Progeny Systems Plans and Requirements
|
|
- Theodore Manning
- 6 years ago
- Views:
Transcription
1 Progeny Systems Plans and Requirements
2 Kentucky Businesses Progeny wants to do more business in KY Progeny has worked with: SMC Manufacturing in Nicholasville, KY Morehead Machining in Morehead, KY JC Tec in Annville, KY Boneal in Means, KY Currently working plans for additional site visits American Metal Works Highlands Diversified
3 Progeny Overview
4 Charleroi Employment Facts Owners are from Pittsburgh.grew up near Kennywood park Started moving production to PA in 2004 with 3 employees ~100 PA jobs including subcontractors Future projections up to 250 within 4 years when torpedo production ramps up Potential for an additional 30 jobs if we get Electronic Warfare Maneuvering work Sponsor to the Challenge Program ($180K so far) Working with local colleges and tech schools to help guide curriculum
5 Progeny Systems Corporation End-To-End System Development, Integration, Production, Test & Evaluation, Support Tactical Systems C4I Systems Non-Tactical Systems Surveillance Systems Naval Tactical Systems Combat Systems Integration Non-Propulsion Electronic Systems Fire Control & Weapon Systems Sonar Systems & Sonar Arrays Training Systems Test & Evaluation Information Assurance Multilevel Security Prime, All US Submarines NSA Approved Solutions UxVs Sensor Systems / Countermeasures Unmanned Undersea Vehicle Systems Wingman Tactical Unmanned Air System Unmanned Air Vehicle Control Surveillance Systems Shore Based Processing Mobile Sensors and Processing Wet-End Sensor Systems Airborne Computer Vision (ACV) Automated Face/Object Detection/Recognition Maritime Systems P-8A Application Based Architecture Littoral Combat Ship Common Software Architecture Net-Centric Warfare Undersea Warfare Decision Support System Unattended Ground Sensors Covert Sensing and Tagging System (CSTS) Torpedo Modernization MK54 Mod 1 MK48 ADCAP
6 Engineering Solutions That Last Generations 1 Weapon Launch & Payload Control Systems 4 Acoustic Intercept & Ranging 8 Sonar Transmit Group 11 Periscope Image Processing 14 Advanced Submarine Control 18 Shipboard Automation and Manning Reduction (Operations, Maintenance, and Administration) LONG RANGE DETECTION 2 Multi-Tube Weapon Simulator 3 Digital Data Collection System/ Acoustic Media Center/ Ruggedized Storage Server 5 Cyber Security Solutions Data Encryption with Centralized Key Management Multi-Level Security Cross- Domain Solutions Intrusion Detection Network Monitoring File Baselining Trusted Boot Linux Kernel Integrity Measurer (LKIM) 6 Tech Insertion Hardware Application White-listing IP Firewall Network Boundary Virus Scan With Definition Update Capability Security Auditing Biometric Auditing Access Control Drive Inventory USB Media Control And Audit 7 Non-Hull Penetrating Hydrophone 9 Hull-mounted Acoustic Sensors: Conformal Acoustic Velocity Sensor, Improved Radius of Curvature Sensor 10 Submarine Reliability Management System LOCAL SCENE DETECTION 12 Next Generation Countermeasure Platform Protection/Acoustic Device Countermeasure MK2 13 Virtualized SWFTS Architecture 15 Torpedo Technology Insertion 16 Towed Array Vector Sensor 17 Lightweight Wide Aperture Array Maintenance Tools Technical Documentation and Drawings Maintenance Planning Maintenance Execution Wireless Sensing 19 SWFTS Systems Engineering and Real Time Service Based Architecture VIRGINIA Class Plan Of Record Capability , ,4,5, ,2 8 Future VIRGINIA Transition Candidate 15 Progeny providing Key Components/Support to Team Submarine since 1995
7 Requirements for Contracting with the Federal Government
8 System for Award Management (SAM) The System for Award Management (SAM) is an official website of the U.S. government. There is no cost to use SAM. You can use this site for FREE to: Register to do business with the U.S. government Update or renew your entity registration Check status of an entity registration Search for entity registration and exclusion records And much more You must have an active registration in SAM to do business with the Federal Government. Contractors must meet the requirements of QA/QMS (ISO 9001:2008; AS9100B, etc.) Certification is typically not required, but desired
