Staff Qualifications 20 points B. Firm s Past Performance on Relevant Projects & reference check 15 points C. Firm's experience on relevant projects 15 points D. Coordination Approach with Owner and Design Team 15 points E. Self Performed Work/Current Work Load 5 points F. Quality Control 10 points Accident Prevention and Safety A. Lost Time Accident rate for the last 3 years 5 points B. Recordable Incident rate for the last 3 years 5 points C. Firm s approach to safety on the project 5 points Apprenticeship Utilization 5 points Total Available Points 100 points Interpretive Exhibits & Graphics RFQ Page 1 of 8

2 In addition to meeting the Pass requirements above, a minimum score of 80 points is required to be considered in the qualification pool. All firms scoring 80 points or higher will be invited to submit a lump sum bid for the subcontract, which shall be awarded to the lowest responsible, eligible bidder (i.e. points awarded in this determination of eligibility stage will not carry forward to the subsequent bid phase once the list of eligible bidders is established) submitting a responsive bid. In the event that fewer than three (3) firms exceed this established minimum score, MPT and PDZA reserves the right to re package and/or rebid the scope of this subcontract package. Pursuant to RCW , Metropolitan Park District of Tacoma (MPT) will manage the bid opening. As such, all inquiries concerning this solicitation shall be directed only to Jonelle Tuffs, Procurement Agent with Turner Construction (GC/CM), at jtuffs@tcco.com. 1. Project Description 1.1. The Pacific Rim Aquarium (the Project) will replace the existing North Pacific Aquarium opened in 1963 and is nearing the end of its ability to contain saltwater. The 2014 Capital Bond was approved to fund the Project. Through assessment of the zoo context, analysis of the previous materials developed to date, and in depth listening sessions with the stakeholders, the Implementation Team derived six over arching goals for the aquarium project. Deliver Project within Budget Care for the Existing Collection Raise Attendance a Minimum of 10% Enhance the Visitor Experience Distribute Experiences Across the Zoo Enhance Destination Point Defiance The Project itself will consist of two primary multi gallon cast in place concrete tanks totaling approximately 340,000 gallons, acrylic viewing windows, animal life support systems, exhibit areas, education space and support spaces totaling 35,000 sq. ft. The project will be built within the current Point Defiance Zoo and Aquarium operating boundaries. The complexity, scale, interdependent system requirements, and the logistical challenges presented at the project site require extensive coordination & quality control management amongst the concrete, LSS, Mechanical, Electrical, and other major systems. Replicated Habitats and Interpretive Graphics are specialized scopes with highly artistic elements where experience is a major contributing factor to the quality and integrity of these systems Major Work Elements to be performed under the GC/CM contract include: Clearing an undeveloped hillside and constructing a new concrete building structure constituted of foundation, exterior and interior walls, beams, and slabs. The structure will also include wood framed walls and roof assemblies. aquarium exhibits contained within FRP/Acrylic structures. integrated with the building s mechanical systems. Interpretive Exhibits & Graphics RFQ Page 2 of 8 Construction of two major concrete/acrylic aquarium tank exhibits and several smaller The exhibit tanks will be supported largely by a central life support system network that is

3 Furnish, install and commission mechanical, electrical, ventilation and wet and dry fire suppression systems Earthwork, shoring, underground utilities, hardscapes, and various other site improvements to integrate the new aquarium structure into the existing zoo s infrastructure Minimum Subcontractor Expectations Project staff shall have an understanding of procuring, coordinating, sequencing, and managing the installation and quality control of the systems within their package Contributing to an atmosphere of open communication amongst the entire construction team to allows everyone to deliver their best efforts towards planning and successfully executing the work Each Subcontractor s Foreman/Superintendent (the person who will be preparing and executing the work) and Project Manager will be attend a Pre Installation Meeting and provide a Subcontractor Work Plan that outlines their approach to completing their scope in accordance with the project Work Plan/Schedule before commencing work Subcontractor s Onsite Foreman/Superintendent (the person who will be preparing and executing the work) will attend the weekly on site coordination (pull planning) meetings. These will continue weekly throughout the phase of Subcontractor s work Required to submit a Daily Construction Reports for their work Expect to participate in occasional constructability meetings with the GC/CM and/or other subcontractor packages Understanding, accountability, and timely turnaround of project deliverables (e.g. certified payroll, submittals, cost estimates, work plans, schedule updates, closeout documents, etc.) Learning or familiar with electronic filing of certified payroll (LCP Tracker) and pay applications (Textura) The #07 Interpretive Exhibits & Graphics subcontract package includes engineering, furnishing and installing custom interactive casework, graphics, murals, and some support for interactive media hardware systems. The contractor for this package shall expect to participate in extensive coordination of their work with the Point Defiance Zoo staff, design team, and other trade assemblies with a major emphasis on Media hardware, electrical, framing, and interior finish systems Project Cost and Schedule The estimated construction cost of the entire Construction Project, including finishes, is $33 million Construction on the contract is anticipated to begin in early July 2016 and be completed December The schedule for the procurement of the Interpretive Exhibits & Graphics subcontractor is subject to change at the Owner s discretion, but is expected to follow the general timelines listed below: Request for Qualifications (RFQ) Publication 03/10/16 Pre Statement of Qualifications (SOQ) Meeting 03/14/16 Final Date for Questions to be Submitted 03/16/16 MPT/TCCO Issues Responses to Questions 03/18/16 Statements of Qualifications Due 03/24/16 Notification of Eligibility Determination 03/31/16 Eligibility Protest Period Expires 04/11/16 Interpretive Exhibits & Graphics RFQ Page 3 of 8

4 Interpretive Exhibits & Graphics RFQ Bid Package Issued to Eligible Firms 04/12/16 Pre Bid Meeting 04/19/16 Final Date for Bid Questions to be Submitted 04/21/16 MPT/TCCO Issues Responses to Questions 04/26/16 Bids Opened 04/28/ Other Considerations The safety of the general public and construction personnel and the security of the construction site are of highest importance to PDZA and will be a continuous point of focus throughout the project Noise, vibration, dust, storm water runoff and construction traffic impacts due to the aquarium construction must be controlled and mitigated per the Contract Documents and Best Management Practices in order to minimize adverse effects to Point Defiance Park, the Zoo, and the general public Neighborhood Construction Work Point Defiance Park Through the same Bond measure that made this project possible, several other projects throughout the Point Defiance Park are in various stages of planning and construction. These projects vary in size, nature, duration, and proximity to this project. Subcontractors should anticipate other construction activity during the course of this project. Limitations such as, but not limited to, parking availability, street improvement work, lane restrictions, should be anticipated. Turner will be actively participating in meetings designed to coordinate this project with the other Point Defiance projects. Major subcontractors are welcome to attend these meetings but it is not mandatory. More information on these projects are available through Metro Parks at their website: Special Requirements Firms interested in submitting a SOQ shall familiarize themselves with the following requirements and documents which are available on the GC/CM s Building Connected site at: Project Bidders Bidding Manual (in development and for reference only and not for bidding or construction purposes) A General Provisions B Insurance Requirements C Schedule & Work Plan D Site Logistics Plan E Safety Manual F Accounting Procedures G MWBE Subcontracting Plan H BIM Implementation I Subcontract Sample % Construction Drawings & Specifications (Issued for Preconstruction Services). Please note that these drawings and specifications are for reference only and are not for bidding or construction purposes. Page 4 of 8

