2 Assistant Secretary of the Army for Acquisition, Logistics, and Technology 2016 Army Acquisition Executive s (AAE) Excellence in Leadership Award PRODUCT MANAGEMENT/ PRODUCT DIRECTOR OFFICE TEAM OF THE YEAR (05 LEVEL) Nominating Organization: PEO CS&CSS PM FP PdM Bridging 6501 E. 11 Mile Road Warren, MI Administrative Information Nomination Submission POC: LTC Jeff Biggans, , jeffrey.s.biggans.mil@mail.mil Team Name: Joint Assault Bridge (JAB) Integrated Product Team (IPT) Team Leader: Ms. Donna Morgan Team Leader donna.j.morgan22.civ@mail.mil

3 Award Narrative Background: The Joint Assault Bridge Integrated Product Team (IPT) manages the development and production of a critical assault gap crossing capability for heavy combat maneuver forces. The JAB will replace the Armored Vehicle Launched Bridge (AVLB), which is beyond its intended useful life and is a challenge to maintain an operationally ready fleet due to obsolescence issues. The JAB improves survivability and mobility of the assault bridgelaying platform by re-utilizing excess M1A1 Abrams tank chassis, and integrating a modern bridge launching mechanism on the more survivable and maneuverable M1A1 compared to the M60 tank chassis of the AVLBs. The Army intends to procure 337 JABs with eighteen-meter bridges capable of a military load classification 85. The JAB IPT is led by a team within the Product Manager (PdM) Bridging, that also includes the acquisition and life-cycle support of sixteen Department of Defense equipment systems within the Army s Project Office, Force Projection which is subordinate to the Program Executive Officer, Combat Support and Combat Service Support (CS&CSS). The JAB is an Army Acquisition Category II program, with an Average Unit Procurement Cost of $5.8 million per system, and an Army Acquisition Objective of 337 systems. During the past year, the Integrated Product Team (IPT) for the Joint Assault Bridge (JAB) completed efforts supporting a production contract award on 11 May 2016, valued over $400 million for an eight-year period of performance. Over the course of the past year, the JAB IPT worked to include technical data rights into the JAB Request for Proposal (RFP) allowing technical data to be completed during full and open competition resulting in a $79 million savings. Efforts to increase competition within the core framework of the latest Better Buying Power initiatives resulted in a cost avoidance of nearly $300 million compared against the most recent Life Cycle Cost Estimate. The government valued the technical data to support recompeting the follow-on contract at $80 million, and the contract award included the technical data as a $700 thousand option. The JAB IPT included proposal language that incentivized the contractors to create a public-private partnership with Anniston Army Depot (ANAD) under a Total Production Management concept requiring the contractor to be responsible for supply chain management and quality control of the production efforts planned at the depot. The JAB IPT managed the key performance risk to the program, a potential shortfall between the force protection and survivability requirements dating back to the early 80 s, and the current, realistic threats, by managing risk through efforts through a unique Configuration Steering Board that clarified the force protection and survivability requirements ahead of live fire testing and evaluation. The JAB IPT conducted risk mitigation efforts for crew protection by designing and testing a potential armor improvement prior to contract award. The effort for armor testing prior to contract award also reduced risk to the full material release schedule. The JAB IPT is truly deserving of this recognition for their outstanding accomplishments on a system vital to Army Engineers, enabling freedom of maneuver on the battlefield and the ability to keep pace with the Armored Brigade Combat Teams and Mobility Augmentation Companies. Talent management and knowledge transfer efforts to build competencies of current and future leaders: During the past year, the JAB IPT and its parent organization experienced approximately 30% turn-over in new personnel during critical Milestone C documentation preparations, source selection support, and mitigation of crew force protection concerns. The majority of the JAB IPT is built through memorandums of agreement with matrix organizations, with large support from contracting command, TACOM logistics divisions, and TARDEC

4 engineering. At every JAB IPT, it was evident that diversity of backgrounds and experiences were welcomed and encouraged to tackle tough and unique problems facing the relatively smallstaffed JAB program. Throughout 2016, the JAB IPT regularly participated in scheduled Bridging Supervisory Leadership Forums, Team Chief Leadership Forums and Bridging Roundtables. These all provided, at different levels of the collective Bridging workforce, the sharing of ideas, best practices, and lessons learned to help foster teamwork and the sharing of information within the geographic disparate team to include key stakeholders in HQDA, ASA (ALT) and TRADOC. The Bridging Roundtables provided professional development and shared lessons learned across the matrix organization, focusing on logistics, acquisition best practices, and promoting respect between functional areas of expertise. Additionally, JAB IPT members were often directed to seek out the best practices of the JAB s peer organizations, especially those successfully navigating similar challenges such as peers from the Joint Light Tactical Vehicle, Armored Multi-Purpose Vehicle, Mine Resistant Ambush Protected, and Medium and Heavy Tactical Vehicle programs. The JAB IPT leaders involved and enabled participation of team members in high-level General Officer/Senior Executive Service chaired meetings, such as a configuration steering board in April 2016 between the commandants, the Engineer School and the JAB Milestone Decision Authority for clarify the crew force protection requirements. By providing junior JAB IPT members the opportunity to attend and brief at these meetings, it helped develop and posture them for positions of increased responsibility. JAB IPT members were also encouraged to apply for developmental assignments as they arose which three people did in the areas of the ASARC Secretariat, Program Officer, an NH-4 level developmental promotion, and HQDA G8 Staff Synchronization Officer developmental programs. These assignments helped accelerate their learning and gave them a better understanding of Army acquisition processes. Additionally, one teammate fulfilled an assignment in the CENTCOM Theater as PM Force Projection Forward, a six-month deployment, to ensure PM Force Projection products are properly supported. The JAB IPT leaders consciously requested junior members of the team and matrix support organization to attend meetings in the Pentagon or via video teleconference for their professional growth and development. Supporting the principles of the ASA(ALT) priorities: The JAB IPT demonstrated their understanding of the ASA(ALT) priorities of: People, Products and Processes throughout the past year while working to get the JAB production contract awarded, while also managing current programs and future schedule risks relating evaluation of crew force protection. Achieve Affordable Products: During the past year, the JAB IPT completed efforts supporting a contract worth up to $400 million, for an eight-year production contract awarded on 11 May The JAB IPT worked to include technical data rights into the JAB request for proposal allowing technical data to be competed in the full and open competition within the framework of the Better Buying Power initiatives. The government valued the technical data at $80 million to support a later competition for a follow-on contract. The contract award resulted in the technical data being included in the price of the JAB plus only a $700 thousand option to procure the technical data package to allow the government to compete the production design at the conclusion of the eight year period of performance. The JAB IPT designed a unique and creative request for proposal process that ultimately stands to realize savings of up to $300 million in production costs over eight years based upon comparing the actual contract price of

