Message from DEP Secretary Chris Abruzzo

Size: px
Start display at page:

Download "Message from DEP Secretary Chris Abruzzo"

Transcription

1

2 Message from DEP Secretary Chris Abruzzo It is hard to imagine that less than five years ago, most Pennsylvanians were unfamiliar with terms such as Marcellus Shale and hydraulic fracturing. Today, most of us are not only familiar with these terms, but many have witnessed the steady transformation of this state into the second largest natural gas producing state in the nation. We are in the midst of an energy revolution that is bringing new jobs to Pennsylvania, spawning new economic development and growth, and providing energy security to our nation. At DEP, we are at the forefront of this revolution, charged with ensuring that this vast energy resource is produced in an environmentally responsible manner. Since joining the Pennsylvania Department of Environmental Protection (DEP) in April 2013, I have met with staff from across the agency to review our programs and identify ways in which we can perform our mission better. I am pleased to work alongside so many dedicated public servants who care about our environment and utilize their problem solving skills to protect our environment and facilitate responsible development across Pennsylvania. We are one DEP. as such, it is our collective mission to protect Pennsylvania s air, land and water from pollution and to provide for the health and safety of our citizens. We are to guarantee that all Pennsylvanians, including future generations, have a safe, healthy environment. We are to work as partners with individuals, organizations, governments and businesses to achieve a balance in preventing pollution and restoring our natural resources, while carrying out these responsibilities in a fair and timely manner that respects both the environment and the regulated community, and is deserving of the public s trust. I hope you find this 2013 Oil and Gas Annual Report to be informative and insightful about DEP s Oil and Gas Program and how we are fulfilling our mission. This report provides information about how we authorize and inspect oil and gas exploration and production operations in the commonwealth. You will also learn about innovative approaches that have been implemented by DEP and get a glimpse of what to expect during Calendar year 2013 was a productive one and DEP continues to build on our past accomplishments to achieve even greater successes during 2014! Enjoy, E. Christopher Abruzzo Secretary

3 Table of Contents: Pennsylvania s Energy Landscape... 2 Advancing Our Energy Security... 3 DEP s Mission... 4 DEP s Structure... 5 DEP s Oil and Gas Program - A World Class Leader... 6 Pennsylvania s Shale Plays... 7 Permitting... 8 Inspections Compliance and Enforcement Stray Gas Investigations Regulatory and Policy Development Innovations What s new for 2014? A Culture of Continuous Improvement Disclaimer: The information contained in this report is based on the data contained in DEP information systems at the time of the publication of this report, including, but not limited to, the department s enterprise-wide permitting and compliance database called efacts (Environment Facility Application Compliance Tracking System). As some data contained in these systems are self-reported by operators and other permitees, data in this report reflects the data as reported to the department. 1 P a g e

4 PENNSYLVANIA S ENERGY LANDSCAPE: The exploration and production of energy sources is not new to Pennsylvania. In fact, the first commercial oil well was successfully drilled in 1859 by Edwin Drake in Titusville, Pennsylvania. This was the birth of what was to become the nation s petroleum industry. During the late 1800s, Pennsylvania was the nation s leading producer of crude oil with production levels peaking in 1891 at approximately 31 million barrels; about 58 percent of the nation s total oil capacity. By the early 1900s, major oil fields were discovered in Texas, Oklahoma and California that shifted exploration and production activities to the mid-west and western portions of the country. Pennsylvania s crude oil production quickly waned as exploration and production of new oil fields opened up in other parts of the country. As conventional oil reserves in Pennsylvania became less productive, new techniques and practices were used to flood unproductive wells with surface water to push oil to the surface. Although the productivity of oil wells in Pennsylvania continued to decline throughout the remainder of the 20 th century, conventional oil reservoirs in the state continued to yield a sufficient volume of oil to support a viable oil industry. During 2013, almost 5 million barrels of crude oil were produced in Pennsylvania. In addition to historic oil reserves, Pennsylvania has also been a source of natural gas for well over a century. Although natural gas was routinely encountered by early oil developers, it was initially considered to be more of a nuisance than a resource. As methods improved for capturing, transporting and using natural gas, a modern natural gas industry began to emerge. It was long suspected that deposits of natural gas existed within vast tight shale formations deep under Pennsylvania s surface; however, conventional extraction methods were not able to effectively unlock the natural gas from its source and the actual quantities were not well understood. Today, these black shale deposits are called shale plays and are referred to by their geological naming conventions such as the Marcellus Shale play and the Utica Shale play. The term unconventional refers to these same shale formations that utilize horizontal drilling methods and hydraulic fracturing techniques to break up the shale rock to allow the natural gas that is trapped within the target formation to flow more freely to the well bore. It was not until recently that effective drilling and hydraulic fracturing techniques could be successfully and economically deployed to capture natural gas from these shale deposits. In 2004, the first unconventional natural gas well was developed in Pennsylvania and positive results led to additional unconventional wells being constructed. Within several years, a renaissance in natural gas production emerged in Pennsylvania making it a dominant supplier of natural gas to the nation. The successful production of unconventional resources such as the 2 P a g e

5 Marcellus and Utica shale plays are transforming not just the United States, but indeed the world. In Pennsylvania, natural gas operators are reporting increased production rates that are expected to rise over the coming years. In 2013, Pennsylvania produced over 3 trillion cubic feet of natural gas. 1,800,000,000 Unconventional Shale Well Gas Production (MCF) ,600,000,000 1,400,000,000 1,200,000,000 1,000,000, ,000, ,000, ,000, ,000,000 0 Jan-Jun 2011 Jul-Dec 2011 Jan-Jun-2012 Jul-Dec-2012 Jan-Jun-2013 Jul-Dec 2013 ADVANCING OUR ENERGY SECURITY: Today, much of the nation s oil production occurs in states such as Texas, North Dakota, Oklahoma, California and Alaska; however, Pennsylvania s conventional oil patch in the northwest corner of the state continues to yield crude oil. Since this crude oil is paraffin-based, it is renowned for its lubricating qualities and is used in the manufacture of petroleum lubricants such as motor oils and as an ingredient in consumer products such as cosmetics, ointments and lotions. Pennsylvania s oil producers typically use conventional drilling methods that have not changed much over the past century to capture this resource. Since 2008, Pennsylvania s natural gas production has increased exponentially as a result of unconventional drilling techniques including hydraulic fracturing and horizontal drilling. This increasing trend in shale gas production is resulting in energy security that translates to national security in the form of less dependence on fossil fuels from other parts of the world. Increased shale gas production has resulted in a number of significant benefits including less expensive energy costs and improvements to Pennsylvania s air quality as a result of the increased use of cleaner burning natural gas. 3 P a g e

6 Pennsylvania s legislature passed several significant amendments to the state s oil and gas laws with Act 13 of This law, for the first time, included an impact fee that is paid for by the natural gas industry to offset the costs of the impacts to local communities and counties where natural gas drilling occurs. During the past three years, more than $630 million has been collected by the commonwealth and these monies have largely been allocated to Pennsylvania s counties and municipalities, in addition to providing funds to support state agencies and organizations that oversee natural gas drilling activities in Pennsylvania. DEP receives $6 million annually in new revenue from the impact fee. Pennsylvania s natural gas reserves are significant compared to other shale gas plays across the country; however, it is not a limitless resource nor is it the only energy resource on which this nation relies. Currently, there is no single energy source that can solely meet the energy demands of the United States, let alone the entire world. Although the production of oil and natural gas provides tangible benefits, it must be done in a way that is protective of Pennsylvania s citizens and the environment. DEP s MISSION: The mission of the Department of Environmental Protection (DEP) is to protect Pennsylvania's air, land and water from pollution and to provide for the health and safety of its citizens through a cleaner environment. We will work as partners with individuals, organizations, governments and businesses to prevent pollution and restore our natural resources. DEP plays a vital role in the comprehensive oversight and regulation of the oil and gas industry in Pennsylvania. Although there are some related federal statutes that affect the oil and gas industry, most laws and regulations that pertain to the oversight and regulation of the oil and gas industry in Pennsylvania reside at the state level. In Pennsylvania, DEP is the primary agency that is responsible for issuing permits that are required prior to the construction and operation of oil and gas wells; and DEP is the primary agency responsible for inspections at well sites. There are other agencies and organizations in Pennsylvania that are responsible for various other roles including the Pennsylvania Public Utility Commission (PUC), the Department of Conservation and Natural Resources and regional river basin commissions to name a few. However, DEP is the primary state agency that is responsible for regulating the construction of well sites and conducting regular inspections to ensure that well sites are operated in a manner that is safe for Pennsylvania s citizens and protective of the environment. PUC and the Federal Energy Regulatory Commission (FERC) also play an important role in terms of inspections of natural gas transmission pipelines in Pennsylvania. Although DEP is responsible for inspections of the construction of natural gas gathering lines, PUC is responsible for safety inspections of intrastate natural gas transmission lines that carry natural 4 P a g e

7 gas to local markets, and FERC is responsible for inspections of interstate natural gas transmission lines that move natural gas to regional and national markets. DEP s STRUCTURE: The Office of Oil and Gas Management was established as a result of the departmental reorganization in 2011 and, for the first time, the Bureau of Oil and Gas Management was elevated to a deputate-level program. The current organization chart for the Office of Oil and Gas Management is depicted to the right. DEP s Office of Oil and Gas Management employs 202 individuals of which approximately 80 percent of are assigned to engineering, scientific or permit/inspection-related work and the remaining 20 percent provide administrative, legal and clerical support. The office consists of two overarching bureaus. The Bureau of Oil and Gas Planning and Program Management is located in central office (Harrisburg) and is responsible for the administrative, policy and regulatory development functions. The Bureau of District Oil and Gas Operations consists of three district oil and gas offices and is responsible for all permitting, inspection, compliance and enforcement functions. The Bureau of Oil and Gas Planning and Program Management includes the following three divisions: Well Development and Surface Activities This division is responsible for developing policies and guidance related to surface activities associated with oil and gas well site design and construction. This includes engineered well pad components such as erosion and sediment control structures, pits and impoundments. Staff in this division advise district permitting and inspection staff to ensure that best management practices and controls are implemented on wells sites to reduce and minimize surface erosion from entering the state s waterways. Well Plugging and Sub-Surface Activities This division consists of the Subsurface Activities Section and the Well Plugging Section. The Subsurface Activities Section is responsible for the management of subsurface oil and gas related program services and activities and offers expertise in the subjects of drilling, casing, cementing, completion, stimulation, workover, and production activities and operations associated with conventional and unconventional 5 P a g e