5 Union Labor Turner is signatory with Carpenters, Laborers, Cement Masons (Finishers), and Operating Engineers Unions. Therefore, any work that falls under the jurisdiction of these unions must be performed by union workers or a job specific agreement must be established between the subcontracting firm and the applicable union(s) Washington State Contractor s licenses shall not preclude them from participating in the eligibility process however they will be required for the bidding process per RCW Statement of Qualifications Submittal Respond to each of the items set forth below in a clear and concise manner. Brevity is encouraged. The submittals shall be organized in a manner that will enable the selection committee to quickly access pertinent information. Organize submittals in the same order as the items are listed below, clearly labeled and separated with tabs. Pay attention to specific requests for information. Every effort should be made to avoid duplicating the information presented in the SOQ. The submittal shall be bound in 8 1/2 x 11 format; three (3) signed hard copies and one PDF electronic copy on thumb drive are required. The submittals shall be tabbed to coincide with the sections below. Please limit submittals to 15 pages maximum, excluding the cover letter, resumes and required forms. Resumes and required Forms A, B and C are to be included in the Appendix and shall not be included in the 15 page limit. Double sided pages shall count as two pages. Any questions regarding the RFQ should be directed to Jonelle Tuffs, Procurement Agent with Turner Construction (GC/CM), at jtuffs@tcco.com. Submit copies of the SOQ by 2:00p.m. PDT, Thursday, March 24, SOQs received after this time will not be considered. Submit SOQ to: Metro Parks c/o Tammy Maines, Project Administrator 4702 S. 19 th St. Tacoma WA Cover Letter (0 points) The letter of interest should not be more than two (2) pages and may contain any information not shown elsewhere in the submittals Staff Qualifications (20 points) Provide an organizational chart and a narrative staffing plan showing proposed staff, reporting relationships and key responsibilities for each staff member to be assigned to this project. Describe roles and responsibilities for construction phase services. At a minimum, include information for the following key staff members: the principal in charge or corporate executive dedicated to the project, the project manager, the superintendent/general foreman, quality control representative, safety officer, and lead installers for the work. The proposer will provide the key individuals identified in this proposal for this package. If the proposer is a joint venture or will be partnering with other firms, provide the requested information for both entities. Be sure to clarify which firm will be the acting lead/prime contractor in the organization chart Provide detailed resumes and portfolio of work for each proposed staff member, including role on project, relevant experience, employment history, education, and personal Interpretive Exhibits & Graphics RFQ Page 5 of 8

6 references. Limit resumes to one page each and include in the Appendix. Resumes are excluded from the 15 page limitation Past Performance on Relevant Projects (15 points) Provide a description of the history and capabilities of your firm as it relates to this package. Describe the types of projects or services the firm normally performs and the relative dollar value of each Provide a brief list of industry awards received for your performance on past Interpretive Exhibits & Graphics projects Provide profiles of successfully completed Interpretive Exhibits & Graphics projects. Profiles should include at least four (4) projects of similar size, scope and complexity to the Pacific Rim Aquarium Project, with higher scores given for projects completed in tightly constrained, logistically challenging environments, complex projects requiring extensive coordination amongst other major trades such as media systems, electrical/lighting, museum quality interior finishes, and projects working as a trade contractor under a GC responsible for managing multiple contractors. For each project, provide the duration of construction, initial bid price, the final price, references for both Owner and Contractor (include the name, e mail, and current telephone number of the manager who is familiar with your firm s performance) and note if any of the individuals named in this proposal participated as members of the project team for the listed project. Use Form B Project Table to provide the information requested in this paragraph If the proposer is a joint venture or will be partnering with other firms for major scopes, please provide the above information for all constituent firms on separate copies of Form B Project Table Firm's experience on relevant projects (15 points) Provide a summary of your firm s experience with a minimum of 10 years constructing museum quality interactive exhibits and graphics of similar nature to the project Provide a summary of your firm s experience with new structure projects located on active, extremely constrained sites environments. Describe how you met challenges working on these types of projects and sites Provide a statement outlining the sustainable design program(s) practiced by the fabricator and how those programs (inclusive of sources, materials and fabrication) will be utilized for this project Firm s Approach to Coordination with Owner, Design Team, and Trades (15 points) Describe your experience working with owners and design teams on past projects between project award to installation to deliver the project and meet expectations for constructing interactive exhibits, graphics and media similar to those shown on the drawings Describe interaction and coordination efforts with other subcontractors, particularly media systems, electrical/lighting, structural support requirements, signage other exhibit fabricators and interior finishes Describe your firm s delivery method approach for capturing the design criteria, approval process, to final construction and commissioning of the work (e.g. prototypes, models, shop drawings, etc.) Interpretive Exhibits & Graphics RFQ Page 6 of 8

7 2.6. Self Performed Work/Current Work Load (5 points) Describe the work your firm typically self performs and your capability to do so on the Pacific Rim Aquarium Project. Proposer shall demonstrate that they are self performing a substantial portion of the scope of work identified in this RFQ. What work would you anticipate subcontracting out on this project? Provide a summary of your firm s current and projected workload through 2018 in addition to this project. What has been your annual volume (in dollars) for the past 5 years? What is your anticipated volume for the current year and through 2018? Use Form C Subcontractor Questionnaire to provide this information If the proposer is a joint venture or will be partnering with other firms, describe what work each entity will perform. In addition provide the information for sections 2.6.1, for each entity. Use Form C Subcontractor Questionnaire to provide this information Quality Control (10 points) Describe your approach to quality control for the work you and your vendors would perform in this package with respect to coordination with other trades and compliance with the contract documents Accident Prevention and Safety (15 points) Provide a summary of your firm s accident prevention program and submit the following information for the past three (3) completed years. Use Form C Subcontractor Questionnaire to provide this information: A Utilizing data from your OSHA No. 300 logs, please provide your lost time incident rate (LTR) per 200,000 man hours worked for each of the last 3 years A three year average rate exceeding 1.5 will earn 0 points. A three year average rate of greater than 1.0 but less than or equal to 1.5 will earn 2 points A three year average rate of greater than 0.75 but less than or equal to 1.0 will earn 3 points A three year average rate of 0.75 or less will earn 5 points B Utilizing data from your OSHA No. 300, please provide your recordable incident rate (RIR) per 200,000 man hours worked for each of the last 3 years A three year average rate exceeding 10.0 will earn 0 points A three year average rate of between 5.0 up to and including 10.0 will earn 2 points A three year average rate of less than 5.0 will earn 5 points If a proposer is a joint venture or will be partnering with other firms, provide the above information for each entity utilizing Form C Subcontractor Questionnaire for each entity. For the purposes of scoring of the above safety statistics for joint ventures the average between the joint venture firms for the EMR, lost time incidents and recordable injuries will be used to assign points Describe your firm s approach to safety on this project (5 points) Provide a summary of your firm s safety approach and how it would be specifically utilized on the Pacific Rim Aquarium project. Interpretive Exhibits & Graphics RFQ Page 7 of 8

8 2.9. Apprenticeship Utilization Plan (5 points) Describe your firm s plan to utilize apprentices on this project in order to achieve a 15% participation level. Please provide apprenticeship utilization statistics from three (3) past projects. List apprenticeship programs your firm is currently involved in Minimum Bidder Responsibility All proposers, including joint ventures, must meet the minimum bidder responsibility requirements of RCW (1) by the date of submission of the qualifications. In addition, proposers shall submit Form A Subcontractor Certification Statements certifying bonding capability. MPT/PDZA reserves the right to waive as informality any non material irregularities in any submittal Protest Procedure Any firm determined ineligible to bid may request that the Owner re evaluate its eligibility. Firms protesting the Owner s initial determination shall submit a notice of protest and any additional information the firm feels establishes its eligibility under the criteria contained in this RFQ no later than 5:00 p.m. on the second business day after receiving notice that they have been deemed ineligible by the Owner. The Owner s determination on the firm s protest will be final. Attachments Form A Subcontractor Certification Statements Form B Project Table Form C Subcontractor Questionnaire Preliminary Construction Schedule Request for Information Form Interpretive Exhibits & Graphics RFQ Page 8 of 8

9 FORM A SUBCONTRACTOR CERTIFICATION STATEMENTS Interpretive Exhibits & Graphics Subcontractor Request for Qualifications The undersigned, as an officer and /or owner authorized to sign for the submitting firm referenced below certifies to the following statements: 1) The representations made in this response to the Request for Qualifications are accurate and factual in every sense. I acknowledge that misrepresentations in our response will be cause for rejection of our submittal without further consideration for eligibility. 2) To the best of my knowledge, our firm is able to procure and provide to the GC/CM, Turner Construction Company, with a performance and payment bond for the full value of the subcontract work of the subject bid package. The undersigned acknowledges that a performance and payment bond is a mandatory requirement for this subcontract and the inability of providing these bonds is cause for rejection of our submittal without further consideration of eligibility. Firm Name: Signed By: Date Signed: Title of Signer: Washington State Contractor s License No:

10 FORM B - Project Table Submitting Firm Name: No. Project Name Brief Description of Project Start Date Completion Date Initial Contract Price Final Contract Price Reason(s) for change between initial and final price Owner and Contractor References (One Each) Interpretive Exhibits & Graphics Subcontractor RFQ Form B - Project Table Pacific Rim Aquarium GC/CM Package No.08

11 FORM C SUBCONTRACTOR QUESTIONNAIRE 1. General Information Name of Business: Street Address: City, State, Zip: Mailing Address: Telephone: Website: Contact: Fax: E mail: 2. Licenses/Registrations Type of License or Number Federal or State Number Federal Employer Identification Number WA Construction Contractors Registration UBI Number Employment Security Department Number Federal EIN Washington (L&I) Washington Washington 3. Organization [ ] C Corporation [ ] S Corporation [ ] LLC [ ] Partnership [ ] Joint Venture [ ] LLP [ ] Sole Proprietor Where incorporated or formed? Date founded? Previous business names and years operated? firm, its officers or principals? _ Name of parent company, if any? _ Other businesses owned or controlled by your _ Officers or Principals: Name and Title Years with Company Percent Ownership 4. Legal Information Has your firm, its officers or principals been involved in any bankruptcy or reorganization proceedings, failed to complete any work awarded to them, defaulted, or had a contract terminated for cause within the last five years? If yes, explain: 5. Revenue Projected revenue for this year and next (2) years? 2016 $ _ 2017 $ 2018 $ 1 OF 3

12 Revenue for the last five years? 2015 $ _ 2014 $ 2013 $ 2012 $ _ 2011 $ Largest individual contract completed in each of the last five years? 2015 $ Description _ 2014 $ Description _ 2013 $ Description _ 2012 $ Description _ 2011 $ Description _ 6. Firm s Current/Projected Workload Project Name Owner and Contact Information Contract Amount % Self Performed Completion Date 7. Employees & Labor Relations Number of Employees: Current Year & 3 Year Average Total Field Shop Office Current Year: 2016 Average of previous 3 Years Labor unions your firm is signatory with, if any? [ ] None [ ] Below Union Name and Local Number Expires If non union, describe your firm s labor acquisition methods and programs: _ Employee & Labor Relations information will not affect the scoring but will be used as information purposes only for which unions they may be signatory to and when those agreements expire. 8. Safety Provide your Workers Compensation Experience Modification Rate (EMR) for the last three years: 2016 EMR: 2015: EMR: 2014: EMR: If any EMR above is greater than 1.00, explain cause and remedial action implemented: Who is responsible for safety at your firm? Their title, qualifications and experience? 2 OF 3

13 Do you have a written safety program? _ Do you require yours subs to have a written safety program? What does senior management do to actively promote your safety program? Any OSHA (Federal or State) Serious, Willful, and/or Repeat violations within last three years? If yes, explain: Any EPA (Federal or State) violations within last 3 years? If yes, explain: _ Utilizing data from your OSHA No. 300 logs provide your Lost Time Accident Rate (LTR) per 200,000 man hours for the last three years: 2015 LTR: _ 2014 LTR: 2013 LTR: _ Utilizing data from your OSHA No. 300 logs provide your Recordable Incident Rate per 200,000 man hours for the last three years: 2015 RIR: 2014 RIR: 2013 RIR: Proposers may add additional pages to supplement the form as necessary without being subject to the page limitations provided the responses are limited to the requested data on the questionnaire. The undersigned warrants and represents that the information provided herein is complete and accurate in all respects and explicitly authorizes the references identified herein to provide any additional information requested by Sound Transit that it may require to complete its prequalification and/or evaluation process. Company Name: Prepared By: Title: _ (must be an officer or principal of the Company) Signature: _ Date: 3 OF 3

14 PLEASE SUBMIT YOUR QUESTIONS TO: Attn: Jonelle Tuffs, Purchasing Agent Construction Interpretive Exhibits & Graphics Bid Package Date: Page 1 of Proposer: Address: Telephone No.: Fax No.: SUBJECT: Information Requested:

REQUEST FOR QUALIFICATIONS. General Contractor Construction Manager (GC/CM) Services. Modernization Project

REQUEST FOR QUALIFICATIONS. General Contractor Construction Manager (GC/CM) Services. Modernization Project REQUEST FOR QUALIFICATIONS General Contractor Construction Manager (GC/CM) Services Centralia High School Modernization Project Centralia High School 813 Eshom Rd Centralia, WA 98531 Submit Proposals to:

More information

REQUEST FOR PROPOSALS. General Contractor/ Construction Manager (GC/CM) Services

REQUEST FOR PROPOSALS. General Contractor/ Construction Manager (GC/CM) Services REQUEST FOR PROPOSALS General Contractor/ Construction Manager (GC/CM) Services Spokane International Airport (SIA) Security Upgrades Project #15-43-1866 SPOKANE INTERNATIONAL AIRPORT (SIA) 9000 W. Airport

More information

REQUEST FOR QAULIFICATONS. General Contractor Construction Manager (GC/CM) Wallace and Lexington Elementary Schools Replacement Project.

REQUEST FOR QAULIFICATONS. General Contractor Construction Manager (GC/CM) Wallace and Lexington Elementary Schools Replacement Project. REQUEST FOR QAULIFICATONS General Contractor Construction Manager (GC/CM) Wallace and Lexington Elementary Schools Replacement Project Kelso, WA Submittal Deadline: August 23, 2018 3:00 pm REQUEST FOR

More information

Request for Qualifications Construction Manager

Request for Qualifications Construction Manager Midland Community Unit School District #7 Request for Qualifications Construction Manager April 6, 2016 MIDLAND ELEMENTARY SCHOOL LACON, ILLINOIS Page 1 of 11 Construction Management Statement of Qualifications

More information

The School Board of Polk County, Florida. Selection Process for Architectural & Engineering Services

The School Board of Polk County, Florida. Selection Process for Architectural & Engineering Services Selection Process for Architectural & Engineering Services TABLE OF CONTENTS PROJECT DESCRIPTION... 1 POLICY-COMPETITIVE SELECTION PROCESS... 1 REQUIREMENTS OF DESIGN PROFESSIONAL (DP)... 3 STATEMENT OF

More information

The School Board of Polk County, Florida. Selection Process for Continuing Contract for Architectural & Engineering Services

The School Board of Polk County, Florida. Selection Process for Continuing Contract for Architectural & Engineering Services Selection Process for Continuing Contract for Architectural & Engineering Services TABLE OF CONTENTS PROJECT DESCRIPTION... 1 POLICY - COMPETITIVE SELECTION PROCESS... 1 REQUIREMENTS OF DESIGN PROFESSIONAL

More information

Request for Proposal No. RFP Consultant Services. for. Building Condition Assessment. Submittal Deadline: Date: March 1, Time: 10:00 a.m.

Request for Proposal No. RFP Consultant Services. for. Building Condition Assessment. Submittal Deadline: Date: March 1, Time: 10:00 a.m. Seattle Public Schools Contracting Services 2445 Third Avenue South Seattle, WA 98134 Telephone: (206) 252-0566 Fax: (206) 743-3018 contractingservices@seattleschools.org Request for Proposal No. RFP01838

More information

Proposals due May 18 th, 2018 at 4:30 PM. Indicate on the Sealed Envelope Do Not Open with Regular Mail.

