1 Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February : Research, Development, Test & Evaluation, Air Force / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions) FY 2017 FY 2018 FY 2019 FY 2020 To Program Element Continuing Continuing : Counter Narcotics Technology A. Mission Description and Budget Item Justification This project provides for Counter-Drug activities Continuing Continuing B. Program Change Summary ($ in Millions) Previous President's Budget Current President's Budget Adjustments Congressional General Reductions - - Congressional Directed Reductions - - Congressional Rescissions - - Congressional Adds - - Congressional Directed Transfers - - Reprogrammings SBIR/STTR Transfer - - Other Adjustments Change Summary Explanation FY14 transfer from Drug Interaction and Counter-Drug Activities, Defense consistent with provisions in Public Law PE F: Counter Narco-Terrorism Air Force Page 1 of 5 R-1 Line #48
2 Exhibit R-2A, RDT&E Project Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) : Counter Narcotics Technology FY 2017 FY 2018 FY 2019 FY 2020 To Continuing Continuing Quantity of RDT&E Articles A. Mission Description and Budget Item Justification This project provides for Counter-Drug activities. B. Accomplishments/Planned Programs ($ in Millions) Title: Counter Narcotics Technology (CNTPO) Description: Funding to support efforts of the CNTPO program office FY 2014 Accomplishments: Support Counter-Drug activities FY 2015 Plans: Plans: Accomplishments/Planned Programs Subtotals C. Other Program Funding Summary ($ in Millions) Remarks D. Acquisition Strategy ing approach varies based on support required. E. Performance Metrics Please refer to the Performance Budget Overview Book for information on how Air Force resources are applied and how those resources are contributing to Air Force performance goals and most importantly, how they contribute to our mission. PE F: Counter Narco-Terrorism Air Force Page 2 of 5 R-1 Line #48
3 Exhibit R-3, RDT&E Project Analysis: PB 2016 Air Force : February 2015 Product Development ($ in Millions) Category Item To Counter-Drug activities Various Various : Various, Sep Subtotal Support ($ in Millions) Category Item To Test and Evaluation ($ in Millions) Category Item Management Services ($ in Millions) Category Item Remarks To To To Project s PE F: Counter Narco-Terrorism Air Force Page 3 of 5 R-1 Line #48
4 Exhibit R-4, RDT&E Schedule Profile: PB 2016 Air Force : February 2015 Counter Drug activities FY 2017 FY 2018 FY 2019 FY PE F: Counter Narco-Terrorism Air Force Page 4 of 5 R-1 Line #48
5 Exhibit R-4A, RDT&E Schedule Details: PB 2016 Air Force : February 2015 Schedule Details Start End Events Quarter Year Quarter Year Counter Drug activities PE F: Counter Narco-Terrorism Air Force Page 5 of 5 R-1 Line #48
UNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #44
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 4: Advanced Component Development & Prototypes (ACD&P) COST
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 32.797 23.511
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: National Security Space Office
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element - 10.630 - - - - - - - Continuing Continuing
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Office of the Secretary Of Defense : February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 4: Advanced Component Development
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 8 R-1 Line #77
Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)
More informationUNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 R-1 Line #208
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 United States Special Operations Command Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems
More informationUNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing EF4: Integrated Broadcast System
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) Years FY 2014
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Multi-Platform Electronics
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 14.370 15.574 - - - - - - - Continuing
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #47
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($
More informationUNCLASSIFIED. Cost To Complete Total Program Element : TECH SURVEIL COUNTER MEAS EQPT. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) Years FY 2014
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force Date: February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 6: RDT&E Management Support COST ($ in Millions) Prior
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: JOINT PERSONNEL RECOVERY AGENCY (JPRA) FY 2011 OCO Estimate. FY 2011 Total Estimate
Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 Air Force Page 1 of 9 FY 2012 FY 2013 FY 2014 FY 2015 To Program Element
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: JOINT PERSONNEL RECOVERY AGENCY (JPRA)
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 11.123 6.107 2.483-2.483 2.014 2.035 2.065 -
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 Navy Page 1 of 8 R-1 Line #82 To Program Element - -
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) FY 2017 FY 2018
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 United States Special Operations Command : February 2016 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 Air Force Page 1 of 6 R-1 Line #142 To Program Element - 2.292
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2014 United States Special Operations Command DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # Base OCO ## FY 2015 FY 2016 FY 2017 FY 2018
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
COST ($ in Millions) Total FY 2014 FY 2015 FY 2016 FY 2017 Air Force Page 1 of 6 R-1 Line #162 Cost To Complete Total Cost Total Program Element 5.829 5.779 5.699-5.699 5.762 5.881 6.046 6.124 Continuing
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: Project MDAP/MAIS Code(s): N42
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #118
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) FY 2017 FY 2018 FY 2019 FY 2020 Air Force Page 1 of 7 R-1 Line #118 To Program Element - 25.733 34.815
More informationUNCLASSIFIED. Cost To Complete Total Program Element : Hard Target Void Sensing Fuze.
