May 22, Pamela Bailey-Campbell. Vice President - North America Infrastructure Consultancy Jacobs Engineering, Inc.
|
|
- Joella Cobb
- 6 years ago
- Views:
Transcription
1 May 22, 2013 Pamela Bailey-Campbell Vice President - North America Infrastructure Consultancy Jacobs Engineering, Inc.
2 Public Partners Arizona Department of Transportation Office of P3 Initiatives City of Flagstaff Project Description Relocation of ADOT s Flagstaff District offices, labs, leased facilities, Motor Vehicle Division offices Driving Force Behind P3 The City of Flagstaff s desire to improve local roadways requiring the relocation of current ADOT facilities ADOT had no funding to relocate ADOT LOCATION IN DOWNTOWN FLAGSTAFF IS A PRIME RETAIL LOCATION
3 Established By H.B Allows DOT To Pursue Enhanced, Upgraded or New Facilities Including Facilities, Roads, Rail, Transit, Rest Areas Allows For Solicited & Unsolicited Projects Exempt From State Procurement Code Closely Follows Model Legislation Gives ADOT Significant Flexibility, Authority to Enter into Negotiations and Agreements
4 Selections on Best Value Basis Outlines Process for both Solicited and Unsolicited proposals If unsolicited, requires ADOT to solicit for competing proposals if they wish to move forward Allows for single or multi-phase procurement process Allows for Pre-Development Agreements Administered by the Office of P3 Initiatives, ADOT who will negotiate and award contract Guidelines can be found on
5 How it Started Discussions with City of Flagstaff and potential P3 participants to gauge interest The Big Question? Could a P3 deliver ADOT new facilities in exchange for valuable property? City of Flagstaff Involvement City decided to include an adjacent piece of property to enhance the value Also included option to construct the City s roadways (to maximize value and potentially accelerate their delivery as well) City of Flagstaff included on selection team
6 Develop and Issue RFQ/CP, Q&A Issued March 2012 Receive SOQ/CPs, Evaluate, Interview, Short- List May 2012 Draft RFCP & PDA Released, Q&A, Final RFCP & PDA August 2012 Negotiate & Enter Implementation Agreement, Deliver Project Complete PDA Scope, Sign PDA, Complete PDA Work Underway Now Receive & Review Proposals, Interview, Select Preferred Proposer Proposals December 2012 Selection February 2013
7 Both Proposers Submitted Multiple Options Selected Preferred Proposer & Preferred Option Vintage Partners Selected as Preferred Proponent with Redevelopment of Harkins Theater ADOT to Receive New Facilities Without Any Out of Pocket Costs Key Component is Successful Relocation of Harkins Within City of Flagstaff
8 DEVELOPMENT FIRM CHOSEN TO LEAD PROJECT, PROVIDE NEW LOCATION FOR ADOT FACILITIES Selected Vintage Partners, an Arizona-based development firm to move ADOT into new office space in Flagstaff, at no cost to the department, in exchange for ADOT s existing property at 1801 S. Milton Road. First-ever P3 - acquire new facilities for the agency, free up prime land for local redevelopment. Upon successful delivery of the new facilities, Vintage Partners will take ownership of the existing ADOT and city parcels and redevelop the land for commercial, retail, and possibly residential uses. Vintage will follow the regular city zoning and approval processes. Expected to take 3-5 years to complete all components: Harkins relocation, extensive renovation of the existing Harkins building, and the construction of the roadway improvements. This project is a great example of the value that a publicprivate partnership can bring to ADOT and the Flagstaff community, while creating a situation that benefits everyone, said ADOT Director John Halikowski. It shows how we worked through the challenges. Due to a lack of funding, ADOT would not have been able to accommodate the city s need for relocation or obtain new facilities to replace its 55-yearold workplace. Now, not only is the city able to proceed with its roadway improvements, but the project also opens up prime commercial property for redevelopment.
9 Public Partner Connecticut Department of Transportation Project Description P3 TOD for innovative delivery of replacement parking garage and associated improvements as part of TOD at the Stamford Transportation Center Driving Force Behind P3 Legislative mandate to maintain all parking spaces in service Developed under TOD statute not P3 statute
10
11 As defined in Section 13b-79kk of the Connecticut General Statutes, Transit Oriented Development means: The development of residential, commercial and employment centers within one-half mile or walking distance of public transportation facilities, including rail and bus rapid transit and services, that meet transit supportive standards for land uses, built environment densities and walkable environments, in order to facilitate and encourage the use of those services.
