1 Expanded Summaries DCMA IRAP Release Document Title: W91GER-06-D-0007, Task Order 0010 [DCMA 8-19] Document Prepared: [No date] Document Content: DCMA 8-the beginning of 11; most of (except for line at bottom of DCMA 13 stating a. The total number of contract employees performing on the contract who receive any support benefits, including but not limited to billeting, food, use of exchanges, laundry by host nations, US Nationals, and Third Country Nationals) and DCMA are redacted except for non responsive. DCMA list regulations (beginning at #5) on prohibitions against human trafficking, inhumane living conditions and withholding employee passports. Document Title: DCMA TIPs Checklist W91GN0-07-D-0010 [DCMA 20-21] Document Prepared: October 20, 2008 Document Content: Scheduled audit of SFI operations at Fz Liberty. The DCMA risk rating and previous risk rating were "L. No follow-up was required. Note this document has four pages but only two are provided. Document Title: Defense Contract Audit Agency Report No S [DCMA 30-56] Document Prepared: November 7, 2010 Document Content: Audit prepared by DCAA Afghanistan Branch Office during August-September 2010 evaluating DynCorp International, LLC compliance with TIP regulations. The evaluation was limited to assessing certain contractor practices used to monitor and report compliance with TIPs requirements and not an examination of all applicable practices and internal controls. The evaluation found significant deficiencies in the contractor s internal controls for ensuring compliance with specific contract requirements [DCMA 31]. Specifically, The contractor s current policy addressing compliance with Trafficking in Persons regulations, DynCorp Policy Combating Human Trafficking Procedure, is inadequate because it does not include procedures that would provide reasonable assurance that its employees and subcontractors adhere to the laws on human trafficking, as required under contract terms DI s policy requires no specific actions on the part of any department or employee to ensure compliance at the DI or subcontractor level. Nor does the policy address specifically who should perform such actions. Also, DI s Revised Quality Master Plan, dated March 2009, does not incorporate checks of life support areas to ensure compliance with TIP. [DCMA 32] Results of the evaluation with [redacted] Government Compliance were discussed in an exit conference held on October 6, 2010 and a copy of the conditions and recommendations was provided to the

2 contractor s representative. DynCorp concurred with the recommendations and has since implemented improvements. DCAA DynCorp International Resident Office undertook to determine the status of corrective actions for the cited deficiencies. DCMA will review the adequacy of the new policies and procedures to ensure TIPs compliance within the next 3-6 months. DCMA 37 is an appendix containing PDF links (unable to be opened) to documents dealing with contractor reaction and corrective action plans. DCMA are not provided. DCMA (top), and are redacted except for non responsive. DCMA 49 lists prohibitions against human trafficking, inhumane living conditions and withholding of employee passports. Document Title: DCMA TIPS Checklist W91GDW-07-D-4021 [DCMA 59-62] Document Prepared: January 18, 2009 Document Content: Scheduled audit of AEGIS operations at T1. The DCMA risk ranking was "LOW." No follow-up was required. Document Title: DCMA TIPS Checklist W91GW-10-A-6001 [DCMA 63-65] Document Prepared: March 18, 2010 Document Content: Scheduled audit of DLS operations at Bonx. The DCMA risk rating was MODERATE (DO NOT CHANGE)." Due to unknown circumstances, some performance requirements could not be observed. A follow-up audit was required. Document Title: DCMA TIPS Checklist W91GDW-07-D-4040 [DCMA 66-68] Document Prepared: October 14, 2008 Document Content: Initial audit of ANHAM operations in Umm Qasr. The DCMA risk rating was "LOW" and no follow-up was required. Document Title: DCMA Southern Iraq Corrective Action Request [DCMA 72] Document Prepared: January 7, 2006 Document Content: Corrective action request sent by DCMA Southern Iraq to KBR, B Sites, QA Manager (acting). It requires a written reply regarding plan to correct TIPs nonconformance.

3 Document Title: DCMA Corrective Action Request [DCMA 77-78] Document Prepared: August 16, 2006 Document Content: Corrective Action Request from DCMA, C7 Camp Warrior, Northern Iraq regarding a KBR subcontractor [name redacted]. The report cites the contractor s failure to enforce Camp Protection requirements for temporary labor camps, noting the lack of concrete blast walls around the labor camp. DCMA informed the contractor they must correct the non-compliance. Document Title: Subcontractor Camp Audit Report DAAA D-0007 [DCMA 79-80] Document Prepared: November 17, 2006 Document Content: Subcontractor camp audit report of a labor camp [name of contractor is redacted]. Though the checklist has all satisfactory marks, the comments section contains many references to exceptions as noted on KBR report. Document Title: DCMA Checklist W91GYO-07-C-0053, Attachment 6: RLOP/LAOTF Rusafa Prison FP Requirements [DCMA ] Document Prepared: May 31, 2008 Document Content: Scheduled audit of EODT operations at Rusafa Prison, finding security services were satisfactory. No DCMA risk rating is listed. Document Title: DCMA Checklist W91GYO-07-C-0053, Attachment 7: Laguna Security and TOC Operations in support of Rusafa Law and Order Project, FOB Shield Security and BPC Security [DCMA ] Document Prepared: July 30, 2008 Document Content: Scheduled audit of EODT operations at FOB shield. Operations were found to be satisfactory. No DCMA risk rating is listed. Document Title: DCMA Checklist W91GY0-07-D [DCMA ] Document Prepared: July 25, 2008

4 Document Content: Initial audit of ALMCO operations at Camp Bucca. The DCMA risk rating was Moderate. No follow-up was required. No defects were cited. Document Title: DCMA TIPS Checklist W91-GY0-07-C-0053 [DCMA ] Document Prepared: July 28, 2008 Document Content: Scheduled audit of EODT operations at FOB shield. No DCMA risk rating is listed. No follow-up was required. Document Title: DCMA Checklist W91GY0-07-D [DCMA ] Document Prepared: August 1, 2008 Document Content: Scheduled audit of ALMCO Life Support operations at Camp Bucca. No DCMA risk rating is listed. No follow-up was required. According to the deficiencies section, 2,000 sandbags have been picked up to place on three sides of the storage facility for the propane propane [sic] containers, coordinating for dirt delivery (Line 43). [DCMA 134]. Document Title: DCMA TIPS Checklist W91GDW-07-C-4042 [DCMA ] Document Prepared: August 12, 2008 Document Content: Initial audit of Falcon Security operations on Umm Qasr. The DCMA risk rating is "Moderate." No follow-up was required. Document Title: DCMA TIPS Checklist W91GDW-07-D-4040 [DCMA ] Document Prepared: August 13, 2008 Document Content: Initial audit of Anham Warehousing, Transportation and Life Support operations at ANHAM Umm Qasr. The DCMA risk rating was "MODERATE." No follow-up was required. Document Title: DCMA TIPS Checklist W91GDW-07-D-4029 [DCMA ] Document Prepared: August 13, 2008

5 Document Content: Initial audit of Hart s operations in Umm Qasr. The DCMA risk rating was "Moderate." No follow-up was required. Document Title: DCMA TIPS Checklist W91GDW-07-D [DCMA ] Document Prepared: August 13, 2008 Document Content: Initial audit of TMG (Agility). The DCMA risk rating was "Moderate." No follow-up was required. Document Title: DCMA TIPS Checklist W91GY0-07-C-0053 [DCMA ] Document Prepared: September 13, 2008 Document Content: Initial audit of EODT operations at FOB Shield D1. No DCMA risk rating is listed, and a follow-up audit was not required. A Corrective Action Report was issued. Document Title: DCMA TIPS Checklist W91GYO-07-D-0018/0006 [DCMA ] Document Prepared: September 19, 2008 Document Content: Initial audit of ALMCO operations at Camp Bucca. The DCMA risk rating was "Low." No follow-up was required. According to the Deficiencies Identified section, Passports are being held by the badgering office after workers are badged. [DCMA 154] The passport is surrendered in exchange for an ID. Document Title: DCMA TIPS Checklist W91GDW-07-D-4023 [DCMA ] Document Prepared: September 25, 2008 Document Content: Initial audit of SOC-SMG operations at COB Adder/Cedar II. The DCMA Risk Rating is "Low " and a follow-up was not required. Note: contracts are not in the employee s native language since all Ugandan employees are required to speak English. Document Title: DCMA TIPS Checklist W91GDW-07-D-4031 [DCMA ] Document Prepared: October 15, 2008

6 Document Content: Initial audit of TMG operations at Umm Qasr. A follow-up was not required. There is no listed DCMA risk rating. Document Title: DCMA TIPS Checklist W91GDW-07-C-4042 [DCMA ] Document Prepared: October 15, 2008 Document Content: initial audit of Falcon Security operations at Umm Qasr. No follow-up audit was required and the DCMA risk rating was "Low." Falcon failed to meet the requirement that contractors shall only hold employee passports for the shortest period of time reasonable [DCMA 165]. Document Title: DCMA TIPS Checklist W91GY0-07-C-0053 [DCMA ] Document Prepared: October 20, 2008 Document Content: Scheduled audit of EODT operations at FOB shield. A follow-up was not required and there is no risk rating. Document Title: DCMA TIPS Checklist W91GY0-07-C-0053 [DCMA ] Document Prepared: October 20, 2008 Document Content: Scheduled audit of EODT operations at FOB Shield. There is no DCMA risk rating listed. No follow-up was required. Document Title: DCMA MNF-I FRAGO Checklist [contract number not listed] [DCMA ] Document Prepared: October 31, 2008 Document Content: Initial audit of SOC-SMG operations at Al Asad Air Base. The DCMA risk rating is "Moderate." No follow-up was required. Comments section is detailed and praises SOC s ability to police their employees. Some checklist items could not be verified. In regards to item 27, VHF radios are not compatible with SINGCARS, but auditors note that there is no requirement for them to be so. SOC also does not provide and use commercial cell phones, satellite phones and radio systems to communicate between convoys (item 36). Document Title: DCMA TIPS Checklist W91GDW07-D-4022 [DCMA ]