9 Additional Requirements Must be ITAR Registered All manufacturers, exporters, and brokers of defense articles, related technical data and defense services as defined on the United States Munitions List (Part 121 of the ITAR) (PDF, 7MB) are required to register with the Directorate of Defense Trade Controls (DDTC). Registration does not confer any export rights or privileges, but is a precondition for the issuance of any license or other approval for export. Manufacturers/Exporters Per ITAR 122.1, any person who engages in the United States in the business of either manufacturing or exporting or temporarily importing defense articles or furnishing defense services is required to register with DDTC. Manufacturers who do not engage in exporting must nevertheless register. Note: U.S. distributors and other U.S. persons exporting parts and components and other defense articles and services outside of the United States are considered to be exporters. Must be ITAR registered and compliant if they re doing build-to-print work for Progeny Website:
10 Unique Contract Requirements Contracts may include other unique requirements Progeny does a significant amount of classified work Employees are required to have classified clearance Facilities must be cleared to do classified work Defense Investigative Service (DIS) provides clearances
Unmanned Systems and Mine Warfare RADM Matthew Klunder Chief of Naval Research November 5, 2014
Unmanned Systems and Mine Warfare RADM Matthew Klunder Chief of Naval Research November 5, 2014 DISTRIBUTION STATEMENT A. Approved for public release The Future of Mine Warfare Offboard unmanned systems
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate
COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 143.612 160.959 162.286 0.000 162.286 165.007 158.842 156.055 157.994 Continuing Continuing
More informationUNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2
Exhibit R-2 PROGRAM ELEMENT: 0603747N PROGRAM ELEMENT TITLE: UNDERSEA WARFARE ADVANCED TECHNOLOGY COST: (Dollars in Thousands) Project Number & Title FY 2006 Actual FY 2007 FY 2008 FY 2009 FY 2010 FY 2011
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY
More informationUNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RDT&E,N/ 07
APPROPRIATION/BUDGET ACTIVITY RDT&E,N/ 07 EXHIBIT R-2, RDT&E Budget Item Justification R-1 ITEM NOMENCLATURE Surface ASW Combat System Integration/ 0205620N COST ($ in Millions) FY 1999 FY 2000 FY 2001
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 5: Development & Demonstration (SDD) COST ($ in Millions) Years R1 Program
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 R-1 Line #120
Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 5: Development & Demonstration (SDD) COST ($ in Millions) Prior Years
More informationUNCLASSIFIED UNCLASSIFIED
EXHIBIT R-2a, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH TEST & EVALUATION, NAVY / BA-5 Submarine Tactical Warfare System/0604562N COST ($ in Millions)
More informationUNCLASSIFIED UNCLASSIFIED
(U) COST: (Dollars in Thousands) PROJECT NUMBER & TITLE FY 2000 ACTUAL FY 2001 ESTIMATE FY 2002 ESTIMATE ** ** 83,557 CONT. ** The Science and Technology Program Elements (PEs) were restructured in FY
More informationNUWC Division Newport Undersea Collaboration & Technology Outreach Center (UCTOC) May 24, 2017
Code 85 Undersea Warfare Weapons, Vehicles and Defensive Systems Department Autonomous Maritime Systems Test Center (AMSTC) Engineering and Technical Support Services Pre-Solicitation Conference NUWC Division
More informationCOMMON AVIATION COMMAND AND CONTROL SYSTEM
Section 6.3 PEO LS Program COMMON AVIATION COMMAND AND CONTROL SYSTEM CAC2S Program Background The Common Aviation Command and Control System (CAC2S) is a modernization effort to replace the existing aviation
More informationFFG(X) Update National Symposium - Surface Navy Association
FFG(X) Update National Symposium - Surface Navy Association Dr. Regan Campbell January 9, 2018 1 FFG(X) System Description Mission: Anti-Submarine Warfare, Surface Warfare, Electromagnetic Maneuver Warfare,
