1 Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February : Research, Development, Test & Evaluation, Navy / BA 7: Operational Systems Development COST ($ in Millions) Years R1 Program Element (Number/Name) FY 2017 FY 2018 FY 2019 FY 2020 Navy Page 1 of 24 R1 Line #218 To Program Element Continuing Continuing 2174: Distributed Common temnavy (DCGSN) 2227: Distributed Common tem (DCGSN) Inc 2 Program MDAP/MAIS Code: Project MDAP/MAIS Code(s): MN40, M Continuing Continuing A. Mission Description and Budget Item Justification The Distributed Common tem Navy (DCGSN) is the Navy's portion of the Under Secretary of Defense, Intelligence (USD (I)) DCGSN Family of Systems (FoS). The Department of Defense (DoD) has defined a DCGS architecture that will be compatible and interoperable across all of the Services' Intelligence, Surveillance and Reconnaissance (ISR) systems and operations. DCGS accesses and ingests data from space borne, airborne, subsurface, and surface ISR collection assets, intelligence databases and intelligence producers. This collected data is shared across a Joint enterprise using the DCGS Integration Backbone (DIB) and in time, the Defense Intelligence Information Enterprise (DI2E) to enhance access and sharing of ISR information across Joint forces through the use of common enterprise standards and services. DCGS FoS supports Joint Task Force (JTF)level and below combat operations with critical intelligence for battle management and information dominance across the full spectrum of operations, including peace, conflict, war, and Overseas Contingency Operations (). DCGS is a cooperative effort between the services, agencies, and DoD to provide systems capable of receiving, processing, exploiting, and disseminating data from airborne and national reconnaissance platforms. DCGSN core components include the Analyst Work Station from the Global Command and Control System (GCCS) Integrated Imagery and Intelligence (I3), Generic Area Limitation Environment (GALE) Signal Intelligence (SIGINT), Common Geopositioning Services (CGS), Image Product Library (IPL), Modernized Integrated Database (MIDB), Joint Concentrator Architecture (JCA) and Track Management Services. The DCGSN system represents the integration of 1) The processing and exploitation of tactical and Imagery Intelligence (IMINT) and Signals Intelligence (SIGINT); 2) Precision target geopositioning, mensuration, and imagery dissemination capabilities; 3) Selected national IMINT requirements and processing capabilities from the National GeospatialIntelligence Agency (NGA); and 4) Sharing of Intelligence, Surveillance, Reconnaissance and ing and Command and Control information via DIB, DI2E, and NetCentric Enterprise Services (NCES) standards with a wide range of customers (e.g., Global Command and Control System Maritime (GCCSM)), Joint Mission Planning System (JMPS), and many others. The DCGSN Enterprise Node (DEN), which incorporates current DIB standards and DI2E policy, facilitates interoperability and data sharing among the DCGS FoS. DCGSN ensures compliance with the DoD DCGS network architecture. The Navy is establishing an ISR Enterprise way ahead that will emphasize a reach back strategy to provide intelligence products to support deployed ship and shore operations. The Navy will also migrate to a Service Oriented Architecture (SOA) that requires the development, integration, and testing of a Maritime ISR Enterprise

2 Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February : Research, Development, Test & Evaluation, Navy / BA 7: Operational Systems Development R1 Program Element (Number/Name) capability, development and migration of ISR SOA applications, and development and integration to leverage a Common Computing Environment (CCE). Additionally, DCGSN will become the focal point for migration of Maritime Domain Awareness (MDA) fusion and analysis (MFAS) tool applications for the Navy. DCGSN Increment 2 addresses a critical shortfall in Tasking, Collection, Processing, Exploitation, and Dissemination (TCPED) capability and capacity to support operational, tactical planning, and execution across the full range of joint military operations. Existing TCPED shortfalls will be exacerbated by planned Navy, Joint, and Allied fielding of new Intelligence, Surveillance and Reconnaissance (ISR) platforms. Currently fielded systems provide localized processing capabilities that will be overwhelmed in future years without a significant change in the way the Navy processes, exploits and disseminates intelligence data. DCGSN Increment 2 will deliver all source fusion and analytical capabilities; provide Maritime Domain Awareness (MDA) capabilities and integrate Tasking, Collection, Processing, Exploitation, and Dissemination (TCPED) capabilities to improve the use and analysis of sensor and platform data. Distributed Common tem Navy (DCGSN) Increment 2 will be based on an enterprise solution to share this information across commands, services, and agencies to promote shared situational awareness. DCGSN Increment 2 consists of multiple releases. The first release provides an enhanced Navy Intelligence, Surveillance and Reconnaissance (ISR) enterprise that converges and builds on the DCGSN Increment 1 and Maritime Domain Awareness Enterprise Nodes; leverages the Defense Intelligence Information Enterprise (DI2E); is compliant with the Common Computing Environment (CCE); federates ISR and TCPED workflow and production improving throughput through automation; exploits new and evolving unmanned systems sensor data; provides MultiIntelligence (MultiINT) crossqueuing and modular tools. The second release enhances afloat ISR capabilities by providing a set of software centric tools providing MultiINT fusion and analysis, behavior prediction and intelligent knowledge management designed to operate in disconnected or denied communications environment. Followon releases will be developed based on Fleet requirements. Intelligence CarryOn Program (ICOP) is a suite of multisource intelligence and analytical capabilities which includes an integrated ThreeDimensional (3D) operational picture displaying intelligence and other data sources to provide a richer and more complete picture of the battle space on Unit Level platforms. The system supports a full motion video capability that receives, processes, exploits, and disseminates organic and nonorganic data as well as the ability to process and correlate Electronic Intelligence (ELINT) and external Communications Intelligence (COMINT Externals). It integrates mature Commercial OfftheShelf (COTS) and Government Offthe Shelf (GOTS) applications with shared storage and communication paths to reach back to the DCGSN Enterprise Node (DEN), and it provides data sharing to the Maritime Operations Centers (MOC) and national ISR systems, making tactical users a part of the larger ISR enterprise. In FY16, DCGSN Increment 1 will support development, integration and regression testing required to align with emerging national imagery standards. In FY16, DCGSN Increment 2 will deliver Fleet Capability Release0 (FCR0) in support of the Program Executive Officer, Command, Control, Communications, Computers and Intelligence (PEO C4I) prototype effort. Increment 2 will begin development of Fleet Capability Release (FCR) 1. Navy Page 2 of 24 R1 Line #218