7 Document Prepared: May 26, 2009 Document Content: Scheduled audit of [contractor name not listed] operations at LSA. The DCMA risk rating was M. A follow-up audit and corrective measures were required and a CAR was issued. Contractor is cited as belligerent, ignorant, disrespectful and rude to DCMA auditors. DCMA s first attempt to enter the compound-we were denied access-had to return 1 hour later. Contractor received a level II CAR for inadequate living space. According to observations, Contractor has placed numerous guards into LSA area and exceeding the 50 square foot requirement. [DCMA 180] Checklist states situation was documented on a report which is also attached to the completed checklist file. No report is attached, however. Document Title: DCMA TIPS Checklist W91GDW07-D-4022 [DCMA ] Document Prepared: August 20, 2009 Document Content: Scheduled audit of Triple Canopy operations at Life Support Area (Camp Olympia). The DCMA risk rating was M. No follow-up was required. According to observations, Triple Canopy has moved guards into different living areas to become compliant with the 50 sq ft requirement for living space. A waiver has been issued for the square footage requirement. [DCMA 187] This appears to correct the concerns cited in the previous audit. Document Title: DCMA TIPS Checklist W27P4A-06-A-0002 [DCMA ] Document Prepared: October 17, 2009 Document Content: Scheduled audit of DLS operations at DLS LSA The Bronx. The DCMA risk ranking was M. No follow-up was required. Document Title: DCMA TIPS Checklist [Contract number not listed] [DCMA ] Document Prepared: May 2, 2009 Document Content: Scheduled audit of SOC-SMG operations at Camp Bucca. The DCMA risk rating is "LOW." No follow-up was required. Document Title: DCMA TIPS Checklist W91GDW [DCMA ] Document Prepared: November 10, 2008

8 Document Content: Scheduled audit of SOC-SMG operations at COB Adder. The DCMA and previous risk rating are L and no follow-up was required. Document Title: DCMA TIPS Checklist W91GY0-07-D-0006 [DCMA ] Document Prepared: November 20, 2008 Document Content: Initial audit of EODT operations at IZ. No DCMA risk rating is listed. A follow-up audit was required to verify section 7 to view standard of living of those personnel living outside of the IZ. The audit verified living quarters for the teams residing in the IZ. Document Title: DCMA TIPS Checklist (Contract number not listed) [DCMA ] Document Prepared: December 2, 2008 Document Content: Initial audit of EODT operations at FOS Shield. There was no DCMA risk rating. A follow-up audit was required as were corrective measures, and a CAR was issued. Document is hand written and difficult to read. There was no evidence of TIP training in workers home nations. Living conditions were not adequate. Document Title: DCMA TIPS Checklist W91GDW-07-D-4023 [DCMA ] Document Prepared: December 19, 2008 Document Content: Scheduled audit of SOC-SMG operations at COB-Adder/Cedar II. The DCMA risk rating was "Low." No follow-up was required. Document Title: DCMA TIPS Checklist W91GDW-07-D [DCMA ] Document Prepared: December 27, 2008 Document Content: Scheduled audit of SOC-SMG operations at COB adder. The DCMA risk rating and previous risk rating were L. A follow-up was not required. Document Title: [No title] [DCMA ] Document Prepared: 29 December 2008

9 Document Content: CAR for SATCO-Iraq, which cites inadequate living conditions. [DCMA ] are an attachment to the CAR consisting of a series of photographs of TIPS violations by SATCO. Supply rooms were being used as living areas, and housed more individuals than there were beds available. No working fire alarms or fire extinguishers were present. In one living quarters, the bathroom for 10 people had only 6 stalls, just one of which had a working toilet. One stall had gallons of battery acid in it [DCMA 220]. The contractor agreed there could be better living conditions. Document Title: DCMA CAR D11-09-TWCA L1 [DCMA 225] Document Prepared: December 8, 2009 Document Content: CAR [contractor not listed] that cites one security guard with a AK47 who did not have an arming authorization letter. Document Title: DCMA CAR Memo [DCMA ] Document Prepared: March 10, 2009 Document Content: Memo stating that during a February 23, 2009 audit at Universal Security Villa in Baghdad, it was determined that Universal Security does not ensure that all contractors receive TIPs training prior to deployment or after arrival in theater, and that it fails to provide safe living conditions. Document Title: DCMA MNF-I FRAGO Checklist [Contract number not listed] [DCMA ] Document Prepared: April 1, 2009 Document Content: Scheduled audit of SOC-SMG operations at Al Asad Air Base. The DCMA Risk Rating was "Moderate." No follow-up audit was required. Some items were unable to be observed. Document Title: DCMA TIPS checklist W91GDW-07-D-4023 [DCMA ] Document Prepared: January 16, 2009 Document Content: Scheduled audit of SOC-SMG operations at COB Adder/Cedar II. The DCMA risk rating was "Low" and no follow-up was required. Document Title: DCMA LOGCAP III Examination Record DAAA D-0007 [DCMA ] Document Prepared: January 19, 2009 Document Content: Initial examination of Contractor SOP section(s): N/A operations at Alamco camp. The DCMA risk rating was "Low". The Contractor Adjectival Performance Rating was 100. The checklist was not filled out, but the observations section notes conditions to be satisfactory.

10 Document Title: DCMA checklist W91GY0-07-D-0017 [DCMA ] Document Prepared: April 4, 2009 Document Content: Scheduled audit of American-Iraqi Solutions Group operations at Al Kasik Military Training Facility. The DCMA risk rating was "Moderate," as was the previous risk rating. A Corrective Action Report was issued, corrective measures were required and a follow-up audit was required. Deficiencies identified were: doesn t ensure equipment is reasonably safe and without hazards; could not provide inspection system; does not have two certified generator technicians; does not have certified personnel to perform vehicle maintenance; does not adhere to sound environmental practices; poor maintenance of living area; and proper and clean uniforms not supplied to employees. Document Title: DCMA TIPS checklist W91GDW-07-D [DCMA ] Document Prepared: February 9, 2009 Document Content: Scheduled audit of SOC-SMG operations at COB Adder/Cedar II. The DCMA risk rating was "Low and no follow-up was required. Document Title: DCMA LOGCAP III Examination Record, DAAA D-0007 [DCMA ] Document Prepared: February 11, 2009 Document Content: Scheduled examination overview of Contractor SOP section(s): 3B Food Services Operation, 3C Headcount Operations, 7L Dining Facility Equipment Maintenance operations at T3 Scania. The DCMA and contractor risk ratings were "MODERATE." The Contractor Adjectival Performance Rating was very good", and no follow-up was required. The checklist was not filled out. Document Title: DCMA LOGCAP III Examination Record, DAAA D-007 [DCMA ] Document Prepared: February 21, 2009 Document Content: Initial examination overview of Contractor SOP operations at Tamimi Camp. The DCMA and contractor risk ratings were "LOW," and no follow-up was required. The Contractor Adjectival Performance Rating score was 100. The checklist was not filled out. Document Title: DCMA TIPS Checklist W91GDW-07-D [DCMA ] Document Prepared: February 24, 2009 Document Content: Scheduled audit of SOC-SMG operations at T1-COB adder. No DCMA risk rating is listed. No follow-up was required. Document Title: DCMA TIPS Checklist W91GDW-07-D [DCMA ] Document Prepared: March 7, 2009

11 Document Content: Scheduled audit of SOC-SMG operations at B1 Al Asad. The DCMA risk rating was "Moderate" and the previous risk rating was "Low." A follow-up audit was required. No corrective measures were required and no CAR was issued. Document Title: DCMA Corrective Action Request IZ-09-TWCA [DCMA ] Document Prepared: March 10, 2009 Document Content: Corrective Action Report resulting from a February 23, 2009 audit of Universal Security operations at Universal Security Villa in Baghdad. The audit discovered that Universal Security does not ensure all contractors receive TIPs training prior to deployment or after arrival in theatre, and failed to provide safe living conditions. Document Title: DCMA LOGCAP III Audit Record, DAAA D-0007 [DCMA ] Document Prepared: March 26, 2009 Document Content: Process audit information for IM Water Operations at TO151. The DCMA risk rating was "Moderate." The Contractor Performance Adjectival Rating was excellent. Document Title: DCMA MNF-I FRAGO Checklist [DCMA ] Document Prepared: March 27, 2009 Document Content: Initial audit of SOC-SMG operations at Al Asad. The DCMA and previous risk ratings were "MR." No follow-up was required. Document Title: DCMA TIPS Checklist W91GDW-07-D-4023 [DCMA ] Document Prepared: March 27, 2009 Document Content: Scheduled audit of SOC-SMG operations at COB Adder/Cedar II. The DCMA risk rating was "Low," and no follow-up was required. Document Title: DCMA Examination Record MNF-I FRAGO [DCMA ] Document Prepared: March 28, 1998 Document Content: Examination information for Contractor SOP section(s): N/A operations at T2- Cedar II. The DCMA and contractor risk ratings were "LOW," and no follow-up was required. Auditor found living conditions adequate. The contractor stated employees get 14 days extra pay or vacation at the end of the year, but there was no evidence of that statement written in the contract. Also KBR stated that they do not inquire about the hiring firms that [redacted] uses. [DCMA 324] Document Title: DCMA TIPS Checklist W91GDW-07-D [DCMA ]

