1 FY 96 SAF/AQ MAXI-$-TRACK MAJ KATHLEEN O REGAN CHIEF, CONGRESSIONAL AFFAIRS DIVISION SAF/AQXC ROSALIE WILDENSTEINER PROJECT OFFICER PHONE: wildenst@safaqpo.hq.af.mil
2 FY 96 CONGRESSIONAL UPDATE The SAF/AQ Congressional Track provides Air Force personnel a historical account of Congressional actions taken on the FY 96 President's Budget Request. The Maxi-$-Track organizes Air Force programs as follows: Aircraft Procurement (3010); Ammunition Procurement (3011); Missile Procurement (3020); Other Procurement (3080); and Research, Development, Test and Evaluation (3600). Within these sections, report language concerning specific programs may be located either by using the table of contents for that section or by referring to the program sequence number. To coincide with budget accounting procedures, programs are listed by either a P-1 (Procurement) or an R-1 (RDT&E) Sequence Number which appears on the budget pages at the beginning of each section. This Maxi-$-Track incorporates numbers and language from the following Congressional reports: HNSC report (H. Rept ) SASC report (S. Rept ) HAC report (H. Rept ) SAC report (S. Rept ) Authorization conference report (H. Rept ) (NOTE: This is the second authorization conference report. A previous report, H. Rept , was filed on H.R. 1530, which was vetoed by the President on December 28, Appropriations conference report (H. Rept ) (NOTE: This is the second appropriations conference report. A previous report, H. Rept , was rejected by the House on September 29, 1995.) Narrative may be found at the end of each section (i.e., 3010, 3011, 3020, 3080, 3600). Pertinent language not readily identifiable with a specific program may be found in the General Comments section which is organized by
3 Congressional Report, i.e., HNSC, SASC, HAC, SAC, Authorization Conference Report, Appropriations Conference Report. The President signed P.L , FY 96 DoD Authorization (S. 1124), on February 10, H.R. 2126, FY 96 DoD Appropriations, became law without the President s signature on December 1, 1995 (P.L ). Complete committee reports are available for review in SAF/AQXRC, Room 4D347. Committee reports and the Maxi-$-Track are also available on the SAF/AQ classified (Q:\maxitrak\fy96) and unclassified (Q:\ wildenst\maxitrak\fy96\word6) nets, as well as on the World Wide Web SAF/AQ Home Page ( Questions regarding this track may be referred to Miss Wildensteiner, AV
4 AIR FORCE PROGRAMS Section I - Aircraft Procurement (3010) Section II - Ammunition Procurement (3011) Section III - Missile Procurement (3020) Section IV - Other Procurement (3080) Section V - RDT&E (3600) GENERAL COMMENTS Section VI - HNSC Report (H. Rept ) Section VII - SASC Report (S. Rept ) Section VIII - Authorization Conference Report (H. Rept ) Section IX - HAC Report (H. Rept ) Section X - SAC Report (S. Rept ) Section XI - Appropriations Conference Report (H. Rept )
5 AIRCRAFT PROCUREMENT (3010) Maxi-$-Track I-1 B-1B (Precision Guided Munitions) I-5 B-2A I-9 F-15E (Precision Guided Munitions) I-14 F-16 C/D (MYP) I-17 C-17 (MYP) I-19 C-17 Adv Proc I-23 WC-130 I-24 Strategic Airlift I-25 Non Development Airlift Aircraft NDAA) I-26 JPATS I-29 E-8B I-31 Modification of In-Service Aircraft B-1 I-32 B-52 (Limitation on Retirement or Dismantlement of I-37 Strategic Nuclear Delivery Systems) F-117 I-40 A-10 I-41 F-15 I-43 F-16 I-46 EF-111 I-47 C-5 I-49 C-141 I-50 T-1 I-52 C-130 I-53 C-135 I-55 E-4 I-58 DARP (RC-135 Re-engining; RIVET JOINT, SR-71, Engine CIP) I-59 Total Spares and Repair Parts (C-17, T-1A, F Engine) I-61 C-17 Spares I-63 Common Age (B-1B Repair, F-16 IAIS) I-65 F-15 Post Production Support I-66 F-16 Post Production Support I-67 Other Production Charges I-68 DARP Support Equipment I-69