3 Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February : Research, Development, Test & Evaluation, Navy / BA 7: Operational Systems Development R1 Program Element (Number/Name) B. Program Change Summary ($ in Millions) Previous President's Budget Current President's Budget Adjustments Congressional General Reductions Congressional Directed Reductions Congressional Rescissions Congressional Adds Congressional Directed Transfers Reprogrammings SBIR/STTR Transfer Program Adjustments Rate/Misc Adjustments Change Summary Explanation Technical: Not applicable. Schedule: 1) DCGSN Increment 1's Full Deployment was moved to 1 QTR of FY15 to align with completion of fielding plan. Increment 1 Block 2 Development Test/Operational Assessment (DT/OA) was moved a half QTR to the right to align with Consolidated Afloat Networks and Enterprise Services (CANES) lab schedule availability. 2) DCGSN Increment 2's development, milestones, and fielding have been updated. Navy Page 3 of 24 R1 Line #218

4 Exhibit R2A, RDT&E Project Justification: PB 2016 Navy : February 2015 COST ($ in Millions) 2174: Distributed Common temnavy (DCGSN) Years R1 Program Element (Number/Name) FY 2017 FY 2018 FY 2019 FY / Distributed Common tem Navy (DCGSN) To Quantity of RDT&E Articles Project MDAP/MAIS Code: MN40 A. Mission Description and Budget Item Justification The Distributed Common tem Navy (DCGSN) is the Navy's portion of the Under Secretary of Defense, Intelligence (USD (I)) DCGSN Family of Systems (FoS). The Department of Defense (DoD) has defined a DCGS architecture that will be compatible and interoperable across all of the Services' Intelligence, Surveillance and Reconnaissance (ISR) systems and operations. DCGS accesses and ingests data from space borne, airborne, subsurface, and surface ISR collection assets, intelligence databases and intelligence producers. This collected data is shared across a Joint enterprise using the DCGS Integration Backbone (DIB) and in time, the Defense Intelligence Information Enterprise (DI2E) to enhance access and sharing of ISR information across Joint forces through the use of common enterprise standards and services. DCGS FoS supports Joint Task Force (JTF)level and below combat operations with critical intelligence for battle management and information dominance across the full spectrum of operations, including peace, conflict, war, and Overseas Contingency Operations (). DCGS is a cooperative effort between the services, agencies, and DoD to provide systems capable of receiving, processing, exploiting, and disseminating data from airborne and national reconnaissance platforms. DCGSN core components include the Analyst Work Station from the Global Command and Control System (GCCS) Integrated Imagery and Intelligence (I3), Generic Area Limitation Environment (GALE) Signal Intelligence (SIGINT), Common Geopositioning Services (CGS), Image Product Library (IPL), Modernized Integrated Database (MIDB), Joint Concentrator Architecture (JCA) and Track Management Services. The DCGSN system represents the integration of 1) The processing and exploitation of tactical and Imagery Intelligence (IMINT) and Signals Intelligence (SIGINT); 2) Precision target geopositioning, mensuration, and imagery dissemination capabilities; 3) Selected national IMINT requirements and processing capabilities from the National GeospatialIntelligence Agency (NGA); and 4) Sharing of Intelligence, Surveillance, Reconnaissance and ing and Command and Control information via DIB, DI2E, and NetCentric Enterprise Services (NCES) standards with a wide range of customers (e.g., Global Command and Control System Maritime (GCCSM)), Joint Mission Planning System (JMPS), and many others. The DCGSN Enterprise Node (DEN), which incorporates current DIB standards and DI2E policy, facilitates interoperability and data sharing among the DCGS FoS. DCGSN ensures compliance with the DoD DCGS network architecture. The Navy is establishing an ISR Enterprise way ahead that will emphasize a reach back strategy to provide intelligence products to support deployed ship and shore operations. The Navy will also migrate to a Service Oriented Architecture (SOA) that requires the development, integration, and testing of a Maritime ISR Enterprise capability, development and migration of ISR SOA applications, and development and integration to leverage a Common Computing Environment (CCE). Additionally, DCGSN will become the focal point for migration of Maritime Domain Awareness (MDA) fusion and analysis (MFAS) tool applications for the Navy. Navy Page 4 of 24 R1 Line #218

