Conduct Field Maintenance on a Hydra-start System Status: Approved

Size: px
Start display at page:

Download "Conduct Field Maintenance on a Hydra-start System Status: Approved"

Transcription

1 Report Date: 03 Oct Conduct Field Maintenance on a Hydra-start System Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice: ne Foreign Disclosure: FD1 - This training product has been reviewed by the training developers in coordination with the U.S. Army Transportation School, Fort Lee, Virginia foreign disclosure officer. This training product can be used to instruct international military students from all approved countries without restrictions. Page 1

2 Conditions: Assigned as a Marine Engineering Officer, given a completed risk assessment, a vessel in port or at sea, all applicable publications, forms, records, tools, materials, personnel, and equipment in all weather conditions day or night and all MOPP levels in an operational environment scenario. Some iterations of this task should be performed in MOPP 4. Standards: Conduct field maintenance on a hydra-start system per the applicable technical publication procedures and specifications without injury to personnel or damage to equipment. Comply with all dangers, warnings, cautions, and notes listed in the applicable references. Once the task is completed, the hydra-start system must be fully mission capable. Make all entries on all forms and records without error. Special Conditions: ne Safety Risk: Low MOPP 4: Sometimes Cue: ne Task Statements ne DANGER Page 2

3 WARNING MODIFICATION HAZARD Unauthorized modifications, alterations or installations of or to this equipment are prohibited and are in violation of AR Any such unauthorized modifications, alterations or installations could result in death, injury or damage to the equipment. HIGH PRESSURE HYDRAULIC SYSTEM HAZARDS Hydraulic systems can cause serious injuries if high pressure lines or equipment fail. Never work on hydraulic systems or equipment unless there is another person nearby who is familiar with the operation and hazards of the equipment, and who can give first aid. A second person should stand by controls to turn off hydraulic pumps in an emergency. When the technicians are aided by the operators, the operators must be warned about dangerous areas. MOVING MACHINERY HAZARDS Be very careful when operating or working near moving machinery. Running engines, rotating shafts, and other moving machinery parts could cause personal injury or death. ELECTRICAL HAZARDS Whenever possible, the power supply to the equipment must be shut off before beginning work on the equipment. Do not be misled by the term "low voltage." Potentials as low as 50 volts may cause death under adverse conditions. Be careful not to contact 115-Vac input connections when installing or operating this equipment. Whenever the nature of the operation permits, keep one hand away from the equipment to reduce the hazard of current flowing through the body. ne CAUTION Remarks: ne tes: 1. All equipment is not the same and may function differently depending on the make, model, and manufacturer. Troubleshooting steps are similar, but may vary. Always consult the applicable manufacturer's literature for each piece of equipment. 2. Tests should be conducted as specified in the manufacturer's literature or industry standards.3. Defective equipment should be repaired or replaced immediately and not used until correctly repaired or replaced. Page 3

4 1. Select and use applicable publications. Performance Steps te: For current updates on technical manuals refer to LOGSA's website: 2. Inspect the hydra-start system. a. Draft a system drawing. b. Identify major components. 3. Determine the maintenance action to be performed. WARNING To avoid personal injury, DO NOT disconnect oil lines or remove plugs from the system until the oil pressure has been released. The system can have extreme pressures. After all the system pressure is released, the accumulator still can still be charged. DO NOT work on the accumulator, unless you have the correct service tools and information. 4. Follow repair procedures in accordance with the applicable vessel's technical manuals. 5. Select and use applicable Tools, Test, Measurement, and Diagnostic Equipment (TMDE). 6. Ensure that the correct tools and test equipment are appropriately utilized. 7. Ensure consumables and repair parts are acquired correctly. 8. Perform final operational test to verify fault(s) have been corrected. a. Verify hydra-start system is set IAW vessel specifications. b. Adjust systems/components as needed. 9. Ensure that the appropriate TAMMS forms are completed in accordance with DA PAM (Asterisks indicates a leader performance step.) Evaluation Guidance: Score the Soldier a GO if all performance measures are correctly completed/pass (P). Score the Soldier a NO-GO if any of the performance measures are missed or incorrectly performed/fail (F). If the Soldier scores a NO GO, show the Soldier what was done wrong and how to do it correctly. Evaluation Preparation: Safety precautions must be adhered to when performing the task listed in the technical manuals. Ensure that all required equipment to perform this task is available. Brief Soldier to perform preventive maintenance checks and services on the hydra-start system. PERFORMANCE MEASURES GO NO-GO N/A 1. Selected and used applicable publications. 2. Inspected the hydra-start system. 3. Determined the maintenance action to be performed. 4. Followed repair procedures in accordance with the applicable vessel's technical manuals. 5. Selected and used applicable Tools, Test, Measurement, and Diagnostic Equipment (TMDE). 6. Ensured that the correct tools and test equipment are appropriately utilized. 7. Ensured consumables and repair parts are acquired correctly. 8. Performed final operational test to verify fault(s) have been corrected. 9. Ensured that the appropriate TAMMS forms are completed in accordance with DA PAM Page 4