5 $400 million for up to 270 plus JABs over eight years to the recent Life Cycle Cost Estimate for the JAB production that estimated the contract value at over $700 million for the same period. Process - Control Costs Throughout the Product Lifecycle: The JAB IPT designed in lifecycle cost control measures in their request for proposal (RFP) for the JAB production contract by requesting and evaluating technical data during the source selection process, and by incentivizing the contractors to create a public/private partnership (PPP) with Anniston Army Depot (ANAD). The government valued the technical data rights at $80 million, but recently awarded the contract for a technical data package (TDP) delivery of less than $1 million, while also reducing expected lifecycle production costs by almost 50%. If the JAB program is funded to support full rate production capability of 48 JABs per year starting in fiscal year 2020, the government could realize up $380 million in savings over eight years including delivery of the TDP and the lower contract price for the bridge launcher contract compared against the 2016 Life Cycle Cost Estimate (LCCE). The government plans to conduct make/buy analysis for supplying parts either through contractor control or through organic government management beyond the third year of production with a goal of achieving the best value for the government over the entire lifecycle of managing the JAB sustainment components. People and Process - Incentivize Productivity in Industry and Government: The JAB IPT incentivized a PPP with ANAD with the aim to pay the contractor to control quality of production at ANAD, ultimately reducing programmatic costs, as well as the contractor being responsible for supply chain management to reduce production schedule risks. Quality control and supply chain management are areas of high risk in many acquisition programs, and especially challenging at government depots. The request for proposal for the JAB production contract incentivized the contractor to assume responsibility of these challenging production issues at the depot. Because the JAB IPT is staffed at Acquisition Category (ACAT) III levels, which is about one-third the size of a typical ACAT I IPT, it was important to shift responsibility of depot production quality control and supply chain management as far into the contractor s lane as possible. The unique request for proposal created three work breakdown structures in which the government would pay depot labor and parts for all of the work on chassis teardown, and the contractor could select depot task for production that the government would also fund directly. This incentivized the contractor to select as many chassis production tasks as possible at the depot, and limited risk to the contractor concerning depot labor rates increasing over the life of the production contract. Process - Eliminate Unproductive Processes and Bureaucracy: The JAB IPT worked closely with the Milestone Decision Action Coordinator (MDAC) of the office of the Program Executive Officer for Combat Support and Combat Service Support (PEO CS&CSS) to create an efficient Milestone C package without undue, excessive staffing requirements. The JAB IPT worked with the PEO CS&CSS MDAC to reduce the required documents from over 50, to 34 documents for Milestone C decision and eventual approval. Product - Promote Effective Competition: The Engineering and Manufacturing Development (EMD) phase ensured competition for the production contract by awarding two contractors EMD contracts. The strategy for two EMD contracts ensured effective competition for the production contracts. The JAB IPT also increased the effective years of the production contract by challenging Army contracting norms by making the contract period eight years, vice the more

6 traditional five year period. An eight year contract period allowed for effective development of the requested technical data for the production contract, and allow for future full and open competition for the remaining JABs that need produced beyond the eight year period of performance of the initial JAB production contract. The unique request for proposal with the three work break down structures for task relating to preparing the tank chassis, remanufacturing of the tank chassis, and integrating the bridge launcher mechanism ensured the maximum competition possible for the JAB production contract by incentivizing a non-tank chassis original equipment manufacturer to partner with an organic government depot that could provide inherit tank chassis production expertise.

7 Award Citation Joint Assault Bridge Integrated Product Team Award Citation The Joint Assault Bridge (JAB) is the Army and the Marine Corp s solution to modernizing and improving assault gap crossing capabilities for the maneuver forces. The JAB Integrated Product Team (IPT) adopted the best practices of Better Buying Power to manage the engineering and manufacturing development phase testing, the request for proposal process, the milestone C approval, and award of an eight year production contract valued at more than $400 million. The JAB IPT consists of approximately 75 individuals, roughly one-third the size of typical Acquisition Category I programs, while under oversight of the Office of the Secretary of Defense for live fire and operational testing. The diversity of backgrounds and expertise ultimately led to successful mitigation of difficult problems relating to technical data and force protection requirements. The JAB IPT embraced the successes of peers, and tailored their best practices for requesting and evaluating technical data in support of the low rate initial production contract. The JAB contract award included a unit cost below the life cycle cost estimate by nearly $300 million over eight years, and included the technical data package for a price approximately $80 million below what the IPT valued the data s worth to the government.