5 Exhibit R2A, RDT&E Project Justification: PB 2016 Navy : February 2015 R1 Program Element (Number/Name) 2174 / Distributed Common tem Navy (DCGSN) DCGSN Increment 2 addresses a critical shortfall in Tasking, Collection, Processing, Exploitation, and Dissemination (TCPED) capability and capacity to support operational, tactical planning, and execution across the full range of joint military operations. Existing TCPED shortfalls will be exacerbated by planned Navy, Joint, and Allied fielding of new Intelligence, Surveillance and Reconnaissance (ISR) platforms. Currently fielded systems provide localized processing capabilities that will be overwhelmed in future years without a significant change in the way the Navy processes, exploits and disseminates intelligence data. DCGSN Increment 2 will deliver all source fusion and analytical capabilities; provide Maritime Domain Awareness (MDA) capabilities and integrate Tasking, Collection, Processing, Exploitation, and Dissemination (TCPED) capabilities to improve the use and analysis of sensor and platform data. Distributed Common tem Navy (DCGSN) Increment 2 will be based on an enterprise solution to share this information across commands, services, and agencies to promote shared situational awareness. DCGSN Increment 2 consists of multiple releases. The first release provides an enhanced Navy Intelligence, Surveillance and Reconnaissance (ISR) enterprise that converges and builds on the DCGSN Increment 1 and Maritime Domain Awareness Enterprise Nodes; leverages the Defense Intelligence Information Enterprise (DI2E); is compliant with the Common Computing Environment (CCE); federates ISR and TCPED workflow and production improving throughput through automation; exploits new and evolving unmanned systems sensor data; provides MultiIntelligence (MultiINT) crossqueuing and modular tools. The second release enhances afloat ISR capabilities by providing a set of software centric tools providing MultiINT fusion and analysis, behavior prediction and intelligent knowledge management designed to operate in disconnected or denied communications environment. Followon releases will be developed based on Fleet requirements. Intelligence CarryOn Program (ICOP) is a suite of multisource intelligence and analytical capabilities which includes an integrated ThreeDimensional (3D) operational picture displaying intelligence and other data sources to provide a richer and more complete picture of the battle space on Unit Level platforms. The system supports a full motion video capability that receives, processes, exploits, and disseminates organic and nonorganic data as well as the ability to process and correlate Electronic Intelligence (ELINT) and external Communications Intelligence (COMINT Externals). It integrates mature Commercial OfftheShelf (COTS) and Government Offthe Shelf (GOTS) applications with shared storage and communication paths to reach back to the DCGSN Enterprise Node (DEN), and it provides data sharing to the Maritime Operations Centers (MOC) and national ISR systems, making tactical users a part of the larger ISR enterprise. In FY16, DCGSN Increment 1 will support development, integration and regression testing required to align with emerging national imagery standards. B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) Title: DCGSN Increment 1 Articles: FY 2014 Accomplishments: Conducted Block 2 Development Testing and prepared for Afloat FollowOn Test and Evaluation efforts. Began developing corrections of deficiencies to the Block 2 baseline based on results noted during FY14 integration efforts and development test events. d development of appropriate schoolhouse curricula in support of DCGSN training plans. FY 2015 Plans: Navy Page 5 of 24 R1 Line #218

6 Exhibit R2A, RDT&E Project Justification: PB 2016 Navy : February 2015 R1 Program Element (Number/Name) 2174 / Distributed Common tem Navy (DCGSN) B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) correction of deficiencies to the Block 2 baseline based on results noted during Block 2 Development Testing and Afloat FollowOn Test and Evaluation efforts. Plans: DCGSN Increment 1 will develop, integrate, and perform regression testing required to align with emerging national imagery standards. In addition, DCGSN Increment 1 will complete any statutory and regulatory requirements needed to meet national imagery standards. Plans: N/A Title: DCGSN Increment 2 Articles: FY 2014 Accomplishments: Began Increment 2 Information System Capability Development Document (IS CDD) Joint Staff routing, provided input to the draft Analysis Requirements Description (CARD) and other acquisition documentation in support of the Development Request for Proposal (RFP) Decision Review. Employed an agile development methodology calling for early, frequent interactions between the developer and the user community to ensure that delivered capabilities met evolving user needs through the Requirements Governance Board (RGB). Continued to conduct exploratory studies, system requirements analysis, design, technical studies and experiments designed to reduce identified risks associated with the recommended AoA solution. FY 2015 Plans: Continue risk reduction efforts, conduct engineering reviews in accordance with agile development methodologies and develop Fleet Capability Release0 (FCR0) in support of the Program Executive Officer, Command, Control, Communications, Computers and Intelligence (PEO C4I) prototype. In addition, finalize Information System Capability Development Document (IS CDD) in preparation for a Requirements Decision Point, participate in a Development Request for Proposal (RFP) Decision Review and finalize acquisition documentation for the MS B review. Plans: N/A Plans: Navy Page 6 of 24 R1 Line #218

7 Exhibit R2A, RDT&E Project Justification: PB 2016 Navy : February 2015 B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) N/A Title: Intelligence CarryOn Program (ICOP) R1 Program Element (Number/Name) Articles: FY 2014 Accomplishments: Built on the Unit Level Rapid Technology Transition (RTT) prototypes and began statutory and regulatory documentation in accordance with premilestone C Decision with a planned Initial Operational Capability (IOC) in FY15. Developed required acquisition documents including the Acquisition Strategy, Analysis Requirements Description (CARD), Acquisition Program line (APB), and Engineering documents such as: Test and Evaluation Master Plan (TEMP), System Engineering Plan (SEP), TailoredInformation Plan (TISP). Developed associated training documents and conducted developmental testing. FY 2015 Plans: Topside Studies for LPD17 and Guided Missile Cruiser class platforms, system design/integration activities, operational testing fixes and patches, and completion of acquisition documentation to support Milestone C/ Full Rate Production (FRP) in FY15. Plans: N/A Plans: N/A Navy Page 7 of 24 R1 Line # / Distributed Common tem Navy (DCGSN) Accomplishments/Planned Programs Subtotals C. Other Program Funding Summary ($ in Millions) Line Item FY 2017 FY 2018 FY 2019 FY 2020 To OPN 2914: Distributed Common temnavy (DCGSN) Remarks D. Acquisition Strategy The Distributed Common tem Navy (DCGSN) program utilizes mature CommercialOffTheShelf (COTS) and GovernmentalOffTheShelf (GOTS) capabilities. The Navy adapts and integrates these capabilities and ensures interoperability with the DCGS Integration Backbone (DIB) standards and Defense

