1 CENTRAL EUROPE PROGRAMME Project financial management and controls Vienna, 7 April 2011 Legal framework of the project implementation Luca FERRARESE JTS CENTRAL EUROPE Programme
2 1. Applicable rules The legal framework EU rules Regulations of the Structural Funds Horizontal rules Subsidy contract National rules Programme rules National legislation Internal/institutional rules Programme documents Partnership agreement
3 1. Applicable rules EU and national rules EU Regulations ruling the general budget of the EU Communities; EU Regulations ruling ERDF funds; Community rules on horizontal policies (Public procurement, equality between men and women and non-discrimination, environment protection, State Aid, Publicity); National Rules applicable to Lead and Project Partners (e.g. national eligibility rules for the Structural Funds, public procurement, etc.). In their latest version!
4 1. Applicable rules Programme documents: CENTRAL EUROPE Operational Programme; Application Manual (call specific); Implementation Manual; Control & Audit Guidelines. Additional documents are available (fact-sheets, templates, FAQ, etc.) but they are for information purposes only and they have no legal value.
5 2. Subsidy Contract and Partnership Agreement Subsidy Contract: Partnership Agreement: Signed between the Managing Authority and the Lead Partner (LP) on behalf of the entire partnership (Lead Partner principle) Signed between the LP and all Project Partners (PPs), ensuring mutual responsibilities and obligations within the partnership Standard templates on
6 2. Subsidy Contract Terms of the Subsidy Contract 1 Legal framework 2 Subject of the contract (max amount of ERDF awarded, total project budget, grant rate); 3 Project duration; 4 Eligibility of costs, budget flexibility (10% and 20%);
7 2. Subsidy Contract Terms of the Subsidy Contract 5 Request for payments: Reporting period Expected payment request * ( ) Progress/final report to be submitted to the JTS at the latest by Total cost ( ) Preparation Costs 6.000, ,80 01/07/ /10-04/ , ,47 01/07/ /11-10/ , ,94 01/01/ /11-04/ , ,51 01/07/ /12-10/ , ,03 01/01/ /12-04/ , ,07 01/07/ /13-10/ , ,68 01/02/2014 Total: , ,50 Payments not requested in time and in full or non in compliance may be lost. No advance payments foreseen!
8 2. Subsidy Contract Terms of the Subsidy Contract 6-7 Obligations of the Lead Partner: Arrangements for its relations with the other PPs (partnership agreement); Project implementation; Overall responsibility on incurred and validated expenditure; Transfer of ERDF contribution to the PPs; Project management: start-up, budget reduction, change of partner, organization of project Steering Committees; Keeping of supporting documents required for an adequate audit trail regarding expenditure incurred and payments, made available for verifications and audit; Additional obligations (e.g. State Aid conditions if applicable).
9 2. Subsidy Contract Terms of the Subsidy Contract 8 Lead Partner liability towards the Managing Authority: Overall financial and legal responsibility on behalf of the partnership and towards third parties. 9 Validation of expenditure and audit of projects: Identification of First Level Controllers for validation of expenditure; Submission of Progress Reports accompanied by validated expenditure at lead and project partner level; Retention of all information and supporting documents, at least until 31 December 2022.
10 2. Subsidy Contract Terms of the Subsidy Contract 10 Recovery of unjustified expenditure in case of irregularities and of infringements of the contract; 11 Publicity: Lack of respect of publicity rules (as in the Implementation Manual and Control & Audit Guidelines) 12 Ownership -Use of outputs: Ownership, title and industrial and intellectual property rights vest in the LP and/or PPs in accordance to the applicable national law; Joint output management must be ruled within the Partnership Agreement; Outputs cannot be transferred according to the terms as in Art. 57 of Regulation (EC) 1083/2006.
11 2. Subsidy Contract Terms of the Subsidy Contract 13 Revenues: Generated earnings (e.g. sales of products, merchandise, participation fees, training sessions offered at market price and other provision of services) will imply a deduction of the ERDF contribution in full or pro-rata (if entirely or partly generated by the project); For revenues generated after the project closure, the estimated net revenue must be deducted from the final request for payment; Until three years after the Programme closure, revenues previously not taken into account will have to be refunded.
12 2. Subsidy Contract Terms of the Subsidy Contract 14 Assignment, legal succession 15 Termination and repayment 16 Force majeure 17 Litigation Subsidy Contract annexes 1. Latest Application Form 2. EU regulations 3. Programme documents
13 2. Subsidy Contract The process 1. Communication to the Monitoring Committee on the finalization of the negotiation process (after the fulfillment of conditions). 2. Subsidy Contract offer (2 months duration) sent to the LP by the MA via the JTS. 3. Signature of the Subsidy Contract by the LP. 4. Signature of the Subsidy Contract by the MA.