6 AMMUNITION PROCUREMENT (3011) Maxi-$-Track 30mm Training II-1 II-3
7 MISSILE PROCUREMENT (3020) Maxi-$-Track HAVE NAP (Precision Guided Munitions) Tri-Service Attack Missile Joint Standoff Weapon AMRAAM AGM-130 Powered GBU-15 Interim JSOW Target Drones Conventional ALCM (CALCM) MM II/III Modifications Global Positioning (MYP) Global Positioning (MYP) Adv Proc Space Boosters Medium Launch Vehicle Defense Meterological Satellite Program (MYP) Defense Support Program (MYP) Defense Satellite Communications System (DSCS) III-1 III-3 III-9 III-10 III-11 III-13 III-16 III-18 III-19 III-24 III-26 III-29 III-30 III-32 III-34 III-35 III-37
8 OTHER PROCUREMENT (3080) Maxi-$-Track CBU-87 (Combined Effects Munitions) Theater Air Control Sys Improvement Weather Observation/Forecast Defense Support Program Strategic Command and Control Space Based IR Sensor Program Automatic Data Processing Equipment Combat Training Ranges Base Level Data Auto Program Base Information Infrastructure Milsatcom Communications Electronic Modifications Mobility Equipment Wartime Host Nation Support Intelligence Production Activity IV-1 IV-6 IV-7 IV-8 IV-9 IV-10 IV-11 IV-13 IV-15 IV-16 IV-18 IV-19 IV-20 IV-21 IV-22 IV-23
9 RDT&E (3600) Maxi-$-Track V-1 Defense Research Sciences (Adaptive optics, Joint Seismic) V-14 Materials V-16 Aerospace Flight Dynamics V-20 Human Systems Technology V-22 Aerospace Propulsion V-24 Aerospace Avionics V-27 Hypersonic Flight Technology V-28 Advanced Weapons V-29 Command/Control/Communication V-34 Advanced Materials for Weapons Systems V-36 Crew Systems and Personnel Protection Technology V-38 Advanced Avionics Integration V-40 Electronic Warfare Technology V-41 Space and Missile Rocket Propulsion V-42 Ballistic Missile Technology V-44 Advanced Spacecraft Technology V-47 Conventional Weapons Technology V-50 Advanced Radiation Technology V-51 Civil/Environmental Engineering V-53 Advanced Computing Technology V-54 Industrial Preparedness Manufacturing Technology V-55 Polar Satcom V-57 National Polar-Orbiting Operational Environmental Satellite System-Dem V-58 Space Based Infrared Architecture (SBIR) - Dem-Val V-60 Joint Advanced Strike Technology Program V-66 ICBM - Dem/Val V-72 B-1B V-75 C-17 Program V-79 F-22 EMD V-81 B-2 Adv Tech Bomber V-85 Night/Precision Attack V-87 Aircraft Engine Component Improvement Program V-88 EW Development V-90 Space Based Infrared Archietecture (SBIR) - EMD V-91 Milstar LDR/MDR Satellite Communications V-96 Submunitions V-97 Joint Direct Attack Munition V-99
10 Joint Standoff Weapons Systems V-102 Surface Defense Suppression V-103 Computer Resources Technology Transition V-104 Joint Tactical Information Distribution System (JTIDS) V-106 Joint Surveillance/Target Attack Radar System (JSTARS) V-108 ICBM - EMD V-111 UHF Satellite Communications V-114 Space Test Program V-116 Threat Simulator Development V-117 Nav/Radar/Sled Track Test Support V-119 Test and Evaluation Support V-120 Environmental Conservation V-124 Rocket Systems Launch Program (RSLP) V-125 Base Operations - RDT&E V-126 Aircraft Engine Component Improvement Program V-128 B-52 Squadrons V-130 F-16 Squadrons V-133 F-15E Squadrons V-134 Manned Destructive Suppression V-135 Joint Air-to-Surface Standoff Missile (JASSM) V-136 Tri-Service Standoff Attack Missile IV-138 Tactical AIM Missiles V-141 Adv Medium Range A/A Msl (AMRAAM) V-143 Theater Battle Management (TBM) C4I V-145 Theater Missile Defenses V-146 Information Systems Security Program V-148 Satellite Control Network V-149 Titan Space Launch Vehicles V-151 Navstar GPS (Space/Control Seg) V-152 NCMC - TW/AA Systems V-153 Spacetrack V-156 Defense Support Program V-158 Nudet Detection System V-162 Industrial Preparedness/Manufacturing Technology V-163