8 hydrocarbon formations in Pennsylvania. The Well Plugging Section maintains and implements the successful Orphan and Abandoned Well Plugging Program. Compliance and Data Management This division works closely with DEP s Bureau of Information Technology to oversee the operation and maintenance of data management systems and databases that track production data that is submitted by the regulated community. This division also runs weekly workload analysis reports, develops interactive reporting tools, prepares statistical and graphical analyses, and maintains the oil and gas website. The Bureau of District Oil and Gas Operations includes three district offices that implement the operational programs in the Eastern, Northwest, and Southwest areas of the Commonwealth. Staff in the district offices conduct the functions of permitting, inspections, compliance and enforcement and are based in Williamsport, Meadville and Pittsburgh. Several small field offices are located in each of the district geographic areas to enable DEP to more effectively implement its inspection and compliance programs and oversight of the regulated community. DEP s OIL AND GAS PROGRAM - A WORLD CLASS LEADER: Pennsylvania is recognized nationally and internationally as having successfully developed a regulatory approach that both protects its environment and citizens while also providing for optimal development of oil and gas resources. Over the past several years, representatives and officials from many countries around the world have traveled to Pennsylvania to meet with DEP s Office of Oil and Gas Management to learn more about its programs and practices. 6 P a g e

9 Closer to home, DEP s regulatory approach has served as a model to other state environmental agencies as well. In May 2013, the State Review of Oil and Natural Gas Environmental Regulations, Inc. (STRONGER) conducted a programmatic and regulatory review of DEP s Oil and Gas program. STRONGER is a non-profit, multi-stakeholder organization whose purpose is to assist states in documenting the environmental regulations associated with the exploration, development and production of crude oil and natural gas. The organization shares innovative techniques and environmental protection strategies and identifies opportunities for program improvement. The state review process is a non-regulatory program and relies on states to volunteer for reviews. On Sept. 20, 2013, STRONGER published the results of its most recent independent peer review of DEP s oil and gas regulatory program at and found it to be proficient and ready to address the increase in oil and gas operations in Pennsylvania. This represents the fifth review of Pennsylvania's oil and gas program since STRONGER recognized the following actions taken by Pennsylvania s Oil and Gas program to strengthen the following key areas: Increased staff levels to address additional permitting, inspection and enforcement activities related to increased unconventional gas well development; Expanded the program s public participation activities associated with the abandoned well sites program; Initiated a comprehensive evaluation of radiation levels specifically associated with unconventional gas development, the first of its kind in the nation; Mandated that operators performing earth disturbance activities associated with oil and gas activities develop and implement erosion and sedimentation control best management practices to minimize the potential for erosion and sedimentation; and Advanced its hydraulic fracturing program and required that well operators conducting well casing and cementing to maintain control and prevent migration of gas or other fluids into sources of fresh groundwater. PENNSYLVANIA S SHALE PLAYS: Unconventional shale basins are commonly characterized according to the geologic formation that serves as the source of its shale gas. The term shale play is used by the oil and gas exploration and development industry to identify areas of shale basins that appear to be particularly suitable for shale gas development. The current predominant shale play in Pennsylvania is the Marcellus Shale Play; however, interest is beginning to increase in the exploration and production of the Utica Shale Play that lies well below the Marcellus Shale Play. There are other less familiar shale plays in and around Pennsylvania including the 7 P a g e

10 Rhinestreet, Huron and a collection of less extensive formations that comprise the Upper Devonian shale formation. The type of gas found in most areas of the Marcellus Shale Play throughout Pennsylvania is geologically mature and consists of mostly methane that requires little processing prior to use. This gas is commonly called dry gas. Marcellus shale gas found along the westernmost border of Pennsylvania is less geologically mature; therefore, in addition to methane, the gas contains additional hydrocarbons such as ethane, propane and butane. This gas is commonly called wet gas and can be used to produce plastics and other high value petroleum-based products. Given the current spot market price of petroleum feedstocks, the value of wet gas is significantly more valuable than dry gas. Although the Marcellus Shale Play overlies the Utica Shale Play, both stretch from the eastern portions of Ohio and West Virginia through the southwest to northeast corners of Pennsylvania and terminate in southern New York State. Map depicting Unconventional Shale Plays in the Northeast PERMITTING: The Office of Oil and Gas Management is responsible for the review of all permit authorizations related to the construction of oil and gas wells and development of the sites on which they are 8 P a g e

11 constructed. Although there are many types of permit authorizations that are issued by permitting staff within the Office of Oil and Gas Management, the two permits that are most commonly issued by DEP include the Erosion and Sediment Control General Permit 2 and the Drill and Operate a Well permit (commonly called the Well Drilling Permit). Although not technically a permit, the Office of Oil and Gas Management also operates a well plugging program that requires entities that intend to plug an orphaned or abandoned well to submit formal notification to DEP. Due to its significance, a summary of DEP s well plugging program is included in this section along with a description of the Erosion and Sediment Control General Permit 2 and the Drill and Operate a Well permitting programs. Erosion and Sediment Control General Permit-2 (ESCGP-2) The Erosion and Sediment Control General Permit-2 (ESCGP-2) is designed to address earth disturbances at oil and gas sites where more than 5 acres of land are disturbed. This general permit is typically used to authorize an operator to construct unconventional gas well pads and associated pipelines, retention basins, pits and impoundments. On Dec. 29, 2012, the department published as final, the ESCGP-2 and revisions to the Policy for Erosion and Sediment Control and Stormwater Management for Earth Disturbance Associated with Oil and Gas Exploration, Production, Processing, or Treatment Operations or Transmission Facilities (hereafter, stormwater policy). The ESCGP-2 permit and associated stormwater policy were developed concurrently and incorporated significant stakeholder input that was received during The ESCGP-2 permit was developed to replace Erosion and Sediment Control General Permit 1 (ESCGP-1) that expired on April 12, The revisions to the stormwater policy were the first since July 2003 and were intended to address the type and scope of oil and gas activities currently occurring in Pennsylvania. Industry training related to the new permit and stormwater policy was held throughout The standard permit review timeframe for an ESCGP-2 permit is 43 business days. DEP offers an expedited review process whereby a permit decision can be reached in 14 business days provided the project achieves the permit standards and ensures protection of the environment. In certain situations, such as when a well site is in close proximity to high quality or exceptional value waters, the expedited review process is not available to the permit applicant. In 2013, DEP issued 287 ESCGP-1 permits and 460 ESCGP-2 permits. Since 2013 was the first year that the ESCGP-2 permit was created and in use, the department will evaluate the longterm permit trends as more information becomes available. Drill and Operate a Well Permit As the name implies, the Drill and Operate a Well Permit (aka, well drilling permit) authorizes an operator to construct and operate a conventional or unconventional well. An unconventional well site and well pad is typically constructed to accommodate multiple wells. 9 P a g e

12 An operator is responsible to obtain an individual permit for each well that is constructed. A Drill and Operate a Well Permit must be submitted to DEP for each additional well that is intended to be drilled on the well pad or when an existing well is drilled deeper into a geologic formation. The Oil and Gas Act requires DEP to render a permit decision within 45 calendar days of receiving a complete application. Distribution of Well Drilling Permits issued in Pennsylvania In 2013, DEP issued a total of 4,617 well drilling permits to include both conventional and unconventional wells in Pennsylvania. Of this amount, DEP issued 2,965 well drilling permits for the construction of unconventional wells and 1,652 well drilling permits for the construction of conventional wells. The graph below shows the total number of conventional and unconventional well drilling permits issued by DEP since As evidenced in this graph, the number of well drilling permits issued by DEP has been trending downward since This downward trend is likely a result of the industry s reaction to the declining market price of natural gas during this same timeframe as well as more efficient planning of well site locations by operators. As the market price of natural gas began to rebound during 2013, there was a slight increase in the number of permits received and issued by DEP as evidenced in the graph below. Conventional and Unconventional Well Permits Issued (by year) 10,000 9,000 8,000 7,000 6,000 5,000 4,000 3,000 2,000 1,000 Conventional Permits Issued Unconventional Permits Issued Unconventional Well Drilling Permits The geographic region of the state where operators have obtained well drilling permits to construct unconventional wells generally correlates to the locations of the unconventional 10 P a g e

13 shale plays. That being the case, not all locations within the unconventional shale plays are equal in terms of the volume of available gas or the productivity of the wells that are constructed. The map below identifies the distribution, by county, of the 2,965 well drilling permits issued in calendar year 2013 for the purpose of constructing unconventional gas wells. Map depicting distribution of permits issued for unconventional wells (2013) During 2013, the top ten counties with the highest number of unconventional permits issued by DEP include: County Number of Unconventional Permits Issued Susquehanna 557 Bradford 455 Washington 414 Lycoming 325 Greene 259 Butler 160 Wyoming 136 Tioga 88 Armstrong 62 Sullivan P a g e

14 Conventional Well Drilling Permits The map below identifies the distribution, by county, of the 1,652 well drilling permits issued in calendar year 2013 for the purpose of constructing conventional oil and gas wells. As evidenced in the map, the majority of all well drilling permits for conventional well sites were issued to operators in McKean, Warren and Venango counties since this area represents the area commonly called the oil patch region of the state where Pennsylvania Grade crude oil is most prevalent. Map depicting distribution of permits issued for conventional wells (2013) During 2013, the top ten counties with the highest number of conventional permits issued by DEP include: County Number of Conventional Permits Issued McKean 445 Warren 427 Venango 310 Forest 276 Lycoming 32 Elk 29 Clarion 24 Butler 15 Crawford 15 Armstrong P a g e

