NAVAL POSTGRADUATE SCHOOL

Size: px
Start display at page:

Download "NAVAL POSTGRADUATE SCHOOL"

Transcription

1 NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT Financial Challenges and Responsibilities in the Management of the Navy Flying Hour Program at the Squadron Level By: Murat Sarisen December 2007 Advisors: Lawrence R. Jones Philip Candreva Approved for public release; distribution is unlimited

2 THIS PAGE INTENTIONALLY LEFT BLANK

3 REPORT DOCUMENTATION PAGE Form Approved OMB No Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instruction, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA , and to the Office of Management and Budget, Paperwork Reduction Project ( ) Washington DC AGENCY USE ONLY (Leave blank) 2. REPORT DATE December TITLE AND SUBTITLE: Financial Challenges and Responsibilities in the Management of the Navy Flying Hour Program at the Squadron Level 6. AUTHOR(S): Murat Sarisen 3. REPORT TYPE AND DATES COVERED MBA Professional Report 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) Naval Postgraduate School Monterey, CA SPONSORING /MONITORING AGENCY NAME(S) AND ADDRESS(ES) N / A 8. PERFORMING ORGANIZATION REPORT NUMBER 10. SPONSORING/MONITORING AGENCY REPORT NUMBER 11. SUPPLEMENTARY NOTES The views expressed in this thesis are those of the author and do not reflect the official policy or position of the Department of Defense or the U.S. Government. 12a. DISTRIBUTION / AVAILABILITY STATEMENT Approved for public release; distribution is unlimited 13. ABSTRACT (maximum 200 words) 12b. DISTRIBUTION CODE A There have been numerous graduate research projects written about the Navy Flying Hour Program at the Department of Navy (DoN) level on down the chain of Command to the TYCOM level. But there is no research regarding the FHP in terms of how it is done and its affects and consequences at the squadron level The primary purpose of this professional report is to bring to light the challenges faced by the squadron and the many obstacles that the Material Control Officer (MCO) has to overcome in meeting the demands set by Commander Naval Air Forces (CNAF) regarding the FHP. Due to the level of inexperience of Aviation Maintenance Officers graduating from Aviation Maintenance Officer School (AMO) who are tasked with the responsibilities as the squadron MCO, this professional report will serve as a reference source both at the micro (squadron) and macro (CNAF & DoN) levels of operation to increase understanding of the funds management process and, consequently, to improve such management. 14. SUBJECT TERMS Type Keywords Here Navy Flying Hour Program, Defense Budget, PPBES Process, CNAF, Material Control Officer (MCO), Budget of the United States, Naval Aviation 15. NUMBER OF PAGES PRICE CODE 17. SECURITY CLASSIFICATION OF REPORT Unclassified 18. SECURITY CLASSIFICATION OF THIS PAGE Unclassified 19. SECURITY CLASSIFICATION OF ABSTRACT Unclassified 20. LIMITATION OF ABSTRACT NSN Standard Form 298 (Rev. 2-89) Prescribed by ANSI Std UU i

4 THIS PAGE INTENTIONALLY LEFT BLANK ii

5 Approved for public release; distribution is unlimited FINANCIAL CHALLENGES AND RESPONSIBILITIES IN THE MANAGEMENT OF THE NAVY FLYING HOUR PROGRAM AT THE SQUADRON LEVEL Murat Sarisen, Lieutenant, United States Navy Submitted in partial fulfillment of the requirements for the degree of MASTER OF BUSINESS ADMINISTRATION from the NAVAL POSTGRADUATE SCHOOL December 2007 Author: Murat Sarisen Approved by: Lawrence R. Jones Principal Advisor. Philip Candreva Associate Advisor Robert N. Beck, Dean Graduate School of Business and Public Policy iii

6 THIS PAGE INTENTIONALLY LEFT BLANK iv

7 FINANCIAL CHALLENGES AND RESPONSIBILITIES IN THE MANAGEMENT OF THE NAVY FLYING HOUR PROGRAM AT THE SQUADRON LEVEL ABSTRACT There have been numerous graduate research projects written about the Navy Flying Hour Program (FHP) at the Department of Navy (DoN) level on down the chain of Command to the TYCOM level. But there is no research regarding the FHP in terms of how it is done and its affects and consequences at the squadron level The primary purpose of this professional report is to bring to light the challenges faced by the squadron and the many obstacles that the Material Control Officer (MCO) has to overcome in meeting the demands set by Commander Naval Air Forces (CNAF) regarding the FHP. Due to the level of inexperience of Aviation Maintenance Officers graduating from Aviation Maintenance Officer School (AMO) who are tasked with the responsibilities as the squadron MCO, this professional report will serve as a reference source both at the micro (squadron) and macro (CNAF & DoN) levels of operation to increase understanding of the funds management process and, consequently, to improve such management. v

8 THIS PAGE INTENTIONALLY LEFT BLANK vi

9 TABLE OF CONTENTS I. INTRODUCTION...1 A. BACKGROUND...1 B. PURPOSE...2 C. RESEARCH QUESTIONS...2 D. METHODOLOGY...3 E. CHAPTER OUTLINE...3 II. THE FEDERAL BUDGET, DOD FUNDING AND NAVY FLYING HOUR PROGRAM PROCESS...5 A. INTRODUCTION...5 B. FEDERAL BUDGET...5 C. DOD FUNDING AND THE PPBES PROCESS Planning Programming Budgeting Budget Execution...17 D. OVERVIEW OF THE NAVY FLYING HOUR PROGRAM...19 E. CONCLUSION...23 III. SQUADRON PROCEDURES AND THE MATERIAL CONTROL OFFICER RESPONSIBILITIES...25 A. INTRODUCTION...25 B. MATERIAL CONTROL OFFICER (MCO)...25 C. BUDGET OPTAR REPORT (BOR) NALCOMIS Aircraft Flight Summary Report Flight Hour Comparison with Operations Officer Fuel Automated System (FAS) and Base/Ship Fuel Receipts Summary Filled Order/Expenditure Difference Listing (SFOEDL)...32 D. OPERATIONS OFFICER PLANNING...35 E. CHAPTER SUM MARY...36 IV. CONCLUSION...37 A. INTRODUCTION...37 B. PRIMARY RESEARCH QUESTION...37 C. SECONDARY RESEARCH QUESTION...37 D. CONCLUSION...38 E. SUGGESTIONS FOR FURTHER RESEARCH Tracking of in-flight Fueling Charges Is there any Correlation Between Aircrew Mishap Rate and the Number of Flight hours Provided by the Navy FHP?...39 LIST OF REFERENCES...41 INITIAL DISTRIBUTION LIST...45 vii

10 THIS PAGE INTENTIONALLY LEFT BLANK viii

11 LIST OF FIGURES Figure 1. Where $3 Trillion Dollars Come From (From Brook, 2007a, Slide 7)...7 Figure 2. Where $3 Trillion Dollars Go (From Brook, 2007a, Slide 5)...8 Figure 3. The Budget Process (From Wildavsky & Caiden, 2004, p. 6)...10 Figure 4. Planning Phase Key Actors (From Brook, 2007b, Slide 5)...14 Figure 5. Programming Phase Key Actors (From Brook, 2007b, Slide 6)...15 Figure 6. Budgeting Phase Key actors (From Brook, 2007b, Slide 7)...17 Figure 7. Execution Phase Key Actors (From Brook, 2007b, Slide 8)...18 Figure 8. FY 2006 FHP (From OPNAV N432 Aviation readiness Branch, 2006)...20 Figure 9. FY 2007 DoN Budget (From Department of the Navy FY 2007 President s Budget)...21 Figure 10. FHP Funding Composition (From Jarvis, 2006, p. 17)...22 Figure 11. BOR Template (From VAQ-138 Material Control Division, 2007)...28 Figure 12. NALCOMIS OMA Aircraft Flight Summary Report (From NALCOMIS Print Out, VAQ-138, 2007)...30 Figure 13. Flow of Accounting Data (From NAMP, 2005, Vol. I, p )...34 ix

12 THIS PAGE INTENTIONALLY LEFT BLANK x

13 LIST OF TABLES Table 1. Phases of the PPBES (From Jarvis, 2006, p.13)...19 xi

14 THIS PAGE INTENTIONALLY LEFT BLANK xii

15 ACKNOWLEDGMENTS I would like to thank all the individuals that have contributed to the successful completion of this project. Specifically Professors Larry Jones and Philip Candreva for their direction, guidance and expert advise concerning the Flying Hour Program and the budget process. Commanding Officer of Electronic Attack Squadron 138, Commander John J. Thompson for allowing me the opportunity to conduct the research at my former squadron and all the Yellow Jackets who took the time out of their busy day to answer all of my questions. I also would to thank Professor Doug Brook for his help and assistance throughout the numerous occasions when I showed up at his office. Finally, I want to thank my family and friends for their tremendous support and constant encouragement throughout this overwhelming task. xiii

16 THIS PAGE INTENTIONALLY LEFT BLANK xiv

17 I. INTRODUCTION A. BACKGROUND Where are the carriers? has been a question that is synonymous with every American President since Franklin Delano Roosevelt when faced with a developing international crisis that involves United States interest (Clancy, 1999, p. xi). In the second half of the 20 th century, the aircraft carrier became a symbol of the U.S. position as a superpower. These massive ships had been essential to Allied victory in the Pacific during World War II, but afterward, they began to find a new important role as the forward military presence of the U.S., arriving first on the scene of trouble. Since 1946, when the USS Roosevelt was sent to Greece to symbolize support for the Pro-Western side during Greece s Civil War against the Communists, the carrier has shown up to warn potential enemies that America is watching. Former President Bill Clinton honored the carrier s importance when he said, when word of crisis breaks out in Washington, it s no accident the first question that comes to everyone s lips is: where is the nearest carrier? Providing forward presence, the aircraft carrier remains an extremely important part of America s power and image (Feltus, 2003, p. 1). This quote from the U.S. Centennial Flight Commission essay sums up and highlights the importance of the aircraft carrier to U.S. National Security, Policy and Diplomacy. The reason the aircraft carrier is such a formidable force is because carrier aviation is inextricably tied to the concept of U.S. forward presence and power projection; the From the Sea doctrine (Clancy, 1999, p. xiii). Carrier aviation is made up of a fleet of Navy squadrons that constitutes the carrier airwing. Each squadron operates on its own allotted budget granted on a quarterly basis from their Air Type Commanders (TYCOMs); Commander Naval Air Forces Pacific (CNAP) for West coast squadrons and Atlantic (CNAL) for East coast squadrons. The TYCOMs use the Navy Flying Hour Program (FHP) to operate, maintain, and deploy aviation forces that support the National Military Strategy (NMS). The FHP is funded through the Operation & Maintenance, Navy (O&M, N) appropriation to fund the 1