12 Maximize the continuous long-term revenue stream to the State Maximize revenue from State property State Set Parking Rates/Retains Revenues Minimize the State s financial contribution Delivery of Station Place and parking garage improvements Total of 1,000 spaces Provide a new Parking Access and Revenue Control System Operations and maintenance for the Replacement Garage and 2004 Garage for 3 years Provide connectivity to commuters between Replacement Garage and 2004 Garage Inclusion of a TOD component as defined in Section 13b-79kk of the Connecticut Statutes
13 Issue Number of Spaces Station Place Improvements Design and Construction Project Requirements Minimum of 1,000 spaces available for commuter parking 24/7/365 days First level of any replacement facility on Original Garage Site for Kiss and Ride, Taxis Improved traffic flow on Station Place; minimization of traffic disruption during the demolition of Original Garage 3-year maximum construction period Meet DOT Standards including High Performance Building Standards, Accommodate Electric Cars and Charging Stations
14 Issue Project Requirements O&M Include O&M during construction plus 3 years after completion Temporary Parking Parking Revenues DOT Financial Contribution Minimize Disruption to Commuters. Existing parking must be available at all times. ConnDOT set rates and retains all revenue Up to $35 million (including DOT costs) available for design, construction and oversight. Priority on minimizing State contribution
15 RFQ Released February 29, 2012 Four Development Teams Short-listed RFP Released July 13, 2012 Questions, Clarifications, One-on-one Meetings, Final Procurement Documents Proposals Received October 9, 2012 Technical Scoring then Financial Review Interviews and Clarifications October 2012 March 2013 Under Final Review
16 Public Partner ocolorado Department of Transportation - High Performance Transportation Enterprise Project Description New U.S. 36 Managed Toll Lanes otwo Separate Projects: Phase I DB and Phase II P3 Driving Force Behind P3 ophase I TIFIA Challenge Grant ophase II Finding Options to Finish the Project 16
17 PROJECT SCOPE P1: 10 miles from Pecos to Interlocken P2: 6 miles from Interlocken to Foothills Parkway Reconstruction of general purpose lanes Replace structurally deficient bridges Build one managed lane in each direction Start time of day tolls migrate to dynamic PROJECT STATUS P1: Design-Build began construction April 2012 Original Goal: Open project for toll collection by July 2015 Winning Proposer Ames Granite: Open for toll collection by January 2015 P2: Concession, preliminary selection April 2013 Goal: Open project for toll collection by December 2015 Winning Proposer Plenary Begin construction late 2013, open by end of 2015
18 Existing Typical Section Barrier 2 Proposed Typical Section 18
19 Concession Model 50 Years, Toll Revenue Risk Private Financing Possible Structure Roll in Phase 1 TIFIA loan New TIFIA Loan for Phase 2 PABs Minimum Subsidy: RTD, DRCOG, CDOT Scope Construction of 6 miles of Phase 2 Express Lane, Reconstruction of GP lanes between 88 th St and Table Mesa, Bridge & ITS Improvements Operations and maintenance of Managed Lanes on existing I-25 Express Lanes, US36 Phase 1 upon completion of DB contract and Phase 2 US36 Phase 1 and Phase 2 full lifecycle cost responsibility 19
20 2/3 of Phase II Project costs funded through private sector equity and non-recourse debt. P3 arrangement enables the project to be completed 20 years sooner than originally planned Operations and Maintenance for 50-year Term Entire US 36 corridor between I-25 and Table Mesa I-25 Express Lanes between downtown Denver and US 36 Routine O&M of all lanes, reimbursed for US36 GP Snow Removal of all lanes, reimbursement for US36 GP Long-term replacement obligations for all aspects of the Managed Lanes
21 Selected Plenary Roads Denver as the Concessionaire for 50-year Phase II agreement for the US 36 Express Lanes/Bus Rapid Transit project Plenary Roads The Plenary Group- team lead and managing partner Ames Construction, Inc.- construction Granite Construction- construction HDR- engineering design Transfield Services- maintenance Goldman Sachs- financial advisor
22 Proposals submitted March 2013 Contractor selected April 2013 Commercial close of contract May/June 2013 Financial close of contract October 2013 Construction begins Late 2013 Project open By end of 2015
23 Maximize the Potential Entrepreneurial Agency Seeks the Optimal Partner Commit to Success Know your goals and stick to them throughout Make the right investments in staffing the process Pick Pamela the right Bailey-Campbell partner and projects Make Vice President, sure the procurement Jacobs Engineering, process Inc. aligns North private America sector Infrastructure interest with Consultancy yours Phone: Jacobs Engineering May 9, 2007
Eagle Project Update
Construction of Peña Bridge November 2012 Eagle Project Update Eagle P3 Project Update Rick Clarke Assistant General Manager, Capital Programs March 5, 2014 Regional Transportation District (RTD) Performs
More informationThe RTD FasTracks Plan
Citizens Advisory Committee Quarterly Meeting June 16, 2010 The RTD FasTracks Plan 122 miles of new light rail and commuter rail 18 miles of Bus Rapid Transit (BRT) 31 new park-n-rides with over 21,000
More informationFinancing Transit Projects with Traditional and Innovative Sources And Mechanisms