SUBJECT: Army Directive (Implementation of Acquisition Reform Initiatives 1 and 2)

SUBJECT: Army Directive (Implementation of Acquisition Reform Initiatives 1 and 2) S E C R E T A R Y O F T H E A R M Y W A S H I N G T O N MEMORANDUM FOR SEE DISTRIBUTION SUBJECT: Army Directive 2017-22 (Implementation of Acquisition Reform Initiatives 1 and 2) 1. References. A complete

More information

NDIA TWV Conference. DISTRIBUTION A: Approved for Public Release (1) 16 May 2017

NDIA TWV Conference. DISTRIBUTION A: Approved for Public Release (1) 16 May 2017 NDIA TWV Conference 16 May 2017 COL Daniel L. Furber Project Manager (586) 282-5569 daniel.l.furber.mil@mail.mil DISTRIBUTION A: Approved for Public Release (1) PEO CS&CSS (2) Roles and Responsibilities

More information

FOR IMMEDIATE RELEASE No June 27, 2001 THE ARMY BUDGET FISCAL YEAR 2002

FOR IMMEDIATE RELEASE No June 27, 2001 THE ARMY BUDGET FISCAL YEAR 2002 FOR IMMEDIATE RELEASE No. 01-153 June 27, 2001 THE ARMY BUDGET FISCAL YEAR 2002 Today, the Army announced details of its budget for Fiscal Year 2002, which runs from October 1, 2001 through September 30,

More information

REQUIREMENTS TO CAPABILITIES

REQUIREMENTS TO CAPABILITIES Chapter 3 REQUIREMENTS TO CAPABILITIES The U.S. naval services the Navy/Marine Corps Team and their Reserve components possess three characteristics that differentiate us from America s other military

More information

Prepared for Milestone A Decision

Prepared for Milestone A Decision Test and Evaluation Master Plan For the Self-Propelled Artillery Weapon (SPAW) Prepared for Milestone A Decision Approval Authority: ATEC, TACOM, DASD(DT&E), DOT&E Milestone Decision Authority: US Army

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 211 FY 212 Total FY 214 FY 215 FY 216 FY 217 Army

More information

A udit R eport. Office of the Inspector General Department of Defense. Report No. D October 31, 2001

A udit R eport. Office of the Inspector General Department of Defense. Report No. D October 31, 2001 A udit R eport ACQUISITION OF THE FIREFINDER (AN/TPQ-47) RADAR Report No. D-2002-012 October 31, 2001 Office of the Inspector General Department of Defense Report Documentation Page Report Date 31Oct2001

More information

Subj: DEPARTMENT OF THE NAVY POLICY ON INSENSITIVE MUNITIONS

Subj: DEPARTMENT OF THE NAVY POLICY ON INSENSITIVE MUNITIONS DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 8010.13E N96 OPNAV INSTRUCTION 8010.13E From: Chief of Naval Operations Subj: DEPARTMENT

More information

TWV Fleet Maintenance Challenges

TWV Fleet Maintenance Challenges TWV Fleet Maintenance Challenges 2012 National Defense Industrial Association (NDIA) Conference 6 February 2012 Mr. Christopher Lowman Maintenance Directorate, G-4 Headquarters, Department of the Army

More information

Tactical Wheeled Vehicle Sustainment

Tactical Wheeled Vehicle Sustainment Tactical Wheeled Vehicle Sustainment NDIA TWV Conference 6 May 2014 LTG Raymond V. Mason Deputy Chief of Staff, G-4 Headquarters, Department of the Army Agenda Overarching Themes Minimizing Hardware Solutions

More information

Commanding an Army Field Support Battalion

Commanding an Army Field Support Battalion Commanding an Army Field Support Battalion The 2d Battalion, 401st Army Field Support Brigade, supported the increase of forces in Afghanistan and the drawdown of forces in Iraq through Army pre-positioned

More information

FORCE XXI BATTLE COMMAND, BRIGADE AND BELOW (FBCB2)

FORCE XXI BATTLE COMMAND, BRIGADE AND BELOW (FBCB2) FORCE XXI BATTLE COMMAND, BRIGADE AND BELOW (FBCB2) Army ACAT ID Program Prime Contractor Total Number of Systems: 59,522 TRW Total Program Cost (TY$): $1.8B Average Unit Cost (TY$): $27K Full-rate production:

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 Army Page 1 of 19 R-1 Line #165 To Program Element 187.27 36.15

More information

MULTIPLE LAUNCH ROCKET SYSTEM (MLRS) M270A1 LAUNCHER

MULTIPLE LAUNCH ROCKET SYSTEM (MLRS) M270A1 LAUNCHER MULTIPLE LAUNCH ROCKET SYSTEM (MLRS) M270A1 LAUNCHER Army ACAT IC Program Prime Contractor Total Number of Systems: 857 Lockheed Martin Vought Systems Total Program Cost (TY$): $2,297.7M Average Unit Cost

More information

REPORT TO CONGRESS ON CHIEF OF STAFF OF THE ARMY ACQUISITION AUTHORITIES. March 2016

REPORT TO CONGRESS ON CHIEF OF STAFF OF THE ARMY ACQUISITION AUTHORITIES. March 2016 REPORT TO CONGRESS ON CHIEF OF STAFF OF THE ARMY ACQUISITION AUTHORITIES March 2016 In Response to Section 801 of the National Defense Authorization Act for Fiscal Year 2016 Pub. L. 114 92 The estimated

More information

Assistant Secretary of the Army for Acquisition, Logistics, and Technology Forward Support to Unified Land Operations. May 2014

Assistant Secretary of the Army for Acquisition, Logistics, and Technology Forward Support to Unified Land Operations. May 2014 ATP 4-70 Assistant Secretary of the Army for Acquisition, Logistics, and Technology Forward Support to Unified Land Operations May 2014 DISTRIBUTION RESTRICTION: Approved for public release; distribution

More information

ACQUISITION OF THE ADVANCED TANK ARMAMENT SYSTEM. Report No. D February 28, Office of the Inspector General Department of Defense

