THE. CERTIFICATION GUIDEBOOK v1 Q1 2018

Size: px
Start display at page:

Download "THE. CERTIFICATION GUIDEBOOK v1 Q1 2018"

Transcription

1 THE CERTIFICATION GUIDEBOOK v1 Q1 2018

2 Copyright 2017 International WELL Building Institute pbc (IWBI). All rights reserved. This document ( Certification Guidebook ) constitutes proprietary information of IWBI. All information contained herein is provided without warranties of any kind, either express or implied, including but not limited to warranties of the accuracy or completeness of the information or the suitability of the information for any particular purpose. Use of this document in any form implies acceptance of these conditions. IWBI authorizes individual use of this Certification Guidebook. In exchange for this authorization, the user agrees: 1. to retain all copyright and other proprietary notices contained in the Certification Guidebook, 2. not to sell or modify the Certification Guidebook, and 3. not to reproduce, display or distribute the Certification Guidebook in any way for any public or commercial purpose. Unauthorized use of the Certification Guidebook violates copyright, trademark and other laws and is prohibited. Disclaimer None of the parties involved in the funding or creation of the WELL Building Standard, the WELL Community Standard and the Certification Guidebook, including IWBI, its affiliates, and its and its affiliates respective owners, officers, directors, employees, agents, representatives, or contractors, assume any liability or responsibility to the user or any third parties for the accuracy, completeness, or use of or reliance on any information contained in this Certification Guidebook, or for any injuries, losses, or damages (including, without limitation, equitable relief) arising from such use or reliance. Although the information contained in the Certification Guidebook is believed to be reliable and accurate, all materials set forth within are provided without warranties of any kind, either express or implied, including but not limited to warranties of the accuracy or completeness of information or the suitability of the information for any particular purpose. This document, the WELL Building Standard and the WELL Community Standard are intended to educate and assist community stakeholders, real estate Owners and tenants in their efforts to create healthier spaces and communities, and nothing in this document or in the WELL Building Standard or the WELL Community Standard should be considered, or used as a substitute for, quality control, safety analysis, legal compliance (including zoning), comprehensive urban planning, or medical advice, diagnosis or treatment. As a condition of use, the user covenants not to sue and agrees to waive and release IWBI, its affiliates, members, employees, or contractors from any and all claims, demands, and causes of action for any injuries, losses or damages (including, without limitation, equitable relief) that the user may now or hereafter have a right to assert against such parties as a result of the use of, or reliance on, the WELL Building Standard, the WELL Community Standard or the Certification Guidebook. 2

3 TABLE OF CONTENTS REGISTRATION... 4 DOCUMENTATION REQUIREMENTS... 6 PERFORMANCE VERIFICATION... 8 WELL REPORT AWARD & CONTINUED ENGAGEMENT INNOVATIONS & ALTERNATIVE ADHERENCE PATHS CURATIVE ACTIONS AND APPEALS PRECERTIFICATION RECERTIFICATION USE OF PROJECT INFORMATION GLOSSARY

4 REGISTRATION Registration signifies your intent to pursue WELL certification. WELL Online (projects.wellcertified.com) is the official online registration application and project management system for WELL. Registration requires submitting basic information about the project and declaring the project path by indicating the primary project space type and project scope as described in the previous section. At this time, the project type must be selected for the project. The project type is based on the primary space type of the project and determines whether a given feature is applicable to the project. Refer to the WELL Building Standard and WELL Community Standard for more information on different types of projects. Upon registration, WELL Building Standard projects must complete documentation submission and schedule Performance Verification within a certain timeframe: Projects utilizing WELL have five years from the date of registration Projects utilizing a WELL Building Standard pilot have three years from the date of registration For the WELL Community Standard, projects must complete documentation submission within five (5) years of registration and undertake and submit measurements for Performance Verification within ten (10) years of registration. If a project does not submit documentation within this period, its registration will expire. If project teams anticipate that they will have difficulty meeting this deadline, they must request an extension from IWBI at least one year prior to the registration expiration date and submit documentation explaining why a longer period of time is necessary. A project will be reviewed under the version of WELL or WELL pilot standard that is in place on the date the project is registered, unless the project team elects to proceed under a subsequently released version. Project Size With respect to projects pursuing certification under the WELL Building Standard, the gross square footage entered for the project should include the sum of the floor areas of the spaces within the building, including basements, mezzanine and intermediate-floored tiers, and penthouses with headroom height of 7.5 ft or greater. Measurements must be taken from the exterior faces of the exterior walls OR from the centerline of walls separating buildings. The gross square footage should exclude non-enclosed (or non- enclosable) roofed-over areas such as exterior covered walkways, porches, terraces or steps, roof overhangs and similar features. Excludes air shafts, pipe trenches, chimneys and floor area dedicated to the parking and circulation of motor vehicles. With respect to projects seeking certification under the WELL Community Standard, the area entered for the project should include the gross area of all land and water area, both owned and not owned by the project Owner, within the project boundary. WELL Assessor After documentation submission, the Green Business Certification Inc. (GBCI) will assign a WELL Assessor to the project. The WELL Assessor is the third-party certification entity responsible for assessing/reviewing your project. After submission for certification, the WELL Assessor is responsible for both the documentation review phase of WELL Certification and for Performance Verification activities. With respect to the WELL Community Standard, the WELL Assessor will be assigned to the project after documentation submission and will review necessary documentation of on-site conditions. Copyright 2017 by International WELL Building Institute, PBC. All rights reserved. 4

5 Project Team Roles Team members will have distinct responsibilities throughout the certification process, as described below. Project Administrator Project administrators act as project managers and oversee the WELL process. The project administrator is the primary point of contact on the project and must be copied on all correspondence with IWBI. This individual will also be the recipient of a comprehensive WELL report following Documentation Review and Performance Verification, as well as the WELL building award package. The project administrator can be a WELL Accredited Professional (WELL AP), the Owner (see below), or another designated representative of the project team. This individual is responsible for ensuring that all project documentation is complete and accurate before submitting for review. The project administrator is ultimately responsible for the overall quality of the documents submitted and is expected to complete a thorough quality control check of all documentation and forms prior to submission for review. Owner Owners are responsible for authorizing registration of the project and will be required to validate various documents used to demonstrate that WELL features are satisfied. An Owner can be an individual property Owner or a representative who is delegated responsibility by an entity that owns the property. Owners have the authority to hold and control project-relevant property and to authorize decisions pertaining to that property. In circumstances where multiple Owners hold rights over a property, a single owner must be identified as the authorized decision-maker for purposes of WELL. In such cases, the project team must submit a Confirmation of Primary Owner s Authority Form, which will be made available upon request. For the WELL Community Standard, the Owner is the individual or organization, which registers the project, pays the applicable fees, and is authorized to fulfill obligations set forth in the WELL Community Standard. Additional Signatories Some WELL documents will require validation by the appropriate professional overseeing the relevant aspect of design, construction or operations. Therefore, architects, contractors, and mechanical, electrical and plumbing (MEP) engineers are required to provide specific declarations and/or calculations pertaining to the project. The group of professionals providing this information under the WELL Community Standard may also include planners, civil engineers, and individuals representing or communicating with the local government. WELL Accredited Professional (WELL AP) The WELL AP credential recognizes building industry professionals who are knowledgeable of the conceptual and applied frameworks of WELL, and are experienced in its application on registered and certified WELL projects. WELL APs can help guide projects to successful certification or compliance awards. Project teams are not required to include a WELL AP, but having a WELL AP as part of a project team will help to address all necessary aspects of WELL. Copyright 2017 by International WELL Building Institute, PBC. All rights reserved. 5

6 DOCUMENTATION REQUIREMENTS While a core tenet of WELL is performance verification and achievement of measurable criteria, it also requires that project teams provide documentation as evidence that certain WELL features have been met. These documentation requirements are summarized below. Required Document Types All documents that the project team is responsible for providing must be submitted via WELL Online. The type of document required to verify each feature is described in the WELL Building Standard or WELL Community Standard. 1. Annotated Documents Annotated documents refer to existing project documents that are marked up to provide additional information to indicate how WELL features and constituent parts have been met. Types of annotated documents include the following: A. Design drawings (with pertinent information marked or highlighted) B. Operations schedules (with time log templates, if appropriate) C. Policy documents (e.g., employee handbooks) D. Other materials, including narratives and balancing reports. 2. Letters of Assurance Separate letters of assurance must be submitted by the appropriate professional overseeing the implementation of a specific WELL feature and its parts during design, construction or operations. Letters of assurance will be required from the following licensed professionals to confirm that the requirements of WELL features have been met: A. Architects B. Contractors C. Engineers D. Owner 3. General Documents Both annotated documents and letters of assurance are tied to specific feature requirements. The documents listed below, however, are not linked to the verification of a specific part, but are instead required as a general document for the certification or compliance process at large. These documents do not need to be annotated but are used to inform IWBI and the WELL Assessor of details on the project. Required general documents include the following: A. Representative floor plans or project maps B. Mechanical drawings C. Narrative describing the project in general and listing the attempted features Copyright 2017 by International WELL Building Institute, PBC. All rights reserved. 6