18 day-to-day operational activities or air operations, organizational and intermediate level maintenance, institutional training, unit training and operational training, and engineering and logistic support (OSD DoN Fiscal Year 2008/2009 O&M, N, 2007). To ensure proper reporting of squadron expenditures, the TYCOMs require monthly Budget Operating Reports (BOR) to be complied and submitted via naval message traffic for accounting purposes. At the squadron level this task is the responsibility of the Material Control Officer (MCO). B. PURPOSE There have been numerous graduate research projects written about the Navy Flying Hour Program at the Department of Navy (DoN) level on down the chain of Command to the TYCOM level. But there is no research regarding the FHP in terms of how it is done and its affects and consequences at the squadron level The primary purpose of this professional report is to bring to light the challenges faced by the squadron and the many obstacles that the Material Control Officer (MCO) has to overcome in meeting the demands set by Commander Naval Air Forces (CNAF) regarding the FHP. Due to the level of inexperience of Aviation Maintenance Officers graduating from Aviation Maintenance Officer School (AMO) who are tasked with the responsibilities as the squadron MCO, this professional report will serve as a reference source both at the micro (squadron) and macro (CNAF & DoN) levels of operation to increase understanding of the funds management process and, consequently, to improve such management C. RESEARCH QUESTIONS This project addresses the following research questions: 1. Primary Research Question What is the squadron s role and responsibilities regarding the Navy Flying Hour Program? 2

19 2. Secondary Research Questions What are the responsibilities and primary tasks of the squadrons Material Control Officer related to financial management and management of the FHP? D. METHODOLOGY The primary source of data collection for this study was through interviews with various members assigned to Electronic Attack Squadron 138 (VAQ-138). These included the current MCO, Operations Officer and enlisted supply personnel assigned to the Material Control division. The remainder of data was collected through the review of numerous publications on the Navy FHP, U.S. Budget procedures and processes, Navy and Government reports, Navy instructions, Naval Postgraduate School Thesis and other related research papers and articles. E. CHAPTER OUTLINE This MBA Professional Report contains four chapters. Chapter I presents the background and purpose along with research questions and methodology. Chapter II provides the procedures and processes of the U.S. Federal Government Budget process, Department of Defense (DoD) funding to include the Planning, Programming, Budgeting, and Execution System (PPBES) and the Navy Flying Hour Program. Chapter III provides an analysis of squadron procedures in meeting the demands of the FHP with emphasis on the responsibilities of the MCO. Chapter IV answers the project research questions presented in chapter I of the report and provides a recommended topic for further research. 3

20 THIS PAGE INTENTIONALLY LEFT BLANK 4

21 II. THE FEDERAL BUDGET, DOD FUNDING AND NAVY FLYING HOUR PROGRAM PROCESS A. INTRODUCTION The Material Control Officer (MCO) having been tasked with the squadron s financial responsibilities should have an understanding of how funds are allocated to the squadron. A macro-view of the federal government budget process, DoD funding process and CNAF (command in charge of the Navy FHP) procedures is advantageous and beneficial in the day-to-day activities of the MCO. This chapter will briefly describe and highlight the process and procedures of the federal government budget, DoD funding and the Navy FHP. How a Navy squadron receives funding from the President s budget on down will be reviewed and explained to better understand the importance of the squadron s financial procedures and the regulations they have to abide by. B. FEDERAL BUDGET Keith and Schick (2003, p. ix) in their book titled, The Federal Budget Process, state that budgeting for the federal government is an enormously complex process entailing dozens of sub processes, countless rules and procedures, the efforts of tens of thousands of staff persons in the executive and legislative branches, millions of work hours each year and the active participation of the President and congressional leaders along with other members of congress and executive officials. No matter how difficult the choices or how uncertain the outlook, the president must submit a budget and Congress must make appropriations (Schick, 2000, p. 1). The federal budget process ends each year with the submission of the Presidents annual budget, officially known as the Budget of the United States Government, to Congress on the first Monday in February but actually begins in the spring of the previous year with the formulation of budget estimates by each government agency. The executive budget estimates spending, revenues, and other financial amounts for the next five or more fiscal years, contains policy and legislative recommendations consistent with 5

22 those estimates, presents data on the actual and projected performance of the economy, and provides detailed information on the finance of federal agencies and programs (Schick, 2000, p. 74). However, the executive budget submitted to Congress is only a request on how the budget should be executed. Each part of the President s budget is broken down and scrutinized by Congress through committees and sub-committees in both the House and Senate as depicted in Figure 3. At the end of the Congressional process the Budget Appropriations Bill is passed sending the Bill to the President for his signature, making the bill law. The President s budget is compiled and executed by the Office of Management and Budget (OMB), previously known as the Bureau of the Budget established by the Budget and Accounting Act of The basic requirement of the Budget and Accounting Act is that the President prepares and submits a budget to Congress each year and OMB assists the President in preparing and implementing the executive budget (Keith & Schick, 2003, p. 47). In the executive branch, OMB is the hub of the federal budget process. Its chief mission is to assist the President by overseeing the preparation of the budget and its submission to Congress, and to supervise its administrative and implementation by the executive agencies. In doing so, OMB helps set funding priorities, assesses competing funding demands among agencies, and evaluates the effectiveness of agency programs. OMB seeks to ensure that the legislative proposals and congressional testimony of agencies, as well as agency reports and rules, are consistent with the President s budget recommendations and administrative policies (Keith & Schick, 2003, p. 48). Government agencies receive instructions and guidance from OMB through publications in the form of Circulars, Bulletins, Regulations and Paperwork, Financial Management Policies and Federal Register Submissions. OMB and government agency procedures are broken down as follows: OMB Circular A-11 is the Budget Preparation Instruction OMB Guidance Letter to Agencies (Winter) Agencies begin Budget Development (Spring) OMB Agency Policy Direction, Hearings and Negotiations (Summer) 6

23 Agencies Submit Budget Request (Fall) OMB Review and Pass Back (November-December) Final Budget Development, Agency Appeals, New Policy Developments (December-January) President s Budget Submitted to Congress (Brook, 2007a, Slide 24). The nearly $3 trillion dollar budget of the United States is broken down as Figures 2 & 3 depict just how federal revenue is gained and federal outlays or spending is accomplished. Figure 1. Where $3 Trillion Dollars Come From (From Brook, 2007a, Slide 7) 7

24 Where $3 Trillion Dollars Come Figure 2. Where $3 Trillion Dollars Go (From Brook, 2007a, Slide 5) The founding fathers of the United States Constitution formed three independent branches of government, the Executive, Legislative, and the Judicial Branch. Their objective was two fold, first the separation of powers was designed to restrain the power of any one branch. Second was to ensure that cooperation would be necessary for effective government (Oleszek, 1996, p. 2). Due to this separation of powers they gave Power of the Purse to Congress as stated in Article 1, Section 9 of the U.S. Constitution; No money shall be drawn from the Treasury, but in Consequence of Appropriations made by law; and a regular Statement and Account of the Receipts and Expenditures of all public money shall be published from time to time; forcing checks and balances between the branches of government and by nature, delaying the budget process. 8

25 Once the President s budget is submitted, Congress, through committees and subcommittees examines the Presidents budget in its entirety and never appropriates the Presidents budget as it is due to the checks and balances between the two branches of government, and the Power of the Purse given to Congress. Congress then writes separate authorization and appropriation bills that may include substantial changes to what the President proposed, votes to approve these huge bills (typically there are 13 separate appropriation bills alone) and sends them to the President for his signature or veto (McCaffery & Jones, 2004, p. 31). Legislative products that affect the budget as depicted in Figure 3 are the following (McCaffery & Jones, 2004, p ): 9

26 Figure 3. The Budget Process (From Wildavsky & Caiden, 2004, p. 6) 10

27 Concurrent Resolution on the Budget: The budget resolution sets aggregate spending and taxing totals and estimates the resulting deficit and surplus. The budget resolution is a plan; once it is adopted, Congress tries to stick to it through a scorekeeping mechanism. The appropriation committees take the amounts allotted to them by the budget resolution and divide them up among the subcommittees that produce appropriation bills. The rules of Congress call for the budget resolution to be reported out of the Senate budget committee by 1 April and to be passed by both chambers by 15 April, though it rarely is. Reconciliation Bills: A reconciliation instruction may be added to the budget resolution to affect tax or mandatory spending changes. When this is done, it results in a reconciliation bill drafted by various committees at the direction of the budget committee and submitted to Congress by the Budget Committees. Appropriation Bills: Discretionary spending for the federal government is provided by 13 annual appropriation bills, including the defense appropriation bill and the military construction bill. Continuing Resolution Appropriation (CRA): When a new appropriation has been passed and the fiscal year is about to begin, Congress passes a CRA to cover the gap. The CRA provides agencies with budget authority to operate in the interim. The amount of money provided may be the current rate or an amount set in a bill passed by one of the chamber or one committee in one chamber. Authorization Bills: Authorization Bills create programs. They establish the department and its mission and any changes to it. An authorization bill does not make money available; only appropriation bill does this. Supplementals: Supplemental appropriations occur when emergency needs dictate, for natural disasters and for defense needs, such as the $48 billion supplemental passed after September 11,

28 Once the President signs the appropriation bill, OMB apportions funds to the individual departmental agencies who then allot further on down to their subunits which in turn allocate appropriated funds to lower administrative levels, i.e., OMB apportions funds to DoD who allots funds to the Chief of Naval Operations (CNO) who then allocates funds to CNAF for the FHP. C. DOD FUNDING AND THE PPBES PROCESS This section briefly addresses the DoD funding procedures and the PPBES process to better understand how funding is eventually provided for the Navy FHP. The budget that the President sends to Congress on the First Monday in February contains the DoD budget that the Office of the Secretary of Defense (OSD) and OMB worked together to review before including it in the Presidents budget. OMB staff work at the Pentagon and are involved not only in the budget review, but also in development and review of program structure in the Program Objective Memorandum (POM) phase of the PPBES process where resource planners decide what program structure needs to be maintained, improved, created, or deemphasized to meet changes in the threat (McCaffery & Jones, 2004, p. 6). The defense budget is, in its entirety, to big for OMB to review alone and requires the assistance of OSD before implementing the defense budget in the Presidents budget to Congress. The DoD utilizes the Planning, Programming, Budgeting and Execution System (PPBES) to articulate strategy, set programming priorities, and allocate resources (Jarvis, 2006, p. 7). The PPBES process is complex, confusing and can best be described by the following quote by President Ronald Reagan: We start by considering what must be done to maintain peace and review all the possible threats against our security. Then a strategy for strengthening peace and defending against those threats must be agreed upon. And, finally, our defense establishment must be evaluated to see what is necessary to protect against any or all of the potential threats. The cost of achieving these ends is totaled up, and the result is the budget for national defense (Brook, 2007c, slide 21). 12