14 2. Partnership Agreement Content of the Partnership Agreement It rules the obligations of LP and PPs focusing on (among others): Budget flexibility within the partnership; Structure of the Steering Committee; Separate accounting system for project management; Internal procedure of reporting and ERDF reimbursement; Identification of First Level Controllers by each PP; Location of documents for each PP (storage and audit trail); Changes in the project (partnership, budget, activities, duration); Budget managed by EU Partners outside CE (20% flexibility); Activities implemented outside EU territory (10% flexibility); Other obligations (e.g. State Aid if applicable).
15 2. Partnership Agreement Correspondence between SC and PA Subsidy Contract 1 Legal Framework Preamble Partnership Agreement 3-9 Contract Duration 3 Duration of the Agreement 6-7 Obligations of the LP 5-6 Obligations of the LP and PP 9 Validation of expenditure and audit of projects 8 budgetary and financial management, accounting principle.. Content of the Programme template must be considered as the minimum possible to be included in the Partnership Agreement.
16 2. Partnership Agreement Partnership Agreement annexes 1. Latest Application Form 2. Subsidy Contract 3. Detailed work plan and timetable of activities per project partner; 4. Partners budget split per work package, budget line and reporting period (template available on the Programme web site).
17 2. Partnership Agreement The process 1. PA signature can be: One document signed by the entire partnership; Bilateral agreements signed by the LP and each PP; 2. The signed PA is not to be sent to the MA/JTS, but evidence of its signature by LP and all PPs must be provided; 3. The PA must be always updated in case of change of partner, activities and budget revision. Lack of evidence of the signed PA will not allow the ERDF reimbursement; The MA/JTS will check the content and proper signature of the PA on a sample basis (within on-the-spot checks).
18 3. Next steps Projects to-dos Projects to be started at the latest within 2 months after the signature of the Subsidy Contract; Installation of separate accounting systems by the LP and PPs; Identification of LP and PPs First Level Controllers in accordance with national systems; Preparation of the PA according to the specific needs, using the Programme template as minimum requirement; Submission of the Start-Up Report to the JTS at the latest 3 months after the contract signature, including evidence of the PA signature by all PPs; Invite the JTS to your project Steering Committee meetings.
19 CENTRAL EUROPE PROGRAMME THANK YOU!
Subsidy contract for the project. Click here to enter text.
Subsidy contract for the project Click here to enter text. Version 02 as of 14.06.2016 The following contract between the Land of Salzburg acting as managing authority (hereinafter MA ) of the European
More informationProgram structure. Steering Committee. Joint Technical Secretariat, in Gdansk
M o n i t o r i n g C o m m i t ee Contact Points Support to potential beneficiaries, marketing and information of the programme. Managing Authority Program structure Ministry of Regional Development of
More informationModel Agreement between Lead Partners and partners of an INTERREG IVC project (Partnership Agreement) 1
Model Agreement between Lead Partners and partners of an INTERREG IVC project (Partnership Agreement) 1 Having regard to Council Regulation (EC) No 1080/2006 of 5 July 2006, amended by Regulation (EC)
More informationApplication Form. Green Infrastructure Fund
Application Form Green Infrastructure Fund January 2016 Application Form For guidance on completing this form, please refer to the Green Infrastructure Fund Application Form Guidance which explains the
More informationSouth East Europe Transnational Cooperation Programme
South East Europe Transnational Cooperation Programme 8th June 2009 Kick-off conference for the project DANUBEPARKS Orth Joint Technical Secretariat SEE Legal framework Reference Document at EU level The
More informationApplication Form Green Infrastructure Fund
Application Form Green Infrastructure Fund Round 2 July 2016 Application Form For guidance on completing this form, please refer to the Green Infrastructure Fund Application Form Guidance which explains
More information1 ST CALL FOR PROPOSALS THE POLAND-RUSSIA CBC PROGRAMME GENERAL INFORMATION
1 ST CALL FOR PROPOSALS THE POLAND-RUSSIA CBC PROGRAMME 2014-2020 GENERAL INFORMATION Poland-Russia CBC Programme The main objective of the Poland-Russia Cross-border Cooperation Programme 2014-2020 is
More informationAtlantic Area Programme Draft Transnational Partnership Agreement For the implementation of the project
Atlantic Area Programme Draft Transnational Partnership Agreement For the implementation of the project ProjectAcronym Project Title ProjectNumber PriorityProject - ObjectiveProject IN VIEW OF Council
More informationTEXMEDIN TEXtile and apparel EuroMEDiterranean heritage for INnovation. Management and Coordination Agreements and Reporting
TEXMEDIN TEXtile and apparel EuroMEDiterranean heritage for INnovation Management and Coordination Agreements and Reporting Overview Subsidy Contract Start-up report Reporting procedures Auditors data
More informationAsylum Migration and Integration Fund
Asylum Migration and Integration Fund Call for Proposals 2016 Information and Guidance for Applicants EUROPEAN UNION Asylum, Migration and Integration Fund Table of Contents Section 1. Overview of Call
More informationJoint Operational Programme Romania Republic of Moldova
Joint Operational Programme Romania Republic of Moldova 2014-2020 Procedure for the evaluation and approval of large infrastructure projects selected through direct award Abbreviations CBC Cross Border
More informationRegulation on the implementation of the European Economic Area (EEA) Financial Mechanism
the European Economic Area (EEA) Financial Mechanism 2009-2014 adopted by the EEA Financial Mechanism Committee pursuant to Article 8.8 of Protocol 38b to the EEA Agreement on 13 January 2011 and confirmed
More informationGUIDANCE HOW TO IMPLEMENT THE PROJECT VIA THE ELECTRONIC MONITORING SYSTEM (PART II)
Approved by the Head of the Managing Authority Sandis Cakuls on 19.06.2017. GUIDANCE HOW TO IMPLEMENT THE PROJECT VIA THE ELECTRONIC MONITORING SYSTEM (PART II) INTERREG V A LATVIA LITHUANIA PROGRAMME
More informationWhat s new in the maritime call? What is the budget framework? How to prevent a project being ineligible?
