SECTION 8 SECTION 9 SECTION 10

Size: px
Start display at page:

Download "SECTION 8 SECTION 9 SECTION 10"

Transcription

1 SUBDIVISION MANUAL Table of ontents SETION 1 Introduction... 1 SETION 2 Pre-application Meeting 2.1 Additional Information Subdivision Process hart SETION 3 Application Requirements 3.1 Application Form ompleting the Application Filing Associated Applications Payment of Fee Subdivision Notice Signs... 6 SETION 4 Application Processing 4.1 Application omments Public Meetings... 9 SETION 5 onditions of Approval SETION 6 Draft Approval SETION 7 Draft M-Plan Submission 7.1 irculation of Draft M-Plans Draft M-Plan omments SETION 8 Second Engineering Submissions SETION 9 By-law to Execute Agreements SETION 10 Release For Registration Development Area Boundary Map For draft plan of subdivision applications submitted prior to March 28, 1995, please contact the Area Manager for the appropriate application process. If an applicant is required to make an application for an Official Plan Amendment, Rezoning or Site

2 SUBDIVISION MANUAL Section 1 and 2 1 Plan, manuals outlining these planning approval requirements are also available from the Planning and Building Department and should be reviewed in conjunction with this manual. 1.0 INTRODUTION On January 1, 1997, the Region of Peel subdelegated approval authority for Draft Plans of Subdivision submitted after March 28, 1995, to ity of Mississauga ouncil. On January 6, 1997, ouncil subdelegated the approval authority by By-law 1-97 to the ommissioner of Planning and Building. The Region of Peel will be further sub-delegating approval authority for all draft plans of subdivision that were submitted prior to March 28, 1995 in three phases during the spring and summer of For further information please contact the Area Manager. This manual has been prepared by the Development and Design Division of the ity of Mississauga s Planning and Building Department and is intended to be used as a guide to assist applicants when submitting a new application, and with current applications that have been subdelegated from the Region of Peel to the ity of Mississauga for approval. It contains requirements and procedures which must be followed when applying for Draft Plan of Subdivision approval under the provisions of the Planning Act R.S.O. 1990, c.p. 13, as amended. The flow chart on page 2 outlines the Planning Process for subdivision application approval in the ity of Mississauga. 2.0 PRE-APPLIATION MEETING Pre-consultation is a vital part of the planning approval process. Before making a development application, applicants are strongly advised to arrange a pre-application meeting with an Area Planner/Manager in the Development and Design Division of the Planning and Building Department. Please telephone (905) to arrange a meeting with the appropriate staff. At least one (1) week prior to the pre-application meeting, the following information must be provided to the Area Planner: a proposed subdivision layout plan showing lot and block dimensions, adjoining land uses and streets; legal description and location of the site; brief description of proposal. The information is circulated to various ity departments and/or outside agencies in order that sufficient feedback can be provided to the applicant at the meeting. Pre-application meetings are held every Wednesday afternoon at 2:00 p.m. and are intended to identify what planning approvals are required for the development of the site. As well, information/studies which will be required for the submission of a complete development application will be outlined. The pre-application meeting provides applicants an opportunity to determine relevant planning policies which apply to the subject site, to be made aware of recent ouncil policies and to identify potential areas of concern. At the meeting, the ity of Mississauga s submission requirements will be reviewed and the development approval process outlined. The applicant should ensure that appropriate external representatives (ie., consultant, engineer, owner, etc.) attend the meeting. The Area Planner will determine other staff who will attend the meeting including: representatives, as necessary, from the Planning and Building Department such as the Director/ Area Manager/ Urban Designer/ Landscape Architect/ Policy Planner/ Zoning Examiner: - the Development and Design Division is

3 SUBDIVISION MANUAL Section 2 2 responsible for coordinating the review and processing of applications for draft plan of subdivision with the ity; - the Policy Planning Division is responsible for the preparation of ity Plan, secondary plans and special studies, and environmental issues; - the Building Division is responsible for interpreting the zoning by-law with respect to uses which may be permitted on the subject lands. representatives from the Transportation and Works Department to address such items as development engineering, traffic/parking studies, grading and storm water management standards and facilities. For further information telephone (905) ; representatives from the ommunity Services Department to address such issues as parkland dedication, tree surveys, heritage properties, etc. For further information telephone (905) ; representatives from the appropriate onservation Authority. For further information the following general telephone numbers are provided: - Metropolitan Toronto and Region onservation Authority (MTRA) (416) ; - redit Valley onservation (V) (905) ; - Halton Region onservation Authority (HRA) (905) ; representatives from the Region of Peel to address matters of a provincial interest, regional roads and water/sewer servicing issues. For further information telephone (905) ; representatives from other ity departments/agencies as deemed appropriate. At the meeting, the Area Planner will indicate to the applicant if any additional information may be required by the ity in addition to the complete application requirements and any information relating to concurrent applications being made for an Official Plan Amendment/Rezoning. Applicants should refer to the Official Plan Amendment/Rezoning Manual for requirements related to this planning approval process. Where a Draft Plan of Subdivision is associated with an Official Plan Amendment/Rezoning application, the List of Required Information/Studies for the submission of a complete Official Plan Amendment/Rezoning application, will be completed at the pre-application meeting by the Area Planner and a copy provided to the applicant. In turn, this checklist must be submitted by the applicant as part of a complete application submission for the Draft Plan of Subdivision and/or Official Plan Amendment/Rezoning applications to ensure that all required information has been submitted. omplete applications for Official Plan Amendment/Rezoning and Draft Plan of Subdivision are submitted directly to the ity Planning and Building Department. This may be done without the benefit of a pre-application meeting if it can be demonstrated to the ity that all the concerns of ity departments and agencies have been addressed. These requirements will be confirmed by the circulation of the application to the next available Pre-application Meeting where the application will be reviewed for completeness and any outstanding information will be identified. A letter summarizing comments from this meeting will be forwarded to the applicant. It should be noted that until all prescribed information and material under Ontario Regulations 198/96 and 199/96 for Official Plan Amendment/Rezoning applications associated with a Draft Plan of Subdivision has been received, ouncil may refuse to accept or further consider the Official Plan/Amendment Rezoning, and the time periods for appeal do not begin. This outstanding information may result in delays to the

4 SUBDIVISION MANUAL Section 2 3 Draft Plan of Subdivision application. 2.1 ADDITIONAL INFORMATION At the pre-application meeting, the level of detail required for accurate evaluation of the proposal will be identified to the applicant. If a Draft Plan of Subdivision proposes the creation of blocks, additional information relating to the potential building layout and/or building massing may be required. Applicants may also reference the Development Manual of the Transportation and Works Department, and the Submission Requirements Manual of the ommunity Services Department for additional information.

5 SUBDIVISION MANUAL Sections 2 and 3 4 onceptual Site Plan - Level 1: Building Layout oncept Processing: Purpose: This concept is used in assessing the proposed lot or block size and orientation within a proposed plan of subdivision, to ensure that it is appropriate for the intended use. After review it may be necessary to adjust the lot boundaries or to reduce the proposed development. Minimum Requirements: - lot boundaries and dimensions (including top-of-bank, flood line, road widenings and easements if appropriate); - conceptual placement of buildings; - dimensions of buildings, setbacks, and spaces between buildings; - internal road layouts and dimensions; - access points; - location of significant vegetation. Processing: The building layout concept is reviewed by the Development and Design Division which will consult with other Divisions and Departments as required. onceptual Site Plan Level 2: Building Massing oncept The Level 2 oncept Plan is reviewed by the Development and Design Division which will consult with other Divisions and Departments as required. onceptual Site Plan for Surrounding Lands (Level 1 or 2) A onceptual Site Plan for surrounding lands may be required where the development of a site may impact the development potential of adjacent sites, or where the development of a site and the surrounding lands are best addressed through coordinated site design. For example, the development of an area may create unacceptable access conditions for adjacent lands which should be resolved through joint access points, or a coordinated massing plan could increase the development potential of all adjacent lots. If a concept plan is required for the surrounding lands, it will be specified as Level 1 or 2 identified above. 3.0 APPLIATION REQUIREMENTS If an applicant submits a complete application and follows the procedures outlined below, the application can be processed by the ity expeditiously. If the application is incomplete or requires major revisions and/or resubmissions the Purpose: This concept is used in assessing the development potential of a site (either in a proposed draft plan of subdivision or an existing site) and in establishing zoning standards for a site. After review, it may be necessary to refine the proposal or, in the case of a proposed subdivision, to adjust the site boundaries. Minimum Requirements: - all information required in the Level 1 oncept Plan; - building heights; - setbacks to building elements; - shadow studies (where appropriate). time frame is likely to be extended significantly.

