DOT&E s Targets Overview. Dennis Mischel (Josh Messner) DOT&E - Targets

Size: px
Start display at page:

Download "DOT&E s Targets Overview. Dennis Mischel (Josh Messner) DOT&E - Targets"

Transcription

1 D&E s argets verview Dennis Mischel (Josh Messner) D&E - argets

2 arget rogram Status - hreat Realism - rocurement - ther Submerged Seaborne Ballistic Missile Scoring Anti Radiation Missile Rotary Information perations argets owed Missile Supersonic Asymmetric Full Scale Aerial "Fighter size" FY08 D&E/A&L 5 th Generation Aerial arget Study Draft FY08 Assessment FY08 D&E/A&L Air Navy Force A Improved Year arget New of Re-start Start Cost Improvement Control Model of QF-4 hreat at Study Replacement Burris/Roger D Group rogram Hayes Department of Defense arget rograms Future &E Requirements at Burris Concept Design Roger Hayes/at Burris Electronic Attack & CM Subscale Aerial "Cruise/Utility" Auxiliary Systems Mobile Ground Fixed Ground arget Control Red Critical Issue Yellow Concern Green No Significant Issue

3 arget Management Initiatives FY08 MI rojects D&E Directed 5 th Generation Full Scale Aerial arget arget Control Study Service Executed Navy SLACE CAM Air Force ACM arget ther n-going Efforts Realistic Low Cost arget Navy Subscale Flight Demonstration Common Interface Demonstration Multi-spectral Mobile Ground arget System Less projects but with more SD focus

4 Summary Significant progress within targets in FY07 Start of hreat D program Start of QF-16 program MI rogram Study department-wide issues 5 th Generation arget arget Control Addressing Service issues orpedo targets Mobile ground targets Advanced Cruise Missile (ACM) ARGE?

5

6 Background

7 DoD s Fighter Size arget rogram Current 3 rd Gen th Gen 2018 and Beyond 5 th Gen

8 5 th Generation Full Scale Aerial arget Study DM II Directed Study of required 5 th Generation Requirements Stealth Maneuverability Speed ayloads Report stated an additional study was needed D&E/A&L Study Future test requirements Commercial cost models Affordable prototype? Involvement Air Force (AFA, AFRL, ACC, AAC) Navy (NAVAIR) Cost eam (Air Force and IDA) Industry (Cirrus, Swift, Eclipse, Adam) Report due in March to potentially effect M

9 arget Control Study Defense Science Board Report he ask Force can envision the gradual introduction of common control elements into each range to provide an increasing degree of interoperability, test flexibility, and lower operational costs. rior common control systems have failed Navy Lead DoD Study LEW Warfare Memo Identify joint common elements pen Architecture pen Source Software rotocols and Standards Involvement Air Force, Navy and Army SD (RMC,D, DDRE) Feasibility report due in March

10 arget Management Initiative New Start roject SUBMARINE LAUNCHED CUNERMEASURE EMULAR (SLACE) DESIGN SUDY roject Description: Identify SLACE requirements, design approaches and options, and submarine launch certification requirements Develop SLACE performance specifications Conduct feasibility, cost, and design tradeoff analyses Recommend an optimum SLACE design approach Execute a preliminary system level SLACE design Deliver preliminary system level design package roject Requirement: SLACE vehicles are required to support FY10 EVFR operational test of CBASS torpedo and ARCI sensor systems in the presence of mobile countermeasures ther Sources of Funding: None roposal Endorsement: EVFR will endorse proposal roject Director: Clarence Ching / NUWC Div Keyport / Comm: (360) / clarence.ching@navy.mil / Navy

11 roject Description: Identify Closest oint of Approach (CA) passive measurement requirements Develop CAM mini-array performance specifications Conduct feasibility, cost, and design tradeoff analyses Identify most likely CAM mini-array design approach(es) Design, fabricate, assemble mini-array candidate(s) Bench test/in-water test mini-array candidate performance Identify suitable mini-array candidate(s) that meet CAM performance specs roject Requirement: FY11 Containerized Countermeasure Anti- orpedo passive attack development spiral mandates orpedo roximity Scoring System (SS) passive CA measurement upgrade arget Management Initiative New Start roject CA ASSIVE MEASUREMEN (CAM) MINI-ARRAY ther Sources of Funding: MS $150K NR - $150K otal - $300K roposal Endorsement: MS 415 and NR endorse proposal roject Director: Clarence Ching / NUWC Div Keyport / Comm: (360) / clarence.ching@navy.mil / Navy