11 GENERAL COMMENTS HNSC REPORT (H. Rept ) Rationale for the Committee Bill VI-1 Addressing Shortfalls, Quality of Life VI-2 CoreReadiness, Modernization VI-3 Reforming the Pentagon VI-4 Title I, Procurement; Modernization Overview VI-6 V-22 VI-8 AF Aircraft Procurement, AF Ammunition Procurement VI-8 AF Missile Procurement VI-9 Precision Guided Munitions VI-9 AF Other Procurement VI-10 Procurement, Defense-wide VI-10 National Guard and Reserve Equipment VI-10 Title II, RDT&E VI-11 Cruise Missile Defense (AF JTIDS) VI-12 Dual Use Technology VI-13 FFRDCs, JAST VI-15 MANTEC VI-17 Precision Guided Munitions VI-18 AF RDT&E, Defense Agencies RDT&E VI-21 Space Launch Modernization VI-22 JAST VI-23 FFRDCs VI-24 Title III, O&M VI-25 B-1B Repair, Depot Maintenance Issues VI-27 DoD Financial Management VI-28 DBOF VI-30 Depot Level Repairable Consolidation VI-31 AF Automated Maintenance Data Systems VI-32 DBOF VI-32 Title VIII, Acquisition Policy, Acquisition Management VI-33 Implementation of the Federal Acquisition Streamlining Act VI-34 DoD Organization and Management VI-35 Restructuring of DoD Acquisition Organization and Workforce VI-36 Incorporation of DoE National Security Functions in DoD; ARPA VI-37
12 Growth in Legislative Liaison Operations Title X, General Provisions Transfer Authority Classified Annex; Funding Mechanisms for Unbudgeted Operations Authorization of Prior Emergency Supplemental Appropriations for FY 95 Defense Reinvestment, Defense Conversion Programs Counter-Drug Activiities Integration of National Security Space Programs; C3I; FEMA Cooperative Threat Reduction with States fo the Former Soviet Union DoE National Security Authorizations Dissenting Views (B-2, ABM Treaty, F-22, National Missile Defense) VI-38 VI-38 VI-38 VI-39 VI-40 VI-40 VI-41 VI-42 VI-43 VI-43 VI-44
13 GENERAL COMMENTS SASC REPORT (S. Rept ) Committee overview and recommendations Title I, Procurement Chemical Demilitarization; F/A-18C/D Avionics Support Equipment; UAVs National Guard and Reserve Equipment Title II, RDT&E JAST Space and Missile Tracking Precision Guided Munitions Defense Nuclear Agency Thermionics Special Operations Forces, Cruise Missile Proliferation Proliferation of Space Technology; Emergency Preparedness FFRDCs Defense Reinvestment and Conversion Revisions of manufacturing of science and technology programs Missile Defense V-22, Airborne electronic warfare RC-135 Re-engining NATO R&D; RDT&E Infrastructure Title III, O&M (Depot-level maintenance and repair) Title VIII, Acquisition Policy, Acquisition Management Joint Exercise, Training, and Doctrine Command Reorganization of the Office of the Sec/Def Title X, General Provisions (Financial Matters)--defense modernization account) Report on Budget Submission regarding Reserve Components Cooperative Threat Reduction with States of the former Soviet Union Matters Relating to Other Nations (NATO) Repeal of Certain Reporting Requirements Global Positioning System START II Treaty (limitation on retirement or dismantlement of strategic nuclear delivery systems) DoD board and commissions; DoD space management and organization Joint Military Intelligence Program Reusable Launch Vehicles, Chinese Military Developments Additional Views VII-1 VII-3 VII-4 VII-5 VII-6 VII-8 VII-9 VII-11 VII-12 VII-13 VII-15 VII-16 VII-17 VII-18 VII-19 VII-20 VII-20 VII-30 VII-31 VII-32 VII-33 VII-34 VII-37 VII-38 VII-39 VII-40 VII-41 VII-42 VII-45 VII-46 VII-47 VII-48 VII-49 VII-50 VII-51