Financing Transit Projects with Traditional and Innovative Sources And Mechanisms Exploring the Potential for Bus Rapid Transit and Transit- Oriented Development in the I- 287/Tappan Zee Bridge Corridor
More informationMassachusetts Department of Transportation (MassDOT) Route 3 South Managed Lanes Project DRAFT FOR DISCUSSION PURPOSES ONLY
Massachusetts Department of Transportation (MassDOT) Project High Level P3 Project Suitability Assessment Report September 11, 2013 Contents Proposed Project Description Project Background and Status Commonwealth
More informationCITY COUNCIL STUDY SESSION MEMORANDUM
City and County of Broomfield, Colorado CITY COUNCIL STUDY SESSION MEMORANDUM To: From: Prepared By: Mayor and City Council George Di Ciero, City and County Manager Debra Baskett, Transportation Manager
More informationLessons Learned for a Transit Public-Private Partnership. Phillip A. Washington, General Manager Regional Transportation District
Lessons Learned for a Transit Public-Private Partnership Phillip A. Washington, General Manager Regional Transportation District Feb. 7, 2011 The RTD FasTracks Plan 122 miles of new light rail and commuter
More informationInnovative Project Finance
Innovative Project Finance National Governor s Association Utah State Planning Retreat on Public-Private Partnerships Ivan Marrero, P.E. Division Administrator, FHWA Utah October 7, 2016 The Status Quo:
More informationREQUEST FOR INFORMATION
REQUEST FOR INFORMATION OKLAHOMA TURNPIKE AUTHORITY GILCREASE EXPRESSWAY RFI Issue Date: January 2, 2018 RFI Response Due Date: January 31, 2018 The Oklahoma Turnpike Authority ( Authority ) is seeking
More informationBuild America Transportation Investment Center. Office of the Secretary U.S. Department of Transportation
Build America Transportation Investment Center Office of the Secretary U.S. Department of Transportation Background On July 17, 2014 the President announced the Build America Investment Initiative: a government-wide
More informationPARTNERSHIPS ACCELERATE ECONOMIC DEVELOPMENT & JOB CREATION. J. Douglas Koelemay, Director
PARTNERSHIPS ACCELERATE ECONOMIC DEVELOPMENT & JOB CREATION J. Douglas Koelemay, Director VIRGINIA LEADERSHIP IN PUBLIC-PRIVATE PARTNERSHIPS PPTA enabling legislation 1995 2001, 2005, 2008 Revisions to
More informationCITY OF ANN ARBOR ECONOMIC COLLABORATIVE TASK FORCE REPORT
CITY OF ANN ARBOR ECONOMIC COLLABORATIVE TASK FORCE REPORT Background Ann Arbor City Council has determined that economic health is one of its key priority areas. Economic sustainability and growth create
More informationPartnership Financing: Improving Transportation Through Public Private Partnerships
Partnership Financing: Improving Transportation Through Public Private Partnerships Executive Summary Long-term funding sources for transportation are uncertain, and innovative alternatives for both financing
More informationCal Poly Pomona Request for Clarification for Lanterman Development Center Land Development Consultant RFC
Cal Poly Pomona Request for Clarification for Lanterman Development Center Land Development Consultant RFC 16-006 A. INTRODUCTION California State Polytechnic University, Pomona ( Cal Poly Pomona ), is
More informationPROJECT DELIVERY MODELS ARKANSAS PLANNING RETREAT ON P3S. J. Douglas Koelemay, Director October 7, 2015
PROJECT DELIVERY MODELS ARKANSAS PLANNING RETREAT ON P3S J. Douglas Koelemay, Director October 7, 2015 VIRGINIA LEADERSHIP IN PUBLIC-PRIVATE PARTNERSHIPS Virginia and California first P3 legislation in
More informationTRB National Cooperative Rail Research Program: Report 1. Alternative Funding and Financing Mechanisms for Passenger and Freight Rail Projects
TRB National Cooperative Rail Research Program: Report 1 (NCRRP 07-01) Alternative Funding and Financing Mechanisms for Passenger and Freight Rail Projects Marc-André Roy December 2, 2015 APTA High Speed
More informationPublic-Private Partnerships for Transportation
2011 NCSL Fall Forum Public-Private Partnerships for Transportation Leon Corbett Project Finance Manager, FDOT Office of Comptroller November 30, 2011 Florida s History of Public-Private Partnerships Outsourcing
More informationMassachusetts Department of Transportation (MassDOT) The South Coast Rail Project DRAFT FOR DISCUSSION PURPOSES ONLY
Massachusetts Department of Transportation (MassDOT) The High Level P3 Project Suitability Assessment Report September 11, 2013 Contents Proposed Project Description Project Background and Status Commonwealth
More informationPUBLIC-PRIVATE PARTNERSHIP PROGRAM, HIGH DESERT CORRIDOR
29 One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2000 l metro. net PLANNING AND PROGRAMMING COMMITTEE MARCH 20, 2013 SUBJECT: ACTION: PUBLIC-PRIVATE PARTNERSHIP PROGRAM, HIGH DESERT CORRIDOR RECEIVE
More informationBeth Day Director, FTA Office of Project Planning RailVolution October 2011
Beth Day Director, FTA Office of Project Planning RailVolution October 2011 What is a New or Small Start? New fixed guideways and extensions to existing systems Includes light rail, heavy rail, commuter
More informationTOD Pilot Program Recommendations
TOD Pilot Program Recommendations Transit Oriented Communities TOD can create communities for RTD riders Mixed income communities Station/development integrated within community setting Jobs: creation
More informationCoolidge - Florence Regional Transportation Plan
Coolidge - Florence Regional Transportation Plan A Partnership Among the City of Coolidge, Town of Florence, and ADOT FINAL REPORT Kimley-Horn Kimley Kimley-Horn and and Associates, Associates, Inc. Inc.