Proposals due May 18 th, 2018 at 4:30 PM. Indicate on the Sealed Envelope Do Not Open with Regular Mail. April 26, 2018 Subject: RFP2M18-06: Request for Proposal Construction Management and Inspection Services for the Sewer Plant #7 Replacement Project. The City of Alhambra is requesting proposals from experienced,

More information

Request for Qualifications No LEWIS AND CLARK HIGH SCHOOL Classroom Addition Project

Request for Qualifications No LEWIS AND CLARK HIGH SCHOOL Classroom Addition Project Request for Qualifications No. 7-1718 Architectural & Engineering Services for LEWIS AND CLARK HIGH SCHOOL Classroom Addition Project Submittal Deadline: November 10, 2017, 2:00 P.M. Spokane Public Schools

More information

Request for Proposals No Project-Management Services. for. Wahluke School District No East Saddle Mountain Drive Mattawa, WA 99349

Request for Proposals No Project-Management Services. for. Wahluke School District No East Saddle Mountain Drive Mattawa, WA 99349 for Wahluke School District No. 73 411 East Saddle Mountain Drive Mattawa, WA 99349 Mailing address: PO Box 907 Mattawa, WA 99349 Submittal Deadline: Date: June 11, 2018 Time: 4:00 P.M. I. Introduction

More information

Request for Proposals (RFP) Consulting and Design Services for Solar Photovoltaic Systems for Iowa City Facilities September 22, 2017

Request for Proposals (RFP) Consulting and Design Services for Solar Photovoltaic Systems for Iowa City Facilities September 22, 2017 (RFP) Consulting and Design Services for Solar Photovoltaic Systems for Iowa City Facilities September 22, 2017 SUMMARY The City of Iowa City, Iowa is soliciting proposals from interested consultants to

More information

REQUEST FOR ARCHITECTURAL SERVICES ACTIVITY CENTER

REQUEST FOR ARCHITECTURAL SERVICES ACTIVITY CENTER REQUEST FOR ARCHITECTURAL SERVICES ACTIVITY CENTER Issued On: February 1, 2018 Date Due: February 23, 2018-2:00 pm CST At: 545 Academy Drive Northbrook, IL 60062 Northbrook Activity Center 180 Anets Drive

More information

STATE OF WASHINGTON Request for Quotes and Qualifications

STATE OF WASHINGTON Request for Quotes and Qualifications Acquisition Title: Expected Results: Response Due Date: RFQQ Coordinator Information: Bid Submittal: Vendor Eligibility: RFQQ Components: RFQQ #03712 Lean Consultant Services Department of Enterprise Services

More information

CITY OF HONDO ENGINEERING REQUEST FOR QUALIFICATIONS

CITY OF HONDO ENGINEERING REQUEST FOR QUALIFICATIONS CITY OF HONDO ENGINEERING REQUEST FOR QUALIFICATIONS The City of Hondo requests the submission of qualifications statements, which will lead to the possible award of a contract to provide planning, design

More information

REQUEST FOR QUALIFICATIONS. Design Professional Services

REQUEST FOR QUALIFICATIONS. Design Professional Services REQUEST FOR QUALIFICATIONS Design Professional Services Return Completed Qualifications To: Bonneville Joint School District No. 93 3497 North Ammon Road Idaho Falls, Idaho 83401 TO BE CONSIDERED, QUALIFICATIONS

More information

Request for Qualifications No. RFQ Pay Card for Payroll Services. for. Seattle Public Schools. Submittal Deadline: Date: April 6, 2018

Request for Qualifications No. RFQ Pay Card for Payroll Services. for. Seattle Public Schools. Submittal Deadline: Date: April 6, 2018 Seattle Public Schools Contracting Services 2445 Third Avenue South Seattle, WA 98134 Telephone: (206) 252-0566 Fax: (206) 743-3018 contractingservices@seattleschools.org Request for Qualifications No.

More information

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK DANBURY INDEPENDENT SCHOOL DISTRICT Project: Danbury I.S.D. Elementary School Issue Date: March 2, 2018 Submission Due Date: March 20, 2018 Table

More information

REQUEST FOR QUALIFICATIONS FOR Energy Services Master Agreement

REQUEST FOR QUALIFICATIONS FOR Energy Services Master Agreement Request for Qualifications for Page 1 of 8 REQUEST FOR QUALIFICATIONS FOR For the RFQ Submittal Deadline: October 17, 2017 at 3:00 PM 1.1 INTRODUCTION: The is soliciting Statements of Qualifications (SOQ)

More information

DALLAS HORSESHOE PROJECT RFQ Q & A MATRIX #6. (February 14, 2012)

DALLAS HORSESHOE PROJECT RFQ Q & A MATRIX #6. (February 14, 2012) DALLAS HORSESHOE PROJECT RFQ Q & A MATRIX #6 (February 14, 2012) RFQ 1. Part A, Section 4.2(a), Page 6 2. Part A, Sections 4.2(b) & 4.2(c) Please confirm that financial requirements are to be provided

More information

CITY OF GOLDEN, COLORADO Parks and Recreation Department

CITY OF GOLDEN, COLORADO Parks and Recreation Department CITY OF GOLDEN, COLORADO Parks and Recreation Department Accredited by the Commission for Accreditation of Park and Recreation Agencies Rod Tarullo, Parks & Recreation Director REQUEST FOR QUALIFICATIONS

More information

Request for Proposals City School District of Albany Empire State After-School Program Coordination and Programming June 14, 2017

Request for Proposals City School District of Albany Empire State After-School Program Coordination and Programming June 14, 2017 Request for Proposals City School District of Albany Empire State After-School Program Coordination and Programming June 14, 2017 Attention: Purchasing Agent Address: City School District of Albany 1 Academy

More information

REQUEST FOR PROPOSALS For Design Services for New Fire Station

REQUEST FOR PROPOSALS For Design Services for New Fire Station REQUEST FOR PROPOSALS For Design Services for PROPOSAL SUBMISSION DEADLINE: March 18, 2015 Page 1 Table of Contents A. Introduction B. Project Description C. Scope of Services D. Qualifications E. Selection

More information

REQUEST FOR QUALIFICATIONS (RFQ) Community Center and Pool Design. City of Fircrest Department of Parks and Recreation, Fircrest, Washington

REQUEST FOR QUALIFICATIONS (RFQ) Community Center and Pool Design. City of Fircrest Department of Parks and Recreation, Fircrest, Washington REQUEST FOR QUALIFICATIONS (RFQ) Community Center and Pool Design City of Fircrest Department of Parks and Recreation, Fircrest, Washington INVITATION The City of Fircrest seeks the services of a qualified

More information

OCTOBER 1, 2015 ADDENDUM NO. 1 FOR REQUEST FOR QUALIFICATIONS ( RFQ ) FOR DESIGN CONSULTING SERVICES (TARGET MARKET) SPECIFICATION NO.

OCTOBER 1, 2015 ADDENDUM NO. 1 FOR REQUEST FOR QUALIFICATIONS ( RFQ ) FOR DESIGN CONSULTING SERVICES (TARGET MARKET) SPECIFICATION NO. OCTOBER 1, 2015 ADDENDUM NO. 1 FOR REQUEST FOR QUALIFICATIONS ( RFQ ) FOR DESIGN CONSULTING SERVICES (TARGET MARKET) SPECIFICATION NO. 132366 For which proposals are scheduled to open in the Bid & Bond

More information

QUALIFICATIONS QUESTIONAIRE REQUEST FOR PROPOSALS BY THE GUILFORD COUNTY BOARD OF EDUCATION FOR CONSTRUCTION MANAGER AT RISK

QUALIFICATIONS QUESTIONAIRE REQUEST FOR PROPOSALS BY THE GUILFORD COUNTY BOARD OF EDUCATION FOR CONSTRUCTION MANAGER AT RISK Page 1 of 24 QUALIFICATIONS QUESTIONAIRE REQUEST FOR PROPOSALS BY THE GUILFORD COUNTY BOARD OF EDUCATION FOR CONSTRUCTION MANAGER AT RISK FOR THE FOLLOWING PROJECTS: (1) BLUFORD ELEMENTARY SCHOOL PROJECT

More information

REQUEST FOR QUALIFICATIONS. Architectural/Engineering Design Services

REQUEST FOR QUALIFICATIONS. Architectural/Engineering Design Services REQUEST FOR QUALIFICATIONS Architectural/Engineering Design Services Logistics DISTRICT CONTACTS FOR QUESTIONS Jeff Collum Superintendent Phone: 903-668-5990 Email: jcollum@hisd.com REQUEST FOR STATEMENT

More information

Request for Qualifications No. RFQ Professional Services Consultants. for. High School Professional Development. for. Seattle Public Schools

Request for Qualifications No. RFQ Professional Services Consultants. for. High School Professional Development. for. Seattle Public Schools Seattle Public Schools Contracting Services 2445 Third Avenue South Seattle, WA 98134 Telephone: (206) 252-0566 Fax: (206) 743-3018 contractingservices@seattleschools.org Request for Qualifications No.