What s new in the maritime call? What is the budget framework? How to prevent a project being ineligible? Documents to be submitted 1. Application form signed and stamped in original 2. Letters of commitment
More informationLong-term Intersectoral Cooperation
Ref. No: MEYS-37304/2016-3 In Prague on 11 th July 2017 Czech Republic Ministry of Education, Youth and Sports MANAGING AUTHORITY OPERATIONAL PROGRAMME RESEARCH, DEVELOPMENT AND EDUCATION announces THE
More informationEUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE
EUROPEAN COMMISSION DIRECTORATE-GENERAL JUSTICE SPECIFIC PROGRAMME "ISEC" (2007-2013) PREVENTION OF AND FIGHT AGAINST CRIME CALL FOR PROPOSALS JUST/2013/ISEC/DRUGS/AG Action grants Targeted call on cross
More informationFIRST LEVEL CONTROL IN FINLAND FOR THE TERRITORIAL COOPERATION OBJECTIVE PROGRAMMES DURING THE PROGRAMMING PERIOD
Regional Development Unit Guidance Note: REV 1 13.8.2010 3357/570/2008 FIRST LEVEL CONTROL IN FINLAND FOR THE TERRITORIAL COOPERATION OBJECTIVE PROGRAMMES DURING THE 2007-2013 PROGRAMMING PERIOD 1. Background
More informationEducation, Audiovisual and Culture Executive Agency GRANT DECISION FOR AN ACTION. Decision Nr
Education, Audiovisual and Culture Executive Agency Creative Europe: Culture GRANT DECISION FOR AN ACTION Decision Nr of the Education, Audiovisual and Culture Executive Agency on the award of a grant
More informationWorkshop 1: How to prepare a good Progress Report Practical Exercises
Workshop 1: How to prepare a good Progress Report Practical Exercises Exercise 1: Together in your group please check the documents attached 1a, 1b, 1c and state whether they are complete and in line with
More informationURBACT III Programme Manual
URBACT III Programme Manual Fact Sheet 2B Implementation Networks Table of contents Fact Sheet 2B 1. Main objectives and expected results... 1 2. Network s development... 3 3. Partnership... 4 4. Activities
More informationGRANT APPLICATION FORM 1
No of proposal: MOVE/C4/SUB/01-2012/.. (for Commission use only) GRANT APPLICATION FORM 1 Road Safety and young road users (a) Project identification Full title Acronym (20 characters max.) (b) Organisation
More informationOpen call for proposals VP/2004/021. Initiatives to promote gender equality between women and men, including activities concerning migrant women
EUROPEAN COMMISSION EMPLOYMENT, SOCIAL AFFAIRS AND EQUAL OPPORTUNITIES DG Horizontal and international issues Equality for Women and Men Open call for proposals VP/2004/021 Initiatives to promote gender
More informationPartner Declaration ITALY-CROATIA PROGRAMME
Partner Declaration ITALY-CROATIA PROGRAMME Before filling in the declaration with due care and attention, the Partner Organisation is requested to read the section D of the Programme Factsheet n. 4 Project
More informationCALL FOR PROPOSALS FOR THE CREATION OF UP TO 25 TRANSFER NETWORKS
Terms of reference CALL FOR PROPOSALS FOR THE CREATION OF UP TO 25 TRANSFER NETWORKS Open 15 September 2017 10 January 2018 September 2017 1 TABLE OF CONTENT SECTION 1 - ABOUT URBACT III & TRANSNATIONAL
More informationSupport for Applied Research in Smart Specialisation Growth Areas. Chapter 1 General Provisions
Issuer: Minister of Education and Research Type of act: regulation Type of text: original text, consolidated text In force from: 29.08.2015 In force until: Currently in force Publication citation: RT I,
More informationSub-granting. 1. Background
Sub-granting 1. Background The European Commission (EC) re-introduced in May 2007 the option of sub-granting in its grant contracts 1. Sub-granting is an indirect financial contribution through an EC grant
More informationSouth East Europe (SEE) Programme Manual
South East Europe (SEE) Programme Manual Version 1.1 September 2008 1 st Call for project proposals European Territorial Co-operation 2007 2013 CONTENTS Glossary 3 1 Purpose and content of the SEE Programme
More informationEducation, Audiovisual and Culture Executive Agency