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 United States Special Operations Command : February 2015 0400:, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Office of the Secretary Of Defense Date: February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 3: Advanced Technology Development
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Office of the Secretary Of Defense : February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 4: Advanced Component Development
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0603432F PE TITLE: Polar MILSATCOM (Space) Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 04 Advanced Component Development and Prototypes (ACD&P) 0603432F
More informationUNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : OC-135 Open Skies Sensors
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete Total Total Program Element - 15.000
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Office of the Secretary Of Defense : February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Air Force Page 1 of 7 R-1 Line #29 Cost To Complete Total Cost Total Program Element 0.967 3.586 3.704-3.704 3.874 3.975
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Missile Defense Agency Date: February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 3: Advanced Development (ATD) COST ($
More informationUNCLASSIFIED. Cost To Complete Total Program Element S750: Mission Training and Preparation Systems FY 2015
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 United States Special Operations Command Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Development
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Army DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete Total Total Program Element - 15.287
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: NUCLEAR WEAPON MODERNIZATION FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element - - 93.867-93.867 158.218 315.238 397.880
More informationUNCLASSIFIED. R-1 Program Element (Number/Name) PE SE / Homeland Security Presidential Directive (HSPD-12) Initiative
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 DoD Human Resources Activity : March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 5: System Development & Demonstration (SDD)
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #90
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) Total Program Element 0.912 2.292 2.095-2.095 3.633 4.555 - - Continuing Continuing 671325: HH-60G
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #169
COST ($ in Millions) Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 FY 2015 OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Cost To Complete Total Program Element - 59.342 38.099 67.057-67.057 73.790 71.702
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Joint Command and Control. FY 2011 Total Estimate. FY 2011 OCO Estimate
Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Program Element 3.140 0.000 0.000 0.000
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 20 R-1 Line #37
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 4: Advanced Component Development & Prototypes (ACD&P) COST
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 12.496 13.253 13.683-13.683 14.037 14.565 15.011 15.378 Continuing
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 7 R-1 Line #91
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 0.000 4.007 2.218-2.218
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 0.000 24.500 23.016-23.016 25.350 26.026
More informationUNCLASSIFIED. Cost To Complete Total Program Element : R/SAOC MODERNIZATION. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 11.589 20.727 63.853-63.853 60.995 19.248 19.291 15.230 Continuing
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 23.729 9.423 21.175-21.175
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #89
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 4: Advanced Component Development & Prototypes (ACD&P) COST
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)
More informationUNCLASSIFIED. Prior Years FY 2013 FY Total Cost FY 2015
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Office of Secretary Of Defense Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 2: Applied Research COST ($ in Millions)
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)
More informationUNCLASSIFIED. Cost To Complete Total Program Element : TECH SURVEIL COUNTER MEAS EQPT. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationUNCLASSIFIED. R-1 Program Element (Number/Name) PE T / Overseas Humanitarian Assistance Shared Information System (OHASIS)
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Defense Security Cooperation Agency Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
COST ($ in Millions) Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 20.022 6.466 5.609-5.609 1.700 1.509 - - Continuing Continuing 674592: Region/Sector Operations
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #123
COST ($ in Millions) Prior Years FY 2013 FY 2014 OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Complete Total Program Element - 0.322 0.450 0.450-0.450 0.454 0.462 0.471 0.481 Continuing Continuing 674797:
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0603432F PE TITLE: Polar MILSATCOM (Space) Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 04 Advanced Component Development and Prototypes (ACD&P) 0603432F