More informationState Route 91 Corridor Improvement Project Update. State Route 91 Advisory Committee June 4, 2010
State Route 91 Corridor Improvement Project Update State Route 91 Advisory Committee June 4, 2010 Presentation Agenda Recent Project Milestones Project Development Schedule Environmental Permitting Design-Build
More informationNorth Carolina Turnpike Authority Joint Appropriations Committee on Transportation Beau Memory & Rodger Rochelle
North Carolina Turnpike Authority Joint Appropriations Committee on Transportation Beau Memory & Rodger Rochelle March 17, 2015 Agenda Legislation Review / Turnpike Vision Beau Memory Turnpike Authority
More informationAugust 2007 Thomas Bohuslav Texas Department of Transportation
Public Private Partnerships Activities in Texas AASHTO SOC 2007 Summer Meeting Biloxi Mississippi August 2007 Thomas Bohuslav Texas Department of Transportation Topics The Problem (Needs) Comprehensive
More informationProject/Report Title: U.S. Surface Transportation Public-Private Partnerships: Objectives and Evidence ABSTRACT
Project/Report Title: U.S. Surface Transportation Public-Private Partnerships: Objectives and Evidence Authors: Lisardo Bolaños Morghan Transue Porter Wheeler Jonathan L. Gifford Institution: Center for
More informationFY 2016 Capital Development Plan. Northern Arizona University. Revised April 2016
FY 2016 Capital Development Plan Northern Arizona University Revised April 2016 Item #7 EXECUTIVE SUMMARY Page 4 of 11 Project Board Approval Status Gross Square Footage Project Cost Amount Financed Funding
More informationNovember 4, 2013 Office of Transportation Public Private Partnerships
November 4, 2013 Office of Transportation Public Private Partnerships Dear Sirs, Via email: i66ppta@vdot.virginia.gov Re: Response of Shikun & Binui Ltd. (a member of the Arison Group) to the Request for
More informationORIGINAL. Public Private Transportation Proposal USR 460. Richmond PROPOSER. September 14, 2006 TEAM MEMBERS
PROPOSER 7700 Chevy Chase Dr, Building I - Suite 500-C Austin, TX 78752 Mr. F. Jeff Hetzer Program Manager Innovative Project Delivery Division Virginia Department of Transportation 1221 E. Broad Street,
More informationSOUTHWEST LRT (METRO GREEN LINE EXTENSION)
10 Joint Development This chapter describes potential long-term direct and indirect and short-term (construction) direct and indirect effects that would result from the Southwest Light Rail Transit (LRT)
More informationVIRGINIA S P3 PROGRAM
Commonwealth of Virginia Office of Transportation P3 s Tony Kinn, Director Jackie Cromwell VIRGINIA S P3 PROGRAM July 28, 2011 Office of Transportation Public-Private Partnerships OTP3 contacts: Tony Kinn,
More informationADDENDUM #2 FOR CONSTRUCTION MANAGEMENT CONSULTANT (CMC) THIS ADDENDUM #2 IS ISSUED: AUGUST 15, 2017
ADDENDUM #2 FOR 17-054 CONSTRUCTION MANAGEMENT CONSULTANT (CMC) THIS ADDENDUM #2 IS ISSUED: AUGUST 15, 2017 QUESTIONS AND ANSWERS The following questions were posed by firms that indicated an interest
More informationPublic-Private Private Partnership Projects (P3P) Seminar
Public-Private Private Partnership Projects (P3P) Seminar Speaker Information: Allen W. Estes, III Partner Gordon & Rees, LLP Practice Areas: Construction, Green Technology & Climate Change and Commercial
More informationUNSOLICITED PROPOSALS
VI-4 UNSOLICITED PROPOSALS 1.0 Applicability. This policy and procedure applies to Unsolicited Proposals received by RTD. It is not designed to address unsolicited proposals regarding the acquisition,
More informationOpportunities and Roles for Consulting Engineers on P3 Projects
2 Opportunities and Roles for Consulting Engineers on P3 Projects Natasha Velickovic and Mike McArdle Introduction 37 Consulting Engineers for Project Owners and the Public Sector 38 Formulating and Presenting
More informationA REQUEST FOR QUALIFICATIONS (RFQ) FOR DENVER UNION STATION HISTORIC BUILDING RE-USE
A (RFQ) FOR DENVER UNION STATION HISTORIC BUILDING RE-USE REGIONAL TRANSPORTATION DISTRICT (RTD) 1600 BLAKE STREET DENVER, COLORADO 80202-1399 RFQ NO. 11DH014 MAY, 2011 DENVER UNION STATION BUILDING RE-USE
More information9. Positioning Ports for Grant Funding and Government Loan Programs
9. Positioning Ports for Grant Funding and Government Loan Programs 9.1. Grant Funding Overview Grant funding continues to be a key factor for ports in meeting capital investment requirements. Grants can
More informationTable of Contents. Page 2
Sixth Avenue Transportation Demand Management Construction Mitigation Plan August 2014 Table of Contents Table of Contents... 2 1.0 Introduction... 3 Development of Recommendations... 6 2.0 Recommendations...