Education, Audiovisual and Culture Executive Agency Creative Europe - MEDIA CREATIVE EUROPE MEDIA Sub-programme Established by Regulation N 1295/2013 of the European Parliament and of the Council of 11
More informationGUIDE FOR APPLICANTS. SUPPORT TO EUROPEAN COOPERATION PROJECTS 2018 and COOPERATION PROJECTS RELATED TO THE EUROPEAN YEAR OF CULTURAL HERITAGE 2018
Education, Audiovisual and Culture Executive Agency Culture Unit GUIDE FOR APPLICANTS SUPPORT TO EUROPEAN COOPERATION PROJECTS 2018 and COOPERATION PROJECTS RELATED TO THE EUROPEAN YEAR OF CULTURAL HERITAGE
More informationNegotiation Guidance Notes
Negotiation Guidance Notes FP7 Collaborative Projects, Networks of Excellence, Coordination and Support Actions, Research for the benefit of Specific Groups (in particular SMEs) Version 31/7/2007 Disclaimer
More informationINTERREG South Baltic Programme th call for proposals 13 November December 2017
INTERREG South Baltic Programme 2014-2020 5th call for proposals 13 November 2017 20 December 2017 ANNOUNCEMENT OF THE CALL FOR GREEN TECHNOLOGIES PROJECTS (Specific objective 2.2) Announcement of the
More informationEuropean Territorial Cooperation Programme Management structures related to the SEE Transnational Programme in Greece
European Territorial Cooperation Programme 2007-2013 Management structures related to the SEE Transnational Programme in Greece National Contact Point First Level Control Audit Authority The SEE National
More informationThe European Research Council. Pierre Dubosc ERC Executive Agency Unit C2 Grant Agreement Preparation Lyon 07/05/2014
The European Research Council Pierre Dubosc ERC Executive Agency Unit C2 Grant Agreement Preparation Lyon 07/05/2014 Overview H2020 ERC Grant Agreement The ERC Grant Agreement and the Annexes New Specificities
More informationCALL FOR FINANCIAL CAPACITY CHECK EXPERTS
CALL FOR FINANCIAL CAPACITY CHECK EXPERTS Call addressed to individuals for the establishment of a roster of prospective independent experts for the assessment of the financial capacity of private Lead
More informationCAPACITIES WORK PROGRAMME PART 3. (European Commission C (2011) 5023 of 19 July 2011) REGIONS OF KNOWLEDGE
WORK PROGRAMME 2012-2013 CAPACITIES PART 3 REGIONS OF KNOWLEDGE (European Commission C (2011) 5023 of 19 July 2011) Capacities Work Programme: Regions of Knowledge The work programme presented here provides
More informationSTANDARD CONDITIONS OF GRANT
ANNEX A STANDARD CONDITIONS OF GRANT EUROPEAN UNION PROGRAMMES INTERREG V PROGRAMME (Cross-border Programme for Territorial Cooperation 2014 2020 Northern Ireland, Border Region of Ireland and Western
More informationINTERREG South Baltic Programme th call for proposals 1October December 2018
INTERREG South Baltic Programme 2014-2020 6th call for proposals 1October 2018 18 December 2018 ANNOUNCEMENT OF THE CALL FOR SKILLED LABOUR FORCES PROJECTS (Specific objective 4.1) Announcement of the
More informationINTERREG South Baltic Programme th call for proposals 1 October December 2018
INTERREG South Baltic Programme 2014-2020 6th call for proposals 1 October 2018 18 December 2018 ANNOUNCEMENT OF THE CALL FOR GREEN TECHNOLOGIES PROJECTS (Specific objective 2.2) Announcement of the 6th
More informationSouth East Europe (SEE) Programme Manual
South East Europe (SEE) Programme Manual Version 1.0, 5 May 2008 1 st Call for project proposals European Territorial Co-operation 2007 2013 CONTENTS Glossary 3 1 Purpose and content of the SEE Programme
More informationIMPULSE Iran-Austria
IMPULSE Iran-Austria Call for Applications for joint activities 2018-2020 Guideline Document Guidelines Call for Applications IMPULSE Iran-Austria Approved (OeAD/MSRT) 1 Content 1 Introduction... 3 2 Aims
More informationEU Aid Volunteers initiative. Deployment. Instructions for Project Management. Selection 2017
EU Aid Volunteers initiative Deployment Instructions for Project Management Selection 2017 Version of February 2018 1 Table of Contents Introduction Overview Project Life Cycle 1. Support and monitoring