14 F-22, B-2 B-2, ABM Treaty Pentagon Waste VII-52 VII-57 VII-59
15 GENERAL COMMENTS AUTHORIZATION CONFERENCE REPORT (H. Rept ) Joint Explanatory Statement of the Committee of Conference Summary Statement, Summary Table Congressional Defense Committees Title I, Procurement Commander s Tactical Terminals Air Force Aircraft Procurement; RC-135 Re-engining Air Force Missile Procurement, Ammunition Procurement, Other Procurement Defense-wide Procurement; DARP Title II, RDT&E AF/Navy cooperative engagement capability forcruise missile defense and theater missile defense Air Force RDT&E; Defense-wide RDT&E BMDO Funding National Security Space Policy, Management, and Oversight JAST SBIR Defense Nuclear Agency Programs FFRDCs Joint Seismic Program; Electronic Combat Consolidation Master Plan Reductions in RDT&E; DARP Ballistic Missile Defense Precision Guided Munitions Aeronautical Research and Test Capabilities Assessment; Cruise Missile Defense Initiative University Research, MANTECH Five Year Plan for Consolidation of Defense Laboratories and T&E Centers; GPS, National Missile Defense Title III, O&M; PACER COIN DBOF Depot Level Activities DBOF Title VIII, Acquisition Policy, Acquisition Management, and Related Matters DoD Organization and Management Financial Management Title X, General Provisions Transfer Authority Classified Annex; Unauthorized Appns; Emergency Supplemental; Revised Economic Assumptions Contractor Fraud; Special Access Reporting Date; Repeal of Certain Requirements VIII-1 VIII-2 VIII-3 VIII-4 VIII-5 VIII-6 VIII-8 VIII-12 VIII-14 VIII-16 VIII-18 VIII-20 VIII-21 VIII-22 VIII-28 VIII-32 VIII-33 VIII-34 VIII-35 VIII-37 VIII-38 VIII-39 VIII-40 VIII-41 VIII-48 VIII-50 VIII-51 VIII-52 VIII-53
16 Defense Technology and Industrial Base, Defense Reinvestment Operational Support Airlift Aircraft Fleet, CRAF, Buy America Arms Export and Military Assistance Arms Control DoE National Security Authorizations Federal Acquisition Reform Information Technology Management Reform Acquisition of Information Technology VIII-54 VIII-55 VIII-56 VIII-57 VIII-60 VIII-61 VIII-67 VIII-70
17 GENERAL COMMENTS HAC REPORT (H. Rept ) Bill Totals, Introduction Major Committee Initiatives Modernization Programs Reforms/Program Reductions Highlights of Committee Recommendations Acquisition Reform, DoD Financial Management Issues O&M, Air Force O&M, Air Force Reserve, Air National Guard Title III, Procurement Aircraft procurement, AF Missile Procurement, Air Force Procurement of Ammunition, AF Other Procurement, AF Procurement, Defense-wide National Guard and Reserve Equipment Automated Maintenance Systems Base Level Systems Modernization, Joint Logistics Systems Center RDT&E JAST RDT&E, Air Force RDT&E, Defense-wide Information Security, STU-III Basic Research, Computing Systems and Communications Technology National Missile Defense, NATO Research and Development Developmental Test and Evaluation, Defense Operational Test and Evaluation, Defense DBOF National Foreign Intelligence Program Classified Report Title VIII, General Provisions Dissenting Views (F-22, B-2) IX-1 IX-2 IX-4 IX-5 IX-9 IX-15 IX-16 IX-18 IX-20 IX-21 IX-22 IX-23 IX-23 IX-24 IX-26 IX-27 IX-28 IX-29 IX-30 IX-31 IX-31 IX-32 IX-33 IX-34 IX-34 IX-36 IX-37 IX-38 IX-39 IX-39 IX-40