8 Exhibit R2A, RDT&E Project Justification: PB 2016 Navy : February 2015 R1 Program Element (Number/Name) 2174 / Distributed Common tem Navy (DCGSN) Intelligence Information Enterprise (DI2E) policies. Integration of DCGSN Increment 1 components has transitioned from Governmentled to Industryled based on the award of DCGSN's Prime Mission Product (PMP) contract. Intelligence CarryOn Program (ICOP) will focus on multisource intelligence and analytical capabilities and unitlevel Intelligence, Surveillance and Reconnaissance (ISR) processing, exploitation and dissemination for Surface operations, facilitating receipt, editing and sharing of imagery and video from aerial assets and shipboard cameras. ICOP will build on the Unit Level Rapid Technology Transition (RTT) prototypes. E. Performance Metrics DCGSN Increment 1 Goal: Meet national imagery standards. DCGSN Increment 1 Metric: development, integration and regression testing required to align with emerging national imagery standards. Navy Page 8 of 24 R1 Line #218

9 Exhibit R3, RDT&E Project Analysis: PB 2016 Navy : February 2015 Product Development ($ in Millions) Category Item Primary Hardware Development (prior) Primary Hardware Development Systems Engineering (prior) Systems Engineering (prior) Method & Type C/CPFF Performing Activity & Location BAE : Rancho Bernardo, CA Years R1 Program Element (Number/Name) 2174 / Distributed Common tem Navy (DCGSN) To Dec C/CPAF Various : Various C/CPAF Systems Engineering C/CPFF Systems Engineering (prior) Systems Engineering C/CPAF Systems Engineering C/CPFF Systems Engineering (prior) JFCOMM : Norfolk, VA BAE : Rancho Bernardo, CA LMSI : Valley Forge, PA SETA SAIC : Columbia, MD Oct Oct Dec Dec Various SAIC : Columbia, MD Systems Engineering C/CPFF L3 : Chantilly, VA Licenses (prior) C/CPAF Systems Engineering Licenses Primary Hardware Development (Inc 2) Primary Hardware Development BAE, Various Oct Oct Oct C/CPFF Unknown : Unknown Mar Software Development C/CPFF BAE : Rancho Bernardo, CA Oct Oct Dec Dec Navy Page 9 of 24 R1 Line #218

10 Exhibit R3, RDT&E Project Analysis: PB 2016 Navy : February 2015 Product Development ($ in Millions) Category Item Software Development Software Development (Inc 2) Licenses Software Development Government Technical Oversight (Dev) Method & Type Performing Activity & Location Years R1 Program Element (Number/Name) Navy Page 10 of 24 R1 Line # / Distributed Common tem Navy (DCGSN) To Oct Oct C/CPFF Unknown : Unknown Mar Oct Oct Oct Subtotal Remarks Various represents several prior year contracts in support of product development, logistics, testing, systems engineering and program management. The majority of these contracts were Plus Fee (CPAF) contract awards. ($ in Millions) Category Item Development (prior) Software Development (prior) Integrated Logistics (prior) Configuration Management (prior) Technical Data (prior) Method & Type Performing Activity & Location Years To Various Various : Various C/CPAF BAE, NG : Various Various L3, SAIC : Various C/CPAF L3 : Chantilly, VA Various Development C/CPFF L3, SSC CHAS : Various SETA SAIC : Columbia, MD Dec Dec

11 Exhibit R3, RDT&E Project Analysis: PB 2016 Navy : February 2015 R1 Program Element (Number/Name) 2174 / Distributed Common tem Navy (DCGSN) ($ in Millions) Category Item Development Method & Type Software Development C/CPFF Integrated Logistics Configuration Management () Development Integrated Logistics Integrated Logistics Configuration Management C/CPFF Performing Activity & Location Northrop Grumman : Los Angeles, CA SETA SAIC : Columbia, MD Years To Oct Oct Oct Oct Oct Oct Oct Dec Dec Oct Oct Subtotal Remarks Various represents several prior year contracts in support of product development, logistics, testing, systems engineering and program management. The majority of these contracts were Plus Fee (CPAF) contract awards. Test and Evaluation ($ in Millions) Category Item Developmental Test & Evaluation (prior) Operational Test & Evaluation (prior) Method & Type Various Various Performing Activity & Location SAIC, L3, SSC LANT : Various SAIC, NAWC, NGES, OPTEVFOR, NSWC Corona : Various Years To Navy Page 11 of 24 R1 Line #218

12 Exhibit R3, RDT&E Project Analysis: PB 2016 Navy : February 2015 Test and Evaluation ($ in Millions) Category Item Developmental Test & Evaluation Developmental Test & Evaluation Operational Test & Evaluation Operational Test & Evaluation Operational Test & Evaluation Operational Test & Evaluation Developmental Test & Evaluation Developmental Test & Evaluation Method & Type C/CPFF C/CPFF Performing Activity & Location BAE : Rancho Bernardo, CA BAE : Rancho Bernardo, CA Charleston, CA Years R1 Program Element (Number/Name) Navy Page 12 of 24 R1 Line # / Distributed Common tem Navy (DCGSN) To Dec Oct Oct Dec C/CPFF COTF : Norfolk, VA Jul Oct Oct C/CPFF COTF : Norfolk, VA Jul Apr Subtotal Remarks Various represents several prior year contracts in support of product development, logistics, testing, systems engineering and program management. The majority of these contracts were Plus Fee (CPAF) contract awards. Management Services ($ in Millions) Category Item Program Management (prior) Travel Government Engineering Method & Type Performing Activity & Location Years To C/CPAF SAIC : Columbia, MD Allot SPAWAR : San Nov Nov Nov Nov

