The Market for U.S. Military Airborne Communications Systems

Size: px
Start display at page:

Download "The Market for U.S. Military Airborne Communications Systems"

Transcription

1 The Market for U.S. Military Airborne Communications Systems Product Code #F632 A Special Focused Market Segment Analysis by:

2

3 Airborne Electronics Forecast Analysis 2 The Market for U.S. Military Airborne Communications Systems Table of Contents Executive Summary...2 Introduction...3 Trends...3 Competitive Environment...4 Market Statistics...12 Table 1 - The Market for U.S. Military Airborne Communications Systems Unit Production by Headquarters/Company/Program Table 2 - The Market for U.S. Military Airborne Communications Systems Value Statistics by Headquarters/Company/Program Table 3 - The Market for U.S. Military Airborne Communications Systems Unit Production % Market Share by Headquarters/Company Table 4 - The Market for U.S. Military Airborne Communications Systems Value Statistics % Market Share by Headquarters/Company Figure 1 - The Market for Airborne Communications Systems Unit Production (Bar Graph)...21 Figure 2 - The Market for Airborne Communications Systems Value Statistics (Bar Graph)...21 Figure 3 - The Market for Airborne Communications Systems Market Value Breakout (Pie Chart)...22 Figure 4 - The Market for Airborne Communications Systems Unit Production % Market Share (Pie Chart)...22 Figure 5 - The Market for Airborne Communications Systems Value Statistics % Market Share (Pie Chart)...23 Figure 6 - The Market for Airborne Communications Systems Segment Unit Statistics % Market Share (Pie Chart)...23 Figure 7 - The Market for Airborne Communications Systems Segment Value Statistics % Market Share (Pie Chart)...24 Conclusion...25 * * * 2010 November 2010

4

5 Product Code F632 The Market for U.S. Military Airborne Communications Systems PROGRAMS The following reports are included in this section: (Note: a single report may cover several programs.) ARC-190(V) ARC-201 ARC-210(V) ARC-231 Assured Worldwide Connectivity Common Data Link (CDL) Hawklink Harris Family of Advanced Beyond line-of-sight Terminals (FAB-T) ICNIA RF Sensors & Countermeasures (U.S. Air Force) Tactical Data Link Fighters Tactical Data Networks Enterprise USQ November 2010

6

7 Product Code F632 The Market for U.S. Military Airborne Communications Systems Background. This Forecast International analysis examines the market for United States military airborne communications systems. This market is defined as airborne military communications systems produced by a United States manufacturer, or airborne military communications systems purchased by the United States. Among the types of communications transmitted or received by the military are radar tracks, target information, imagery, and command assignments. The information needs to be transmitted or acquired in realtime or near real-time in order to be the most useful to troops and commanders. Of note, the senders and receivers can be human or machine. Method. For the purpose of this analysis, Forecast International defines the U.S. military airborne communications market as the 12 systems or programs Introduction listed below (also see Table 2). Consequently, this study does not examine every airborne military communications product being developed or manufactured, nor does it look at every airborne military communications program in existence. "The Market for U.S. Military Airborne Communications Systems" integrates data gathered by Forecast International from open, unclassified sources throughout the world. The information is collected from government agencies, company officials, industry experts, defense publications, and a variety of other sources. Forecast International generated the statistics for this analysis on September 22, These statistics represent a "snapshot in time" of the projected 10-year market performance of the 12 systems or programs listed below. System/Program USQ-140 ARQ-58 ARC-201 Integrated Communications/Navigation/Identification Avionics (ICNIA) System ARC-231 ARC-190 ARC-210 Family of Advanced Beyond line-of-sight Terminals (FAB-T) RF Sensors & Countermeasures (U.S. Air Force) Tactical Data Networks Enterprise Fighter Tactical Data Link Assured Worldwide Connectivity Prime Contractor Data Link Solutions/ViaSat Harris ITT Northrop Grumman Raytheon Boeing Manufacturer Varies Manufacturer Varies Manufacturer Varies Manufacturer Varies * * * 2010

8

9 Airborne Electronics Forecast ARC-210(V) Outlook Forecast International projects that defense departments worldwide will procure more than 13,000 ARC-210 radios in the years ahead Based on the personal computer model of software customization, ARC-210 customers have the ability to upgrade communications capabilities via software Unit Production Forecast Units Units Description. The ARC-210 is an airborne military radio manufactured by. The ARC-210 operates by software. Sponsor Inc 400 Rd NE Cedar Rapids, IA USA Tel: +1 (319) Fax: + 1 (319) Prime Orientation Contractors Status. In production and service. Application. Communications Price Range. According to the U.S. General Services Administration (GSA) Advantage Web site, the price of one ARC-210 airborne military radio ranges from $44,205 to 72,285. Note: Among other factors, price appears to vary according to the number of radios ordered (the larger the quantity ordered, the lower the price). Inc Rd NE, Cedar Rapids, IA United States, Tel: + 1 (319) , Fax: + 1 (319) , Prime Comprehensive information on Contractors can be found in Forecast International s International Contractors series. For a detailed description, go to (see Products & Samples/Governments & Industries) or call + 1 (203) Contractors are invited to submit updated information to Editor, International Contractors, Forecast International, 22 Commerce Road, Newtown, CT 06470, USA; rich.pettibone@forecast1.com 2010 October 2010