ACQUISITION OF THE ADVANCED TANK ARMAMENT SYSTEM. Report No. D February 28, Office of the Inspector General Department of Defense ACQUISITION OF THE ADVANCED TANK ARMAMENT SYSTEM Report No. D-2001-066 February 28, 2001 Office of the Inspector General Department of Defense Form SF298 Citation Data Report Date ("DD MON YYYY") 28Feb2001

More information

Quartermaster Hall of Fame Nomination

Quartermaster Hall of Fame Nomination Nominator Instructions PACKET: A Hall of Fame Nomination Packet must include: Nomination Letter Official Photograph Biographical Information (dates of service, date retired, highest level of education,

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 214 Army DATE: April 213 COST ($ in Millions) Years FY 212 FY 213 # ## FY 215 FY 216 FY 217 FY 218 To Program Element - 35.46 253.959 177.532-177.532 219.937

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / ADVANCED TANK ARMAMENT SYSTEM (ATAS)

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / ADVANCED TANK ARMAMENT SYSTEM (ATAS) Exhibit R2, RDT&E Budget Item Justification: PB 2015 Army : March 2014 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

Since formally creating an Army Acquisition

Since formally creating an Army Acquisition Life Cycle Management Commands Building a Better Logistics Sustainment Base for the Future LTC James O. Winbush Jr., Christopher S. Rinaldi and Antonia R. Giardina Since formally creating an Army Acquisition

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE COST (In Thousands) FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate

More information

To THE DEFENSE ACQUISITION WORKFORCE

To THE DEFENSE ACQUISITION WORKFORCE To THE DEFENSE ACQUISITION WORKFORCE When I took over my duties as Deputy Under Secretary of Defense for Acquisition and Technology, I was awed by the tremendous professionalism and ability of our acquisition

More information

The Army s Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress

The Army s Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress The Army s Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress Andrew Feickert Specialist in Military Ground Forces February 24, 2016 Congressional Research Service 7-5700 www.crs.gov

More information

Department of Defense INSTRUCTION

Department of Defense INSTRUCTION Department of Defense INSTRUCTION NUMBER 4245.14 October 26, 2012 Incorporating Change 1, October 31, 2017 USD(AT&L) SUBJECT: DoD Value Engineering (VE) Program References: See Enclosure 1 1. PURPOSE.

More information

NAVAIR Commander s Awards recognize teams for excellence

NAVAIR Commander s Awards recognize teams for excellence NAVAIR News Release NAVAIR Commander Vice Adm. David Architzel kicks of the 11th annual NAVAIR Commander's National Awards Ceremony at Patuxent River, Md., June 22. (U.S. Navy photo) PATUXENT RIVER, Md.

More information

The Army Executes New Network Modernization Strategy

The Army Executes New Network Modernization Strategy The Army Executes New Network Modernization Strategy Lt. Col. Carlos Wiley, USA Scott Newman Vivek Agnish S tarting in October 2012, the Army began to equip brigade combat teams that will deploy in 2013

More information

AMC s Fleet Management Initiative (FMI) SFC Michael Holcomb

AMC s Fleet Management Initiative (FMI) SFC Michael Holcomb AMC s Fleet Management Initiative (FMI) SFC Michael Holcomb In February 2002, the FMI began as a pilot program between the Training and Doctrine Command (TRADOC) and the Materiel Command (AMC) to realign

More information

GLOBAL BROADCAST SERVICE (GBS)

GLOBAL BROADCAST SERVICE (GBS) GLOBAL BROADCAST SERVICE (GBS) DoD ACAT ID Program Prime Contractor Total Number of Receive Suites: 493 Raytheon Systems Company Total Program Cost (TY$): $458M Average Unit Cost (TY$): $928K Full-rate

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 Navy Page 1 of 8 R-1 Line #83 To Program Element - -

More information

process since the beginning of the program and will continue that involvement throughout the life cycle of the program.

process since the beginning of the program and will continue that involvement throughout the life cycle of the program. The Expeditionary Fighting Vehicle (EFV) is a key component of the Marine Corps' Expeditionary Maneuver Warfare (EMW) and Ship-to-Objective Maneuver (STOM) warfighting concepts. It represents the Marine

More information

Future Combat Systems

Future Combat Systems Future Combat Systems Advanced Planning Briefing for Industry (APBI) BG John Bartley 15 October Overarching Acquisition Strategy Buy Future Combat Systems; Equip Soldiers; Field Units of Action (UA) Embrace

More information

COMMON AVIATION COMMAND AND CONTROL SYSTEM

COMMON AVIATION COMMAND AND CONTROL SYSTEM Section 6.3 PEO LS Program COMMON AVIATION COMMAND AND CONTROL SYSTEM CAC2S Program Background The Common Aviation Command and Control System (CAC2S) is a modernization effort to replace the existing aviation

More information

OPNAVINST DNS-3/NAVAIR 24 Apr Subj: MISSIONS, FUNCTIONS, AND TASKS OF THE COMMANDER, NAVAL AIR SYSTEMS COMMAND

OPNAVINST DNS-3/NAVAIR 24 Apr Subj: MISSIONS, FUNCTIONS, AND TASKS OF THE COMMANDER, NAVAL AIR SYSTEMS COMMAND DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 5450.350 DNS-3/NAVAIR OPNAV INSTRUCTION 5450.350 From: Chief of Naval Operations Subj:

More information

U.S. Army representatives used the venue of the 2012

U.S. Army representatives used the venue of the 2012 By Scott R. Gourley U.S. Army representatives used the venue of the 2012 AUSA Annual Meeting and Exposition to outline a wide range of fielding, modernization and sustainment activities for its fleet of

More information

UNCLASSIFIED. Cost To Complete Total Program Element ED8: Paladin Integrated Management (PIM)

UNCLASSIFIED. Cost To Complete Total Program Element ED8: Paladin Integrated Management (PIM) Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