More information

SCHOOL BOARD ACTION REPORT

SCHOOL BOARD ACTION REPORT SCHOOL BOARD ACTION REPORT DATE: October 25, 2017 FROM: Executive Committee of the School Board For Introduction: November 15, 2017 For Action: November 15, 2017 1. TITLE Approval of a contract for an

More information

Associated with the District s Measure A Bond Program and Facilities Improvement Projects

Associated with the District s Measure A Bond Program and Facilities Improvement Projects Request for Qualifications / Proposal (RFQ/P) for Hazardous Material Assessment, Abatement Plan, Cost Estimating, and Monitoring Services Associated with the District s Measure A Bond Program and Facilities

More information

All proposals must be received by August 30, 2016 at 2:00 PM EST

All proposals must be received by August 30, 2016 at 2:00 PM EST July 25, 2016 REQUEST FOR PROPOSAL Northwood School District SAU #44 Strategic Planning for the Northwood School District You are cordially invited to submit a proposal for Strategic Planning for the Northwood

More information

Request for Qualifications for Selected San Francisco Public Utilities Commission Construction Projects

Request for Qualifications for Selected San Francisco Public Utilities Commission Construction Projects SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE DIVISION Request for Qualifications for Selected San Francisco Public Utilities Commission Construction Projects Parts I, II, III (Out of Four)

More information

District Office Building Seismic Retrofit At Contra Costa Community College District 500 Court St. Martinez, CA March 21, 2016

District Office Building Seismic Retrofit At Contra Costa Community College District 500 Court St. Martinez, CA March 21, 2016 REQUEST FOR QUALIFICATIONS (RFQ) ARCHITECT/ENGINEER (A/E) PROFESSIONAL SERVICES For the At Contra Costa Community College District 500 Court St. Martinez, CA March 21, 2016 PART 1 GENERAL INTRODUCTION

More information

REQUEST FOR QUALIFICATIONS CONSULTING SERVICES FOR WALLA WALLA REGIONAL AIRPORT (ALW) WALLA WALLA, WASHINGTON. October 2, 2018

REQUEST FOR QUALIFICATIONS CONSULTING SERVICES FOR WALLA WALLA REGIONAL AIRPORT (ALW) WALLA WALLA, WASHINGTON. October 2, 2018 REQUEST FOR QUALIFICATIONS CONSULTING SERVICES FOR WALLA WALLA REGIONAL AIRPORT (ALW) WALLA WALLA, WASHINGTON October 2, 2018 The Port of Walla Walla, owner and operator of the Walla Walla Regional Airport,

More information

REQUEST FOR QUALIFICATIONS (RFQ) AIRPORT ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT MINOT INTERNATIONAL AIRPORT

REQUEST FOR QUALIFICATIONS (RFQ) AIRPORT ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT MINOT INTERNATIONAL AIRPORT REQUEST FOR QUALIFICATIONS (RFQ) AIRPORT ARCHITECTURAL AND ENGINEERING SERVICES AGREEMENT MINOT INTERNATIONAL AIRPORT 2016-2021 GENERAL The intent and purpose of this Request for Qualifications (RFQ) is

More information

REQUEST FOR QUALIFICATIONS CONSULTING SERVICES FOR PULLMAN-MOSCOW REGIONAL AIRPORT PULLMAN, WA

REQUEST FOR QUALIFICATIONS CONSULTING SERVICES FOR PULLMAN-MOSCOW REGIONAL AIRPORT PULLMAN, WA July 12, 2018 REQUEST FOR QUALIFICATIONS CONSULTING SERVICES FOR PULLMAN-MOSCOW REGIONAL AIRPORT PULLMAN, WA The Pullman-Moscow Regional Airport (PMRA) is soliciting Statements of Qualifications (SOQ)

More information

Request for Qualifications (RFQ) Indefinite Delivery Indefinite Quantity (IDIQ) Athletic Facility Architectural Services

Request for Qualifications (RFQ) Indefinite Delivery Indefinite Quantity (IDIQ) Athletic Facility Architectural Services The Board of Regents of the University System of Georgia & Georgia Institute of Technology Atlanta, Georgia Request for Qualifications (RFQ) For Indefinite Delivery Indefinite Quantity (IDIQ) Athletic

More information

Request for Qualifications for Assistive Technology Consultant Services

Request for Qualifications for Assistive Technology Consultant Services SPRING BRANCH INDEPENDENT SCHOOL DISTRICT Scott R. Muri, Ed.D. Superintendent of Schools PURCHASING DEPARTMENT 1031 Witte Road, Building T-1A, Houston, Texas 77055-6016 Phone 713/251-1100 Fax 713/251-1115

More information

REQUEST FOR STATEMENTS OF QUALIFICATIONS CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR CSJ: PASS-THROUGH FINANCE PROJECT

REQUEST FOR STATEMENTS OF QUALIFICATIONS CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR CSJ: PASS-THROUGH FINANCE PROJECT REQUEST FOR STATEMENTS OF QUALIFICATIONS CONSTRUCTION MANAGEMENT AND INSPECTION SERVICES FOR FM 471 (CULEBRA ROAD) KALLISON LANE TO FM 1560 CSJ: 0849-01-046 PASS-THROUGH FINANCE PROJECT Bexar County Public

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS REQUEST FOR QUALIFICATIONS PROJECT AND CONSTRUCTION MANAGEMENT CONSULTANT RFQ # 17-001 DUE: April 12, 2017 1:00 P.M. Grandview School District #200 913 W. 2 nd Street Grandview, WA 98930 District Representative/Contact:

More information

This request for qualifications seeks the following type of service providers:

This request for qualifications seeks the following type of service providers: ANNOUNCEMENT REQUEST FOR STATEMENT OF QUALIFICATIONS NOTICE SAN FRANCISCO UNIFIED SCHOOL DISTRICT FACILITIES DESIGN AND CONSTRUCTION ARCHITECTURAL SERVICES The San Francisco Unified School District, Facilities,

More information

STATE OF FLORIDA DEPARTMENT OF CHILDREN AND FAMILIES OFFICE OF CHILD WELFARE

STATE OF FLORIDA DEPARTMENT OF CHILDREN AND FAMILIES OFFICE OF CHILD WELFARE STATE OF FLORIDA DEPARTMENT OF CHILDREN AND FAMILIES OFFICE OF CHILD WELFARE REQUEST FOR PROPOSALS ADOPTION AND INDEPENDENT LIVING SERVICES RFP# 07J15GN1 Commodity Code #: 93141505 1 TABLE OF CONTENTS

More information

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY

SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY SUSQUEHANNA AREA REGIONAL AIRPORT AUTHORITY REQUEST FOR QUALIFICATIONS/PROPOSALS Professional Construction Management Services Gettysburg Regional Airport Rehabilitate Runway 6-24, Phase IV Susquehanna

More information

Request for Qualifications. Construction Management at Risk Services - William J. Rish Recreational Park Improvements RFQ-REDM17/ ADDENDUM #1

Request for Qualifications. Construction Management at Risk Services - William J. Rish Recreational Park Improvements RFQ-REDM17/ ADDENDUM #1 Request for Qualifications Construction Management at Risk Services - William J. Rish Recreational Park Improvements RFQ-REDM17/18-005 ADDENDUM #1 FAILURE TO FILE A PROTEST WITHIN THE TIME PRESCRIBED IN

More information

STATE OF FLORIDA DEPARTMENT OF MANAGEMENT SERVICES DIVISION OF REAL ESTATE DEVELOPMENT AND MANAGEMENT PUBLIC ANNOUNCEMENT FOR CONSTRUCTION CONTRACTORS

STATE OF FLORIDA DEPARTMENT OF MANAGEMENT SERVICES DIVISION OF REAL ESTATE DEVELOPMENT AND MANAGEMENT PUBLIC ANNOUNCEMENT FOR CONSTRUCTION CONTRACTORS STATE OF FLORIDA DEPARTMENT OF MANAGEMENT SERVICES DIVISION OF REAL ESTATE DEVELOPMENT AND MANAGEMENT PUBLIC ANNOUNCEMENT FOR CONSTRUCTION CONTRACTORS TO PROVIDE CONSTRUCTION MANAGEMENT AT RISK SERVICES