5 Supporting Reference(s): Step Number Reference ID Reference Name Required Primary AR ARMY MODIFICATION PROGRAM DA PAM The Army Maintenance Management System (TAMMS) Users Manual TC MARINE ENGINEMAN's HANDBOOK TC FUNDAMENTALS OF MACHINE TOOLS TM &P TM TM TM TM OPERATOR'S, UNIT, DIRECT SUPPORT AND GENERAL SUPPORT MAINTENANCE MANUAL FIELD AND SUSTAINMENT MAINTENANCE MANUAL FOR EMERGENCY GENERATOR SET INLAND AND COASTAL LARGE TUG (LT) (NSN ) (EIC XAG) Operator s Manual For Inland Coastal Large Tug (LT) (NSN )(EIC XAG) TECHNICAL MANUAL OPERATOR`S MANUAL FOR INLAND AND COASTAL LARGE TUG (LT) NSN (EIC XAG) OPERATOR`S MANUAL FOR INLAND AND COASTAL LARGE TUG (LT) NSN (EIC XAG)(THIS ITEM IS INCLUDED ON EM 0272) TADSS : ne Equipment Items (LIN): LIN L36989 V00426 T68330 Name Landing Craft Utility: Roll on Roll Off Type 245 to 300 FT LG Vessel Logistic Support: 245 to 300 Feet Long 3000 to 5500 Long Ton Capacity Tug: Large Coastal and Inland Waterway Diesel Materiel Items (NSN) : Step ID NSN LIN Title Qty W45060 Tool Kit, General Mechanic s 1 Environment: Environmental protection is not just the law but the right thing to do. It is a continual process and starts with deliberate planning. Always be alert to ways to protect our environment during training and missions. In doing so, you will contribute to the sustainment of our training resources while protecting people and the environment from harmful effects. Refer to the current Environmental Considerations manual and the current GTA Environmental-related Risk Assessment card. Safety: In a training environment, leaders must perform a risk assessment in accordance with ATP 5-19, Risk Management. Leaders will complete the current Deliberate Risk Assessment Worksheet in accordance with the TRADOC Safety Officer during the planning and completion of each task and sub-task by assessing mission, enemy, terrain and weather, troops and support available-time available and civil considerations, (METT-TC). te: During MOPP training, leaders must ensure personnel are monitored for potential heat injury. Local policies and procedures must be followed during times of increased heat category in order to avoid heat related injury. Consider the MOPP work/rest cycles and water replacement guidelines IAW FM , Multiservice Tactics, Techniques, and Procedures for Nuclear, Biological, and Chemical (NBC) Protection, FM , Multiservice Tactics, Techniques, and Procedures for Chemical, Biological, Radiological, and Nuclear Decontamination. Prerequisite Individual Tasks : Task Number Title Proponent Status Manage Vessel Supply Operations Transportation (Individual) Approved Comply with TAMMS Standards Transportation (Individual) Approved Direct the Maintenance of Test, Measurement, and Diagnostic Equipment (TMDE) Supporting Individual Tasks : ne Supported Individual Tasks : ne Transportation (Individual) Approved Page 5

6 Supported Collective Tasks : ne Page 6

Summary Report for Individual Task E-1069 Maintain the KVG-72(*) Status: Approved

Summary Report for Individual Task E-1069 Maintain the KVG-72(*) Status: Approved Report Date: 04 Jun 2014 Summary Report for Individual Task 091-94E-1069 Maintain the KVG-72(*) Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction

More information

Summary Report for Individual Task A-0050 Replace the Traverse Mechanism on the M1 Series Track Vehicle Status: Approved

Summary Report for Individual Task A-0050 Replace the Traverse Mechanism on the M1 Series Track Vehicle Status: Approved Summary Report for Individual Task 091-91A-0050 Replace the Traverse Mechanism on the M1 Series Track Vehicle Status: Approved Report Date: 17 Jun 2014 Distribution Restriction: Approved for public release;

More information

Summary Report for Individual Task E-1102 Repair Communications System Control C-6533(*)/ARC Status: Approved

Summary Report for Individual Task E-1102 Repair Communications System Control C-6533(*)/ARC Status: Approved Report Date: 14 Oct 2014 Summary Report for Individual Task 091-94E-1102 Repair Communications System Control C-6533(*)/ARC Status: Approved Distribution Restriction: Approved for public release; distribution

More information

Summary Report for Individual Task MANAGE PRODUCTION CONTROL OPERATIONS Status: Approved

Summary Report for Individual Task MANAGE PRODUCTION CONTROL OPERATIONS Status: Approved Report Date: 13 Jun 2014 Summary Report for Individual Task 552-101-1258 MANAGE PRODUCTION CONTROL OPERATIONS Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited.

More information

Summary Report for Individual Task 805K-79R-8201 Evaluate Education Credentials Status: Approved

Summary Report for Individual Task 805K-79R-8201 Evaluate Education Credentials Status: Approved Report Date: 13 Apr 2015 Summary Report for Individual Task 805K-79R-8201 Evaluate Education Credentials Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited.