7 Documentation Submission, Review and Approval WELL Online is the official online registration application and project management system for WELL Certification and compliance. This online system is used to house all documentation related to a WELL project, and to submit information for review by the WELL Assessor. The project must successfully complete the Documentation Review phase (marked as approved in WELL Online) before Performance Verification can be scheduled. Documents can be uploaded to WELL Online as they are prepared. Once all documents are uploaded, the project administrator is expected to perform a thorough quality check before submitting the documentation for review in WELL Online. A first round of Documentation Review by the WELL Assessor will follow documentation submission. The WELL Assessor will respond with his/her preliminary review within business days, indicating which of the features the documentation requirements have met, and indicating what additional information is needed. If all documents are found to be satisfactory, then the project team will be able to proceed to the next steps. The project team will be notified if any submitted documents are found to be inaccurate or unsatisfactory, or if further documentation is necessary. In that case, the project team will have an opportunity to correct existing documents or submit further documentation for a second round of review. The WELL Assessor will respond with the results of the second round of review within business days. If more than two rounds of review are needed before all documentation is found to be satisfactory, additional fees will apply. Any additional rounds of review will also be completed within business days. The project team will be notified via WELL Online when all documents have been reviewed and approved. At this point, WELL Community projects becomes Design Verified. This is a designation which is awarded by IWBI and allows projects to market the proposed wellness features and communicate their progress toward WELL Certification. WELL Building Standard projects can at this time schedule Performance Verification. Features approved during Documentation Review are subject to inspection during Performance Verification. Copyright 2017 by International WELL Building Institute, PBC. All rights reserved. 7

8 PERFORMANCE VERIFICATION WELL Building Standard Performance Verification entails a site visit during which a WELL Assessor performs or oversees tests and inspections to verify that all applicable requirements of WELL features have been met. Scheduling Performance Verification For a project seeking to achieve WELL Certification, certain conditions must be met before the project can schedule Performance Verification. These vary based on the project type and are described in Table 1. For projects utilizing WELL pilot standards, there may be additional criteria as outlined in the introduction to the pilot standard. All documents for which the project team is responsible must be submitted, reviewed and approved in WELL Online through the Documentation Review process. At least one month must pass since the space s certificate of occupancy was issued. A minimum of 50% of expected occupancy must be achieved in the project. Table 1: Conditions Necessary to Schedule Performance Verification PATH New and Existing Buildings New and Existing Interiors DOCUMENTATION APPROVED ONE MONTH FROM CERTIFICATE OF OCCUPANCY 50% OCCUPANCY Yes Yes Yes Core and Shell Yes No No Retail Pilot Program Education Facilities Pilot Program Restaurant Pilot Program Commercial Kitchen Pilot Program Yes Yes No Multifamily Residential Pilot Program Yes No No On-Site Measurements and Inspections Performance Verification is performed or overseen by the WELL Assessor. Depending on the building size, this may require the WELL Assessor (and testing organization, if applicable) to be at the site for multiple days in order to fully validate the project s design documentation via inspections and spot-checks, and to complete all on-site performance tests to confirm adherence to WELL requirements. Please note that due to the nature of performance testing, there are variables outside of the control of GBCI or IWBI that could impact the Performance Verification timeline. Performance Verification involves analysis performed by various third-party laboratories for radon, formaldehyde, VOCs, and up to 32 different water contaminants. In some cases, the results analysis may take additional time. Additionally, if the results from the laboratory are outside of the accepted accuracy or tolerance range outlined in the Performance Verification Guidebook, or if laboratory samples are damaged during shipping, additional testing may be required and could increase the certification Copyright 2017 by International WELL Building Institute, PBC. All rights reserved. 8

9 timeline. Any additional testing is done to ensure the accuracy of the results and for the benefit of the project team. During Performance Verification, an individual with authorized access to all areas of the building must be present so that performance tests and inspections may be conducted in any area, including mechanical and tenant spaces, grounds and the roof. Testing and measurement during Performance Verification will be completed according to sampling protocols set by IWBI based on the size and project type of the project, and some collected samples will be sent to a third-party laboratory for analysis. The WELL Assessor will evaluate all applicable environmental parameters in accordance with WELL, including, for example: 1. Air quality (e.g., organic and inorganic gases, and particulates) 2. Water quality (e.g., dissolved chemicals and suspended solids) 3. Light attributes (e.g., color quality, intensity and spectral power distribution) 4. Thermal considerations (e.g., ambient and radiant temperature, air speed and humidity) 5. Acoustic elements (e.g., decibel levels and reverberation) Refer to the WELL Performance Verification guidebook for details on all activities executed during Performance Verification. Any WELL feature and its parts are subject to verification on-site by the WELL Assessor during Performance Verification, including those accounted for by documentation. This means that the WELL Assessor will perform spot-checks and confirm on-site that certain features reflected in the submitted documents are in fact satisfied. WELL Community Standard For WELL Community projects, the project team is responsible for gathering, assembling and submitting performance data for the necessary features in the Air and Water concepts. Projects may gather the performance data or, when available, utilize existing data collected at the municipal level through state agencies, universities, or other entities. GBCI will review this information following the project s achievement of Design Verified and will assess this information and quality thereof in its sole discretion. Furthermore, the sufficient buildings and infrastructure within the WELL Community project must be constructed (not just designed) to achieve the features pursued in the Documentation Review phase. Additional information regarding this process is located in the WELL Community Standard under Certification Steps. Copyright 2017 by International WELL Building Institute, PBC. All rights reserved. 9

10 WELL REPORT The WELL report will provide a feature-by-feature assessment of whether requirements of WELL features pursued by the project were approved. A comprehensive WELL report will be available on WELL Online within business days of the site visit. This includes inspection details, analysis results and the status of documents previously submitted by the project team for approval. For WELL Community projects, the WELL report will be issued within days following the submission of performance data and will include analysis of this data plus the status of documents previously submitted to the project team for approval. If the project has not met WELL criteria in any area, the WELL report will indicate where deficiencies exist. Once the WELL report is issued, the project team is required to either accept their WELL report via WELL Online, or initiate curative actions or an appeal within 180 calendar days. If the WELL report indicates a pass, then the project will be issued the applicable certification level or compliance as described in the WELL report. If, within 180 calendar days after issuance of the WELL report, the project has neither affirmatively accepted the WELL report on WELL Online nor initiated a curative action or appeal, the project will be deemed to have accepted the WELL report as final. Copyright 2017 by International WELL Building Institute, PBC. All rights reserved. 10

11 AWARD & CONTINUED ENGAGEMENT Certification Award Projects that have satisfied the requirements of WELL and have accepted the WELL report will receive a WELL award package from IWBI. The WELL building award package will contain the official award letter, the WELL Certification plaque and other relevant documents and signage. IWBI will also provide sample materials to assist the project in its promotion of successful WELL Certification. The WELL Certified plaque or other signage will indicate the level of certification and the year certified, and may only be displayed at the site of the WELL Certified project. For additional details, please view the IWBI Trademark Policy and Branding Guidelines. Continued Engagement In order to maintain status as a WELL Certified project prior to recertification, there are specific ongoing requirements. Certain features may require projects to provide ongoing records of the following: A. Results of post-occupancy surveys B. Proof of maintenance (e.g., logs of cleaning schedules and filter replacement) C. Ongoing environmental parameter measurements (e.g., air and water quality) These features generally require submission to GBCI for review on an annual basis. To remain in good standing, projects must submit the documents within 15 months of certification and then every 12 months thereafter. Failure to provide these documents within this time frame may result in an additional fee assessed at recertification. If the ongoing records are not submitted at all by recertification, then in addition to the fee, the project will be ineligible to pursue these features for the following certification period. For details on what is required in these documents, please refer to the relevant features in the WELL Building Standard or WELL Community Standard. Copyright 2017 by International WELL Building Institute, PBC. All rights reserved. 11