12 Document Prepared: April 16, 2009 Document Content: Initial audit of SOC SMG operations at B4 Ar Ramadi. The DCMA risk rating was "MED" and no follow-up was required. Living conditions were found to be adequate, but One concern still remains from the February 16 th audit: The guards seem to be very hard on Western style ablution and latrine units. KBR s maintenance department is having a hard time maintaining the units. To date, no maintenance solution has been reached. Additionally the auditor commented I m not sure if requiring the employee to reimburse travel costs if they elect to leave prior to completing their agreed to period of performance constitutes a penalty. The fee is $300. Document Title: DCMA Examination Record MNF-I FRAGO [DCMA ] Document Prepared: April 19, 2009 Document Content: Initial examination overview of contractor (not listed) operations at T1 Tallil. The DCMA and contractor risk ratings were "LOW." The Contractor Adjectival Performance Rating was very good (score 89). No follow-up was required. Document Title: DCMA TIPS Checklist W91GDW TO-0005 [DCMA ] Document Prepared: May 3, 2009 Document Content: Scheduled audit of SABRE operations at BASRA. The DCMA risk rating was "Medium." No follow-up was required. Generally conditions were satisfactory, but [i]ssues beyond the control of SABRE due to being in the expeditionary stages of US government building up there is a lack of enough sleeping space per the regulation of 50 feet, facility for personal hygene for the 259 employees. There are only 10 shower and 10 sinks Porta-potties are at a minimum also and not being cleaned on a regular bases per sanitation requirements. With the change of command on this base there is a disrupted with the bottled water issuing to the camp sites. Presently they are only receiving 2 pallets per day for 259+ personnel. The new camp Mayor [redacted] has been made aware of the issue by [redacted]. [DCMA 336] Document Title: DCMA TIPS Checklist W91GDW-07-A-4004 [DCMA ] Document Prepared: May 4, 2009 Document Content: Audit of SOC operations at B1 Al Asad. There is no listed DCMA risk rating. The checklist is incomplete. Document Title: DCMA TIPS Checklist [Contract number not listed] [DCMA ] Document Prepared: May 4, 2009 Document Content: Audit of a SOC TWISS contract at T1-Tallil. There is no listed DCMA risk rating. No follow-up was required. No TIPs violations were observed.

13 Document Title: DCMA TIPS Checklist [Contract number not listed] [DCMA ] Document Prepared: May 5, 2009 Document Content: Audit of SOC-SMG operations at [site not listed]. No DCMA risk rating is listed and the checklist is incomplete. Document Title: DCMA Checklist W91GDW-07-D [DCMA ] Document Prepared: May 16, 2009 Document Content: Audit of SOC-SMG operations at B4-Air Ramadi. The risk rating was MED. No follow-up was required. All requirements were met except the Contractor did not have a training plan practicing emergency drills. Document Title: DCMA Checklist W27P4A-05-C-0002 [DCMA ] Document Prepared: May 19, 2009 Document Content: Initial audit of Oasis International Water, Inc. operations at Al Asad. No follow-up was required. There is no listed DCMA risk rating. Document Title: DCMA Checklist W27P4A-05-C-0002 [DCMA ] Document Prepared: May 19, 2009 Document Content: [Note this appears to be the same document as previous.] Initial audit of Oasis International Water, Inc. operations at Al Asad. No follow-up was required. There is no listed DCMA risk rating. Document Title: DCMA TIPS Checklist W91GDW-07-D-4021/0005 [DCMA ] Document Prepared: May 28, 2009 Document Content: Scheduled audit of AEGIS operations at Basra. The DCMA risk rating was MED. No follow-up was required. Observations note the contractor s operations run very professionally. Document Title: DCMA TIPS Checklist W91GDW-07-D-4023 [DCMA ] Document Prepared: June 16, 2009 Document Content: Scheduled audit of SOC-SMG operations at T1-COB ADDER. No follow-up was required. No DCMA risk rating is listed. Document Title: DCMA Checklist W91GDW-07-D [DCMA ] Document Prepared: July 9, 2009

14 Document Content: Audit of SOC-SMG operations at B4-Ar Ramadi. The DCMA risk rating was "Medium." All requirements were met except the Contractor does not have a training plan practicing emergency drills. [DCMA 381] [Note this document has 8 pages but only 7 are available.] Document Title: DCMA Checklist W91GDW-07-D [DCMA ] Document Prepared: June 19-20, 2009 Document Content: [Note this appears to be the same document as previous, but contains all 8 pages.] Audit of SOC-SMG operations at B4-Ar Ramadi. The DCMA risk rating was "Medium." All requirements were met. Document Title: DCMA Checklist W27P4A-05-C-0002 [DCMA ] Document Prepared: June 24, 2009 Document Content: Initial audit of Oasis International Water, Inc. operations at Al Asad. No follow-up was required. No DCMA risk rating is listed. Document Title: DCMA Examination record MNF-I FRAGO [DCMA ] Document Prepared: June 26, 2009 Document Content: Examination record for Contractor SOP section(s): N/A operations at T3 Scania. The DCMA and Contractor risk ratings were "LOW." No follow-up was required. The Contractor Adjectival Performance Rating was excellent (score 91). Document Title: DCMA Checklist [Contract number not listed] [DCMA ] Document Prepared: March 2, 2009 Document Content: Scheduled audit of ALMCO operations at T4 Bucca. No follow-up was required. The DCMA risk rating was "LOW". There were no deficiencies with the living area but the audit notes: there appears to still be a problem with the transfer of money to families of employees, contact the COR for more information, but at least one person can do a wire transfer in the PX for the group. [DCMA 401] Document Title: DCMA Examination record MNF-I FRAGO [DCMA ] Document Prepared: July 20, 2009 Document Content: Examination information for Contractor SOP section(s): N/A operations at T3 Scania. The DCMA and contractor risk ratings were "LOW." The Contractor Adjectival performance Rating was excellent (score 91). No follow-up was required. Document Title: DCMA Checklist [Contract number not listed] [DCMA ] Document Prepared: July 21, 2009

15 Document Content: DCMA Checklist of [Contractor not listed] operations at T1-Talil. The DCMA risk rating was "MODERATE." No follow-up was required. According to the audit observations, This contract will end next month; as such, the contractor had a lot of records boxed up and shipped out already, making spot checking of records minimal at best. [DCMA 410] Document Title: DCMA TIPS Checklist W91GDW-07-D-4023 [DCMA ] Document Prepared: July 17, 2009 Document Content: Initial audit of SOC-SMG operations at G6 Echo. The DCMA risk rating was "LOW." No follow-up was required. Note, employee is required to pay $ for return airfare. [DCMA 415] Also there was no data available to ensure that the contractor and subcontractors at all tiers ensure not to utilize unlicensed recruiting firms, or firms that charge illegal recruiting fees. [DCMA 415] Additionally there was No SOP on hand to assess measurable enforcement standards for living conditions. [DCMA 416] Document Title: DCMA Examination Record MNF-I FRAGO [DCMA ] Document Prepared: August 31, 2009 Document Content: Initial examination of Contractor SOP section(s): N/A operations at FOB Endeavor. The DCMA risk rating was "HIGH" and contractor risk rating was "LOW." A follow-up examination was required. According to observations, Contractor is not complying with the TIPS requirements called out in the checklist [DCMA 418]. The violations were as follows: Nonconformance: It was noted that up to six employees were housed in one standard 8 x 20 (160 square feet) container converted into housing. Minimum requirement without waiver is 300 square feet. Nonconformance: Shower and latrine unit unsanitary and not properly maintained. There is standing black/gray water from storage tank behind the shower latrine unit. Water pump to shower/latrine unit has cover remove exposing electrical wiring. Kitchen, cooking area, and refrigerator dirty and unsanitary. Electrical wiring exposed by air conditioner in kitchen/dining area. [DCMA ] Note the checklist [DCMA ] is not filled out. Document Title: DCMA Checklist W27P4A-05-C-0002 [DCMA ] Document Prepared: August 5, 2009 Document Content: Initial audit of Oasis International Water, Inc. operations at Al Asad. No follow-up was required. There was no listed DCMA risk rating. Document Title: DCMA Examination Record MNF-I FRAGO [DCMA ] Document Prepared: August 31, 2009

16 Document Content: [Note this appears to be a repeat of DCMA ] Initial examination of Contractor SOP section(s): N/A operations at FOB Endeavor. The DCMA risk rating was "HIGH" and the contractor risk rating was "LOW." A follow-up examination was required. According to observations, Contractor is not complying with the TIPS requirements called out in the checklist [DCMA 418]. The violations were as follows: Nonconformance: It was noted that up to six employees were housed in one standard 8 x 20 (160 square feet) container converted into housing. Minimum requirement without waiver is 300 square feet. Nonconformance: Shower and latrine unit unsanitary and not properly maintained. There is standing black/gray water from storage tank behind the shower latrine unit. Water pump to shower/latrine unit has cover remove exposing electrical wiring. Kitchen, cooking area, and refrigerator dirty and unsanitary. Electrical wiring exposed by air conditioner in kitchen/dining area. [DCMA ] Note the checklist [DCMA ] is not filled out. Document Title: DCMA TIPS Checklist W91GDW-07-D-4023 [DCMA ] Document Prepared: August 29, 2009 Document Content: Initial audit of SOC-SMG operations at G6 Echo. The DCMA risk rating was "LOW." No follow-up was required. Note: employee is required to pay $ for return airfare. [DCMA 435] Also, No data available to verify at FOB level that the contractor and subcontractors at all tiers ensure not to utilize unlicensed recruiting firms, or firms that charge illegal recruiting fees [DCMA 435]. Additionally, No SOP on hand to verify that the contractor has measurable, enforceable standards for living conditions. Document Title: DCMA Examination Record MNF-I-FRAGO [DCCMA ] Document Prepared: November 3, 2005 Document Content: Scheduled examination of Contractor SOP section(s): N/A operations at T3 Scania. The DCMA and Contractor risk ratings were "LOW." The Contractor Adjectival Performance Rating was very good (score 90). No follow-up was required. Document Title: DCMA Checklist W91GDW-07-D [DCMA ] Document Prepared: September Document Content: Audit of SOC-SMG operations at B4-Ar Ramadi. The risk rating was MED. No follow-up was required. All checklist items were satisfactory except the Contractor did not have a training plan practicing emergency drills. [DCMA 445] Document Title: DCMA Examination Report MNF-I FRAGO [DCMA ] Document Prepared: September 28, 2009