6 SUBDIVISION MANUAL Section 3 5 Prior to the submission of the application, the applicant shall have submitted the proposed notice sign map and wording to the ounter Planner or the Area Planner at the preliminary application meeting, for review and approval. The notice sign wording should clearly describe the proposal and the map should be legible and accurate. When the applicant is ready to prepare the notice sign, the ounter Planner/Area Planner shall provide an application number(s) to be included on the notice sign. The application cannot be circulated until photographic proof of the installation of the sign(s) are received. For further information refer to Section Section Subdivision Notice Signs. digital disk of the Draft Plan of Subdivision; - five (5) copies of any supporting reports; 3.1 APPLIATION FORM The ity of Mississauga Draft Plan of Subdivision application form may be obtained from the Development and Design Division, Planning and Building Department, 11th Floor, ity Hall, 300 ity entre Drive, Mississauga, Ontario L5B 31. All enquiries with respect to completion of the form are to be directed to the ounter Planner, Development and Design Division, Planning and Building Department, (905) OMPLETING THE APPLIATION The ity of Mississauga s complete application form includes the following: - application form; - site screening questionnaire; - information for installation of a notice sign; - list of required information/studies. The applicant is to submit the following to the ounter Planner: - one (1) copy of the completed application form/site screening questionnaire/notice sign deposit form and fee; - fifty (50) copies of the Draft Plan of Subdivision folded to 8 1/2 x 11; - an 8 1/2 x 11 mylar reduction and/or

7 SUBDIVISION MANUAL Section ity s Application Fee (see Section Payment of Fee); - Region s Application Fee of $ made payable to the Region of Peel; - if applicable, the List of Required Information/Studies completed at the preliminary meeting; and - photograph of the notice sign(s). 3.3 FILING ASSOIATED APPLIATIONS Associated with the Draft Plan of Subdivision may be applications for Official Plan Amendment/Rezoning. These applications should be submitted to the ity of Mississauga Planning and Building Department at the same time the Draft Plan of Subdivision is being submitted. If complete applications have been received, the applications will be reviewed and processed at the same time. Please refer to the Official Plan Amendment/Rezoning Manual for the application requirements associated with that process. It should be noted that applications for Official Plan Amendment/Rezoning which require Draft Plan of Subdivision applications will not be circulated until such application is received and complete. 3.4 PAYMENT OF FEE Payment of the ity of Mississauga subdivision application fee may be made by cash or cheque payable to the ity of Mississauga. urrent fees are found in the Department document entitled Typical Development Approval ost Guideline calculated as per the Fees and harges By-law in force at the time of the application. Note: The balance of the Subdivision Processing Fee is to be paid to the Development Services Section of the Planning and Building Department prior to circulation of the draft final M-plan. For applications which are subject to both a rezoning and Draft Plans of Subdivision, the final processing fee will only be charged on the subdivision. requirements: Prior to submission of the application, the applicant shall have completed the proposed wording for the notice sign and the map as shown on the detail titled Project Identification Sign. Prior to the sign being manufactured, the proposed wording and map are to be reviewed by the ounter Planner/Area Planner who will undertake the following: - make any necessary changes and provide acceptable wording for the applicant to use as the wording for the notice sign; - review the map which is to be in the form as shown on the detail titled Project Identification Sign ; - determine the number and location of the notice sign(s). Notice signs shall be located on private property, approximately 1.5 m from the property along each street frontage of the property and midway between opposing property boundaries, and/or as directed by the Planning and Building Department. are should be taken to ensure that signs are not obstructed from view from the street; - provide a file number to be included on the notice sign (ie. 21T-M97001 W1 and/or OZ 97/001 W1); 3.5 SUBDIVISION NOTIE SIGNS The applicant is required to install the Subdivision notice sign in accordance with the following

8 SUBDIVISION MANUAL Section 3 - for complex applications additional time may be required to approve appropriate wording. irculation of the application does not begin until photographic proof of the notice sign(s) installation is received. The applicant shall construct, install and maintain the required notice sign(s) in good condition (in both structure and paint work), to the satisfaction of the ity of Mississauga throughout the processing of the application and in accordance with the requirements outlined in the Project Identification Sign detail. The detail to be shown on the accompanying notice sign map depends on the complexity of the development application. This map example is used when a draft plan of subdivision application accompanies an Official Plan Amendment/Rezoning application or is a Draft Plan of Subdivision application only. Basic details to include on the map are: - subject property outlined in bold and dimensioned (in metric and imperial measurement); - distance from nearest intersection (in metric and imperial measurement); - nearest intersection street names; - north arrow; - dimensions of all property boundaries (in metric and imperial measurement); - show collector road, or main local road (as applicable).

9 SUBDIVISION MANUAL Section 3 8

10 SUBDIVISION MANUAL Section 3 and 4 9 All proposed land uses to be shown schematically using the following colour code (as well, each proposed land use should be labelled), i.e: Berol Letraset Prismacolour Pantone oloured Letrafilm Land Use Pencils Nos. Nos. Det. Dwellings Yellow A Semi-Det. DwellingsYellow A Townhouses Orange A Apartments Dark Brown A ommercial Light Purple 930 Purple General Industrial Light Blue 903 Process Blue Prestige Industrial Dark Blue 901 Reflex Blue Greenbelt Light Green A Open Space Dark Green A Utilities Grey A Institutional Red 922 Warm Red amended significantly at any time during the processing of the application, the department will determine if the notice sign(s) should be revised. If a revision is required, the department will specify the revised wording. The amended application will not be considered complete until photographic evidence is provided to indicate that the sign(s) has been revised. 4.0 APPLIATION PROESSING Once all of the required information has been submitted to the Development and Design Division of the Planning and Building Department and the application is deemed to be complete, the Area Planner then circulates the application within five (5) working days to the appropriate internal departments and external agencies for review and comment. The applicant is provided with a copy of the circulation letter which indicates to whom the application was circulated. A notice sign deposit of $500 and completed form shall be deposited at the time of application submission. The notice sign must be removed within one week following the date that: - ouncil refuses application; - application is withdrawn, or; - the Draft Plan of Subdivision is registered. Failure to remove the notice signs will constitute a forfeiture of the notice sign deposit and whereupon the ity will enter the lands and remove the sign. On the application form the applicant agrees that the sign will be maintained both in structure and paint work to the satisfaction of the ity of Mississauga. PLEASE NOTE: If the development proposal is changed significantly at any time during the processing of the application, a formal revised application is required. 4.1 APPLIATION OMMENTS Upon receipt of the application departments and agencies have twenty (20) working days to prepare initial comments and can request an additional ten (10) working days if necessary. opies of comments will be sent directly to the applicant by the commenting departments and agencies. The Area Planner is responsible for facilitating the resolution of any conflicts arising from the comments. The applicant is responsible for addressing all comments. Applicants should note that the greatest delays in processing result from delays in, or failure to address comments. 4.2 PUBLI MEETINGS Ward Meetings - At the ouncillor's discretion, informal ratepayer (ward) meetings may be held early in the process: to provide preliminary information to the public; to obtain the public's reaction; and to answer questions about the proposal. These ward meetings are arranged by the ouncillor who may invite ity staff and/or the applicant to attend. In the event that the development proposal is