National Guard Priority Equipment Synchronization Mr Rick F. Yates ARNG-RMQ

National Guard Priority Equipment Synchronization Mr Rick F. Yates ARNG-RMQ National Guard Priority Equipment Synchronization Mr Rick F. Yates ARNG-RMQ 703-607-7891 rickey.f.yates.civ@mail.mil RMQ Overview ARNG-RMQ The Materiel Programs Division (RMQ) is the Army National Guard

More information

Public-Private Private Partnering

Public-Private Private Partnering Public-Private Private Partnering Anniston Army Depot a key and critical asset () Anniston Army Depot and complement each other (-Anniston) M1A1 AIM -Abrams Integrated Management M1A2 SEP-Systems Enhancement

More information

Army National Guard & Reserve Equipment Appropriation (NGREA 101) Mr. Andy Tate ARNG-RMQ

Army National Guard & Reserve Equipment Appropriation (NGREA 101) Mr. Andy Tate ARNG-RMQ Army National Guard & Reserve Equipment Appropriation (NGREA 101) Mr. Andy Tate ARNG-RMQ 703-601-6918 andrew.j.tate4.civ@mail.mil Authority/Intent of NGREA NGREA is a special Defense Appropriation (procurement)

More information

DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS 3000 MARINE CORPS PENTAGON WASHINGTON, DC

DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS 3000 MARINE CORPS PENTAGON WASHINGTON, DC DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS 3000 MARINE CORPS PENTAGON WASHINGTON, DC 20350-3000 MCO 3100.4 PLI MARINE CORPS ORDER 3100.4 From: To: Subj: Commandant of the Marine Corps

More information

AUSA BACKGROUND BRIEF

AUSA BACKGROUND BRIEF ... - AUSA BACKGROUND BRIEF No. 57 May 1993 Army Issue: STRATEGIC MOBILITY, SUSTAINMENT AND ARMY MISSIONS EXECUTIVE SUMMARY The Army has developed a strategy to meet its mobility challenges for the 1990s

More information

Department of Defense INSTRUCTION

Department of Defense INSTRUCTION Department of Defense INSTRUCTION NUMBER 1348.30 November 27, 2013 USD(AT&L) SUBJECT: Secretary of Defense Maintenance Awards References: See Enclosure 1 1. PURPOSE. This instruction reissues DoD Instruction

More information

NOTICE OF DISCLOSURE

NOTICE OF DISCLOSURE NOTICE OF DISCLOSURE A recent Peer Review of the NAVAUDSVC determined that from 13 March 2013 through 4 December 2017, the NAVAUDSVC experienced a potential threat to audit independence due to the Department

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 125.44 31.649 4.876-4.876 25.655

More information

Army Participation in the Defense Logistics Agency Weapon System Support Program

Army Participation in the Defense Logistics Agency Weapon System Support Program Army Regulation 711 6 Supply Chain Integration Army Participation in the Defense Logistics Agency Weapon System Support Program Headquarters Department of the Army Washington, DC 15 May 2009 UNCLASSIFIED

More information

Applying Enterprise Architecting within Army Transformation

Applying Enterprise Architecting within Army Transformation Applying Enterprise Architecting within Army Transformation Prof. Nightingale / LTC Matty 22 January 2009 http://lean.mit.edu 2008 Massachusetts Institute of Technology Nightingale 11/17/08-1 Agenda Enterprise

More information

Better Cost-Control Measures Are Needed on the Army's Cost-Reimbursable Services Contract for Logistics Support of Stryker Vehicles

Better Cost-Control Measures Are Needed on the Army's Cost-Reimbursable Services Contract for Logistics Support of Stryker Vehicles Report No. DODIG-2012-102 June 18, 2012 Better Cost-Control Measures Are Needed on the Army's Cost-Reimbursable Services Contract for Logistics Support of Stryker Vehicles Report Documentation Page Form

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 Total FY 214 FY 215 FY 216 FY 217 To Complete Total Total Program Element 35.849 4.314 3.56-3.56

More information

Tank Automotive Research, Development & Engineering Center (TARDEC)

Tank Automotive Research, Development & Engineering Center (TARDEC) Tank Automotive Research, Development & Engineering Center (TARDEC) A major element of RDECOM and partner in the TACOM Life-Cycle Management Command: Provides full life-cycle engineering support provider-of-first-choice

More information

DoD Countermine and Improvised Explosive Device Defeat Systems Contracts for the Vehicle Optics Sensor System

DoD Countermine and Improvised Explosive Device Defeat Systems Contracts for the Vehicle Optics Sensor System Report No. DODIG-2012-005 October 28, 2011 DoD Countermine and Improvised Explosive Device Defeat Systems Contracts for the Vehicle Optics Sensor System Report Documentation Page Form Approved OMB No.

More information

DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS 3000 MARINE CORPS PENTAGON WASHINGTON, DC

DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS 3000 MARINE CORPS PENTAGON WASHINGTON, DC DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS 3000 MARINE CORPS PENTAGON WASHINGTON, DC 20350-3000 MARINE CORPS BULLETIN 4105 L BEC From: To: Subj: Ref: Commandant of the Marine Corps

More information

Program Manager Training Systems PM 203

Program Manager Training Systems PM 203 13-14 May 2008 Program Manager Training Systems PM 203 Col Frank L. Kelley, Program Manager Brian S. Kummer, Business & Operations Manager Mission: To improve the Warfighting effectiveness of the MAGTF

More information

PERFORMANCE WORK STATEMENT (PWS) Logistics Support for the Theater Aviation Maintenance Program (TAMP) Equipment Package (TEP)

PERFORMANCE WORK STATEMENT (PWS) Logistics Support for the Theater Aviation Maintenance Program (TAMP) Equipment Package (TEP) PERFORMANCE WORK STATEMENT (PWS) Logistics Support for the Theater Aviation Maintenance Program (TAMP) Equipment Package (TEP) 1.0 MISSION OBJECTIVE: Provide sustainment and logistics support to the Theater