17 Document Content: Scheduled examination of Contractor SOP section(s): N/A operations at T3 Scania. DCMA and Contractor risk ratings were "LOW." The Contractor Adjectival Performance Rating was very good (score 90). No follow-up was required. Document Title: DCMA Examination Report MNF-I FRAGO [DCMA ] Document Prepared: November 27, 2009 Document Content: Scheduled examination of Contractor SOP section(s): N/A operations at T3 Scania. The DCMA risk rating was MOSERATE [sic] and the Contractor risk rating was "MODERATE." The Contractor Adjectival Performance Rating was very good (score 90). No follow-up was required. Document Title: DCMA TIPS Checklist [Contract number not listed] [DCMA ] Document Prepared: September 30, 2009 Document Content: Initial audit of STS operations at Basra/COB Basrah. A follow-up audit was required and Corrective Measures were required. There is no listed DCMA risk rating. The auditors looked at two types of rooms, One Room type was 11 by 13 = 143 sq Ft had 6 people = 23.6 Sq Ft. need to reduce occupancy down to 3 people (47 Sq Ft). Other room was 15 by 17 = 255 Sq Ft with 9 people = Sq Ft per person, need to reduce occupancy down to 6 people for 42.5 Sq Ft. They have an at will contract. [DCMA 457] Contractor is keeping the passport for the employees, informaed [sic] them if they are holding them per the employees request then have a singed [sic] agreement that they want them to lock them up. [DCMA 458] Also the contractor need to provide [sic] proof all employees are provided a contract. [DCMA 458] Document Title: DCMA Memorandum for American Iraqi Life Support Solution Group, Attn: [Redacted], FOB Endeavor-site manager r.e. Corrective Action Request (CAR) Endeavor BLS-0002 LII [DCMA ] Document Prepared: September 4, 2009 Document Content: Memo citing American Iraqi Life Support Solution Group noncompliance with living conditions requirements: Nonconformance: It was noted that up to six employees were housed in one standard 8 x 20 (160 square feet) container converted into housing. Minimum requirement without waiver is 300 square feet. Nonconformance: Shower and latrine unit unsanitary and not properly maintained. There is standing black/gray water from storage tank behind the shower latrine unit. Water pump to shower/latrine unit has cover remove exposing electrical wiring. Kitchen, cooking area, and refrigerator dirty and unsanitary. Electrical wiring exposed by air conditioner in kitchen/dining area. [DCMA 460] DCMA contain photographs of the living areas. Document Title: Notice to Ground Tools[DCMA ] Document Prepared: September 25, 2009

18 Document Content: Handwritten letter to the Base Commander, FOB Camp Echo, stating This is to inform you that the undersigned persons of the Kenyan guard force working for SOC force protections will lay down their tools of work with effect from Saturday 26 September 2009 at This decision was reached after all efforts to reach a consensus on the contents of our new contract failed [DCMA 466] DCMA ] are mostly redacted handwritten pages containing the signatories to the aforementioned letter. Document Title: DCMA TIPS Checklist W91GYO-07-D-008/0006 [DCMA ] Document Prepared: [Undated] Document Content: Audit of ALMCO operations. Checklist information is not filed out. Document Title: DCMA Examination Record MNF-I FRAGO [DCMA ] Document Prepared: October 29, 2009 Document Content: Follow-up examination information for Contractor SOP section(s): N/A operations at FOB Endeavor. The DCMA risk rating was "HIGH" and contractor risk rating was "LOW." A follow-up examination was required. According to observations, Contractor is not complying with the TIPS requirements called out in the checklist [DCMA 489]. The violations were as follows: Nonconformance: It was noted that up to six employees were housed in one standard 8 x 20 (160 square feet) container converted into housing. Minimum requirement without waiver is 300 square feet. Nonconformance: Shower and latrine unit unsanitary and not properly maintained. There is standing black/gray water from storage tank behind the shower latrine unit. Water pump to shower/latrine unit has cover remove exposing electrical wiring. Kitchen, cooking area, and refrigerator dirty and unsanitary. Electrical wiring exposed by air conditioner in kitchen/dining area. [ ] Note the rest of the checklist is not filled out. Document Title: DCMA Memorandum for American Iraqi Life Support Solution Group attn. FOB Endeavor Site Manager r.e. Corrective Action Request(CAR) SI-Endeavor-10-TWCA-0017_ LI [DCMA ] Document Prepared: October 8, 2009 Document Content: Memo regarding failure to comply with TIPs regulations. The violations were as follows: A: Nonconformance: It was noted that up to six employees were housed in one standard 8 x 20 (160 square feet) container converted into housing. Minimum requirement without waiver is 300 square feet. Nonconformance: Shower and latrine unit unsanitary and not properly maintained. There is standing black/gray water from storage tank behind the shower latrine unit. Water pump to shower/latrine unit has cover remove exposing electrical wiring. Kitchen, cooking area, and refrigerator

19 dirty and unsanitary. Electrical wiring exposed by air conditioner in kitchen/dining area.b: Contractor did not provide evidence that the Food Service Supervisor had attended a formal certified training program in FOOD sanitation that is equivalent in content and scope to the Education Foundation of the National Restaurant Association s C: Contractor did not have test kit or other device that accurately measures concentration of sanitation solutions D: Food found thawed and/or partially frozen in freezer unit number 9 at 18:30 hours 31 August 2009 E: Fire extinguisher located by containers in the vicinity of the vehicle fueling area has nozzle broken off. [DCMA ] DCMA are photographs of the living conditions. Document Title: DCMA Checklist W01GDW-07-D [DCMA ] Document Prepared: November 1, 2009 Document Content: Audit of SOC-SMG operations at B4-Ar Ramadi. The risk rating was "MED." No follow-up was required. All requirements were met except the Contractor does not have a training plan practicing emergency drills. [DCMA 505] Document Title: DCMA JCCI Examination Record W91GY3-09-C-0028 [DCMA ] Document Prepared: November 24, 2009 Document Content: Scheduled examination of [Contractor not listed] operations at Basrah/DFAC 3. The DCMA risk rating and contractor risk rating were "MODERATE." The Contractor Adjectival Performance Rating was good. No follow-up examination was required, but Corrective Measures were required and a CAR was issued. Observations noted some doors do not close properly, there are no air curtains on the back of DFAC doors, there were ants and beetles outside the doors [DCMA 509]. Some dumpsters were overflowing and the kitchen area was unsanitary. Importantly, TIPs had not been presented. [DCMA 511] Identified deficiencies were: Pan drying procedures are not per TB MED 530. Multiple pans were still wet and stacked; Serving trays on main line do [sic] dryed [sic] properly per TB MED 530; mops not properly stored per TB MED 530; 2 of 20 condiment caps were not cleaned from prior meal; back doors to kitchen, and doors at both sides were left open a multiple time during the audit; generally floors in areas under equipment need more attention to detail cleaning [DCMA 511]. Document Title: DCMA Examination Record MNF-I FRAGO [DCMA ] Document Prepared: November 7, 2009

20 Document Content: Initial examination of Contractor SOP section(s): N//A operations at T2 Cedar. The DCMA and contractor risk ratings were "LOW." The Contractor Adjectival Performance Rating score was 80. No follow-up examination was required. Corrective measures were required and a CAR was issued. According to the observations, Ktr leadership did demonstrated [sic] that they understand dynamics and indicators of trafficking. Ktr states that they go through training for transit/entry/exit procedures four times a year. [DCMA 531] The rest of the checklist is not filled out, and it is unclear why or what corrective measures were required. Document Title: Examination Record MNF-I FRAGO [DCMA ] Document Prepared: November 9, 2009 Document Content: Scheduled examination of Contractor SOP section(s): N//A operations at T3 Scania. The DCMA and contractor risk ratings were "LOW." The Contractor Adjectival Performance Rating was excellent (score 100). No follow-up was required. The deficiencies identified section is redacted. The contractor received satisfactory remarks on all checklist items. Document Title: DCMA TIPS Checklist FRAGO [DCMA ] Document Prepared: November 21, 2009 Document Content: Initial audit of Triple Canopy operations at B1/Al Asad. No follow-up was required. The DCMA risk rating was MOD. According to observations, Contractor could not produce certificates of Trafficking in Persons awareness training. After reviewing the independent contractor s agreement, I could not find anything about work hours, overtime and vacation. [DCMA 543] Document Title: DCMA TIPS Checklist W91GDW-09-D-4028 (0001) [DCMA ] Document Prepared: November 21, 2009 Document Content: Audit of OASIS operations at B1/Al Assad. The DCMA risk rating was MOD. No follow-up was required. Document Title: DCMA Examination Record MNF-I FRAGO [DCMA ] Document Prepared: November 23, 2009

21 Document Content: Scheduled examination of Contractor SOP section(s): N/A operations at T3 Scania. Contractor and DCMA risk ratings were "LOW." Contractor Adjectival Performance Rating was very good (score 90). No follow-up was required. Document Title: DCMA TIPS Checklist W91GY3-09-C-0042 [DCMA ] Document Prepared: November 25, 2009 Document Content: Scheduled audit of STS operations at Basra Main COB. The DCMA risk rating was MOD. A follow-up audit was required and corrective measures were required. No CAR was issued. According to the observations, Contractor is not in compliance with many aspects of this requirement. #3 Workers in laundry facility stated the office kept their passports. Only 1 of 8 could produce theirs. #8 For example, 4 people in 1 living space of 140 square feet (20x7). Should be 200 square feet, unless approved by ACO, then minimum standard would be 160 square feet. #8 the contractor does not display evidence of measurable, enforceable, standards for living conditions (sanitation, health, and safety). Abultion units were molded in shower units beyond healthy, floors were in terrible condition, and exterior of ablution unit had exposed electrical wiring. Living units were not grounded. Task force safe identified these deficiencies and identified them as failure on November 17, [DCMA 555]

SIGAR JANUARY. Special Inspector General for Afghanistan Reconstruction. SIGAR Inspection Report. SIGAR IP/Camp Commando Phase IV