12 Director, perational est and Evaluation arget Management Initiative Multi-spectral Mobile Ground arget System (MMGS) System Description and Capabilities Summary For more information, contact: Mr. Joshua Messner D&E arget Resources hone: (703) age <#> 12

13 arget Management Initiative New Start roject? roject Description Feasibility Study to determine if Advanced Cruise Missiles may be retrofitted to become air drone to meet future target requirement New Mission for Advanced Cruise Missile Drone Feasibility Study Robert Dang; inker AFB, 706 MSUS,

14 Defense Science Board 2005 Report on Aerial argets

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 143.612 160.959 162.286 0.000 162.286 165.007 158.842 156.055 157.994 Continuing Continuing

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO COST ($ in Millions) FY 2011 FY 2012 FY 2013 Base FY 2013 OCO FY 2013 Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 157.971 156.297 144.109-144.109 140.097 141.038

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Surface Ship Torpedo Defense FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Surface Ship Torpedo Defense FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Navy DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 Total FY 2013 FY 2014 FY 2015 FY 2016 To Complete Total Total Program Element 57.922

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE D8Z / Prompt Global Strike Capability Development. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE D8Z / Prompt Global Strike Capability Development. Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Office of Secretary Of Defense Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 5: System Development & Demonstration

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February Exhibit R, RDT&E Budget Item Justification: PB 119: Research, Development, Test & Evaluation, / BA : Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions) FY R1 Program Element

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2012 OCO COST ($ in Millions) FY 2010 FY 2011 FY 2012 Base FY 2012 OCO FY 2012 Total FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Total Cost Total Program Element 160.351 162.286 140.231-140.231 151.521 147.426

More information

First Announcement/Call For Papers

First Announcement/Call For Papers AIAA Strategic and Tactical Missile Systems Conference AIAA Missile Sciences Conference Abstract Deadline 30 June 2011 SECRET/U.S. ONLY 24 26 January 2012 Naval Postgraduate School Monterey, California

More information

Differences Between House and Senate FY 2019 NDAA on Major Nuclear Provisions

Differences Between House and Senate FY 2019 NDAA on Major Nuclear Provisions Differences Between House and Senate FY 2019 NDAA on Major Nuclear Provisions Topline President s Request House Approved Senate Approved Department of Defense base budget $617.1 billion $616.7 billion

More information

Rapid Development and Integration of Remote Weapon Systems to Meet Operational Requirements Abstract May 2011

Rapid Development and Integration of Remote Weapon Systems to Meet Operational Requirements Abstract May 2011 Small Arms Air Platform Integration Rapid Development and Integration of Remote Weapon Systems to Meet Operational Requirements Abstract 12109 25-May 2011 Joseph Burkart Crane Division, Naval Surface Warfare

More information

NAVAIR Overview. 30 November 2016 NAVAIR. PRESENTED TO: Radford University. PRESENTED BY: David DeMauro / John Ross

NAVAIR Overview. 30 November 2016 NAVAIR. PRESENTED TO: Radford University. PRESENTED BY: David DeMauro / John Ross NAVAIR Overview PRESENTED TO: Radford University 30 November 2016 PRESENTED BY: David DeMauro / John Ross NAVAIR NOV 2016 Mission NAVAIR's mission is to provide full life-cycle support of naval aviation

More information

DDG 1000 Class Destroyer

DDG 1000 Class Destroyer DDG 1000 Class Destroyer 10 April 2018 Sea Air Space (SAS) DDG 1000 October February 2016 2017 DDG 1001 July February 20162018 DDG 1000 Program Manager, PMS 500 DDG 1002 December October 2016 2017 CAPT

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #10

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #10 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 2: Applied Research COST ($ in Millions) Prior Years FY 2013 FY 2014

More information

UNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2

UNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2 Exhibit R-2 PROGRAM ELEMENT: 0603747N PROGRAM ELEMENT TITLE: UNDERSEA WARFARE ADVANCED TECHNOLOGY COST: (Dollars in Thousands) Project Number & Title FY 2006 Actual FY 2007 FY 2008 FY 2009 FY 2010 FY 2011

More information

US Army Space and Missile Defense Command/US Army Forces Strategic Command (USASMDC/ARSTRAT)