10 Page 2 ARC-210(V) Airborne Electronics Forecast Technical Data Metric U.S. Dimensions Size (RT-1556) 12.7 cm x 14.2 cm x 25.1 cm 5 in x 5.6 in x 9.9 in Weight (RT-1556) 5.53 kg 12.2 lb Characteristics Frequency Range 30 MHz - 88 MHz FM tactical/close air support, SINCGARS-V (normal/secure voice) 108 MHz -118 MHz AM receive only 118 MHz -137 MHz AM air traffic control 137 MHz -156 MHz FM land mobile 156 MHz -174 MHz FM maritime 225 MHz MHz AM CASS/DICASS, HAVE QUICK, HAVE QUICK II 225 MHz MHz FM HAVE QUICK, HAVE QUICK II RT Gen 5 UHF 225 MHz 512 MHz military/homeland defense UHF , , , MHz public safety bands Frequency Spacing 25 khz, with 5 khz increments in normal modes 1.25 khz for ECCM modes 8.33 khz for European ATC Preset Channels 25 simplex frequencies in normal mode 25 ECCM nets SINCGARS cue channel SINCGARS cold-start channel 5 half duplex 25-kHz channels for SATCOM 57 VHF maritime channels ECCM Capability HAVE QUICK I/II, SINCGARS (embedded) Data Rate Up to 80,000 bps Power Requirements 150 W transmit; 25 W receive Transmitter Power Output AM W; FM W Operating Temperature -54 C to +71 C up to 95 C for 30 min Operating Altitude Up to 70,000 ft Environmental MIL-E-5400 Class 2 ARC-210 Receiver/Transmitter Source: October 2010

11 Airborne Electronics Forecast Page 3 Variants/Upgrades ARC-210(V) Variants of the ARC-210 include the ARC-210(V)2, ARC-210(V)3, ARC-210(V)4, and ARC-210, Generation 5. In March of 2006, the United States Navy awarded a $6.2 million order against a previously awarded basic ordering agreement (N G-0024) for services in support of the design and development of the fifth generation of the ARC-210 radio (ARC-210, Generation 5). In the summer of 2007 (July 2007), received a modification to a previously awarded contract from the U.S. Navy to produce more than 300 ARC-210 radios for the U.S. Air Force. The following summer (August 2008), the U.S. Navy awarded a modification to a previously awarded contract to manufacture more than 160 ARC-210 radios for the Government of Australia. In February 2009, received an order from the U.S. Navy against a previously issued Basic Funding Program Review Revenue generated by funds production of the ARC-210. Contracts/Orders & Options Ordering Agreement to "evolve" the Ultra High Frequency (UHF) Satellite Communication (SATCOM) waveform capability in the ARC-210, Generation 5. In June of 2009, the U.S. Navy awarded an order against a previously issued Basic Ordering Agreement for services in support of cryptographic work for the fifth generation of the ARC-210. In March 2010, received a modification to a previously awarded contract from the U.S. Navy to produce more than 120 ARC-210 radios. In May of 2010, the U.S. Navy awarded a modification to a previously awarded contract to manufacture ARC-210 radios for the U.S. Army, U.S. Air Force, and the U.S. Navy. Award Contractor ($ millions) Date/Description 25.8 Jul 2006 A 10-year contract for performance-based logistics (PBL) support of ARC-210(V) systems used on aircraft and ships. This contract includes one five-year option that, if exercised, would bring the total contract value to $53.2 million. Work is expected to be completed Jul The Naval Inventory Control Point is the contracting agency. (N D-007G) Jul 2007 The U.S. Navy awarded a modification to a previously awarded firm-fixed-priced contract (N C-0050) to exercise an option for ARC-210(V) Electronic Protection Radio Systems for the U.S. Air Force. This modification consists of 329 each RT-1851 ARC-210 Receiver-Transmitter Radios; 323 each C Radio Control Sets, and 294 each MT-4935 Mounting Bases for the Air Force's A-10 aircraft. Work was scheduled to be completed in Jul The Naval Air Systems Command, Patuxent River, MD, is the contracting activity Nov 2007 The U.S. Navy awarded a modification to exercise an option for ARC-210(V) Electronic Protection Radio Systems for the Air Force. This modification consists of six each high power amplifiers; six each diplexers; and six each 5-year warranties for the Air Force's F-15E aircraft. Also, 386 each antennas and 392 amplifiers for the Air Force's A-10 aircraft. Work was expected to be completed in Jun The Naval Air Systems Command, Patuxent River, MD, is the contracting activity October 2010

12 Page 4 ARC-210(V) Airborne Electronics Forecast Contractor Award ($ millions) Date/Description 7.42 Feb 2008 The U.S. Navy awarded a modification to a previously awarded firm-fixed-priced contract (N C-0050) to exercise an option for the FY08 production of ARC-210(V) Electronic Protection Radio Systems for U.S. Air Force (USAF) A-10 and F-16 aircraft and U.S. Navy (USN) MV-22 aircraft. This option exercise consists of 58 RT-1824(C) ARC-210 Receiver-Transmitter Radios for the U.S. Navy; 54 C-12561A Radio Control Sets for the U.S. Navy (29) and U.S. Air Force (25). In addition, this option provides for 50 RT-1851A(C) ARC-210 Receiver Transmitter Radios; six MT-4935 Mounting Bases; 60 MT-6567 Mounting Bases; 60 C Controls; and 60 RF Filter Diplexers for the U.S. Air Force. Work was scheduled to be completed in Jul The Naval Air Systems Command, Patuxent River, MD, is the contracting activity Mar 2008 The U.S. Navy awarded a modification to a previously awarded firm-fixed-priced contract (N C-0050) to exercise an option for the FY08 production of 137 each RT-1556B ARC-210 Receiver-Transmitter Radios and 81 each C-11898A Radio Control Sets for the U.S. Air Force Unmanned Air Vehicle Predator aircraft. Work was scheduled to be completed in May The Naval Air Systems Command, Patuxent River, MD, is the contracting activity Aug 2008 The U.S. Navy awarded a modification to a previously awarded firm-fixed-priced contract (N C-0050) to exercise an option for the FY08 production of ARC-210(V) Electronic Protection Radio Systems for the Government of Australia's MRH-90 helicopter. This modification provides for 162 each RT-1851A(C) Receiver Transmitters and HAVEQUICK Royalty Fee Category one licenses for each radio. Work was scheduled to be completed in Nov The Naval Air Systems Command, Patuxent River, MD, is the contracting activity Aug 2008 The U.S. Navy awarded a modification to a previously awarded firm-fixed-priced contract (N C-0050) to exercise an option for the FY08 production of ARC-210(V) Electronic Protection Radio System for the Air Force F-16 aircraft. This modification includes 74 RT-1851A(C) ARC-210 receiver-transmitter radios; 59 MT-6567 mounting bases; 62 C controls; and 59 RF filter diplexers. Work was scheduled to be completed in Dec The Naval Air Systems Command, Patuxent River, MD, is the contracting activity Sep 2008 The U.S. Navy awarded a firm-fixed-priced order against a previously issued Basic Ordering Agreement (N G-0016) for services in support of the FY08 ARC-210 Radio hardware design changes to evolve the Ultra High Frequency (UHF) satellite communication waveform capability in the next generation tactical networking radio, RT-1939(C) radio system. Tasking includes program management, system engineering, hardware development, and data deliverables. Work was scheduled to be completed in Aug The Naval Air Systems Command, Patuxent River, MD, is the contracting activity Sep 2008 The U.S. Navy awarded a firm fixed priced order against a previously issued Basic Ordering Agreement (N G-0016) for services in support of the FY08 ARC-210 Radio software changes to evolve the Ultra High Frequency Satellite Communication waveform capability in the next generation Tactical Networking Radio, RT-1939(C) radio system. Tasking includes program management, system engineering, and data deliverables. Work was expected to be completed in Feb The Naval Air Systems Command, Patuxent River, MD, is the contracting activity. October 2010