More information1st Programme MED Capitalisation call Information day. Valencia
1st Programme MED Capitalisation call Information day Valencia 18.09.2012 MED Capitalisation Process: Expectations With capitalisation, we wish to transform relevant skills into information that can be
More informationAnswers to questions following the call for tender for a Fund Operator for the EEA and Norway Grants Global Fund for Regional Cooperation
Answers to questions following the call for tender for a Fund Operator for the EEA and Norway Grants Global Fund for Regional Cooperation Question 1: Does re-granting experience refer to direct experience
More informationHorizon 2020 Legal Documents
TURKEY IN HORIZON 2020 ALTUN/HORIZ/TR2012/0740.14-2/SER/005 Legal & Financial Issues in H2020 Understanding the Legal background of your proposal Model Grant Agreement Odysseas Spyroglou IPR, Legal & Financial
More informationParticipating in the 7th Community RTD Framework Programme. Athens 28/2/07 SSH Information Day
Participating in the 7th Community RTD Framework Programme Athens 28/2/07 SSH Information Day 1 2 Overview How proposals are submitted: the EPSS system What happens next Who can participate Funding schemes
More informationGUIDANCE NOTES ON PROJECT REPORTING
EUROPEAN COMMISSION RESEARCH EXECUTIVE AGENCY P3 Marie Curie Integration Grants and Researchers' Night GUIDANCE NOTES ON PROJECT REPORTING Career Integration Grants (CIG) International Reintegration Grants
More informationFactsheet n. 5 Project Selection
INTERREG V A Italy Croatia CBC Programme Factsheet n. 5 Project Selection Version N 1 of 20 th February 2017 Programme co-financed by the European Regional Development Fund (ERDF) TABLE OF CONTENTS A.
More informationPART II: GENERAL CONDITIONS APPLICCABLE TO GRANTS FROM THE NORWEGIAN MINISTRY OF FOREIGN AFFAIRS
PART II: GENERAL CONDITIONS APPLICCABLE TO GRANTS FROM THE NORWEGIAN MINISTRY OF FOREIGN AFFAIRS TABLE OF CONTENTS 1 IMPLEMENTATION PLAN AND BUDGET... 2 2 PROGRESS REPORT... 2 3 FINANCIAL REPORT... 2 4
More informationCALL FOR THEMATIC EXPERTS
CALL FOR THEMATIC EXPERTS Call addressed to individuals for the establishment of a roster of prospective independent experts for the assessment of project proposals in the Interreg CENTRAL EUROPE Programme
More informationNEGOTIATION GUIDANCE NOTES
NEGOTIATION GUIDANCE NOTES FP7 Collaborative Projects, Networks of Excellence, Coordination and Support Actions, Research for the benefit of Specific Groups (in particular SMEs) Version 27/01/2009 Disclaimer
More informationERASMUS+ Capacity Building in the Field of Youth. Project Handbook. Selection 2016
ERASMUS+ Capacity Building in the Field of Youth Project Handbook Selection 2016 Version of August 2016 1 Table of Contents Introduction Overview Project Life Cycle 1) Monitoring of the Project by the
More informationGuidelines for Project Progress Report
Guidelines for Project Progress Report Version 2.1 October 2017 A stream of cooperation Programme co-funded by the European Union Content List of abbreviations... 5 Introduction... 6 PART I TECHNICAL GUIDELINES...
More informationUniversity of Belgrade Belgrade SERBIA
DOCUMENT TYPE PLACE External/internal document University of Belgrade Belgrade SERBIA Financial Management, Accounting & Controlling curricula development for capacity building of public administration
More information"ERA-NET Plus Actions"
"ERA-NET Plus Actions" PROVISIONS FOR THE PREPARATION OF ERA-NET PLUS ACTIONS AND THEIR PRACTICAL IMPLEMENTATION A draft issue paper serving as background document 1 RTD B.1 Coordination of national research
More informationJean Monnet activities within the Erasmus+ Programme
Jean Monnet activities within the Erasmus+ Programme Context Management of projects Snejina Nikolova Unit A2, EACEA Europe week video-conference Voronezh, 18 May 2017 Erasmus + Programme - How is it managed
More informationYou & Your Organisation. Welcome to The London Marathon Charitable Trust's online application form for a Major Capital Grant.