More informationIT TAKES A VILLAGE AND MULTIPLE SOURCES OF REVENUE: A CASE STUDY OF THE DENVER UNION STATION REDEVELOPMENT PROJECT
IT TAKES A VILLAGE AND MULTIPLE SOURCES OF REVENUE: A CASE STUDY OF THE DENVER UNION STATION REDEVELOPMENT PROJECT CATHERINE C. GALE, ESQ. EMMA R. KEYSER, ESQ. BROWNSTEIN HYATT FARBER SCHRECK, LLP I. Introduction
More information- j / <-, rei BOARD OF AIRPORT COMMISSIONERS. e:t. Flin hief Executive Officer REPORT TO THE
5/31/2017 111 NY I 1 MT BY rei Los Angeles World Airports REPORT TO THE BOARD OF AIRPORT COMMISSIONERS /
More informationMiami-Dade County Expressway Authority. Policy For Receipt, Solicitation And Evaluation Of Public. Private Partnership Proposals
Miami-Dade County Expressway Authority Policy For Receipt, Solicitation And Evaluation Of Public Private Partnership Proposals SECTION 1. Background Miami-Dade County Expressway Authority ( MDX ) finds
More informationCommuter Rail Expansion and Transit Oriented Development in Northwest Indiana. Northwest Indiana Regional Development Authority
Commuter Rail Expansion and Transit Oriented Development in Northwest Indiana Northwest Indiana Regional Development Authority REGIONAL DEVELOPMENT AUTHORITY TEAM RDA was created in 2006 to catalyze key
More informationAPPENDIX D CHECKLIST FOR PROPOSALS
APPENDIX D CHECKLIST FOR PROPOSALS Is proposal content complete, clear, and concise? Proposals should include a comprehensive scope of work, and have enough detail to permit the responsible public entity
More informationRequest for Proposals # P12-044A. Pre-Qualification - Purchase and. Development of Bloomfield Property
Request for Proposals # P12-044A Pre-Qualification - Purchase and Development of Bloomfield Property Bloomfield is a dynamic hub where community, cultural, social, and economic activities converge. Good
More informationLocal Taxes and Highway Tolls: The New Normal
Local Taxes and Highway Tolls: The New Normal Los Angeles County Metropolitan Transportation Authority Public-Private Partnership Program August 16, 2012 Transportation and Infrastructure Summit Michael
More informationGold Rush Circulator Study Charlotte, North Carolina REQUEST FOR PROPOSALS
Gold Rush Circulator Study Charlotte, North Carolina REQUEST FOR PROPOSALS September 25, 2012 for the Gold Rush Circulator Study A. Purpose Charlotte Center City Partners (CCCP) and the City of Charlotte
More informationAPA/PAW 2013 Joint Awards Program Submittal
May 30, 2013 APA/PAW Awards Committee Washington APA Office 603 Stewart Street, Suite 610 Seattle, WA 98101 Dear APA/PAW Awards Committee: RE: APA/PAW 2013 Joint Awards Program Submittal Enclosed is a
More informationThe Maryland Transportation Authority has. Staff Approve Resolution R to amend the FY TIP.