13 Airborne Electronics Forecast Page 5 ARC-210(V) Award Contractor ($ millions) Date/Description 6.78 Sep 2008 The U.S. Navy awarded a firm-fixed-priced order against a previously issued Basic Ordering Agreement (N G-0016) for services in support of the FY08 ARC-210 Radio software changes to evolve the Ultra High Frequency Satellite Communication (SATCOM) waveform capability in the Next Generation Tactical Networking Radio, RT-1939(C) radio system. Tasking includes program management, system engineering, hardware design, and data deliverables. Work was scheduled to be completed in Sep The Naval Air Systems Command, Patuxent River, MD, is the contracting activity Dec 2008 The U.S. Navy awarded a modification to a previously awarded firm fixed priced contract to exercise an option for the FY09 production of the ARC-210(V) Electronic Protection Radio System for the U.S. Navy's MH-60R and MH-60S aircraft. This modification consists of 96 RT-1794 ARC-210 Receiver- Transmitter Radios; 48 C-12561A Radio Control Sets; 96 MT-6567 Mounting Bases; 48 MT-7006 Amplifier Mounts; 48 AM-7526 High Power Amplifiers; and 48 MX LNA Diplexer with Hi Power RF Switch. Work expected to be completed in Dec The Naval Air Systems Command, Patuxent River, MD, is the contracting activity (N C-0050) Feb 2009 The U.S. Navy awarded a firm fixed priced order against a previously issued Basic Ordering Agreement (N G-0016) for services in support of the FY09 ARC-210 Radio software changes to evolve the Ultra High Frequency (UHF) Satellite Communication (SATCOM) waveform capability in the Next Generation Tactical Networking Radio, RT-1939(C) radio system. Tasking includes program management, system engineering, hardware design, and data deliverables. Work was scheduled to be completed in Sep The Naval Air Systems Command, Patuxent River, MD, is the contracting activity Feb 2009 The U.S. Navy awarded a modification to a previously awarded firm fixed priced contract (N C-0050) to exercise an option for the FY09 production of ARC-210(V) Electronic Protection Radio System for the U.S. Air Force F-15 E aircraft. This modification provides for 121 RT-1851A(C) Receiver- Transmitter (RT) radios; 121 RT Warranties; 121 AM-7526 High Power Amplifiers; and 121 MX LNA Diplexers. Work was scheduled to be completed in Dec The Naval Air Systems Command, Patuxent River, MD, is the contracting activity Feb 2009 The U.S. Navy awarded a modification to a previously awarded firm-fixed-priced contract (N C-0050) to exercise an option for the FY09 production of the ARC-210(V) Electronic Protection Radio Systems for the U.S. Air Force F-16 Block 30 aircraft. This modification provides for 90 MT-6567/ARC mounting bases; 90 ARC 210-C radio set controls; 90 RT-1851A(C)/ARC receiver-transmitters; and 90 ARC 210 RF filter diplexers. Work was scheduled to be completed in September The Naval Air Systems Command, Patuxent River, MD, is the contracting activity Apr 2009 The U.S. Navy awarded a modification to a previously awarded firm fixed priced contract (N C-0050) to exercise an option for the FY09 production of the ARC-210(V) Electronic Protection Radio Systems for the U.S. Air Force F-16 Block aircraft. This modification provides for 118 MT-4935/ARC mounting bases, and 118 RT-1851A (C)/ARC receiver-transmitters. Work was scheduled to be completed in Sep The Naval Air Systems Command, Patuxent River, MD, is the contracting activity Jun 2009 The U.S. Navy awarded a firm-fixed-priced order against a previously issued Basic Ordering Agreement (N G-0016) for services in support of the FY09 tactical secure voice cryptographic equipment application implementation, as part of the RT-1939(C)/ARC-210 radio system. Work was scheduled to be completed in Jul The Naval Air Systems Command, Patuxent River, MD, is the contracting activity October 2010