More information

Summary Report for Individual Task R Repair the Aviator's Night Vision Imaging System AN/AVS-6 Status: Approved

Summary Report for Individual Task R Repair the Aviator's Night Vision Imaging System AN/AVS-6 Status: Approved Report Date: 12 v 2014 Summary Report for Individual Task 091-94R-1500 Repair the Aviator's Night Vision Imaging System AN/AVS-6 Status: Approved Distribution Restriction: Approved for public release;

More information

Summary Report for Individual Task L-2038 Comply With TAMMS (The Army Maintenance Management System) Standards Status: Approved

Summary Report for Individual Task L-2038 Comply With TAMMS (The Army Maintenance Management System) Standards Status: Approved Summary Report for Individual Task 551-88L-2038 Comply With TAMMS (The Army Maintenance Management System) Standards Status: Approved Report Date: 30 Apr 2012 DISTRIBUTION RESTRICTION: Approved for public

More information

Summary Report for Individual Task 805C-42A-4023 Review the Awards and Decorations Program Status: Approved

Summary Report for Individual Task 805C-42A-4023 Review the Awards and Decorations Program Status: Approved Report Date: 10 Feb 2016 Summary Report for Individual Task 805C-42A-4023 Review the Awards and Decorations Program Status: Approved Distribution Restriction: Approved for public release; distribution

More information

805C-42A-4020 Process Line of Duty (LOD) Investigations Status: Approved

805C-42A-4020 Process Line of Duty (LOD) Investigations Status: Approved Report Date: 25 May 2016 805C-42A-4020 Process Line of Duty (LOD) Investigations Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice: ne

More information

805C-42A-3007 Review Awards and Decorations Status: Approved

805C-42A-3007 Review Awards and Decorations Status: Approved Report Date: 21 Apr 2016 805C-42A-3007 Review Awards and Decorations Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: Foreign Disclosure:

More information

Summary Report for Individual Task 805K-79R-8102 Manage the Battalion Recruiting Standards Program Status: Approved

Summary Report for Individual Task 805K-79R-8102 Manage the Battalion Recruiting Standards Program Status: Approved Report Date: 16 Apr 2015 Summary Report for Individual Task 805K-79R-8102 Manage the Battalion Recruiting Standards Program Status: Approved Distribution Restriction: Approved for public release; distribution

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Task : 71-8-5702 Task Title: Determine Integrated Airspace User Requirements (Brigade-Corps) Distribution Restriction: for public release; distribution is unlimited.

More information

551-88K-4722 Conduct Life Boat Navigation. Status: Approved

551-88K-4722 Conduct Life Boat Navigation. Status: Approved Report Date: 02 Jan 2018 551-88K-4722 Conduct Life Boat Navigation Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: Foreign Disclosure:

More information

Summary Report for Individual Task A-0048 Borescope the 120 MM Main Gun on the M1A1/M1A2 Series Track Vehicle Status: Approved

Summary Report for Individual Task A-0048 Borescope the 120 MM Main Gun on the M1A1/M1A2 Series Track Vehicle Status: Approved Summary Report for Individual Task 091-91A-0048 Borescope the 120 MM Main Gun on the M1A1/M1A2 Series Track Vehicle Status: Approved Report Date: 28 May 2014 Distribution Restriction: Approved for public

More information

805C-42A-4000 Analyze Personnel Readiness Management (PRM) Considerations Status: Approved

805C-42A-4000 Analyze Personnel Readiness Management (PRM) Considerations Status: Approved Report Date: 25 May 2016 805C-42A-4000 Analyze Personnel Readiness Management (PRM) Considerations Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction

More information

Summary Report for Individual Task H-1401 Perform Preventive Maintenance Checks and Services on Material Handling Equipment Status: Approved

Summary Report for Individual Task H-1401 Perform Preventive Maintenance Checks and Services on Material Handling Equipment Status: Approved Report Date: 06 May 2014 Summary Report for Individual Task 551-88H-1401 Perform Preventive Maintenance Checks and Services on Material Handling Equipment Status: Approved Distribution Restriction: Approved

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 06 Oct 2005 Effective Date: 06 Dec 2016 Task Number: 34-PLT-0005 Task Title: Perform Risk Management Distribution Restriction: Approved for public

More information

Summary Report for Individual Task 805B-79T-3306 Conduct Professional Development Counseling Status: Approved

Summary Report for Individual Task 805B-79T-3306 Conduct Professional Development Counseling Status: Approved Report Date: 29 Apr 2015 Summary Report for Individual Task 805B-79T-3306 Conduct Professional Development Counseling Status: Approved Distribution Restriction: Approved for public release; distribution

More information

805C-42A-1304 Interpret the Enlisted Record Brief (ERB) and Officer Record Brief (ORB) Status: Approved

805C-42A-1304 Interpret the Enlisted Record Brief (ERB) and Officer Record Brief (ORB) Status: Approved Report Date: 22 Jun 2016 805C-42A-1304 Interpret the Enlisted Record Brief (ERB) and Officer Record Brief (ORB) Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited.