US Army Space and Missile Defense Command/US Army Forces Strategic Command (USASMDC/ARSTRAT) US Army Space and Missile Defense Command/US Army Forces Strategic Command (USASMDC/ARSTRAT) M. Cathy Dickens PARC/Director, Contracting and Acquisition Management Office (CAMO) Acquisition Overview 1

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #211

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #211 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Prior

More information

Rapid Development and Integration of Remote Weapon Systems to Meet Operational Requirements Abstract October 2009

Rapid Development and Integration of Remote Weapon Systems to Meet Operational Requirements Abstract October 2009 Small Arms Air Platform Integration Rapid Development and Integration of Remote Weapon Systems to Meet Operational Requirements Abstract 8851 28-October 2009 Joseph Burkart Crane Division, Naval Surface

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5 Program Element (PE) No. and Name: 0604218N Air/Ocean

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) PE NUMBER: 0604256F PE TITLE: Threat Simulator Development RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) COST ($ In Thousands) FY 1998 Actual FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005

More information

Armed Unmanned Systems

Armed Unmanned Systems Armed Unmanned Systems A Perspective on Navy Needs, Initiatives and Vision Rear Admiral Tim Heely, USN Program Executive Officer Strike Weapons and Unmanned Aviation 10 July 2007 Armed UASs A first time

More information

MISSILE S&T STRATEGIC OVERVIEW

MISSILE S&T STRATEGIC OVERVIEW Presented to: THE SPACE AND MISSILE DEFENSE WORKING GROUP MISSILE S&T STRATEGIC OVERVIEW Distribution Statement A - Approved for Public Release - Distribution Unlimited. Review completed by AMRDEC Public

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Office of Secretary Of Defense DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete Total Total

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: RADAR DEVELOPMENT

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: RADAR DEVELOPMENT Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 Total FY 2013 FY 2014 FY 2015 FY 2016 Army Page 1 of 10 R-1 Line Item #116 To Complete

More information

I n t r o d u c t i o n

I n t r o d u c t i o n The President and the Congress have given me the opportunity to serve as Director, Operational Test and Evaluation for these last two and a half years. I have been honored and humbled to serve in this

More information

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item No. 3 Page 1 of 15

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item No. 3 Page 1 of 15 Exhibit R-2, RDT&E Project Justification May 2009 OPERATIONAL TEST AND EVALUATION, DEFENSE (0460) BUDGET ACTIVITY 6 (RDT&E MANAGEMENT SUPPORT) OPERATIONAL TEST ACTIVITIES AND ANALYSES (OT&A) PROGRAM ELEMENT

More information

Gerry Christeson Test Resource Management Center 20 October 2010

Gerry Christeson Test Resource Management Center 20 October 2010 Building Next Generation Range Capabilities Central Test and Evaluation Investment Program (CTEIP) Gerry Christeson Test Resource Management Center 20 October 2010 1 Test Resource Management Center (TRMC)

More information

A d. e P. nc e. a A. M d. e G. - P h ase 2 - M e d. r the ADF

A d. e P. nc e. a A. M d. e G. - P h ase 2 - M e d. r the ADF AIR6500t Battle Management System sile Defe is M d n a ir A d e -Phase 1 - Join und-bas ro G e g n a R m iu - P h ase 2 - M e d sile Defence fo is M d n a ir A d te istent Integra rs e P d se a B d n a

More information

WEAPONS DEVELOPMENT AND INTEGRATION DIRECTORATE OVERVIEW SPACE AND MISSILE DEFENSE WORKING GROUP 22 SEPTEMBER 2016

WEAPONS DEVELOPMENT AND INTEGRATION DIRECTORATE OVERVIEW SPACE AND MISSILE DEFENSE WORKING GROUP 22 SEPTEMBER 2016 Presented to: SPACE AND MISSILE DEFENSE WORKING GROUP WEAPONS DEVELOPMENT AND INTEGRATION DIRECTORATE OVERVIEW Distribution Statement A - Approved for Public Release - Distribution Unlimited. Review completed

More information

The DoD T&E/S&T Program

The DoD T&E/S&T Program The DoD T&E/S&T Program George Rumford Program Manager Test Resource Management Center Test & Evaluation / Science & Technology Program (TRMC, T&E/S&T) NDIA 11 TH Annual Science & Engineering Technology