15 Distribution of Wells Drilled in PA In 2013, operators drilled a total of 2,174 wells in Pennsylvania, including both conventional and unconventional wells. Of this amount, 1,207 are unconventional wells and 967 are conventional wells. The actual numbers of unconventional and conventional wells that are drilled in Pennsylvania vary from the numbers of well drilling permits that are issued by DEP. One reason for this is that a well drilling permit is valid for a full year and can be extended if requested and approved by DEP. An operator may commence drilling at any time during the period that the permit is in effect. Depending on individual business practices, oil and gas operators may secure a well drilling permit far in advance of commencing actual drilling operations. In some cases, an operator may also determine that a site is not suitable for drilling. Due to these reasons, it is common that the number of permits issued by DEP exceeds the number of wells drilled in any given year. Unconventional Wells Drilled The following map identifies the distribution, by county, of the 1,207 unconventional wells that were drilled in calendar year Map depicting distribution of wells drilled for unconventional wells (2013) 13 P a g e

16 During 2013, the top 10 counties with the highest number of unconventional wells drilled in Pennsylvania include: Conventional Wells Drilled County Number of Unconventional Wells Drilled Washington 220 Susquehanna 207 Lycoming 166 Greene 117 Bradford 109 Butler 92 Wyoming 67 Armstrong 34 Tioga 30 Westmoreland 28 The following map identifies the distribution, by county, of the 967 conventional wells that were drilled in calendar year Of all conventional wells drilled in Pennsylvania in 2013, more than 86 percent were drilled in only four northwestern counties located in the oil patch region of the state. Map depicting distribution of wells drilled in PA for conventional wells (2013) 14 P a g e

17 During 2013, the top 10 counties with the highest number of conventional wells drilled in Pennsylvania include: Well Plugging Program County Number of Conventional Wells Drilled Warren 304 McKean 198 Forest 168 Venango 164 Elk 61 Crawford 13 Indiana 10 Clarion 10 Greene 9 Armstrong 6 It is estimated that more than 350,000 wells have been drilled in Pennsylvania, since the drilling of oil and gas wells began over a century ago. Some wells that are drilled produce oil and gas for many years while other wells are found to be dry and do not produce enough oil or gas to be profitable. All wells that are drilled must be properly plugged or sealed to ensure that communication between deeper brines and hydrocarbons and fresh groundwater sources does not occur. Although stringent requirements currently exist regarding the proper methods to plug wells, this was not always the case. In fact, it was not until the passage of the Oil and Gas Act of 1984 that laws and regulations were created to ensure the safe plugging of orphaned and abandoned wells. Prior to the passage of modern oil and gas laws, wells were sometimes plugged using crude techniques such as driving a wood log into a well; while, in other cases, wells were simply abandoned and never plugged. Abandoned well locations sometimes exist in unlikely places such as residential communities, rural and farm communities, cemeteries, parking lots, under buildings and in rare cases even in streams. Today, stringent oil and gas laws and regulations have been promulgated and require wells to be properly plugged when they are no longer able to serve their intended purpose. Also, operators are now required to post bonds with DEP to ensure that wells are properly plugged at the end of their useful life. DEP tracks all known orphaned and abandoned wells; however, many thousands of wells continue to exist and their exact locations may not be known. Currently, there are over 8,300 orphaned and abandoned wells that are known to exist and are on record with DEP; and many of them are located in the northwest and southwest regions of the state where much of the early oil and gas exploration and production occurred. To date, the Well Plugging Program has plugged a total of 2,948 wells. Typically, the Well Plugging Program issues between 10 and 14 new plugging contracts each year. The individual contracts vary in size and include between one to more than 100 wells. In 15 P a g e

18 2013, the Well Plugging Program issued 14 new well plugging contracts that resulted in the plugging of 38 individual wells located in the following counties: Washington, Allegheny, McKean, Venango, Potter, Jefferson, Elk, Erie and Armstrong. Of that total, 14 were oil wells, eight were gas wells and 16 were combined oil and gas wells. The general locations of the wells that were plugged in 2013 are displayed on the map below. Map depicting distribution of wells plugged in 2013 When a responsible owner is known to exist or is identified, they are legally responsible to plug a well when it is no longer capable of effectively producing oil or gas as intended or after it has been abandoned. In this case, the operator is required to submit a Notice of Intent by Well Operator to Plug Wells form to DEP prior to plugging the well. After well plugging is completed, a Certificate of Well Plugging form must be submitted to DEP by the operator. When orphaned and abandoned wells are discovered and no responsible owner exists, those wells are placed on the department s list of orphaned and abandoned wells. DEP inspects each newly-discovered orphaned and abandoned well and ranks and subsequently prioritizes all wells. Prioritization is based on health and safety criteria, environmental degradation and other potential impacts. Wells that present a high risk to human health and safety and the environment are plugged first. DEP inspectors routinely follow up to ensure that all wells are plugged in accordance with DEP s regulatory requirements. Funding for the Orphan and Abandoned Well Plugging Program is derived from surcharges established by Section 3271 of the 2012 Oil and Gas Act. Well plugging contracts are funded by permit surcharges that are collected separately from, and in addition to, the well drilling permit application fee. The orphan well surcharge is $100 for an oil well or $200 for a natural gas well. A separate additional abandoned well surcharge of $50 applies to both oil and gas wells. The Orphan Well Plugging Fund and the Abandoned Well Plugging Fund are dependent on the 16 P a g e

19 number of new drilling permits submitted to DEP by oil and gas operators. In addition to these fees, the Oil and Gas Act of 2012 allocated funding to the Commonwealth Financing Authority for the purpose of administering a program that includes the plugging of wells. Streamlining the Permitting Process e-well Permitting The e-well Permit is intended to streamline the oil and gas permitting process and convert DEP paper-based permits to a fully online system that will include an electronic application, electronic review and electronic permit issuance. DEP s Oil and Gas Program is the first permit program within DEP that has been migrated to an electronic permitting platform and will result in the elimination of paper-based permit applications, reducing processing and physical storage space requirements. This new tool will also increase efficiency, improve data integrity, and improve DEP s ability to more quickly locate records and provide timely responses to Right-to-Know requests. The e-well permit was developed in-house in partnership with DEP s Bureau of Information Technology. Oil and gas operators utilize a secure web interface where they can create and electronically submit a well permit application with supporting documentation and associated supplemental permits. DEP staff now has the ability to review and route permits more efficiently while seamlessly interacting with the department s enterprise-wide permitting and compliance database called efacts (Environment Facility Application Compliance Tracking System). A user/operator workgroup was identified in 2012 to provide input to DEP regarding early design concepts. DEP convened a user workgroup of select oil and gas operators to conduct beta testing in late August The user workgroup provided comments to DEP regarding the use of the proposed e-well application. Feedback from the user workgroup as well as ongoing internal testing assisted in the refinement of the e-well application. The e-well Permitting System went live Nov. 13, 2013 for the initial user workgroup to use and will be opened to all operators in Natural Gas Compression Facilities General Permit (GP-5 permit) On Feb. 2, 2013, DEP finalized revisions to a general plan approval and general operating permit for natural gas-fired engines, dehydrators, storage tanks and other equipment at natural gas compression and/or processing facilities (aka, GP-5 permit). Compressor stations help move gas from well sites into transmission pipelines. This revised general permit establishes requirements for best available technology, authorizes the construction, modification and operation of these natural gas facilities. These minor sources typically are not subject to major source permitting requirements including Title V and New Source Review of the federal Air 17 P a g e

20 Pollution Control Act. The new GP-5 permit was developed after considering public comment and includes significantly lower allowable emission limits than the previous general permit. The GP-5 permit imposes emission limitations that are 75 to 90 percent more stringent than previously permitted emission limits for natural gas-fired engines used at compressor stations. In addition to more stringent emission limitations, this general permit includes municipal notification, source testing, recordkeeping and reporting requirements. Operators of facilities authorized to use the GP-5 permit must demonstrate that their facilities continue to be minor sources as defined by the Clean Air Act which allows for operational flexibility. In addition to the air quality benefits, this general permit has streamlined the overall air quality permitting process. Air Quality Permit Exemption Criteria Modification Since 1996, oil and gas well sites in Pennsylvania had been granted blanket exemptions from obtaining air quality plan approvals and operating permits (i.e., Exemption Criteria Category 38 for Gas Well Sites). Given the recent expansion in natural gas exploration and production activities in Pennsylvania this blanket exemption has been modified and on Aug. 10, 2013, DEP finalized new exemption criteria. These criteria require actions to be taken that are more stringent than the EPA s standards for new emission sources and result in emission levels of minor significance. If an owner or operator is unwilling to or cannot meet these criteria, they must seek an air quality plan approval for construction of the well site from DEP. Permit Review Process and Permit Decision Guarantee On July 24, 2012, Gov. Tom Corbett issued Executive Order that required DEP to implement a Permit Decision Guarantee by immediately: Assessing how best to make timely permitting decisions; Providing clear expectations for applicants to improve the quality of applications; Establishing performance measures for review staff; and Developing, improving and encouraging electronic permitting tools. Executive Order also rescinded a 1995 Executive Order that established the original Money Back Guarantee for permits. Over the course of 18 months, DEP reviewed existing permitting procedures and developed a draft Permit Review Process and Permit Decision Guarantee policy that was published for public comment. The "Permit Review Process and Permit Decision Guarantee" policy, replaces the former Money Back Guarantee policy. A separate "Permit Coordination Policy" was also developed to direct how the department will review projects that require multiple permits from DEP. 18 P a g e