18 GENERAL COMMENTS SAC REPORT (S. Rept ) Purpose of the Bill, Summary of the Bill X-1 Title II, O&M (Depot Maintenance) X-2 Financial Management X-2 O&M, Air Force and Air National Guard (TICARRS/CAMS/REMIS) X-4 ANG Fighter Force Structure X-5 Title III, Procurement X-6 Aircraft Procurement, AF X-8 Missile Procurement, AF X-10 Other Procurement, AF X-11 60,000 A/C loader; 25,000 loader modification X-11 Procurement, Defense-wide X-12 National Guard and Reserve Equipment X-12 RDT&E X-15 RDT&E, Air Force X-17 RDT&E, Defense-wide X-20 Developmental Test and Evaluation, Defense X-24 Operational Test and Evaluation, Defense X-25 Revolving and Management Funds, DBOF X-25 Drug Interdiction X-26 Title VIII, General Provisions X-30 Rescissions X-31 FFRDCs X-32
19 GENERAL COMMENTS APPROPRIATIONS CONFERENCE REPORT (H. Rept ) Joint Explanatory Statement of the Cmte of Conference Title II, O&M Financial Managment O&M, Air Force Title III, Procurement Joint Forces Command, Control and Communications Ammunition and Missile Quantities, NAVSTAR GPS, JSTARS Ground Stations, EA-6B Procurement, Defense-Wide Defense Airborne Reconnaissance program National Guard and Reserve Equipment Information Technology Resources Joint Logistics Systems Center Title IV, RDT&E (Defense-wide) Computing Systems and Communications Technology, Advanced Electronics Technologies Electronic Combat Mster Plan, Strategic Target System, Rivet Joint Re-engining Developmental Test and Evaluation DBOF General Provisions (FFRDCs) Rescissions XI-1 XI-1 XI-2 XI-4 XI-15 XI-15 XI-16 XI-17 XI-17 XI-18 XI-20 XI-24 XI-24 XI-43 XI-44 XI-44 XI-45 XI-46 XI-46-53
20
UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO
COST ($ in Millions) FY 2011 FY 2012 FY 2013 Base FY 2013 OCO FY 2013 Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 157.971 156.297 144.109-144.109 140.097 141.038
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate
COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 143.612 160.959 162.286 0.000 162.286 165.007 158.842 156.055 157.994 Continuing Continuing
More informationFISCAL YEAR 2019 DEFENSE SPENDING REQUEST BRIEFING BOOK
FISCAL YEAR 2019 DEFENSE SPENDING REQUEST BRIEFING BOOK February 2018 Table of Contents The Fiscal Year 2019 Budget in Context 2 The President's Request 3 Nuclear Weapons and Non-Proliferation 6 State
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Requirements Analysis and Maturation. FY 2011 Total Estimate. FY 2011 OCO Estimate
Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 0.000 35.533
More informationSERIES 1300 DIRECTOR, DEFENSE RESEARCH AND ENGINEERING (DDR&E) DEFENSE RESEARCH AND ENGINEERING (NC )
SERIES 1300 DIRECTOR, DEFENSE RESEARCH AND ENGINEERING (DDR&E) 1300. DEFENSE RESEARCH AND ENGINEERING (NC1-330-77-15) These files relate to research and engineering (R&E) and pertain to: Scientific and
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0603500F PE TITLE: MULTI-DISCIPLINARY ADV Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE Cost ($ in Millions) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011
More informationRDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2003
COST ($ in Thousands) FY 2002 Actual FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 FY 2008 FY 2009 Cost to Complete Total Cost 0191 Initial Operational Test & Eval 32,550 26,483 34,646 26,896 27,866 28,399 33,656
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)
More informationRDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001