14 Page 6 ARC-210(V) Airborne Electronics Forecast Contractor Award ($ millions) Date/Description Nov 2009 announced that the U.S. Navy had awarded a four-year contract to produce ARC-210 radios. The contract has a potential value of $450 million over the four-year life of the program. Included in the contract is production of the fifth generation of the ARC-210 radio (ARC-210, Generation 5) Feb 2010 The U.S. Navy awarded a modification to a previously awarded firm-fixed-priced contract to exercise an option for the procurement of 208 ARC-210 radio high power amplifiers and LNA diplexers for the Air Force F-16 Block 40/50 aircraft. Work is expected to be completed in Jul The Naval Air Systems Command, Patuxent River, MD, is the contracting activity (N C- 0069) Mar 2010 The U.S. Navy awarded a modification to a previously awarded firm-fixed-priced contract (N C-0069) to exercise an option for the procurement of 124 ARC-210 RT-1824(C)/ARC receiver transmitters for the F/A-18E/F and EA-18G aircraft. Work is expected to be completed in Dec The Naval Air Systems Command, Patuxent River, MD, is the contracting activity Mar The U.S. Navy awarded a modification to a previously awarded firm-fixed-priced contract (N C-0069) to exercise an option for the procurement of ARC-210(V) electronic radio and ancillary equipment for the H-1 Helicopter. Equipment being procured includes 88 ARC-210 receiver transmitters; 22 radio set controls; 66 mounting bases; 22 amplifier mounts; 22 high power amplifiers, 22 LNA diplexers; 50 nine- inch tunable antennas and 48 digital converters. Work is expected to be completed in May The Naval Air Systems Command, Patuxent River, MD, is the contracting activity May 2010 The U.S. Navy awarded a modification to a previously awarded firm-fixed-priced contract (N C-0069) to exercise an option for the procurement of ARC-210(V) electronic radios and ancillary equipment for the EA-18G, F/A-18E/F, F-16 Block 40, and U.S. European Command aircraft. Equipment being procured includes 40 RT-1556B receiver transmitters; 144 RT-1851A(C) receiver transmitters; and 143 MT-4935 mounting bases. Work is expected to be completed in Dec This contract combines purchases for the Navy ($1,768,320; 16 percent); Air Force ($9,212,346; 83.4 percent); and Army ($66,536; 0.6 percent). The Naval Air Systems Command, Patuxent River, MD, is the contracting activity. Timetable Month Year Major Development 1990 TECHEVAL of ARC-210 initiated 1992 OPEVAL completed; Milestone III production decision; LRIP contract awarded Jan 1994 Deliveries to U.S. services begin 1995 Start of ARC-210 system upgrade reviews 1999 U.S. Navy's ARC-210/RT-1794 project begins to receive RDT&E funding Dec 2004 ARC-210 contract awarded for Canadian and Australian programs Mar 2006 U.S. Navy awards an order for services in support of the design and development of the fifth generation of the ARC-210 radio Jul 2007 receives a contract modification from the U.S. Navy to produce more than 300 ARC-210 radios for the U.S. Air Force Aug 2008 The U.S. Navy awards a contract modification manufacture over 160 ARC-210 radios for the Government of Australia Jun 2009 The U.S. Navy awards an order for services in support of cryptographic work for the fifth generation of the ARC-210 May 2010 The U.S. Navy awards a contract modification to manufacture ARC-210 radios for the U.S. Army, U.S. Air Force, and the U.S. Navy October 2010

15 Airborne Electronics Forecast Page 7 Worldwide Distribution/Inventories ARC-210(V) Forecast International believes the following countries have purchased the ARC-210: Canada, Finland, Greece, Italy, Malaysia, the Netherlands, New Zealand, Poland, South Korea, Spain, Switzerland, Thailand, Taiwan, the United Kingdom, and the United States. states that the ARC-210 is operating in more than 40 countries. The ARC-210 is an airborne military radio manufactured by. The ARC-210 operates via software. Forecast International projects that defense departments worldwide will buy some 13,200 ARC-210 radios in the coming years. The ARC-210 airborne military radio provides two-way voice and data communications over the 30 to 512 MHz Ten-Year Outlook Forecast Rationale frequency ranges, including the UHF DAMA satellite communication (SATCOM) band. According to, the ARC-210's flexible, multi-mode architecture allows software re-programmability and upgrading for future requirements. Based on the PC model of software customization, ARC-210 users/customers have the ability to upgrade communications capabilities via software. ESTIMATED CALENDAR YEAR UNIT PRODUCTION Designation or Program High Confidence Good Confidence Speculative Thru Total Inc (Prime) ARC-210 Military <> United States <> Air Force ARC-210 Military <> United States <> Army ARC-210 Military <> United States <> Coast Guard ARC-210 Military <> United States <> Department of Defense ARC-210 Military <> United States <> Navy ,295 ARC-210 Military <> Worldwide <> Department of Defense Subtotal ,200 Total , October 2010

16

17 ORDER FORM FOR PROPER SHIPPING, PLEASE PROVIDE ALL OF THE FOLLOWING INFORMATION. Name Title Company Street Address City State/Prov. Country Zip Phone Fax Cardholder Name Check Enclosed Bill Company (Purchase Order # and Signature Required) Quotation Requested VISA MasterCard American Express Card# Exp. csc# Billing Address (if different from above) Name of Product/Service Code Address Qty. Price Please include your address to receive twice-weekly E-Market Alert Newsletters. E-Market ALERT Subtotal Shipping In Connecticut add 6% sales tax Grand Total U.S. World Market Intelligence Services Binder $45 $85 Binder & DVD $95 $180 Binder & RT $45 $85 Worldwide Inventories Aerospace Systems CD $50 $95 Weapons Systems Hard Copy $45 $85 CD $50 $95 Power Systems Hard Copy $45 $85 Focused Market Segment Analyses Hard Copy $25 $45 SHIPPING AND HANDLING RATES U.S. World Market Intelligence Libraries Complete Library (Civil/Commercial & Military) Binder $1,575 $2,975 Military Market Library Binder $1,440 $2,720 Civil/Commercial Library Binder $360 $680 Market Intelligence Group Libraries Aerospace Binder $360 $680 Electronics Binder $360 $680 U.S. World Governments & Industries Binder $540 $1,020 International Military Markets (A Subset of G&I above) Binder $270 $510 Naval Binder $90 $170 Power Binder $90 $170 Weapons Binder $180 $340 NOTE: No charge for Real-Time format Historic Art Calendar $5.95 $12.95 NOTE: ORDERS CAN TAKE UP TO 5 BUSINESS DAYS TO SHIP. 22 Commerce Road, Newtown, CT USA Phone: Fax: Toll-Free (U.S. and Canada): sales@forecast1.com Website:

18 WORLDWIDE SALES OFFICES HEADQUARTERS USA FORECAST INTERNATIONAL INC. 22 Commerce Road, Newtown, CT USA Phone: Fax: SALES/CUSTOMER SERVICE/MARKETING Phone: Worldwide Toll-Free: U.S. & Canada Fax: PROPRIETARY RESEARCH & CONSULTING Phone: Fax: EDITORIAL Phone: Fax: TECHNICAL SUPPORT Phone: Fax: WEBSITE ADDRESSES HEADQUARTERS EUROPE (INCLUDING RUSSIA) HAWK ASSOCIATES LTD. UNITED KINGDOM Templehurst House New Street, Chipping Norton Oxon, OX7 5LJ, U.K. Phone: (44) Fax: (44) Website: Contact: Mr. Michael Hobbs HAWK ASSOCIATES LTD. FRANCE 6 Rue de Levis, Paris FRANCE Phone: (33) Fax: (33) france@hawkinformation.com Contact: Mr. Edward Hobbs CHINA AND SOUTHEAST ASIA CHINA NATIONAL PUBLICATIONS I & E GROUP CORPORATION PO Box Gongti East Road Chaoyang Beijing CHINA Phone: (86) ext Fax: (86) xiaoxiao0640@hotmail.com Contact: Mr. Xiaoxiao Zhang JAPAN AVIATION RESEARCH INSTITUTE Takano Misato City Saitama Pref Tokyo JAPAN Phone: (81) Fax: (81) max@arijapan.com Website: Contact: Mr. Kenichi Oyama REPUBLIC OF KOREA PAMANONG TRADING COMPANY Yangjae Dong Seocho-Gu Seoul KOREA Phone: (82) or (82) Fax: (82) nhk@forecast1.com Website: Contact: Ms. Nam Hee Kim TERMS AND CONDITIONS DISCOUNT PRICING Discount Pricing Codes prefaced by CH, RH, Z, P or RTPS, and multi-user subscriptions, include a discount that is reflected in the marketed cost. BOOKSELLER DISCOUNTS For information, call or (Toll-Free U.S. & Canada). E Mail: info@forecast1.com. NEW CLIENTS Payment in full is required with the initial order. TERMS Net 30 days. For overdue accounts we reserve the right to assess interest of 12% annually, and add collection fees. PURCHASE ORDER If company requires, please submit a purchase order to ensure timely delivery. RETURNS OR REFUNDS Due to the nature of our products, no returns are accepted and no refunds are provided. FORMS OF PAYMENT We accept VISA, MasterCard, American Express, or a company check drawn on a U.S. bank in U.S. dollars. Wire Transfer Details: Contact customerservice@forecast1.com or call Please ensure bank charges are not deducted from the total amount due. Note: Include the quotation or invoice number with your payment. DATA USAGE Photocopy/Copyright Permission: Forecast International observes all Copyright laws. Reproduction and distribution of any product is prohibited by law. To obtain a release, please call or contact customerservice@forecast1.com. ELECTRONIC DATA LICENSING All products provided on DVD or CD, or in Real-Time, are sold and licensed for single-site, single-user applications. Multi-site, multi-user licensing is available. Call or contact sales@forecast1.com to discuss your requirements. 22 Commerce Road, Newtown, CT USA Phone: Fax: Toll-Free (U.S. and Canada): sales@forecast1.com Website:

The Market for Airborne and Space-Based Electro-Optical Systems

The Market for Airborne and Space-Based Electro-Optical Systems The Market for Airborne and Space-Based Electro-Optical Systems Product Code #F633 A Special Focused Market Segment Analysis by: Electro-Optical Systems Forecast Analysis 1 The Market for Airborne and

More information

The Market for Airborne ASW Sensors

The Market for Airborne ASW Sensors The Market for Airborne ASW Sensors Product Code #F672 A Special Focused Market Segment Analysis by: Anti-Submarine Warfare Forecast Analysis 1 The Market for Airborne ASW Sensors 2010-2019 Table of Contents

More information

ARCHIVED REPORT. For data and forecasts on current programs please visit or call

ARCHIVED REPORT. For data and forecasts on current programs please visit  or call Airborne Electronics Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 Outlook The will soon leave production in favor

More information

ARCHIVED REPORT. USC-38/LDR/MDR EHF SATCOM Terminals - Archived 02/2008

ARCHIVED REPORT. USC-38/LDR/MDR EHF SATCOM Terminals - Archived 02/2008 Electronic Systems Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 USC-38/LDR/MDR EHF SATCOM Terminals - Archived

More information

The Market for Air-to-Air Missiles

The Market for Air-to-Air Missiles The Market for Air-to-Air Missiles Product Code #F659 A Special Focused Market Segment Analysis by: Missile Forecast Analysis 4 The Market for Air-to-Air Missiles 2011-2020 Table of Contents Executive

More information

ARCHIVED REPORT. For data and forecasts on current programs please visit or call

ARCHIVED REPORT. For data and forecasts on current programs please visit  or call Electronic Systems Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 Outlook Forecast International projects that the

More information

Joint Tactical Radio System (JTRS)

Joint Tactical Radio System (JTRS) C4I - Command, Control, Communications, Computers & Intelligence Forecast Outlook On September 30, 2012, the Joint Tactical Radio System program was officially closed Forecast International expects "residual"

More information

ARCHIVED REPORT. Battlefield Airborne Communications Node (BACN)

ARCHIVED REPORT. Battlefield Airborne Communications Node (BACN) C4I - Command, Control, Communications, Computers & Intelligence Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 Battlefield

More information

ARCHIVED REPORT. For data and forecasts on current programs please visit or call

ARCHIVED REPORT. For data and forecasts on current programs please visit  or call Electronic Systems Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 Outlook FI projects that the U.S. Army will spend

More information

The Market for Strike Missiles

The Market for Strike Missiles The Market for Strike Missiles Product Code #F660 A Special Focused Market Segment Analysis by: Missile Forecast Analysis 5 The Market for Strike Missiles 2011-2020 Table of Contents Executive Summary...2

More information

ARCHIVED REPORT. APX-111(V)/113(V) (CIT) - Archived 4/2009. Outlook. Orientation. Unit Production Forecast AN Equipment Forecast

ARCHIVED REPORT. APX-111(V)/113(V) (CIT) - Archived 4/2009. Outlook. Orientation. Unit Production Forecast AN Equipment Forecast AN Equipment Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 - Archived 4/2009 Outlook Most recent customers include

More information

AGENCY: Defense Security Cooperation Agency, Department of Defense.