More information

Summary Report for Individual Task D-3100 Implement the Munitions Rule (MR) Status: Approved

Summary Report for Individual Task D-3100 Implement the Munitions Rule (MR) Status: Approved Report Date: 05 May 2014 Summary Report for Individual Task 091-89D-3100 Implement the Munitions Rule (MR) Status: Distribution Restriction: for public release; distribution is unlimited. Destruction tice:

More information

Summary Report for Individual Task 805C-42H-8102 Direct Deployed Personnel Accountability Status: Approved

Summary Report for Individual Task 805C-42H-8102 Direct Deployed Personnel Accountability Status: Approved Report Date: 24 Sep 2015 Summary Report for Individual Task 805C-42H-8102 Direct Deployed Personnel Accountability Status: Approved Distribution Restriction: Approved for public release; distribution is

More information

Summary Report for Individual Task Prepare OER/NCOER Status: Approved

Summary Report for Individual Task Prepare OER/NCOER Status: Approved Report Date: 07 Aug 2014 Summary Report for Individual Task 031-503-3002 Prepare OER/NCOER Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction

More information

Summary Report for Individual Task E-1402 Repair Receiver-Transmitter RT-(*)/ARC-164(V)(*) Status: Approved

Summary Report for Individual Task E-1402 Repair Receiver-Transmitter RT-(*)/ARC-164(V)(*) Status: Approved Report Date: 02 Sep 2014 Summary Report for Individual Task 091-94E-1402 Repair Receiver-Transmitter RT-(*)/ARC-164(V)(*) Status: Approved Distribution Restriction: Approved for public release; distribution

More information

Summary Report for Individual Task H-3511 Direct Lashing Containers on the Deck of a Landing Craft Status: Approved

Summary Report for Individual Task H-3511 Direct Lashing Containers on the Deck of a Landing Craft Status: Approved Report Date: 20 Mar 2014 Summary Report for Individual Task 551-88H-3511 Direct Lashing Containers on the Deck of a Landing Craft Status: Approved DISTRIBUTION RESTRICTION: Approved for public release;

More information

Summary Report for Individual Task 805D Conduct a Military Memorial Ceremony Status: Approved

Summary Report for Individual Task 805D Conduct a Military Memorial Ceremony Status: Approved Report Date: 12 Feb 2015 Summary Report for Individual Task 805D-207-6071 Conduct a Military Memorial Ceremony Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited.

More information

805C-COM-3095 Coordinate Unit Deployment Readiness Activities Status: Approved

805C-COM-3095 Coordinate Unit Deployment Readiness Activities Status: Approved Report Date: 12 Feb 2018 805C-COM-3095 Coordinate Unit Deployment Readiness Activities Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice:

More information

Summary Report for Individual Task 805C-42A-3499 Determine Entitlement to Military Pay and Allowances Status: Approved

Summary Report for Individual Task 805C-42A-3499 Determine Entitlement to Military Pay and Allowances Status: Approved Report Date: 30 Mar 2016 Summary Report for Individual Task 805C-42A-3499 Determine Entitlement to Military Pay and Allowances Status: Approved Distribution Restriction: Approved for public release; distribution

More information

Summary Report for Individual Task TROUBLESHOOT THE AVIATION GROUND POWER UNIT (AGPU) Status: Approved

Summary Report for Individual Task TROUBLESHOOT THE AVIATION GROUND POWER UNIT (AGPU) Status: Approved Summary Report for Individual Task 552-816-3103 TROUBLESHOOT THE AVIATION GROUND POWER UNIT (AGPU) Status: Approved Report Date: 09 Jun 2014 Distribution Restriction: Approved for public release; distribution

More information

805C-42A-3406 Review the Human Resources Authorization Report (HRAR) Status: Approved

805C-42A-3406 Review the Human Resources Authorization Report (HRAR) Status: Approved Report Date: 23 May 2016 805C-42A-3406 Review the Human Resources Authorization Report (HRAR) Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction

More information

805C-42A-1219 Process Semi-Centralized Promotions Status: Approved

805C-42A-1219 Process Semi-Centralized Promotions Status: Approved Report Date: 01 Aug 2016 805C-42A-1219 Process Semi-Centralized Promotions Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: None Foreign

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 31 Mar 2014 Effective Date: 05 Oct 2016 Task Number: 05-PLT-5121 Task Title: Set Up Asphalt Plant Equipment Distribution Restriction: Approved for

More information

805D-56A-7808 Apply Principles of Worship Development Status: Approved

805D-56A-7808 Apply Principles of Worship Development Status: Approved Report Date: 01 May 2017 805D-56A-7808 Apply Principles of Worship Development Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: Foreign

More information

805C-42A-1307 Create an Ad Hoc Query Status: Approved

805C-42A-1307 Create an Ad Hoc Query Status: Approved Report Date: 12 Feb 2018 805C-42A-1307 Create an Ad Hoc Query Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice: Foreign Disclosure: FD1

More information

Summary Report for Individual Task N-2107 Verify Vehicle and Equipment Loads Status: Approved

Summary Report for Individual Task N-2107 Verify Vehicle and Equipment Loads Status: Approved Report Date: 24 Jun 2014 Summary Report for Individual Task 551-88N-2107 Verify Vehicle and Equipment Loads Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited.

More information

Summary Report for Individual Task Q-1055 Record ATC Facility Daily Activities Status: Approved

Summary Report for Individual Task Q-1055 Record ATC Facility Daily Activities Status: Approved Report Date: 06 May 2015 Summary Report for Individual Task 011-15Q-1055 Record ATC Facility Daily Activities Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited.