12 INNOVATIONS & ALTERNATIVE ADHERENCE PATHS WELL features create linkages between elements of building design and occupant health, wellness and comfort. WELL ultimately seeks to establish a set of universally applicable features that are feasible across all building types and contexts. However, the various ways in which the built environment impacts health across diverse contexts are multiple and overlapping, and there are paths to healthful construction and design that may be uncovered during implementation of the current version of WELL. In recognition of the complexity involved in fully exhausting all dimensions of health through the built environment, and of the challenges that may be involved in meeting requirements as outlined, WELL provides opportunities for creativity through two processes: 1. Alternative adherence paths 2. Innovation features Alternative Adherence Paths WELL allows for innovative, alternate solutions for meeting requirements through the alternative adherence path process, as long as proposals still meet the intent of the requirement and are supported by cited scientific, medical and industry research. Project teams may propose an alternative for any requirement of WELL by submitting a completed alternative adherence path form to IWBI. These forms are used specifically for proposing alternate means to meeting existing WELL features. Each form pertains to one feature, and there is no limit on the number of alternative adherence path forms that can be submitted per project. Usually, each AAP ruling applies only to the project that submitted the application. However, in some situations, multiple projects may submit a single AAP and utilize the ruling across all specified projects. Projects eligible to utilize this pathway are required to meet at least one of the following requirements: The projects are located at the same development site. The AAPs submitted are for features categorized as Organizational Protocol. In both cases, the strategy proposed must be identical across all projects using the AAP. Furthermore, the project team must specify in the AAP submission the names and IDs of all projects using the AAP. Only projects registered for WELL Certification may be specified. While requests for alternative adherence paths will be kept private, summaries may be published. If alternative adherence paths have broad application, the strategies described in the application may be incorporated as official precedent-setting alternative adherence paths. Project teams may submit an alternative adherence path proposal for pre-approval before or after registration. Each WELL v1 project receives three alternative adherence path submissions at no additional cost; further alternative adherence path forms may be submitted for a fee. Pilot projects receive ten free AAP submissions. To request an alternative adherence path form, contact technical@wellcertified.com. Copyright 2017 by International WELL Building Institute, PBC. All rights reserved. 12

13 Innovation Features Innovation Features pave the way for project teams to develop unique strategies for creating a healthy environment. The features can relate to any of the WELL Concepts. For a given project, Innovation Features must either address a novel concept or strategy not already included in WELL or use strategies above and beyond the existing requirements in a WELL Feature. Innovation Features must be supported by sufficient rationale based on cited scientific, medical and industry research. To request input on Innovation Feature proposals ahead of the Documentation Review submission, the innovation proposal may be submitted as an alternative adherence path using the process described above. For more information and additional guidance, please see the Innovation Features in the WELL Building Standard (Features ) and the WELL Community Standard (Features GND, INP, INV, and WLP). International Projects and Standards Projects registered in countries other than the United States may find some challenges based on local regulations and standards that differ from those outlined in WELL. In those instances, a project will have two options: 1. Adhere to the requirements cited in WELL. 2. Petition IWBI for the use of equivalent requirements within a standard that is more relevant to the country where a project is located, along with evidence of equivalency. If IWBI approves use of a new requirement as sufficiently equivalent to a WELL requirement in a given country, the new requirements will be incorporated into WELL features addenda and interpretations, as an Equivalency available for other projects in the pertinent country to use. Copyright 2017 by International WELL Building Institute, PBC. All rights reserved. 13

14 CURATIVE ACTIONS AND APPEALS The WELL report will outline any failed performance criteria or other requirements. As previously stated, after the WELL report is issued, the project Owner has 180 calendar days to either accept the WELL report, initiate curative action or file an appeal. Curative action is available to project teams that wish to enact curative efforts to address unmet criteria and request to schedule follow-up Performance Verification. Appeals are available to project teams that wish to contest findings of the WELL report. Fixed baseline fees are associated with curative action requests and appeals. Additional fees apply depending on the WELL features in question, and whether performance re-testing is necessary to confirm compliance with WELL requirements. Visit WELLCertified.com for a current schedule of fees and for further details on the curative actions or appeals processes. Curative Actions To pursue a curative action path for any features with unmet requirements, a curative action plan must be submitted within 180 calendar days after issuance of the WELL report. The plan must be signed by the project Owner and outline steps for addressing unmet features. The curative action plan will be reviewed by the WELL Assessor and results will be provided within business days. If the curative action plan is accepted, the project team must then enact curative actions as outlined and schedule another Performance Verification with their WELL Assessor. The features that are re-tested during the follow-up Performance Verification will vary based on which features are impacted during the execution of the curative action plan. For example, projects that fail to meet requirements concerning microorganisms in a Water feature may address this problem with the addition of chlorine. By doing so, however, they could risk exceeding the chlorine limits of another feature in Water. After follow-up Performance Verification has been completed, an updated WELL report will be created and shared with the project administrator. Performance Verification can be repeated (for additional fees) following additional curative actions should the WELL report resulting from the follow-up Performance Verification again indicate a failure to achieve certification or compliance. Appeals Project teams may (for a fee) challenge any findings of the WELL report or submit new features for review by submitting an appeal application. The appeal application allows the submission of supplementary information and allows for an additional round of review. Each appeal is applicable to one feature; a separate appeal must be submitted for each feature being challenged. All appeals must be submitted within 180 calendar days after the date of issuance of the WELL report. An appeal must provide an explanation of the basis of the appeal and identify suspected errors. Upon receiving the appeal, GBCI will respond with an appeal review report within business days. Like the WELL report, a project may either accept or appeal the review report. Projects are limited to one subsequent appeal for each feature, which must be submitted within 90 calendar days of the date of issuance of the appeal review report being challenged. Copyright 2017 by International WELL Building Institute, PBC. All rights reserved. 14

15 PRECERTIFICATION This is an optional review pathway available to all project types for a fee. The Precertification review is focused on the intended design, construction, and operational strategies for the project. WELL Precertification allows project Owners to demonstrate health and wellness in the built environment, market the proposed wellness features of a project to potential tenants looking to occupy the WELL-certified space, and determine which features the project is likely to achieve during the full WELL certification review. Precertification is not available for projects pursuing the WELL Community Standard. These projects should instead use the Design Verified designation prior to completion of construction. Copyright 2017 by International WELL Building Institute, PBC. All rights reserved. 15

16 RECERTIFICATION WELL Certification for the WELL Building Standard is valid for three years. WELL Certification for the WELL Community Standard is valid for five years. During this time period, annual performance data must be submitted for the select features that require more frequent reporting. In order to maintain a current certification, a project must file an application for recertification on WELL Online no later than three years (or five years for the WELL Community Standard) after the date on which the project was awarded its initial certification. Filing an application for recertification extends the validity of the project s original certification period for six months, during which time the project must satisfactorily complete the recertification process to determine that the building continues to perform to the WELL standard. If a project does not file an application for recertification before the expiration of the original certification period, or fails to successfully obtain recertification within 42 months of receiving the initial certification (or 66 months for the WELL Community Standard), the project s WELL Certification will expire. Upon expiration of a project s WELL Certification, the project must immediately discontinue all use and display of the WELL Certified plaque or other signage, trademark and logo, and must not indicate or imply that the project is WELL Certified. The project will be removed from IWBI s list of certified projects. Recertification includes review of newly validated letters of assurance. WELL Certified buildings undergo a full site visit for Performance Verification. WELL Certified communities must submit updated air and water quality measurements. A project s certification may be compromised if WELL features have not been properly maintained or if the quality of the environment has declined below the thresholds required in WELL. During recertification, projects can elect to submit additional WELL features to improve their score and achieve a higher level of certification. For the first recertification event following initial certification, a project can elect to be reviewed under either the version of WELL for which it achieved initial certification or any subsequently released version. For all subsequent recertifications, a project will be reviewed under the version of the rating system that is in place 12 months prior to expiration of their certification. If they so choose, a project team may elect to be recertified under a more recent version of the standard. Projects may preemptively begin the recertification process before the certification period is up. All of the rules and timelines regarding acceptance of the WELL report apply normally. The new results from Performance Verification and the WELL report supersede the results from the prior certification. WELL Community projects may change their boundary at the time of recertification. In this case, the new project will be evaluated as a whole under the new boundary. (The additional areas added are not evaluated for feature compliance or minimum program requirements in isolation.) Copyright 2017 by International WELL Building Institute, PBC. All rights reserved. 16