29 The purpose of PPBES is to provide a systematic and structured approach allocating resources in support of the national security strategy of the U.S. The ultimate goal of the entire PPBES process is to provide the military Commanders in Chief with the best mix of forces, equipment, and support attainable within resource constraints (McCaffery & Jones, 2004, p. 97). 1. Planning The planning phase begins with the National Security Strategy (NSS) developed by the executive branch where the National Defense Strategy (NDS) is outlined. The National Military Strategy Document (NMSD) is produced by the Joint Chiefs of Staff (JCS) on how to fulfill the executive branches NSS along with producing the Chairman s Program Recommendation (CPR) as a follow up to the NMSD for the Secretary of Defense (SecDef). The Defense Planning Guide (DPG); a map for the military to produce their respective Program Objective Memorandum (POM), and the Future Year Defense Plan (FYDP); a six year projection of department wide force structure requirements; is ultimately drafted and issued by the SecDef (McCaffery & Jones, 2004, p. 98). Figure 5 below depicts the key departments or actors involved in the DoN Planning Phase. 13

30 SECDEF OMB JCS SECNAV CNO ASN(FM&C) N1 N3/5 N4 N6/7 N8 BSO N80 N81 N82 FMB FMO Field Activity / Program Office Planning -Key Actors Figure 4. Planning Phase Key Actors (From Brook, 2007b, Slide 5) 2. Programming The programming phase is where each military component produces a POM to address the allocation of resources over the six year FYDP period while meeting the requirements of the DPG within the financial limitations set by OSD. Military department and service POMs are reviewed by JCS to ensure compliance with the NMSD and DPG, assessing force levels, balance, and capabilities. Following the review, Chairman of the Joint Chiefs of Staff (CJCS) issues the Chairman s Program Assessment (CPA) to influence the SecDef decisions delineated in the Program Decision 14

31 Memorandum (PDM) marking the end of the programming phase (McCaffery & Jones, 2004, p. 100). Figure 6 below depicts the key departments or actors involved in the DoN programming phase. SECDEF OMB JCS SECNAV CNO ASN(FM&C) N1 N3/5 N4 N6/7 N8 BSO N80 N81 N82 FMB FMO Field Activity / Program Office Programming - Key Actors Figure 5. Programming Phase Key Actors (From Brook, 2007b, Slide 6) 3. Budgeting The budgeting phase begins with the approved programs in each military service POM where each military component costs out the items that support its POM for the budget year and submits its part of the budget as its Budget Estimate Submission (BES). Every BES is reviewed by military secretaries under the authority of the military department secretaries which are then reviewed by DoD Comptroller, other OSD 15

32 officials, the JCS, and ultimately by the Deputy and Secretary of Defense (McCaffery & Jones, 2004, p. 101). These reviews are conducted so that they meet the criteria of the Presidents NSS, DPG and the PDM where if changes are needed to be made, OSD provides the Program Budget Decisions (PBD). The PBD is only a draft that allows the military departments a chance to appeal and or reclama. The reclama is a justification by the program sponsor in response to the marks made by the analyst in the PBD. The PBD analyst can take three courses of actions: 1) approve exhibits as presented, 2) disapprove portions of exhibits by issuing a mark, or 3) approve additional funds where shortfalls are detected (Jarvis, 2006, p. 12). The budgeting phase is completed with the submission of the DoD budget to OMB to be included in the President s budget. Figure 7 below depicts the key departments or actors involved in the DoN budgeting phase. 16

33 SECDEF OMB JCS SECNAV CNO ASN(FM&C) N1 N3/5 N4 N6/7 N8 BSO N80 N81 N82 FMB FMO Field Activity / Program Office Budgeting - Key Actors Figure 6. Budgeting Phase Key actors (From Brook, 2007b, Slide 7) 4. Budget Execution After the President signs the appropriations bill sent from Congress, DoD is required to complete an allotment process before any spending can take place. This process indicates how DoD will spend the appropriated funds, by month, quarter, or by fiscal year for longer programs in a multiyear cycle. After allotment approval is received from OMB and the Treasury, DoD begins the process of separating and distributing shares of the DoD budget to the military departments and services and other DoD commands and agencies (McCaffery & Jones, 2004, p. 102). During the current year while obligations and outlays are being conducted by the services, military departments in charge of allocating funds to subunits also conducts a midyear review. The midyear 17

34 review allows the military departments to shift funds around to where they are needed most. Figure 8 depicts below depicts the key departments or actors involved in the DoN budget execution phase. SECDEF OMB JCS SECNAV CNO ASN(FM&C) N1 N3/5 N4 N6/7 N8 BSO N80 N81 N82 FMB FMO Field Activity / Program Office Execution - Key Actors Figure 7. Execution Phase Key Actors (From Brook, 2007b, Slide 8) This section briefly discussed the DoD funding process and the Planning, Programming, Budgeting and Execution System. Table 1 below breaks down each phase of the PPBES process and includes the output that each phase produces. 18

35 Table 1. Phases of the PPBES (From Jarvis, 2006, p.13) D. OVERVIEW OF THE NAVY FLYING HOUR PROGRAM The Navy Flying Hour Program funds the day to day operational activities or air operations, organizational and intermediate maintenance, institutional training; unit training and operational training, and engineering and logistic support to operate, maintain and deploy aviation forces that support the National Military Strategy (OSD DoN FY 2007 Budget Estimates Submission, 2006). The FHP is part of the Operation and Maintenance, Navy (O&M, N) appropriation and is the Navy s largest budget as shown in Figure 9 where the FHP constituted over $4.7 billion dollars in fiscal year (FY) The O&M, N appropriation finances the day to day costs of operating naval forces, including fuel, supplies, and maintenance of ships, Navy and Marine Corps aircraft, related weapon systems, and the support establishment ashore (OSD DoN Fiscal Year 2008/2009 Budget Estimates O&M, N, 2007). In FY 2006, O&M, N received $35 billion 19

36 dollars as shown in Figure 10 out of $122.9 billion dollars allotted to DoN from the DoD budget. The four major claimants or Air Type Commanders (TYCOMs), also known as Budget Submitting Offices (BSO) that received these funds for the FHP are Commander Atlantic Fleet (COMLANTFLT), Commander Pacific Fleet (COMPACFLT), Commander Naval Forces Europe (COMNAVEUR), and Commander Naval Reserve Forces (COMNAVRESFOR) (Jarvis, 2006, p. 13). N432 Resource Sponsorship FY06 Program Summary TOA $6.8 Billion FHP 71% AIMD 1% Air Ops/Safety 2% Aircraft Depot Maint 17% Equipment Maint 2% FY06 $M FHP $4,770 AIMD $72 Air Ops/Safety $115 Aircraft Depot Maint $1,185 Equipment Maint $118 Air Systems Support $484 Aircraft Depot Ops $28 $6,793 Aircraft Depot Ops 0.4% Air Systems Support 7% Figure 8. FY 2006 FHP (From OPNAV N432 Aviation readiness Branch, 2006) 20

37 Figure 9. FY 2007 DoN Budget (From Department of the Navy FY 2007 President s Budget) The funding for the FHP comes from the O&M, N appropriation and is further broken down; for accounting purposes, into activity groups (AG s) and sub-activity groups (SAG s). The Aircraft Flight Operations (AFO) also known as Operational Target Function Categories (OFCs) or Operating Targets (OPTARs) and the Aircraft Operations Maintenance (AOM) are the primary SAG for the FHP. The OPTARs in the SAG are further divided into two OFCs, OFC-01 and OFC-50 as Figure 11 shows (Jarvis, 2006, p16). OFC 01: is for organizational/squadron level of funding. It consists of fund codes 7B for aviation fuels and 7F for flight equipment and administrative supplies in direct support of flight operations and aircraft maintenance. OFC 50: is for Intermediate Maintenance Activity (IMA) and organizational Maintenance Activity (OMA) level of funding. These funds support Navy and Marine Aircraft Groups, Naval Air Station Aircraft Intermediate Maintenance Department, and aircraft carrier (CV) class ships maintenance departments. It consists of fund codes 9S for Aviation Depot Level repairable (AVDLR) and 7L for Aviation Fleet Maintenance (AFM). 21

38 The TYCOM Figure 10. FHP Funding Composition (From Jarvis, 2006, p. 17) The budget for the FHP is compiled from the Flying Hour Projection System (FHPS) which is a model that captures, stores, tracks, and projects FHP costs, flight hours, and aircraft inventory to produce required budget exhibits (Jarvis, 2006, p. 25). The FHPS is utilized with the Planning, Programming, and Budgeting System to establish and justify FHP requirements in the Department of Navy s Budget. The FHPS produces a primary product called the Operational Plan-20 (OP-20) Budget Exhibit which depicts: budgeted flight hours; a cost breakout AFO, AVDLR, and other AOM costs in terms of a projected average fleet-wide Cost Per Flight Hour (CPH); and annual costs for each type/model/series (T/M/S) aircraft assigned to specific program elements within budget activities (COMNAVAIRPAC Instruction , 1986, Encl 4). Three schedules support the OP-20 budget exhibit displaying number of aircraft, crew seat ratios, crews, and required versus budgeted flight hours. Schedule A covers Tactical Air (TACAIR), Schedule B covers Fleet Air Training (FAT), and Schedule C cover Fleet Air Support (FAS). Schedule A: Funds all navy and Marine Corps deployable squadrons that serve as the operating forces ready to support national objectives. 22