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Task Number: 12-1-1212 Task Title: Perform Transient Personnel Accountability Distribution Restriction: Approved for public release; distribution is unlimited. Destruction

More information

805A-36A-7022 Establish Army e-commerce Systems Status: Approved

805A-36A-7022 Establish Army e-commerce Systems Status: Approved Report Date: 13 Apr 2018 805A-36A-7022 Establish Army e-commerce Systems Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: Foreign Disclosure:

More information

Report Date: 05 Jun 2012

Report Date: 05 Jun 2012 Report Date: 05 Jun 2012 Summary Report for Individual Task 158-100-4001 Understand how to establish and maintain a Positive Command Climate in relation to command responsibilities. Status: Approved DISTRIBUTION

More information

150-MC-7654 Employ the Knowledge Management Processes Status: Approved

150-MC-7654 Employ the Knowledge Management Processes Status: Approved Report Date: 09 Jun 2017 150-MC-7654 Employ the Knowledge Management Processes Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: None

More information

805C Administer Strength Reporting Information Status: Approved

805C Administer Strength Reporting Information Status: Approved Report Date: 12 Feb 2018 805C-201-0011 Administer Strength Reporting Information Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice: ne

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Task Number: 71-8-3510 Task Title: Plan for a Electronic Attack (Brigade - Corps) Distribution Restriction: for public release; distribution is unlimited. Destruction

More information

Summary Report for Individual Task 805K-79R-4400 Implement the Battalion Training Program Status: Approved

Summary Report for Individual Task 805K-79R-4400 Implement the Battalion Training Program Status: Approved Report Date: 30 Mar 2015 Summary Report for Individual Task 805K-79R-4400 Implement the Battalion Training Program Status: Approved Distribution Restriction: Approved for public release; distribution is

More information

805C-42A-1250 Process a Request for Leave, Pass, or Permissive Temporary Duty (PTDY) Status: Approved

805C-42A-1250 Process a Request for Leave, Pass, or Permissive Temporary Duty (PTDY) Status: Approved Report Date: 27 Jul 2016 805C-42A-1250 Process a Request for Leave, Pass, or Permissive Temporary Duty (PTDY) Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited.

More information

Report Date: 17 Nov 2014

Report Date: 17 Nov 2014 Report Date: 17 Nov 2014 Summary Report for Individual Task 805C-42B-6118 Administer Interactive Personnel Electronic Records Management System (iperms) Personnel and Finance Records Review Program Status:

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 07 Jan 2015 Effective Date: 03 Oct 2016 Task : 71-8-7648 Task Title: Plan Offensive Operations During Counterinsurgency Operations (Brigade - Distribution

More information

Summary Report for Individual Task H-3527 Determine Compatibility of Dangerous or Hazardous Cargo Status: Approved

Summary Report for Individual Task H-3527 Determine Compatibility of Dangerous or Hazardous Cargo Status: Approved Report Date: 26 Mar 2014 Summary Report for Individual Task 551-88H-3527 Determine Compatibility of Dangerous or Hazardous Cargo Status: Approved DISTRIBUTION RESTRICTION: Approved for public release;

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 04 Dec 2014 Effective Date: 01 Mar 2017 Task Number: 05-PLT-5722 Task Title: Prepare Power Systems Construction Estimates Distribution Restriction:

More information

805A-36B-4001 Conduct Central Funding Status: Approved

805A-36B-4001 Conduct Central Funding Status: Approved Report Date: 13 Apr 2018 805A-36B-4001 Conduct Central Funding Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice: Foreign Disclosure: FD1

More information

Summary Report for Individual Task 805P-COM-1108 Perform the Ability Group Run (AGR) Status: Approved

Summary Report for Individual Task 805P-COM-1108 Perform the Ability Group Run (AGR) Status: Approved Report Date: 12 Aug 2014 Summary Report for Individual Task 805P-COM-1108 Perform the Ability Group Run (AGR) Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited.

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 11 Feb 2015 Effective Date: 05 Jan 2017 Task Number: 05-TM-5525 Task Title: Support Underwater Security Operations Distribution Restriction: Approved

More information

Summary Report for Individual Task H-1506 Secure Cargo Aboard Aircraft Status: Approved

Summary Report for Individual Task H-1506 Secure Cargo Aboard Aircraft Status: Approved Report Date: 06 May 2014 Summary Report for Individual Task 551-88H-1506 Secure Cargo Aboard Aircraft Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited.