COST ($ in Thousands) Actual FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost 2808 Nuc Detonation Det Sys (sensors) 13,497 11,977 18,823 20,002 24,878 23,406 24,413 25,166 Continuing TBD Quantity
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total Program Element 752.328 704.475 722.071-722.071 701.000 702.979 716.873 725.979
More informationBMDO RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)
COST (In Thousands) FY2000 Actual FY 2004 FY2005 FY2006 FY2007 to Theater High Altitude Area Defense (THAAD) 81614 540998 A. Mission Description and Budget Item Justification The Theater High Altitude
More informationUNCLASSIFIED FY 2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2008 Exhibit R-2
Exhibit R-2 PROGRAM ELEMENT: 0605155N PROGRAM ELEMENT TITLE: FLEET TACTICAL DEVELOPMENT AND EVALUATION COST: (Dollars in Thousands) Project Number & Title FY 2007 Actual FY 2008 FY 2009 FY 2010 FY 2011
More informationRDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001
PE NUMBER: 0605807F PE TITLE: Test and Evaluation Support BUDGET ACTIVITY RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001 PE NUMBER AND TITLE 06 - Management and Support 0605807F Test and
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2012 OCO
COST ($ in Millions) FY 2010 FY 2011 FY 2012 Base FY 2012 OCO FY 2012 Total FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Total Cost Total Program Element 160.351 162.286 140.231-140.231 151.521 147.426
More informationUNCLASSIFIED FY 2008/2009 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET DATE: February 2007 Exhibit R-2
Exhibit R-2 PROGRAM ELEMENT: 0605155N PROGRAM ELEMENT TITLE: FLEET TACTICAL DEVELOPMENT AND EVALUATION COST: (Dollars in Thousands) Project Number & Title FY 2006 Actual FY 2007 FY 2008 FY 2009 FY 2010
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force Date: February 2015 3600: Research,, Test & Evaluation, Air Force / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2014
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Major T&E Investment. FY 2011 Total Estimate. FY 2011 OCO Estimate
Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 Air Force Page 1 of 12 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0101113F PE TITLE: B-52 SQUADRONS Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0101113F B-52 SQUADRONS ($ in Millions) FY
More informationRDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)
PE NUMBER: 0604256F PE TITLE: Threat Simulator Development RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) COST ($ In Thousands) FY 1998 Actual FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005
More informationTo THE DEFENSE ACQUISITION WORKFORCE
To THE DEFENSE ACQUISITION WORKFORCE When I took over my duties as Deputy Under Secretary of Defense for Acquisition and Technology, I was awed by the tremendous professionalism and ability of our acquisition
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 27448F PE TITLE: C2ISR Tactical Data Link Exhibit R-2, RDT&E Budget Item Justification 27448F C2ISR Tactical Data Link 23 24 25 26 27 28 29 Total Actual Complete Total Program Element (PE) Cost
More informationExhibit R-2, RDT&E Budget Item Justification February 2007
PE NUMBER: 27133F PE TITLE: F-16 SQUADRONS Exhibit R-2, RDT&E Budget Item Justification February 27 7 Operational System Development 27133F F-16 SQUADRONS ($ in Millions) 2671 Total Program Element (PE)
More informationSummary: FY 2019 Defense Appropriations Bill Conference Report (H.R. 6157)