11 SUBDIVISION MANUAL Section 4 10 Public Information Meeting - Applications made for Draft Plans of Subdivision prior to March 28, 1995 do not require formal public meetings. Applications made for Draft Plans of Subdivision after March 28, 1995 are subject to the formal public meeting requirements of the Planning Act, R.S.O.1990, c.p.13, as amended. Where an application for a Draft Plan of Subdivision is associated with an application for rezoning, the public meetings are held as one meeting. Once comments have been addressed to a satisfactory level, the Area Planner will schedule the application for a Planning and Development ommittee (PD) meeting which is considered to be the formal public meeting under the requirements of the Planning Act. NOTE: The Planning and Development ommittee is a committee of ouncil and generally meet every other Monday of the calendar year. Some meeting dates may be revised because of holidays. professional presentation which clearly conveys to the ommittee and the public the full nature of the application. The ity shall provide overheads of the maps from the report, an overhead projector and a slide projector for the applicant s use. The presentation should be no longer than 5-10 minutes. The presenter is expected to come forward promptly to the podium to address the ommittee. (Presenters should consider sitting close to the podium to avoid delays). The presenter should introduce themself and then identify the site, its location, describe the context and all adjacent land uses, note the existing Secondary Plan designation/district Policies and zoning. The proposal should then be described including proposed development standards. Every detail of the proposal should not be described as ommittee members and the Public will have an opportunity to ask questions. To introduce the proposal, the applicant should use the overheads from the exhibits in the Department's Public Information Planning Report including: Notice of the formal public meeting is given by personal service or prepaid first class mail to every person assessed in respect of land within 120 m (400 ft.) of the area covered by the proposed Plan of Subdivision and, to every person assessed within 120 m (400 ft.) of lands owned by the proponent of the proposed plan of subdivision. For the PD meeting, a Public Information Report will be prepared by the Planning and Building Department containing comments from most of the circulated ity Departments and outside agencies who have commented on the application. At the PD meeting, the applicant will present the proposal and answer questions from the ommittee and the public. The following Guidelines for Applicants making presentations at Planning and Development ommittee Meetings should be observed: Applicants/agents should prepare a - the location map showing the relationship to adjacent land uses; - the secondary plan map indicating surrounding land use designations. Where an Official Plan Amendment is also required, the presenter should discuss the Secondary Plan designations of the surrounding area. Following the presentation, the presenter should remain at the podium to answer any questions from members of the ommittee or the Public. When questions raised by the ommittee have been addressed, presenters will return to their seats and the ommittee will hear from any person at the meeting who wishes to speak. Presenters should continue to sit near the podium while their proposal is being discussed since the ommittee may ask them to come forward to answer any questions raised by the

12 SUBDIVISION MANUAL Section 4 11 Public. Planner will: review all public comments; address any requests for information; conduct any additional research required; resolve all outstanding issues. Depending on the issues to be resolved, additional information may be requested from the applicant at this time. When all issues have been appropriately addressed, the Planning and Building Department will prepare a Supplementary Planning Report which will recommend approval or refusal and include the onditions of Approval on the application. This report will: outline all issues raised by the public and ommittee; show how these issues have been addressed; contain a planning analysis; provide a recommendation on the application; include the onditions of Approval. The PD can take one of the following actions: Recommend to ouncil that the report be received for information. The report then follows the normal Supplementary Planning Report process. See next section When the report is complete, it will be scheduled for a PD meeting. Notices of the meeting will be sent to those who have requested a notice of the meeting. If more than 6 months have elapsed between the Public Information Meeting and consideration of the Supplementary Report, full public meeting notification will take place. OR Recommend to ouncil that the report be received for information and that notwithstanding Planning Protocol, the Supplementary Planning Report be considered at the earliest possible ouncil meeting for consideration. ouncil then deals with the Planning and Building Department s recommendation directly. Those members of the public who have requested notification of when the application will be considered by ouncil, receive notice by the Planning and Building Department. Supplementary Planning Report - Following the Public Information meeting the Area The Planning and Building Department presents the Supplementary Report and recommendation. PD can take one of the following actions: support or refuse the Department recommendation; make an amended recommendation; defer making a decision. The recommendation is then forwarded to the next ouncil meeting for a decision. In situations where a draft plan of subdivision was submitted prior to March 28, 1995 and is not associated with a rezoning application, a public meeting will not be held for the draft plan of subdivision and a report with a recommendation and onditions of Approval will be prepared by

13 SUBDIVISION MANUAL Section 4, 5, 6 and 7 12 the Planning and Building Department for consideration by PD at the same time as a Supplementary Report is prepared for an associated OPA and Rezoning Application. Following consideration by PD, the recommendation will be forwarded to the next meeting of ouncil. Sunset lause - It should be noted that the decision of ouncil for approval of rezoning applications associated with draft plans of subdivision will be considered null and void and a new development application required, unless a zoning by-law is passed within 36 months of the ouncil decision on the zoning. 7.0 DRAFT M-PLAN SUBMISSION The Planning and Building Department coordinates the circulation of the draft final M-Plan. 5.0 ONDITIONS OF APPROVAL The onditions of Approval will be compiled by the Area Planner and are based on the comments received from all internal departments and external agencies. A copy of the conditions, all comments received from the departments and agencies and if applicable a copy of the red-lined draft plan will be sent to the applicant and to the Transportation and Works Department prior to the Supplementary Report being considered by PD or ouncil. 6.0 DRAFT APPROVAL When ouncil has made a decision on the application, the ity lerk forwards a copy of the ouncil resolution to the Applicant. The applicant shall contact the Area Planner to determine how many copies of the draft plan are required for stamping. Draft Approval of the Plan of Subdivision is issued by the ommissioner of Planning and Building. When a plan has been draft approved, the Area Planner notifies and forwards a copy of the onditions of Draft Approval and a copy of the draft approved plan to the Applicant, Development Services Section, as well as to the departments and agencies that had conditions of draft approval. Following draft approval, the Planning and Building Department will request that the applicant submit draft M-Plans and lot schedules. Final plan submissions will be reviewed by the Area Planner only after draft approval. The following information must be submitted to the Planning and Building Department: thirty-two (32) prints of the draft final M-Plan folded to 22 cm x 30 cm (8.5 in. x 11 in.) signed by an Ontario Land Surveyor (OLS); seven (7) copies of the schedule of areas and lot frontages as measured at the street line and as measured 7.5 m (25 ft.) back from the street line, certified by an OLS to be in conformity with the draft M-plan and the Zoning By-law; seven (7) copies of the supplementary lot schedule, if required, certified by an OLS that any reserve blocks, when added to adjacent lands, will form complete lots/blocks in conformity with the Zoning By-law; the final Planning Processing Fee as per the Fees and harges By-law in force at the time of the application, to be submitted to the Development Services Section. 7.1 IRULATION OF DRAFT M-PLANS

14 SUBDIVISION MANUAL Section 7 and 8 The draft M-Plan and lot schedules will be reviewed by the Area Planner and if there are any discrepancies, the applicant will be notified and revised plans and schedules will be requested prior to circulation. If the plans and schedules appear to be satisfactory, they will be circulated to the appropriate departments and agencies for comment. The Area Planner is to circulate the Draft M-Plan within five (5) working days of receipt of the plans. It is at this time that the preparation of the Zoning By-law, if required, will be initiated by the Area Planner based on the Draft M-plan. 7.2 DRAFT M-PLAN OMMENTS At the time the Draft M-Plan is circulated to various departments and agencies for comment, the Development Services Section of the Planning and Building Department will advise the applicant or agent of any items, such as payment of preregistration development charges and the ity Administration Fee, which must be paid prior to the execution of the Servicing and Development Agreements. 8.0 SEOND ENGINEERING SUBMISSIONS The Transportation and Works Department has a three submission procedure for the processing of Servicing Agreements, as outlined in Section Three of their Development Manual. All second engineering submissions are to be made directly to the ity Transportation and Works Department for circulation to the Planning and Building Department and other departments and agencies for review of certain components. The Transportation and Works Department should be contacted with respect to engineering submission requirements at (905) The Planning and Building Department does not review the first engineering submission. The Transportation and Works Department circulates the Second Engineering Submission to the Planning and Building Department for review and comment which includes two (2) sets of the following : The applicant is also advised of the items such as the payment of outstanding taxes and Hydro Mississauga approval, which in addition to the conditions of draft approval, must be satisfied prior to the release of the plan for registration. Departments and agencies have ten (10) working days from receipt of the final M-Plan package in which to provide their comments. omments will be sent directly to the applicant with a copy sent to the Area Planner in the Planning and Building Department. The Area Planner will facilitate the resolution of any conflicts arising from the comments. It is the responsibility of the applicant to address all comments. servicing agreement schedules; development agreement warning clauses; warning clauses; final M-Plan; above ground plans; grading plans; landscape plans; fencing details; parking layout plans as required; If the submission of revised Draft M-Plans is required, the Area Planner will advise the applicant. Agencies will have ten (10) working days from receipt of the revised package from the Planning and Building Department in order to comment. detailed cost breakdowns; Ontario Land Surveyors certification of zoning. The applicant is to ensure that the following matters have been addressed in the submission