39 TACAIR requirements state the minimum number of flight hours needed to maintain the appropriate training/combat readiness level (Jarvis, 2006, p. 14). Schedule B: Funds the Navy and Marine Corps training squadrons, known as Fleet Replacement squadrons (FRS), after completion of basic flight training. It also funds the Naval Strike and Air Warfare Center (NSAWC) which is the primary authority on training and tactics development (Jarvis, 2006, p. 15). Schedule C: Provides fleet tactical, strategic and other miscellaneous direct and indirect support (including logistics) to Navy and Marine Corps operating forces and shore establishments. FAS funds the flight hours for squadrons in the combat support role (Jarvis, 2006, p. 15). The TYCOMs mentioned above receive funding for the FHP which they allocate on down to the squadrons, aircraft carriers, and naval air stations that fall under their command in the form of OFC-01 and OFC-50 OPTARs. As these commands incur obligations and make outlays, it is recorded in a Flying Hour Cost Report (FHCR) via the squadrons, carriers, and naval air stations Budget Optar report (BOR) submitted to their TYCOMs on a monthly basis. The FHCR is the key source for cost data for future FHP budgets (Jarvis, 2006, p.17). The BOR will be explained further in the next chapter regarding the financial reporting procedures of a West coast squadron assigned to Commander Naval Air Forces, Pacific. E. CONCLUSION This chapter briefly discussed and provided background information on the federal budget process, DoD funding and the PPBES process, and an overview of the Navy FHP. In order to understand the next chapter regarding the responsibilities of the Material Control Officer (MCO) it is necessary to cover how funding is broken down and allocated to the squadrons. If further in-depth information is required on the material covered in chapter II there are numerous NPS thesis and graduate research projects 23

40 available regarding the Navy FHP as well as books on the federal and DoD budget process and procedures, many of which are cited in this report. 24

41 III. SQUADRON PROCEDURES AND THE MATERIAL CONTROL OFFICER RESPONSIBILITIES A. INTRODUCTION Chapter II briefly covered the federal budget process, the DoD funding process and an overview of the Navy FHP. Chapter III will introduce the Material Control Officer (MCO) and evaluate the procedures within a Navy squadron with regard to the management of Navy FHP, the rules and regulations that a squadron must abide by in the daily operations to track and execute the squadrons OPTAR, and how to submit a proper end of month Budget Optar Report (BOR) for accounting purposes. B. MATERIAL CONTROL OFFICER (MCO) The MCO within a squadron maintenance department is in charge of the Material Control Division which is made up of the squadrons supply personnel. The responsibility of Material Control is to provide material support to their cognizant organizations and coordinate indirect material requirements to ensure the material ordered is the material required and delivered to the work centers (NAMP, 2005, Vol. I, p ). Material Control shall: Establish delivery/pickup points for material ordered. Maintain liaison with the supporting Aviation Support Division (ASD) on maintenance material matters to ensure the material needs of the organization are satisfied. Prepare documents for material required for operational support. Furnish information to the Supply activity on the identity and quantity of material. Establish procedures to ensure proper operation of tool rooms and the performance of tool inventories. Ensure surveys are prepared in the event of loss, damage, or destruction of accountable material. Perform memorandum OPTAR funding, accounting, charting and budgeting of costs. Maintain adequate accountability of material and equipment on custody. 25

42 Maintain inventory control of authorized allowances of material listed in the Individual Material Readiness List (IMRL) and authorized allowance lists. Validate Non-Mission Capable Supply and Partial Mission Capable Supply (NMCS/PMCS) requisitions daily and maintain current NMCS/PMCS status records. Perform an inventory of aircraft, with technical assistance, upon receipt or transfer to ensure inventory log entries are made and inventory shortage listings are prepared and forwarded to Maintenance Control for inclusion in the AIR or Aircraft Inventory Record (NAMP, 2005, Vol. I, p ). Among the listed responsibilities of Material Control, the MCO is also the squadron Tool Control Program Manager (TCP), Individual Material Readiness List (IMRL) program manager and is in charge of managing and executing the squadron s budget OPTAR. Although COMNAVAIRPAC retains complete legal responsibility for all obligations incurred, Commanding Officer s (CO s) are responsible to COMNAVAIRPAC for the effective and efficient use of funds..co s are expected to exercise management control of OPTAR funds as vigorously as they would as allotment involving legal constraints and penalties. A high degree of planning and administrative control is required to ensure that material requirements are satisfied and that authorized OPTAR s and Operating Budgets (OB s) are not exceeded (COMNAVAIRPAC Instruction A, 1991, p. 4). The responsibility of the squadron OPTAR is delegated to the MCO by the CO and is the most important task that the MCO has where accurate tracking and reporting of squadron financials on a monthly basis is required. The end of month squadron Budget OPTAR Report (BOR) is the culmination of all squadron financial activities in a given month, recorded and submitted to their respected Air Type Commanders (TYCOMs) and Defense Finance and Accounting Services (DFAS) via Naval Message Traffic for accounting purposes. 26

43 C. BUDGET OPTAR REPORT (BOR) At the beginning of the fiscal year (FY) in October, the squadrons receive their quarterly OPTAR grants and scheduled due dates for when their BOR s and 7F Transmittals (TL) are to be submitted via Naval message traffic. The due dates specify the exact day of the month that a BOR and TL are to be submitted and list them for the entire FY. The 7F TL covers all the requisitions that the squadron has made during a specific week and has four submission dates in a month, where the BOR only has one due date per month. The BOR is a summary of squadron financial activities that categorizes obligations by aircraft type and includes the following (Philips, 2001, p.20): Obligation totals by fund code for OFC-01 and OFC-50 for that month. Total gallons and type of fuel (e.g., JP-4/5) consumed for the month and fiscal year to date (FYTD). Flight hours flown for the month and FYTD. Number of aircraft assigned by Type/Model/Series (T/M/S) and Type Equipment Code (TEC). Remaining OPTAR grant balance for the squadron. Figure 12 is a sample BOR used as a template to formulate the squadron s BOR. The Material Control division checks and cross checks this information throughout the month ensuring that all the data that comprises the BOR is accurate and reflects actual squadron expenditures. These checks and balances include: NALCOMIS OMA Aircraft Flight Summary Report. Comparing Flight Hours Flown with the Operations Officers records. Verifying fuel documents via the Fuel Automated System (FAS) website and fuel receipts from station customer service department. Validating the Summary Filled Order/Expenditure Difference Listing (SFOEDL) for 7F and 7B charges. These four controls are further examined in detail: 27

44 Figure 11. BOR Template (From VAQ-138 Material Control Division, 2007) 28

45 1. NALCOMIS Aircraft Flight Summary Report The Naval Aviation Logistics Command Management Information System (NALCOMIS) provides a modern, real time, responsive, computer based management information system. The three objectives of NALCOMIS are to increase aircraft readiness by providing local maintenance and supply managers with timely and accurate information required in their day to day management and decision making process, reduce the administrative burden on the fleet, and improve the quality of up-line reported data (NAMP, 2005, Vol. III, p. 7-1). The NALCOMIS Aircraft Flight Summary Report or NAVFLIR, as shown by Figure 13, is printed out by Maintenance Control and kept in a binder with all daily flight hour records during the current month. The MCO uses the NAVFLIR binder to cross check the actual hours flown with the records kept in material control to ensure the accuracy of the data to report in the BOR. This report shows all hours flown by all squadron aircraft and is recorded in to the NALCOMIS system by the pilot who checked out the aircraft. 29

46 Figure 12. NALCOMIS OMA Aircraft Flight Summary Report (From NALCOMIS Print Out, VAQ-138, 2007) 30

47 2. Flight Hour Comparison with Operations Officer Throughout the month and definitely before the BOR is due, the MCO cross checks material controls records of the current months flight hours with the record kept by the Operations Officer (Ops-O). Working together, they rectify any mistakes or inaccuracies with the monthly total flight hours logged by the squadron. The Ops-O tracks flight hours in order to budget the allotted quarterly hour s directly affecting squadron readiness. 3. Fuel Automated System (FAS) and Base/Ship Fuel Receipts When the squadron is operating out of its homeport, the fuel received is from the base fuel depot and once a week material control receives all fuel receipts from base customer service (VAQ-138 Material Control Division interview, 2007). These receipts are for every individual aircraft that received fuel from the previous week. On board an aircraft carrier when the squadron is on deployment or exercises, material control fills out two DD Form 1348 s and submits them to the ships supply department, S-1 division. The 1348 is a single line item requisition system document used by the Navy to requisition items and to charge the specific unit through their Type Equipment Code (TEC). Material control fills out one DD Form 1348 for the first of the month to the fifteenth, the second from the sixteenth to the last day of the month. This is done so S-1 can accurately charge the squadrons that are on board whenever they receive fuel. If the squadrons come aboard on any other day of the month the 1348 dates will cover the next day after arrival to either the fifteenth or to the end of the month. The Fuel Automated System (FAS) is a grouping of applications and people working together to create a means to record, report and manage the Department of Defense (DoD) energy business. It is an automated material management system that spans from requirements determination to point of sale, vendor payment and customer billing for all energy commodities (Fuel Automated System (FAS) Overview Course). Material control has one person assigned to access the FAS website to verify, monitor, check, and challenge any 7B fuel charged to the squadrons OPTAR account. The FAS 31

48 website posts fuel received by squadron aircraft for in-flight refueling and has to be accounted for by material control for proper recording of fuel dollar expenditures on the BOR. There are a couple of issues that material control has difficulty when using FAS; the charges that are posted on FAS are not posted immediately after the fuel has been taken by squadron aircraft causing confusion as to when the fuel transfer actually took place, and the document numbers used to charge the squadron OPTAR account are not the same further complicating the process of tracking fuel charges posted on FAS. All of these fuel charges have to be verified and confirmed before the BOR can be compiled and sent out reporting the squadron s expenditures with regards to fuel dollars (VAQ-138 Material Control Division interview, 2007). 4. Summary Filled Order/Expenditure Difference Listing (SFOEDL) All requisitions made by the squadron that fall under the OFC-01 account are 7F fund codes. The 7F charges/transactions are compiled and sent out on the weekly TL report by material control to DFAS on the due dates provided at the beginning of the FY. Each TL constitutes all individual 7F charges that the squadron made for that week. The four TL totals are reported on the BOR and subtracted from the OFC-01/7F OPTAR grant. The OFC-01/7B OPTAR grant constitutes the funds for the squadron to purchase aviation fuel. The monthly fuel charges are added up from base customer service fuel receipts and FAS transactions are checked for accuracy and reported on the BOR. Both 7F and 7B fund code transactions made by the squadron are posted on the monthly SFOEDL for verification purposes before any outlay of funds is made by DFAS. The Summary Filled Order/Expenditure Difference Listing (SFOEDL) is sent out to the OPTAR holders by DFAS on or about the fifteenth of every month individually listing all squadron charges/transactions in document number sequence from both fund codes 7F and 7B. OPTAR holders will accept and post to the Requisition/OPTAR Log all difference listing followed by reviewing the listing and annotating transactions considered invalid with the appropriate rejection code. Valid rejections will be reversed with a correction transaction by the fleet accounting office and will appear on a later 32