Top Line 1 Summary: FY 2019 Defense Appropriations Bill Conference Report (H.R. 6157) September 24, 2018 A. Total Appropriations: House: Total discretionary funding: $667.5 billion (an increase of $20.1
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
COST ($ in Millions) All Prior FY 2014 Years FY 2012 FY 2013 # Base FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Cost To Complete Total Program Element - 17.754 16.197 13.610-13.610 14.019
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0207133F PE TITLE: F-16 SQUADRONS Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0207133F F-16 SQUADRONS Cost ($ in Millions)
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total
More informationUNCLASSIFIED FY 2017 OCO. FY 2017 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) (+)
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 Base OCO Total FY 214 FY 215 FY 216 FY 217 To Complete Total Total Program Element 168.157
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: 121
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Initial Operational Test & Evaluation FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Cost Program Element 25.368 20.665 17.767-17.767
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Specialized Undergraduate Pilot Training. FY 2011 Total Estimate. FY 2011 OCO Estimate
Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 11.801 10.862
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0207134F PE TITLE: F-15E SQUADRONS Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0207134F F-15E SQUADRONS Cost ($ in Millions)
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 16.397 1.975 1.971-1.971 1.990 1.989 2.023
More informationOverview. Vision Guiding Principles Across the FYDP FY15 President s Budget (PB) Request FY15 Opportunity, Growth and Security Initiatives
Overview Vision Guiding Principles Across the FYDP FY15 President s Budget (PB) Request FY15 Opportunity, Growth and Security Initiatives I n t e g r i t y - S e r v i c e - E x c e l l e n c e 2 Vision
More informationSAF/FMB FEBRUARY 2018 UNITED STATES AIR FORCE FISCAL YEAR 2019 BUDGET OVERVIEW
SAF/FMB FEBRUARY 2018 UNITED STATES AIR FORCE FISCAL YEAR 2019 BUDGET OVERVIEW This page is intentionally left blank UNITED STATES AIR FORCE FISCAL YEAR 2019 BUDGET OVERVIEW The information contained in
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 5 R-1 Line #213
COST ($ in Millions) Prior Years FY 2013 FY 2014 Base OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Cost To Complete Total Program Element - 12.205 13.491 13.516-13.516 13.767 14.037 14.311 14.584 Continuing
More informationRDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001
COST ($ in Thousands) Actual FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost 2487 MILSATCOM Terminals 7,572 17,634 41,763 57,601 98,275 81,748 68,438 30,738 25,500 2,324,552 Quantity of RDT&E
More informationUNCLASSIFIED. R-1 Program Element (Number/Name) PE J / Joint Integrated Air & Missile Defense Organization (JIAMDO) Prior Years FY 2013 FY 2014
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 The Joint Staff Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 6: RDT&E Management Support COST ($ in Millions)
More information(111) VerDate Sep :55 Jun 27, 2017 Jkt PO Frm Fmt 6601 Sfmt 6601 E:\HR\OC\A910.XXX A910
TITLE III PROCUREMENT The fiscal year 2018 Department of Defense procurement budget request totals $113,906,877,000. The Committee recommendation provides $132,501,445,000 for the procurement accounts.