21 The department reported on Nov. 1, 2013 as part of its 4 th Quarterly Report that 95 percent of permits were issued within the guarantee timeframes according to the Permit Review Process and Permit Decision Guarantee. It was further reported that the Office of Oil and Gas Management increased its permitting efficiency by 13 percent when comparing the permitting efficiency under the prior Money-Back Guarantee policy. The Office of Oil and Gas Management remains committed to conducting permit reviews in a manner that is protective of our environment; while also conducting such reviews in a timely manner as directed by the Permit Review Process and Permit Decision Guarantee. INSPECTIONS: Another important responsibility of DEP s Office of Oil and Gas Management is to conduct rigorous inspections at oil and gas sites across the state. Inspections at well sites are necessary to ensure that permit requirements are achieved at the actual well sites. In response to enhanced oversight and in conjunction with the notification requirements contained in the 2012 Oil and Gas Act, the Office of Oil and Gas Management has significantly increased the number of inspections conducted at conventional and unconventional well sites. Likewise, DEP has increased the number of its inspectors since 2009 to its current level of more than 80 inspectors. As depicted in the bar chart on the following page, the total number of all well inspections has steadily increased from 2008 through 2012; and remained steady in In 2008, the Office of Oil and Gas Management conducted 1,262 inspections of 377 unconventional wells. By 2012, the number of inspections increased to 12,680 inspections of 4,859 unconventional wells. This reflects an order of magnitude increase in the number of inspections that were conducted during this five-year period. The inspection rates remained steady during 2013 with 12,391 inspections of 5,559 unconventional wells. In 2008, the Office of Oil and Gas Management conducted 10,058 inspections of 7,143 conventional wells. By 2012, the number of inspections increased to 11,762 inspections of 7,765 unconventional wells. The inspection rates remained steady during 2013 with 11,713 inspections of 7,808 conventional wells. While the number of inspections of conventional wells has increased over time since 2008, the significant increase in the number of inspections of unconventional wells, coupled with inspections of oil and gas well pad sites and administrative inspections, has resulted in a significant increasing trend of total oil and gas inspections over the past five years. 19 P a g e

22 26,000 24,000 22,000 20,000 18,000 16,000 14,000 12,000 10,000 8,000 6,000 4,000 2,000 0 COMPLIANCE AND ENFORCEMENT: The department has increased its efforts over the past several years to ensure improved regional consistency and continuous improvement in its compliance and enforcement programs that are administered by DEP s district oil and gas offices. It should also be noted that the number of violations as a result of DEP s inspection efforts has been steadily decreasing over this same time period. The record suggests that DEP s compliance initiatives and outreach to unconventional operators are working as compliance rates are improving. Compliance Trends Compliance Inspections Total Inspections Unconventional Inspections Conventional Inspections Well Site & Administrative Inspections 28, The following graph indicates that the number of violations observed at unconventional oil and gas well sites has been decreasing throughout Pennsylvania since From 2010 until 2013, the number of violations at unconventional well sites decreased from 1,281 to 512. This represents a reduction of more than one half the number of violations during this four-year time frame. The number of enforcement actions has proportionally increased by percentage during this same time period. This suggests that although overall compliance by unconventional oil and gas operators has been improving, DEP has continued to vigorously pursue enforcement actions as warranted. 20 P a g e

23 Unconventional Shale Wells Compliance Violations and Enforcements 1,400 Unconventional Violations Unconventional Enforcements 1,200 1, STRAY GAS INVESTIGATIONS: One of the most important issues associated with oil and gas exploration and development pertains to the effective engineering and construction of oil and gas wells. If wells are not constructed or operated properly, there is a potential risk for natural gas to escape from the well bore and into subsurface geologic strata or groundwater sources. If this happens, it is called stray gas migration and the responsible operator is required by law to correct or mitigate the situation. Through efficient communication and collaboration with district oil and gas operations staff, the Office of Oil and Gas Management has created a database of stray gas case investigations. The information compiled dates back to 1987 and allows for critical data trend analysis and some level of forensic work aimed at identifying causes and solutions in the rare instances when operating oil and gas wells in the state have been found to not provide adequate protection of water resources. This invaluable summary of information helps to direct policy decisions and inform the development of focused new regulations. Following is a graph that identifies the number of stray gas investigations conducted by DEP from 2008 through For comparison sake, the graph also includes the investigations that were conducted by each district oil and gas office. 21 P a g e

24 # of Investigations Number of Stray Gas Case Investigations by District: 2008 to 2013 SW District NW District Eastern District Total Year Stray gas investigations are primarily driven by complaints from individuals who believe their property may have been impacted by gas migrating into a water well or surface water body such as a pond, stream or wetland. Since natural gas is colorless and odorless, the most common indicators suggesting potential gas migration are the appearance of many tiny bubbles (i.e., effervescence) in tap water drawn from the supply or off-gassing from a water well or surface water body; or the sound of knocking in a water well that results when infiltrating gas disturbs the well pump. In some cases, an initial review of the complaint may reveal that the condition is, in fact, not related to gas migration. Such cases are tracked and responded to via DEP s Complaint Tracking System and are not cataloged as gas migration events. In other cases, the investigation might require a lengthy series of site visits and multiple rounds of lab analyses to reach a determination concerning the alleged gas migration event. It could take many months or even years to reach a final determination. After a thorough inspection, review of all laboratory analyses, an assessment of construction and integrity data and a geological assessment, DEP renders a determination regarding the event. The determination may result in either of the following findings: Positive Determination: The migration of gas is confirmed and is the result of hydrocarbon exploration and production activities. These findings are either documented through issuance of an official determination letter to the complainant, or, if no formal complaint is filed with DEP, the department documents which water 22 P a g e

25 # of New Cases supplies or residences have been impacted as a result of hydrocarbon exploration and production activities and responds as appropriate. Negative Determination: The presence of gas is either confirmed, but cannot be positively attributed to hydrocarbon exploration and production activities or, in certain cases, no gas is found. There are generally two classifications of natural gas biogenic gas and thermogenic gas. Biogenic gas is formed by microbial decomposition of organic matter nearer to the earth s surface; whereas, thermogenic gas is formed when organic matter in sedimentary rock is subjected to heat and pressure deep under the earth s surface. In some cases, Negative Determinations result when it is found that the type of gas detected is biogenic rather than thermogenic gas that is targeted during natural gas exploration and production activities. However, both gas types are found to exist naturally in portions of Pennsylvania s fresh groundwater system. The following bar chart identifies the number of confirmed Positive Determinations from 2008 through 2013 for gas migration cases investigated by DEP. If a stray gas investigation does not result in a confirmed Positive Determination, then it is not included in this bar graph. If a stray gas investigation extends from one calendar year into a future calendar year, the confirmed positive determination is reported in the year in which the investigation was initiated. DEP is currently conducting several investigations that are expected to be completed during Number of Confirmed Stray Gas Migration Cases: 2008 to Year The Pennsylvania Oil and Gas Regulation at 25 Pa. Code, Chapter 78, Subchapter D provides specific requirements for the construction of oil and gas wells including, but not limited to, casing and cementing practices. It also details requirements that operators must fulfill when a potential gas migration incident has occurred. The department updated these subsurface 23 P a g e

26 # of Water Supplies activities regulations to strengthen well construction practices that are required of operators and place many of the responsibilities of investigating stray gas incidents on the oil and gas industry. The revised rulemaking went into effect on Feb. 5, The department intends to further strengthen these subsurface activity regulations through a subsequent rulemaking package that it will initiate in Number of Impacted Water Supplies Associated with Confirmed Gas Migration Cases: 2008 to Year The bar chart above identifies the number of drinking water supplies impacted by confirmed gas migration events. It is not uncommon for a single confirmed gas migration to affect multiple water sources. The Oil and Gas Act of 2012 presumes that an operator of an unconventional well is responsible for pollution of a water supply when the source is located within 2,500 feet of the unconventional well and when the pollution occurred within 12 months of the drilling, stimulation or completion of the unconventional well. Unless, the operator can successfully demonstrate that the pollution was not caused by its actions based on specific statutory defenses, the operator must restore or replace the affected water supply with an alternate water source. REGULATORY AND POLICY DEVELOPMENT: When the 2012 Oil and Gas Act was signed by Gov. Corbett on Feb. 14, 2012, it represented the first major overhaul of the commonwealth s Oil and Gas Act in 28 years. The act became effective within 60 days of passage, which required the Office of Oil and Gas Management to prepare new forms, standard operating procedures, guidance documents, policy statements and Frequently-Asked-Question responses. DEP provided training to the regulated community 24 P a g e

27 and the public on the new documents. The department successfully met that challenge by working to define specific planning and containment requirements of the 2012 Oil and Gas Act and conducting a series of outreach webinars to inform and train the public and regulated community on the new requirements. Regulatory Revisions for Surface Activities DEP s Oil and Gas program has devoted more than two years to developing a proposed rulemaking to amend the existing oil and gas regulations (25 Pa. Code, Chapter 78, Subchapter C) to specifically address surface-related activities at well sites in Pennsylvania. In particular, these regulations will address the requirements for pits, impoundments, temporary site containment, spill reporting and cleanup, site restoration, pipelines, horizontal directional drilling, water management plans and the road spreading of brine from conventional well sites. This rulemaking also serves to codify environmental provisions mandated by the 2012 Oil and Gas Act. A draft proposed rulemaking was presented to the Oil and Gas Technical Advisory Board on five separate occasions. The Oil and Gas Program also received input from multiple stakeholder groups including oil and gas operators/associations, the environmental community, municipalities and the public. On Aug. 27, 2013 this proposed rulemaking was presented to the Environmental Quality Board (EQB) for consideration and was approved for publication and a 60-day public comment period. The public comment period opened on Dec. 14, 2013 and was initially scheduled to close on Feb. 12, The EQB initially announced that it would host seven public hearings throughout each of the regions of Pennsylvania; however, to promote a greater level of public participation, the EQB and DEP in an unprecedented manner extended the public comment period for 30 additional days to close on March 14, 2014 and added two more public hearings. In addition to the public hearings, the department hosted two webinars to brief the public on the key provisions of the proposed rulemaking and inform the public how comments can be submitted to the department. The department will consider all comments received as it proceeds with the development of this final rulemaking. It is anticipated that a proposed final rulemaking will be presented to the Oil and Gas Technical Advisory Board in Regulatory Revisions for Unconventional Well Permit Fees As required by the Oil and Gas regulations, DEP prepared a three-year report on its fee structure and developed a proposed rulemaking to address the disparity between program income and program costs. This rulemaking proposes to amend the existing oil and gas regulations (25 Pa. Code, Chapter 78, Subchapter B) to modify the unconventional natural gas 25 P a g e

Pennsylvania s Act 13 of SRBC Water Quality Advisory Committee Meeting May 21, 2012

Pennsylvania s Act 13 of SRBC Water Quality Advisory Committee Meeting May 21, 2012 Pennsylvania s Act 13 of 2012 SRBC Water Quality Advisory Committee Meeting May 21, 2012 Roadmap Statutory and Regulatory Framework Marcellus Shale Advisory Commission Act 13/2012 Oil and Gas Act Questions

More information

DEP has three main regulatory chapters that relate to pipeline construction.