49 SFOEDL (NAVSO P , 1990, p ). The SFOEDL covers the previous month charges but can include up to three years of data separated by FY mainly due to floating charges. Floating charges are unfilled orders (charges) that have not posted yet but will eventually show up on the SFOEDL and need to be accounted for. The Requisition/OPTAR Log is established by each ship, aviation squadron or command to record OPTAR grants and the value of transactions incurred as chargeable to the type commander s operating budget. The Requisition/OPTAR Log parallels and provides a check on the official accounting records maintained at the fleet accounting office. OPTAR grants will be entered in the Requisition/OPTAR Log and reduced by the value of chargeable requisitions (NAVSO P , 1990, p. 4-25). Throughout each month the MCO delegates these responsibilities to personnel assigned to material control ensuring that the data reported on the BOR is verified, checked, and accurate; trust but verify is always a good motto. Figure 14 below is a diagram depicting the flow of accounting data from the OPTAR holder (the squadron) to all the pertinent agencies involved. 33

50 Figure 13. Flow of Accounting Data (From NAMP, 2005, Vol. I, p ) 34

51 D. OPERATIONS OFFICER PLANNING The squadron operations officer is in charge of planning and scheduling the flight hours among the entire aircrew ensuring their operational readiness. During the research period for this professional report, VAQ-138 was operating at 40 percent primary mission readiness (PMR) level where their allotted quarterly flight hour was 221. Along with the OP-20 mentioned in chapter two, final distribution of funding to fleet squadrons is calculated by matching squadron flying activity levels with that of the Chief of Naval Operations (CNO) PMR goal. An activity level indicates a phase of employment for a squadron during its 18 month turn-around cycle. The turn around cycle is the period used for scheduling aircraft deployments, along with all the requisite aircraft and airwing training in preparation for deployment (Philips, 2001, p. 31). Through the 18 month turnaround deployment cycle the level of squadron flight hours vary and are funded by the schedule below (Philips, 2001, p.31): Month 1: Personnel turnover and leave 40% PMR Months 2-6: Turn-around training 65% PMR Months 7-10: Turn-around training 75% PMR Months 11-16: Pre-deployment training 95% PMR Month 17: Pre-deployment Stand down 50% PMR Deployment Month 1: 70% PMR Deployment Months 2-5: 115% PMR Deployment Month 6: 60% PMR The overall goal of VAQ-138 Ops-O is to have 6 crews consisting of 4 aircrew men each and to evenly distribute the flight hours among these crews to optimize overall squadron readiness (VAQ-138 Operations Officer, 2007). During the various phases of the turn-around cycle, Electronic Attack squadrons have anywhere from two to four aircraft assigned to them. On Months and during deployment months, the squadron operates with four aircraft. At the time of the research for this professional report, VAQ-138 was operating at 40 percent PMR, had three aircraft assigned, two in 35

NAVAL POSTGRADUATE SCHOOL

NAVAL POSTGRADUATE SCHOOL NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA MBA PROFESSIONAL REPORT OPNAV N432D Responsibilities and Impact on Budget Formulation for the Navy Flying Hour Program By: David K. Jarvis December 2006 Principal

More information

DEPARTMENT OF T H E OFFICE OF THE CHI F or AVAL O PER ATIONS 2000 NAVY PENTAGON ASHING ON. D.C

DEPARTMENT OF T H E OFFICE OF THE CHI F or AVAL O PER ATIONS 2000 NAVY PENTAGON ASHING ON. D.C DEPARTMENT OF T H E N AVY OFFICE OF THE CHI F or AVAL O PER ATIONS 2000 NAVY PENTAGON ASHING ON. D.C. 203 50-2000 IN EPLY EfE TO OPNAVINST 7310.1F N43 Sep 07 OPNAV INSTRUCTION 7310.1F From: Chief of Naval

More information

Aviation Logistics Officers: Combining Supply and Maintenance Responsibilities. Captain WA Elliott

Aviation Logistics Officers: Combining Supply and Maintenance Responsibilities. Captain WA Elliott Aviation Logistics Officers: Combining Supply and Maintenance Responsibilities Captain WA Elliott Major E Cobham, CG6 5 January, 2009 Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting

More information

Financial Management

Financial Management August 17, 2005 Financial Management Defense Departmental Reporting System Audited Financial Statements Report Map (D-2005-102) Department of Defense Office of the Inspector General Constitution of the

More information

Chief of Staff, United States Army, before the House Committee on Armed Services, Subcommittee on Readiness, 113th Cong., 2nd sess., April 10, 2014.

Chief of Staff, United States Army, before the House Committee on Armed Services, Subcommittee on Readiness, 113th Cong., 2nd sess., April 10, 2014. 441 G St. N.W. Washington, DC 20548 June 22, 2015 The Honorable John McCain Chairman The Honorable Jack Reed Ranking Member Committee on Armed Services United States Senate Defense Logistics: Marine Corps

More information

Report No. D February 22, Internal Controls over FY 2007 Army Adjusting Journal Vouchers

Report No. D February 22, Internal Controls over FY 2007 Army Adjusting Journal Vouchers Report No. D-2008-055 February 22, 2008 Internal Controls over FY 2007 Army Adjusting Journal Vouchers Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection

More information

Acquisition. Air Force Procurement of 60K Tunner Cargo Loader Contractor Logistics Support (D ) March 3, 2006

Acquisition. Air Force Procurement of 60K Tunner Cargo Loader Contractor Logistics Support (D ) March 3, 2006 March 3, 2006 Acquisition Air Force Procurement of 60K Tunner Cargo Loader Contractor Logistics Support (D-2006-059) Department of Defense Office of Inspector General Quality Integrity Accountability Report

More information

Office of the Inspector General Department of Defense

Office of the Inspector General Department of Defense DEFENSE DEPARTMENTAL REPORTING SYSTEMS - AUDITED FINANCIAL STATEMENTS Report No. D-2001-165 August 3, 2001 Office of the Inspector General Department of Defense Report Documentation Page Report Date 03Aug2001

More information

Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress

Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress Order Code RS20643 Updated November 20, 2008 Summary Navy Ford (CVN-78) Class Aircraft Carrier Program: Background and Issues for Congress Ronald O Rourke Specialist in Naval Affairs Foreign Affairs, Defense,

More information

Report Documentation Page

Report Documentation Page Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour per response, including the time for reviewing instructions,

More information

Subj: CHEMICAL, BIOLOGICAL, RADIOLOGICAL, AND NUCLEAR DEFENSE REQUIREMENTS SUPPORTING OPERATIONAL FLEET READINESS

Subj: CHEMICAL, BIOLOGICAL, RADIOLOGICAL, AND NUCLEAR DEFENSE REQUIREMENTS SUPPORTING OPERATIONAL FLEET READINESS DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 3400.10G N9 OPNAV INSTRUCTION 3400.10G From: Chief of Naval Operations Subj: CHEMICAL,

More information

Headquarters, Department of the Army Distribution Restriction: Approved for public release; distribution is unlimited.

Headquarters, Department of the Army Distribution Restriction: Approved for public release; distribution is unlimited. January 1998 FM 100-11 Force Integration Headquarters, Department of the Army Distribution Restriction: Approved for public release; distribution is unlimited. *Field Manual 100-11 Headquarters Department

More information

Navy CVN-21 Aircraft Carrier Program: Background and Issues for Congress

Navy CVN-21 Aircraft Carrier Program: Background and Issues for Congress Order Code RS20643 Updated January 17, 2007 Summary Navy CVN-21 Aircraft Carrier Program: Background and Issues for Congress Ronald O Rourke Specialist in National Defense Foreign Affairs, Defense, and

More information

Navy Enterprise Resource Planning System Does Not Comply With the Standard Financial Information Structure and U.S. Government Standard General Ledger

Navy Enterprise Resource Planning System Does Not Comply With the Standard Financial Information Structure and U.S. Government Standard General Ledger DODIG-2012-051 February 13, 2012 Navy Enterprise Resource Planning System Does Not Comply With the Standard Financial Information Structure and U.S. Government Standard General Ledger Report Documentation

More information

Afloat Electromagnetic Spectrum Operations Program (AESOP) Spectrum Management Challenges for the 21st Century

Afloat Electromagnetic Spectrum Operations Program (AESOP) Spectrum Management Challenges for the 21st Century NAVAL SURFACE WARFARE CENTER DAHLGREN DIVISION Afloat Electromagnetic Spectrum Operations Program (AESOP) Spectrum Management Challenges for the 21st Century Presented by: Ms. Margaret Neel E 3 Force Level

More information

GAO AIR FORCE WORKING CAPITAL FUND. Budgeting and Management of Carryover Work and Funding Could Be Improved

GAO AIR FORCE WORKING CAPITAL FUND. Budgeting and Management of Carryover Work and Funding Could Be Improved GAO United States Government Accountability Office Report to the Subcommittee on Readiness and Management Support, Committee on Armed Services, U.S. Senate July 2011 AIR FORCE WORKING CAPITAL FUND Budgeting

More information

FFC COMMAND STRUCTURE

FFC COMMAND STRUCTURE FLEET USE OF PRECISE TIME Thomas E. Myers Commander Fleet Forces Command Norfolk, VA 23551, USA Abstract This paper provides a perspective on current use of precise time and future requirements for precise

More information

Office of the Inspector General Department of Defense

Office of the Inspector General Department of Defense ACCOUNTING ENTRIES MADE BY THE DEFENSE FINANCE AND ACCOUNTING SERVICE OMAHA TO U.S. TRANSPORTATION COMMAND DATA REPORTED IN DOD AGENCY-WIDE FINANCIAL STATEMENTS Report No. D-2001-107 May 2, 2001 Office

More information

Panel 12 - Issues In Outsourcing Reuben S. Pitts III, NSWCDL

Panel 12 - Issues In Outsourcing Reuben S. Pitts III, NSWCDL Panel 12 - Issues In Outsourcing Reuben S. Pitts III, NSWCDL Rueben.pitts@navy.mil Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection of information is