SIGAR JANUARY. Special Inspector General for Afghanistan Reconstruction. SIGAR Inspection Report. SIGAR IP/Camp Commando Phase IV SIGAR Special Inspector General for Afghanistan Reconstruction SIGAR 18-28 Inspection Report Afghan National Army Camp Commando Phase IV: Construction Met Contract Requirements and Most Facilities are

More information

Army Needs to Improve Contract Oversight for the Logistics Civil Augmentation Program s Task Orders

Army Needs to Improve Contract Oversight for the Logistics Civil Augmentation Program s Task Orders Inspector General U.S. Department of Defense Report No. DODIG-2016-004 OCTOBER 28, 2015 Army Needs to Improve Contract Oversight for the Logistics Civil Augmentation Program s Task Orders INTEGRITY EFFICIENCY

More information

Defense Contract Management Agency, Iraq/Afghanistan

Defense Contract Management Agency, Iraq/Afghanistan Contract Number DAAA-09-02-D-0007 LOGCAP III Examination Record EXAMINATION OVERVIEW Purpose: This Examination assesses the contractor s adherence to standards set forth in the base contract, the specified

More information

SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION

SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION SPECIAL INSPECTOR GENERAL FOR IRAQ RECONSTRUCTION October 28, 2011 LETTER FOR SECRETARY OF DEFENSE COMMANDER, U.S. CENTRAL COMMAND COMMANDING GENERAL, U.S. FORCES IRAQ COMMANDING GENERAL, CENTCOM CONTRACTING

More information

2016 Plan of Correction Data 1

2016 Plan of Correction Data 1 2016 Plan of Correction Data 1 Retail Data Calendar Year 2015 2016 Number of Inspections 1263 1694 number of Plan of Correction s (POC s) issued 502 523 Regulatory Citations 2 & 2015 2016 number of POC

More information

Contractors on the Battlefield. 27 February 2007

Contractors on the Battlefield. 27 February 2007 Contractors on the Battlefield 27 February 2007 LOGCAP III in OEF and OIF Turkey Jan 03 Jan 06 Jordan Dec 02 Aug 03 Republic of Georgia May 02 - Present Iraq Mar 03 - Present Afghanistan Aug 02 - Present

More information

Middle East Regional Office

Middle East Regional Office United States Department of State and the Broadcasting Board of Governors Office of Inspector General Middle East Regional Office The Bureau of Diplomatic Security Baghdad Embassy Security Force Performance

More information

DPW/ENRMD ROTATIONAL SUPPORT

DPW/ENRMD ROTATIONAL SUPPORT General DPW/ENRMD ROTATIONAL SUPPORT This information paper describes policies for key environmental programs and assigns duties, roles, and responsibilities for each of the three environmental branches

More information

CHEMICAL HYGIENE PLAN

CHEMICAL HYGIENE PLAN SAMPLE WRITTEN CHEMICAL HYGIENE PLAN For Compliance With 29 CFR 1910.1450 Wyoming General Rules and Regulations Wyoming Department of Workforce Services OSHA Division Consultation Program ACKNOWLEDGEMENTS

More information

Facility Information. Overview of Visit. Report Summary

Facility Information. Overview of Visit. Report Summary Team Advocacy Inspection for December 15, 2015 Miles Residential Care Inspection conducted by Nicole Davis, P&A Team Advocate, and Bethany Schweer, Volunteer Facility Information Miles Residential Care

More information

Head Start Facilities and Safe Environments Checklist

Head Start Facilities and Safe Environments Checklist Head Start Facilities and Safe Environments Checklist Place a C for Compliant and NC for Non-Compliant in the box when you observe evidence of each of the items listed. Describe any problems or concerns

More information

Section II: Food Service. MPR 1 Plan Review

Section II: Food Service. MPR 1 Plan Review Plan Review Michigan Local Public Health Accreditation Program MPR 1 Plan Review Materials necessary for auditing the MPR Plan review log book or tracking system Facility files selected for the review

More information

UTAH ARMY NATIONAL GUARD 4 th BN (MI TRNG), 640th Regiment (RTI) Camp Williams Road Bluffdale, Utah

UTAH ARMY NATIONAL GUARD 4 th BN (MI TRNG), 640th Regiment (RTI) Camp Williams Road Bluffdale, Utah UTAH ARMY NATIONAL GUARD 4 th BN (MI TRNG), 640th Regiment (RTI) 17800 Camp Williams Road Bluffdale, Utah 84065-4905 NGUT-RTD-Y MEMORANDUM FOR Students attending 35F30 ALC at 4/640th RTI SUBJECT: Welcome

More information

INTRADEPARTMENTAL CORRESPONDENCE. June 7, 2016 BPC #

INTRADEPARTMENTAL CORRESPONDENCE. June 7, 2016 BPC # INTRADEPARTMENTAL CORRESPONDENCE June 7, 2016 BPC #16-0173 1.0 TO: The Honorable Board of Police Commissioners FROM: Inspector General, Police Commission SUBJECT: OFFICE OF THE INSPECTOR GENERAL INVESTIGATION

More information

HORRY COUNTY FIRE/RESCUE DEPARTMENT PROUD * PREPARED * PROFESSIONAL STANDARD OPERATING PROCEDURE SOP 202 SHIFT MANAGEMENT

HORRY COUNTY FIRE/RESCUE DEPARTMENT PROUD * PREPARED * PROFESSIONAL STANDARD OPERATING PROCEDURE SOP 202 SHIFT MANAGEMENT HORRY COUNTY FIRE/RESCUE DEPARTMENT PROUD * PREPARED * PROFESSIONAL STANDARD OPERATING PROCEDURE APPROVED BY GARRY B. ALDERMAN, FIRE CHIEF: DATE: April 2, 2012 SOP 202 SHIFT MANAGEMENT PURPOSE OF THIS

More information

2018 Program Review and Certification Standards J. Facilities

2018 Program Review and Certification Standards J. Facilities 2018 Review and Certification Standards New requirements are in red text and do not apply for the 2018 PR&C review. These requirements will be applicable in 2019. Minor adjustments and clarifications and

More information

4BN218REGT-TNCO 25 July * Course Title/ Number/ Phase TATS Military Police Reclassification Course / B10(R) MOS-T / Phase I.

4BN218REGT-TNCO 25 July * Course Title/ Number/ Phase TATS Military Police Reclassification Course / B10(R) MOS-T / Phase I. 4 th Battalion (General Studies), 218 th Regiment (Leadership) South Carolina Army National Guard Regional Training Institute 5411 Leesburg Road Eastover, South Carolina 29044-9732 25 July 2013 MEMORANDUM

More information

Virginia. Phone. Web Site Licensure Term. Assisted Living Facilities.

Virginia. Phone. Web Site  Licensure Term. Assisted Living Facilities. Virginia Phone Agency Department of Social Services, Division of Licensing Programs (804) 726-7157 Contact Judy McGreal (804) 726-7157 E-mail judith.mcgreal@dss.virginia.gov Web Site http://www.dss.virginia.gov/facility/alf.cgi

More information

REPORT 2015/046 INTERNAL AUDIT DIVISION

REPORT 2015/046 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2015/046 Audit of the management of super camp facilities in the African Union- United Nations Hybrid Operation in Darfur Overall results relating to the effective management

More information

HEALTH & SAFETY POLICY

HEALTH & SAFETY POLICY HEALTH & SAFETY POLICY HEALTH & SAFETY POLICY Introduction: Platinum Performing Arts has a general duty to ensure the health, safety and welfare of students, staff and visitors associated with the organisation,

More information

State of North Carolina Department of Correction Division of Prisons

State of North Carolina Department of Correction Division of Prisons State of North Carolina Department of Correction Division of Prisons POLICY & PROCEDURES Chapter: F Section:.1200 Title: Inspections Issue Date: 11/05/10 Supersedes: 07/20/10.1201 PURPOSE The purpose of

More information

Report NO. SPO July 24, Assessment of Electrical Safety In Afghanistan

Report NO. SPO July 24, Assessment of Electrical Safety In Afghanistan Report NO. SPO-2009-005 July 24, 2009 Assessment of Electrical Safety In Afghanistan Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection of information

More information

Personal Care Home Regulation

Personal Care Home Regulation Summary Introduction The Health and Community Services Act (the Act) provides the Department of Health and Community Services (the Department) with the overall responsibility of regulating Personal Care

More information

Facility Demographic Report

Facility Demographic Report Facility Demographic Report Introduction and Overview (Revision 2017) Each healthcare facility is responsible for providing an environment in which to deliver healthcare services that are safe and hazard

More information

WHEELING-OHIO COUNTY BOARD OF HEALTH WHEELING-OHIO COUNTY HEALTH DEPARTMENT

WHEELING-OHIO COUNTY BOARD OF HEALTH WHEELING-OHIO COUNTY HEALTH DEPARTMENT WHEELING-OHIO COUNTY BOARD OF HEALTH WHEELING-OHIO COUNTY HEALTH DEPARTMENT TITLE This Regulation shall be known as the Wheeling-Ohio County Health Department Tanning Bed Regulation and shall cover Ohio

More information

March 4, Jonathan Huber Huber Rental Properties, LLC 324 Cherry Street Arkadelphia, AR RE: White Elephant Apartments. Dear Mr.