More information

Summary Report for Individual Task M-2408 Implement Defensive Procedures When Under Attack/Ambush in a Truck Convoy Status: Approved

Summary Report for Individual Task M-2408 Implement Defensive Procedures When Under Attack/Ambush in a Truck Convoy Status: Approved Summary Report for Individual Task 551-88M-2408 Implement Defensive Procedures When Under Attack/Ambush in a Truck Convoy Status: Approved Report Date: 28 Jul 2014 Distribution Restriction: Approved for

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 07 Sep 2016 Effective Date: 12 May 2017 Task Number: 12-BDE-0012 Task Title: Conduct Personnel Readiness Procedures (S1) Distribution Restriction:

More information

805C-42A-1232 Process Decentralized Promotions (PV2 - SPC) Status: Approved

805C-42A-1232 Process Decentralized Promotions (PV2 - SPC) Status: Approved Report Date: 09 Feb 2018 805C-42A-1232 Process Decentralized Promotions (PV2 - SPC) Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice:

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 10 Oct 2014 Effective Date: 30 Nov 2016 Task Number: 05-PLT-5144 Task Title: Perform Dump Truck-Hauling Operations Distribution Restriction: Approved

More information

Summary Report for Individual Task M-4202 Manage Mortuary Affairs Contaminated Remains Mitigation Site (MACRMS) Status: Approved

Summary Report for Individual Task M-4202 Manage Mortuary Affairs Contaminated Remains Mitigation Site (MACRMS) Status: Approved Summary Report for Individual Task 101-92M-4202 Manage Mortuary Affairs Contaminated Remains Mitigation Site (MACRMS) Status: Approved Report Date: 16 Oct 2014 Distribution Restriction: Approved for public

More information

Summary Report for Individual Task 805B-79T-3302 Conduct an Army Physical Fitness Test / Physical Fitness Assessment Status: Approved

Summary Report for Individual Task 805B-79T-3302 Conduct an Army Physical Fitness Test / Physical Fitness Assessment Status: Approved Summary Report for Individual Task 805B-79T-3302 Conduct an Army Physical Fitness Test / Physical Fitness Assessment Status: Approved Report Date: 29 Apr 2015 Distribution Restriction: Approved for public

More information

Summary Report for Individual Task M-3335 Supervise Driver's Training Program Status: Approved

Summary Report for Individual Task M-3335 Supervise Driver's Training Program Status: Approved Report Date: 13 Aug 2015 Summary Report for Individual Task 551-88M-3335 Supervise Driver's Training Program Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited.

More information

805C-COM-2145 Counsel a Soldier on the Contents of a Noncommissioned Officer Evaluation Report and NCOER Checklist Status: Approved

805C-COM-2145 Counsel a Soldier on the Contents of a Noncommissioned Officer Evaluation Report and NCOER Checklist Status: Approved Report Date: 12 Feb 2018 805C-COM-2145 Counsel a Soldier on the Contents of a ncommissioned Officer Evaluation Report and NCOER Checklist Status: Approved Distribution Restriction: Approved for public

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 27 Jul 2010 Effective Date: 28 Feb 2018 Task Number: 12-BDE-0037 Task Title: Conduct Strength Reporting (S1) Distribution Restriction: Approved for

More information

Summary Report for Individual Task 805B-79T-5502 Administer Recruit Sustainment Program Operations at the Company/ Region level Status: Approved

Summary Report for Individual Task 805B-79T-5502 Administer Recruit Sustainment Program Operations at the Company/ Region level Status: Approved Summary Report for Individual Task 805B-79T-5502 Administer Recruit Sustainment Operations at the Company/ Region level Status: Approved Report Date: 29 Apr 2015 Distribution Restriction: Approved for

More information

Summary Report for Individual Task H-2306 Conduct Rail Loading Operations Status: Approved

Summary Report for Individual Task H-2306 Conduct Rail Loading Operations Status: Approved Report Date: 17 Jun 2014 Summary Report for Individual Task 551-88H-2306 Conduct Rail Loading Operations Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited.

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 29 Dec 2014 Effective Date: 08 Mar 2017 Task Number: 05-SEC-5001 Task Title: Perform Construction Survey Distribution Restriction: Approved for public

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 08 Dec 2015 Effective Date: 19 Jan 2017 Task Number: 05-PLT-5117 Task Title: Provide Grading Support Distribution Restriction: Approved for public

More information

805C-42A-4062 Coordinate Morale, Welfare, and Recreation (MWR) Operations Status: Approved

805C-42A-4062 Coordinate Morale, Welfare, and Recreation (MWR) Operations Status: Approved Report Date: 12 Feb 2018 805C-42A-4062 Coordinate Morale, Welfare, and Recreation (MWR) Operations Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction

More information

805A-36B-3027 Identify Commitment and Obligation Accounting Transactions Status: Approved

805A-36B-3027 Identify Commitment and Obligation Accounting Transactions Status: Approved Report Date: 13 Apr 2018 805A-36B-3027 Identify Commitment and Obligation Accounting Transactions Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction

More information

Summary Report for Individual Task H-4501 Monitor External Sling Load Operation Status: Approved

Summary Report for Individual Task H-4501 Monitor External Sling Load Operation Status: Approved Report Date: 10 Apr 2014 Summary Report for Individual Task 551-88H-4501 Monitor External Sling Load Operation Status: Approved DISTRIBUTION RESTRICTION: Approved for public release; distribution is unlimited.