DEP has three main regulatory chapters that relate to pipeline construction. Testimony of Patrick McDonnell, Secretary Pennsylvania Department of Environmental Protection Hearing on Pipeline Safety and Development House Majority Policy Committee July 17, 2018 Good morning, Chairman

More information

Craig Lobins, PG District Manager Oil & Gas Program. Erin Wells Local Government Liaison NW Regional Office

Craig Lobins, PG District Manager Oil & Gas Program. Erin Wells Local Government Liaison NW Regional Office Craig Lobins, PG District Manager Oil & Gas Program Erin Wells Local Government Liaison NW Regional Office Utica Source Rock DEP Oil and Gas Program 7 UNCONVENTIONAL PERMITS ISSUED 2005 5 2006

More information

The DEP has four main regulations that relate to pipeline construction.

The DEP has four main regulations that relate to pipeline construction. Testimony of Domenic Rocco, Acting Environmental Program Manager, Regional Permit Coordination Office Pennsylvania Department of Environmental Protection Joint Hearing on Pipeline Safety Senate Environmental

More information

Opportunity & Perspective

Opportunity & Perspective Connecting Local Businesses to the Shale Gas Supply Chain, Penn State Marcellus Center (MCOR) & Shale Training and Education Center (ShaleTEC) Photo Courtesy Penn State Marcellus Center Opportunity & Perspective

More information

AUG /0 TESTIMONY PROVIDED AT EQB HEARING / JULY 21, 2010 / DEPENDENT REGI a. !^MSSTci? RV

AUG /0 TESTIMONY PROVIDED AT EQB HEARING / JULY 21, 2010 / DEPENDENT REGI a. !^MSSTci? RV 2857 TESTIMONY PROVIDED AT EQB HEARING / AUG 1 7 20/0 JULY 21, 2010 / DEPENDENT REGI a!^msstci? RV Good evening. My name is Barbara Jarmoska. I own and reside on 20 clean and green and unleased acres of

More information

DEP Webinar. April 10, 2012

DEP Webinar. April 10, 2012 DEP Webinar April 10, 2012 AGENDA 1. Welcome 2. Environmental Protections & Enhancements 3. Questions & Comments Note: WebEx Technical Support is available at 866-229-3239 2 3 Environmental Protections

More information

I. Preliminary Data Management and Fee Processing (Administrative Staff)

I. Preliminary Data Management and Fee Processing (Administrative Staff) Office of Oil and Gas Management Standard Operating Procedure (SOP) for Erosion and Sediment Control General Permit (ESCGP-1 and ESCGP-2) Review of Notices of Intent (NOIs) by Department Staff Only This

More information

Orphan or Abandoned Well Plugging

Orphan or Abandoned Well Plugging Orphan or Abandoned Well Plugging Program Guidelines March 2014 > ready > set > succeed Commonwealth of Pennsylvania Tom Corbett, Governor www.pa.gov newpa.com Table of Contents Section I Statement of

More information

Thank you for the opportunity to present Governor Wolf's proposed Fiscal Year budget for the Department of Environmental Protection (DEP).

Thank you for the opportunity to present Governor Wolf's proposed Fiscal Year budget for the Department of Environmental Protection (DEP). Testimony of Patrick McDonnell, Secretary Pennsylvania Department of Environmental Protection Governor s Proposed Fiscal Year 2018-19 Budget Pennsylvania House Appropriations Committee February 26, 2018

More information

I. Preliminary Data Management and Fee Processing (Administrative Staff)

I. Preliminary Data Management and Fee Processing (Administrative Staff) Office of Oil and Gas Management Standard Operating Procedure (SOP) for Erosion and Sediment Control General Permit (ESCGP-1 and ESCGP-2) Review of Notices of Intent (NOIs) by Department Staff Only This

More information

CFA Orphan or Abandoned Well Plugging (OAWP) Program Information for Potential CFA OAWP Grant Applicants

CFA Orphan or Abandoned Well Plugging (OAWP) Program Information for Potential CFA OAWP Grant Applicants CFA Orphan or Abandoned Well Plugging (OAWP) Program 2018 Information for Potential CFA OAWP Grant Applicants CFA OAWP Program Summary Grant source: Act 13 Marcellus Legacy Fund Eligible projects: well

More information

Chesapeake Bay Restoration Strategy FAQs

Chesapeake Bay Restoration Strategy FAQs Chesapeake Bay Restoration Strategy FAQs Updated February 23, 2016 Q: What happens if Pennsylvania does not meet its Chesapeake Bay goals? A: The U.S. Environmental Protection Agency (EPA) has notified

More information

Permit Review Process and Permit Decision Guarantee. Quarterly Report

Permit Review Process and Permit Decision Guarantee. Quarterly Report Permit Review Process and Permit Decision Guarantee Quarterly Report Nov. 1, 2013 Executive Summary By signing Executive Order 2012-11, Gov. Tom Corbett charged the Department of Environmental Protection

More information

Act 13 Impact Fee Revenues Frequently Asked Questions

Act 13 Impact Fee Revenues Frequently Asked Questions Act 13 Impact Fee Revenues Frequently Asked Questions Revised March 2015 Act 13 Impact Fee Revenues Frequently Asked Questions Table of Contents Overview of Act 13... 3 Local Government Distributions...

More information

Testimony of. John Quigley, Secretary. Pennsylvania Department of Environmental Protection. Governor s Proposed Fiscal Year 2016/2017 Budget

Testimony of. John Quigley, Secretary. Pennsylvania Department of Environmental Protection. Governor s Proposed Fiscal Year 2016/2017 Budget Testimony of John Quigley, Secretary Pennsylvania Department of Environmental Protection Governor s Proposed Fiscal Year 2016/2017 Budget Senate Appropriations Committee Budget Hearing Thursday, February

More information

March 14,2014. Please contact me at (716) , if you have any questions concerning this matter.

March 14,2014. Please contact me at (716) , if you have any questions concerning this matter. 3cK' March 14,2014 Environmental Quality Board Rachel Carson State Office Building, 16th Floor 400 Market Street Harrisburg, PA 17101-2301 Re: Comments on Proposed Amendments to 25 Pa. Code Chapter 78,

More information

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT LAND DIVISION - SOLID WASTE PROGRAM

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT LAND DIVISION - SOLID WASTE PROGRAM Environmental Management Chapter 335-13-14 ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT LAND DIVISION - SOLID WASTE PROGRAM CHAPTER 335-13-14 COMPOSITING FACILITIES TABLE OF CONTENTS 335-13-14-.01 Purpose

More information

TOWN OF GREENWICH Annual Department Operational Plan (FY )

TOWN OF GREENWICH Annual Department Operational Plan (FY ) TOWN OF GREENWICH Annual Department Operational Plan (FY 2012 2013) 1. Department: Inland Wetlands and Watercourses Agency 2. Divisions: N/A 3. Department Mission Statement: The Inland Wetlands and Watercourses

More information

Standard Operating Procedures for Processing Municipal and Residual Waste General Permit Applications. Bureau of Waste Management

Standard Operating Procedures for Processing Municipal and Residual Waste General Permit Applications. Bureau of Waste Management Standard Operating Procedures for Processing Municipal and Residual Waste General Permit Applications Bureau of Waste Management Revised 9/18/2014 Table of Contents Section Page Number I. Receipt of Application...

More information

DEP Permit. Public Water Systems

DEP Permit. Public Water Systems DEP Permit Public Water Systems COMMONWEALTH OF PENNSYLVANIA Department of Environmental Protection For more information, visit DEP s website at www.dep.state.pa.us, Keyword: DEP Drinking Water. DEPARTMENT

More information

Hazardous Discharge Site Remediation Fund 2013Annual Report

Hazardous Discharge Site Remediation Fund 2013Annual Report Introduction Hazardous Discharge Site Remediation Fund 2013Annual Report The Hazardous Discharge Site Remediation Fund (HDSRF), administered by the New Jersey Economic Development Authority (EDA) and the

More information

Abandoned Mine Drainage Abatement and Treatment

Abandoned Mine Drainage Abatement and Treatment Abandoned Mine Drainage Abatement and Treatment Program Guidelines March 2014 > ready > set > succeed Commonwealth of Pennsylvania Tom Corbett, Governor www.pa.gov newpa.com Table of Contents Section I

More information

The City of Franklin has already expressed its intention to opt-in and administer the program locally.