March 4, Jonathan Huber Huber Rental Properties, LLC 324 Cherry Street Arkadelphia, AR RE: White Elephant Apartments. Dear Mr. March 4, 2009 Jonathan Huber Huber Rental Properties, LLC 324 Cherry Street Arkadelphia, AR 71923 RE: White Elephant Apartments Dear Mr. Huber: On March 3, 2009, I performed a routine complaint investigation

More information

North Carolina. Phone. Agency (919) Department of Health and Human Services, Division of Health Service Regulation

North Carolina. Phone. Agency (919) Department of Health and Human Services, Division of Health Service Regulation North Carolina Agency Department of Health and Human Services, Division of Health Service Regulation (919) 855-3765 Contact Doug Barrick (919) 855-3778 E-mail doug.barrick@dhhs.nc.gov Phone Web Site http://ncdhhs.gov/dhsr/acls

More information

Division of Early Care and Education. Child Care Emergency Plan Template for Exempt Providers

Division of Early Care and Education. Child Care Emergency Plan Template for Exempt Providers Division of Early Care and Education Child Care Emergency Plan Template for Exempt Providers Federal law requires child care facilities that receive federal funds to have a plan in place that addresses

More information

SIGAR. Afghan National Defense and Security Forces: DOD Cannot Fully Account for U.S.-funded Infrastructure Transferred to the Afghan Government

SIGAR. Afghan National Defense and Security Forces: DOD Cannot Fully Account for U.S.-funded Infrastructure Transferred to the Afghan Government SIGAR 0506flights Special Inspector General for Afghanistan Reconstruction SIGAR 18-29 Audit Report Afghan National Defense and Security Forces: DOD Cannot Fully Account for U.S.-funded Infrastructure

More information

Division of Early Care and Education. Child Care Emergency Plan Template

Division of Early Care and Education. Child Care Emergency Plan Template Division of Early Care and Education Child Care Emergency Plan Template South Carolina Department of Social Services regulations require child care facilities to have a plan in place that addresses emergency

More information

Trinity School. Health & Safety Policy

Trinity School. Health & Safety Policy Trinity School Health & Safety Policy GOVERNOR APPROVAL DATE: Sept 2017 DOCUMENT REVIEW COMMITTEE RESPONSIBLE: Resources NEXT REVIEW DATE: 1 September 2018 Health & Safety Policy Introduction Purpose The

More information

245D-HCBS Community Residential Setting (CRS) Licensing Checklist

245D-HCBS Community Residential Setting (CRS) Licensing Checklist 245D-HCBS Community Residential Setting (CRS) Licensing Checklist License Holder s Name: CRS License #: Program Address: Date of review: Type of review: Initial Renewal Other C = Compliance NC = Non-Compliance

More information

Okla. Admin. Code 340: : Purpose. Okla. Admin. Code 340: : Definitions [REVOKED] Okla. Admin.

Okla. Admin. Code 340: : Purpose. Okla. Admin. Code 340: : Definitions [REVOKED] Okla. Admin. Okla. Admin. Code 340:110-1-1 340:110-1-1. Purpose The purpose of this Chapter is to describe the responsibilities and functions of Licensing Services in regard to the licensure of child care facilities.

More information

RULES OF THE TENNESSEE DEPARTMENT OF INTELLECTUAL AND DEVELOPMENTAL DISABILITIES OFFICE OF LICENSURE

RULES OF THE TENNESSEE DEPARTMENT OF INTELLECTUAL AND DEVELOPMENTAL DISABILITIES OFFICE OF LICENSURE RULES OF THE TENNESSEE DEPARTMENT OF INTELLECTUAL AND DEVELOPMENTAL DISABILITIES OFFICE OF LICENSURE CHAPTER 0465-02-05 ADEQUACY OF ENVIRONMENT AND SERVICES TABLE OF CONTENTS 0465-02-05-.01 Standard for

More information

RULES OF TENNESSEE DEPARTMENT OF MENTAL HEALTH AND MENTAL RETARDATION CHAPTER ADEQUACY OF FACILITY ENVIRONMENT AND ANCILLARY SERVICES

RULES OF TENNESSEE DEPARTMENT OF MENTAL HEALTH AND MENTAL RETARDATION CHAPTER ADEQUACY OF FACILITY ENVIRONMENT AND ANCILLARY SERVICES RULES OF TENNESSEE DEPARTMENT OF MENTAL HEALTH AND MENTAL RETARDATION CHAPTER 0940-5-5 ADEQUACY OF FACILITY ENVIRONMENT TABLE OF CONTENTS 0940-5-5-.01 Standard for New Construction 0940-5-5-.02 General

More information

UTAH ARMY NATIONAL GUARD 3rd BATTALION (FA) 640TH REGIMENT (RTI) SOUTH CAMP WILLIAMS ROAD RIVERTON, UTAH NGUT-RTC-Y 30 April 2014

UTAH ARMY NATIONAL GUARD 3rd BATTALION (FA) 640TH REGIMENT (RTI) SOUTH CAMP WILLIAMS ROAD RIVERTON, UTAH NGUT-RTC-Y 30 April 2014 UTAH ARMY NATIONAL GUARD 3rd BATTALION (FA) 640TH REGIMENT (RTI) 17800 SOUTH CAMP WILLIAMS ROAD RIVERTON, UTAH 84065-4999 NGUT-RTC-Y 30 April 2014 MEMORANDUM FOR Field Artillery Fire Support Specialist

More information

NYC Agency Safe Handling Program for Universal & Electronic Waste

NYC Agency Safe Handling Program for Universal & Electronic Waste Agency Safe Handling Program for Universal & Electronic Waste Dave Hirschler Director, Waste Prevention Unit Department of Sanitation Consent Agreement In August, 2009, entered into a consent agreement

More information

SAMPLE: Environmental Rounds and Safety Assessment Tool

SAMPLE: Environmental Rounds and Safety Assessment Tool SAMPLE: Environmental Rounds and Safety Assessment Tool Area/Department Evaluated: Date: Security and Incident Management Y N N/A Comments 1. Are emergency telephone numbers posted by all stationary phones?

More information

RADIATION EXPOSURE CONTROL PLAN

RADIATION EXPOSURE CONTROL PLAN RADIATION EXPOSURE CONTROL PLAN The use of Nova Radiographic Exposure Devices is limited to Nova Advanced Imaging Inc. employees under the supervision of the corporations Radiation Safety Officer (RSO).

More information

Commercial White Box Grant Program

Commercial White Box Grant Program Commercial White Box Grant Program City of Racine 730 Washington Ave. Program Contact: Ken Plaski Chief Building Official (262) 636-9161 The White Box Program is targeted to currently vacant, first-floor

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY PACIFIC REGIONAL MEDICAL COMMAND INSPECTOR GENERAL First Annual Inspection of Facilities Used to House Warriors in Transition 12-16 July 2010 Dissemination is prohibited EXEMPT FROM MANDATORY Release

More information

Shelter Fundamentals Exercise Disaster Cycle Services

Shelter Fundamentals Exercise Disaster Cycle Services Shelter Fundamentals Exercise Disaster Cycle Services Participant Handout November 2013 This document was prepared under a grant from FEMA's Grant Programs Directorate, U.S. Department of Homeland Security.

More information

Agency for Health Care Administration

Agency for Health Care Administration Page 1 of 13 ST - P0000 - Initial Comments Title Initial Comments Statute or Rule Type Memo Tag ST - P0102 - Registration Changes Title Registration Changes Statute or Rule 400.980(2) FS; 59A-27.002(1)

More information

Health and Safety Policy

Health and Safety Policy Health and Safety Policy EYFS Requirement This policy has been written in line with the Early Years Foundation Stage Safeguarding and Welfare requirements (section 3.52 to 3.54) Related Policies Child

More information

NACCC Accreditation of Child Contact Centres Health and Safety Checklist

NACCC Accreditation of Child Contact Centres Health and Safety Checklist NACCC Accreditation of Child Contact Centres Health and Safety Checklist Name of Child Contact Centre: 1. Fire 1.1 Are your centre s fire and emergency procedures clearly displayed, compliant with fire

More information

Testimony. April G. Stephenson Director, Defense Contract Audit Agency. before the. November 2, 2009

Testimony. April G. Stephenson Director, Defense Contract Audit Agency. before the. November 2, 2009 Testimony of April G. Stephenson Director, Defense Contract Audit Agency before the Commission on Wartime Contracting November 2, 2009 Chairman Thibault, Chairman Shays, and members of the Commission,

More information

DEPARTMENT OF DEFENSE Defense Contract Management Agency INSTRUCTION. Corrective Action Process

DEPARTMENT OF DEFENSE Defense Contract Management Agency INSTRUCTION. Corrective Action Process DEPARTMENT OF DEFENSE Defense Contract Management Agency INSTRUCTION Corrective Action Process Multifunctional Instruction DCMA-INST 1201 Lead Component: Quality Assurance Directorate Incorporating Administrative

More information

RESIDENT VOLUNTEER FIREFIGHTER PROGRAM

RESIDENT VOLUNTEER FIREFIGHTER PROGRAM -------Fortuna Volunteer Fire Department------- 320 SO. FORTUNA BLVD. FORTUNA, CA. 95540 (707)725-5021 http://fortunafire.com Always Ready Always Willing RESIDENT VOLUNTEER FIREFIGHTER PROGRAM (Procedures

More information

CONTRACTING IN IRAQ AND AFGHANISTAN AND PRIVATE SECURITY CONTRACTS IN IRAQ AND AFGHANISTAN

CONTRACTING IN IRAQ AND AFGHANISTAN AND PRIVATE SECURITY CONTRACTS IN IRAQ AND AFGHANISTAN CONTRACTING IN IRAQ AND AFGHANISTAN AND PRIVATE SECURITY CONTRACTS IN IRAQ AND AFGHANISTAN BACKGROUND: The DoD has been criticized for its contracting practices in Iraq, and the accounting of contractor

More information

Pre-Requisite Form SSPC Protective Coatings Inspector (PCI) Program & Certification Level 3

Pre-Requisite Form SSPC Protective Coatings Inspector (PCI) Program & Certification Level 3 SSPC Use Only Date Initial Application Verified Supervisor Approval Pre-Requisite Form SSPC Protective Coatings Inspector (PCI) Program & Certification Level 3 Document Checklist - Your completed packet

More information

City of Waterbury Safety & Security Assessment

City of Waterbury Safety & Security Assessment City of Waterbury Safety & Security Assessment Dear School Official, Pursuant to guidelines set forth by the Department of Justice, Office of Domestic Preparedness and the Department of Homeland Security,