More information

REQUEST FOR PROPOSAL: RFP No Asphalt Repair Services

REQUEST FOR PROPOSAL: RFP No Asphalt Repair Services REQUEST FOR PROPOSAL: RFP No. 2016-02 Asphalt Repair Services MAAC is soliciting competitive sealed proposals from licensed contractors to provide Asphalt Repair services, complying with all terms and

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS ENGINEERING/ARCHITECTURAL DESIGN SERVICES FOR THE NORTHEAST STOCKTON LIBRARY AND RECREATION CENTER CITY PROJECT NO. PW1724 City of Stockton Public Works Department 22 E. Weber Avenue,

More information

REQUEST FOR QUALIFICATIONS PROJECT AND CONSTRUCTION MANAGEMENT CONSULTANT

REQUEST FOR QUALIFICATIONS PROJECT AND CONSTRUCTION MANAGEMENT CONSULTANT REQUEST FOR QUALIFICATIONS PROJECT AND CONSTRUCTION MANAGEMENT CONSULTANT DUE: May 4, 2018 4:00 P.M. Walla Walla Public Schools 364 S. Park Street Walla Walla, WA 99362 District Representative/Contact:

More information

University of Washington. Request for Qualifications. Commissioning Services for. UW Bothell Phase 3 Project Number:

University of Washington. Request for Qualifications. Commissioning Services for. UW Bothell Phase 3 Project Number: University of Washington Request for Qualifications Commissioning Services for UW Bothell Phase 3 Project Number: 202235 Submittal Date: October 3, 2012 at 3:00 p.m. The University of Washington is soliciting

More information

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS POLICY ON CONSULTANT SELECTION. October 2011

CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS POLICY ON CONSULTANT SELECTION. October 2011 CUYAHOGA COUNTY DEPARTMENT OF PUBLIC WORKS POLICY ON CONSULTANT SELECTION October 2011 CONTENTS SECTION PAGE INTRODUCTION...1 OBJECTIVE...1 A. Determination of Need to Use Consultant Services...2 B. Consultant

More information

TERREBONNE PARISH REQUEST FOR QUALIFICATIONS FOR ENGINEERING SERVICES. Generator Sizing and Installation

TERREBONNE PARISH REQUEST FOR QUALIFICATIONS FOR ENGINEERING SERVICES. Generator Sizing and Installation TERREBONNE PARISH REQUEST FOR QUALIFICATIONS FOR ENGINEERING SERVICES Generator Sizing and Installation Proposal Due Date: June 26, 2017 Proposal Due Time: 2:00 P.M. Released May 23, 2017 Table of Contents

More information

REQUEST FOR QUALIFICATIONS MUNICIPAL ENGINEERING SERVICES

REQUEST FOR QUALIFICATIONS MUNICIPAL ENGINEERING SERVICES CITY OF CASTLE HILLS TEXAS REQUEST FOR QUALIFICATIONS MUNICIPAL ENGINEERING SERVICES PROPOSED AWARD SCHEDULE December 6, 2017 December 20, 2017 January 16, 2018 January 23, 2018 January 30, 2018 February

More information

Massachusetts Bay Transportation Authority. POLICIES & PROCEDURES Design Build Procurement Procedures April 2016

Massachusetts Bay Transportation Authority. POLICIES & PROCEDURES Design Build Procurement Procedures April 2016 Massachusetts Bay Transportation Authority POLICIES & PROCEDURES Design Build Procurement Procedures April 2016 Design Build Procurement Procedures April 2016 Massachusetts Bay Transportation Authority

More information

Attention Design Firms

Attention Design Firms Attention Design Firms If you are downloading the RFQ from the website, continue to monitor the website for addenda. Failure to incorporate any addenda into your submittal may cause your submittal to be

More information

Request for Qualifications Construction Manager at Risk Contract

Request for Qualifications Construction Manager at Risk Contract Request for Qualifications Construction Manager at Risk Contract Project Owner: The MetroHealth System Project Name: Hybrid Operating Room (OR) CM 15.17 and OR Renovation Upgrade CM 16.06 Project Location:

More information

THE ARIZONA BOARD OF REGENTS. for and on behalf of ARIZONA STATE UNIVERSITY REQUEST FOR QUALIFICATIONS FOR: CMAR

THE ARIZONA BOARD OF REGENTS. for and on behalf of ARIZONA STATE UNIVERSITY REQUEST FOR QUALIFICATIONS FOR: CMAR REQUEST FOR QUALIFICATIONS CONSTRUCTION MANAGER AT RISK CONSTRUCTION SERVICES DATE ISSUED: February 13, 2018 THE ARIZONA BOARD OF REGENTS for and on behalf of ARIZONA STATE UNIVERSITY REQUEST FOR QUALIFICATIONS

More information

Request for Proposals Construction Services Workplace Excellence Project

Request for Proposals Construction Services Workplace Excellence Project Request for Proposals Construction Services Workplace Excellence Project December 5, 2014 INTRODUCTION Atlanta BeltLine, Inc. (ABI) invites you to submit a response to this Request for Proposals (RFP)

More information

Request for Qualifications Wayfinding, Signage and Streetscape Design Initiative City of Mobile, AL

Request for Qualifications Wayfinding, Signage and Streetscape Design Initiative City of Mobile, AL 1.0 INTRODUCTION The City of Mobile is inviting qualified consultants to submit a statement of qualifications (SOQ) in response to this RFQ for a wayfinding signage program and streetscape design standards

More information

REQUEST FOR QUALIFICATIONS AND PROPOSALS (RFQ/P) RFQ # ARCHITECTURAL SERVICES Bond Measure G

REQUEST FOR QUALIFICATIONS AND PROPOSALS (RFQ/P) RFQ # ARCHITECTURAL SERVICES Bond Measure G REQUEST FOR QUALIFICATIONS AND PROPOSALS (RFQ/P) RFQ #14-002 ARCHITECTURAL SERVICES Bond Measure G The Solano Community College District ( District ) is requesting qualified persons, firms, partnerships,

More information

Request for Qualifications

Request for Qualifications Request for Qualifications Professional Services For Greenway Farms New Conference Facility Contract Number: R-17-004 Chattanooga Parks Department City of Chattanooga, Tennessee October 2017 Rev. 1.0 10/31/17

More information

REMINDER RFQ#: Administering Screens and Assessments: ASQ3 and ASQ-SE Training DEADLINE FOR SUBMISSION IS. July 24, PM

REMINDER RFQ#: Administering Screens and Assessments: ASQ3 and ASQ-SE Training DEADLINE FOR SUBMISSION IS. July 24, PM 1 P age REMINDER RFQ#: 12-005 Administering Screens and Assessments: ASQ3 and ASQ-SE Training DEADLINE FOR SUBMISSION IS July 24, 2012 2 PM REPLIES ARRIVING AFTER 2 PM ON JULY 24, 2012 WILL NOT BE ACCEPTED

More information

Request for Qualifications CULTURAL COMPETENCY TRAINING

Request for Qualifications CULTURAL COMPETENCY TRAINING Request for Qualifications CULTURAL COMPETENCY TRAINING RFQ #13-009 Deadline for Responses: 2 PM August 7, 2013 2300 High Ridge Road Boynton Beach, FL 33426 (561) 740-7000 www.cscpbc.org Table of Contents

More information

MONTGOMERY COUNTY, OHIO SECTION 3 CONTRACTING POLICY & PROCEDURES

MONTGOMERY COUNTY, OHIO SECTION 3 CONTRACTING POLICY & PROCEDURES MONTGOMERY COUNTY, OHIO SECTION 3 CONTRACTING POLICY & PROCEDURES INTRODUCTION The purpose of Section 3 of the Housing and Urban Development Act of 1968 (12 U.S.C. 1701u) (Section 3) is to ensure that

More information

REQUEST FOR PROPOSAL FOR SECURITY CAMERA INSTALLATION: Stones River Baptist Church. 361 Sam Ridley Parkway East. Smyrna, Tennessee 37167