More information

The Security Plan: Effectively Teaching How To Write One

The Security Plan: Effectively Teaching How To Write One The Security Plan: Effectively Teaching How To Write One Paul C. Clark Naval Postgraduate School 833 Dyer Rd., Code CS/Cp Monterey, CA 93943-5118 E-mail: pcclark@nps.edu Abstract The United States government

More information

OPNAVINST B N98 4 Jun 2018

OPNAVINST B N98 4 Jun 2018 DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON DC 20350-2000 OPNAVINST 3510.15B N98 OPNAV INSTRUCTION 3510.15B From: Chief of Naval Operations Subj: AVIATION-SERIES

More information

DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON DC

DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON DC DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON DC 20350-2000 OPNAVINST 8011.9C N81 OPNAV INSTRUCTION 8011.9C From: Chief of Naval Operations Subj: NAVAL MUNITIONS

More information

Report No. D July 30, Status of the Defense Emergency Response Fund in Support of the Global War on Terror

Report No. D July 30, Status of the Defense Emergency Response Fund in Support of the Global War on Terror Report No. D-2009-098 July 30, 2009 Status of the Defense Emergency Response Fund in Support of the Global War on Terror Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden

More information

H-60 Seahawk Performance-Based Logistics Program (D )

H-60 Seahawk Performance-Based Logistics Program (D ) August 1, 2006 Logistics H-60 Seahawk Performance-Based Logistics Program (D-2006-103) This special version of the report has been revised to omit contractor proprietary data. Department of Defense Office

More information

NATIONAL DEFENSE BUDGET ESTIMATES FOR FY 2012 OFFICE OF THE UNDER SECRETARY OF DEFENSE (COMPTROLLER) MARCH 2011

NATIONAL DEFENSE BUDGET ESTIMATES FOR FY 2012 OFFICE OF THE UNDER SECRETARY OF DEFENSE (COMPTROLLER) MARCH 2011 NATIONAL DEFENSE BUDGET ESTIMATES FOR FY 2012 OFFICE OF THE UNDER SECRETARY OF DEFENSE (COMPTROLLER) MARCH 2011 Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the

More information

https://www.metricsthatmatter.com/url/u.aspx?0cbf11b3e Guest Presenter Jay Bottelson

https://www.metricsthatmatter.com/url/u.aspx?0cbf11b3e Guest Presenter Jay Bottelson Defense Acquisition University Lunch n Learn Navy VAMOSC 12 April 2017 Session will start at 1230 EDT (1130 CDT). Audio will be through DCS there will be a sound check 30 minutes prior to the session.

More information

A udit R eport. Office of the Inspector General Department of Defense. Report No. D October 31, 2001

A udit R eport. Office of the Inspector General Department of Defense. Report No. D October 31, 2001 A udit R eport ACQUISITION OF THE FIREFINDER (AN/TPQ-47) RADAR Report No. D-2002-012 October 31, 2001 Office of the Inspector General Department of Defense Report Documentation Page Report Date 31Oct2001

More information

Preliminary Observations on DOD Estimates of Contract Termination Liability

Preliminary Observations on DOD Estimates of Contract Termination Liability 441 G St. N.W. Washington, DC 20548 November 12, 2013 Congressional Committees Preliminary Observations on DOD Estimates of Contract Termination Liability This report responds to Section 812 of the National

More information

Operational Energy: ENERGY FOR THE WARFIGHTER

Operational Energy: ENERGY FOR THE WARFIGHTER Operational Energy: ENERGY FOR THE WARFIGHTER Office of the Assistant Secretary of Defense for Operational Energy Plans and Programs Mr. John D. Jennings 30 July 2012 UNCLASSIFIED DRAFT PREDECISIONAL FOR

More information

DEPARTMENT OF DEFENSE AGENCY-WIDE FINANCIAL STATEMENTS AUDIT OPINION

DEPARTMENT OF DEFENSE AGENCY-WIDE FINANCIAL STATEMENTS AUDIT OPINION DEPARTMENT OF DEFENSE AGENCY-WIDE FINANCIAL STATEMENTS AUDIT OPINION 8-1 Audit Opinion (This page intentionally left blank) 8-2 INSPECTOR GENERAL DEPARTMENT OF DEFENSE 400 ARMY NAVY DRIVE ARLINGTON, VIRGINIA

More information

OPNAVINST A N Oct 2014

OPNAVINST A N Oct 2014 DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 3501.360A N433 OPNAV INSTRUCTION 3501.360A From: Chief of Naval Operations Subj: DEFENSE

More information

Comparison of Navy and Private-Sector Construction Costs

Comparison of Navy and Private-Sector Construction Costs Logistics Management Institute Comparison of Navy and Private-Sector Construction Costs NA610T1 September 1997 Jordan W. Cassell Robert D. Campbell Paul D. Jung mt *Ui assnc Approved for public release;

More information

DEPARTMENT OF THE NAVY OFFICE OF THE ASSISTANT SECRETARY (FINANCIAL MANAGEMENT AND COMPTROLLER) 1000 NAVY PENTAGON WASHINGTON DC

DEPARTMENT OF THE NAVY OFFICE OF THE ASSISTANT SECRETARY (FINANCIAL MANAGEMENT AND COMPTROLLER) 1000 NAVY PENTAGON WASHINGTON DC DEPARTMENT OF THE NAVY OFFICE OF THE ASSISTANT SECRETARY (FINANCIAL MANAGEMENT AND COMPTROLLER) 1000 NAVY PENTAGON WASHINGTON DC 20350-1000 SECNAVINST 7000.27A ASN(FM&C): FMB-5 SECNAV INSTRUCTION 7000.27A

More information

Acquisition. Diamond Jewelry Procurement Practices at the Army and Air Force Exchange Service (D ) June 4, 2003

Acquisition. Diamond Jewelry Procurement Practices at the Army and Air Force Exchange Service (D ) June 4, 2003 June 4, 2003 Acquisition Diamond Jewelry Procurement Practices at the Army and Air Force Exchange Service (D-2003-097) Department of Defense Office of the Inspector General Quality Integrity Accountability

More information

a GAO GAO AIR FORCE DEPOT MAINTENANCE Management Improvements Needed for Backlog of Funded Contract Maintenance Work

a GAO GAO AIR FORCE DEPOT MAINTENANCE Management Improvements Needed for Backlog of Funded Contract Maintenance Work GAO United States General Accounting Office Report to the Chairman, Subcommittee on Defense, Committee on Appropriations, House of Representatives June 2002 AIR FORCE DEPOT MAINTENANCE Management Improvements

More information

Review of Defense Contract Management Agency Support of the C-130J Aircraft Program

Review of Defense Contract Management Agency Support of the C-130J Aircraft Program Report No. D-2009-074 June 12, 2009 Review of Defense Contract Management Agency Support of the C-130J Aircraft Program Special Warning: This document contains information provided as a nonaudit service

More information

Navy Ford (CVN-78) Class (CVN-21) Aircraft Carrier Program: Background and Issues for Congress

Navy Ford (CVN-78) Class (CVN-21) Aircraft Carrier Program: Background and Issues for Congress Order Code RS20643 Updated December 5, 2007 Navy Ford (CVN-78) Class (CVN-21) Aircraft Carrier Program: Background and Issues for Congress Summary Ronald O Rourke Specialist in National Defense Foreign

More information

MEDIA CONTACTS. Mailing Address: Phone:

MEDIA CONTACTS. Mailing Address: Phone: MEDIA CONTACTS Mailing Address: Defense Contract Management Agency Attn: Public Affairs Office 3901 A Avenue Bldg 10500 Fort Lee, VA 23801 Phone: Media Relations: (804) 734-1492 FOIA Requests: (804) 734-1466

More information

Independent Auditor's Report on the Attestation of the Existence, Completeness, and Rights of the Department of the Navy's Aircraft

Independent Auditor's Report on the Attestation of the Existence, Completeness, and Rights of the Department of the Navy's Aircraft Report No. DODIG-2012-097 May 31, 2012 Independent Auditor's Report on the Attestation of the Existence, Completeness, and Rights of the Department of the Navy's Aircraft Report Documentation Page Form

More information

The Effects of Multimodal Collaboration Technology on Subjective Workload Profiles of Tactical Air Battle Management Teams

The Effects of Multimodal Collaboration Technology on Subjective Workload Profiles of Tactical Air Battle Management Teams STINFO COPY AFRL-HE-WP-TP-2007-0012 The Effects of Multimodal Collaboration Technology on Subjective Workload Profiles of Tactical Air Battle Management Teams Victor S. Finomore Benjamin A. Knott General

More information

Global Combat Support System Army Did Not Comply With Treasury and DoD Financial Reporting Requirements

Global Combat Support System Army Did Not Comply With Treasury and DoD Financial Reporting Requirements Report No. DODIG-2014-104 I nspec tor Ge ne ral U.S. Department of Defense SEPTEMBER 3, 2014 Global Combat Support System Army Did Not Comply With Treasury and DoD Financial Reporting Requirements I N

More information

OPNAVINST E N97 7 Nov 2017

OPNAVINST E N97 7 Nov 2017 DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON DC 20350-2000 OPNAVINST 1540.51E N97 OPNAV INSTRUCTION 1540.51E From: Chief of Naval Operations Subj: SUBMARINE

More information

Great Decisions Paying for U.S. global engagement and the military. Aaron Karp, 13 January 2018

Great Decisions Paying for U.S. global engagement and the military. Aaron Karp, 13 January 2018 Great Decisions 2018 Paying for U.S. global engagement and the military Aaron Karp, 13 January 2018 I. Funding America s four militaries not as equal as they look Times Square Strategy wears a dollar sign*

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE INSTRUCTION 10-301 20 DECEMBER 2017 Operations MANAGING OPERATIONAL UTILIZATION REQUIREMENTS OF THE AIR RESERVE COMPONENT FORCES COMPLIANCE WITH THIS

More information

Report No. D May 14, Selected Controls for Information Assurance at the Defense Threat Reduction Agency

Report No. D May 14, Selected Controls for Information Assurance at the Defense Threat Reduction Agency Report No. D-2010-058 May 14, 2010 Selected Controls for Information Assurance at the Defense Threat Reduction Agency Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for

More information

GAO WARFIGHTER SUPPORT. DOD Needs to Improve Its Planning for Using Contractors to Support Future Military Operations

GAO WARFIGHTER SUPPORT. DOD Needs to Improve Its Planning for Using Contractors to Support Future Military Operations GAO United States Government Accountability Office Report to Congressional Committees March 2010 WARFIGHTER SUPPORT DOD Needs to Improve Its Planning for Using Contractors to Support Future Military Operations

More information

OPNAVINST D N4 24 May (a) OPNAV M , Naval Ordnance Management Policy Manual

OPNAVINST D N4 24 May (a) OPNAV M , Naval Ordnance Management Policy Manual DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 8000.16D N4 OPNAV INSTRUCTION 8000.16D From: Chief of Naval Operations Subj: NAVAL

More information

Information Technology

Information Technology May 7, 2002 Information Technology Defense Hotline Allegations on the Procurement of a Facilities Maintenance Management System (D-2002-086) Department of Defense Office of the Inspector General Quality

More information

World-Wide Satellite Systems Program

World-Wide Satellite Systems Program Report No. D-2007-112 July 23, 2007 World-Wide Satellite Systems Program Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection of information is estimated

More information

Subj: OVERSIGHT OF THE DEPARTMENT OF THE NAVY MILITARY INTELLIGENCE PROGRAM

Subj: OVERSIGHT OF THE DEPARTMENT OF THE NAVY MILITARY INTELLIGENCE PROGRAM D E P A R T M E N T O F T H E N A V Y OFFICE OF THE SECRETARY 1000 NAVY PENTAGON WASHINGTON DC 20350-1000 SECNAVINST 5000.38A DUSN Intel SECNAV INSTRUCTION 5000.38A From: Secretary of the Navy Subj: OVERSIGHT

More information

CRS prepared this memorandum for distribution to more than one congressional office.