13 Exhibit R3, RDT&E Project Analysis: PB 2016 Navy : February 2015 Management Services ($ in Millions) Category Item Program Management Program Management Program Management Method & Type C/CPFF Performing Activity & Location PSS BAH : San Years R1 Program Element (Number/Name) 2174 / Distributed Common tem Navy (DCGSN) To Nov Nov Nov Oct Subtotal Remarks Various represents several prior year contracts in support of product development, logistics, testing, systems engineering and program management. The majority of these contracts were Plus Fee (CPAF) contract awards. Remarks Years To Project s Navy Page 13 of 24 R1 Line #218

14 Exhibit R4, RDT&E Schedule Profile: PB 2016 Navy : February 2015 R1 Program Element (Number/Name) 2174 / Distributed Common tem Navy (DCGSN) Navy Page 14 of 24 R1 Line #218

15 Exhibit R4A, RDT&E Schedule Details: PB 2016 Navy : February 2015 R1 Program Element (Number/Name) Schedule Details 2174 / Distributed Common tem Navy (DCGSN) Start End Events by Sub Project Quarter Year Quarter Year Proj 2174 DCGSN Inc 2 FCR1 RALOT Review Trident Warrior / DCGS Family of Systems Inc Trident Warrior / DCGS Family of Systems Inc DCGSN BLK 2 Development DCGSN Inc 1 FD ICOP and Foundation Kit Procurement DCGSN BLK 2 DT/OA Landbased (CANES) DCGSN BLK 2 OT AFLOAT DCGSN Inc 1 Procurement DCGSN Inc 1 Tech Refresh DCGSN Inc 1 BLK 2 FD ICOP MS C/FRP ICOP DT/OT DCGSN Inc 2 FCR0 PEO C4I Prototype Navy Page 15 of 24 R1 Line #218

16 Exhibit R2A, RDT&E Project Justification: PB 2016 Navy : February 2015 COST ($ in Millions) 2227: Distributed Common tem (DCGSN) Inc 2 Years R1 Program Element (Number/Name) FY 2017 FY 2018 FY 2019 FY / Distributed Common tem (DCGSN) Inc 2 To Continuing Continuing Quantity of RDT&E Articles 1 Project MDAP/MAIS Code: M464 Note To reflects DCGSN Increment 2 only. DCGSN Increment 2 reflects August 2014 Program Life Cycle Estimate (PLCCE) and a Life Cycle Estimate (LCCE) is scheduled to complete in FY16 as part of Milestone B. A. Mission Description and Budget Item Justification DCGSN Increment 2 addresses a critical shortfall in Tasking, Collection, Processing, Exploitation, and Dissemination (TCPED) capability and capacity to support operational, tactical planning, and execution across the full range of joint military operations. Existing TCPED shortfalls will be exacerbated by planned Navy, Joint, and Allied fielding of new Intelligence, Surveillance and Reconnaissance (ISR) platforms. Currently fielded systems provide localized processing capabilities that will be overwhelmed in future years without a significant change in the way the Navy processes, exploits and disseminates intelligence data. DCGSN Increment 2 will deliver all source fusion and analytical capabilities; provide Maritime Domain Awareness (MDA) capabilities and integrate Tasking, Collection, Processing, Exploitation, and Dissemination (TCPED) capabilities to improve the use and analysis of sensor and platform data. Distributed Common tem Navy (DCGSN) Increment 2 will be based on an enterprise solution to share this information across commands, services, and agencies to promote shared situational awareness. DCGSN Increment 2 consists of multiple releases. The first release provides an enhanced Navy Intelligence, Surveillance and Reconnaissance (ISR) enterprise that converges and builds on the DCGSN Increment 1 and Maritime Domain Awareness Enterprise Nodes; leverages the Defense Intelligence Information Enterprise (DI2E); is compliant with the Common Computing Environment (CCE); federates ISR and TCPED workflow and production improving throughput through automation; exploits new and evolving unmanned systems sensor data; provides MultiIntelligence (MultiINT) crossqueuing and modular tools. The second release enhances afloat ISR capabilities by providing a set of software centric tools providing MultiINT fusion and analysis, behavior prediction and intelligent knowledge management designed to operate in disconnected or denied communications environment. Followon releases will be developed based on Fleet requirements. In FY16, DCGSN Increment 2 will deliver Fleet Capability Release0 (FCR0) in support of the Program Executive Officer, Command, Control, Communications, Computers and Intelligence (PEO C4I) prototype effort. Increment 2 will begin development of Fleet Capability Release (FCR) 1. B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) Title: DCGSN Increment 2 Articles: FY 2014 Accomplishments: Navy Page 16 of 24 R1 Line #218

17 Exhibit R2A, RDT&E Project Justification: PB 2016 Navy : February 2015 B. Accomplishments/Planned Programs ($ in Millions, Article Quantities in Each) N/A FY 2015 Plans: N/A R1 Program Element (Number/Name) Plans: Will develop, deliver, install and demonstrate Fleet Capability Release0 (FCR0) in support of the Program Executive Office, Command, Control, Communications, Computers and Intelligence (PEO C4I) prototype effort. Will prepare and deliver statutory and regulatory requirements/artifacts for MSB review. MSB preparations, and development and integration of FCR1 will entail significant engineering design and development work. This design and development work includes statutory and regulatory requirements such as completing the program's Acquisition Strategy, System Engineering Plan, Integrated Logistics Assessment, and ensuring operational and Acquisition alignment of requirements, resources, and schedule. Will execute development and integration of Fleet Capability Release1 (FCR1) in preparation for fielding aboard the Initial Operational Test and Evaluation platform in FY18. In conjunction with FCR1 development and integration, MSB artifacts will need to be updated and aligned with ongoing FY16 agile software development. Preparations for the development and integration of FCR1 include capturing the initial lessons learned and best practices from the FCR0 prototype effort and initial prioritization of the Requirements Development Package (RDP) in support of the DCGSN Requirements Governance Board (DRGB) process. Plans: N/A Navy Page 17 of 24 R1 Line # / Distributed Common tem (DCGSN) Inc 2 Accomplishments/Planned Programs Subtotals C. Other Program Funding Summary ($ in Millions) Line Item FY 2017 FY 2018 FY 2019 FY 2020 To N/2914: Distributed Common temnavy Remarks D. Acquisition Strategy The DCGSN Increment 2 streamlined Information Technology (IT) acquisition strategy is based on an accelerated acquisition model as defined in the Interim Department of Defense Instruction (DoDI ). DCGSN Increment 2 capabilities will be developed through an evolutionary process that calls for multiple releases.