Major Capital Grants Application Form City You & Your Organisation Welcome to The London Marathon Charitable Trust's online application form for a Major Capital Grant. This application form is for funding
More informationYorkshire and Humber ERDF Programme Document Retention Records to Keep
Yorkshire and Humber ERDF Programme 2007 2013 Document Retention Records to Keep Title Document Retention Records to Keep Version 1 Status Date created 02.09.08 Author LC Date of Issue 05.09.08 Next review
More informationReporting in the ems Manual
INTERREG V-A ROMANIA-HUNGARY PROGRAMME Reporting in the ems Manual For lead partners and project partners Partnership for a better future www.interreg-rohu.eu Version 1 February 2017 Disclaimer: This is
More informationGUIDE FOR APPLICANTS INTERREG VA
GUIDE FOR APPLICANTS INTERREG VA Cross-border Programme for Territorial Co-operation 2014-2020, Northern Ireland, Border Region of Ireland and Western Scotland & PEACE IV EU Programme for Peace and Reconciliation
More informationANNEX III FINANCIAL AND CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS
ANNEX III FINANCIAL AND CONTRACTUAL RULES I. RULES APPLICABLE TO BUDGET CATEGORIES BASED ON UNIT CONTRIBUTIONS I.1 Conditions for eligibility of unit contributions Where the grant takes the form of a unit
More informationIncentive Guidelines Innovation Clusters
Incentive Guidelines Innovation Clusters Issue Date: 1 st June 2009 (updated 04/02/2014) Version: 1.1 http://support.maltaenterprise.com This incentive forms part of a group of R&D&I incentives under the
More informationProjecte IMAILE. Information session Viladecans
IMPORTANT NOTICE: In the case incoherence between the information in this presentation and the official documentation of the call, the texts of the official call (ITT) and all related annexes prevail.
More informationFMO External Monitoring Manual
FMO External Monitoring Manual The EEA Financial Mechanism & The Norwegian Financial Mechanism Page 1 of 28 Table of contents 1 Introduction...4 2 Objective...4 3 The monitoring plan...4 4 The monitoring
More informationInternational Mobility of Researchers MSCA IF
Ref. No: MEYS 6246/2017 In Prague, on 14 9 2017 Czech Republic Ministry of Education, Youth and Sports MANAGING AUTHORITY OPERATIONAL PROGRAMME RESEARCH, DEVELOPMENT AND EDUCATION announces THE CALL International
More informationCALL FOR PROPOSALS. GRANT FOR ROMACT "SUPPORT ORGANISATIONS" IN SLOVAKIA SRSGRoma/SPU/2017/27. Joint EU/CoE Projects ROMACT3 and ROMACT4
CALL FOR PROPOSALS GRANT FOR ROMACT "SUPPORT ORGANISATIONS" IN SLOVAKIA SRSGRoma/SPU/2017/27 Project Joint EU/CoE Projects ROMACT3 and ROMACT4 Awarding entity Funding COUNCIL OF EUROPE Directorate General
More informationOverall status of ECOSEA implementation
Overall status of ECOSEA implementation Index Check on the compliance with project time-plan: activities foreseen VS realised Status of procurement procedures of all partners Status of project expenditures
More informationGRANT AGREEMENT FOR AN ACTION ACTION 2 - ERASMUS MUNDUS PARTNERSHIPS Financing exclusively by lump sum contribution(s) and/or unit contribution(s)
Grant Agreement number «NO_REF» MONO BENEFICIARY GRANT AGREEMENT MARCH 2013 Education, Audiovisual and Culture Executive Agency Erasmus Mundus and External Cooperation GRANT AGREEMENT FOR AN ACTION ACTION
More informationCAPACITIES WORK PROGRAMME (European Commission C(2009)5905 of 29 July 2009)
WORK PROGRAMME 2010 1 CAPACITIES (European Commission C(2009)5905 of 29 July 2009) 1 In accordance with Articles 163 to 173 of the EC Treaty, and in particular Article 166(1) as contextualised in the following
More informationSTANDARD GRANT APPLICATION FORM 1 REFERENCE NUMBER OF THE CALL FOR PROPOSALS: 2 TREN/SUB
STANDARD GRANT APPLICATION FORM 1 PROGRAMME CONCERNED: 2 ACTIONS IN THE FIELD OF URBAN MOBILITY REFERENCE NUMBER OF THE CALL FOR PROPOSALS: 2 TREN/SUB 02-2008 [Before filling in this form, please read
More informationBusiness Development, Innovation and SMEs Practical Information and Guidance to Applicants
Business Development, Innovation and SMEs Practical Information and Guidance to Applicants Innovation Norway Sofia, 22.05.2018 Programme website www.innovationnorway.no/bgbusiness Essential reading and
More informationDepartment of Agriculture, Environment and Rural Affairs (DAERA)
Department of Agriculture, Environment and Rural Affairs (DAERA) Guidance for the implementation of LEADER Cooperation activities in the Rural Development Programme for Northern Ireland 2014-2020 Please
More informationThe Dialogue Facility THE DIALOGUE FACILITY Bridging Phase Guidelines and Criteria for Support
www.dialoguefacility.org THE DIALOGUE FACILITY Bridging Phase Guidelines and Criteria for Support 1 This publication has been produced with the assistance of the European Union. The contents of this publication
More informationGuidelines. 1st Call for proposals
Managing Authority Ministry of Finance of the Republic of Estonia Estonia Russia Cross Border Cooperation Programme 2014-2020 EC decision No C (2015) 9193 Guidelines for the Approved by chapters on 2 nd
More informationArchive and Retention Policy
Archive and Retention Policy Introduction Data protection Freedom of Information Who owns the records that BIG holds? Specialist retention schedules for non lottery programmes Who is responsible for ensuring
More informationFact Sheet How to manage IP in FP7 during and after the project
European IPR Helpdesk Fact Sheet How to manage IP in FP7 during and after the project April 2014 1 Introduction... 1 1. Implementation stage... 2 1.1 Knowledge management bodies... 2 1.2 Results ownership...