More information

Welcome & Opening PRESENTER INTRODUCTIONS HOUSEKEEPING INFO EMERGENCY EXITS

Welcome & Opening PRESENTER INTRODUCTIONS HOUSEKEEPING INFO EMERGENCY EXITS Daycare.com LLC 1 Welcome & Opening PRESENTER INTRODUCTIONS HOUSEKEEPING INFO EMERGENCY EXITS 2 Orientation Agenda Role of Community Care Licensing Licensing Requirement Overview Application Process Review

More information

FOR OFFICIAL USE ONLY

FOR OFFICIAL USE ONLY PACIFIC REGIONAL MEDICAL COMMAND INSPECTOR GENERAL Second Annual Inspection of Facilities Used to House Warriors in Transition 25 July 2 August 2011 Dissemination is prohibited EXEMPT FROM MANDATORY Release

More information

FINAL AUDIT REPORT DEPARTMENT OF COMMUNITY AFFAIRS CALHOUN COUNTY WEATHERIZATION ASSISTANCE PROGRAM - ARRA SUBGRANT AGREEMENT

FINAL AUDIT REPORT DEPARTMENT OF COMMUNITY AFFAIRS CALHOUN COUNTY WEATHERIZATION ASSISTANCE PROGRAM - ARRA SUBGRANT AGREEMENT FINAL AUDIT REPORT DEPARTMENT OF COMMUNITY AFFAIRS CALHOUN COUNTY WEATHERIZATION ASSISTANCE PROGRAM - ARRA SUBGRANT AGREEMENT SUBGRANT AGREEMENT NUMBER 10-WX-7X-17-49-01-706 SEPTEMBER 14, 2009 THROUGH

More information

MAPLE LEAF GOLF & COUNTRY CLUB HURRICANE PREPAREDNESS PLAN

MAPLE LEAF GOLF & COUNTRY CLUB HURRICANE PREPAREDNESS PLAN MAPLE LEAF GOLF & COUNTRY CLUB HURRICANE PREPAREDNESS PLAN March 23, 2018 MAPLE LEAF GOLF & COUNTRY CLUB HURRICANE PREPAREDNESS PLAN 1. DEFINITIONS TROPICAL DEPRESSION AN ORGANIZED SYSTEM OF CLOUDS AND

More information

BSA UNIT CAMPING AT FORT HOOD S CAMP FINLAYSON. There are NO daily users fee required for use of the Camp Finlayson facilities.

BSA UNIT CAMPING AT FORT HOOD S CAMP FINLAYSON. There are NO daily users fee required for use of the Camp Finlayson facilities. Page 1 of 8 BSA UNIT CAMPING AT FORT HOOD S CAMP FINLAYSON There are NO daily users fee required for use of the Camp Finlayson facilities. Camp Finlayson is U.S. Government property designated for shared

More information

House of Order, House of Prayer. Chores & Charts

House of Order, House of Prayer. Chores & Charts House of Order, House of Prayer Heidi Hill, Annette Simmons BYU Women s Conference 2012 Chores & Charts We believe in work for ourselves and for our children. We should train our children to work, and

More information

Health and Safety Policy Statement

Health and Safety Policy Statement Health and Safety Policy Statement Author: Michelle Bingham Date of Issue: 16 th September 2017 Review date: 16 th September 2018 At Brookside Preschool, we believe that the health and safety of children

More information

Request for Proposal. Purchase of New Mobile Trailer Climbing Wall. No November 23, 2015

Request for Proposal. Purchase of New Mobile Trailer Climbing Wall. No November 23, 2015 Request for Proposal Purchase of New Mobile Trailer Climbing Wall No. 2016-002 November 23, 2015 1 Contents Price Proposal-----------------------------------------------------------------------------------------------------3

More information

Standard Operating Procedure (SOP)

Standard Operating Procedure (SOP) Standard Operating Procedure (SOP) Maintaining a Clean Environment on the Health Bus DOCUMENT CONTROL: Version: 1 Ratified by: Clinical Effectiveness Committee Date ratified: 6 August 2013 Name of originator/author:

More information

A Comparison of ALF Regulatory Systems

A Comparison of ALF Regulatory Systems A Comparison of ALF Regulatory Systems The Florida Assisted Living Workgroup In 2011, the governor of Florida directed the Agency for Health Care Administration (AHCA) to examine assisted living facilities

More information

Type: Routine Date: 07/27/2017 Arrival/Departure Time: 02:16 PM to 03:43 PM Staff Present: 6 Children Present: 51 [School Readiness Inspection]

Type: Routine Date: 07/27/2017 Arrival/Departure Time: 02:16 PM to 03:43 PM Staff Present: 6 Children Present: 51 [School Readiness Inspection] Child Care Facility Information Name: Deliverance Tabernacle Child Development Center ID Number: C01ES0184 Address: 1780 W Detroit Blvd City: Pensacola State: FL Zip Code: 32534-1631 Phone Number: (850)

More information

(as of 5/21/04) Name of Facility: Address of Facility: Number & Street Barangay & Municipality. Province/City Region. Name of Owner: Tel. No.

(as of 5/21/04) Name of Facility: Address of Facility: Number & Street Barangay & Municipality. Province/City Region. Name of Owner: Tel. No. Page 1 of 12 CHECKLIST FOR ACCREDITATION OF RESIDENTIAL DRUG ABUSE TREATMENT AND REHABILITATION CENTER (DATRC) (as of 5/21/04) Name of Facility: Address of Facility: Number & Street Barangay & Municipality

More information

SIGAR. $14.7 Million Warehouse Facility at Kandahar Airfield: Construction Delays Prevented the Facility from Being Used as Intended J U L Y

SIGAR. $14.7 Million Warehouse Facility at Kandahar Airfield: Construction Delays Prevented the Facility from Being Used as Intended J U L Y SIGAR Special Inspector General for Afghanistan Reconstruction SIGAR 15-74 Inspection Report $14.7 Million Warehouse Facility at Kandahar Airfield: Construction Delays Prevented the Facility from Being

More information

UNCLASSIFIED//FOR OFFICIAL USE ONLY

UNCLASSIFIED//FOR OFFICIAL USE ONLY UNCLASSIFIED//FOR OFFICIAL USE ONLY 070902Z Nov 06 DOD, CENTCOM, ORGANIZATIONS, COS USCENTCOM(MC) Subject: MODIFICATION TO USCENTCOM CIVILIAN AND CONTRACTOR ARMING POLICY AND DELEGATION OF AUTHORITY FOR

More information

FAMILY DISASTER PLAN. Name: Date: 4 STEPS OF SAFETY LOCAL OFFICE:

FAMILY DISASTER PLAN. Name: Date: 4 STEPS OF SAFETY LOCAL OFFICE: FAMILY DISASTER PLAN Name: Date: It is recommended that every employee of the judicial branch have a personalized Family Disaster Plan. Families can - and do - cope with disaster by preparing in advance

More information

Q & A from November 1st Tour

Q & A from November 1st Tour State College of Florida Manatee-Sarasota Contracted Custodial Services ITN Question & Answer Questions and Answers originally posted on November 2, 2012, dates of changes and additions noted below Q &

More information

Food Service and Pool Sanitation

Food Service and Pool Sanitation 1.0 Regulatory Authority Food Service and Pool Sanitation California Health and Safety Code 109875-110040, 113700-114437, 116025-116068, and California Code of Regulation (CCR) Title 22 65501-65551. These

More information

The U.S. military has successfully completed hundreds of Relief-in-Place and Transfers of

The U.S. military has successfully completed hundreds of Relief-in-Place and Transfers of The LOGCAP III to LOGCAP IV Transition in Northern Afghanistan Contract Services Phase-in and Phase-out on a Grand Scale Lt. Col. Tommie J. Lucius, USA n Lt. Col. Mike Riley, USAF The U.S. military has

More information

Contract Oversight for the Broad Area Maritime Surveillance Contract Needs Improvement

Contract Oversight for the Broad Area Maritime Surveillance Contract Needs Improvement Report No. D-2011-028 December 23, 2010 Contract Oversight for the Broad Area Maritime Surveillance Contract Needs Improvement Additional Copies To obtain additional copies of this report, visit the Web

More information

Emergency Preparedness

Emergency Preparedness In the interest of maintaining a safe environment for all visitors at Stanford University, it is important for your program s staff and participants to know the following procedures in the unlikely event

More information

School Safety Audit Checklist

School Safety Audit Checklist School Safety Audit Checklist Based on work done by Virginia State Education Department and modified by the New York State Police as a resource for school personnel. Components of the Audit Process School

More information

ARTICLE III, CHAPTER 3. Department Vehicle Operation. Effective: Revised:

ARTICLE III, CHAPTER 3. Department Vehicle Operation. Effective: Revised: ARTICLE III, CHAPTER 3 Department Vehicle Operation Effective: 09-20-95 Revised: 07-01-09 III.3.1 Policy It is the policy of the Arvada Police Department that its employees maintain and operate city vehicles

More information

CONTRACTOR SUPPORT OF U.S. OPERATIONS IN USCENTCOM AOR, IRAQ, AND AFGHANISTAN

CONTRACTOR SUPPORT OF U.S. OPERATIONS IN USCENTCOM AOR, IRAQ, AND AFGHANISTAN CONTRACTOR SUPPORT OF U.S. OPERATIONS IN USCENTCOM AOR, IRAQ, AND AFGHANISTAN BACKGROUND: This update reports DoD contractor personnel numbers in theater and outlines DoD efforts to improve management

More information

Emergency Plan Guidelines For Child Care Providers

Emergency Plan Guidelines For Child Care Providers South Carolina Division of Early Care and Education Health. Safety. Supervision. Emergency Plan Guidelines For Child Care Providers Visit us on the Web at: www.scchildcare.org Phone Numbers Region 1 (Upstate):

More information

Tusla Early Years Inspectorate. Corrective Actions and Preventive Actions (CAPA) to Address Non-Compliances

Tusla Early Years Inspectorate. Corrective Actions and Preventive Actions (CAPA) to Address Non-Compliances Tusla Early Years Inspectorate s and s (CAPA) to Address Non-Compliances Please read the following guidance notes carefully before completing your CAPA form Where Non Compliances have been documented in

More information

Yukon Government s. Telework Guidelines. February 2010 Policy, Planning & Communication Branch, PSC

Yukon Government s. Telework Guidelines. February 2010 Policy, Planning & Communication Branch, PSC Yukon Government s Telework Guidelines Table of Contents Telework Guidelines 1 Appendix A: Telework Agreement Template 6 Appendix B: Health & Safety Checklist 10 These guidelines are intended to be read

More information

Emergency & Evacuation

Emergency & Evacuation Emergency & Evacuation POLICY STATEMENT: Victory OOSH will provide an environment that ensures the safety and wellbeing of the children at all times ( My Time, Our Place 1.1, 3.1). All children and educators

More information

We are the regulator: Our job is to check whether hospitals, care homes and care services are meeting essential standards.