18 Exhibit R2A, RDT&E Project Justification: PB 2016 Navy : February 2015 R1 Program Element (Number/Name) 2227 / Distributed Common tem (DCGSN) Inc 2 E. Performance Metrics DCGSN Increment 2 Goal: afloat forces through a robust enterprise ISR capability, satisfying maritime needs for processing, exploitation, and dissemination. DCGSN Increment 2 Metric: Successful completion of Development Release for Proposal (RFP) review. Navy Page 18 of 24 R1 Line #218

19 Exhibit R3, RDT&E Project Analysis: PB 2016 Navy : February 2015 Product Development ($ in Millions) Category Item Primary Hardware Development Software Development Software Development (Inc 2) Software Development Government Technical Oversite (Dev) Method & Type Performing Activity & Location Years R1 Program Element (Number/Name) 2227 / Distributed Common tem (DCGSN) Inc 2 To Oct Oct C/CPFF Unknown : Unknown Mar Oct Oct Subtotal Remarks Various represents several prior year contracts in support of product development, logistics, testing, systems engineering and program management. The majority of these contract were Plus Fee (CPAF) contract awards. ($ in Millions) Category Item Method & Type Development C/CPFF Development Integrated Logistics Integrated Logistics C/CPFF Performing Activity & Location SETA SAIC : Columbis, MD SETA SAIC : Columbis, MD Years To Dec Oct Oct Dec Subtotal Remarks Various represents several prior year contracts in support of product development, logistics, testing, systems engineering and program management. The majority of these contract were Plus Fee (CPAF) contract awards. Navy Page 19 of 24 R1 Line #218

20 Exhibit R3, RDT&E Project Analysis: PB 2016 Navy : February 2015 Test and Evaluation ($ in Millions) Category Item Developmental Test & Evaluation Developmental Test & Evaluation Developmental Test & Evaluation Method & Type Performing Activity & Location Years R1 Program Element (Number/Name) 2227 / Distributed Common tem (DCGSN) Inc 2 To Oct Oct C/CPFF COTF : Norfolk, VA Nov Subtotal Remarks Various represents several prior year contracts in support of product development, logistics, testing, systems engineering and program management. The majority of these contract were Plus Fee (CPAF) contract awards. Management Services ($ in Millions) Travel Category Item Government Engineering Program Management Program Management Program Management Method & Type Allot C/CPFF Performing Activity & Location SPAWAR : San PSS BAH : San Years To Nov Nov Nov Oct Oct Subtotal Remarks Various represents several prior year contracts in support of product development, logistics, testing, systems engineering and program management. The majority of these contract were Plus Fee (CPAF) contract awards. Navy Page 20 of 24 R1 Line #218

21 Exhibit R3, RDT&E Project Analysis: PB 2016 Navy : February 2015 Remarks Years R1 Program Element (Number/Name) 2227 / Distributed Common tem (DCGSN) Inc 2 To Project s Navy Page 21 of 24 R1 Line #218

22 Exhibit R4, RDT&E Schedule Profile: PB 2016 Navy : February 2015 R1 Program Element (Number/Name) 2227 / Distributed Common tem (DCGSN) Inc 2 Navy Page 22 of 24 R1 Line #218

23 Exhibit R4A, RDT&E Schedule Details: PB 2016 Navy : February 2015 R1 Program Element (Number/Name) Schedule Details 2227 / Distributed Common tem (DCGSN) Inc 2 Start End Events by Sub Project Quarter Year Quarter Year Proj 2227 Trident Warrior/DCGS Family of Systems Inc Trident Warrior/DCGS Family of Systems Inc Trident Warrior/DCGS Family of Systems Inc Trident Warrior/DCGS Family of Systems Inc Trident Warrior/DCGS Family of Systems Inc DCGSN Inc 2 FCR1 Development DCGSN Inc 2 FCR2 Development DCGSN Inc 2 FCR3 Development DCGSN Inc 2 Release 1 Build Decision (MS B) DCGSN Inc 2 Procurement DCGSN Inc 2 FDDR DCGSN Inc 2 Fielding Decision DCGSN Inc 2 FCR2 Build Decision DCGSN Inc 2 FCR3 Build Decision DCGSN Inc 2 FCR2 RALOT Review DCGSN Inc 2 DT/IOT&E DCGSN Inc 2 FCR3 RALOT Review DCGSN Inc 2 FCR2 Fielding Decision DCGSN Inc 2 FCR3 Fielding Decision DCGSN Inc 2 FCR0 PEO C4I Prototype DCGSN Inc 2 FCR1 Integrated Test Navy Page 23 of 24 R1 Line #218

24 Exhibit R4A, RDT&E Schedule Details: PB 2016 Navy : February 2015 R1 Program Element (Number/Name) 2227 / Distributed Common tem (DCGSN) Inc 2 Start End Events by Sub Project Quarter Year Quarter Year DCGSN Inc 2 FCR2 Integrated Test DCGSN Inc 2 FCR3 Integrated Test Navy Page 24 of 24 R1 Line #218

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element 127.403 27.495 14.676 19.718-19.718