17 USE OF PROJECT INFORMATION WELL requires the submission of extensive information related to each project. Collected information typically includes project and Owner identifying information, attestations, narratives, data, calculations, maps, drawings, specifications and other design, construction and operational-related information. This information may contain personal or proprietary information, as well as valuable intellectual property including copyrighted materials and/or trademarks. By submitting this information, each project grants IWBI and its affiliates and their respective employees, agents, representatives and subcontractors a limited, non-exclusive and non-revocable license to access and view all information that is submitted in the application as necessary to perform an assessment. IWBI also uses project data to educate and provide resources for WELL project teams and others, showcase project strategies and promote WELL on a global scale. WELL-registered and certified projects are, by default, considered public projects and, as such, they are included in IWBI s public WELL project directory. Inclusion in this directory allows the general public and members of the media to look up specific project listings and details, including the following: project name, project address, project type, registration date, identity of the Owner, Owner organization type, project team information, project gross square footage, date of certification and level of certification achieved, among other project identifying information. With the exception of information provided to IWBI s and its affiliates employees, agents, representatives and subcontractors, IWBI and its affiliates will not distribute or publish any submitted plans, drawings or schematics pertaining to any project without permission. All public projects also benefit from publicity opportunities: IWBI may use project data to create case studies highlighting a project s features, reference a project on the website or to the media, or create other derivative works. Information that may be used for articles, project profiles or similar promotional pieces may include service providers, project team members, promotional or other project photographs, project strategies for certification, or quotations from team members. A project may opt-out of the WELL project directory and publicity opportunities by electing to be a private project at the time of registration. See WELL Online for specific instructions in this regard. A private project means that the project name, street address and identity of the Owner will not appear within the WELL project directory. Certain other non-project identifying information may be disclosed, including, but not limited to, the city and state in which the project is located and the total project square footage. All private projects that achieve WELL Certification or WELL Compliance will be prompted upon issuance of award, if any, to transition to public status. A project that wishes to remain a private project will need to re-confirm its private status at the time of certification. For so long as a project maintains its election as a private project, the project cannot market or represent itself to the general public as having applied for certification or compliance, or as being certified or compliant, and no intellectual property including the WELL certification or compliance trademarks may be utilized or displayed in relation to the project. Project Owners may change the privacy setting for a project at any time before acceptance of the final award, using functionality in WELL Online. Further development of the WELL program depends upon the collection, analysis and distribution of information pertaining to WELL design, construction and performance. IWBI and its affiliates may make internal use of any information that is submitted to IWBI whether by a public or private project including, and not limited to, project performance data, and may publish this information to third parties, including the general public, in aggregated non-identifying form. Copyright 2017 by International WELL Building Institute, PBC. All rights reserved. 17

18 GLOSSARY Alternative Adherence Path Alternative solutions for meeting the intent of any WELL feature requirement. Projects may submit an alternative adherence path proposal to IWBI to replace any requirement in WELL. Fees apply. Appeal Document that outlines a project team s disagreement with any finding of the WELL report, or of any decision regarding proposals for alternative adherence paths, curative actions, or innovation features. Appeals must be submitted to IWBI within 90 calendar days of the date of issuance of the WELL report or the appeal review report, as applicable. Curative Action Plan Document that outlines strategies that project teams will employ to address any unmet criteria as identified in a WELL report. These plans must be submitted to IWBI within 180 calendar days of receiving the WELL report, and must detail a specific and feasible plan of action. Feature One of 100+ sections of the WELL Building Standard with a specific health intent. Features are classified as either mandatory Preconditions or as Optimizations that offer more flexibility. Innovation Features Features which allow for project teams to submit ideas for new features under a certain concept. The proposals for these features must address a novel aspect relevant to the concept, with robust supporting literature from health and medical research. Innovation features for a given project may include implementation of the requirements in an existing WELL feature that is designated as not applicable to the project s project type. Performance Verification A site visit where a WELL Assessor conducts performance tests, visual inspections and spot-checks, and also includes follow-up analysis of collected data and samples from the site. WELL Accredited Professional (WELL AP) A professional who has extensive industry experience and knowledge of the WELL process. Such professionals have successfully completed IWBI s WELL AP exam, and may be hired by a project team as consultants to guide successful certification or compliance award. WELL Assessor An independent professional who conducts on-site performance tests, inspections, and spotchecks, as well as Documentation Review in order to evaluate a project s eligibility for WELL Certification. These professionals are trained to understand proper adherence to testing protocols for evaluating WELL performance criteria. WELL Online (projects.wellcertified.com) Official online registration application and project management system for WELL. Project administrators must register projects on WELL Online, and may delegate responsibilities over specific features to other project team members. All documents must be uploaded onto WELL Online for review and approval. WELL report Comprehensive report of the project which includes a feature-by-feature summary of whether or not project teams successfully provided documentation to verify that each feature has been satisfied, or if the project has successfully performed to measurable criteria relevant for specific features. Provided via WELL Online for the project administrator to view. Copyright 2017 by International WELL Building Institute, PBC. All rights reserved. 18

19

20 381 Park Avenue South Suite 1101 New York, NY

THE. BUILDING STANDARD Certification Guidebook January 2017

THE. BUILDING STANDARD Certification Guidebook January 2017 THE BUILDING STANDARD Certification Guidebook January 2017 WELL Building Standard Copyright Copyright 2016 by Delos Living LLC. All rights reserved. Delos Living LLC authorizes individual use of this WELL

More information

CMGT 380 Green Building Practices and LEED Certification Department of Construction Management California State University, Chico

CMGT 380 Green Building Practices and LEED Certification Department of Construction Management California State University, Chico CMGT 380 Green Building Practices and LEED Certification Department of Construction Management California State University, Chico Discussion #4 LEED Process GA05 Guide to LEED Certification: Commercial

More information

LEED Canada Certification Process

LEED Canada Certification Process For LEED Canada NC, CS, CI and EB:O&M projects Version 10, updated February 2017 Table of Contents 1. Preface 2. Documentation 3. Where to Find Documentation Requirements 4. Organizing Documentation for

More information

Collaborative Operations and Services Grant Program GUIDELINES Revised January 15, 2014

Collaborative Operations and Services Grant Program GUIDELINES Revised January 15, 2014 Collaborative Operations and Services Grant Program GUIDELINES Revised January 15, 2014 OVERVIEW The Corporation for Public Broadcasting ( CPB ) has a broad mandate to foster a healthy public media system

More information

REQUEST FOR PROPOSALS. For: As needed Plan Check and Building Inspection Services

REQUEST FOR PROPOSALS. For: As needed Plan Check and Building Inspection Services Date: June 15, 2017 REQUEST FOR PROPOSALS For: As needed Plan Check and Building Inspection Services Submit Responses to: Building and Planning Department 1600 Floribunda Avenue Hillsborough, California

More information

CHAPTER SIX RESNET STANDARDS 600 ACCREDIATION STANDARD FOR SAMPLING PROVIDERS

CHAPTER SIX RESNET STANDARDS 600 ACCREDIATION STANDARD FOR SAMPLING PROVIDERS CHAPTER SIX RESNET STANDARDS 600 ACCREDIATION STANDARD FOR SAMPLING PROVIDERS 601 GENERAL PROVISIONS 601.1 Purpose. Sampling is intended to provide certification that a group of new homes meets a particular

More information

201 North Forest Avenue Independence, Missouri (816) [September 25, 2017] REQUEST FOR PROPOSAL GRADUATION CAPS AND GOWNS

201 North Forest Avenue Independence, Missouri (816) [September 25, 2017] REQUEST FOR PROPOSAL GRADUATION CAPS AND GOWNS 201 North Forest Avenue Independence, Missouri 64050 (816) 521-5300 [September 25, 2017] REQUEST FOR PROPOSAL GRADUATION CAPS AND GOWNS Sealed proposals will be received by the Independence School District

More information

PROPERTY IMPROVEMENT PROGRAM

PROPERTY IMPROVEMENT PROGRAM Hollywood, Florida Community Redevelopment Agency PROPERTY IMPROVEMENT PROGRAM (PIP) December 2011 PROPERTY IMPROVEMENT PROGRAM (PIP) GUIDELINES PROGRAM PURPOSE AND BENEFITS: City of Hollywood, Florida

More information

DEPARTMENT OF HUMAN SERVICES AGING AND PEOPLE WITH DISABILITIES OREGON ADMINISTRATIVE RULES CHAPTER 411 DIVISION 069 LONG TERM CARE ASSESSMENT

DEPARTMENT OF HUMAN SERVICES AGING AND PEOPLE WITH DISABILITIES OREGON ADMINISTRATIVE RULES CHAPTER 411 DIVISION 069 LONG TERM CARE ASSESSMENT 411-069-0000 Definitions DEPARTMENT OF HUMAN SERVICES AGING AND PEOPLE WITH DISABILITIES OREGON ADMINISTRATIVE RULES CHAPTER 411 DIVISION 069 LONG TERM CARE ASSESSMENT Unless the context indicates otherwise,

More information

2016 Park Assessment https://bethelpark.net/recreation/municipal-parks-assessment/

2016 Park Assessment https://bethelpark.net/recreation/municipal-parks-assessment/ REQUEST FOR PROPOSAL PROFESSIONAL SERVICES IMPLEMENTABLE COMPREHENSIVE PLAN February 2018 The Municipality of Bethel Park ( Municipality ) is seeking proposals for a one-time contract to perform certain