ITEM 13 Action March 29, 2017 Approval to Amend the FY 2017-2022 Transportation Improvement Program (TIP) to Add the Governor Harry W. Nice Bridge Improvement Project For the Maryland Transportation Authority
More informationTransportation Demand Management (TDM)
DEVELOPMENT OF A REGIONAL TRANSPORTATION PLAN FOR THE GREATER TORONTO AND HAMILTON AREA Transportation Demand Management (TDM) Presentation to Metrolinx Board February 8, 2008 TDM Primer TDM is the use
More informationCity of Portsmouth Economic Development Commission 2011 Action Plan
City of Portsmouth Economic Development Commission 2011 Action Plan Statement of Purpose: The City of Portsmouth Economic Development Commission (EDC) is committed to ensuring continued economic prosperity,
More informationTRB/AASHTO Environment & Energy Research Conference June 6-9, 2010 Session 47: Lessons Learned from P3 Public Involvement Initiatives
TRB/AASHTO Environment & Energy Research Conference June 6-9, 2010 Session 47: Lessons Learned from P3 Public Involvement Initiatives Lessons Learned from Virginia P3 Projects Dana C. Nifosi, Venable LLP
More informationAppendix H Sample Partnership Policy
Appendix H Sample Partnership Policy 231 Appendix H Sample Partnership Policy and Proposal Format Created By: 3050 Industrial Lane, Suite 200 Broomfield, CO 80020 303-439-8369 Fax: 303-439-0628 Toll Free:
More informationRoute 58 PPTA Project Finance Plan Annual Update Hillsville to Stuart Corridor. Submitted By:
Route 58 PPTA Project Finance Plan Annual Update Hillsville to Stuart Corridor Submitted By: Robert P. Williams District Construction Engineer Salem District Virginia Department of Transportation Submitted
More informationProcurement Process of PPP Projects in Korea
Procurement Process of PPP Projects in Korea December, 2007 Public and Private Infrastructure Investment Management Center (PIMAC) Korea Development Institute 1. PPP Project Types in Korea 2. Procurement
More informationOverview of the Procurement and Project Milestones
Overview of the Procurement and Project Milestones November 3, 2016 Charles A. Kilpatrick, P.E. Commissioner of Highways Virginia Department of Transportation Project Development The Path to Date Summer
More informationCity of Bartow Community Redevelopment Agency
City of Bartow Community Redevelopment Agency Residential Blight Elimination Program East End Rehabilitation Project Overview The Bartow Community Redevelopment Agency (CRA) is a government agency created
More informationFlorida s Design Build Program
Florida s Design Build Program 2016 Transportation Short Course October 11 th, 2016 Larry Ritchie, Florida DOT Mike Spain, Lane Construction Phil Schwab, RS&H Florida Design Build Documents and Procedures
More informationHighway and Light Rail Public-Private Partnerships in the U.S.: Protecting the Public Interest
Highway and Light Rail Public-Private Partnerships in the U.S.: Protecting the Public Interest Maureen Luna-Long U.S. Government Accountability Office 5 th Annual Meeting of Senior PPP Officials Organisation
More informationDoing Business with the Airports Authority
Doing Business with the Airports Authority June 23, 2017 Office of Supply Chain Management Introduction to MWAA Agenda Office of Supply Chain Management Procurement & Contracting Small Business Programs
More informationEconomic Development Subsidy Report Pursuant to Government Code Section 53083
San Joaquin Regional Rail Commission, 1/6/17 Economic Development Subsidy Report Pursuant to Government Code Section 53083 TABLE OF CONTENTS 1.0 Introduction 1.1 Introduction 1.2 Background 1.3 Legal Requirements
More informationRequest for Developer Qualifications-John Deere Commons Development Opportunity
Request for Developer Qualifications-John Deere Commons Development Opportunity Moline, IL January 2012 Open Letter Inviting the Interest of Private Developers Attached please find a Request for Qualifications
More informationUNFUNDED TRANSPORTATION PROJECTS OVERVIEW
UNFUNDED TRANSPORTATION PROJECTS OVERVIEW THE LIST 40 unique unfunded projects are on the list All projects are important to the future of Arvada s transportation needs. The list has developed over many
More informationFlorida s Future: Funding Growth Through Public Private Partnerships. Ed Turanchik. March 10, 2014
Florida s Future: Funding Growth Through Public Private Partnerships Ed Turanchik March 10, 2014 Fla. Statute 287.05712 Effective July 1, 2013, Florida s new public-private partnership statute introduces
More informationConstruction of Peña Bridge - March 2013 Jersey Cutoff Bridge October Eagle Project Update. East Corridor Stakeholder Committee April 23, 2013
Construction of Peña Bridge - March 2013 Jersey Cutoff Bridge October 2012 Eagle Project Update East Corridor Stakeholder Committee April 23, 2013 FasTracks Plan 122 miles of new light rail and commuter
More informationMINISTÈRE DES TRANSPORTS, DE LA MOBILITÉ DURABLE ET DE L ÉLECTRIFICATION DES TRANSPORTS
MINISTÈRE DES TRANSPORTS, DE LA MOBILITÉ DURABLE ET DE L ÉLECTRIFICATION DES TRANSPORTS An Overview of the Public- Private Partnership Model in Québec June 6th, 2016 Agenda Introduction The P3 Approach