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Distributed Common Ground Sys FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Distributed Common Ground Sys FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Navy DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 Total FY 2013 FY 2014 FY 2015 FY 2016 To Complete Total Total Program Element 11.979

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Consolidated Afloat Network Ent Services(CANES) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Consolidated Afloat Network Ent Services(CANES) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Navy DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 46.823 63.563 12.906-12.906 15.663 15.125

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 Navy Page 1 of 7 R-1 Line #203 To Program Element

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 Navy Page 1 of 8 R-1 Line #82 To Program Element - -

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total Program Element 9.334 6.602 - - - - - - - 0.000 15.936 9.334 6.602 - - - - - -

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 0.000 24.500 23.016-23.016 25.350 26.026

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 125.44 31.649 4.876-4.876 25.655

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years R1 Program

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 6 R-1 Line #162

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 6 R-1 Line #162 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2013

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Tactical Electronic Surveillance System - Adv Dev. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Tactical Electronic Surveillance System - Adv Dev. Prior Years FY 2013 FY 2014 FY 2015 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Army : March 2014 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #222

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #222 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) (+) #

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Distributed Common Ground/Surface Systems. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Distributed Common Ground/Surface Systems. Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Prior

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Army DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 19.610 5.856 8.660-8.660 14.704 14.212

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 Navy Page 1 of 8 R-1 Line #142 To Complete Total

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 214 Navy DATE: April 213 COST ($ in Millions) Years FY 212 FY 213 # ## FY 215 FY 216 FY 217 FY 218 To Program Element 217.794 3.418 3.773 3.262-3.262 3.433

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 0305208N Distributed Common Ground Systems (DCGS) COST

More information

2016 Major Automated Information System Annual Report

2016 Major Automated Information System Annual Report 2016 Major Automated Information System Annual Report Distributed Common Ground System-Navy Increment 2 (DCGS-N Inc 2) Defense Acquisition Management Information Retrieval (DAMIR) UNCLASSIFIED Table of

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 7: Operational Systems Development COST ($ in Millions) Years R1 Program

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 7: Operational Systems Development COST ($ in Millions) FY 2017 FY 2018

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 5: Development & Demonstration (SDD) COST ($ in Millions) Years R1 Program

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 Total FY 214 FY 215 FY 216 FY 217 To Complete Total Total Program Element - 75.7 122.481-122.481

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 68.421 62.044 71.300-71.300 27.600

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Biometrics Enabled Intelligence FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Biometrics Enabled Intelligence FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element - 14.114 15.018-15.018 15.357 15.125

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 0.000 35.533

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Defense Information Systems Agency : February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February Exhibit R, RDT&E Budget Item Justification: PB 119: Research, Development, Test & Evaluation, / BA : Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions) FY R1 Program Element

More information

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 R-1 Line #208

UNCLASSIFIED. UNCLASSIFIED United States Special Operations Command Page 1 of 6 R-1 Line #208 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 United States Special Operations Command Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit P-40, Budget Line Item Justification: PB 2017 Navy Date: February 2016 1810N: Other Procurement, Navy / BA 04: Ordnance Support Equipment / BSA 3: Ship Missile Systems Equipment ID Code (A=Service

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Common Data Link Executive Agent (CDL EA) FY 2016 OCO. FY 2016 Base

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Common Data Link Executive Agent (CDL EA) FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 33.896 32.015 43.986-43.986 42.760 41.790

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) FY 2017 FY 2018 FY 2019 FY 2020 To Program Element 65.370 76.553 59.826 142.551-142.551 190.973 180.205

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 216 Exhibit R2, RDT&E Budget Item Justification: PB 217 24: Research, Development, Test & Evaluation, / BA 5: tem Development & Demonstration (SDD) COST ($ in Millions) FY 215 FY 216 R1 Program

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 United States Special Operations Command : February 2016 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element 174.037 11.276 8.610 1.971-1.971

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Program Element 3.997 3.72 3.773-3.773 3.327 3.424 3.539 3.69

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research,, Test & Evaluation, Navy / BA 5: System & Demonstration (SDD) COST ($ in Millions) Years R1 Program Element (Number/Name)

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 Total FY 214 FY 215 FY 216 FY 217 To Complete Total Total Program Element 1.613 1.418 1.56-1.56

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: WEATHER SERVICE. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: WEATHER SERVICE. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Program Element 45.918 33.291 32.373 0.000

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #90

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #90 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 R-1 Line #120

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 R-1 Line #120 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 5: Development & Demonstration (SDD) COST ($ in Millions) Prior Years

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 19 R-1 Line #71

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 19 R-1 Line #71 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy : March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Defense Information Systems Agency : February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 United States Special Operations Command DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # Base OCO ## FY 2015 FY 2016 FY 2017 FY 2018

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 R-1 Line #31

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 7 R-1 Line #31 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 25.229.872.863 7.6 8.463.874.876.891.96

More information

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing EF4: Integrated Broadcast System

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing EF4: Integrated Broadcast System Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) Years FY 2014

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research,, Test & Evaluation, Navy / BA 5: System & Demonstration (SDD) COST ($ in Millions) FY 2017 FY 2018 FY 2019 FY

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) (+)

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Distributed Common Ground/Surface Systems FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Distributed Common Ground/Surface Systems FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 212 Army DATE: February 211 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 21 FY 211 PE 3528A: Distributed Common Ground/ FY

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Integrated Personnel and Pay System-Army (IPPS-A) Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Integrated Personnel and Pay System-Army (IPPS-A) Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army : March 2014 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) # FY 2016

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 6 R-1 Line #62

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 6 R-1 Line #62 COST ($ in Millions) Prior Years FY 2013 FY 2014 Base OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Cost To Complete Total Program Element - 0.051-3.926-3.926 4.036 4.155 4.236 4.316 Continuing Continuing