We are the regulator: Our job is to check whether hospitals, care homes and care services are meeting essential standards. Inspection Report We are the regulator: Our job is to check whether hospitals, care homes and care services are meeting essential standards. Eastbourne Villa 21 Eastbourne Road, Hornsea, HU18 1QS Tel:

More information

STOP THE FOLLOWING SECTIONS WILL BE COMPLETED DURING THE MEETING

STOP THE FOLLOWING SECTIONS WILL BE COMPLETED DURING THE MEETING TIME IN: TIME OUT: SERVICE: 618 RESULT: FUTURE : TRAVEL TIME: EH# SR# PR# SOUTHERN NEVADA HEALTH DISTRICT FOOD SAFETY ASSESSMENT MEETING QUESTIONAIRE: Per SNHD Regulation 2-101.11 Responsibility, The Permit

More information

UNACCOMPANIED HOUSING RESIDENT GUIDELINE HANDBOOK

UNACCOMPANIED HOUSING RESIDENT GUIDELINE HANDBOOK UNACCOMPANIED HOUSING RESIDENT GUIDELINE HANDBOOK DOVER AIR FORCE BASE 1 Welcome to Dover AFB Unaccompanied Enlisted Personnel Housing (UEPH). We are honored to have you stay in our quarters, and we will

More information

DEPARTMENT OF THE ARMY HEADQUARTERS U.S. ARMY MANEUVER SUPPORT CENTER AND FORT LEONARD WOOD FORT LEONARD WOOD, MISSOURI

DEPARTMENT OF THE ARMY HEADQUARTERS U.S. ARMY MANEUVER SUPPORT CENTER AND FORT LEONARD WOOD FORT LEONARD WOOD, MISSOURI *FLW Reg 672-11 DEPARTMENT OF THE ARMY HEADQUARTERS U.S. ARMY MANEUVER SUPPORT CENTER AND FORT LEONARD WOOD FORT LEONARD WOOD, MISSOURI 65473-5000 FLW Regulation 19 June 2002 No 672-11 Decorations, Awards

More information

STANDARD OPERATING GUIDELINE Civil Disturbances

STANDARD OPERATING GUIDELINE Civil Disturbances Purpose Fire Ground Safety Initiative STANDARD OPERATING GUIDELINE Civil Disturbances This standard operating guideline has been developed to provide basic operating guidelines for the personnel responding

More information

IOWA. Downloaded January 2011

IOWA. Downloaded January 2011 IOWA Downloaded January 2011 481 58.24(135C) Dietary. 58.24(1) Organization of dietetic service department. The facility shall meet the needs of the residents and provide the services listed in this standard.

More information

Christiana Care Visiting Nurse Association. Safety In The Home. Helpful tips to lower your risk of accidents. Visiting Nurse Association

Christiana Care Visiting Nurse Association. Safety In The Home. Helpful tips to lower your risk of accidents. Visiting Nurse Association Christiana Care Visiting Nurse Association Safety In The Home Helpful tips to lower your risk of accidents Visiting Nurse Association Christiana Care Visiting Nurse Association Each year three out of every

More information

INSTRUCTION BOOKLET. HPNAP Operations Support and Capital Equipment Funds Funding Period: November 1, October 31, 2019

INSTRUCTION BOOKLET. HPNAP Operations Support and Capital Equipment Funds Funding Period: November 1, October 31, 2019 INSTRUCTION BOOKLET FOR HPNAP Operations Support and Capital Equipment Funds Funding Period: November 1, 2018- October 31, 2019 Ten (10) copies of application due at Food Bank of the Southern Tier by Monday,

More information

City of Denton Parks & Recreation Department. City of Denton Parks and Recreation. Standards of Care

City of Denton Parks & Recreation Department. City of Denton Parks and Recreation. Standards of Care City of Denton Parks & Recreation Department City of Denton Parks and Recreation Standards of Care 2016-2017 1 TABLE OF CONTENTS Standards of Care General Administration 3 Organization 3 Definitions 3

More information

REQUEST FOR PROPOSAL (RFP)

REQUEST FOR PROPOSAL (RFP) REQUEST FOR PROPOSAL (RFP) ILLINOIS CENTRAL COLLEGE FOOD SERVICES Issue Date: September 12, 2017 Responses Deadline: Wednesday, October 25, 2017, 2:30 p.m. Submit responses to: Illinois Central College

More information

R E S O L U T I O N. C. History: The existing buildings on Lots 30 and 31 were constructed prior to 1970.

R E S O L U T I O N. C. History: The existing buildings on Lots 30 and 31 were constructed prior to 1970. R E S O L U T I O N WHEREAS, the Prince George s County Planning Board has reviewed CNU-33471-11, CNC Concrete, requesting certification of a nonconforming use for a concrete batching/mixing plant located

More information

Cook Team Application

Cook Team Application Cook Team Application Thank you for your interest as a Cook Team in the 2017 Fairhope Rotary 12th Annual International Steak Championship for Charity, also known as "Fairhope's Premier Street Party!" With

More information

Recommended Physical Plant Improvements to Existing Nursing Homes for Disaster Preparedness. Report to the Governor and to the Legislature

Recommended Physical Plant Improvements to Existing Nursing Homes for Disaster Preparedness. Report to the Governor and to the Legislature Recommended Physical Plant Improvements to Existing Nursing Homes for Disaster Preparedness Report to the Governor and to the Legislature 1999 Recommended Physical Plant Improvements to Existing Nursing

More information

Type: Routine Date: 08/31/2017 Arrival/Departure Time: 09:45 AM to 11:45 AM Staff Present: 20 Children Present: 87 [School Readiness Inspection]

Type: Routine Date: 08/31/2017 Arrival/Departure Time: 09:45 AM to 11:45 AM Staff Present: 20 Children Present: 87 [School Readiness Inspection] Child Care Facility Information Name: Sky Family YMCA ID Number: 580300125 Address: 701 Center Rd City: Venice State: FL Zip Code: 34285-4808 Phone Number: (941) 375-9122 Capacity: 342 Owner/Director/Staff

More information

SIGAR. Gardez Hospital: $14.6 Million and Over 5 Years to Complete, Yet Construction Deficiencies Still Need to be Addressed A U G U S T

SIGAR. Gardez Hospital: $14.6 Million and Over 5 Years to Complete, Yet Construction Deficiencies Still Need to be Addressed A U G U S T SIGAR Special Inspector General for Afghanistan Reconstruction SIGAR 16-56 Inspection Report Gardez Hospital: $14.6 Million and Over 5 Years to Complete, Yet Construction Deficiencies Still Need to be

More information

ANNOUNCEMENT CCDOC

ANNOUNCEMENT CCDOC Special Management Team Pilot Project Specialized Detail ANNOUNCEMENT CCDOC-2017-01 Cook County Sheriff s Office Department of Corrections Special Management Team Summary The CCDOC is seeking highly motivated,

More information

Beacon Rules for Clients

Beacon Rules for Clients Beacon Rules for Clients 1. SOBRIETY: No drinking of alcoholic beverages. No caffeinated beverages on or off the premises. This includes passes. No use of non-prescribed drugs on or off the premises. Any

More information

GAO REBUILDING IRAQ. Report to Congressional Committees. United States Government Accountability Office. July 2008 GAO

GAO REBUILDING IRAQ. Report to Congressional Committees. United States Government Accountability Office. July 2008 GAO GAO United States Government Accountability Office Report to Congressional Committees July 2008 REBUILDING IRAQ DOD and State Department Have Improved Oversight and Coordination of Private Security Contractors

More information

Report No. D September 22, Kuwait Contractors Working in Sensitive Positions Without Security Clearances or CACs

Report No. D September 22, Kuwait Contractors Working in Sensitive Positions Without Security Clearances or CACs Report No. D-2010-085 September 22, 2010 Kuwait Contractors Working in Sensitive Positions Without Security Clearances or CACs Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting

More information

Food Defense Tabletop Exercise: Schools as a Target

Food Defense Tabletop Exercise: Schools as a Target Food Defense Tabletop Exercise: Schools as a Target Presented by Douglas Conwell Instructor National Food Service Management Institute 1 What Is Food Defense? FOOD DEFENSE is defined as the protection

More information

ARSD 67 :42:07 : :42:07 :01. Definitions.

ARSD 67 :42:07 : :42:07 :01. Definitions. ARSD 67 :42:07 :01 67 :42:07 :01. Definitions. Terms used in this chapter mean: (1) After-care services, supportive social services, as specified in the treatment plan, for the family after the child has

More information

Checklist of Health and Safety Standards. for Approval of Family Caregiver Home

Checklist of Health and Safety Standards. for Approval of Family Caregiver Home STATE OF CALIFORNIA -- HEALTH AND HUMAN SERVICES AGENCY CALIFORNIA DEPARTMENT OF SOCIAL SERVICES Checklist of Health and Safety Standards Pursuant to Division 31, MPP Section 31-445.3, in order to be approved,

More information