The City of Franklin has already expressed its intention to opt-in and administer the program locally. SOUTHAMPTON COUNTY BOARD OF SUPERVISORS Regular Session i April 28, 2014 13. VIRGINIA STORMWATER MANAGEMENT PROGRAM CONSIDERATION IN OPTING-IN During its 2014 session, the General Assembly reversed course

More information

Watershed Restoration and Protection

Watershed Restoration and Protection Watershed Restoration and Protection Program Guidelines March 2014 > ready > set > succeed Commonwealth of Pennsylvania Tom Corbett, Governor www.pa.gov newpa.com Table of Contents Section I Statement

More information

Governor s Report on the Capability Enhancement Program. Bureau of Safe Drinking Water

Governor s Report on the Capability Enhancement Program. Bureau of Safe Drinking Water Governor s Report on the Capability Enhancement Program Bureau of Safe Drinking Water September 2014 Introduction The 1996 amendments to the federal Safe Drinking Water Act require all states to implement

More information

PENNSYLVANIA ACT 13 CONSERVATION AND RECREATION FUNDING

PENNSYLVANIA ACT 13 CONSERVATION AND RECREATION FUNDING LOCAL FUNDING GUIDE :: NOVEMBER 2012 (UPDATED FEBRUARY 2013) PENNSYLVANIA ACT 13 CONSERVATION AND RECREATION FUNDING The for The Trust for Public Land (TPL) is a national nonprofit land conservation organization

More information

Bureau of Waste Management

Bureau of Waste Management Standard Operating Procedures for Processing Municipal and Residual Waste Major Permit Modifications, not Including Increases in Capacity Applications for Landfills, Resource Recovery Facilities, Transfer

More information

Pennsylvania. Department of Environmental Protection. Program Guidelines & Application for Assistance

Pennsylvania. Department of Environmental Protection. Program Guidelines & Application for Assistance Pennsylvania Department of Environmental Protection Program Guidelines & Application for Assistance Commonwealth of Pennsylvania Edward G. Rendell, Governor Department of Environmental Protection Kathleen

More information

BERKS COUNTY CONSERVATION DISTRICT 1238 COUNTY WELFARE ROAD, SUITE 200 LEESPORT, PA FAX

BERKS COUNTY CONSERVATION DISTRICT 1238 COUNTY WELFARE ROAD, SUITE 200 LEESPORT, PA FAX BERKS COUNTY CONSERVATION DISTRICT 1238 COUNTY WELFARE ROAD, SUITE 200 LEESPORT, PA 19533-9710 610-372-4657 FAX 610-478-7058 www.berkscd.com PROJECT APPLICATION APPLICATION TYPE(check all that apply) New

More information

Blueprint for Sustainable Community Development Investing in the Future

Blueprint for Sustainable Community Development Investing in the Future MARCELLUS SHALE Blueprint for Sustainable Community Development Investing in the Future Advanced Planning Comprehensive Planning Law of natural consequences If you Fail to Plan and you should Plan to Fail

More information

Sec moves to amend H.F. No as follows: 1.2 Delete everything after the enacting clause and insert:

Sec moves to amend H.F. No as follows: 1.2 Delete everything after the enacting clause and insert: 1.1... moves to amend H.F. No. 1731 as follows: 1.2 Delete everything after the enacting clause and insert: 1.3 "Section 1. CLEAN WATER FUND APPROPRIATIONS. 1.4 The sums shown in the columns marked "Appropriations"

More information

Unregulated Heating Oil Tank Program Guidance

Unregulated Heating Oil Tank Program Guidance Unregulated Heating Oil Tank Program Guidance Scope and Intent The Unregulated Heating Oil Tank Program allows pre-qualified environmental professionals to investigate and remediate certain low risk Unregulated

More information

Oil and Gas Annual Report

Oil and Gas Annual Report 2014 Oil and Gas Annual Report Message from the DEP Secretary Before joining the Department of Environmental Protection (DEP) as Acting Secretary in January 2015, Governor Wolf shared with me his vision

More information

Standard Operating Procedure (SOP) For Review and Issuance of Drill and Operate Well Permits 1 Departmental Staff Only.

Standard Operating Procedure (SOP) For Review and Issuance of Drill and Operate Well Permits 1 Departmental Staff Only. Standard Operating Procedure (SOP) For Review and Issuance of Drill and Operate Well Permits 1 Departmental Staff Only October 18, 2012 This SOP describes the procedures and work flow for the review, and

More information

PIPES Act of 2006 Redline of 49 USC CHAPTER SAFETY 49 USC CHAPTER SAFETY 01/19/04 CHAPTER SAFETY

PIPES Act of 2006 Redline of 49 USC CHAPTER SAFETY 49 USC CHAPTER SAFETY 01/19/04 CHAPTER SAFETY 49 USC CHAPTER 601 - SAFETY 01/19/04 CHAPTER 601 - SAFETY Sec. 60101. Definitions. 60102. Purpose and general authority. 60103. Standards for liquefied natural gas pipeline facilities. 60104. Requirements

More information

INTRODUCTION nonprofit organizations are also a major force in the state s economy

INTRODUCTION nonprofit organizations are also a major force in the state s economy INTRODUCTION Nonprofit organizations contribute to the quality of life for all Pennsylvania citizens through the health care, education, job training, youth development, nursing home care, arts, culture,

More information

RADIATION PROTECTION PROGRAM THREE-YEAR REGULATORY FEE AND PROGRAM COST ANALYSIS REPORT TO THE ENVIRONMENTAL QUALITY BOARD

RADIATION PROTECTION PROGRAM THREE-YEAR REGULATORY FEE AND PROGRAM COST ANALYSIS REPORT TO THE ENVIRONMENTAL QUALITY BOARD RADIATION PROTECTION PROGRAM THREE-YEAR REGULATORY FEE AND PROGRAM COST ANALYSIS REPORT TO THE ENVIRONMENTAL QUALITY BOARD The Department of Environmental Protection s (DEP or Department) Radiation Protection

More information

The PAMAP Program Ortho and LiDAR GIS-T 2008 Houston, TX Special thanks for to Helen Delano & Chris Markel, BAE Systems

The PAMAP Program Ortho and LiDAR GIS-T 2008 Houston, TX Special thanks for to Helen Delano & Chris Markel, BAE Systems The PAMAP Program Ortho and LiDAR GIS-T 2008 Houston, TX Special thanks for to Helen Delano & Chris Markel, BAE Systems 0 Agenda PA Map Program Ortho-photography LiDAR (Light Detection and Ranging) Cool

More information

BERKS COUNTY CONSERVATION DISTRICT 1238 COUNTY WELFARE ROAD, SUITE 200 LEESPORT, PA (610) FAX (610)

BERKS COUNTY CONSERVATION DISTRICT 1238 COUNTY WELFARE ROAD, SUITE 200 LEESPORT, PA (610) FAX (610) BERKS COUNTY CONSERVATION DISTRICT 1238 COUNTY WELFARE ROAD, SUITE 200 LEESPORT, PA 19533-0520 (610) 372-4657 FAX (610) 478-7058 www.berkscd.com PROJECT APPLICATION APPLICATION TYPE(check all that apply)

More information

BDWW-GP-1 Number Fish Habitat Enhancement Structures N Days 43. BDWM-GP-6 BDWM-GP-7 Agricultural Minor Road Crossings and Ramps N 43

BDWW-GP-1 Number Fish Habitat Enhancement Structures N Days 43. BDWM-GP-6 BDWM-GP-7 Agricultural Minor Road Crossings and Ramps N 43 Bureau of Waterways Engineering and Wetlands SOP_WET_WOE_03 Standard Operating Procedure (SOP) for Chapter 105 Water Obstruction and Encroachment Program Review of General Permits by Delegated County Conservation

More information

Guidance and Instructions for the Implementation of Land Disturbing Activities on Fort Jackson

Guidance and Instructions for the Implementation of Land Disturbing Activities on Fort Jackson Guidance and Instructions for the Implementation of Land Disturbing Activities on Fort Jackson 1. Purpose: This document is to provide a summary of regulations that Fort Jackson and associated consultants,

More information

LETTERS TO THE EDITOR

LETTERS TO THE EDITOR ATLANTIC SUNRISE EXPANSION A QUICK GUIDE TO WRITING GUIDE CONTENTS 1HOW TO WRITE A LETTER Quick Tips on keeping on message and how to be clear in your position. 2SAMPLE LETTER An example of a letter to

More information

MISSION INNOVATION ACTION PLAN

MISSION INNOVATION ACTION PLAN MISSION INNOVATION ACTION PLAN Introduction Mission Innovation (MI) is a global initiative designed to accelerate the pace of innovation and make clean energy widely affordable. Led by the public sector,

More information

I. NPDES Permits BUREAU OF MINING PROGRAMS

I. NPDES Permits BUREAU OF MINING PROGRAMS BUREAU OF MINING PROGRAMS Standard Operating Procedure (SOP) 1 for District Mining Operations Enforcing NPDES Permit Requirements for Mining Operations SOP No. BMP-004 The NPDES program for mining is implemented

More information

MEETING MINUTES. Oil and Gas Technical Advisory Board April 13, 2017

MEETING MINUTES. Oil and Gas Technical Advisory Board April 13, 2017 TAB MEMBERS PRESENT MEETING MINUTES Oil and Gas Technical Advisory Board April 13, 2017 Voting Members: Bryan McConnell, P.G. (Chair), Robert Hendricks, P.G., Casey Saunders, P.E., David Yoxtheimer, P.G.,

More information

Qualified Provider Assurances: How Pennsylvania Reports on the Quality of Home and Community Based Service Providers to CMS

Qualified Provider Assurances: How Pennsylvania Reports on the Quality of Home and Community Based Service Providers to CMS Qualified Provider Assurances: How Pennsylvania Reports on the Quality of Home and Community Based Service Providers to CMS Session Objectives Review the Qualified Provider Assurance, Sub-Assurances, and

More information

UST Common Compliance Violations Report FY 2014

UST Common Compliance Violations Report FY 2014 UST Common Compliance Violations Report FY 2014 FINAL September 2016 Prepared by: UST Task Force Tanks Subcommittee Association of State and Territorial Solid Waste Management Officials 1101 17 th Street,

More information

Standard Operating Procedure (SOP) 1 for Chapter 105 Dam Safety Program Review of Chapter 105 New Dam Permit November 2, 2012

Standard Operating Procedure (SOP) 1 for Chapter 105 Dam Safety Program Review of Chapter 105 New Dam Permit November 2, 2012 Bureau of Waterways Engineering and Wetlands Standard Operating Procedure (SOP) 1 for Chapter 105 Dam Safety Program Review of Chapter 105 New Dam Permit This SOP describes the procedures and work flows