15 SUBDIVISION MANUAL Section 8 and 9 where applicable: that lands to be transferred to the ity be held until they can be developed in conjunction with adjoining lands and setting out the conditions to be met before the lands will be reconveyed to the developer or in accordance with the developer s written direction; that the parking plans identify driveway and sidewalk locations and sufficient landscape areas; that the above ground servicing plan identify location of all required fencing including corner lot privacy fences and any noise attenuation fencing having regard for coordinated fence design, amenity area accessibility and safety; that any warning clauses required by the Planning and Building Department have been included in the Development Agreement; that regard has been given to achieving a desirable streetscape design and that buffer requirements have been illustrated; that any entry features, gates and noise attenuation walls have been detailed on the plans. omments are provided by the Development and Design Division to the Transportation and Works Department within ten (10) working days of receipt of the submission. The Transportation and Works Department will provide a coordinated response of all comments back to the applicant. The certification of zoning by-law compliance to be provided by the Ontario Land Surveyor (OLS) to the Transportation and Works Department, is intended to certify that the M-Plan has not changed since the associated Zoning By-law came into effect. If minor changes have been made to the Draft M-Plan after the by-law has been enacted, then certification by the OLS cannot occur and the following alternate procedure is to be followed: the applicant is to submit three (3) Draft M- Plans and three (3) new sets of lot schedules to the Supervisor of Zoning Administration of the Planning and Building Department; if the plans and schedules are satisfactory, a clearance will be provided directly to the Manager of Development Services of the Planning and Building Department. If final plans are revised at any time prior to final approval, revised plans and lot schedules are to be submitted to the Area Planner for review and a limited circulation. The Area Planner should be consulted as to the number of plans and schedules that will be required, which will be based on the nature of the revisions. 9.0 BY-LAW TO EXEUTE AGREEMENTS Upon approval of the final engineering submission by the Transportation and Works Department, the Development Services Section of the Planning and Building Department will prepare a by-law authorizing the execution of the Development and Servicing Agreements. The following items and clearances must be received by the Development Services Section prior to the preparation of the bylaw: ten (10) executed copies of the Development Agreement; ity Administration Fee - $350.00; pre-registration development charges; Transportation and Works Department clearance; ommunity Services Department clearance. Subsequent to the enactment of the by-law for the agreements, the agreements will be forwarded to the Region of Peel for execution. Upon return of the agreements to the ity, copies of the agreements are available from the Development Services Section for the applicant to pick-up.

16 SUBDIVISION MANUAL Section opies of the executed agreements are required by the applicant to satisfy certain conditions of draft approval RELEASE FOR REGISTRATION The Development Services Section of the Planning and Building Department is responsible for preparing the ity s release of the Draft Plan of Subdivision. opies of the appropriate clearance letters must be submitted to Development Services. In addition, the following clearances/material are required: Office must accompany the final plan package. Upon receipt of the required plans, the ommissioner of the Planning and Building Department will sign the plans. The plans will be forwarded by the Development Services Division to the Registry Office. The Development Services Division may be reached at (905) fully executed copies of both the Servicing and Development Agreements; Finance Department clearance (that all taxes have been paid); Hydro Mississauga clearance; three (3) signed copies of the final M-plan; Inhibiting order; Development and Design Division clearance; payment of the balance of the Planning Processing Fee; payment of cash-in-lieu of parkland (if applicable). When the conditions of draft approval have been fulfilled, the survey has been completed and the final plan prepared, the following should be forwarded to the undersigned: - the original mylar; - four mylar duplicates; - four white prints (Association of Ontario Land Surveyors Plan Submission Form must be affixed to one copy). Prior to submitting the final plans to the ity, please file a copy to the Peel Land Registry Office in Brampton for approval. A copy of the plan reviewed and revised (if applicable) by the Registry

17 SUBDIVISION MANUAL Section 10 16

Section F: Committee of Adjustment: Minor Variance and Consent Applications

Section F: Committee of Adjustment: Minor Variance and Consent Applications Executive Summary Introduction The Development Review Process STAR Process Pre-application Consultation Submission of "Complete" Applications STAR Application Streams Section A: Official Plan and Zoning

More information

Storefront Cannabis Retailer Rezoning Information and Application

Storefront Cannabis Retailer Rezoning Information and Application T 250.361.0283 E DevelopmentServices@victoria.ca Rezoning Information and Application This package contains information for rezoning applications within the City of Victoria: Frequently Asked Questions

More information

Planning: a Short Guide

Planning: a Short Guide Planning: a Short Guide Planning: a Short Guide www.doi.vic.gov.au/planning Introduction This booklet outlines the planning permit process and planning scheme amendment process, and the course to be followed

More information

TOWN OF NEW TECUMSETH PROTOCOL FOR ESTABLISHING TELECOMMUNICATION FACILITIES

TOWN OF NEW TECUMSETH PROTOCOL FOR ESTABLISHING TELECOMMUNICATION FACILITIES TOWN OF NEW TECUMSETH PROTOCOL FOR ESTABLISHING TELECOMMUNICATION FACILITIES February 2009 Table of Contents Section Page Number 1.0 Introduction... 1 2.0 Objectives... 1 3.0 Jurisdiction... 1 4.0 Full

More information

Manual of Development Review Procedures for Montgomery County, Maryland

Manual of Development Review Procedures for Montgomery County, Maryland Attachment B Manual of Development Review Procedures for Montgomery County, Maryland ADMINISTRATIVE STANDARDS for Plans Submitted to the Maryland-National Capital Park and Planning Commission, Development

More information

COUNTY OFFICIAL PLAN AMENDMENT PROCESS (TYPICAL)

COUNTY OFFICIAL PLAN AMENDMENT PROCESS (TYPICAL) COUNTY OFFICIAL PLAN AMENDMENT PROCESS (TYPICAL) Refer to Process Flow Chart: Typical County Official Plan Amendment Process 1. PRE-CONSULTATION Pre-application consultation with prospective applicants

More information

June 22, Corporate Services C. Grant, City Solicitor P. Fay, City Clerk E. Evans, Deputy Clerk C. Urquhart, Legislative Coordinator

June 22, Corporate Services C. Grant, City Solicitor P. Fay, City Clerk E. Evans, Deputy Clerk C. Urquhart, Legislative Coordinator Clerical Correction (June 26, 2009): In accordance with Section 2.11 (7) (a) of Procedure By-law 160-2004, as amended, a clerical correction has been made by the City Clerk s Office to Recommendation HB073-2009,

More information

Plan of Development Review Process County of Henrico, Virginia

Plan of Development Review Process County of Henrico, Virginia Plan of Development Review Process County of Henrico, Virginia October 27, 2000 (Revised January 8, 2007, December 7, 2007) (Revised September 11, 2015, effective September 14, 2015) POF011 TABLE OF CONTENTS

More information

City of Guelph. Site Plan User Guide. Version 1

City of Guelph. Site Plan User Guide. Version 1 City of Guelph Site Plan User Guide Version 1 Table of contents Chapter 1 What is the site plan process?...1 About this user guide...1 Standard site plan process...1 Minor site plan process...3 Site plan

More information

Guide to Rezoning. Step 1. Step 2. Step 5. Step 6. Step 7. Step 8

Guide to Rezoning. Step 1. Step 2. Step 5. Step 6. Step 7. Step 8 Guide to Rezoning Introduction The Douglas County (DCD) is committed to providing an open, transparent application process to the public. This Guide has been developed to assist anyone with interest in

More information

Your Development Project and the Public Works Department Part

Your Development Project and the Public Works Department Part Other useful publications available to help you through the development process: Title 8, Planning and Zoning, County Ordinance Code Title 9, Subdivisions, County Ordinance Code Your Development Project

More information

Bartlesville City Planning Commission SITE DEVELOPMENT PLAN PROCEDURE AND APPLICATION

Bartlesville City Planning Commission SITE DEVELOPMENT PLAN PROCEDURE AND APPLICATION Bartlesville City Planning Commission SITE DEVELOPMENT PLAN PROCEDURE AND APPLICATION Site Development Plans must be submitted prior to the issuance of any building permit for any tract within a district

More information

1136 Dupont Street - Zoning Amendment Application - Preliminary Report

1136 Dupont Street - Zoning Amendment Application - Preliminary Report STAFF REPORT ACTION REQUIRED 1136 Dupont Street - Zoning Amendment Application - Preliminary Report Date: May 15, 2012 To: From: Wards: Reference Number: Planning and Growth Management Committee Acting

More information

MANDATORY NEIGHBORHOOD MEETING & MAILINGS REQUIREMENTS

MANDATORY NEIGHBORHOOD MEETING & MAILINGS REQUIREMENTS MANDATORY NEIGHBORHOOD MEETING & MAILINGS REQUIREMENTS Per R&O 2006-20, ADOPTED FEBRUARY 7, 2006 Washington County Department of Land Use & Transportation Planning and Development Services Current Planning

More information

Planning Board Submission Process and Instructions

Planning Board Submission Process and Instructions City Planning Board Department of Planning and Community Development City Hall - Roosevelt Square Mount Vernon, New York 10550-2060 (914) 699-7230 FAX (914) 699-1435 Ernest D. Davis Mayor William Holmes