More information

The Army s Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress

The Army s Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress The Army s Armored Multi-Purpose Vehicle (AMPV): Background and Issues for Congress Andrew Feickert Specialist in Military Ground Forces September 14, 2016 Congressional Research Service 7-5700 www.crs.gov

More information

DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON DC

DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON DC DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON DC 20350-2000 OPNAVINST 8011.9C N81 OPNAV INSTRUCTION 8011.9C From: Chief of Naval Operations Subj: NAVAL MUNITIONS

More information

NDIA Ground Robotics Symposium

NDIA Ground Robotics Symposium NDIA Ground Robotics Symposium Mr. Tom Dee DASN ELM 703-614-4794 Pentagon 4C746 1 Agenda Context Current environment Robotics Way Ahead AAV MRAP Family of Vehicles 2 ELM Portfolio U.S. Marine Corps ground

More information

Alternatives for Success. One Program s Unconventional Structure

Alternatives for Success. One Program s Unconventional Structure Alternatives for Success One Program s Unconventional Structure Maj. Christopher P. Hill Frank Kendall, Under Secretary of Defense for Acquisition, Technology and Logistics, continues to champion the initiatives

More information

Defense Acquisition Review Journal

Defense Acquisition Review Journal Defense Acquisition Review Journal 18 Image designed by Jim Elmore Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection of information is estimated to average

More information

***************************************************************** TQL

***************************************************************** TQL ---------------------------------TQL----------------------------- DEPARTMENT OF THE NAVY VISION, GUIDING PRINCIPLES, AND STRATEGIC GOALS AND STRATEGIC PLAN FOR TOTAL QUALITY LEADERSHIP Published for the

More information

Subj: SUPPLY CHAIN INTEGRATION; MARINE CORPS PARTICIPATION IN THE DEFENSE LOGISTICS AGENCY (DLA) WEAPON SYSTEM SUPPORT PROGRAM (WSSP)

Subj: SUPPLY CHAIN INTEGRATION; MARINE CORPS PARTICIPATION IN THE DEFENSE LOGISTICS AGENCY (DLA) WEAPON SYSTEM SUPPORT PROGRAM (WSSP) DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS 3000 MARINE CORPS PENTAGON WASHINGTON, DC 20350-3000 Canc: Jan 2016 MCBul 4105 LPC-2 MARINE CORPS BULLETIN 4105 From: Commandant of the Marine

More information

Department of Defense INSTRUCTION

Department of Defense INSTRUCTION Department of Defense INSTRUCTION SUBJECT: DoD Munitions Requirements Process (MRP) References: See Enclosure 1 NUMBER 3000.04 September 24, 2009 Incorporating Change 1, November 21, 2017 USD(AT&L) 1.

More information

OUTLINE CONTRACTING BUDGET ITEMS FOR PROCUREMENT TACOM BUSINESS DRIVERS CONTRACTING POINTS OF CONTACT

OUTLINE CONTRACTING BUDGET ITEMS FOR PROCUREMENT TACOM BUSINESS DRIVERS CONTRACTING POINTS OF CONTACT Leadership Teaming Communication Employee Support Strategic Thinking Organizational Clima The TACOM Market - An Overview Advanced Planning Briefing to Industry October 2003 Dan Mehney Director, TACOM Acquisition

More information

DEPARTMENT OF THE AIR FORCE PRESENTATION TO THE COMMITTEE ON ARMED SERVICES DEFENSE ACQUISITION REFORM PANEL UNITED STATES HOUSE OF REPRESENTATIVES

DEPARTMENT OF THE AIR FORCE PRESENTATION TO THE COMMITTEE ON ARMED SERVICES DEFENSE ACQUISITION REFORM PANEL UNITED STATES HOUSE OF REPRESENTATIVES DEPARTMENT OF THE AIR FORCE PRESENTATION TO THE COMMITTEE ON ARMED SERVICES DEFENSE ACQUISITION REFORM PANEL UNITED STATES HOUSE OF REPRESENTATIVES SUBJECT: MISSION OF THE AIR FORCE GLOBAL LOGISTICS SUPPORT

More information

Name of Program: The Boeing Company / Apache 64 D Block III

Name of Program: The Boeing Company / Apache 64 D Block III Name of Program: The Boeing Company / Apache 64 D Block III Name of Program Leader: David Koopersmith Phone Number: (480) 891-9001 Email: david.m.koopersmith@boeing.com Postage Address: 5000 East McDowell

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) Budget Item Justification Exhibit R-2 ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) - COST (In Thousands) INTERIM ARMORED VEHICLE (IAV) FAMILY FY 2010 FY 2011 FY 2012 FY 2013 to 8391 143568 108012

More information

2012 Secretary of Defense Environmental Award Submission: Environmental Excellence in Weapon System Acquisition, Large Program

2012 Secretary of Defense Environmental Award Submission: Environmental Excellence in Weapon System Acquisition, Large Program 2012 Secretary of Defense Environmental Award Submission: Environmental Excellence in Weapon System Acquisition, Large Program Project Management Office Stryker Brigade Combat Team SFAE-GCS-SBCT/MS 325

More information

A QUANTITATIVE ACQUISITION PROCESS MODELING APPROACH TOWARD EXPEDITING SYSTEMS ENGINEERING Yvette Rodriguez

A QUANTITATIVE ACQUISITION PROCESS MODELING APPROACH TOWARD EXPEDITING SYSTEMS ENGINEERING Yvette Rodriguez A QUANTITATIVE ACQUISITION PROCESS MODELING APPROACH TOWARD EXPEDITING SYSTEMS ENGINEERING Yvette Rodriguez 06 April 2017 USC Center for Systems and Software Engineering 2017 Annual Research Review Research

More information

a. To promulgate policy on cost analysis throughout the Department of the Navy (DON).