More information

Redevelopment Authority of Allegheny County

Redevelopment Authority of Allegheny County Request for Proposals (RFP) Architectural and Engineering Services Block and Lot No. 233-A-119 Block and Lot No. 233-A-122 Block and Lot No. 233-A-125 Block and Lot No. 233-A-126 Block and Lot No. 233-A-128

More information

RULES OF PROCEDURE FOR CALIBRATION LABORATORY ACCREDITATION

RULES OF PROCEDURE FOR CALIBRATION LABORATORY ACCREDITATION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 RULES OF PROCEDURE FOR CALIBRATION LABORATORY ACCREDITATION 1.0 INTRODUCTION 1.1 Scope: The purpose of these rules is to

More information

ASSE International Seal Control Board Procedures

ASSE International Seal Control Board Procedures ASSE International Seal Control Board Procedures 2014 PREAMBLE Written operating procedures shall govern the methods used for maintaining the product listing program and shall be available to any interested

More information

REQUEST FOR QUALIFICATIONS (RFQ)

REQUEST FOR QUALIFICATIONS (RFQ) REQUEST FOR QUALIFICATIONS (RFQ) Professional Architectural/Engineering Services to Provide Space Planning and Building Assessments. INTRODUCTION The Snohomish Health District has entered into a purchase

More information

POLICY NUMBER: C553B AUTHORITY: City Manager EFFECTIVE DATE: October 31, Development Incentive Program Procedures

POLICY NUMBER: C553B AUTHORITY: City Manager EFFECTIVE DATE: October 31, Development Incentive Program Procedures Page 1 of 24 1. DEFINITIONS 1.1 Apartment Housing means a development consisting of one or more Dwellings contained within a building in which the Dwellings are arranged in any horizontal or vertical configuration,

More information

REQUEST FOR QUALIFICATIONS. Architectural/Engineering Design Services

REQUEST FOR QUALIFICATIONS. Architectural/Engineering Design Services REQUEST FOR QUALIFICATIONS Architectural/Engineering Design Services Logistics DISTRICT CONTACTS FOR QUESTIONS Jeff Collum Superintendent Phone: 903-668-5990 Email: jcollum@hisd.com REQUEST FOR STATEMENT

More information

Request for Proposal (RFP)

Request for Proposal (RFP) Consolidated Edison Company of New York, Inc. Request for Proposal (RFP) Non-Wires Alternatives to Provide Demand Side Management for Transmission and Distribution System Load Relief Columbus Circle Network

More information

SEATTLE ART MUSEUM #SummerAtSAM PHOTO CONTEST OFFICIAL RULES

SEATTLE ART MUSEUM #SummerAtSAM PHOTO CONTEST OFFICIAL RULES All The Details: SEATTLE ART MUSEUM #SummerAtSAM PHOTO CONTEST OFFICIAL RULES The Seattle Art Museum #SummerAtSAM Photo Contest ("Contest") begins on July 10, 2014 at 12:00 AM PDT and ends on August 18,

More information

Information & Application

Information & Application City of Holly Hill Community Redevelopment Area Commercial Property Improvement Matching Grant Program Guidelines and Application adopted April 14, 2015 Information & Application Please note that applications

More information

2017 Developer Handbook

2017 Developer Handbook 2017 Developer Handbook This handbook will guide you through the four step development review process in the City of Arvada. You will find detailed information, helpful hints, resources, and answers to

More information

Use of External Consultants

Use of External Consultants Summary Introduction The Department of Transportation and Works (the Department) is responsible for the administration, supervision, control, regulation, management and direction of all matters relating

More information

Win a Panda Trek in Nepal Contest Official Rules

Win a Panda Trek in Nepal Contest Official Rules Win a Panda Trek in Nepal Contest Official Rules Introduction: The objective of this Contest is to promote the conservation of wildlife and wild places and to give the Mozilla community an opportunity

More information

RESEARCH PROJECT GUIDELINES FOR CONTRACTORS PREPARATION, EVALUATION, AND IMPLEMENTATION OF RESEARCH PROJECT PROPOSALS

RESEARCH PROJECT GUIDELINES FOR CONTRACTORS PREPARATION, EVALUATION, AND IMPLEMENTATION OF RESEARCH PROJECT PROPOSALS RESEARCH PROJECT GUIDELINES FOR CONTRACTORS PREPARATION, EVALUATION, AND IMPLEMENTATION OF RESEARCH PROJECT PROPOSALS Fire Protection Research Foundation Issued: 28 February 2011; Updated: 22 December

More information

RULES OF PROCEDURE FOR TESTING LABORATORY ACCREDITATION

RULES OF PROCEDURE FOR TESTING LABORATORY ACCREDITATION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RULES OF PROCEDURE FOR TESTING LABORATORY ACCREDITATION 1.0 INTRODUCTION 1.1 Scope: The purpose of these rules is to establish

More information

Terms of Submission In order to participate, you must be at least eighteen (18) years old.

Terms of Submission In order to participate, you must be at least eighteen (18) years old. Terms of Submission NBCUniversal Media, LLC company ( NBCU ) located at 30 Rockefeller Plaza, New York, NY 10112, invites you to join in on the fun with The Tonight Show Starring Jimmy Fallon (the Show

More information

Energy Efficiency Alberta Residential and Commercial Solar Program Guidebook

Energy Efficiency Alberta Residential and Commercial Solar Program Guidebook Energy Efficiency Alberta Residential and Commercial Solar Program Guidebook This Guidebook provides an overview of the eligibility requirements, available funding, and process for municipalities to participate

More information

MY.BAKUGAN.COM BAKUGAN S MECHTANIUM SURGE DREAM TEAM CONTEST RULES

MY.BAKUGAN.COM BAKUGAN S MECHTANIUM SURGE DREAM TEAM CONTEST RULES Bakugan s Mechtanium Surge Dream Team Contest Rules Official Rules: MY.BAKUGAN.COM BAKUGAN S MECHTANIUM SURGE DREAM TEAM CONTEST RULES 1. Eligibility. SPIN MASTER (referred to herein as "SPONSOR") IS THE

More information

Belmar Business Partnership, Inc. Business Development Committee

Belmar Business Partnership, Inc. Business Development Committee Belmar Business Partnership, Inc. Business Development Committee Façade Improvement and Renovation Grant Program 2017 To encourage existing businesses to improve the appearance of their place of business,

More information

Request for Proposal No. RFP Consultant Services. for. Building Condition Assessment. Submittal Deadline: Date: March 1, Time: 10:00 a.m.

Request for Proposal No. RFP Consultant Services. for. Building Condition Assessment. Submittal Deadline: Date: March 1, Time: 10:00 a.m. Seattle Public Schools Contracting Services 2445 Third Avenue South Seattle, WA 98134 Telephone: (206) 252-0566 Fax: (206) 743-3018 contractingservices@seattleschools.org Request for Proposal No. RFP01838

More information

BOOKLET ON RECERTIFICATION MAINTENANCE OF CERTIFICATION

BOOKLET ON RECERTIFICATION MAINTENANCE OF CERTIFICATION THE AMERICAN BOARD OF SURGERY BOOKLET ON RECERTIFICATION AND MAINTENANCE OF CERTIFICATION The Booklet on Recertification and Maintenance of Certification (MOC) is published by the American Board of Surgery

More information

Google Capture the Flag 2018 Official Rules

Google Capture the Flag 2018 Official Rules Google Capture the Flag 2018 Official Rules NO PURCHASE NECESSARY TO ENTER OR WIN. VOID WHERE PROHIBITED. CONTEST IS OPEN TO RESIDENTS OF THE 50 UNITED STATES, THE DISTRICT OF COLUMBIA AND WORLDWIDE, EXCEPT

More information

Our Terms of Use and other areas of our Sites provide guidelines ("Guidelines") and rules and regulations ("Rules") in connection with OUEBB.

Our Terms of Use and other areas of our Sites provide guidelines (Guidelines) and rules and regulations (Rules) in connection with OUEBB. OUE Beauty Bar - Terms of Use These are the terms of use ("Terms of Use") governing the purchase of products in the vending machine(s) installed by Alkas Realty Pte Ltd at OUE Downtown Gallery, known as

More information

RULES AND REGULATIONS OF THE AMERICAN BOARD OF QUALITY ASSURANCE AND UTILIZATION REVIEW PHYSICIANS, INC.

RULES AND REGULATIONS OF THE AMERICAN BOARD OF QUALITY ASSURANCE AND UTILIZATION REVIEW PHYSICIANS, INC. RULES AND REGULATIONS OF THE AMERICAN BOARD OF QUALITY ASSURANCE AND UTILIZATION REVIEW PHYSICIANS, INC. Health Care Quality and Management (HCQM) Certification and Diplomate Status Certification in Health

More information

REQUEST FOR PROPOSAL DESIGN BUILD PUBLIC WORKS BUILDING. March 2017

REQUEST FOR PROPOSAL DESIGN BUILD PUBLIC WORKS BUILDING. March 2017 REQUEST FOR PROPOSAL DESIGN BUILD PUBLIC WORKS BUILDING The City of Alabaster is currently accepting proposals for Design Build Services for the design and construction of a new public works facility to

More information

Important: Please read these rules before entering this contest (the "Contest").