More information

Table A-4 Population by County: Pennsylvania, 1990 and 1999

Table A-4 Population by County: Pennsylvania, 1990 and 1999 Table A-4 Population by County: Pennsylvania, 1990 and 1999 1999 1990 Percent 1999 1990 Percent Estimated Enumerated Change Estimated Enumerated Change County Population Population 1990-1999 County Population

More information

PERMIT FEE PROGRAM EVALUATION

PERMIT FEE PROGRAM EVALUATION PERMIT FEE PROGRAM EVALUATION A Report to the Honorable Robert F. McDonnell, Governor and the House Committees on Appropriations, Agriculture, Chesapeake and Natural Resources, and Finance and the Senate

More information

Overview of Draft Final Revisions to GP-5A and GP-5. November 30, 2017

Overview of Draft Final Revisions to GP-5A and GP-5. November 30, 2017 Overview of Draft Final Revisions to GP-5A and GP-5 November 30, 2017 Tom Wolf, Governor Patrick McDonnell, Secretary Background Governor Wolf s Methane Reduction Strategy directed DEP to enhance its oversight

More information

Cumberland County Conservation District Strategic Plan Adopted June 23, 2009

Cumberland County Conservation District Strategic Plan Adopted June 23, 2009 Cumberland County Conservation District Strategic Plan Adopted June 23, 2009 Strategic Planning process and purpose This strategic plan is intended to provide a clear and realistic view of the Cumberland

More information

ECONOMIC & WORKFORCE DEVELOPMENT WORK GROUP MARCELLUS SHALE ADVISORY COMMISSION

ECONOMIC & WORKFORCE DEVELOPMENT WORK GROUP MARCELLUS SHALE ADVISORY COMMISSION ECONOMIC & WORKFORCE DEVELOPMENT WORK GROUP MARCELLUS SHALE ADVISORY COMMISSION Frank Thompson NTRPDC NT WIB NT Quick Facts There are 166 municipalities in the 5 counties that we serve, with a total population

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION OFFICE OF POLICY AND COMMUNICATIONS

DEPARTMENT OF ENVIRONMENTAL PROTECTION OFFICE OF POLICY AND COMMUNICATIONS DEPARTMENT OF ENVIRONMENTAL PROTECTION OFFICE OF POLICY AND COMMUNICATIONS DOCUMENT ID NUMBER: 012-0700-001 TITLE: AUTHORITY: IMPLEMENTATION OF THE PENNSYLVANIA STATE HISTORY CODE: POLICY AND PROCEDURES

More information

Armstrong County Dirt, Gravel & Low Volume Roads Program Quality Assurance Board - Policies and Procedures

Armstrong County Dirt, Gravel & Low Volume Roads Program Quality Assurance Board - Policies and Procedures Armstrong County Dirt, Gravel & Low Volume Roads Program Quality Assurance Board - Policies and Procedures The purpose of the Quality Assurance Board (QAB) in Armstrong County is to recommend to the Armstrong

More information

If you have any questions or need additional information, please contact me by phone at (919) or via at

If you have any questions or need additional information, please contact me by phone at (919) or via  at North Carolina Department of Environment and Natural Resources Pat McCrory Governor John E. Skvarla, III Secretary MEMORANDUM TO: ENVIRONMENTAL REVIEW COMMISSION The Honorable Brent Jackson, Chairman The

More information

SECTION 4. Construction Site Runoff Control Program

SECTION 4. Construction Site Runoff Control Program SECTION 4 Construction Site Runoff Control Program SECTION 4 Construction Site Runoff Control Program (Permit Part D.1.d.) I. Introduction The purpose of the (USAG HI) Construction Site Runoff Control

More information

Wyoming Public Service Commission (WPSC) Biennium Strategic Plan

Wyoming Public Service Commission (WPSC) Biennium Strategic Plan Wyoming Public Service Commission (WPSC) 2017-2018 Biennium Strategic Plan Results Statement Wyoming state government is a responsible steward of State assets and effectively responds to the needs of residents

More information

Program Plan For the Energy Efficiency and Renewable Energy Technology Account Under New York s Clean Air Interstate Rules (CAIR)

Program Plan For the Energy Efficiency and Renewable Energy Technology Account Under New York s Clean Air Interstate Rules (CAIR) Program Plan For the Energy Efficiency and Renewable Energy Technology Account Under New York s Clean Air Interstate Rules (CAIR) New York Battery and Energy Storage Technology Consortium Originally prepared

More information

DRINKING DIMOCK: A GLASS FULL OF GAS WATER

DRINKING DIMOCK: A GLASS FULL OF GAS WATER DRINKING DIMOCK: A GLASS FULL OF GAS WATER If the case of groundwater contamination by natural gas drilling in Dimock, Pennsylvania sets precedent for how the state deals with damaged private water wells,

More information

PA Chesapeake Bay Watershed Implementation Plan Agricultural Section Strategy to Fill Gaps Update September 2011

PA Chesapeake Bay Watershed Implementation Plan Agricultural Section Strategy to Fill Gaps Update September 2011 Non-Regulatory Efforts PA Chesapeake Bay Watershed Implementation Plan Agricultural Section Strategy to Fill Gaps Update September 2011 Page 82 Chesapeake Bay Implementation Grant Special Projects Funding

More information

Bureau of Point and Non-Point Source Management

Bureau of Point and Non-Point Source Management Bureau of Point and Non-Point Source Management Standard Operating Procedure (SOP) 1 for Clean Water Program New and Reissuance Individual Site Permit Applications for Beneficial Use of Biosolids SOP No.

More information

Thank you for the opportunity to discuss the Department of Environmental Protection s efforts to expedite the permitting process in the Commonwealth.

Thank you for the opportunity to discuss the Department of Environmental Protection s efforts to expedite the permitting process in the Commonwealth. Testimony of John Quigley, Secretary Pennsylvania Department of Environmental Protection Joint Hearing, Senate Majority Policy and Senate Democratic Policy Committees Monday, April 11, 2016 Thank you for

More information

Benefits and Services for Veterans and Their Beneficiaries in Pennsylvania

Benefits and Services for Veterans and Their Beneficiaries in Pennsylvania OFFICE OF THE DEPUTY ADJUTANT GENERAL FOR VETERANS AFFAIRS Main Office Department of Military and Veterans Affairs Building S-O-47, Fort Indiantown Gap Annville, PA 17003-5002 Phone: (717) 861-8910 Fax:

More information

SOUTH HEIDELBERG TOWNSHIP - SUNOCO MARINER EAST II PIPELINE TALKING POINTS

SOUTH HEIDELBERG TOWNSHIP - SUNOCO MARINER EAST II PIPELINE TALKING POINTS SOUTH HEIDELBERG TOWNSHIP - SUNOCO MARINER EAST II PIPELINE TALKING POINTS WHAT The overall pipeline project involves construction of two new, larger pipelines to convey natural gas liquids. Since the

More information

General Permit Number. Description

General Permit Number. Description Bureau of Waterways Engineering and Wetlands SOP_WET_WOE_04 Standard Operating Procedure (SOP) for Chapter 105 Water Obstruction and Encroachment Program Review of General Permits not covered by Permit

More information

Submission, Review, and Approval Procedures

Submission, Review, and Approval Procedures CHAPTER 2 Submission, Review, and Approval Procedures 2.0 Introduction Chapter 2, Submission, Review, and Approval Procedures, outlines the steps required to obtain Philadelphia Water Department (PWD)

More information

ASTSWMO POSITION PAPER 128(a) Brownfields Funding

ASTSWMO POSITION PAPER 128(a) Brownfields Funding ASTSWMO POSITION PAPER 128(a) Brownfields Funding Introduction On January 11, 2002, President Bush signed the Small Business Liability Relief and Brownfields Revitalization Act (Pub.L.No. 107-118, 115

More information

Purpose 1 : Conflict of Interest 2 :

Purpose 1 : Conflict of Interest 2 : 146 Stoney Creek Drive, Suite 4 Mifflintown, PA 17059 (717) 436-8953 ext. 5 Purpose 1 : Juniata County Dirt, Gravel, and Low Volume Roads Quality Assurance Board Policies and Procedures Effective January

More information

Ch. 55 NONCARRIER RATES AND PRACTICES CHAPTER 55. NONCARRIER RATES AND PRACTICES

Ch. 55 NONCARRIER RATES AND PRACTICES CHAPTER 55. NONCARRIER RATES AND PRACTICES Ch. 55 NONCARRIER RATES AND PRACTICES 52 55.1 CHAPTER 55. NONCARRIER RATES AND PRACTICES Subch. Sec. A. DISCONTINUATION OF SERVICE... 55.1 B. TERMINATION OF UTILITY SERVICE TO HEALTH CARE FACILITIES...