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Test & Evaluation Support FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Test & Evaluation Support FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 212 Navy DATE: February 211 COST ($ in Millions) FY 21 FY 211 FY 212 Base PE 65864N: Test & Evaluation Support FY 212 OCO FY 212 Total FY 213 FY 214 FY

More information

ASNE Combat Systems Symposium. Balancing Capability and Capacity

ASNE Combat Systems Symposium. Balancing Capability and Capacity ASNE Combat Systems Symposium Balancing Capability and Capacity RDML Jim Syring, USN Program Executive Officer Integrated Warfare Systems This Brief is provided for Information Only and does not constitute

More information

ARCHIVED REPORT. Submarine Acoustic Warfare Development Archived 12/2002

ARCHIVED REPORT. Submarine Acoustic Warfare Development Archived 12/2002 Electronic Warfare Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 Submarine Acoustic Warfare Development Archived

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Army DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete Total Total Program Element - 2.885

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: ASW Systems Development

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: ASW Systems Development Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Navy DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 Navy Page 1 of 17 R-1 Line Item #30 To Program Element 25.144

More information

SYSTEM DESCRIPTION & CONTRIBUTION TO JOINT VISION

SYSTEM DESCRIPTION & CONTRIBUTION TO JOINT VISION F-22 RAPTOR (ATF) Air Force ACAT ID Program Prime Contractor Total Number of Systems: 339 Lockheed Martin, Boeing, Pratt &Whitney Total Program Cost (TY$): $62.5B Average Flyaway Cost (TY$): $97.9M Full-rate

More information

AGI Technology for EW and AD Dominance

AGI Technology for EW and AD Dominance AGI Technology for EW and AD Dominance Singapore 2015 Content Overview of Air Defense Overview of Electronic Warfare A practical example Value proposition Summary AMD - a multidisciplinary challenge Geography

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE COST ($ in Millions) All Prior FY 2014 Years FY 2012 FY 2013 # Base FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Cost To Complete Total Program Element - 94.303 174.316 149.804-149.804

More information

U.S. Army Space and Missile il Defense Command / Army Forces Strategic Command. Management Office

U.S. Army Space and Missile il Defense Command / Army Forces Strategic Command. Management Office U.S. Army Space and Missile il Defense Command / Army Forces Strategic Command Contracting ti and Acquisition iti Management Office 2 Mission The U.S. Army Space and Missile Defense Command / Army Forces

More information

Annual Automated ISR and Battle Management Symposium

Annual Automated ISR and Battle Management Symposium Defense Strategies Institute professional educational forum: 6th Annual Automated ISR and Battle Management Symposium February 13-14, 2018: Mary M. Gates Learning Center 701 N. Fairfax St. Alexandria,

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Missile Defense Agency Date: February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 3: Advanced Development (ATD) COST ($

More information

Code 85 Weapons Analysis Facility (WAF) Technical Engineering Services Pre-Solicitation Conference

Code 85 Weapons Analysis Facility (WAF) Technical Engineering Services Pre-Solicitation Conference Code 85 Weapons Analysis Facility (WAF) Technical Engineering Services Pre-Solicitation Conference NUWC Division Newport Undersea Collaboration & Technology Outreach Center (UCTOC) June 12, 2014 Agenda

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 213 Base FY 213 OCO FY 213 Total FY 214 FY 215 FY 216 FY 217 Navy Page 1 of 5 R-1 Line

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE J / Joint Integrated Air & Missile Defense Organization (JIAMDO) Prior Years FY 2013 FY 2014

UNCLASSIFIED. R-1 Program Element (Number/Name) PE J / Joint Integrated Air & Missile Defense Organization (JIAMDO) Prior Years FY 2013 FY 2014 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 The Joint Staff Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 6: RDT&E Management Support COST ($ in Millions)

More information

Type: Excalibur Faction: EMF Availability: Common

Type: Excalibur Faction: EMF Availability: Common Dual Missile Pods 4 4 4 4 4 4 Defensive Missile Pod X X X X X X Quad Mini- Missiles X X X X X X X X Type: Excalibur Availability: Common Regular 6 5 / 2 5 2 2 0 0 30 Veteran 6 5 / 2 5 3 2 0 1 33 Specials:

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force Date: February 2015 3600: Research,, Test & Evaluation, Air Force / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2014

More information

BUDGET ITEM JUSTIFICATION SHEET. WEAPONS PROCUREMENT, NAVY/ BA 2 - Other Missiles CLASSIFICATION: UNCLASSIFIED. DATE: P-40 February 2011