REQUEST FOR PROPOSAL FOR SECURITY CAMERA INSTALLATION: Stones River Baptist Church. 361 Sam Ridley Parkway East. Smyrna, Tennessee 37167 REQUEST FOR PROPOSAL FOR SECURITY CAMERA INSTALLATION: Stones River Baptist Church 361 Sam Ridley Parkway East Smyrna, Tennessee 37167 Released on February 2, 2018 SECURITY CAMERA INSTALLATION Stones River

More information

Request for Qualifications/Proposals LAND ACQUISITION DUE DILIGENCE & PROFESSIONAL TECHNICAL SERVICES ADDENDUM #1: FEBRUARY 1, 2018

Request for Qualifications/Proposals LAND ACQUISITION DUE DILIGENCE & PROFESSIONAL TECHNICAL SERVICES ADDENDUM #1: FEBRUARY 1, 2018 ADDENDUM #1: FEBRUARY 1, 2018 Unless explicitly noted herein, all requirements will remain as originally prepared. Any variations or claims of equality or superiority must be demonstrated, proven and tested

More information

Request for Qualifications and Proposals (RFQ/P) #564. for. Program and Construction Management Services

Request for Qualifications and Proposals (RFQ/P) #564. for. Program and Construction Management Services Request for Qualifications and Proposals (RFQ/P) #564 for Program and Construction Management Services OXNARD UNION HIGH SCHOOL DISTRICT NOTICE INVITING QUALIFICATIONS and PROPOSALS NOTICE IS HEREBY given

More information

$35,750 $40,850 $45,950 $51,050 $55,150 $59,250 $63,350 $67,400

$35,750 $40,850 $45,950 $51,050 $55,150 $59,250 $63,350 $67,400 SECTION 3 UTILIZATION PLAN FOR SUBRECIPIENTS, OWNERS, DEVELOPERS, CONTRACTORS, AND SUBCONTRACTORS ON ALL APPLICABLE CITY OF PUEBLO PROGRAMS, PROJECTS, AND ACTIVITIES USING HUD SOURCED FUNDS (EXHIBIT A)

More information

Request for Proposals (RFP) For A Mobile Meal Bus Retrofit

Request for Proposals (RFP) For A Mobile Meal Bus Retrofit Request for Proposals (RFP) For A Mobile Meal Bus Retrofit Fresno Economic Opportunities Commission (Fresno EOC) 1920 Mariposa Mall, Suite 330 Fresno, CA 93721 1 Summary and Background Fresno EOC (The

More information

REQUEST FOR STATEMENTS OF QUALIFICATIONS ARCHITECTURAL SERVICES. University of California, Merced

REQUEST FOR STATEMENTS OF QUALIFICATIONS ARCHITECTURAL SERVICES. University of California, Merced REQUEST FOR STATEMENTS OF QUALIFICATIONS ARCHITECTURAL SERVICES The is soliciting Statements of Qualifications from architecture firms interested in providing architectural services for the following project:

More information

Request for Qualifications # For. Architecture/Engineering Professional Services For Small Projects

Request for Qualifications # For. Architecture/Engineering Professional Services For Small Projects Request for Qualifications #0030094 For Architecture/Engineering Professional Services For Small Projects Commodity Code: 90600 September 16, 2013 Specifications Prepared by: Virginia Tech University Planning,

More information

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION

OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION OHIO TURNPIKE AND INFRASTRUCTURE COMMISSION REQUEST FOR PROPOSALS ( RFP ) PROFESSIONAL ENGINEERING AND CONSTRUCTION ADMINISTRATION AND INSPECTION SERVICES REF: REHABILITATION OF VARIOUS BRIDGES AT MILEPOSTS

More information

TRAFFIC DATA COLLECTION REQUEST FOR PROPOSALS

TRAFFIC DATA COLLECTION REQUEST FOR PROPOSALS PIMA ASSOCIATION OF GOVERNMENTS 2014-2016 TRAFFIC DATA COLLECTION REQUEST FOR PROPOSALS Proposals may be obtained by contacting: Pima Association of Governments 1 E. Broadway Blvd, Ste.401 Tucson, AZ 85701

More information

REQUEST FOR QUALIFICATIONS G ELLUCIAN (Datatel) COLLEAGUE CONVERSION TO MS SQL AND RELATED UPGRADES PROJECT

REQUEST FOR QUALIFICATIONS G ELLUCIAN (Datatel) COLLEAGUE CONVERSION TO MS SQL AND RELATED UPGRADES PROJECT SAN JOSE/EVERGREEN COMMUNITY COLLEGE DISTRICT 4750 San Felipe Road, San Jose, CA 95135 REQUEST FOR QUALIFICATIONS G2010.0069 ELLUCIAN (Datatel) COLLEAGUE CONVERSION TO MS SQL AND RELATED UPGRADES PROJECT

More information

BID # Hunters Point Community Library. Date: December 20, Invitation for Bid: Furniture & Shelving

BID # Hunters Point Community Library. Date: December 20, Invitation for Bid: Furniture & Shelving BID # 1217-2 Hunters Point Community Library Date: December 20, 2017 Invitation for Bid: Furniture & Shelving Bids must be submitted by: January 17, 2018 2:00 P.M., to: Purchasing Department Queens Borough

More information

Multi-Municipal Collaboration Grants Grant Guidelines March 2018

Multi-Municipal Collaboration Grants Grant Guidelines March 2018 Multi-Municipal Collaboration Grants Grant Guidelines March 2018 Impact Area: Municipalities To foster progress and functional cooperation among Erie County s 38 municipal governments. Section I. Introduction

More information

REQUEST FOR PROPOSAL FOR DESIGN-BUILD SERVICES

REQUEST FOR PROPOSAL FOR DESIGN-BUILD SERVICES REQUEST FOR PROPOSAL FOR DESIGN-BUILD SERVICES Agricultural Sciences Complex West Texas A&M University Canyon, Texas Project No. 18-3119 DEADLINE FOR SUBMITTAL: 2pm, Thursday, February 11, 2016 OFFICE

More information

University of California, Merced Central Plant/Telecommunications Reliability Upgrade

University of California, Merced Central Plant/Telecommunications Reliability Upgrade REQUEST FOR STATEMENTS OF QUALIFICATIONS FOR EXECUTIVE ENGINEERING SERVICES University of California, Merced Central Plant/Telecommunications Project # 900310 TABLE OF CONTENTS PROJECT INFORMATION: Advertisement

More information

Facilities Condition Assessment

Facilities Condition Assessment Facilities Condition Assessment (O&M 16 018) Date Issued: January 29, 2016 Date Due: Contact: March 3, 2016 at 4:00:00 pm Paul Acosta, Program Manager III paul.acosta@stocktonca.gov City of Stockton Public

More information

GUILFORD COUNTY PARTNERSHIP FOR CHILDREN REQUEST FOR PROPOSALS

GUILFORD COUNTY PARTNERSHIP FOR CHILDREN REQUEST FOR PROPOSALS GUILFORD COUNTY PARTNERSHIP FOR CHILDREN REQUEST FOR PROPOSALS TITLE: Catering Services, Human Resources Services, Information Technology Services, Outreach Services, Printing Services, Program Evaluation

More information

Montgomery Housing Authority 525 South Lawrence Street Montgomery, Alabama 36104

Montgomery Housing Authority 525 South Lawrence Street Montgomery, Alabama 36104 Montgomery Housing Authority 525 South Lawrence Street Montgomery, Alabama 36104 Request For Qualification (RFQ) Number: RFQ 2017-01 Architect for the Plaza at Centennial Hill - Phase III DATE OF ISSUANCE:

More information

REQUEST FOR QUALIFICATIONS RFQ # Jamestown-Yorktown Foundation P.O. Box 1607 Williamsburg, VA

REQUEST FOR QUALIFICATIONS RFQ # Jamestown-Yorktown Foundation P.O. Box 1607 Williamsburg, VA Jamestown-Yorktown Foundation P.O. Box 1607, Williamsburg, Virginia 23187-1607 (757) 253-4838 (757) 253-5299 Fax (757) 253-5110 TDD www.historyisfun.org REQUEST FOR QUALIFICATIONS RFQ # 15-425-006 Issue

More information

REQUEST FOR QUALIFICATIONS for Vancouver Life Sciences Building Pre-Design/Programming Services