CRS prepared this memorandum for distribution to more than one congressional office. MEMORANDUM Revised, August 12, 2010 Subject: Preliminary assessment of efficiency initiatives announced by Secretary of Defense Gates on August 9, 2010 From: Stephen Daggett, Specialist in Defense Policy

More information

OPNAVINST DNS 25 Apr Subj: MISSION, FUNCTIONS AND TASKS OF COMMANDER, NAVAL SUPPLY SYSTEMS COMMAND

OPNAVINST DNS 25 Apr Subj: MISSION, FUNCTIONS AND TASKS OF COMMANDER, NAVAL SUPPLY SYSTEMS COMMAND DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 5450.349 DNS OPNAV INSTRUCTION 5450.349 From: Chief of Naval Operations Subj: MISSION,

More information

Opportunities to Streamline DOD s Milestone Review Process

Opportunities to Streamline DOD s Milestone Review Process Opportunities to Streamline DOD s Milestone Review Process Cheryl K. Andrew, Assistant Director U.S. Government Accountability Office Acquisition and Sourcing Management Team May 2015 Page 1 Report Documentation

More information

Department of Defense SUPPLY SYSTEM INVENTORY REPORT September 30, 2003

Department of Defense SUPPLY SYSTEM INVENTORY REPORT September 30, 2003 Department of Defense SUPPLY SYSTEM INVENTORY REPORT September 30, 2003 TABLE OF CONTENTS Table 1.0 Department of Defense Secondary Supply System Inventories A. Secondary Items - FY 1973 through FY 2003

More information

Report No. D-2011-RAM-004 November 29, American Recovery and Reinvestment Act Projects--Georgia Army National Guard

Report No. D-2011-RAM-004 November 29, American Recovery and Reinvestment Act Projects--Georgia Army National Guard Report No. D-2011-RAM-004 November 29, 2010 American Recovery and Reinvestment Act Projects--Georgia Army National Guard Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden

More information

COTS Impact to RM&S from an ISEA Perspective

COTS Impact to RM&S from an ISEA Perspective COTS Impact to RM&S from an ISEA Perspective Robert Howard Land Attack System Engineering, Test & Evaluation Division Supportability Manager, Code L20 DISTRIBUTION STATEMENT A: APPROVED FOR PUBLIC RELEASE:

More information

Department of Defense

Department of Defense Tr OV o f t DISTRIBUTION STATEMENT A Approved for Public Release Distribution Unlimited IMPLEMENTATION OF THE DEFENSE PROPERTY ACCOUNTABILITY SYSTEM Report No. 98-135 May 18, 1998 DnC QtUALr Office of

More information

or.t Office of the Inspector General Department of Defense DISTRIBUTION STATEMENTA Approved for Public Release Distribution Unlimited

or.t Office of the Inspector General Department of Defense DISTRIBUTION STATEMENTA Approved for Public Release Distribution Unlimited t or.t 19990818 181 YEAR 2000 COMPLIANCE OF THE STANDOFF LAND ATTACK MISSILE Report No. 99-157 May 14, 1999 DTIO QUr~ Office of the Inspector General Department of Defense DISTRIBUTION STATEMENTA Approved

More information

DoD Countermine and Improvised Explosive Device Defeat Systems Contracts for the Vehicle Optics Sensor System

DoD Countermine and Improvised Explosive Device Defeat Systems Contracts for the Vehicle Optics Sensor System Report No. DODIG-2012-005 October 28, 2011 DoD Countermine and Improvised Explosive Device Defeat Systems Contracts for the Vehicle Optics Sensor System Report Documentation Page Form Approved OMB No.

More information

Department of Defense INSTRUCTION

Department of Defense INSTRUCTION Department of Defense INSTRUCTION SUBJECT: DoD Munitions Requirements Process (MRP) References: See Enclosure 1 NUMBER 3000.04 September 24, 2009 Incorporating Change 1, November 21, 2017 USD(AT&L) 1.

More information

Fleet Logistics Center, Puget Sound

Fleet Logistics Center, Puget Sound Naval Supply Systems Command Fleet Logistics Center, Puget Sound FLEET & INDUSTRIAL SUPPLY CENTER, PUGET SOUND Gold Coast Small Business Conference August 2012 Report Documentation Page Form Approved OMB

More information

Human Capital. DoD Compliance With the Uniformed and Overseas Citizens Absentee Voting Act (D ) March 31, 2003

Human Capital. DoD Compliance With the Uniformed and Overseas Citizens Absentee Voting Act (D ) March 31, 2003 March 31, 2003 Human Capital DoD Compliance With the Uniformed and Overseas Citizens Absentee Voting Act (D-2003-072) Department of Defense Office of the Inspector General Quality Integrity Accountability

More information

Staffing Cyber Operations (Presentation)

Staffing Cyber Operations (Presentation) INSTITUTE FOR DEFENSE ANALYSES Staffing Cyber Operations (Presentation) Thomas H. Barth Stanley A. Horowitz Mark F. Kaye Linda Wu May 2015 Approved for public release; distribution is unlimited. IDA Document

More information

February 8, The Honorable Carl Levin Chairman The Honorable James Inhofe Ranking Member Committee on Armed Services United States Senate

February 8, The Honorable Carl Levin Chairman The Honorable James Inhofe Ranking Member Committee on Armed Services United States Senate United States Government Accountability Office Washington, DC 20548 February 8, 2013 The Honorable Carl Levin Chairman The Honorable James Inhofe Ranking Member Committee on Armed Services United States

More information

Infantry Companies Need Intelligence Cells. Submitted by Captain E.G. Koob

Infantry Companies Need Intelligence Cells. Submitted by Captain E.G. Koob Infantry Companies Need Intelligence Cells Submitted by Captain E.G. Koob Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection of information is estimated

More information

AUTOMATIC IDENTIFICATION TECHNOLOGY

AUTOMATIC IDENTIFICATION TECHNOLOGY Revolutionary Logistics? Automatic Identification Technology EWS 2004 Subject Area Logistics REVOLUTIONARY LOGISTICS? AUTOMATIC IDENTIFICATION TECHNOLOGY A. I. T. Prepared for Expeditionary Warfare School

More information

STATEMENT OF ADMIRAL WILLIAM F. MORAN U.S. NAVY VICE CHIEF OF NAVAL OPERATIONS BEFORE THE HOUSE ARMED SERVICES COMMITTEE STATE OF THE MILITARY

STATEMENT OF ADMIRAL WILLIAM F. MORAN U.S. NAVY VICE CHIEF OF NAVAL OPERATIONS BEFORE THE HOUSE ARMED SERVICES COMMITTEE STATE OF THE MILITARY STATEMENT OF ADMIRAL WILLIAM F. MORAN U.S. NAVY VICE CHIEF OF NAVAL OPERATIONS BEFORE THE HOUSE ARMED SERVICES COMMITTEE ON STATE OF THE MILITARY FEBRUARY 7, 2017 Mr. Chairman, Ranking Member Smith, and

More information

ASNE Combat Systems Symposium. Balancing Capability and Capacity

ASNE Combat Systems Symposium. Balancing Capability and Capacity ASNE Combat Systems Symposium Balancing Capability and Capacity RDML Jim Syring, USN Program Executive Officer Integrated Warfare Systems This Brief is provided for Information Only and does not constitute

More information

Trinity Valley Community College. Grants Accounting Policy and Procedures 2012

Trinity Valley Community College. Grants Accounting Policy and Procedures 2012 Trinity Valley Community College Grants Accounting Policy and Procedures 2012 TABLE OF CONTENTS I. Overview.....3 II. Project Startup.... 3 III. Contractual Services.......3 IV. Program Income.....4 V.