BUDGET ITEM JUSTIFICATION SHEET. WEAPONS PROCUREMENT, NAVY/ BA 2 - Other Missiles CLASSIFICATION: UNCLASSIFIED. DATE: P-40 February 2011 III: II I III H : -40 ebruary 2011 II/ II -1 I W, / 2 - ther issiles rogram lement for ode Items: ther elated rogram lements 210100, HWK rior I ase otal o ears ode 2010 2011 2012 2012 2012 2013 2014 2015

More information

NAWCWD Long Range Acquisition Forecast (LRAF) Requirements FY15 FY17

NAWCWD Long Range Acquisition Forecast (LRAF) Requirements FY15 FY17 NAWCWD Long Range Acquisition Forecast (LRAF) Requirements FY15 FY17 Distribution Statement A Approved for public release, distribution is unlimited. File: NAVAIR Brief 1 Weapons Systems Integration and

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Program Element 1.352 8.819 11.265-11.265 4.626 4.769 4.93

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Multi-Service Systems Engineering FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Multi-Service Systems Engineering FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) Total FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Total Cost Total Program Element - 18.901

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) All Prior FY 2014 Years FY 2012 FY 2013 # Base FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

More information

Common Range Integrated Instrumentation System (CRIIS)

Common Range Integrated Instrumentation System (CRIIS) Common Range Integrated Instrumentation System (CRIIS) National Defense Industrial Association 50 th Annual Targets, UAVs & Range Operations Symposium & Exhibition CRIIS Program Overview October 2012 Ms.

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO COST ($ in Millions) Prior Years FY 2014 FY 2015 FY 2016 Base FY 2016 OCO FY 2016 Total FY 2017 FY 2018 FY 2019 FY 2020 Cost To Complete Total Program Element - 146.789 129.723 185.043-185.043 193.011

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Unmanned Combat Air Veh(UCAV) Adv Cp/Proto Dev. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Unmanned Combat Air Veh(UCAV) Adv Cp/Proto Dev. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Navy DATE: February 2010 COST ($ in Millions) FY 2009 Actual Navy Page 1 of 19 FY 2012 FY 2013 FY 2014 FY 2015 To Program Element 266.469 304.907 266.368

More information

AMRDEC. Core Technical Competencies (CTC)

AMRDEC. Core Technical Competencies (CTC) AMRDEC Core Technical Competencies (CTC) AMRDEC PAMPHLET 10-01 15 May 2015 The Aviation and Missile Research Development and Engineering Center The U. S. Army Aviation and Missile Research Development

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Landmine Warfare and Barrier Advanced Technology. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Landmine Warfare and Barrier Advanced Technology. Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element 174.037 11.276 8.610 1.971-1.971

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Military Engineering Advanced Technology

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Military Engineering Advanced Technology Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 Base OCO Total FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Total Cost Total Program

More information

The Navy P-8A Poseidon Aircraft Needs Additional Critical Testing Before the Full-Rate Production Decision

The Navy P-8A Poseidon Aircraft Needs Additional Critical Testing Before the Full-Rate Production Decision Report No. DODIG-2013-088 June 10, 2013 The Navy P-8A Poseidon Aircraft Needs Additional Critical Testing Before the Full-Rate Production Decision This document contains information that may be exempt

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete Total Total Program Element 49.625

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Tomahawk Mssn Planning Ctr. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Tomahawk Mssn Planning Ctr. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Navy DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 Navy Page 1 of 23 FY 2012 FY 2013 FY 2014 FY 2015 To Program Element 17.556 17.077

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, elopment, Test & Evaluation, Navy / BA 7: Operational Systems elopment COST ($ in Millions) Prior Years FY 2014

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Army DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 Army Page 1 of 14 R-1 Line #167 To Program Element - 52.811 20.733

More information

MILITARY STRATEGIC AND TACTICAL RELAY (MILSTAR) SATELLITE SYSTEM

MILITARY STRATEGIC AND TACTICAL RELAY (MILSTAR) SATELLITE SYSTEM MILITARY STRATEGIC AND TACTICAL RELAY (MILSTAR) SATELLITE SYSTEM Air Force ACAT ID Program Prime Contractor Total Number of Systems: 6 satellites Lockheed Martin Total Program Cost (TY$): N/A Average Unit

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4 0603563N/Ship Concept Advanced Design COST ($ in Millions)

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) (+)