Important: Please read these rules before entering this contest (the Contest). Photo Contest Rules June 6, 2014 Fishful Thinker LLC PHOTO CONTEST OFFICIAL RULES Important: Please read these rules before entering this contest (the "Contest"). By participating in this Contest, you

More information

ENERGY AUDITS & RETRO-COMMISSIONING LOCAL LAW 87 OF 2009 Compliance Checklist & User s Guide

ENERGY AUDITS & RETRO-COMMISSIONING LOCAL LAW 87 OF 2009 Compliance Checklist & User s Guide ENERGY AUDITS & RETRO-COMMISSIONING LOCAL LAW 87 OF 2009 Compliance Checklist & User s Guide February 20, 2013 Version 5.0 This document is intended to help real estate owners and property managers comply

More information

Participant Handbook

Participant Handbook Participant Handbook Advanced Practical Pathology Program March, 2016 2016 College of American Pathologists. All rights reserved. TABLE OF CONTENTS Overview 3 Program Purpose 4 Program Development 5 AP

More information

Ch. 79 FIREARM EDUCATION COMMISSION CHAPTER 79. COUNTY PROBATION AND PAROLE OFFICERS FIREARM EDUCATION AND TRAINING COMMISSION

Ch. 79 FIREARM EDUCATION COMMISSION CHAPTER 79. COUNTY PROBATION AND PAROLE OFFICERS FIREARM EDUCATION AND TRAINING COMMISSION Ch. 79 FIREARM EDUCATION COMMISSION 37 79.1 CHAPTER 79. COUNTY PROBATION AND PAROLE OFFICERS FIREARM EDUCATION AND TRAINING COMMISSION Sec. 79.1. Scope. 79.2. Definitions. 79.3. Enrollment. GENERAL PROVISIONS

More information

Congress required the Secretary of DOT to prescribe regulations to establish a program requiring the certification of railroad train conductors.

Congress required the Secretary of DOT to prescribe regulations to establish a program requiring the certification of railroad train conductors. FRA_RRS_ OP_2012 Congress required the Secretary of DOT to prescribe regulations to establish a program requiring the certification of railroad train conductors. This authority was delegated to the Federal

More information

I Love My Community Summer Photo Contest OFFICIAL CONTEST RULES

I Love My Community Summer Photo Contest OFFICIAL CONTEST RULES I Love My Community Summer Photo Contest OFFICIAL CONTEST RULES NO PURCHASE OR PAYMENT NECESSARY TO ENTER OR TO WIN. A PURCHASE WILL NOT IMPROVE YOUR CHANCES OF WINNING. VOID WHERE PROHIBITED. SPONSOR:

More information

REQUEST FOR DEVELOPMENT PROPOSALS

REQUEST FOR DEVELOPMENT PROPOSALS REQUEST FOR DEVELOPMENT PROPOSALS SITE 8 INDUSTRY DRIVE PITTSBURGH INTERNATIONAL AIRPORT ALLEGHENY COUNTY, PENNSYLVANIA SEPTEMBER 2017 I. SCHEDULE Request for Development Proposals September 12, 2017 -

More information

Suffolk COUNTY COMMUNITY COLLEGE PROCUREMENT POLICY

Suffolk COUNTY COMMUNITY COLLEGE PROCUREMENT POLICY Suffolk COUNTY COMMUNITY COLLEGE PROCUREMENT POLICY A. INTENT Community colleges must procure commodities and services in accordance with Article 5-A of the New York State General Municipal Law. This law

More information

The Chevron-Marketer Miami-Dade Fuel Your School Promotion Miami-Dade County in Florida

The Chevron-Marketer Miami-Dade Fuel Your School Promotion Miami-Dade County in Florida The Chevron-Marketer Miami-Dade Fuel Your School Promotion Miami-Dade County in Florida 1. Agreement and Use By accessing and using the www.fuelyourschool.com/miami-dadecounty website and its contents,

More information

City of Jacksonville, Alabama Public Square Overlay District. Façade Improvement Program APPLICATION AND AGREEMENT

City of Jacksonville, Alabama Public Square Overlay District. Façade Improvement Program APPLICATION AND AGREEMENT City of Jacksonville, Alabama Public Square Overlay District Façade Improvement Program APPLICATION AND AGREEMENT The following includes the Façade Improvement Program Description, Grant Application and

More information

Request for Proposal

Request for Proposal Consolidated Edison Company of New York, Inc. Request for Proposal Non-Wires Solutions to Provide Demand Side Management for Subtransmission and Distribution System Load Relief Newtown Substation Project

More information

Blue Jeans Go Green UltraTouch Denim Insulation Grant Program OFFICIAL GRANT APPLICATION GUIDELINES

Blue Jeans Go Green UltraTouch Denim Insulation Grant Program OFFICIAL GRANT APPLICATION GUIDELINES Blue Jeans Go Green UltraTouch Denim Insulation Grant Program OFFICIAL GRANT APPLICATION GUIDELINES The Blue Jeans Go Green UltraTouch Denim Insulation Grant Program ("Grant Program") provides UltraTouch

More information

2018 Developer Handbook

2018 Developer Handbook 2018 Developer Handbook This handbook will guide you through the four step development review process in the City of Arvada. You will find detailed information, helpful hints, resources, and answers to

More information

Energy Efficiency Programs Process and Impact Evaluation

Energy Efficiency Programs Process and Impact Evaluation Energy Efficiency Programs Process and Impact Evaluation Issued: 4/3/2018 Questions Due: 4/17/2018 Responses Due: 5/18/2018 RFP Coordinator: Rob Ward *This RFP process will be conducted via Idaho Power

More information

REQUEST FOR PROPOSALS RFP# CAFTB

REQUEST FOR PROPOSALS RFP# CAFTB REQUEST FOR PROPOSALS RFP# CAFTB25092017-01 THE CHILDREN S AID FOUNDATION OF THE DISTRICT OF THUNDER BAY WEBSITE REDESIGN/DEVELOPMENT Issue Date: 25 September 2017 Closing Date: 20 October 2017 Submit

More information

Giant Tiger s Home for the Holidays Christmas Contest Official Rules

Giant Tiger s Home for the Holidays Christmas Contest Official Rules Giant Tiger s Home for the Holidays Christmas Contest 2017 Official Rules 1. NO PURCHASE OR PAYMENT NECESSARY TO ENTER OR WIN. A PURCHASE OR PAYMENT OF ANY KIND WILL NOT INCREASE YOUR CHANCES OF WINNING.

More information

IAF Guidance on the Application of ISO/IEC Guide 61:1996

IAF Guidance on the Application of ISO/IEC Guide 61:1996 IAF Guidance Document IAF Guidance on the Application of ISO/IEC Guide 61:1996 General Requirements for Assessment and Accreditation of Certification/Registration Bodies Issue 3, Version 3 (IAF GD 1:2003)

More information

Request for Quotes (RFQ) for Quality Assurance & Quality Control Services for Photogrammetric Base Map Update

Request for Quotes (RFQ) for Quality Assurance & Quality Control Services for Photogrammetric Base Map Update . GIS Manager 305 Michaelian Office Building White Plains, NY 10601 Request for Quotes (RFQ) for Quality Assurance & Quality Control Services for Photogrammetric Base Map Update Westchester County, New

More information

BULLETIN NO. 2. Planning Department Priority Application Processing Guidelines PLANNING DIRECTOR.