More informationDISCUSSION ITEM EXECUTIVE SUMMARY
F4 Office of the President TO THE MEMBERS OF THE COMMITTEE ON FINANCE: For the Meeting of DISCUSSION ITEM UPDATE ON THE 2020 PROJECT, MERCED CAMPUS EXECUTIVE SUMMARY Twenty years ago, the Regents of the
More informationFunding Principles. Years Passed New Revenue Credit Score Multiplier >3 years 0% % % % After Jan %
Funding Principles I. Infrastructure Incentives Initiative: encourages state, local and private investment in core infrastructure by providing incentives in the form of grants. Federal incentive funds
More informationPublic-Private Partnership Program May 2015 Transit Coalition Update
Public-Private Partnership Program May 2015 Transit Coalition Update Los Angeles County Metropolitan Transportation Authority Mark Linsenmayer Director Presentation Agenda Overview of Metro Public Private
More informationFHWA/USDOT Role in Project Finance
April 2008 Federal Tools for Project Finance Transportation Infrastructure Finance Workshop U.S. DOT/AASHTO Center for Excellence Chicago, IL Jennifer R. Mayer Federal Highway Administration Resource Center
More informationFY BUDGET BY PROGRAM
ECONOMIC DEVELOPMENT/REDEVELOPMENT Budget Summary CATEGORY FY 06/07 FY 05/06 FY 04/05 Proposed Year-End Actuals Budget Estimate Salaries $608,860 $686,700 $537,051 Operations & Maintenance 905,395 253,585
More informationSUMMARY OF THE GROW AMERICA ACT As Submitted to Congress on April 29, 2014
SUMMARY OF THE ACT As Submitted to Congress on April 29, 2014 The U.S. Department of Transportation (USDOT) submitted the Generating Renewal, Opportunity, and Work with Accelerated Mobility, Efficiency,
More informationFinancing Strategies to Encourage Transit Oriented Development Rail~Volution 2009
Financing Strategies to Encourage Transit Oriented Development Rail~Volution 2009 October 31, 2009 1 Six considerations for successful funding of transit oriented development. 1.Transit alone cannot create
More information634 NORTH PARK AVENUE
Evaluation Criteria Submission Incentives, Districts & Zones Site Location Executive Summary Site Overview OPPORTUNITY FOR DEVELOPMENT 634 NORTH PARK AVENUE Warren, Ohio PREPARED BY: SITE OVERVIEW Address:
More informationCity of Edina, Minnesota GrandView Phase I Redevelopment, 5146 Eden Avenue Request for Interest for Development Partner
City of Edina, Minnesota GrandView Phase I Redevelopment, 5146 Eden Avenue Request for Interest for Development Partner The City of Edina has a rich history of innovative developments that have become
More informationREQUEST FOR CONSULTANT SERVICES. Economic Development Consultant. Town of Cortlandt 1 Heady Road, Cortlandt Manor NY, 10567
REQUEST FOR CONSULTANT SERVICES Economic Development Consultant Town of Cortlandt 1 Heady Road, Cortlandt Manor NY, 10567 Prepared By Town of Cortlandt Department of Technical Services Engineering Division
More informationMassachusetts Bay Transportation Authority. POLICIES & PROCEDURES Design Build Procurement Procedures April 2016
Massachusetts Bay Transportation Authority POLICIES & PROCEDURES Design Build Procurement Procedures April 2016 Design Build Procurement Procedures April 2016 Massachusetts Bay Transportation Authority
More informationPublic Private Partnerships and Transit Not Just for Mega Projects Karin DeMoors October 28, 2015
Public Private Partnerships and Transit Not Just for Mega Projects Karin DeMoors October 28, 2015 Presentation Overview What is a Public Private Partnership (P3)? Mega Project Focus Range of Partnerships
More informationInfrastructure Financing: A Guide for Local Government Managers
Infrastructure Financing: A Guide for Local Government Managers Dr. Can Chen, Assistant Professor Florida International University Dr. John R. Bartle, Professor and Dean University of Nebraska at Omaha
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS Town of Hope Mills Multi-Modal Congestion Management Plan September 19, 2016 Fayetteville Area Metropolitan Planning Organization Proposal Due Date: 3:00 PM Eastern Time, 28 th October,
More informationI-225 Light Rail Design/Build/Finance Staff Recommendation. RTD FasTracks Monitoring Committee July 3, 2012
I-225 Light Rail Design/Build/Finance Staff Recommendation RTD FasTracks Monitoring Committee July 3, 2012 FasTracks Guiding Principles Staff relied heavily on our Guiding Principles to develop our recommended
More informationCone Mill Master Development
Cone Mill Master Development Solicitation for Development Partner Qualifications Pineville, NC Fall 2017 Contents Executive Summary... 3 About this Solicitation... 4 Town and Market Overview... 5 Site
More informationHR&A Advisors. TOD Financing: The Reality of Today. Eric Rothman President HR&A Advisors, Inc. OCTOBER 2016
HR&A Advisors TOD Financing: The Reality of Today OCTOBER 2016 Eric Rothman President HR&A Advisors, Inc. The 30 th Street Station District Plan is a long-term TOD vision and strategy to create a mixed-use
More informationMETHODOLOGY - Scope of Work
The scope of work for the Truckee West River Site Redevelopment Feasibility Study will be undertaken through a series of sequential steps or tasks and will comprise four major tasks as follows. TASK 1:
More informationThe Boynton Beach Community Redevelopment Agency Request for Proposals and Developer Qualifications
The Boynton Beach Community Redevelopment Agency Request for Proposals and Developer Qualifications For the Development of a 2.97 +/- Acre Site City of Boynton Beach, Florida Issue Date: June 16, 2016
More informationPark and Recreation Department Strategic Plan Dallas Park and Recreation Board October 1, 2015
Park and Recreation Department Strategic Plan Dallas Park and Recreation Board October 1, 2015 1 Agenda Process Review Action Plan Contents Strategic Directions & Actions Next Steps 2 Park & Recreation
More informationTRANSPORTATION RESEARCH BOARD. 85th ANNUAL MEETING
TRANSPORTATION RESEARCH BOARD 85th ANNUAL MEETING Panel on Public Private Initiatives: New Concepts in Transportation Project Delivery Recent Trends and Innovations January 23, 2006 Washington, DC GEOFFREY
More informationRequest for Proposal Number #512-11
Request for Proposal Number #512-11 Traffic and Transportation Feasibility Study Due: January 24, 2012 at 4:00pm Buyer: Steve Boyd Purchasing and Contracts Manager 831 Grand Avenue Glenwood Springs, CO
More informationClient: Boulder County Transportation Project: SH 119 Bus Rapid Transit & Bikeway Facility Design
Client: Boulder County Transportation Project: SH 119 Bus Rapid Transit & Bikeway Facility Design I. Applicant (Client) Information Organization Name and Address Boulder County Transportation, 2525 13th
More informationGeorge Douglas John Bowker Mayor Jon Costas Jan Dick David Smith Stu Summers Dave Pilz Jim Jorgensen Craig Phillips Patrick Lyp
July 10, 2008 VALPARAISO REDEVELOPMENT COMMISSION MEETING: Valparaiso Redevelopment Commission LOCATION: North Fire Station 2605 Cumberland Dr. SUBJECT: Minutes of the July 10, 2008 Meeting IN ATTENDANCE:
More informationLong Beach Civic Center
Long Beach Civic Center Evaluation of Proposals & Recommended Actions December 9, 2014 Presentation Outline Background Proposal Overview Evaluation Process and Scoring Evaluation Results & Recommendation
More informationLast Updated June 20, Goal: Service Development
FY Goals, Strategies and Projects Last Updated June 20, MANAGEMENT ACTION PLAN (MAP) Goal: Service Development Strategies (those highlighted in bold indicate highest priority) 1. Provide routes and services
More informationCITY OF LANCASTER REVITALIZATION AND IMPROVEMENT ZONE AUTHORITY
CITY OF LANCASTER REVITALIZATION AND IMPROVEMENT ZONE AUTHORITY Guidelines for Obtaining Financing for Projects in the City of Lancaster s City Revitalization and Improvement Zone Purposes of These Guidelines
More informationCommunity Meeting: Campus Land Use & Square 54 Discussion May 4, 2005
Community Meeting: Campus Land Use & Square 54 Discussion May 4, 2005 1 Overview of Presentation Goals To understand. How GW plans to accommodate its forecasted housing and academic space needs within
More informationREQUEST FOR QUALIFICATIONS
REQUEST FOR QUALIFICATIONS DEVELOPMENT PARTNER RFQ # 3-007012012 HOUSING AUTHORITY of the CITY of GRIFFIN GRIFFIN, GEORGIA BOARD OF COMMISSIONERS HARVEY PILKENTON Chairperson EULA REDDING Vice Chairperson
More informationDesign-Build Procurement Overview Manual. Alternative Project Delivery
Design-Build Procurement Overview Manual Alternative Project Delivery Table of Contents Chapter 1: Introduction to Design-Build Procurements... 1 1.1 Introduction... 1 1.2 Scope... 1 1.3 Acronyms... 2
More informationRequest for Proposals - Asset Management
City of Beacon One Municipal Plaza Beacon, New York 12508 Mayor Randy Casale City Council George Mansfield, At Large Lee Kyriacou, At Large Terry Nelson, Ward One John Rembert, Ward Two Jodi McCredo, Ward
More informationRequest for Qualifications
CSU, Channel Islands Site Authority Ground Sub-Lease for the Development of 31.5-Acres and the Town Center Request for Qualifications Contact Valerie Patscheck, Dir Procurement & Logistical Services, valerie.patscheck@csuci.edu
More informationAssociation of Metropolitan Planning Organizations Fixing America s Surface Transportation (FAST) Act
Association of Metropolitan Planning Organizations Fixing America s Surface Transportation (FAST) Act General Overview Total authorizations (Highway Trust Fund, HTF, Contract Authority plus General Funds
More informationREQUEST FOR QUALIFICATIONS/PROPOSALS SUBASE NEW LONDON JOINT LAND USE STUDY (JLUS) IMPLEMENTATION PROJECT
SOUTHEASTERN CONNECTICUT COUNCIL OF GOVERNMENTS 5 Connecticut Avenue, Norwich, Connecticut 06360 (860) 889-2324/Fax: (860) 889-1222/E-Mail: office@seccog.org REQUEST FOR QUALIFICATIONS/PROPOSALS SUBASE
More informationVista Ridge Project Technical Advisor
Tim Skoglund, P.E. Senior Director Vista Ridge Maria Franco Contract Administrator SOQ Pre-Submittal Meeting Disclaimer Oral statements or discussion during the SOQ Pre-Submittal Meeting will not be binding,
More informationSouthern Dallas GO Bond Program Public/Private Partnership Amendment
Southern Dallas GO Bond Program Public/Private Partnership Amendment A Briefing to the Economic Development Committee Economic Development and Housing Department December 3, 2007 1 KEY FOCUS AREA: ECONOMIC
More information