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2012 OCO
COST ($ in Millions) FY 2010 FY 2011 FY 2012 Base FY 2012 OCO FY 2012 Total FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Total Cost Total Program Element 160.351 162.286 140.231-140.231 151.521 147.426
More informationUNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Landmine Warfare and Barrier Advanced Technology. Prior Years FY 2013 FY 2014 FY 2015
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY
More informationUNCLASSIFIED. Cost To Complete Total Program Element : Undersea Warfare Advanced Technology
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Technology Development (ATD) OCO FY 2016 FY 2017 FY 2018
More informationUNCLASSIFIED FY 2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2008 Exhibit R-2
Exhibit R-2 PROGRAM ELEMENT: 0605155N PROGRAM ELEMENT TITLE: FLEET TACTICAL DEVELOPMENT AND EVALUATION COST: (Dollars in Thousands) Project Number & Title FY 2007 Actual FY 2008 FY 2009 FY 2010 FY 2011
More informationCol Alan Pratt, USMC Commander. Distribution Statement A Approved for Public Release. Mr. Matthew Craig Acting Technical Director
1 Col Alan Pratt, USMC Commander Mr. Matthew Craig Acting Technical Director 2 TEAM Crane 3 rd Largest Naval Installation in the World (100 Square Miles) TEAM Crane $2.24 B FY 11 Business Base 4,372+ Govt.
More informationDepartment of Defense INSTRUCTION. SUBJECT: Security of Unclassified DoD Information on Non-DoD Information Systems
Department of Defense INSTRUCTION NUMBER 8582.01 June 6, 2012 Incorporating Change 1, October 27, 2017 SUBJECT: Security of Unclassified DoD Information on Non-DoD Information Systems References: See Enclosure
More informationUNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2
Exhibit R-2 PROGRAM ELEMENT: 0605155N PROGRAM ELEMENT TITLE: FLEET TACTICAL DEVELOPMENT AND EVALUATION COST: (Dollars in Thousands) Project Number & Title FY 2006 Actual FY 2007 FY 2008 FY 2009 FY 2010
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total Program Element 9.334 6.602 - - - - - - - 0.000 15.936 9.334 6.602 - - - - - -
More informationDRDO started its first major project in surface-to-air missiles (SAM) known as Project Indigo in 1960s. Indigo was discontinued in later years
DRDO started its first major project in surface-to-air missiles (SAM) known as Project Indigo in 1960s. Indigo was discontinued in later years without achieving full success. Project Indigo led to Project
More informationUNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #9
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040:, Development, Test & Evaluation, Army / BA 2: Applied COST ($ in Millions) Prior Years FY 2013 FY 2014 FY 2015 Base FY
More informationSTATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE
NOT FOR PUBLICATION UNTIL RELEASED BY THE SENATE ARMED SERVICES COMMITTEE STATEMENT OF MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE
More informationRDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7
RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) DATE MAY 2009 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7 R-1 ITEM NOMENCLATURE / PROJECT NO. PE 1160404BB Special Operations (SO) Tactical
More informationUNCLASSIFIED UNCLASSIFIED
Exhibit R-2 BUDGET ACTIVITY: 3 PROGRAM ELEMENT: 0603747N Technology COST: (Dollars in Thousands) PROJECT FY 2002 NUMBER/ ACTUAL TITLE FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 R2916 Undersea
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO
COST ($ in Millions) FY 2011 FY 2012 FY 2013 Base FY 2013 OCO FY 2013 Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 157.971 156.297 144.109-144.109 140.097 141.038
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Army DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program
More informationNavy Outlook The Future of Underwater Warfare in the RCN. Presentation to CADSI 11 April 2013
Navy Outlook 2013 The Future of Underwater Warfare in the RCN Presentation to CADSI 11 April 2013 Cdr Jason Armstrong, DNR 5, Underwater Warfare Requirements Cdr Brian May, DNR 9, Submarine Requirements
More informationFFG UPGRADE Brochure Delivering tag integrated line warfare solutions.