More information

General Plan Referral

General Plan Referral APPLICATION PACKET FOR General Plan Referral Planning Department 1650 Mission Street Suite 400 San Francisco, CA 94103-9425 T: 415.558.6378 F: 415.558.6409 San Francisco Charter Section 4.105 and Sections

More information

FILE MANAGER-SUBDIVISION APPROVAL PROCESS INTRODUCTION

FILE MANAGER-SUBDIVISION APPROVAL PROCESS INTRODUCTION FILE MANAGER-SUBDIVISION APPROVAL PROCESS INTRODUCTION Subdivision Approval Process About the Subdivision Approval Process The File Manager System for managing the Subdivision Approval Process redefines

More information

555 Dupont Street - Rezoning - Preliminary Report

555 Dupont Street - Rezoning - Preliminary Report STAFF REPORT ACTION REQUIRED 555 Dupont Street - Rezoning - Preliminary Report Date: July 23, 2010 To: From: Wards: Reference Number: Toronto and East York Community Council Director, Community Planning,

More information

THE CORPORATION OF THE CITY OF ST. CATHARINES

THE CORPORATION OF THE CITY OF ST. CATHARINES THE CORPORATION OF THE CITY OF ST. CATHARINES PO Box 3012, 50 Church Street St. Catharines, ON L2R 7C2 Tel : 905.688.5600 Fax: 905.682.3631 www.stcatharines.ca TTY : 905.688.4TTY (4889) PLANNING SERVICES

More information

URBAN DESIGN PEER REVIEW PANEL TERMS OF REFERENCE

URBAN DESIGN PEER REVIEW PANEL TERMS OF REFERENCE URBAN DESIGN PEER REVIEW PANEL TERMS OF REFERENCE April 7, 2008 1.0 PROTOCOL 1.1 PURPOSE To provide timely, consistent and effective urban design advice within the development approvals process by: (a)

More information

PLANNING BOARD APPLICATION

PLANNING BOARD APPLICATION ZONING TEXT AMENDMENT (Ord. Sec. 27-115) **Please read the entire packet for instructions prior to completing the application form** *Submit pages 1 thru 4 only, keep pages 5 thru 8 for your records *

More information

Downtown Shoulder Area Community Improvement Plan. Investing in our Community

Downtown Shoulder Area Community Improvement Plan. Investing in our Community Downtown Shoulder Area Community Improvement Plan Investing in our Community The Downtown Shoulder Area Renaissance Community Improvement Plan consists of the following: PART A - The preamble which does

More information

ADMINISTRATIVE VARIANCE APPLICATION PACKET

ADMINISTRATIVE VARIANCE APPLICATION PACKET ADMINISTRATIVE VARIANCE APPLICATION PACKET Relief from strict compliance with the following regulations of the UDO may be reviewed and approved by the Development Director: (1) Front yard or street side

More information

Chairman and Members of the Planning and Development Committee. Thomas S. Mokrzycki, Commissioner of Planning and Building

Chairman and Members of the Planning and Development Committee. Thomas S. Mokrzycki, Commissioner of Planning and Building CD.03.CIT City Plan DATE: TO: FROM: SUBJECT: Chairman and Members of the Planning and Development Committee Thomas S. Mokrzycki, Commissioner of Planning and Building Proposed City Plan, Draft Mississauga

More information

York Mills Road Rezoning Application Refusal Report

York Mills Road Rezoning Application Refusal Report STAFF REPORT ACTION REQUIRED 850-858 York Mills Road Rezoning Application Refusal Report Date: July 30, 2010 To: From: Wards: Reference Number: Planning and Growth Management Committee Chief Planner and

More information

MARIJUANA BUSINESS NEW LICENSE APPLICATION

MARIJUANA BUSINESS NEW LICENSE APPLICATION MARIJUANA BUSINESS NEW LICENSE APPLICATION Date: Applicant Name: Trade Name of Business (d/b/a): Physical Address of Business: Address/City/State/Zip Code Mailing Address of Business: Address/City/State/Zip

More information

ACTIVE BUSINESS IMPROVEMENT AREAS COMMERCIAL PROPERTY IMPROVEMENT GRANT PROGRAM APPLICANT INFORMATION

ACTIVE BUSINESS IMPROVEMENT AREAS COMMERCIAL PROPERTY IMPROVEMENT GRANT PROGRAM APPLICANT INFORMATION Name of Applicant: Contact Name: Mailing Address: City & Postal Code: Telephone Number: Cell Phone Number: Email: Planning and Economic Development Department Urban Renewal Section 71 Main Street West,

More information

CASSELBERRY NEIGHBORHOOD IMPROVEMENT GRANT PROGRAM FY APPLICATION

CASSELBERRY NEIGHBORHOOD IMPROVEMENT GRANT PROGRAM FY APPLICATION CASSELBERRY NEIGHBORHOOD IMPROVEMENT GRANT PROGRAM FY 2016-2017 APPLICATION A. Program Description 3 B. Who can apply for which grant 3 C. Eligibility 3 D. Grant Calendar 4 E. Grant Action and Maintenance

More information

REPORT Meeting Date: Regional Council

REPORT Meeting Date: Regional Council 6.5-1 REPORT Meeting Date: 2017-02-23 Regional Council DATE: February 15, 2017 REPORT TITLE: PEEL 2041 REGIONAL OFFICIAL PLAN REVIEW ROPA 27 ADOPTION - HEALTH AND THE BUILT ENVIRONMENT, AGE- FRIENDLY PLANNING,

More information

Practice Review Guide

Practice Review Guide Practice Review Guide October, 2000 Table of Contents Section A - Policy 1.0 PREAMBLE... 5 2.0 INTRODUCTION... 6 3.0 PRACTICE REVIEW COMMITTEE... 8 4.0 FUNDING OF REVIEWS... 8 5.0 CHALLENGING A PRACTICE

More information

ADAPTIVE REUSE & MOTEL REVITALIZATION GRANT PROGRAM

ADAPTIVE REUSE & MOTEL REVITALIZATION GRANT PROGRAM LUNDY S LANE COMMUNITY IMPROVEMENT PLAN ADAPTIVE REUSE & MOTEL REVITALIZATION GRANT PROGRAM PLANNING & DEVELOPMENT BUSINESS DEVELOPMENT 4310 Queen Street, P.O. Box 1023 Niagara Falls, ON L2E 6X5 (905)

More information

CITY OF HOOD RIVER NEIGHBORHOOD MEETING REQUIREMENT

CITY OF HOOD RIVER NEIGHBORHOOD MEETING REQUIREMENT CITY OF HOOD RIVER NEIGHBORHOOD MEETING REQUIREMENT Neighborhood meetings are held by developers to inform neighboring property owners of development activity prior to formal review by the City. The developer

More information

The Town of Caledon s Review Process of Niagara Escarpment Development Permit Applications

The Town of Caledon s Review Process of Niagara Escarpment Development Permit Applications The Town of Caledon s Review Process of Niagara Escarpment Development Permit Applications March 2015 Table of Contents Introduction 1 What Approvals Are Required? 2 3 4 5 NEC Decision and Clearing 6 7

More information

Central Area Community Improvement Plan

Central Area Community Improvement Plan Central Area Community Improvement Plan Facade Improvement Grant Program Application Package Program Guide Application Process Chart Application Form General Administration Provisions Facade Improvement

More information

Right-of-Way Improvement Standard Chapter 2 Streets Department Plan Review Standards. Right-of-Way Unit March 2015 Rev. June 2015

Right-of-Way Improvement Standard Chapter 2 Streets Department Plan Review Standards. Right-of-Way Unit March 2015 Rev. June 2015 2.1 General Review Standards Right-of-Way Unit March 2015 Rev. June 2015 The Streets Department review standards were implemented both to enforce the Complete Streets standards (Section 11-900 of the Philadelphia

More information

APPENDIX A PROGRAMMATIC AGREEMENT FOR MINOR TRANSPORTATION PROJECTS

APPENDIX A PROGRAMMATIC AGREEMENT FOR MINOR TRANSPORTATION PROJECTS APPENDIX A PROGRAMMATIC AGREEMENT FOR MINOR TRANSPORTATION PROJECTS PROGRAMMATIC AGREEMENT AMONG THE FEDERAL HIGHWAY ADMINISTRATION THE PENNSYLVANIA DEPARTMENT OF TRANSPORTATION, THE PENNSYLVANIA STATE