a. To promulgate policy on cost analysis throughout the Department of the Navy (DON). SECNAV INSTRUCTION 5223.2A THE SECRETARY OF THE NAVY WASHINGTON DC 20350 1000 SECNAVINST 5223.2A ASN(FM&C): NCCA ij E ~~ (W -~ 20/12 From: Subj: Ref: Encl: Secretary of the Navy DEPARTMENT OF THE NAVY

More information

S E C R E T A R Y O F T H E A R M Y W A S H I N G T O N

S E C R E T A R Y O F T H E A R M Y W A S H I N G T O N S E C R E T A R Y O F T H E A R M Y W A S H I N G T O N MEMORANDUM FOR SEE DISTRIBUTION SUBJECT: Army Directive 2015-42 (Army Contingency Basing Policy) 1. References. A complete list of references is

More information

BG William M. Lenaers Commanding General

BG William M. Lenaers Commanding General Combat Vehicle Conference MG Mike Lenaers 24 OCT 2006 BG William M. Lenaers Commanding General TACOM LCMC Organization PEO Ground Combat Systems PEO PEO Soldier COMMAND Integrated Logistics Support Center

More information

Army Participation in the Defense Logistics Agency Weapon System Support Program

Army Participation in the Defense Logistics Agency Weapon System Support Program Army Regulation 711 6 Supply Chain Integration Army Participation in the Defense Logistics Agency Weapon System Support Program Headquarters Department of the Army Washington, DC 17 July 2017 UNCLASSIFIED

More information

The Tactical Engagement Team Concept: Operational Employment of DCGS-A in Support of Mission Command

The Tactical Engagement Team Concept: Operational Employment of DCGS-A in Support of Mission Command The Tactical Engagement Team Concept: Operational Employment of DCGS-A in Support of Mission Command Introduction MG Robert P. Ashley COL William L. Edwards As the Army faces the challenges of the new

More information

For the US Army to expand rapidly, its leaders will have to make

For the US Army to expand rapidly, its leaders will have to make Army Expansibility Rapid Expansion and the Army s Matériel: Is There Enough? Robb C. Mitchell ABSTRACT: This article examines the matériel challenges the US Army might encounter if it were required to

More information

(111) VerDate Sep :55 Jun 27, 2017 Jkt PO Frm Fmt 6601 Sfmt 6601 E:\HR\OC\A910.XXX A910

(111) VerDate Sep :55 Jun 27, 2017 Jkt PO Frm Fmt 6601 Sfmt 6601 E:\HR\OC\A910.XXX A910 TITLE III PROCUREMENT The fiscal year 2018 Department of Defense procurement budget request totals $113,906,877,000. The Committee recommendation provides $132,501,445,000 for the procurement accounts.

More information

US Special Operations Command

US Special Operations Command US Special Operations Command Operational Test & Evaluation Overview HQ USSOCOM LTC Kevin Vanyo 16 March 2011 The overall classification of this briefing is: Agenda OT&E Authority Mission and Tenants Responsibilities

More information

Subj: IDENTIFICATION OF MAJOR PROGRAM MANAGER EQUIVALENT BILLETS

Subj: IDENTIFICATION OF MAJOR PROGRAM MANAGER EQUIVALENT BILLETS DEPARTMENT OF THE NAVY OFFICE OF THE SECRETARY 1000 NAVY PENTAGON WASHINGTON, D.C. 20350-1000 SECNAVINST 1211.1 ASN (RD&A) SECNAV INSTRUCTION 1211.1 From: Secretary of the Navy Subj: IDENTIFICATION OF

More information

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 8 R-1 Line #163

UNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 8 R-1 Line #163 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Office of Secretary Of Defense Date: March 2014 0400: Research, Development, Test &, Defense-Wide / BA 6: RDT&E Management Support COST ($ in Millions)

More information

The Armed Forces Communications and Electronics Association (AFCEA)

The Armed Forces Communications and Electronics Association (AFCEA) U.S. ARMY TEST AND EVALUATION COMMAND The Armed Forces Communications and Electronics Association (AFCEA) MG John W. Charlton 8 November 2017 Mission What does ATEC do for the Army? ATEC plans, integrates,

More information

Subj: CORROSION PREVENTION AND CONTROL (CPAC) PROGRAM

Subj: CORROSION PREVENTION AND CONTROL (CPAC) PROGRAM DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS 3000 MARINE CORPS PENTAGON WASHINGTON, DC 20350-3000 LPC MARINE CORPS ORDER 4790.18C From: Commandant of the Marine Corps To: Distribution

More information

38 th Chief of Staff, U.S. Army

38 th Chief of Staff, U.S. Army 38 th Chief of Staff, U.S. Army CSA Strategic Priorities October, 2013 The Army s Strategic Vision The All Volunteer Army will remain the most highly trained and professional land force in the world. It

More information

OPNAVINST A N2/N6 31 Oct Subj: NAVY ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM POLICY AND STANDARDS

OPNAVINST A N2/N6 31 Oct Subj: NAVY ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM POLICY AND STANDARDS DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 9420.2A N2/N6 OPNAV INSTRUCTION 9420.2A From: Chief of Naval Operations Subj: NAVY

More information

Subj: CORROSION PREVENTION AND CONTROL (CPAC) PROGRAM

Subj: CORROSION PREVENTION AND CONTROL (CPAC) PROGRAM LPC-2 MARINE CORPS ORDER 4790.18B From: Commandant of the Marine Corps To: Distribution List Subj: CORROSION PREVENTION AND CONTROL (CPAC) PROGRAM Ref: (a) TM 4750-15/1 1. Situation. The Marine Corps is

More information

Force Projection ~ Project Management Office

Force Projection ~ Project Management Office Force Projection ~ Project Management Office Project Manager COL Timothy G. Goddette (Incoming - COL Steve Myers) Deputy PM Acquisition: Ms. Patricia Plotkowski Deputy PM Logistics: Mr. Dan Lorentz Deputy