Brochure Delivering tag integrated line warfare solutions www.thalesgroup.com.au FFG UPGRADE Delivering Integrated Warfare Solutions Overview UPGRADE PROGRAM Thales Australia has developed a comprehensive
More informationSUBMARINE COMBAT SYSTEMS July 9 July 13, 2018
SUBMARINE COMBAT SYSTEMS July 9 July 13, 2018 LECTURER-IN-CHARGE: Mr. Martin Moebus, Chief Strategic Analyst, Naval Undersea Warfare Center (NUWC) TUITION: $2080 DAILY CLASS ROUTINE: Monday: Classroom
More informationCode 25 Industry Day Brief
Code 25 Industry Day Brief 14 June 2016 USW Combat Systems Department OUR MISSION: We will exceed customer expectations by providing high quality, affordable products and services while helping to shape
More informationExport Controls & International Travel Update RGA 070: Research Administrators Forum May 23, 2017 Kimmel Center, Room 914
Export Controls & International Travel Update RGA 070: Research Administrators Forum May 23, 2017 Kimmel Center, Room 914 Robert F. Roach, VP Chief Global Compliance Officer Office of Compliance and Risk
More informationARCHIVED REPORT. For data and forecasts on current programs please visit or call
Electronic Systems Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 BSY-2 - Archived 10/2004 Outlook No further production
More informationDATE: FY 2013 President's Budget February 2012 PRIOR YR FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 TO COMP TOTAL PROG QUANTITY
BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: APPROPRIATION/BUDGET ACTIVITY P-1 LINE ITEM NOMENCLATURE /BA 2 Other Warships LITTORAL COMBAT SHIP () BLI: 2127 / SUBHEAD NO. (Dollars in Millions) PRIOR YR
More informationFirst Announcement/Call For Papers
AIAA Strategic and Tactical Missile Systems Conference AIAA Missile Sciences Conference Abstract Deadline 30 June 2011 SECRET/U.S. ONLY 24 26 January 2012 Naval Postgraduate School Monterey, California
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost
More informationARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)
BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE and Sensor Tech COST (In Thousands) FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Actual Estimate
More informationCode 85 Weapons Analysis Facility (WAF) Technical Engineering Services Pre-Solicitation Conference
Code 85 Weapons Analysis Facility (WAF) Technical Engineering Services Pre-Solicitation Conference NUWC Division Newport Undersea Collaboration & Technology Outreach Center (UCTOC) June 12, 2014 Agenda
More informationC4I System Solutions.
www.aselsan.com.tr C4I SYSTEM SOLUTIONS Information dominance is the key enabler for the commanders for making accurate and faster decisions. C4I systems support the commander in situational awareness,
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research,, Test & Evaluation, Navy / BA 5: System & Demonstration (SDD) COST ($ in Millions) FY 2017 FY 2018 FY 2019 FY
More informationICCRTS Paper 103 Anti-submarine Warfare (ASW) Capability Transformation: Strategy of Response to Effects Based Warfare.
ICCRTS Paper 103 Anti-submarine Warfare (ASW) Capability Transformation: Strategy of Response to Effects Based Warfare. dr David Finch SC, SSM, CD 32yrs Naval Experience 18 yrs at Sea 16 yrs with Towed
More informationCybersecurity United States National Security Strategy President Barack Obama
Cybersecurity As the birthplace of the Internet, the United States has a special responsibility to lead a networked world. Prosperity and security increasingly depend on an open, interoperable, secure,
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Landmine Warfare and Barrier Advanced Technology FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 Base OCO Total FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Total Cost Total Program
More informationGovernment Contracts University. ITAR & EAR Awareness GOVCON U. Milt Johns Partner, Senior Government Contracts Counsel
Government Contracts University GOVCON U Milt Johns Partner, Senior Government Contracts Counsel About FH+H GOVCON U FH+H is a veteran owned law firm focused on helping corporate clients thrive FH+H lawyers
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 Navy Page 1 of 7 R-1 Line #203 To Program Element
More informationUNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #45
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior
More informationStatus of Unmanned Systems: EXECUTING!