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 Total FY 214 FY 215 FY 216 FY 217 To Complete Total Total Program Element - 75.7 122.481-122.481

More information

NOT FOR PUBLICATION UNTIL RELEASED BY THE HOUSE ARMED SERVICES COMMITTEE STATEMENT OF VICE ADMIRAL JOHN J. DONNELLY COMMANDER NAVAL SUBMARINE FORCES

NOT FOR PUBLICATION UNTIL RELEASED BY THE HOUSE ARMED SERVICES COMMITTEE STATEMENT OF VICE ADMIRAL JOHN J. DONNELLY COMMANDER NAVAL SUBMARINE FORCES NOT FOR PUBLICATION UNTIL RELEASED BY THE HOUSE ARMED SERVICES COMMITTEE STATEMENT OF VICE ADMIRAL JOHN J. DONNELLY COMMANDER NAVAL SUBMARINE FORCES AND REAR ADMIRAL CARL V. MAUNEY DIRECTOR OF SUBMARINE

More information

Naval Unmanned Combat Air Vehicle

Naval Unmanned Combat Air Vehicle Naval Unmanned Combat Air Vehicle Advanced Technology Program TTO Tactical Technology Office Dr. William Scheuren DARPA/TTO wscheuren@darpa.mil (703) 696-2321 UCAV-N Vision ❶ Revolutionary New Ship-based

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED (U) COST: (Dollars in Thousands) PROJECT NUMBER & TITLE FY 2000 ACTUAL FY 2001 ESTIMATE FY 2002 ESTIMATE ** ** 83,557 CONT. ** The Science and Technology Program Elements (PEs) were restructured in FY

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED. UNCLASSIFIED R-1 Shopping List No EXHIBIT R-2, RDT&E Budget Item Justification February 2006

UNCLASSIFIED. UNCLASSIFIED R-1 Shopping List No EXHIBIT R-2, RDT&E Budget Item Justification February 2006 EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE REASEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA 7 0204229N, TOMAHAWK & TMPC COST ($ in Millions) FY 2005

More information

1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY

1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY EXHIBIT R-2, FY 2001 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0204229N PROGRAM ELEMENT TITLE: TOMAHAWK AND THEATER MISSION (U) COST: (Dollars in Thousands) FY 1999 FY

More information

Common Range Integrated Instrumentation System (CRIIS)

Common Range Integrated Instrumentation System (CRIIS) Common Range Integrated Instrumentation System (CRIIS) National Defense Industrial Association 49 th Annual Targets, UAVs & Range Operations Symposium & Exhibition CRIIS Program Overview October 2011 Mr.

More information

United States Air Force and Military Aircraft

United States Air Force and Military Aircraft United States Air Force and Military Aircraft US Air Force Mission: Defend the United States through the control and exploitation of air and space. Aim: air dominance United States Air Force Functions:

More information

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 7 R-1 Line #73

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 7 R-1 Line #73 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Office of Secretary Of Defense Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 3: Advanced Technology Development

More information

17 th ITEA Engineering Workshop: System-of-Systems in a 3rd Offset Environment: Way Forward

17 th ITEA Engineering Workshop: System-of-Systems in a 3rd Offset Environment: Way Forward 17 th ITEA Engineering Workshop: System-of-Systems in a 3rd Offset Environment: Way Forward Mr. Paul D. Mann (Acting) Principal Deputy Director Test Resource Management Center January 26, 2017 1 2 TRMC

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Common Data Link Executive Agent (CDL EA) FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Common Data Link Executive Agent (CDL EA) FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 33.896 32.015 43.986-43.986 42.760 41.790

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY

More information

Joint Distributed Engineering Plant (JDEP)

Joint Distributed Engineering Plant (JDEP) Joint Distributed Engineering Plant (JDEP) JDEP Strategy Final Report Dr. Judith S. Dahmann John Tindall The MITRE Corporation March 2001 March 2001 Table of Contents page Executive Summary 1 Introduction

More information

REPORT ON THE IMPACT OF THE SUNZIA SOUTHWEST TRANSMISSION PROJECT ON CURRENT AND FUTURE CAPABILITIES OF WHITE SANDS MISSILE RANGE, NEW MEXICO

REPORT ON THE IMPACT OF THE SUNZIA SOUTHWEST TRANSMISSION PROJECT ON CURRENT AND FUTURE CAPABILITIES OF WHITE SANDS MISSILE RANGE, NEW MEXICO REPORT ON THE IMPACT OF THE SUNZIA SOUTHWEST TRANSMISSION PROJECT ON CURRENT AND FUTURE CAPABILITIES OF WHITE SANDS MISSILE RANGE, NEW MEXICO Pursuant to pages 327-330 of the Joint Explanatory Statement

More information

Test By Trial. The unique 46th Test Group tries out a wide range of weapons systems over the white sands of southern New Mexico.