More information

ERASE REDEVELOPMENT GRANT

ERASE REDEVELOPMENT GRANT Planning and Economic Development Department Economic Development Division 71 Main Street West, 7 th Floor Hamilton, Ontario, L8P 4Y5 Phone: (905) 546-2424 Ext. 1219 Fax: (905) 546-2693 ERASE REDEVELOPMENT

More information

CITY OF BROCKVILLE APPLICATION FOR SITE PLAN CONTROL Residential Development

CITY OF BROCKVILLE APPLICATION FOR SITE PLAN CONTROL Residential Development CITY OF BROCKVILLE APPLICATION FOR SITE PLAN CONTROL Residential Development TO BE COMPLETED BY THE PLANNING DEPARTMENT: Date Submitted: Date Complete: Fee Rec'd: File No.: 1.0 Owner Information Name of

More information

Revised January 6, The Park Master Planning Process

Revised January 6, The Park Master Planning Process Revised January 6, 2004 Resolution (2003) 735 A RESOLUTION TO REVISE THE PROCESS FOR APPROVAL OF MASTER PLANS FOR PARK AND RELATED PROJECTS PURPOSE: To develop a total program for a park which will best

More information

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) SKETCH PLAN

APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) SKETCH PLAN 209 S. Main Street Marysville, Ohio 43040 Phone: (937) 645-7350 Fax: (937) 645-7351 www.marysvilleohio.org APPLICATION FOR PLANNED UNIT DEVELOPMENT (PUD) SKETCH PLAN *** IMPORTANT INFORMATION ~ Please

More information

OFFICE OF THE CENTRAL AREA CENTRAL AREA COMMUNITY IMPROVEMENT PLAN DOWNTOWN BRAMPTON BUILDING IMPROVEMENT PROGRAM PROGRAM IMPLEMENTATION GUIDELINES

OFFICE OF THE CENTRAL AREA CENTRAL AREA COMMUNITY IMPROVEMENT PLAN DOWNTOWN BRAMPTON BUILDING IMPROVEMENT PROGRAM PROGRAM IMPLEMENTATION GUIDELINES OFFICE OF THE CENTRAL AREA CENTRAL AREA COMMUNITY IMPROVEMENT PLAN DOWNTOWN BRAMPTON BUILDING IMPROVEMENT PROGRAM PROGRAM CENTRAL AREA COMMUNITY IMPROVEMENT PLAN DOWNTOWN BRAMPTON BUILDING IMPROVEMENT

More information

KANATA HIGHLANDS URBAN EXPANSION STUDY TERMS OF REFERENCE

KANATA HIGHLANDS URBAN EXPANSION STUDY TERMS OF REFERENCE KANATA HIGHLANDS URBAN EXPANSION STUDY TERMS OF REFERENCE REVISED MAY 2015 Prepared by: FOTENN Consultants Inc. 223 McLeod Street Ottawa, ON K2P 0Z8 T: 613-730-5709 F: 613-730-1136 www.fotenn.com Prepared

More information

NCR Streetscape Revitalization Grant Program FAQ. 1. Q. What is the NCR Streetscape Revitalization Grant Program?

NCR Streetscape Revitalization Grant Program FAQ. 1. Q. What is the NCR Streetscape Revitalization Grant Program? NCR Streetscape Revitalization Grant Program FAQ 1. Q. What is the NCR Streetscape Revitalization Grant Program? A. The NCR Streetscape Revitalization Grant Program offers grants to municipalities to assist

More information

EXCAVATION & FILL PROCEDURE 1

EXCAVATION & FILL PROCEDURE 1 EXCAVATION & FILL PROCEDURE 1 This handout is intended to provide guidance on putting together and submitting an application to excavate or fill areas in excess of the allowed exemptions outlined by Minnetrista

More information

Online Development Applications

Online Development Applications Online Development Applications Frequently Asked Questions Melbourne Water are introducing an online application process for all planning and development applications from 29 March 2017. These Frequently

More information

Heritage Grants - Receiving a grant. Mentoring and monitoring; Permission to Start; and Grant payment

Heritage Grants - Receiving a grant. Mentoring and monitoring; Permission to Start; and Grant payment Heritage Grants - Receiving a grant Mentoring and monitoring; Permission to Start; and September 2017 1 Introduction... 2 Filling in forms... 2 Before Starting... 2 Reporting on progress... 3 Mentoring

More information

CHAIR AND MEMBERS INVESTMENT AND ECONOMIC PROSPERITY COMMITTEE MEETING ON AUGUST 27, 2014 CITY MANAGER ART ZUIDEMA PERFORMING ARTS CENTRE STUDIES

CHAIR AND MEMBERS INVESTMENT AND ECONOMIC PROSPERITY COMMITTEE MEETING ON AUGUST 27, 2014 CITY MANAGER ART ZUIDEMA PERFORMING ARTS CENTRE STUDIES Item Page TO: CHAIR AND MEMBERS INVESTMENT AND ECONOMIC PROSPERITY COMMITTEE MEETING ON AUGUST 27, 2014 FROM: CITY MANAGER ART ZUIDEMA SUBJECT: PERFORMING ARTS CENTRE STUDIES RECOMMENDATIONS That, on the

More information

Subdivision Presubmittal Conference Submittal Package Cover Page

Subdivision Presubmittal Conference Submittal Package Cover Page Subdivision Presubmittal Conference Submittal Package Cover Page The Hillsborough County Development Services Department is pleased to offer a Presubmittal Conference to anyone seeking help in determining

More information

City of Batavia Signage Assistance Grant Program

City of Batavia Signage Assistance Grant Program City of Batavia Signage Assistance Grant Program INTRODUCTION The Downtown Signage Assistance Program is designed to enhance the overall appearance and image of Batavia s Downtown Historic District while

More information

ELECTRICAL INSPECTION ACT CANADIAN ELECTRICAL CODE REGULATIONS

ELECTRICAL INSPECTION ACT CANADIAN ELECTRICAL CODE REGULATIONS c t ELECTRICAL INSPECTION ACT CANADIAN ELECTRICAL CODE REGULATIONS PLEASE NOTE This document, prepared by the Legislative Counsel Office, is an office consolidation of this regulation, current to June

More information

Casino Reinvestment Development Authority c/o: Lance Landgraf, PP, AICP CRDA Director of Planning 15 South Pennsylvania Avenue Asbury Park, NJ 08401

Casino Reinvestment Development Authority c/o: Lance Landgraf, PP, AICP CRDA Director of Planning 15 South Pennsylvania Avenue Asbury Park, NJ 08401 Casino Reinvestment Development Authority c/o: Lance Landgraf, PP, AICP CRDA Director of Planning 15 South Pennsylvania Avenue Asbury Park, NJ 08401 Via Email: llandgraf@njcrda.com April 14, 2017 Subject:

More information

Practice Review Guide April 2015

Practice Review Guide April 2015 Practice Review Guide April 2015 Printed: September 28, 2017 Table of Contents Section A Practice Review Policy... 1 1.0 Preamble... 1 2.0 Introduction... 2 3.0 Practice Review Committee... 4 4.0 Funding

More information

E E D C S I G N G R A N T P R O G R A M

E E D C S I G N G R A N T P R O G R A M E E D C S I G N G R A N T P R O G R A M CONTENTS SIGN GRANT INFORMATION SHEET SIGN GRANT APPLICATION EEDC MEMBERSHIP APPLICATION DESIGN GALLERY & EXAMPLES ZONING INFORMATION SHEET ZONING ORDINANCE - SIGNAGE

More information

DECISION OF THE CAPE COD COMMISSION

DECISION OF THE CAPE COD COMMISSION Date: To: From: Re: Applicant: Michael D. Ford, Esq. P.O. Box 665 Harwich, MA 02671 Cape Cod Commission Development of Regional Impact Hardship Exemption Cape Cod Commission Act, Section 23 Couto Management

More information

APPENDIX 1 BROWARD COUNTY PLANNING COUNCIL PLAN AMENDMENT REQUIREMENTS AND PROCEDURES

APPENDIX 1 BROWARD COUNTY PLANNING COUNCIL PLAN AMENDMENT REQUIREMENTS AND PROCEDURES APPENDIX 1 BROWARD COUNTY PLANNING COUNCIL PLAN AMENDMENT REQUIREMENTS AND PROCEDURES Broward County Land Use Plan Amendment Requirements Amendments which are not within the rules of flexibility or more

More information

Master Land Use Instructions B Abutting Owner=s Notification Los Angeles City Planning Department