Status of Unmanned Systems: EXECUTING! CAPT Jon Rucker Program Manager PMS406 Jan 2018 Distribution Statement A: Approved for Public Release; Distribution Unlimited. This Brief is provided for Information
More informationAnnual Naval Technology Exercise ANTX 2016 Overview NUWC Division Newport
Annual Naval Technology Exercise ANTX 2016 Overview NUWC Division Newport DISTRIBUTION STATEMENT A Approved for public release; Distribution is unlimited. 1 What is ANTX? ANTX is an annual event created
More informationAir Defense System Solutions.
Air Defense System Solutions www.aselsan.com.tr ADSS AIR DEFENSE SYSTEM SOLUTIONS AIR DEFENSE SYSTEM SOLUTIONS Effective air defense is based on integration and coordinated use of airborne and/or ground
More informationDATE: FY 2016 President's Budget February 2015 PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY
APPROPRIATION/BUDGET ACTIVITY /BA 2 Other Warships BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: P-1 LINE ITEM NOMENCLATURE LITTORAL COMBAT SHIP () BLI: 2127 / SUBHEAD NO. (Dollars in Millions) PRIOR YR
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior
More informationARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)
BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE Sensor Tech COST (In Thousands) FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: ASW Systems Development
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Navy DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 Navy Page 1 of 17 R-1 Line Item #30 To Program Element 25.144
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Surface Ship Torpedo Defense FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Navy DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 Total FY 2013 FY 2014 FY 2015 FY 2016 To Complete Total Total Program Element 57.922
More informationUNCLASSIFIED UNCLASSIFIED
EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-5 Program Element (PE) No. and Name: 0604218N Air/Ocean
More informationML 4 ML 3 ML 5 ML 2 PL 5001 ML 21 ML 15 ML 22 1C 950 1C 350 1C 111 1C 450 S1 P1
UNITED ARAB EMIRATES ML ML ML ML ML ML ML ML 9 ML ML ML ML ML ML PL PL PL PL PL PL B C C C C 9 A 99 A E A A A S P aiming devices (T); air rifles/pistols; airborne systems (T); aircraft ground equipment;
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY
More informationCode 25 Submarine Network Support Services. Pre-Solicitation Conference
Code 25 Submarine Network Support Services Pre-Solicitation Conference NUWC Division Newport Undersea Collaboration & Technology Outreach Center (UCTOC) June 17, 2014 1 Agenda Introduction/Ground Rules
More informationInspector General FOR OFFICIAL USE ONLY
Report No. DODIG-2017-014 Inspector General U.S. Department of Defense NOVEMBER 8, 2016 Acquisition of the Navy Surface Mine Countermeasure Unmanned Undersea Vehicle (Knifefish) Needs Improvement INTEGRITY
More informationArmed Unmanned Systems
Armed Unmanned Systems A Perspective on Navy Needs, Initiatives and Vision Rear Admiral Tim Heely, USN Program Executive Officer Strike Weapons and Unmanned Aviation 10 July 2007 Armed UASs A first time
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 44.172 29.787 6.704-6.704 5.696 4.409
More informationUNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2
Exhibit R-2 PROGRAM ELEMENT: 0203761N PROGRAM ELEMENT TITLE: RAPID TECHNOLOGY TRANSITION (RTT) COST: (Dollars in Thousands) Project Number & Title FY 2006 Actual FY 2007 FY 2008 FY 2009 FY 2010 FY 2011
More informationWe provide innovative solutions that protect and save lives.