More informationINTERREG South Baltic Programme st call for proposals 2 November December 2015 ANNOUNCEMENT
INTERREG South Baltic Programme 2014-2020 1 st call for proposals 2 November 2015 18 December 2015 ANNOUNCEMENT Please note: this document is valid ONLY for the 1 st call for proposals for Interreg South
More informationSouth East Europe (SEE) Programme Manual
South East Europe (SEE) Programme Manual Version 2.0 November 2009 2 nd Call for project proposals European Territorial Co-operation 2007 2013 CONTENTS Glossary 4 List of acronyms 7 1 Purpose and content
More informationGreen Industry Innovation Programme Poland. Call for Project Proposals
Norwegian Financial Mechanism 2009-2014 (Norway Grants) Green Industry Innovation Programme Poland Call for Project Proposals The Green Industry Innovation Programme Poland (later referred to as the Programme)
More informationIncentive Guidelines Start-Up Finance
Incentive Guidelines Start-Up Finance 2017-2020 Issue Date: 31 st May 2017 Version: 1 http://support.maltaenterprise.com Malta Enterprise provides support to interested applicants to understand the objectives
More informationStructural Funds Outline Assessment ESIF-Form-X-XXX
Structural Funds Outline Assessment ESIF-Form-X-XXX The Outline Assessment must be completed by the Managing Authority (MA) based exclusively on the Outline Application (including any appendices). This
More informationSPECIFIC PRIVACY STATEMENT IMI JU
SPECIFIC PRIVACY STATEMENT IMI JU Innovative Medicines Initiative Joint Undertaking - Proposals Evaluation and Grants Management This statement concerns the processing operation called "Innovative Medicines
More informationParticipation and funding in H2020 actions Ingrid Mariën-Dusak, DG CONNECT
Participation and funding in H2020 actions Ingrid Mariën-Dusak, DG CONNECT Disclaimer : H2020 Regulations are not yet adopted by the legislator. Any information contained in this presentation is legally
More informationPROFESSIONAL AND INSTITUTIONAL DEVELOPMENT PROGRAM: PROGRAM GUIDELINES
PROFESSIONAL AND INSTITUTIONAL DEVELOPMENT PROGRAM: PROGRAM GUIDELINES 2016-2017 INTRODUCTION These Program Guidelines for Aboriginal Affairs and Northern Development Canada s (AANDC) Professional and
More informationSTANDARD TERMS AND CONDITIONS ON NORWAY GRANTS FROM INNOVATION NORWAY
STANDARD TERMS AND CONDITIONS ON NORWAY GRANTS FROM INNOVATION NORWAY 1 Scope of the Project Contract The Grant to the Project Promoter is offered on the terms and conditions laid down in the Grant Offer
More informationJean Monnet Activities within the Erasmus+ Programme Grant Management & Procedures. Seminar for on-going Erasmus+ Jean Monnet Projects
Jean Monnet Activities within the Erasmus+ Programme Grant Management & Procedures Seminar for on-going Erasmus+ Jean Monnet Projects Reference Documents Jean Monnet Programme Guide Grant Agreement Jean
More informationIncentive Guidelines Research and Development - Tax Credits INDUSTRIAL RESEARCH PROJECTS; EXPERIMENTAL DEVELOPMENT PROJECTS; INTELLECTUAL PROPERTY
Incentive Guidelines Research and Development - Tax Credits INDUSTRIAL RESEARCH PROJECTS; EXPERIMENTAL DEVELOPMENT PROJECTS; INTELLECTUAL PROPERTY RIGHTS COSTS (FOR SMALL AND MEDIUM-SIZED ENTERPRISES).