More information

PROJECT MANAGEMENT OFFICE BRIGADE COMBAT TEAM WORKING TOGETHER TOWARD A COMMON GOAL

PROJECT MANAGEMENT OFFICE BRIGADE COMBAT TEAM WORKING TOGETHER TOWARD A COMMON GOAL FY 2003 SECRETARY OF DEFENSE ENVIRONMENTAL AWARDS PROGRAM EXCELLENCE IN WEAPON SYSTEM ACQUISITION PROJECT MANAGEMENT OFFICE BRIGADE COMBAT TEAM WORKING TOGETHER TOWARD A COMMON GOAL INTRODUCTION In October

More information

Where Have You Gone MTO? Captain Brian M. Bell CG #7 LTC D. Major

Where Have You Gone MTO? Captain Brian M. Bell CG #7 LTC D. Major Where Have You Gone MTO? EWS 2004 Subject Area Logistics Where Have You Gone MTO? Captain Brian M. Bell CG #7 LTC D. Major 1 Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden

More information

Strategic Cost Reduction

Strategic Cost Reduction Strategic Cost Reduction American Society of Military Comptrollers May 29, 2014 Agenda Cost Assessment and Program Evaluation Budget Uncertainty Efficiencies History Specific Efficiency Examples 2 Cost

More information

FIGHTER DATA LINK (FDL)

FIGHTER DATA LINK (FDL) FIGHTER DATA LINK (FDL) Joint ACAT ID Program (Navy Lead) Prime Contractor Total Number of Systems: 685 Boeing Platform Integration Total Program Cost (TY$): $180M Data Link Solutions FDL Terminal Average

More information

JUDGING CRITERIA U.S. Army Aviation and Missile Command, G-4 E-Team

JUDGING CRITERIA U.S. Army Aviation and Missile Command, G-4 E-Team U.S. Army Nomination Secretary of Defense Environmental Awards INTRODUCTION From FY 2008 2009, the U.S. Army Aviation and Missile Command (AMCOM) G-4 Environmental Team (G-4 E-Team) excelled in incorporating

More information

Logistics Civil Augmentation Program

Logistics Civil Augmentation Program Army Regulation 700 137 Logistics Logistics Civil Augmentation Program Headquarters Department of the Army Washington, DC 28 December 2012 UNCLASSIFIED SUMMARY of CHANGE AR 700 137 Logistics Civil Augmentation

More information

RECRUIT SUSTAINMENT PROGRAM SOLDIER TRAINING READINESS MODULES Army Structure/Chain of Command 19 January 2012

RECRUIT SUSTAINMENT PROGRAM SOLDIER TRAINING READINESS MODULES Army Structure/Chain of Command 19 January 2012 RECRUIT SUSTAINMENT PROGRAM SOLDIER TRAINING READINESS MODULES Army Structure/Chain of Command 19 January 2012 SECTION I. Lesson Plan Series Task(s) Taught Academic Hours References Student Study Assignments

More information

DoD Analysis Update: Support to T&E in a Net-Centric World

DoD Analysis Update: Support to T&E in a Net-Centric World Session C: Past and Present T&E Lessons Learned 40 Years of Excellence in Analysis DoD Analysis Update: Support to T&E in a Net-Centric World 2 March 2010 Dr. Wm. Forrest Crain Director, U.S. Army Materiel

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 214 Army DATE: April 213 COST ($ in Millions) Years FY 212 FY 213 # ## FY 215 FY 216 FY 217 FY 218 To Program Element - 62.343 14.347 49.989-49.989 58.6

More information

2009 ARMY MODERNIZATION WHITE PAPER ARMY MODERNIZATION: WE NEVER WANT TO SEND OUR SOLDIERS INTO A FAIR FIGHT

2009 ARMY MODERNIZATION WHITE PAPER ARMY MODERNIZATION: WE NEVER WANT TO SEND OUR SOLDIERS INTO A FAIR FIGHT ARMY MODERNIZATION: WE NEVER WANT TO SEND OUR SOLDIERS INTO A FAIR FIGHT Our Army, combat seasoned but stressed after eight years of war, is still the best in the world and The Strength of Our Nation.

More information

The Army Force Modernization Proponent System

The Army Force Modernization Proponent System Army Regulation 5 22 Management The Army Force Modernization Proponent System Rapid Action Revision (RAR) Issue Date: 25 March 2011 Headquarters Department of the Army Washington, DC 6 February 2009 UNCLASSIFIED

More information

JAVELIN ANTITANK MISSILE

JAVELIN ANTITANK MISSILE JAVELIN ANTITANK MISSILE Army ACAT ID Program Total Number of Systems: Total Program Cost (TY$): Average CLU Cost (TY$): Average Missile Cost (TY$): Full-rate production: 4,348 CLUs 28,453 missiles $3618M

More information

ORGANIZATION AND FUNDAMENTALS

ORGANIZATION AND FUNDAMENTALS Chapter 1 ORGANIZATION AND FUNDAMENTALS The nature of modern warfare demands that we fight as a team... Effectively integrated joint forces expose no weak points or seams to enemy action, while they rapidly

More information

The Rebalance of the Army National Guard

The Rebalance of the Army National Guard January 2008 The Rebalance of the Army National Guard The Army National Guard is an essential and integral component of the Army in the Joint and nteragency efforts to win the [war], secure the homeland,

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB Amended 2014 Army DATE: May 2013 COST ($ in Millions) Years # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 5.239 3.077 21.321 7.000 28.321 14.511

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Consolidated Afloat Network Ent Services(CANES) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Consolidated Afloat Network Ent Services(CANES) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Navy DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 46.823 63.563 12.906-12.906 15.663 15.125

More information