BULLETIN NO. 2. Planning Department Priority Application Processing Guidelines PLANNING DIRECTOR. PLANNING DIRECTOR Planning Department Priority Application Processing Guidelines This Bulletin provides guidelines to ensure that no preferential treatment is given to applications excepting those that

More information

COUNTY OF DUNN, WISCONSIN REQUEST FOR PROPOSALS PROCUREMENT NO CSB CONSTRUCTION MANAGEMENT SERVICES

COUNTY OF DUNN, WISCONSIN REQUEST FOR PROPOSALS PROCUREMENT NO CSB CONSTRUCTION MANAGEMENT SERVICES COUNTY OF DUNN, WISCONSIN REQUEST FOR PROPOSALS PROCUREMENT NO. 2018-19-CSB CONSTRUCTION MANAGEMENT SERVICES The County of Dunn is requesting proposals for Construction Management Services. The services

More information

Commercial White Box Grant Program

Commercial White Box Grant Program Commercial White Box Grant Program City of Racine 730 Washington Ave. Program Contact: Ken Plaski Chief Building Official (262) 636-9161 The White Box Program is targeted to currently vacant, first-floor

More information

COMMUNITY HOWARD REGIONAL HEALTH KOKOMO, INDIANA. Medical Staff Policy POLICY #4. APPOINTMENT, REAPPOINTMENT AND CREDENTIALING POLICY

COMMUNITY HOWARD REGIONAL HEALTH KOKOMO, INDIANA. Medical Staff Policy POLICY #4. APPOINTMENT, REAPPOINTMENT AND CREDENTIALING POLICY COMMUNITY HOWARD REGIONAL HEALTH KOKOMO, INDIANA Medical Staff Policy POLICY #4. APPOINTMENT, REAPPOINTMENT AND CREDENTIALING POLICY 1.1 PURPOSE The purpose of this Policy is to set forth the criteria

More information

Home Energy Saving scheme. Application Guide Version 1.1

Home Energy Saving scheme. Application Guide Version 1.1 Home Energy Saving scheme Application Guide Version 1.1 IMPORTANT NOTICE It is the responsibility of each applicant to the Home Energy Saving scheme to ensure that they have read, and fully understand,

More information

Design Tool Kit. Moving Day T-Shirt Contest Moving Day Contest Guidelines & Regulations

Design Tool Kit. Moving Day T-Shirt Contest Moving Day Contest Guidelines & Regulations Design Tool Kit Moving Day T-Shirt Contest 2014 Moving Day Contest Guidelines & Regulations Table of Contents Deadlines & Submissions.. 03 Past Shirt Design Examples.. 04 Design Guidelines 05 Judging &

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL September 16, 2009 REQUEST FOR PROPOSAL CONSULTING SERVICES FOR THE ESTABLISHMENT OF STORMWATER UTILITY Sealed proposals will be received in the Purchasing Division on Friday, November 6, 2009 prior to

More information

#AcneFreeLife Sweepstakes Official Rules:

#AcneFreeLife Sweepstakes Official Rules: #AcneFreeLife Sweepstakes Official Rules: NO PURCHASE IS NECESSARY TO ENTER OR WIN. A PURCHASE DOES NOT INCREASE THE CHANCES OF WINNING. 1. INTRODUCTION: During the period beginning at 12:00:00 PM Eastern

More information

Request for Proposal

Request for Proposal Consolidated Edison Company of New York, Inc. Request for Proposal Non-Wires Solutions to Provide Demand Side Management for Subtransmission and Distribution System Load Relief West 42 nd Street Load Transfer

More information

1. TIMING: The Contest starts on September 17, 2014 at 12:00:00 A.M. EDT and ends on December 5, 2014 at 11:59:59 P.M. ("Entry Period").

1. TIMING: The Contest starts on September 17, 2014 at 12:00:00 A.M. EDT and ends on December 5, 2014 at 11:59:59 P.M. (Entry Period). Freedom Funnies Comic Strip Contest Official Rules NO PURCHASE OR PAYMENT IS NECESSARY TO ENTER OR WIN Sponsor: American Civil Liberties Union Foundation, Inc. 125 Broad Street, 18 th Floor, New York,

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS TO MANAGE, OPERATE, AND MAINTAIN THE MOBILE CONVENTION CENTER IN MOBILE, ALABAMA DEADLINE: August 1, 2008 City of MOBILE Government Plaza 205 Government Street Mobile, Alabama 36602

More information

SmartStart Buildings Program Performance Lighting Application FY18 July 1, 2017 June 30, 2018

SmartStart Buildings Program Performance Lighting Application FY18 July 1, 2017 June 30, 2018 SmartStart Buildings Program Performance Lighting Application FY18 July 1, 2017 June 30, 2018 MEASURE DESCRIPTION Performance Lighting incentives are available for installation of new lighting in groundup

More information

Culture Projects Grant Program

Culture Projects Grant Program 2019 Guidelines Culture Projects Grant Program Grant applications are due Friday, October 12, 2018 by 4:30 PM Due Date: Friday, October 12, 1, 2018 by 4:30pm Table of Contents Program Purpose..........

More information

Solar Photovoltaic. Standard Offer Program (SVPSOP) 2018 Program Manual. Rev # Final

Solar Photovoltaic. Standard Offer Program (SVPSOP) 2018 Program Manual. Rev # Final Solar Photovoltaic Standard Offer Program (SVPSOP) 2018 Program Manual Rev # Final CONTENTS 1 Introduction... 3 2 Program Overview... 3 3 Solar Photovoltaic Standard Offer Program... 3 3.1 Program Options...

More information

URBAN DEVELOPMENT CORPORATION INFORMATION MEMORANDUM GREEN GROTTO CAVES VIDEO AND PHOTOGRAPHY

URBAN DEVELOPMENT CORPORATION INFORMATION MEMORANDUM GREEN GROTTO CAVES VIDEO AND PHOTOGRAPHY URBAN DEVELOPMENT CORPORATION INFORMATION MEMORANDUM GREEN GROTTO CAVES VIDEO AND PHOTOGRAPHY November 15, 2015 Urban Development Corporation 12 Ocean Boulevard Kingston 1 TABLE OF CONTENTS Request for

More information

Façade Improvement Program

Façade Improvement Program Policy Guidelines for the Façade Improvement Program Neighborhood Economic Development Entrepreneurs Discovering Opportunities Through Neighborhood Revitalization Community Development Department 2008

More information

Spectrum Auction Planning Grant GUIDELINES

Spectrum Auction Planning Grant GUIDELINES Spectrum Auction Planning Grant GUIDELINES APPLICATION DEADLINE: January 31, 2015 OVERVIEW The Corporation for Public Broadcasting ( CPB ) will make matching grants of up to $50,000 to eligible public

More information

ADAPTIVE REUSE & MOTEL REVITALIZATION GRANT PROGRAM

ADAPTIVE REUSE & MOTEL REVITALIZATION GRANT PROGRAM LUNDY S LANE COMMUNITY IMPROVEMENT PLAN ADAPTIVE REUSE & MOTEL REVITALIZATION GRANT PROGRAM PLANNING & DEVELOPMENT BUSINESS DEVELOPMENT 4310 Queen Street, P.O. Box 1023 Niagara Falls, ON L2E 6X5 (905)

More information

INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED

INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED Dear Applicant: Enclosed in this reappointment application for membership to the Guadalupe Regional Medical Center (GRMC) Allied Health Professionals Staff, you will find the following. Allied Health Professional

More information

SOMERSET COUNTY, MARYLAND

SOMERSET COUNTY, MARYLAND SOMERSET COUNTY, MARYLAND REQUEST FOR PROPOSAL ***** ARMORY FEASIBILITY STUDY TO EVALUATE THE CURRENT CONDITIONS OF THE CRISFIELD ARMORY, LOCATED AT 8 EAST MAIN STREET IN THE CITY OF CRISFIELD, MD., INCLUDING

More information

Request for Proposal for Digitizing Document Services and Document Management Solution RFP-DOCMANAGESOLUTION1

Request for Proposal for Digitizing Document Services and Document Management Solution RFP-DOCMANAGESOLUTION1 City of Hinesville 115 East ML King Jr Drive Hinesville, GA 31313 Request for Proposal for Digitizing Document Services and Document Management Solution RFP-DOCMANAGESOLUTION1 Closing Date: December 20,

More information

Version September 2014

Version September 2014 Guide for Grant Agreement Preparation Version 0.3 25 September 2014 Disclaimer: This document is aimed at assisting applicants and beneficiaries for Horizon 2020 funding. Its purpose is to explain the

More information

THE AMERICAN OSTEOPATHIC BOARD OF EMERGENCY MEDICINE APPLICATION FOR CERTIFICATION AND EXAMINATION (TYPE WRITTEN OR LEGIBLY PRINTED)

THE AMERICAN OSTEOPATHIC BOARD OF EMERGENCY MEDICINE APPLICATION FOR CERTIFICATION AND EXAMINATION (TYPE WRITTEN OR LEGIBLY PRINTED) THE AMERICAN OSTEOPATHIC BOARD OF EMERGENCY MEDICINE APPLICATION FOR CERTIFICATION AND EXAMINATION (TYPE WRITTEN OR LEGIBLY PRINTED) I hereby make application to the American Osteopathic Board of Emergency

More information

PPL s Business Energy Efficiency Program Direct Discount for Small Commercial & Industrial

PPL s Business Energy Efficiency Program Direct Discount for Small Commercial & Industrial PPL s Business Energy Efficiency Program Direct Discount for Small Commercial & Industrial 2018 Program Manual PPL Electric Utilities Business Energy Efficiency Program 3 Park Plaza, Suite 101, Wyomissing,

More information

Central Area Community Improvement Plan

Central Area Community Improvement Plan Central Area Community Improvement Plan Facade Improvement Grant Program Application Package Program Guide Application Process Chart Application Form General Administration Provisions Facade Improvement

More information

ARRT Rules and Regulations

ARRT Rules and Regulations ARRT Rules and Regulations Last Revised: September 1, 20156 Published: September 1, 20156 ARTICLE I. CERTIFICATION AND REGISTRATION Section 1.01 General. The American Registry of Radiologic Technologists

More information

AMSP Guidebook. February 2017

AMSP Guidebook. February 2017 AMSP Guidebook This Guidebook provides an overview of the eligibility requirements, available funding, and process for municipalities to participate in the Alberta Municipal Solar Program. February 2017

More information

Navasota Economic Development Corporation

Navasota Economic Development Corporation Navasota Economic Development Corporation Business Improvement Grant Program 200 E. McAlpine P. 936-825-6475 P.O. Box NAVASOTA 910 ECONOMIC DEVELOPMENT CORPORATION BUSINESS IMPROVEMENT GRANT PROGRAM F.