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 20 Apr 2015 Effective Date: 13 Sep 2016 Task Number: 71-8-3501 Task Title: Coordinate Electronic Warfare (Brigade - Corps) Distribution Restriction:

More information

805A-36A-6004 Conduct Paying Agent Operations Status: Approved

805A-36A-6004 Conduct Paying Agent Operations Status: Approved Report Date: 13 Apr 2018 805A-36A-6004 Conduct Paying Agent Operations Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice: ne Foreign Disclosure:

More information

805C-42A-3006 Prepare the Unit Status Report (USR) Status: Approved

805C-42A-3006 Prepare the Unit Status Report (USR) Status: Approved Report Date: 05 Jul 2016 805C-42A-3006 Prepare the Unit Status Report (USR) Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: None Foreign

More information

805A-36A-8005 Implement e-commerce Activities Status: Approved

805A-36A-8005 Implement e-commerce Activities Status: Approved Report Date: 02 May 2017 805A-36A-8005 Implement e-commerce Activities Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: Foreign Disclosure:

More information

Summary Report for Individual Task 805B-79T-5501 Administer Company/Region Professional Development Status: Approved

Summary Report for Individual Task 805B-79T-5501 Administer Company/Region Professional Development Status: Approved Report Date: 29 Apr 2015 Summary Report for Individual Task 805B-79T-5501 Administer Company/Region Professional Development Status: Approved Distribution Restriction: Approved for public release; distribution

More information

Summary Report for Individual Task 805C-LF Prepare Daily Money Order Business Report Status: Approved

Summary Report for Individual Task 805C-LF Prepare Daily Money Order Business Report Status: Approved Report Date: 09 May 2014 Summary Report for Individual Task 805C-LF5-1215 Prepare Daily Report Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction

More information

Summary Report for Individual Task Write the CBRN Portion to Brigade's Tactical Standard Operating Procedures (TACSOP) Status: Approved

Summary Report for Individual Task Write the CBRN Portion to Brigade's Tactical Standard Operating Procedures (TACSOP) Status: Approved Report Date: 12 Mar 2014 Summary Report for Individual Task 031-506-4010 Write the CBRN Portion to Brigade's Tactical Standard Operating Procedures (TACSOP) Status: Approved DISTRIBUTION RESTRICTION: Approved

More information

113-SIG-3007 Configure Point-to-Point Connections to Enable Wide Area Network (WAN) Communication Status: Approved

113-SIG-3007 Configure Point-to-Point Connections to Enable Wide Area Network (WAN) Communication Status: Approved Report Date: 02 May 2016 11-SIG-007 Configure Point-to-Point Connections to Enable Wide Area Network (WAN) Communication Status: Approved Distribution Restriction: Approved for public release; distribution

More information

805C-42H-8104 Interpret Unit Status Reporting Data Status: Approved

805C-42H-8104 Interpret Unit Status Reporting Data Status: Approved Report Date: 09 Aug 2017 805C-42H-8104 Interpret Unit Status Reporting Data Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: Foreign

More information

Summary Report for Individual Task A-1410 Process Monthly Customer Due-Out Reconciliation Status: Approved

Summary Report for Individual Task A-1410 Process Monthly Customer Due-Out Reconciliation Status: Approved Report Date: 13 May 2014 Summary Report for Individual Task 101-92A-1410 Process Monthly Customer Due-Out Reconciliation Status: Approved Distribution Restriction: Approved for public release; distribution

More information

805C-42A-3011 Review Absent Without Leave (AWOL) / Dropped From Rolls (DFR) Packets Status: Approved

805C-42A-3011 Review Absent Without Leave (AWOL) / Dropped From Rolls (DFR) Packets Status: Approved Report Date: 12 Feb 2018 805C-42A-3011 Review Absent Without Leave (AWOL) / Dropped From Rolls (DFR) Packets Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited.

More information

805C-42A-1259 Create a Manifest Using the Tactical Personnel System (TPS) Status: Approved

805C-42A-1259 Create a Manifest Using the Tactical Personnel System (TPS) Status: Approved Report Date: 12 Feb 2018 805C-42A-1259 Create a Manifest Using the Tactical Personnel System (TPS) Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 29 Dec 2011 Effective Date: 23 May 2017 Task Number: 12-BDE-0011 Task Title: Maintain Unit Strength (S1) Distribution Restriction: Approved for public

More information

Summary Report for Individual Task N-1125 Operate Force XXI Battle Command Brigade and Below (FBCB2) for Movement Operations Status: Approved

Summary Report for Individual Task N-1125 Operate Force XXI Battle Command Brigade and Below (FBCB2) for Movement Operations Status: Approved Report Date: 24 Jun 2014 Summary Report for Individual Task 551-88N-1125 Operate Force XXI Battle Command Brigade and Below (FBCB2) for Movement Operations Status: Approved Distribution Restriction: Approved

More information

Perform Primary Voltage Live-Line Testing Status: Approved

Perform Primary Voltage Live-Line Testing Status: Approved Report Date: 09 Mar 2018 052-204-2303 Perform Primary Voltage Live-Line Testing Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice: ne Foreign

More information

150-MC-0002 Validate the Intelligence Warfighting Function Staff (Battalion through Corps) Status: Approved

150-MC-0002 Validate the Intelligence Warfighting Function Staff (Battalion through Corps) Status: Approved Report Date: 09 Jun 2017 150-MC-0002 Validate the Intelligence Warfighting Function Staff (Battalion through Corps) Status: Approved Distribution Restriction: Approved for public release; distribution