Test By Trial. The unique 46th Test Group tries out a wide range of weapons systems over the white sands of southern New Mexico. The unique 46th Test Group tries out a wide range of weapons systems over the white sands of southern New Mexico. Test By Trial Staff photo by Guy Aceto 66 AIR FORCE Magazine / August 2004 Photography

More information

FIGHTER DATA LINK (FDL)

FIGHTER DATA LINK (FDL) FIGHTER DATA LINK (FDL) Joint ACAT ID Program (Navy Lead) Prime Contractor Total Number of Systems: 685 Boeing Platform Integration Total Program Cost (TY$): $180M Data Link Solutions FDL Terminal Average

More information

OHIO Replacement. Meeting America s Enduring Requirement for Sea-Based Strategic Deterrence

OHIO Replacement. Meeting America s Enduring Requirement for Sea-Based Strategic Deterrence OHIO Replacement Meeting America s Enduring Requirement for Sea-Based Strategic Deterrence 1 Why Recapitalize Our SSBN Force? As long as these weapons exist, the United States will maintain a safe, secure,

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) Exhibit R-2 0602712A Countermine Systems ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 Total Program Element (PE) Cost 26267 29171 22088 21965

More information

Navy & Marine Corps Vertical Lift: Past and Future

Navy & Marine Corps Vertical Lift: Past and Future Navy & Marine Corps Vertical Lift: Past and Future 22 Oct 2015 Cleared for public release NAVAIR-PEOA-055-2014 1 Presented to: Center for Strategic and International Studies Presented by: Michael Fallon

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete Total Total Program Element - 3.377

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 0.000 35.533

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element 92.713 23.188 31.064 46.007-46.007

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED FY 2001 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2000 BUDGET ACTIVITY: 3 PROGRAM ELEMENT: 0603238N PROGRAM ELEMENT TITLE: Global Surveillance/Precision Strike and Air Defense Technology (U)

More information

ARLEIGH BURKE DESTROYERS. Delaying Procurement of DDG 51 Flight III Ships Would Allow Time to Increase Design Knowledge

ARLEIGH BURKE DESTROYERS. Delaying Procurement of DDG 51 Flight III Ships Would Allow Time to Increase Design Knowledge United States Government Accountability Office Report to Congressional Committees August 2016 ARLEIGH BURKE DESTROYERS Delaying Procurement of DDG 51 Flight III Ships Would Allow Time to Increase Design

More information

ARCHIVED REPORT. For data and forecasts on current programs please visit or call

ARCHIVED REPORT. For data and forecasts on current programs please visit  or call Electronic Systems Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 Outlook Forecast International projects that the

More information

UNCLASSFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7

UNCLASSFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 UNCLASSFIED EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 R-1 ITEM NOMENCLATURE 0204229N, TOMAHAWK & TMPC COST ($ in Millions)

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE COST (In Thousands) FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 214 Navy DATE: April 213 COST ($ in Millions) Years FY 212 FY 213 # ## FY 215 FY 216 FY 217 FY 218 To Program Element 378.884 24.75 19.28 21.729-21.729

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Specialized Undergraduate Pilot Training. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Specialized Undergraduate Pilot Training. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 11.801 10.862

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Office of the Secretary Of Defense Date: February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 6: RDT&E Management Support

More information

Air Force WALEX Applications

Air Force WALEX Applications AIR FORCE WALEX APPLICATIONS Air Force WALEX Applications John F. Keane, Karen Kohri, Donald W. Amann, and Douglas L. Clark Aworkshop was conducted for the Air Force Command and Control (C 2 B) in May

More information

This Product Area Directorate encompasses the following core equities:

This Product Area Directorate encompasses the following core equities: SEAPORTe FUNCTIONAL AREAS The 22 functional areas supported by SeaPort-e are: 3.1 Research & Development Support 3.2 Engineering, System Engineering, & Process Engineering Support 3.3 Modeling, Simulation,

More information