More information

UNCLASSIFIED. UNCLASSIFIED Defense Information Systems Agency Page 1 of 11 R-1 Line #189

UNCLASSIFIED. UNCLASSIFIED Defense Information Systems Agency Page 1 of 11 R-1 Line #189 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Defense Information Systems Agency : March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) Exhibit R-2 0305208A Distributed Common Ground/Surface Systems ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) COST (In Thousands) Actual to Total Total Program Element (PE) 128334 68662 188425 Continuing

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 0307207N Aerial Common Sensor COST ($ in Millions) *FY

More information

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Physical Security Equipment

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Physical Security Equipment COST ($ in Millions) Prior Years FY 2013 FY 2014 Base OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Cost To Complete Total Program Element - 3.350 3.874 - - - 1.977 - - - Continuing Continuing 645121: Physical

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 0305192N - JOINT MILITARY INTELLIGENCE PROGRAM Prior

More information

UNCLASSIFIED. FY 2016 Base

UNCLASSIFIED. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Defense Security Cooperation Agency : February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Tactical Data Links. FY 2011 OCO Estimate. FY 2011 Total Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Tactical Data Links. FY 2011 OCO Estimate. FY 2011 Total Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Navy DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2012 FY 2013 FY 2014 FY 2015 To Program Element 4.053 14.948 28.854 0.000 28.854 65.152

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 Navy Page 1 of 8 R-1 Line #83 To Program Element - -

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #176

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #176 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) Years FY 2018 FY 2019 FY 2020 FY 2021 To Program Element - 24.963 76.760 30.948 0.000 30.948 20.563

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 PE 65866N: Navy Space & Electr Warfare FY 214 FY 215 FY 216 FY 217 Cost To Complete Cost

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Surface Ship Torpedo Defense FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Surface Ship Torpedo Defense FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Navy DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 Total FY 2013 FY 2014 FY 2015 FY 2016 To Complete Total Total Program Element 57.922

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: ARMY INTEGRATED AIR AND MISSILE DEFENSE (AIAMD) FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: ARMY INTEGRATED AIR AND MISSILE DEFENSE (AIAMD) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 MISSILE Total FY 2013 FY 2014 FY 2015 FY 2016 Army Page 1 of 11 R-1 Line Item #128 To

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Indirect Fire Protection Capability Increment 2-Intercept (IFPC2)

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Indirect Fire Protection Capability Increment 2-Intercept (IFPC2) Exhibit R2, RDT&E Budget Item Justification: PB 2015 Army : March 2014 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

UNCLASSIFIED. FY 2016 Base

UNCLASSIFIED. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Office of the Secretary Of Defense : February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 4: Advanced Component Development

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Joint Command and Control. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Joint Command and Control. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Program Element 3.140 0.000 0.000 0.000

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #79

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #79 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 COST ($ in Millions) Years FY 2013 FY 2014 # FY 2016 FY 2017 FY 2018 FY 2019 To Program Element 49.457 65.370 118.411 59.826-59.826

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 13.610 13.355 12.874-12.874

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete Total Total Program Element 49.625

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element 578.093 95.097 137.369 205.615-205.615 196.665 257.393

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 6.021 8.312 7.963-7.963 8.046 8.146 8.194

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational s Development COST ($ in Millions) FY 2017

More information

UNCLASSIFIED. FY 2011 Total Estimate

UNCLASSIFIED. FY 2011 Total Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 The Joint Staff DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 for the Warrior (C4IFTW) FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete

More information

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 10 R-1 Line #181

UNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 10 R-1 Line #181 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 7: Operational Systems Development COST ($ in Millions) Prior Years

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 Total FY 214 FY 215 FY 216 FY 217 To Complete Total Total Program Element.96 8.765 21.17-21.17

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 211 FY 212 Total FY 214 FY 215 FY 216 FY 217 Army

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / NAVSTAR Global Positioning System (User Equipment) (SPACE) Prior Years FY 2013 FY 2014

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / NAVSTAR Global Positioning System (User Equipment) (SPACE) Prior Years FY 2013 FY 2014 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 COST ($ in Millions) Years FY 2013 FY 2014 # FY 2016 FY 2017 FY 2018 FY 2019 To Program Element 0.000 63.687 127.172 156.659-156.659

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #164

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #164 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in

More information

UNCLASSIFIED. FY 2017 Base FY 2017 OCO

UNCLASSIFIED. FY 2017 Base FY 2017 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Navy Date: February 2016 1319: Research, Development, Test & Evaluation, Navy / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 205 Exhibit R2, RDT&E Budget Item Justification: PB 2040: Research, Development, Test & Evaluation, / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) R Program Element (Number/Name)

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 26 Exhibit R2, RDT&E Budget Item Justification: PB 27 2: Research, Development, Test & Evaluation, / BA 7: Operational Systems Development COST ($ in Millions) FY 25 FY 26 R Program Element

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE K: Minimum Essential Emergency Communications Network (MEECN)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE K: Minimum Essential Emergency Communications Network (MEECN) Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Defense Information Systems Agency DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # Base Network OCO ## FY 2015 FY 2016 FY 2017 FY 2018

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: SOF Underwater Systems

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: SOF Underwater Systems Exhibit R-2, RDT&E Budget Item Justification: PB 2012 United States Special Operations Command DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 Total FY 2013 FY 2014 FY 2015 FY 2016 To Complete

More information

PROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD)

PROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD) EXHIBIT R-2, FY 2001 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0305206N PROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD) (U) COST: (Dollars in

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #213

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #213 COST ($ in Millions) Prior Years FY 2013 FY 2014 Base OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Cost To Complete Total Program Element - 12.205 13.491 13.516-13.516 13.767 14.037 14.311 14.584 Continuing