REQUEST FOR QUALIFICATIONS for Vancouver Life Sciences Building Pre-Design/Programming Services for Vancouver Life Sciences Building Pre-Design/Programming Services February 9, 2018 For Washington State University By Facilities Services, Capital Statement of Qualifications Deadline: February 23,

More information

Glenview School District Greenwood Rd Glenview IL Request for Qualifications For Architect Services

Glenview School District Greenwood Rd Glenview IL Request for Qualifications For Architect Services Glenview School District 34 1401 Greenwood Rd Glenview IL 60026 Request for Qualifications For Architect Services Eric Miller Assistant Superintendent for Business Services (847) 998-5008 A. Introduction

More information

REQUEST FOR PROPOSAL (RFP) for Feasibility Study Borough of Kennett Square New Municipal Office and Police Station Joint Facility

REQUEST FOR PROPOSAL (RFP) for Feasibility Study Borough of Kennett Square New Municipal Office and Police Station Joint Facility REQUEST FOR PROPOSAL (RFP) for Feasibility Study Borough of Kennett Square New Municipal Office and Police Station Joint Facility 1 Borough of Kennett Square Request for Proposals (RFP) Feasibility Study

More information

GRANT WRITING ASSISTANCE FOR THE HIGHWAY SAFETY IMPROVEMENT PROGRAM CYCLE 9

GRANT WRITING ASSISTANCE FOR THE HIGHWAY SAFETY IMPROVEMENT PROGRAM CYCLE 9 REQUEST FOR PROPOSALS PROFESSIONAL SERVICES GRANT WRITING ASSISTANCE FOR THE HIGHWAY SAFETY IMPROVEMENT PROGRAM CYCLE 9 PROJECT NO. SEB-18-005 Issued by: City of Stockton Public Works Department 22 E.

More information

Colquitt Regional Medical Center

Colquitt Regional Medical Center March 21 st, 2018 REQUEST FOR QUALIFICATIONS (PHASE I) And REQUEST FOR PROPOSAL (PHASE II) To Provide CONSTRUCTION MANAGEMENT AT-RISK SERVICES For The Hospital Authority of Colquitt County At Colquitt

More information

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES GRANT WRITING ASSISTANCE FOR THE ACTIVE TRANSPORTATION PROGRAM

REQUEST FOR PROPOSALS PROFESSIONAL SERVICES GRANT WRITING ASSISTANCE FOR THE ACTIVE TRANSPORTATION PROGRAM REQUEST FOR PROPOSALS PROFESSIONAL SERVICES GRANT WRITING ASSISTANCE FOR THE ACTIVE TRANSPORTATION PROGRAM PROJECT NO. SEB-18-004 Issued by: City of Stockton Public Works Department 22 E. Weber Avenue,

More information

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES DELTONA MIDDLE 250 ENTERPRISE ROAD DELTONA, FLORIDA MASTER PLAN PROJECT NO.

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES DELTONA MIDDLE 250 ENTERPRISE ROAD DELTONA, FLORIDA MASTER PLAN PROJECT NO. REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES FOR DELTONA MIDDLE 250 ENTERPRISE ROAD DELTONA, FLORIDA 32725 MASTER PLAN PROJECT NO. 184620 School Board of Volusia County Florida Facilities Services

More information

REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC)

REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) REQUEST FOR QUALIFICATIONS/PROPOSAL (RFQ/P) FOR CONSTRUCTION MANAGER/GENERAL CONTRACTOR (CM/GC) Ricardo Flores Magón Academy (Owner) 5301 Lowell Boulevard Denver, CO 80122 Phone (303) 412-7610 PROPOSAL

More information

REQUEST FOR PROPOSAL FOR A & E Services for the Spokane Tribe of Indians Health and Human Services Building

REQUEST FOR PROPOSAL FOR A & E Services for the Spokane Tribe of Indians Health and Human Services Building REQUEST FOR PROPOSAL FOR A & E Services for the Spokane Tribe of Indians Health and Human Services Building PROPOSAL NO. FY2012/008 BY SPOKANE TRIBE OF INDIANS PURCHASING/PROPERTY DEPARTMENT 6195 FORD/WELLPINIT

More information

Office of Business and Financial Services Procurement and Contracts Division Section SUBJECT: PROCUREMENT OF CONSTRUCTION SERVICES

Office of Business and Financial Services Procurement and Contracts Division Section SUBJECT: PROCUREMENT OF CONSTRUCTION SERVICES 2510.8 SUBJECT: PROCUREMENT OF CONSTRUCTION SERVICES :1 OBJECTIVE: To establish a uniform policy and procedure for the acquisition of construction services for the City of Orlando (City), including, but

More information

DALTON PUBLIC SCHOOLS REQUEST FOR PROPOSAL. RFP FY18 Drivers Education RFP

DALTON PUBLIC SCHOOLS REQUEST FOR PROPOSAL. RFP FY18 Drivers Education RFP DALTON PUBLIC SCHOOLS PURCHASING DEPARTMENT REQUEST FOR PROPOSAL FOR RFP FY18 Drivers Education RFP RFP NUMBER (FY18 Drivers Education) ISSUED February 5th, 2018 Request for Proposal To: All Proposers

More information

REQUEST FOR QUALIFICATIONS

REQUEST FOR QUALIFICATIONS FACILITIES MANAGEMENT 4202 EAST FOWLER AVENUE / OPM 100 TAMPA, FL 33620-7550 EDITION: NOVEMBER 1, 2016 PHONE: (813) 974-2845 FAX: (813) 974-3542 REQUEST FOR QUALIFICATIONS PROJECT NAME: USF CPT REPLACE

More information

City of Malibu Request for Proposal

City of Malibu Request for Proposal Request for Proposal North Santa Monica Bay Coastal Watersheds Monitoring Services Date Issued: April 26, 2016 Date Due: May 17, 2016, 4:00 P.M. The Qualifications Proposal and Cost Proposal must be submitted

More information

Galesburg Public Library, Galesburg, IL

Galesburg Public Library, Galesburg, IL Galesburg Public Library, Galesburg, IL Request for Qualifications ( RFQ ) Architectural, Engineering, Construction Management and Related Services I. OVERVIEW The Galesburg Public Library is seeking architectural,

More information

Request for Qualifications. Professional Design and Construction Services as a Design-Builder. For. Delhi Township Fire Station

Request for Qualifications. Professional Design and Construction Services as a Design-Builder. For. Delhi Township Fire Station Request for Qualifications Professional Design and Construction Services as a Design-Builder For Submittal Due Date: August 4, 2015 Notice is hereby given that Delhi Township is seeking Statements of Qualification

More information

Request for Proposal

Request for Proposal Consolidated Edison Company of New York, Inc. Request for Proposal Non-Wires Solutions to Provide Demand Side Management for Subtransmission and Distribution System Load Relief Newtown Substation Project

More information

ARCHITECTURAL, LANDSCAPE, AND ENGINEERING CONSULTING SERVICES

ARCHITECTURAL, LANDSCAPE, AND ENGINEERING CONSULTING SERVICES REQUEST FOR QUALIFICATIONS # 1206-18/19 FOR ARCHITECTURAL, LANDSCAPE, AND ENGINEERING CONSULTING SERVICES Issue Date: June 26, 2018 Pre-Bid July 9, 2018 at 10:00 A.M. Conference: 1515 West Mission Road,

More information

Request for Proposals for Baggage Handling System / Checked Baggage Inspection System (CBIS)

Request for Proposals for Baggage Handling System / Checked Baggage Inspection System (CBIS) Request for Proposals for Baggage Handling System / Checked Baggage Inspection System (CBIS) Eagle County is soliciting Proposals and Statement of Qualifications from Construction Manager/General Contractors

More information

REQUEST FOR PROPOSALS. For: As needed Plan Check and Building Inspection Services

REQUEST FOR PROPOSALS. For: As needed Plan Check and Building Inspection Services Date: June 15, 2017 REQUEST FOR PROPOSALS For: As needed Plan Check and Building Inspection Services Submit Responses to: Building and Planning Department 1600 Floribunda Avenue Hillsborough, California

More information

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES Medical Research & Education Building 2 Texas A&M Health Science Center Bryan, Texas Project No. 23-3203 DEADLINE FOR SUBMITTAL: 2pm, Thursday,

More information