Master Land Use Instructions B Abutting Owner=s Notification Los Angeles City Planning Department Revised 11/06/2008 Master Land Use Instructions B Abutting Owner=s Notification Los Angeles City Planning Department Page 1 of 5 1. The MASTER LAND USE APPLICATION FORM CP-7771 must be filled out completely,

More information

Application for vehicle crossing permit

Application for vehicle crossing permit Private Bag 9023 Whangarei 0148 New Zealand T: 09 430 4200 0800 WDC INFO 0800 932 463 F: 09 438 7632 W: www.wdc.govt.nz E: mailroom@wdc.govt.nz Application for vehicle crossing permit (Whangarei District

More information

MOBILE FOOD UNIT FOOD CART (TYPE I)

MOBILE FOOD UNIT FOOD CART (TYPE I) MOBILE FOOD UNIT FOOD CART (TYPE I) Why does the City need to review a Mobile Food Unit Application? It allows the City to clearly review the proposal and ensure compatibility between the proposed use

More information

Airport Zoning Regulation to Protect Hospital Helicopter Flight Paths- Final Report. Planning and Growth Management Committee

Airport Zoning Regulation to Protect Hospital Helicopter Flight Paths- Final Report. Planning and Growth Management Committee PG24.3 STAFF REPORT ACTION REQUIRED Airport Zoning Regulation to Protect Hospital Helicopter Flight Paths- Final Report Date: October 18, 2017 To: From: Planning and Growth Management Committee Acting

More information

METHODOLOGY - Scope of Work

METHODOLOGY - Scope of Work The scope of work for the Truckee West River Site Redevelopment Feasibility Study will be undertaken through a series of sequential steps or tasks and will comprise four major tasks as follows. TASK 1:

More information

Chester County Vision Partnership Grant Program January 2017

Chester County Vision Partnership Grant Program January 2017 Chester County Vision Partnership Grant Program January 2017 Municipal Planning Grant Manual Bringing i growth and preservation together for Chester County Vision Partnership Program Grant Manual 1.0 Program

More information

APPLICATION FOR PARCEL MAP

APPLICATION FOR PARCEL MAP Public Works Number: - / 3- APPLICATION FOR PARCEL MAP Department of Public Works Development Services 200 East Santa Clara Street San Jose, California 95113 (408) 535-7802 Applicant Phone Number Fax Number

More information

g g g Community Arts Grants g Grant Compliance 2009 g Arts Council of New Orleans g g g

g g g Community Arts Grants g Grant Compliance 2009 g Arts Council of New Orleans g g g g g g Community Arts Grants g Grant Compliance 2009 g Arts Council of New Orleans g g g COMMUNITY ARTS GRANTS PROGRAM Through the Community Arts Grants Program, the Arts Council of New Orleans provides

More information

Page 1 EXTRAORDINARY COUNCIL MEETING 4 April 2016

Page 1 EXTRAORDINARY COUNCIL MEETING 4 April 2016 Page 1 Item 00: Author: Reason for report: Amendment No.2 of LEP 2012 - Planning Proposal for the New City Plan - Area within the Town Centre zoned B4 - Mixed Use. Rod Logan - Director Planning and Environmental

More information

Registration, renewal and variation application handbook. Guidance for registered providers completing a registration application pack.

Registration, renewal and variation application handbook. Guidance for registered providers completing a registration application pack. Registration, renewal and variation application handbook Guidance for registered providers completing a registration application pack. October 2017 Page 2 of 33 About the The (HIQA) is an independent authority

More information

Y CARRIED I LOST TOWN OF CALEDON. Project Update and Proposed Revisions to the Work Program be received

Y CARRIED I LOST TOWN OF CALEDON. Project Update and Proposed Revisions to the Work Program be received 6 2 TOWN OF CALEDON 190 2009 te April 2009 Moved by Seconded by THAT Report No PD 009 021 Mayfield West Phase 2 Secondary Plan MYV2 Project Update and Proposed Revisions to the Work Program be received

More information

Agenda Item No. October 14, Honorable Mayor and City Council Attention: David J. Van Kirk, City Manager

Agenda Item No. October 14, Honorable Mayor and City Council Attention: David J. Van Kirk, City Manager Agenda Item No. October 14, 2008 TO: FROM: SUBJECT: Honorable Mayor and City Council Attention: David J. Van Kirk, City Manager Scott D. Sexton, Community Development Director RESOLUTION OF THE CITY COUNCIL

More information

2017 Developer Handbook

2017 Developer Handbook 2017 Developer Handbook This handbook will guide you through the four step development review process in the City of Arvada. You will find detailed information, helpful hints, resources, and answers to

More information

Councillors Coe, Drumm, Emm, Mitchell, Pitchforth, Roy and Scott

Councillors Coe, Drumm, Emm, Mitchell, Pitchforth, Roy and Scott PRESENT: Mayor Perkins Councillors Coe, Drumm, Emm, Mitchell, Pitchforth, Roy and Scott Mayor Perkins in the Chair ALSO PRESENT: R. S. Petrie, Chief Administrative Officer B. Short, Director of Planning

More information

NOTICE OF REVISED APPLICATION & NOTICE OF CITY COUNCIL DECISION MEETING

NOTICE OF REVISED APPLICATION & NOTICE OF CITY COUNCIL DECISION MEETING INFRASTRUCTURE, DEVELOPMENT AND ENTERPRISE File: OP1706 75 Dublin Street North March 26, 2018 NOTICE OF REVISED APPLICATION & NOTICE OF CITY COUNCIL DECISION MEETING Council Decision Meeting: Further to

More information

CITY OF LANCASTER, PENNSYLVANIA

CITY OF LANCASTER, PENNSYLVANIA CITY OF LANCASTER, PENNSYLVANIA REQUEST FOR PROPOSALS FOR PROFESSIONAL SERVICES May 11, 2012 The City of Lancaster, Pennsylvania, is seeking the professional services of an urban planning firm to assist

More information

2017 PARKLET APPLICATION

2017 PARKLET APPLICATION FOR OFFICIAL USE ONLY UPON APPLICATION SUBMITTAL, INSERT RECEIVED DATE STAMP HERE 2017 PARKLET APPLICATION NOTICE: 1. It is required that the applicant, or a representative, meet with a Planner prior to

More information

Municipality of North Grenville Rideau-Sanders Community Improvement Plan (CIP) Financial Incentive Program

Municipality of North Grenville Rideau-Sanders Community Improvement Plan (CIP) Financial Incentive Program Municipality of North Grenville Rideau-Sanders Community Improvement Plan (CIP) Financial Incentive Program Program Information Guide In accordance with the Ontario Planning Act, the Municipality of North

More information

Agreement. Between: The Research Foundation, Cerebral Palsy Alliance. And: (Name of Institution) Project: (Name of project)

Agreement. Between: The Research Foundation, Cerebral Palsy Alliance. And: (Name of Institution) Project: (Name of project) Agreement Between: The Research Foundation, Cerebral Palsy Alliance And: (Name of Institution) Project: (Name of project) Contents 1. Defined meanings... 1 2. Administration of Award... 1 3. Funding...

More information

Navasota Economic Development Corporation

Navasota Economic Development Corporation Navasota Economic Development Corporation Business Improvement Grant Program 200 E. McAlpine P. 936-825-6475 P.O. Box NAVASOTA 910 ECONOMIC DEVELOPMENT CORPORATION BUSINESS IMPROVEMENT GRANT PROGRAM F.