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Program Element 24.648 42.347 68.325-68.325 66.869 4.46 -
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 3.288 8.653 7.029-7.029
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Office of Secretary Of Defense DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # PE 0607210D8Z: Industrial Analysis and Support ## FY 2015
More informationUNCLASSIFIED. R-1 Program Element (Number/Name) PE BB / SOF Visual Augmentation, Lasers and Sensor Systems. Prior Years FY 2013 FY 2014 FY 2015
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 United States Special Operations Command Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 16.397 1.975 1.971-1.971 1.990 1.989 2.023
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 6.321 5.000 0.400-0.400 66.100 69.800 11.800
More informationUNCLASSIFIED. R-1 Program Element (Number/Name) PE A / ADVANCED TANK ARMAMENT SYSTEM (ATAS)
Exhibit R2, RDT&E Budget Item Justification: PB 2015 Army : March 2014 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Program Element 147.268 6.751 61.163-61.163 94.537 369.826
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 1.920 2.055 2.048-2.048 2.049 2.085 2.120
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)
More informationUNCLASSIFIED. Cost To Complete Total Program Element 1, , : Evolved Expendable Launch Vehicle
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Program Element 14.686 19.596 5.54-5.54 5.597 5.362 5.54 5.51
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Biometrics Enabled Intelligence FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element - 14.114 15.018-15.018 15.357 15.125
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #176
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) Years FY 2018 FY 2019 FY 2020 FY 2021 To Program Element - 24.963 76.760 30.948 0.000 30.948 20.563
More informationUNCLASSIFIED. FY 2016 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Office of the Secretary Of Defense : February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 4: Advanced Component Development
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 4.270 1.629 3.680-3.680 3.696 3.742 3.811 3.827 Continuing Continuing
More informationUNCLASSIFIED FY 2017 OCO. FY 2017 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Army : February 2016 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) Years FY 2015
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Defense Information Systems Agency DATE: February 2012 COST ($ in Millions) FY 2014 FY 2015 FY 2016 FY 2017 To Complete Element - 5.500 - - - - - -
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #164
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational s Development COST ($ in Millions) FY 2017
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: 493
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) Years PE 0605230F / Ground d Strategic Deterrent FY 2018 FY 2019 FY 2020 FY 2021 To Program Element
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: 468
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 Air Force Page 1 of 9 R-1 Line #85 To Program
More informationUNCLASSIFIED UNCLASSIFIED
Exhibit R, RDT&E Budget Item Justification: PB 017 1319: Research, Development, Test & Evaluation, / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions) FY 015 FY 016 R1 Program
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #90
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 25.793 5.631 14.652-14.652 - - - - Continuing Continuing 65A023: Satellite
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 214 Army DATE: April 213 COST ($ in Millions) Years FY 212 FY 213 # ## FY 215 FY 216 FY 217 FY 218 To Program Element - 62.343 14.347 49.989-49.989 58.6
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Human, Social and Culture Behavior (HSCB) Modeling Advanced Development FY 2011 OCO Estimate
Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Office of Secretary Of Defense DATE: February 2010 0400: Research,, Test & Evaluation, Defense-Wide BA 4: Advanced Component & Prototypes (ACD&P) COST
More informationUNCLASSIFIED. Cost To Complete Total Program Element : Integrated Broadcast Service FY 2015
COST ($ in Millions) Prior Years FY 2013 FY 2014 OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Air Force Page 1 of 5 R-1 Line #36 Complete Total Program Element - 18.216 - - - - - - - - - 18.216 644778:
More informationUNCLASSIFIED. UNCLASSIFIED Army Page 1 of 5 R-1 Line #138
Exhibit R2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2013
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 To Complete Total Total Program Element - 1.650 - - - 0.069 0.215 - - 0.000 1.934 2906:
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 13.610 13.355 12.874-12.874
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Defense Security Cooperation Agency : February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE T: Overseas Humanitarian Assistance Shared Information System (OHASIS)
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Defense Security Cooperation Agency DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Army DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete Total Total Program Element 3.000 10.165
More information