1 We provide innovative solutions that protect and save lives. Defense Commercial Aviation Homeland Security Medical Instrumentation Sustainment & Support 2 Our Corporate Snapshot Elbit Systems of America
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Common Joint Tactical Information. FY 2011 Total Estimate. FY 2011 OCO Estimate
COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 19.873 20.466 20.954 0.000 20.954 21.254 21.776 22.071 22.305 Continuing Continuing 771: Link-16
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 R-1 Line #16
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY 2013
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 United States Special Operations Command : February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development
More informationFW: C5 Request for White Papers - C5-17-RWP Unmanned Aerial Vehicle (UAV) Developments for Undersea Applications. Members:
FW: C5 Request for White Papers - C5-17-RWP-0085 - Unmanned Aerial Vehicle (UAV) Developments for Undersea Applications Members: C5 is pleased to announce this Request for White Papers C5-17-RWP-0085 to
More informationAMRDEC Fuzing Activities
Presented to: NDIA Fuze Conference 2014 AMRDEC Fuzing Activities DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Control Number: pr0898 29 July 2014 Presented by: Anthony
More informationThe Integral TNO Approach to NAVY R&D
NAVAL PLATFORMS The Integral TNO Approach to NAVY R&D TNO Knowledge for Business Source: AVDKM Key elements to TNO s integral approach in support of naval platform development are operational effectiveness,
More informationFuture Combat Systems
Future Combat Systems Advanced Planning Briefing for Industry (APBI) BG John Bartley 15 October Overarching Acquisition Strategy Buy Future Combat Systems; Equip Soldiers; Field Units of Action (UA) Embrace
More informationARCHIVED REPORT. SSQ-72/108(V) (OUTBOARD/OUTBOARD II) - Archived 7/2002. Outlook. Orientation. Electronic Warfare Forecast
Electronic Warfare Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 SSQ-72/108(V) (OUTBOARD/OUTBOARD II) - Archived
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: SOF Underwater Systems
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 United States Special Operations Command DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 Total FY 2013 FY 2014 FY 2015 FY 2016 To Complete
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, elopment, Test & Evaluation, Navy / BA 7: Operational Systems elopment COST ($ in Millions) Prior Years FY 2014
More informationThis Product Area Directorate encompasses the following core equities:
SEAPORTe FUNCTIONAL AREAS The 22 functional areas supported by SeaPort-e are: 3.1 Research & Development Support 3.2 Engineering, System Engineering, & Process Engineering Support 3.3 Modeling, Simulation,
More informationCAPT Tim Kelly Program Executive Office
CAPT Tim Kelly Program Executive Office Maritime 1 PEO Maritime Portfolio UNDERSEA SYSTEMS SURFACE SYSTEMS UOES 2 Combatant Craft Medium Mark 1 (CCM Mk 1) (Conceptual) UOES 3 Shallow Water Combat Submersible
More informationCapabilities Presentation
Capabilities Presentation Corporate Profile Established in 1977 Small Business (FAR subpart 19.001) Over 300 Professional Staff Members DUNS Number - 094744138 Cage Code - 1W582 Primary NAICS (541330,
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 7: Operational Systems Development COST ($ in Millions) Years R1 Program
More informationSpecial Program Announcement for 2013 Office of Naval Research. Ground-Based Air Defense Directed Energy On-The-Move
I. INTRODUCTION: Special Program Announcement for 2013 Office of Naval Research Ground-Based Air Defense Directed Energy On-The-Move This announcement describes an advanced technology development opportunity,
More informationUNCLASSIFIED. RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) COST (Dollars in Millions) FY03 FY04 FY05 FY06 FY07 FY08 FY09 Cost to Complete
RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) DATE FEBRUARY 2004 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 3 R-1 ITEM NOMENCLATURE / PROJECT NO. PE 1160402BB Special Operations (SO) Advanced
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 211 FY 212 FY 213 Base PE 64256A: THREAT SIMULATOR
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force Date: February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior
More informationPROGRAM EXECUTIVE OFFICER TACTICAL AIRCRAFT PROGRAMS TECHNOLOGY GOALS. NAVAIR Small Business Aviation Technology Conference
PROGRAM EXECUTIVE OFFICER TACTICAL AIRCRAFT PROGRAMS TECHNOLOGY GOALS NAVAIR Small Business Aviation Technology Conference Rear Admiral David J. Venlet 29 November 2006 Discussion Outline Program Executive
More informationNSWCCD-SSES SSES COMMAND OVERVIEW. 12 June Patricia C. Woody Department Head Machinery Research and Engineering
NSWCCD-SSES SSES COMMAND OVERVIEW 12 June 2009 Patricia C. Woody Department Head Machinery Research and Engineering Our Chain of Command Secretary of Defense Secretary of the Navy Navy Acquisition Executive
More informationUNCLASSIFIED UNCLASSIFIED
FY 2001 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2000 BUDGET ACTIVITY: 3 PROGRAM ELEMENT: 0603238N PROGRAM ELEMENT TITLE: Global Surveillance/Precision Strike and Air Defense Technology (U)
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years R1 Program
More informationFire Support Systems.