More information

Sport, Culture and Heritage PUBLISHER MARKETING ASSISTANCE NEW Program Guidelines

Sport, Culture and Heritage PUBLISHER MARKETING ASSISTANCE NEW Program Guidelines Sport, Culture and Heritage PUBLISHER MARKETING ASSISTANCE NEW Program Guidelines 2018-19 PURPOSE: The Publisher Marketing Assistance program provides Manitoba book publishers with project grants that

More information

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.4 STAFF REPORT June 21, Staff Contact: Peyman Behvand (707)

CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.4 STAFF REPORT June 21, Staff Contact: Peyman Behvand (707) CITY OF VACAVILLE PLANNING COMMISSION Agenda Item No. G.4 STAFF REPORT June 21, 2011 Staff Contact: Peyman Behvand (707) 449-5140 TITLE: MEEK S LUMBER & HARDWARE PLANNED SIGN PROGRAM (MESSAGE CENTER SIGN)

More information

Guide for New Food Primary (Restaurant) Application

Guide for New Food Primary (Restaurant) Application Guide for New Food Primary (Restaurant) Application Part 1: Applicant Information... 3 Applicant Name... 3 Business Number... 3 Applicant Email Address... 3 Applicant Type - Documents... 3 Personal History

More information

City of Signal Hill Wireless Communications Facility Application

City of Signal Hill Wireless Communications Facility Application Wireless Telecom Application 2017 rev02.docx City of Signal Hill Wireless Communications Facility Application INTRODUCTION a. All applicants seeking to install a wireless communication facility ( WCF )

More information

Corporation of the County of Grey Committee Report

Corporation of the County of Grey Committee Report Corporation of the County of Grey Committee Report Report PDR-PCD-24-12 To: Chair Wright and Members of Planning and Community Development Committee From: Scott Taylor, Senior Planner Meeting Date: August

More information

Wyoming Main Street Application Certified or Affiliate Levels (Letter of intent is due October 2, 2017) (Application is due December 1, 2017)

Wyoming Main Street Application Certified or Affiliate Levels (Letter of intent is due October 2, 2017) (Application is due December 1, 2017) Wyoming Main Street Application Certified or Affiliate Levels (Letter of intent is due October 2, 2017) (Application is due December 1, 2017) Submitted by: (Community) (Date) Wyoming Main Street Wyoming

More information

Downtown Mural Grant Program Guidelines

Downtown Mural Grant Program Guidelines Downtown Mural Grant Program Guidelines A Program of: El Paso Downtown Management District (DMD) Effective January 1, 2017 DMD - Program Administrator Contact Information: El Paso Downtown Management District

More information

DEVELOPMENT SERVICES COMMITTEE AGENDA Wednesday July 11, :00 p.m. Town Council Chambers Page 1

DEVELOPMENT SERVICES COMMITTEE AGENDA Wednesday July 11, :00 p.m. Town Council Chambers Page 1 DEVELOPMENT SERVICES COMMITTEE AGENDA Wednesday 7:00 p.m. Town Council Chambers Page 1 1. CALL TO ORDER 2. DECLARATIONS OF PECUNIARY INTEREST 3. PUBLIC MEETINGS Nil. 4. DELEGATIONS AND PRESENTATIONS 4.1

More information

EXHIBIT E DRDAP [ ATTACHED ]

EXHIBIT E DRDAP [ ATTACHED ] EXHIBIT E DRDAP [ ATTACHED ] LEGAL_US_W # 66181446.1 E-1 DISPOSITION AND DEVELOPMENT AGREEMENT (CANDLESTICK POINT AND PHASE 2 OF THE HUNTERS POINT SHIPYARD) DESIGN REVIEW AND DOCUMENT APPROVAL PROCEDURE

More information

Historic Preservation

Historic Preservation A guide to the Individual Designation of Historic Properties Historic Preservation Planning Services Department, 50 West 13th Street, Dubuque, IA 52001-4864 (563) 589-4210 e-mail: planning@cityofdubuque.org

More information

NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS METROPOLITAN PLANNING ORGANIZATION REQUEST FOR PROPOSALS

NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS METROPOLITAN PLANNING ORGANIZATION REQUEST FOR PROPOSALS NORTH CENTRAL TEXAS COUNCIL OF GOVERNMENTS METROPOLITAN PLANNING ORGANIZATION REQUEST FOR PROPOSALS CITY OF CEDAR HILL CITY CENTER TRANSIT-ORIENTED DEVELOPMENT PLAN August 19, 2011 REQUEST FOR PROPOSALS

More information

Creating a World-Class Public Participation Process for Land Use and Zoning Decisions

Creating a World-Class Public Participation Process for Land Use and Zoning Decisions Creating a World-Class Public Participation Process for Land Use and Zoning Decisions Executive Summary Prince George s County Planning Department July 2016 Introduction The regulation of land use and

More information

COMMUNITY CARE FACILITY - CLASS B AND GROUP RESIDENCE GUIDELINES

COMMUNITY CARE FACILITY - CLASS B AND GROUP RESIDENCE GUIDELINES City of Vancouver Land Use and Development Policies and Guidelines Planning and Development Services, 453 W. 12th Ave Vancouver, BC V5Y 1V4 F 604.873.7344 fax 604.873.7060 planning@vancouver.ca COMMUNITY

More information

HAMILTON HERITAGE PROPERTY GRANT PROGRAM

HAMILTON HERITAGE PROPERTY GRANT PROGRAM $340 Administration Fee to Accompany Application Planning and Economic Development Department Urban Renewal Section 71 Main Street West, 7th Floor Hamilton, Ontario L8P 4Y5 Phone: (905) 546-2424 Ext. 2755

More information

coordination and collaboration between St. Mary s College and the Town of Moraga

coordination and collaboration between St. Mary s College and the Town of Moraga Chapter Five Implementation The Campus Master Plan will be implemented in stages over the next 15 years (2015 2030). During this time coordination and collaboration between St. Mary s College and the Town

More information

Follow-up Report - Area-Specific Amendment to the City's Sign By-law Sherway Drive

Follow-up Report - Area-Specific Amendment to the City's Sign By-law Sherway Drive PG23.4 REPORT FOR ACTION Follow-up Report - Area-Specific Amendment to the City's Sign By-law - 150 Sherway Drive Date: September 21, 2017 To: Planning and Growth Management Committee From: Chief Building

More information

CHAIR AND MEMBERS PLANNING & ENVIRONMENT COMMITTEE JOHN M. FLEMING MANAGING DIRECTOR, PLANNING AND CITY PLANNER

CHAIR AND MEMBERS PLANNING & ENVIRONMENT COMMITTEE JOHN M. FLEMING MANAGING DIRECTOR, PLANNING AND CITY PLANNER TO: FROM: CHAIR AND MEMBERS PLANNING & ENVIRONMENT COMMITTEE JOHN M. FLEMING MANAGING DIRECTOR, PLANNING AND CITY PLANNER SUBJECT: FIBRE OPTIC CONNECTION GRANT PILOT PROGRAM FOR DOWNTOWN LONDON- ONE YEAR

More information

CITIZEN PARTICIPATION PLAN GUIDELINES

CITIZEN PARTICIPATION PLAN GUIDELINES CITIZEN PARTICIPATION PLAN GUIDELINES Planning July 2012 www.glendaleaz.com 1. Attach a cover page titled Citizen Participation Plan, which lists information such as the project name and location. The

More information

LARGE PROJECT AUTHORIZATION

LARGE PROJECT AUTHORIZATION 1650 MISSION STREET, #400 SAN FRANCISCO, CA 94103 www.sfplanning.org LARGE PROJECT AUTHORIZATION In Eastern Neighborhoods INFORMATIONAL PACKET Pursuant to Planning Code Section 329, the Planning Commission

More information

Research Equipment Grants 2018 Scheme 2018 Guidelines for Applicants Open to members of Translational Cancer Research Centres

Research Equipment Grants 2018 Scheme 2018 Guidelines for Applicants Open to members of Translational Cancer Research Centres Research Equipment Grants 2018 Scheme 2018 Guidelines for Applicants Open to members of Translational Cancer Research Centres Applications close 12 noon 08 March 2018 Contents Definitions 3 Overview 4

More information

Section 2 General Requirements DRAFT 1

Section 2 General Requirements DRAFT 1 Section 2 General Requirements DRAFT 1 Aerial view of the San Fernando Valley, east of Sepulveda Boulevard. Tujunga Wash cuts through the center of the photo and connects with the Los Angeles River. Small

More information

Private Gas Well Policy and Incentive Program

Private Gas Well Policy and Incentive Program APPLICANT GUIDE Private Gas Well Policy and Incentive Program ontario.ca/privategaswells Ministry of Natural Resources Petroleum Operations Section Integration Branch Regional Operations Division 659

More information

2018 MARITIME ARCHITECTURAL DESIGN AWARDS

2018 MARITIME ARCHITECTURAL DESIGN AWARDS 1 2 The Architects Association of Prince Edward Island (AAPEI), the Architects Association of New Brunswick (AANB) and the Nova Scotia Association of Architects (NSAA) are pleased to invite all Architects/Firms

More information

Submission, Review, and Approval Procedures

Submission, Review, and Approval Procedures CHAPTER 2 Submission, Review, and Approval Procedures 2.0 Introduction Chapter 2, Submission, Review, and Approval Procedures, outlines the steps required to obtain Philadelphia Water Department (PWD)

More information

Home Energy Saving (HES) scheme - Homeowner Application Form Version 10.0

Home Energy Saving (HES) scheme - Homeowner Application Form Version 10.0 Home Energy Saving (HES) scheme - Homeowner Application Form Version 10.0 Instructions for Completing the Application Form All fields in the form are MANDATORY. Incomplete applications will be returned.

More information