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 21 May 2015 Effective Date: 03 Oct 2016 Task Number: 71-8-7511 Task Title: Destroy a Designated Enemy Force (Division - Corps) Distribution Restriction:

More information

805C-42A-4411 Manage Enlisted Strength Management Status: Approved

805C-42A-4411 Manage Enlisted Strength Management Status: Approved Report Date: 12 Feb 2018 805C-42A-4411 Manage Enlisted Strength Management Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: None Foreign

More information

Summary Report for Individual Task 805B-79T-3222 Process a Suitability Review Status: Approved

Summary Report for Individual Task 805B-79T-3222 Process a Suitability Review Status: Approved Report Date: 29 Apr 2015 Summary Report for Individual Task 805B-79T-3222 Process a Suitability Review Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited.

More information

805C-42A-3411 Employ Enlisted Distribution and Assignment System (EDAS) Status: Approved

805C-42A-3411 Employ Enlisted Distribution and Assignment System (EDAS) Status: Approved Report Date: 04 May 2016 805C-42A-3411 Employ Enlisted Distribution and Assignment System (EDAS) Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction

More information

Summary Report for Individual Task 805B-79R-3406 Process a Future Soldier to Ship (FSL) Status: Approved

Summary Report for Individual Task 805B-79R-3406 Process a Future Soldier to Ship (FSL) Status: Approved Report Date: 06 Jan 2014 Summary Report for Individual Task 805B-79R-3406 Process a Future Soldier to Ship (FSL) Status: Approved DISTRIBUTION RESTRICTION: Approved for public release; distribution is

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 10 Feb 2015 Effective Date: 05 Jun 2018 Task Number: 71-CORP-6220 Task Title: Develop Personnel Recovery Guidance (Brigade - Corps) Distribution

More information

805C-42A-1255 Prepare Casualty Reports Status: Approved

805C-42A-1255 Prepare Casualty Reports Status: Approved Report Date: 25 Aug 2017 805C-42A-1255 Prepare Casualty Reports Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice: ne Foreign Disclosure:

More information

805A-36B-1005 Prepare a Stored Value Card Status: Approved

805A-36B-1005 Prepare a Stored Value Card Status: Approved Report Date: 13 Apr 2018 805A-36B-1005 Prepare a Stored Value Card Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: Foreign Disclosure:

More information

805A-36B-2005 Audit Military Pay Transactions Status: Approved

805A-36B-2005 Audit Military Pay Transactions Status: Approved Report Date: 13 Apr 2018 805A-36B-2005 Audit Military Pay Transactions Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: Foreign Disclosure:

More information

Summary Report for Individual Task 805B-79T-4404 Develop Army National Guard Officer Strength Maintenance Plan Status: Approved

Summary Report for Individual Task 805B-79T-4404 Develop Army National Guard Officer Strength Maintenance Plan Status: Approved Summary Report for Individual Task 805B-79T-4404 Develop Army National Guard Officer Strength Maintenance Plan Status: Approved Report Date: 29 Apr 2015 Distribution Restriction: Approved for public release;

More information

Conduct a Bridge Reconnaissance Status: Approved

Conduct a Bridge Reconnaissance Status: Approved Report Date: 19 Apr 2016 052-196-3008 Conduct a Bridge Reconnaissance Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction Notice: None Foreign

More information

805A-36A-7006 Process a Military Interdepartmental Purchase Request (MIPR) Status: Approved

805A-36A-7006 Process a Military Interdepartmental Purchase Request (MIPR) Status: Approved Report Date: 13 Apr 2018 805A-36A-7006 Process a Military Interdepartmental Purchase Request (MIPR) Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction

More information

805C-LF Prepare Consolidated Business Report Status: Approved

805C-LF Prepare Consolidated Business Report Status: Approved Report Date: 13 Feb 2018 3519 Prepare Consolidated Business Report Status: Distribution Restriction: for public release; distribution is unlimited. Destruction tice: ne Foreign Disclosure: FD5 - This product/publication

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: 22 Sep 2010 Effective Date: 12 Sep 2016 Task Number: 16-TM-1001 Task Title: Conduct Religious Services Distribution Restriction: for public release; distribution

More information

805C-42H-8101 Direct Personnel Readiness Management (PRM) Status: Approved

805C-42H-8101 Direct Personnel Readiness Management (PRM) Status: Approved Report Date: 12 Feb 2018 805C-42H-8101 Direct Personnel Readiness Management (PRM) Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice: ne

More information

Training and Evaluation Outline Report

Training and Evaluation Outline Report Training and Evaluation Outline Report Status: Approved 04 Jun 2012 Effective Date: 22 May 2017 Task Number: 12-EAC-1233 Task Title: Monitor Casualty Reporting (HROB) Distribution Restriction: Approved

More information

805C Implement Administrative and Personnel Actions Status: Approved

805C Implement Administrative and Personnel Actions Status: Approved Report Date: 12 Feb 2018 805C-010-8016 Implement Administrative and Personnel Actions Status: Approved Distribution Restriction: Approved for public release; distribution is unlimited. Destruction tice:

More information