AGENCY: Defense Security Cooperation Agency, Department of Defense. This document is scheduled to be published in the Federal Register on 000 and available online at https:federalregister.govd0-66, and on FDsys.gov Billing Code: 500-06 DEPARTMENT OF DEFENSE Office of the

More information

ARCHIVED REPORT TPN-31 ATNAVICS/FPN-67 FBPAR

ARCHIVED REPORT TPN-31 ATNAVICS/FPN-67 FBPAR Radar Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 Outlook While production of the TPN-31 and FPN-67 is expected

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 Base OCO Total FY 214 FY 215 FY 216 FY 217 To Complete Total Total Program Element 168.157

More information

ARCHIVED REPORT. SSQ-72/108(V) (OUTBOARD/OUTBOARD II) - Archived 7/2002. Outlook. Orientation. Electronic Warfare Forecast

ARCHIVED REPORT. SSQ-72/108(V) (OUTBOARD/OUTBOARD II) - Archived 7/2002. Outlook. Orientation. Electronic Warfare Forecast Electronic Warfare Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 SSQ-72/108(V) (OUTBOARD/OUTBOARD II) - Archived

More information

ARCHIVED REPORT. For data and forecasts on current programs please visit or call

ARCHIVED REPORT. For data and forecasts on current programs please visit  or call Electronic Warfare Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 APR-48A - Archived 4/2006 Outlook DF cueing for

More information

The Market for Anti-Tank Missiles

The Market for Anti-Tank Missiles The Market for Anti-Tank Missiles Product Code #F656 A Special Focused Market Segment Analysis by: Missile Forecast Analysis 1 The Market for Anti-Tank Missiles 2010-2019 Table of Contents Executive Summary...2

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

Exhibit R-2, RDT&E Budget Item Justification February 2008

Exhibit R-2, RDT&E Budget Item Justification February 2008 PE NUMBER: 41318F PE TITLE: CV-22 Exhibit R-2, RDT&E Budget Item Justification February 28 5 System Development and Demonstration (SDD) 41318F CV-22 ($ in Millions) 413 Total Program Element (PE) CV-22

More information

F-35 Lightning II. 5 th Generation True Stealth for Korea From 2016 and Beyond

F-35 Lightning II. 5 th Generation True Stealth for Korea From 2016 and Beyond F-35 Lightning II 5 th Generation True Stealth for Korea From 2016 and Beyond A11-33765B_1 The Evolving Threat... SA-10 SA-12 SA-20 HQ-9 Shipborne SAM Double Digit Surface-to-Air Missiles SD-10/PL-12 AA-11

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) Years FY 2018 FY 2019 FY 2020 FY 2021 To Program Element 966.537 66.374 29.083 54.838 0.000 54.838 47.369

More information

PROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD)

PROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD) EXHIBIT R-2, FY 2001 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0305206N PROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD) (U) COST: (Dollars in

More information

ARCHIVED REPORT. AGM-45 Shrike - Archived 10/2001

ARCHIVED REPORT. AGM-45 Shrike - Archived 10/2001 Missile Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 AGM-45 Shrike - Archived 10/2001 Outlook Production concluded.

More information

ARCHIVED REPORT. IDECM (ALQ-214(V), ALE-55(V)) - Archived 02/2008

ARCHIVED REPORT. IDECM (ALQ-214(V), ALE-55(V)) - Archived 02/2008 Airborne Electronics Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 - Archived 02/2008 Outlook IDECM designed for

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0207581F PE TITLE: JOINT STARS Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0207581F JOINT STARS Cost ($ in Millions) FY

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element 578.093 95.097 137.369 205.615-205.615 196.665 257.393

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete

More information

DATE: FY 2013 President's Budget February 2012 PRIOR YR FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 TO COMP TOTAL PROG QUANTITY

DATE: FY 2013 President's Budget February 2012 PRIOR YR FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 TO COMP TOTAL PROG QUANTITY BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: APPROPRIATION/BUDGET ACTIVITY P-1 LINE ITEM NOMENCLATURE /BA 2 Other Warships LITTORAL COMBAT SHIP () BLI: 2127 / SUBHEAD NO. (Dollars in Millions) PRIOR YR

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0603432F PE TITLE: Polar MILSATCOM (Space) Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 04 Advanced Component Development and Prototypes (ACD&P) 0603432F

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Office of Secretary Of Defense DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 Office of Secretary Of

More information

CLASSIFICATION: UNCLASSIFIED

CLASSIFICATION: UNCLASSIFIED Exhibit P-40, BUDGET ITEM JUSTIFICATION APPROPRIATION/BUDGET ACTIVITY Aircraft Procurement, Navy/APN-5 Aircraft Modifications Program Element for Code B Items: P-1 ITEM NOMENCLATURE 051100, EA-6 SERIES

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 57.205 93.145

More information

DATE: FY 2016 President's Budget February 2015 PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY

DATE: FY 2016 President's Budget February 2015 PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY APPROPRIATION/BUDGET ACTIVITY /BA 2 Other Warships BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: P-1 LINE ITEM NOMENCLATURE LITTORAL COMBAT SHIP () BLI: 2127 / SUBHEAD NO. (Dollars in Millions) PRIOR YR

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 99.992 132.881 143.000-143.000

More information

Billing Code:

Billing Code: This document is scheduled to be published in the Federal Register on 01/08/2016 and available online at http://federalregister.gov/a/2016-00148, and on FDsys.gov Billing Code: 5001-06 DEPARTMENT OF DEFENSE