More informationGENERAL CONDITIONS FOR PLANNING GRANTS WITHIN THE DEMO ENVIRONMENT PROGRAMME
GENERAL CONDITIONS FOR PLANNING GRANTS WITHIN THE DEMO ENVIRONMENT PROGRAMME 2015-2019 1. General 1.1 Scope These conditions set forth the terms for projects that have been awarded a Grant for Planning
More informationBlue Tech Kick off meeting Unioncamere del Veneto Parco tecnologico VEGA Building LYBRA Via delle Industrie 19/C Venezia Marghera 27 May 2016
Blue Tech Kick off meeting Unioncamere del Veneto Parco tecnologico VEGA Building LYBRA Via delle Industrie 19/C 30175 Venezia Marghera 27 May 2016 MINUTES 27.05.2016 10:00-10.30 Welcome 10:30-11:30 Introduction
More informationLifelong Learning Programme Leonardo da Vinci
Lifelong Learning Programme 2007-2013 Leonardo da Vinci TRANSFER OF INNOVATION Project Handbook (Annex III Guidelines for Administrative and Financial Management and Reporting) IMPORTANT! Before using
More informationEUROPEAN UNION ITALIAN REPUBLIC APULIA REGION
EUROPEAN UNION ITALIAN REPUBLIC APULIA REGION Managing Authority of European Territorial Cooperation Programmes Address: 65, Georgikis Scholis Avenue, Pilea 57001, Thessaloniki, Greece Contact person:
More informationCALL FOR PROPOSALS LOCAL INITIATIVES ON INTER-MUNICIPAL COOPERATION IN MOLDOVA
CALL FOR PROPOSALS LOCAL INITIATIVES ON INTER-MUNICIPAL COOPERATION IN MOLDOVA European Union/Council of Europe Programmatic Cooperation Framework (PCF) for Armenia, Azerbaijan, Georgia, Moldova, Ukraine
More informationQ&A Call Force Protection and Soldier Systems PADR-FPSS-2017 and the General Annexes
Q&A Call Force Protection and Soldier Systems PADR-FPSS-2017 and the General Annexes Q1. Can a proposal answering to the Call Force Protection and Soldier Systems address one or more subtopics of the Call?
More informationErasmus+ Application Form. Call: A. General Information. B. Context. B.1. Project Identification
A. General Information This application form consists of the following main sections: - Context: this section asks for general information about the type of project proposal you want to submit; - Participating
More informationHorizon Support to Public-Public Partnershiups
Horizon 2020 Support to Public-Public Partnershiups Jörg NIEHOFF DG Research & Innovation Dir. B Innovation Union and European Research Area Unit B2 ERA Policy and Reform ERA-NET Cofund main features ERA-NET
More informationErasmus+ General Information. Context. Application Form Call: KA2 Cooperation and Innovation for Good Practices
General Information This application form consists of the following main sections: - Context: this section asks for general information about the type of project proposal you want to submit; - Participating
More informationTRANSNATIONAL COOPERATION PROGRAMME INTERREG V-B BALKAN - MEDITERRANEAN CO-FINANCED BY THE EUROPEAN REGIONAL DEVELOPMENT FUND (ERDF)
1 MANAGING AUTHORITY OF EUROPEAN TERRITORIAL COOPERATION PROGRAMMES Thessaloniki, 22-08-2016 Ref. No.: 300997/MA 3834 TRANSNATIONAL COOPERATION PROGRAMME INTERREG V-B BALKAN - MEDITERRANEAN 2014-2020 CO-FINANCED
More informationGENERAL TENDER CONDITIONS
GENERAL TENDER CONDITIONS F4E_D_27E7D9 v 2.2 Page 1 of 15 TABLE OF CONTENTS 1. Introduction... 3 2. Procurement rules... 3 3. Procurement procedures... 4 4. Compliance with requirements... 5 4.1. Completeness
More informationINDIVIDUAL CONSULTANT PROCUREMENT NOTICE
INDIVIDUAL CONSULTANT PROCUREMENT NOTICE Date: 2 June 2017 Country: Thailand Description of the assignment: Graphic Designer (3 Positions) Duty Station: Home- based with possible travel to countries in
More informationERA-LEARN 2020: In-Kind/ Institutional ERA-NET-COFUND- Projects An Overview
ERA-LEARN 2020: In-Kind/ Institutional ERA-NET-COFUND- Projects An Overview April 2015 Overview ERA-NET COFUND: In general The exceptional case: In-Kind/ Institutional ERA-NET- COFUND-Projects Who can
More informationGOVERNMENT OF ROMANIA. Republic of SERBIA APPLICANT S GUIDE ROMANIA-SERBIA IPA CROSS-BORDER COOPERATION PROGRAMME
EUROPEAN UNION GOVERNMENT OF ROMANIA GOVERNMENT OF SERBIA MANAGING AUTHORITY NATIONAL AUTHORITY MINISTRY OF FINANCE ROMANIA Republic of SERBIA APPLICANT S GUIDE ROMANIA-SERBIA IPA CROSS-BORDER COOPERATION
More information