More information

1 Customer and Contact Information

1 Customer and Contact Information Appalachian Power C&I Program Rebate Application Before you start Review the eligibility detail requirements and terms and conditions at the end of this application to verify that you are eligible for

More information

CIP Cyber Security Incident Reporting and Response Planning

CIP Cyber Security Incident Reporting and Response Planning A. Introduction 1. Title: Incident Reporting and Response Planning 2. Number: CIP-008-5 3. Purpose: To mitigate the risk to the reliable operation of the BES as the result of a Incident by specifying incident

More information

Home Energy Saving (HES) scheme - Homeowner Application Form Version 1.0

Home Energy Saving (HES) scheme - Homeowner Application Form Version 1.0 Home Energy Saving (HES) scheme - Homeowner Application Form Version 1.0 Instruction for Completing the Application Form All fields in the form are MANDATORY. Incomplete applications will be returned.

More information

YOUTH SUMMIT 2016 COMPETITION RULES AND REGULATIONS

YOUTH SUMMIT 2016 COMPETITION RULES AND REGULATIONS YOUTH SUMMIT 2016 COMPETITION RULES AND REGULATIONS These Rules and Regulations ( Rules ) for the Youth Summit 2016 Competition (the Competition ) are part of the Terms and Conditions of Use & Privacy

More information

REQUEST FOR PROPOSALS PROFESSIONAL ARCHITECTURAL FIRM FOR DESIGN & CONSTRUCTION MANAGEMENT SERVICES

REQUEST FOR PROPOSALS PROFESSIONAL ARCHITECTURAL FIRM FOR DESIGN & CONSTRUCTION MANAGEMENT SERVICES REQUEST FOR PROPOSALS PROFESSIONAL ARCHITECTURAL FIRM FOR DESIGN & CONSTRUCTION MANAGEMENT SERVICES Prepared By: Ellis County Administration 718 Main Street P.O. Box 720 Hays, KS 67601 Contact: Phillip

More information

BOARD OF FINANCE REQUEST FOR PROPOSALS FOR PROFESSIONAL AUDITING SERVICES

BOARD OF FINANCE REQUEST FOR PROPOSALS FOR PROFESSIONAL AUDITING SERVICES TOWN OF KILLINGWORTH BOARD OF FINANCE REQUEST FOR PROPOSALS FOR PROFESSIONAL AUDITING SERVICES DATE: February 14, 2018 1 I. INTRODUCTION A. General Information The Town of Killingworth is requesting proposals

More information

DALTON PUBLIC SCHOOLS REQUEST FOR PROPOSAL. RFP FY18 Drivers Education RFP

DALTON PUBLIC SCHOOLS REQUEST FOR PROPOSAL. RFP FY18 Drivers Education RFP DALTON PUBLIC SCHOOLS PURCHASING DEPARTMENT REQUEST FOR PROPOSAL FOR RFP FY18 Drivers Education RFP RFP NUMBER (FY18 Drivers Education) ISSUED February 5th, 2018 Request for Proposal To: All Proposers

More information

Energy Efficiency Alberta Residential and Commercial Solar Program Terms and Conditions

Energy Efficiency Alberta Residential and Commercial Solar Program Terms and Conditions Energy Efficiency Alberta Residential and Commercial Solar Program Terms and Conditions Thi Updated: ebook provides an overview of the eligibility Page 1 of 11 requirements, available funding, and process

More information

Provider Rights. As a network provider, you have the right to:

Provider Rights. As a network provider, you have the right to: NETWORK CREDENTIALING AND SANCTIONS ValueOptions program for credentialing and recredentialing providers is designed to comply with national accrediting organization standards as well as local, state and

More information

Home Energy Saving (HES) scheme - Homeowner Application Form Version 10.0

Home Energy Saving (HES) scheme - Homeowner Application Form Version 10.0 Home Energy Saving (HES) scheme - Homeowner Application Form Version 10.0 Instructions for Completing the Application Form All fields in the form are MANDATORY. Incomplete applications will be returned.

More information

BROOKS RUNNING MEDALIST PHOTO CONTEST CONTEST OFFICIAL RULES

BROOKS RUNNING MEDALIST PHOTO CONTEST CONTEST OFFICIAL RULES BROOKS RUNNING MEDALIST PHOTO CONTEST CONTEST OFFICIAL RULES Important: Please read these rules before entering this contest (the "Contest"). By participating in this Contest, you agree to be bound by

More information

MEMBERSHIP AGREEMENT FOR THE ANALYTIC TECHNOLOGY INDUSTRY ROUNDTABLE

MEMBERSHIP AGREEMENT FOR THE ANALYTIC TECHNOLOGY INDUSTRY ROUNDTABLE MEMBERSHIP AGREEMENT FOR THE ANALYTIC TECHNOLOGY INDUSTRY ROUNDTABLE This (hereinafter referred to as the Agreement ) is entered by and among Members (as defined below). Each respective Member is bound

More information

Facilities Condition Assessment

Facilities Condition Assessment Facilities Condition Assessment (O&M 16 018) Date Issued: January 29, 2016 Date Due: Contact: March 3, 2016 at 4:00:00 pm Paul Acosta, Program Manager III paul.acosta@stocktonca.gov City of Stockton Public

More information

REQUEST FOR PROPOSALS. Former Fire Station 47 Site - 24,400 square feet

REQUEST FOR PROPOSALS. Former Fire Station 47 Site - 24,400 square feet REQUEST FOR PROPOSALS City of SeaTac Former Fire Station 47 Site - 24,400 square feet 3215 South 152 nd Street, SeaTac, WA 98188 ISSUE DATE: May 4, 2018 PROPOSALS DUE: June 15, 2018 1. OVERVIEW The City

More information

Request for Proposals City School District of Albany Empire State After-School Program Coordination and Programming June 14, 2017

Request for Proposals City School District of Albany Empire State After-School Program Coordination and Programming June 14, 2017 Request for Proposals City School District of Albany Empire State After-School Program Coordination and Programming June 14, 2017 Attention: Purchasing Agent Address: City School District of Albany 1 Academy

More information

The Upgrade Your Date Contest on 92Q.com

The Upgrade Your Date Contest on 92Q.com The Upgrade Your Date Contest on 92Q.com OFFICIAL CONTEST RULES NO PURCHASE NECESSARY TO ENTER OR WIN. CONTEST DESCRIPTION: The Upgrade Your Date Contest ( Contest ) will begin on January 22, 2018 at 12:00am

More information

Commercial Façade Improvement Grant Program Application Packet

Commercial Façade Improvement Grant Program Application Packet VILLAGE OF GLEN ELLYN Commercial Façade Improvement Grant Program Application Packet Village Manager s Office 535 Duane Street Glen Ellyn, IL 60137 Telephone 630.547.5345 Fax 630.469.8849 X:\Plandev\PLANNING\FORMS\Commercial

More information

Industrial Optimization Program: Feasibility Study

Industrial Optimization Program: Feasibility Study Industrial Optimization Program: Feasibility Study The Feasibility Study is a detailed study of a specific process or system within an industrial facility to fully investigate an opportunity to use natural

More information

Ground Source Heat Pump - July 1, 2016 through June 30, 2017

Ground Source Heat Pump - July 1, 2016 through June 30, 2017 Ground Source Heat Pump - July 1, 2016 through June 30, 2017 Customer Information Company Name (as listed on utility bill) Doing Business as (if applicable) Installation Start Date: Installation Completion

More information

Farm Energy and Agri-Processing Program Terms and Conditions

Farm Energy and Agri-Processing Program Terms and Conditions Farm Energy and Agri-Processing Program Terms and Conditions 1. Purpose The Farm Energy and Agri-Processing Program shares costs with the agriculture and agriprocessing sector on energy efficiency investments.

More information