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0603860F PE TITLE: Joint Precision Approach Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE Cost ($ in Millions) FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element 92.713 23.188 31.064 46.007-46.007

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Unmanned Combat Air Veh(UCAV) Adv Cp/Proto Dev. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Unmanned Combat Air Veh(UCAV) Adv Cp/Proto Dev. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Navy DATE: February 2010 COST ($ in Millions) FY 2009 Actual Navy Page 1 of 19 FY 2012 FY 2013 FY 2014 FY 2015 To Program Element 266.469 304.907 266.368

More information

ARCHIVED REPORT. For data and forecasts on current programs please visit or call

ARCHIVED REPORT. For data and forecasts on current programs please visit  or call Electronic Systems Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 S-3 WSIP - Archived 11/04 Outlook 10 Year Unit

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: C2ISR Tactical Data Link FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: C2ISR Tactical Data Link FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 1.604 1.584 1.536-1.536 1.626

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / NAVSTAR Global Positioning System (User Equipment) (SPACE) Prior Years FY 2013 FY 2014

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / NAVSTAR Global Positioning System (User Equipment) (SPACE) Prior Years FY 2013 FY 2014 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 COST ($ in Millions) Years FY 2013 FY 2014 # FY 2016 FY 2017 FY 2018 FY 2019 To Program Element 0.000 63.687 127.172 156.659-156.659

More information

National Polar-Orbiting Operational Environmental Satellite System (NPOESS) - Archived 12/2005

National Polar-Orbiting Operational Environmental Satellite System (NPOESS) - Archived 12/2005 C 4 I Forecast National Polar-Orbiting Operational Environmental Satellite System (NPOESS) - Archived 12/2005 Outlook Forecast International projects the U.S. NOAA, U.S. DoD, and NASA will spend some US$5.21

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 6.021 8.312 7.963-7.963 8.046 8.146 8.194

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2014 FY 2015 FY 2016 FY 2017 Air Force Page 1 of 14 R-1 Line #216 To Program Element

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 Total FY 214 FY 215 FY 216 FY 217 To Complete Total Total Program Element - 75.7 122.481-122.481

More information

Q Manpower. Employment Outlook Survey New Zealand. A Manpower Research Report

Q Manpower. Employment Outlook Survey New Zealand. A Manpower Research Report Manpower Q4 6 Employment Outlook Survey New Zealand A Manpower Research Report Manpower Employment Outlook Survey New Zealand Contents Q4/6 New Zealand Employment Outlook 1 Regional Comparisons Sector

More information

Exhibit R-2, RDT&E Budget Item Justification February 2007

Exhibit R-2, RDT&E Budget Item Justification February 2007 PE NUMBER: 27133F PE TITLE: F-16 SQUADRONS Exhibit R-2, RDT&E Budget Item Justification February 27 7 Operational System Development 27133F F-16 SQUADRONS ($ in Millions) 2671 Total Program Element (PE)

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #232

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #232 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) # FY

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0401318F PE TITLE: CV-22 Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 05 System Development and Demonstration (SDD) 0401318F CV-22 Cost ($ in Millions) FY

More information

Cryptologic & Cyber Systems Division Contract/Acquisition Forecast

Cryptologic & Cyber Systems Division Contract/Acquisition Forecast 2014 AFCEA Alamo Ace Cryptologic & Cyber Systems Division Contract/Acquisition Forecast Mark D. Adams Chief of Contracts AFLCMC/HNCK 30 October 2014 HNC/PA Clearance: 20 October 2014 1 Outline Vision/Mission

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 10 R-1 Line #98

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 10 R-1 Line #98 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy : March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years FY

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 42.067 6.509 5.000-5.000 41.500 30.000

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Air Control

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Air Control Exhibit R-2, RDT&E Budget Item Justification: PB 212 Navy DATE: February 211 COST ($ in Millions) FY 21 FY 211 PE 6454N: Air Control FY 213 FY 214 FY 215 FY 216 To Complete Program Element 6.373 5.665

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 5 of 10 P-1 Line #11

UNCLASSIFIED. UNCLASSIFIED Navy Page 5 of 10 P-1 Line #11 Exhibit P-27, Ship Production Schedule: PB 2017 Navy Date: February 2016 Ship Shipbuilder Fiscal Year Contract Award Start of Construction Delivery Date LCS 7 LOCKHEED MARTIN 2011 Mar 2011 Apr 2012 Jun

More information

FY 2016 President's Budget February Electronics (NOTIONAL): N/A. RCS (Radio Communication System) Turnkey 216 M CANES 32 M

FY 2016 President's Budget February Electronics (NOTIONAL): N/A. RCS (Radio Communication System) Turnkey 216 M CANES 32 M APPROPRIATION/BUDGET ACTIVITY /BA 5 Auxiliaries, Craft and Prior Year Program Costs (Dollars in Millions) QUANTITY End Cost Full Funding TOA Total Obligational Authority Plus Outfitting / Plus Post Delivery

More information

ARCHIVED REPORT. Submarine Acoustic Warfare Development Archived 12/2002

ARCHIVED REPORT. Submarine Acoustic Warfare Development Archived 12/2002 Electronic Warfare Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 Submarine Acoustic Warfare Development Archived

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 Air Force Page 1 of 16 R-1 Line #227 To Program

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Program Element 1.352 8.819 11.265-11.265 4.626 4.769 4.93

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0207434F PE TITLE: Link 16 Support and Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE Cost ($ in Millions) FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 FY

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 19 R-1 Line #71

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 19 R-1 Line #71 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy : March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

The World Military Market for Connectors

The World Military Market for Connectors The World Military Market for Connectors Bishop & Associates Inc. has just released a new report providing a quantitative analysis of the World Military Connector Market. This 16 chapter, 315-page research

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Defense Information Systems Agency : February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #156

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #156 Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research,, Test & Evaluation, Air Force / BA 7: Operational Systems COST ($ in Millions) FY 2018 FY 2019 FY 2020 FY