Fire Support Systems www.aselsan.com.tr AFSAS FIRE SUPPORT SYSTEM FIRE SUPPORT SYSTEMS ASELSAN Fire Support System (AFSAS) is a system of systems which provides the automation of planning and execution
More informationARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)
BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE 7 - Operational system development 0303140A - Information Systems Security Program COST (In Thousands) FY 2002 FY
More informationTECHNICAL CAPABILITIES MANUAL
TECHNICAL CAPABILITIES MANUAL Revision 7 15 December 2017 NAVSEA Warfare Centers Technical Capabilities Manual, Rev 7 Distribution A: Approved For Release Distribution Unlimited Distribution D Government
More informationSubj: MISSION, FUNCTIONS AND TASKS OF DIRECTOR, STRATEGIC SYSTEMS PROGRAMS, WASHINGTON NAVY YARD, WASHINGTON, DC
DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 IN REPLY REFER TO OPNAVINST 5450.223B N87 OPNAV INSTRUCTION 5450.223B From: Chief of Naval Operations
More informationNavy Information Warfare Pavilion 19 February RADM Matthew Kohler, Naval Information Forces
Navy Information Warfare Pavilion 19 February 2016 1030 RADM Matthew Kohler, Naval Information Forces It s All About Warfighting 2 IDC Reserve Command July 2012 Information Dominance Forces TYCOM October
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 5 R-1 Line #174
Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, elopment, Test & Evaluation, Navy / BA 7: Operational Systems elopment COST ($ in Millions) Prior Years FY 2013
More informationSet Up Page. America s Only Complete Vehicle Solution. dcn: 9972
dcn: 9972 Set Up Page 1 Presented By: LTC Damon Walsh Commander, DCMA GDLS April 13, 2004 2 TODAY S AGENDA Introduction Mission / Vision Statements What Makes JSMC Unique Investment Workload Partnerships
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 6 R-1 Line #162
Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2013
More informationDepartment of Defense DIRECTIVE
Department of Defense DIRECTIVE NUMBER 8320.2 December 2, 2004 ASD(NII)/DoD CIO SUBJECT: Data Sharing in a Net-Centric Department of Defense References: (a) DoD Directive 8320.1, DoD Data Administration,
More informationBilling Code:
This document is scheduled to be published in the Federal Register on 10/29/2015 and available online at http://federalregister.gov/a/2015-27505, and on FDsys.gov Billing Code: 5001-06 DEPARTMENT OF DEFENSE
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 Total FY 214 FY 215 FY 216 FY 217 To Complete Total Total Program Element - 75.7 122.481-122.481
More informationUNMANNED GROUND VEHICLES UPDATE
UNMANNED GROUND VEHICLES UPDATE Jeffrey Jaczkowski, Deputy Project Manager June 2012 Distribution Statement A: Approved for public release; distribution is unlimited. RS JPO Robots Currently in Combat
More informationOPNAVINST A N2/N6 31 Oct Subj: NAVY ELECTRONIC CHART DISPLAY AND INFORMATION SYSTEM POLICY AND STANDARDS
DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 9420.2A N2/N6 OPNAV INSTRUCTION 9420.2A From: Chief of Naval Operations Subj: NAVY
More information