More information

Perspectives on the Analysis M&S Community

Perspectives on the Analysis M&S Community v4-2 Perspectives on the Analysis M&S Community Dr. Jim Stevens OSD/PA&E Director, Joint Data Support 11 March 2008 Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for

More information

Shadow 200 TUAV Schoolhouse Training

Shadow 200 TUAV Schoolhouse Training Shadow 200 TUAV Schoolhouse Training Auto Launch Auto Recovery Accomplishing tomorrows training requirements today. Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for

More information

The Need for NMCI. N Bukovac CG February 2009

The Need for NMCI. N Bukovac CG February 2009 The Need for NMCI N Bukovac CG 15 20 February 2009 Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection of information is estimated to average 1 hour per

More information

The Need for a Common Aviation Command and Control System in the Marine Air Command and Control System. Captain Michael Ahlstrom

The Need for a Common Aviation Command and Control System in the Marine Air Command and Control System. Captain Michael Ahlstrom The Need for a Common Aviation Command and Control System in the Marine Air Command and Control System Captain Michael Ahlstrom Expeditionary Warfare School, Contemporary Issue Paper Major Kelley, CG 13

More information

OPNAVINST H N12 3 Sep 2015

OPNAVINST H N12 3 Sep 2015 DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 1500.22H N12 OPNAV INSTRUCTION 1500.22H From: Chief of Naval Operations Subj: GENERAL

More information

Subj: CERTIFICATION OF THE AVIATION CAPABILITY OF SHIPS OPERATING AIRCRAFT

Subj: CERTIFICATION OF THE AVIATION CAPABILITY OF SHIPS OPERATING AIRCRAFT DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON DC 20350-2000 OPNAVINST 3120.28D N96 OPNAV INSTRUCTION 3120.28D From: Chief of Naval Operations Subj: CERTIFICATION

More information

GAO. DEFENSE BUDGET Trends in Reserve Components Military Personnel Compensation Accounts for

GAO. DEFENSE BUDGET Trends in Reserve Components Military Personnel Compensation Accounts for GAO United States General Accounting Office Report to the Chairman, Subcommittee on National Security, Committee on Appropriations, House of Representatives September 1996 DEFENSE BUDGET Trends in Reserve

More information

Report No. D February 9, Internal Controls Over the United States Marine Corps Military Equipment Baseline Valuation Effort

Report No. D February 9, Internal Controls Over the United States Marine Corps Military Equipment Baseline Valuation Effort Report No. D-2009-049 February 9, 2009 Internal Controls Over the United States Marine Corps Military Equipment Baseline Valuation Effort Report Documentation Page Form Approved OMB No. 0704-0188 Public

More information

NORMALIZATION OF EXPLOSIVES SAFETY REGULATIONS BETWEEN U.S. NAVY AND AUSTRALIAN DEFENCE FORCE

NORMALIZATION OF EXPLOSIVES SAFETY REGULATIONS BETWEEN U.S. NAVY AND AUSTRALIAN DEFENCE FORCE NORMALIZATION OF EXPLOSIVES SAFETY REGULATIONS BETWEEN U.S. NAVY AND AUSTRALIAN DEFENCE FORCE Presenter: Richard Adams Naval Ordnance Safety and Security Activity (NOSSA) 3817 Strauss Ave., Suite 108 (BLDG

More information

Naval VAMOSC Overview

Naval VAMOSC Overview Naval VAMOSC Overview Department of the Navy Cost Analysis Symposium 08 Sep 2011 Naval Center for Cost Analysis Visibility and Management of Operating & Support Costs (VAMOSC) Web-enabled management information

More information

DOD INVENTORY OF CONTRACTED SERVICES. Actions Needed to Help Ensure Inventory Data Are Complete and Accurate

DOD INVENTORY OF CONTRACTED SERVICES. Actions Needed to Help Ensure Inventory Data Are Complete and Accurate United States Government Accountability Office Report to Congressional Committees November 2015 DOD INVENTORY OF CONTRACTED SERVICES Actions Needed to Help Ensure Inventory Data Are Complete and Accurate

More information

a GAO GAO DEFENSE ACQUISITIONS Better Information Could Improve Visibility over Adjustments to DOD s Research and Development Funds

a GAO GAO DEFENSE ACQUISITIONS Better Information Could Improve Visibility over Adjustments to DOD s Research and Development Funds GAO United States Government Accountability Office Report to the Subcommittees on Defense, Committees on Appropriations, U.S. Senate and House of Representatives September 2004 DEFENSE ACQUISITIONS Better

More information

Make or Buy: Cost Impacts of Additive Manufacturing, 3D Laser Scanning Technology, and Collaborative Product Lifecycle Management on Ship Maintenance

Make or Buy: Cost Impacts of Additive Manufacturing, 3D Laser Scanning Technology, and Collaborative Product Lifecycle Management on Ship Maintenance Make or Buy: Cost Impacts of Additive Manufacturing, 3D Laser Scanning Technology, and Collaborative Product Lifecycle Management on Ship Maintenance and Modernization David Ford Sandra Hom Thomas Housel

More information

Policies and Procedures Needed to Reconcile Ministry of Defense Advisors Program Disbursements to Other DoD Agencies

Policies and Procedures Needed to Reconcile Ministry of Defense Advisors Program Disbursements to Other DoD Agencies Report No. DODIG-213-62 March 28, 213 Policies and Procedures Needed to Reconcile Ministry of Defense Advisors Program Disbursements to Other DoD Agencies Report Documentation Page Form Approved OMB No.

More information

DODIG July 18, Navy Did Not Develop Processes in the Navy Enterprise Resource Planning System to Account for Military Equipment Assets

DODIG July 18, Navy Did Not Develop Processes in the Navy Enterprise Resource Planning System to Account for Military Equipment Assets DODIG-2013-105 July 18, 2013 Navy Did Not Develop Processes in the Navy Enterprise Resource Planning System to Account for Military Equipment Assets Report Documentation Page Form Approved OMB No. 0704-0188

More information

HQMC 7 Jul 00 E R R A T U M. MCO dtd 9 Jun 00 MARINE CORPS POLICY ON DEPOT MAINTENANCE CORE CAPABILITIES

HQMC 7 Jul 00 E R R A T U M. MCO dtd 9 Jun 00 MARINE CORPS POLICY ON DEPOT MAINTENANCE CORE CAPABILITIES HQMC 7 Jul 00 E R R A T U M TO MCO 4000.56 dtd MARINE CORPS POLICY ON DEPOT MAINTENANCE CORE CAPABILITIES 1. Please insert enclosure (1) pages 1 thru 7, pages were inadvertently left out during the printing

More information

Incomplete Contract Files for Southwest Asia Task Orders on the Warfighter Field Operations Customer Support Contract

Incomplete Contract Files for Southwest Asia Task Orders on the Warfighter Field Operations Customer Support Contract Report No. D-2011-066 June 1, 2011 Incomplete Contract Files for Southwest Asia Task Orders on the Warfighter Field Operations Customer Support Contract Report Documentation Page Form Approved OMB No.

More information

OPNAVINST N9 16 Jun Subj: CHIEF OF NAVAL OPERATIONS SIMULATOR DEVELOPMENT AND TRAINING STRATEGY

OPNAVINST N9 16 Jun Subj: CHIEF OF NAVAL OPERATIONS SIMULATOR DEVELOPMENT AND TRAINING STRATEGY DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 1500.84 N9 OPNAV INSTRUCTION 1500.84 From: Chief of Naval Operations Subj: CHIEF OF

More information

REQUIREMENTS TO CAPABILITIES

REQUIREMENTS TO CAPABILITIES Chapter 3 REQUIREMENTS TO CAPABILITIES The U.S. naval services the Navy/Marine Corps Team and their Reserve components possess three characteristics that differentiate us from America s other military

More information

Defense Science Board Task Force Developmental Test and Evaluation Study Results

Defense Science Board Task Force Developmental Test and Evaluation Study Results Invited Article ITEA Journal 2008; 29: 215 221 Copyright 2008 by the International Test and Evaluation Association Defense Science Board Task Force Developmental Test and Evaluation Study Results Pete

More information

Subj: MISSION, FUNCTIONS, AND TASKS OF NAVAL SPECIAL WARFARE COMMAND

Subj: MISSION, FUNCTIONS, AND TASKS OF NAVAL SPECIAL WARFARE COMMAND DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON DC 20350-2000 OPNAVINST 5450.221E N3/N5 OPNAV INSTRUCTION 5450.221E From: Chief of Naval Operations Subj: MISSION,

More information

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2019 BUDGET ESTIMATES

DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2019 BUDGET ESTIMATES DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2019 BUDGET ESTIMATES JUSTIFICATION OF ESTIMATES MARCH 2018 Addendum to THIS PAGE INTENTIONALLY LEFT BLANK Activity Group: Air Operations Detail by Subactivity Group:

More information

An Introduction to Wargaming

An Introduction to Wargaming An Introduction to Wargaming Matthew B. Caffrey Jr. Chief, Wargaming Plans & Programs Directorate Air Force Research Laboratory 10 March 2008 Case Number AFRL 06-0042 Distribution A: Approved for public

More information

ACQUISITION OF THE ADVANCED TANK ARMAMENT SYSTEM. Report No. D February 28, Office of the Inspector General Department of Defense

ACQUISITION OF THE ADVANCED TANK ARMAMENT SYSTEM. Report No. D February 28, Office of the Inspector General Department of Defense ACQUISITION OF THE ADVANCED TANK ARMAMENT SYSTEM Report No. D-2001-066 February 28, 2001 Office of the Inspector General Department of Defense Form SF298 Citation Data Report Date ("DD MON YYYY") 28Feb2001

More information

DOD Leases of Foreign-Built Ships: Background for Congress

DOD Leases of Foreign-Built Ships: Background for Congress Order Code RS22454 Updated August 17, 2007 Summary DOD Leases of Foreign-Built Ships: Background for Congress Ronald O Rourke Specialist in National Defense Foreign Affairs, Defense, and Trade Division

More information

Developmental Test and Evaluation Is Back

Developmental Test and Evaluation Is Back Guest Editorial ITEA Journal 2010; 31: 309 312 Developmental Test and Evaluation Is Back Edward R. Greer Director, Developmental Test and Evaluation, Washington, D.C. W ith the Weapon Systems Acquisition

More information

Report No. D June 20, Defense Emergency Response Fund

Report No. D June 20, Defense Emergency Response Fund Report No. D-2008-105 June 20, 2008 Defense Emergency Response Fund Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection of information is estimated to average

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE POLICY DIRECTIVE 25-1 15 JANUARY 2015 Logistics Staff WAR RESERVE MATERIEL COMPLIANCE WITH THIS PUBLICATION IS MANDATORY ACCESSIBILITY: Publications

More information

GAO. DEPOT MAINTENANCE The Navy s Decision to Stop F/A-18 Repairs at Ogden Air Logistics Center

GAO. DEPOT MAINTENANCE The Navy s Decision to Stop F/A-18 Repairs at Ogden Air Logistics Center GAO United States General Accounting Office Report to the Honorable James V. Hansen, House of Representatives December 1995 DEPOT MAINTENANCE The Navy s Decision to Stop F/A-18 Repairs at Ogden Air Logistics

More information

White Space and Other Emerging Issues. Conservation Conference 23 August 2004 Savannah, Georgia

White Space and Other Emerging Issues. Conservation Conference 23 August 2004 Savannah, Georgia White Space and Other Emerging Issues Conservation Conference 23 August 2004 Savannah, Georgia Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection of information

More information

Department of Defense

Department of Defense '.v.'.v.v.w.*.v: OFFICE OF THE INSPECTOR GENERAL DEFENSE FINANCE AND ACCOUNTING SERVICE ACQUISITION STRATEGY FOR A JOINT ACCOUNTING SYSTEM INITIATIVE m

More information