More information

NAWCWD Long Range Acquisition Forecast (LRAF) Requirements FY15 FY17

NAWCWD Long Range Acquisition Forecast (LRAF) Requirements FY15 FY17 NAWCWD Long Range Acquisition Forecast (LRAF) Requirements FY15 FY17 Distribution Statement A Approved for public release, distribution is unlimited. File: NAVAIR Brief 1 Weapons Systems Integration and

More information

Manpower Employment Outlook Survey Australia

Manpower Employment Outlook Survey Australia Manpower Employment Outlook Survey Australia 3 215 Australian Employment Outlook The Manpower Employment Outlook Survey for the third quarter 215 was conducted by interviewing a representative sample of

More information

Proposed U.S. Arms Export Agreements From January 1, 2011 to December 31, 2011 Published on Arms Control Association (

Proposed U.S. Arms Export Agreements From January 1, 2011 to December 31, 2011 Published on Arms Control Association ( Proposed U.S. Arms Export Agreements From January 1, 2011 to December 31, 2011 Fact Sheets & Briefs Contact: Jeff Abramson, Non-Resident Senior Fellow for Arms Control and Conventional Arms Transfers,

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) COST (In Thousands) FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate Estimate Estimate Estimate Estimate Complete 389 SCAMP BLK II 19493 6895 21006 28028

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 0305206N Airborne Reconnaissance Advanced Development

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) COST (In Thousands) FY1999 Actual FY 2002 FY 2003 FY2004 FY2005 to Army Joint STARS (TIARA) 5316 25676 17898 17713 12833 14372 11527 Continuing Continuing A. Mission Description and Justification: The

More information

UNCLASSIFIED FY Quantity of RDT&E Articles

UNCLASSIFIED FY Quantity of RDT&E Articles COST ($ in Millions) Prior Years FY 2013 FY 2014 Base OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Air Force Page 1 of 5 R-1 Line #159 Cost To Complete Total Program Element - 1.447 1.406 1.782-1.782 1.770

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 R-1 Line #87

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 17 R-1 Line #87 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

Proposed U.S. Arms Export Agreements From January 1, 2012 to December 31, 2012 Published on Arms Control Association (

Proposed U.S. Arms Export Agreements From January 1, 2012 to December 31, 2012 Published on Arms Control Association ( Proposed U.S. Arms Export Agreements From January 1, 20 to December 31, 20 Fact Sheets & Briefs Contact: Jeff Abramson, Non-Resident Senior Fellow for Arms Control and Conventional Arms Transfers, jeff@armscontrol.org

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Specialized Undergraduate Pilot Training. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Specialized Undergraduate Pilot Training. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 11.801 10.862

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 22.756 - - - - - - - - Continuing Continuing 675043: Fighter Tactical

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) Exhibit R-2 0604201A AIRCRAFT AVIONICS ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) COST (In Thousands) FY 2008 FY 2009 FY 2010 FY 2011 to Program Element (PE) 72521 13259 61946 71307 85450 99440

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research,, Test & Evaluation, Navy / BA 5: System & Demonstration (SDD) COST ($ in Millions) FY 2017 FY 2018 FY 2019 FY

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0401132F PE TITLE: C-130J PROGRAM Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0401132F C-130J PROGRAM Cost ($ in Millions)

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) (+)

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 P-1 Line #50

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 P-1 Line #50 Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service

More information

Engaging U.S. Markets: Strategy and Programs

Engaging U.S. Markets: Strategy and Programs Engaging U.S. Markets: Strategy and Programs Ralph D. Crosby, Jr. CEO North America North America Investor Forum New York 7 th October 2003 1 EADS Accessing the U.S. Aerospace and Defense Market Executing

More information

Abstract. Presented at the 2018 ICEAA Professional Development & Training Workshop - Proactive estimating June 2018 QinetiQ 2018

Abstract. Presented at the 2018 ICEAA Professional Development & Training Workshop -  Proactive estimating June 2018 QinetiQ 2018 Abstract Fed up with being reactive to cost estimating and forecasting requests? Had enough of being last in the queue for time and resources? Dismayed at being consulted at the last minute for an opinion

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: WEATHER SERVICE. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: WEATHER SERVICE. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Program Element 45.918 33.291 32.373 0.000

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 13 R-1 Line #68 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #82

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #82 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Army : March 2014 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) # FY 2016

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element 174.037 11.276 8.610 1.971-1.971

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 26 Exhibit R2, RDT&E Budget Item Justification: PB 27 2: Research, Development, Test & Evaluation, / BA 7: Operational Systems Development COST ($ in Millions) FY 25 FY 26 R Program Element

More information

SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES. As of Date: September 30, SAR Narrative Highlights 1. Program Acquisition Cost 4

SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES. As of Date: September 30, SAR Narrative Highlights 1. Program Acquisition Cost 4 SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES As of Date: September 30, 2007 INDEX SUBJECT PAGE SAR Narrative Highlights 1 Program Acquisition Cost 4 Distribution of Cost Changes - Base-Year Dollars

More information

Q Manpower. Employment Outlook Survey Global. A Manpower Research Report

Q Manpower. Employment Outlook Survey Global. A Manpower Research Report Manpower Q3 211 Employment Outlook Survey Global A Manpower Research Report Manpower Employment Outlook Survey Global Contents Q3/11 Global Employment Outlook 1 International Comparisons Americas International

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Joint Air-to-Surface Standoff Missile (JASSM) Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Joint Air-to-Surface Standoff Missile (JASSM) Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) # FY

More information

OPCW UN JOINT MISSION IN SYRIA

OPCW UN JOINT MISSION IN SYRIA OPCW UN JOINT MISSION IN SYRIA STATUS OF CONTRIBUTIONS TO THE OPCW-UN JOINT MISSION IN SYRIA As of 31January 2014 BACKGROUND Following the implementation of decision EC-M-33.DEC.1 of the Executive Council

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Common Data Link Executive Agent (CDL EA) FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Common Data Link Executive Agent (CDL EA) FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 33.896 32.015 43.986-43.986 42.760 41.790

More information