More information

Connected Care Connected Car Program Connected Care

Connected Care Connected Car Program Connected Care Connected Care Program Connected Care Initiative to improve the connection and coordination of care for those with Serious Mental Illness among health plans, PCPs, and behavioral health providers in outpatient,

More information

The Guide to Smart Outsourcing (Nov 06)

The Guide to Smart Outsourcing (Nov 06) The Guide to Smart Outsourcing (Nov 06) JOSH BERSIN, PRINCIPAL, BERSIN & ASSOCIATES The outsourcing market is on fire, proclaims one industry insider. Overall, companies are spending more on outsourcing

More information

Greenways, Trails and Recreation Program (GTRP)

Greenways, Trails and Recreation Program (GTRP) Greenways, Trails and Recreation Program (GTRP) Program Guidelines January 2015 Commonwealth of Pennsylvania Tom Wolf, Governor Department of Community & Economic Development Table of Contents Section

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION Policy Office. Upon publication of notice as final in the Pennsylvania Bulletin

DEPARTMENT OF ENVIRONMENTAL PROTECTION Policy Office. Upon publication of notice as final in the Pennsylvania Bulletin DEPARTMENT OF ENVIRONMENTAL PROTECTION Policy Office DOCUMENT NUMBER: 012-0820-001 TITLE: EFFECTIVE DATE: AUTHORITY: POLICY: PURPOSE: APPLICABILITY: DISCLAIMER: Development and Review of Regulations Upon

More information

Introduction. Background. Environmental Restoration, Installation Cannon Air Force Base Environmental Restoration Program

Introduction. Background. Environmental Restoration, Installation Cannon Air Force Base Environmental Restoration Program Environmental Restoration, Installation Cannon Air Force Base Environmental Restoration Program Introduction Cannon Air Force Base (AFB) is home to the 27th Special Operations Wing (SOW), whose primary

More information

REQUEST FOR PROPOSALS (RFP) FOR A YORK COUNTY STORMWATER AUTHORITY FEASIBILITY STUDY

REQUEST FOR PROPOSALS (RFP) FOR A YORK COUNTY STORMWATER AUTHORITY FEASIBILITY STUDY REQUEST FOR PROPOSALS (RFP) FOR A YORK COUNTY STORMWATER AUTHORITY FEASIBILITY STUDY The York County Planning Commission, York, PA is accepting proposals for a one-time contract to perform certain professional

More information

Standard Penn State Poll Demographic Questions/Recodes Included in the Per Question Cost

Standard Penn State Poll Demographic Questions/Recodes Included in the Per Question Cost Before we begin, I need to make sure that you live in Pennsylvania. What county do you live in? Adams... 1 Allegheny... 2 Armstrong... 3 Beaver... 4 Bedford... 5 Berks... 6 Blair... 7 Bradford... 8 Bucks...

More information

SECURITY and MANAGEMENT CONTROL OUTSOURCING STANDARD for NON-CHANNELERS

SECURITY and MANAGEMENT CONTROL OUTSOURCING STANDARD for NON-CHANNELERS SECURITY and MANAGEMENT CONTROL OUTSOURCING STANDARD for NON-CHANNELERS The goal of this document is to provide adequate security and integrity for criminal history record information (CHRI) while under

More information

Pennsylvania Department of Health - Health Status Indicators - Page 18

Pennsylvania Department of Health - Health Status Indicators - Page 18 Summary of Percent of Children by Age Below Poverty Level, 1997 Related Children All Children

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION POLICY OFFICE DOCUMENT ID: TITLE: Environmental Justice Public Participation Policy EFFECTIVE

DEPARTMENT OF ENVIRONMENTAL PROTECTION POLICY OFFICE DOCUMENT ID: TITLE: Environmental Justice Public Participation Policy EFFECTIVE DEPARTMENT OF ENVIRONMENTAL PROTECTION POLICY OFFICE DOCUMENT ID: 012-0501-002 TITLE: Environmental Justice Public Participation Policy EFFECTIVE DATE: April 24, 2004 Minor revisions were made to the appendices

More information

Discharges Associated with Pesticide Applications Under the NPDES Permit Program. Frequently Asked Questions (FAQ)

Discharges Associated with Pesticide Applications Under the NPDES Permit Program. Frequently Asked Questions (FAQ) Bureau of Point and Non-Point Source Management Discharges Associated with Pesticide Applications Under the NPDES Permit Program Frequently Asked Questions (FAQ) Background On October 29, 2011, the Pennsylvania

More information

BETTER REGULATION OF MEDICINES INITIATIVE (BROMI): FIFTH REPORT ON PROGRESS

BETTER REGULATION OF MEDICINES INITIATIVE (BROMI): FIFTH REPORT ON PROGRESS A2 BETTER REGULATION OF MEDICINES INITIATIVE (BROMI): FIFTH REPORT ON PROGRESS March 2012 A3 BETTER REGULATION OF MEDICINES INITIATIVE (BROMI) FIFTH REPORT ON PROGRESS Chief Executive s foreword In January

More information

ARIZONA ASSOCIATION OF CONSERVATION DISTRICTS STRATEGIC PLAN P age 75 Years of Locally Led Conservation

ARIZONA ASSOCIATION OF CONSERVATION DISTRICTS STRATEGIC PLAN P age 75 Years of Locally Led Conservation ARIZONA ASSOCIATION OF CONSERVATION DISTRICTS STRATEGIC PLAN 2017-2020 1 P age 75 Years of Locally Led Conservation 2 P a g e 75 Years of Locally Led Conservation OUR MISSION To support Conservation Districts

More information

NATURAL GAS AMERICA S NEW ENERGY OPPORTUNITY: CREATING JOBS, ENERGY, AND COMMUNITY GROWTH

NATURAL GAS AMERICA S NEW ENERGY OPPORTUNITY: CREATING JOBS, ENERGY, AND COMMUNITY GROWTH AED Government Affairs Office 121 North Henry Street Alexandria, VA 22314 Telephone: 703.739.9513 Facsimile: 703.739.9488 E-Mail: aeddc@aednet.org NATURAL GAS AMERICA S NEW ENERGY OPPORTUNITY: CREATING

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) )

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) ) ) UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Coordination of Protection Systems for Performance During Faults and Specific Training for Personnel Reliability Standards ) ) )

More information

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1

TABLE OF CONTENTS 1.0 INTRODUCTION PLAN CERTIFICATION (B)(4) 1 TABLE OF CONTENTS 1.0 INTRODUCTION 1 2.0 PLAN CERTIFICATION 257.102(B)(4) 1 3.0 MONITORING AND MAINTENANCE 2 3.1 Final Cover Maintenance 2 3.2 Groundwater Monitoring System 2 4.0 POST-CLOSURE CONTACT 2

More information

MEMORANDUM OF AGREEMENT BETWEEN THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION AND THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY

MEMORANDUM OF AGREEMENT BETWEEN THE FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION AND THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY ***DRAFT DELIBERATIVE. DO NOT RELEASE UNDER FOIA. NOTHING CONTAINED HEREIN SHALL BE CONSTRUED AS CREATING ANY RIGHTS OR BINDING EITHER PARTY*** MEMORANDUM OF AGREEMENT BETWEEN THE FLORIDA DEPARTMENT OF

More information

Food Stamp Program State Options Report

Food Stamp Program State Options Report United States Department of Agriculture Food and Nutrition Service Fifth Edition Food Stamp Program State s Report August 2005 vember 2002 Program Development Division Food Stamp Program State s Report

More information

DAM AND LEVEE SAFETY

DAM AND LEVEE SAFETY A SPECIAL PERFORMANCE AUDIT OF THE DEPARTMENT OF ENVIRONMENTAL PROTECTION MAY 2008 BUREAU OF DEPARTMENTAL AUDITS May 1, 2008 The Honorable Edward G. Rendell Governor Commonwealth of Pennsylvania 225 Main

More information

Standard FAC Facility Ratings. A. Introduction

Standard FAC Facility Ratings. A. Introduction A. Introduction 1. Title: Facility Ratings 2. Number: FAC-008-3 3. Purpose: To ensure that Facility Ratings used in the reliable planning and operation of the Bulk Electric System (BES) are determined

More information

Title 35-A: PUBLIC UTILITIES

Title 35-A: PUBLIC UTILITIES Maine Revised Statutes Title 35-A: PUBLIC UTILITIES Chapter 97: EFFICIENCY MAINE TRUST ACT 10104. DUTIES 1. Generally. In accordance with this section and other applicable law, the trust administers and

More information

2016 Park Assessment https://bethelpark.net/recreation/municipal-parks-assessment/

2016 Park Assessment https://bethelpark.net/recreation/municipal-parks-assessment/ REQUEST FOR PROPOSAL PROFESSIONAL SERVICES IMPLEMENTABLE COMPREHENSIVE PLAN February 2018 The Municipality of Bethel Park ( Municipality ) is seeking proposals for a one-time contract to perform certain

More information

Guidelines for the Virginia Investment Partnership Grant Program

Guidelines for the Virginia Investment Partnership Grant Program Guidelines for the Virginia Investment Partnership Grant Program Purpose: The Virginia Investment Partnership Grant Program ( VIP ) is used to encourage existing Virginia manufacturers or research and

More information

Construction Update Pennsylvania Rapid Bridge Replacement Project Issue 3: Spring 2016

Construction Update Pennsylvania Rapid Bridge Replacement Project Issue 3: Spring 2016 Construction Update Pennsylvania Rapid Bridge Replacement Project Issue 3: Spring 2016 BEFORE JV 556 SR2013, Slate Creek, Westmoreland Co. AFTER DURING CONSTRUCTION Over 200 Bridges to be Replaced Across

More information

RAILROAD COMMISSION OF TEXAS

RAILROAD COMMISSION OF TEXAS RAILROAD COMMISSION OF TEXAS Oil and Gas Monitoring and Enforcement Plan FISCAL VEAR 2019 RYAN SITTON CHRISTI CRADDICK WAYNE CHRISTIAN Commissioner Chairman Commissioner Annual Oil and Gas Division Monitoring

More information

Section 5 BMP Implementation and Evaluation 5.1 Introduction

Section 5 BMP Implementation and Evaluation 5.1 Introduction 5.1 Introduction As noted in Section 1 each municipality regulated under stormwater NPDES permits, whether categorized as a Phase I or Phase II municipality, is required to implement a stormwater management

More information

Food Stamp Program State Options Report

Food Stamp Program State Options Report United States Department of Agriculture Food and Nutrition Service Fourth Edition Food Stamp Program State s Report September 2004 vember 2002 Program Development Division Program Design Branch Food Stamp

More information

A Chesapeake Bay Program Partnership Proposal for Ensuring Full Accountability of Best Practices and Technologies Implemented

A Chesapeake Bay Program Partnership Proposal for Ensuring Full Accountability of Best Practices and Technologies Implemented A Chesapeake Bay Program Partnership Proposal for Ensuring Full Accountability of Best Practices and Technologies Implemented January 9, 2012 Chesapeake Bay Program Water Quality Goal Implementation Team

More information