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationMAJ GEN PLETCHER 12 February 2018
MAJ GEN PLETCHER 12 February 2018 Overview Strategic Environment FY19 Budget Priorities FY19 Budget Request FY19 by Appropriation Final Thoughts I n t e g r i t y - S e r v i c e - E x c e l l e n c e
More informationUNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : OC-135 Open Skies Sensors
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 22.756 - - - - - - - - Continuing Continuing 675043: Fighter Tactical
More informationARCHIVED REPORT. For data and forecasts on current programs please visit or call
Electronic Systems Forecast ARCHIVED REPORT For data and forecasts on current programs please visit www.forecastinternational.com or call +1 203.426.0800 Outlook Forecast International projects that the
More informationRDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit)
PE NUMBER: 0305913F PE TITLE: Nudet Detection System BUDGET ACTIVITY COST ($ In Thousands) FY 1998 Actual FY 1999 FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 Cost to Complete Cost Nuc Detonation Det
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #98
COST ($ in Millions) Prior Years FY 2013 FY 2014 FY 2015 Base FY 2015 FY 2015 OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Air Force Page 1 of 8 R-1 Line #98 Cost To Complete Total Program Element - 33.968
More informationCRS Report for Congress
Order Code RL33601 CRS Report for Congress Received through the CRS Web U.S. Military Space Programs: An Overview of Appropriations and Current Issues Updated August 7, 2006 Patricia Moloney Figliola Specialist
More informationIV. Organizations that Affect National Security Space
IV. Organizations that Affect National Security Space The previous chapters identified U.S. national security interests in space and measures needed to advance them. This chapter describes the principal
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: NUCLEAR WEAPON MODERNIZATION FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element - - 93.867-93.867 158.218 315.238 397.880
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Spacelift Range System
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2013 FY 2014 FY 2015 FY 2016 Air Force Page 1 of 9 R-1 Line Item #197 To Program Element 10.973
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #96
COST ($ in Millions) Prior Years FY 2015 FY 2016 FY 2017 Base FY 2017 OCO FY 2017 Total FY 2018 FY 2019 FY 2020 FY 2021 Cost To Complete Total Program Element - 8.916 10.476 11.529 0.000 11.529 11.985
More informationSELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES. As of Date: September 30, 2002 INDEX. SAR Narrative Highlights 1. Program Acquisition Cost 4
SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES As of Date: September 30, 2002 INDEX SUBJECT PAGE SAR Narrative Highlights 1 Program Acquisition Cost 4 Distribution of Cost Changes - Base-Year Dollars
More informationSELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES. As of Date: December 31, SAR Narrative Highlights 1. Program Acquisition Cost 9
SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES As of Date: December 31, 2002 INDEX SUBJECT PAGE SAR Narrative Highlights 1 Program Acquisition Cost 9 Distribution of Cost Changes - Base-Year Dollars
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0401132F PE TITLE: C-130J PROGRAM Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0401132F C-130J PROGRAM Cost ($ in Millions)
More informationOFFICE OF ASSISTANT SECRETARY OF DEFENS E (PUBLIC AFFAIRS )
OFFICE OF ASSISTANT SECRETARY OF DEFENS E (PUBLIC AFFAIRS ) WASHINGTON, D.C. - 2030 1 PLEASE NOTE DATE No. 26-9 2 HOLD FOR RELEASE AT 7 :30 AM, EASTERN TIME, JANUARY 29, 1992 (703) 697-5131 (info ) (703)
More informationHeadquarters U.S. Air Force
Headquarters U.S. Air Force Presented to the National Defense Industrial Association (DoD Technology Exposition) Mr. Jim Engle Deputy Assistant Secretary (Science, Technology & Engineering) 6 March 2003
More informationA Ready, Modern Force!
A Ready, Modern Force! READY FOR TODAY, PREPARED FOR TOMORROW! Jerry Hendrix, Paul Scharre, and Elbridge Colby! The Center for a New American Security does not! take institutional positions on policy issues.!!
More informationI n t e g r i t y - S e r v i c e - E x c e l l e n c e UNCLASSIFIED
I n t e g r i t y - S e r v i c e - E x c e l l e n c e UNCLASSIFIED Today s Environment AF Engaged Globally Ended US military operations in Iraq; 17 Dec was the first day in 20 years with no air tasking
More informationmm*. «Stag GAO BALLISTIC MISSILE DEFENSE Information on Theater High Altitude Area Defense (THAAD) and Other Theater Missile Defense Systems 1150%
GAO United States General Accounting Office Testimony Before the Committee on Foreign Relations, U.S. Senate For Release on Delivery Expected at 10:00 a.m.,edt Tuesday May 3,1994 BALLISTIC MISSILE DEFENSE
More informationARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)
BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE 5 - ENG MANUFACTURING DEV 0604768A - BAT COST (In Thousands) FY 2000 FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006
More informationUNCLASSIFIED. R-1 Program Element (Number/Name) PE D8Z / Prompt Global Strike Capability Development. Prior Years FY 2013 FY 2014 FY 2015
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Office of Secretary Of Defense Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 5: System Development & Demonstration
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force Date: February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 211 FY 212 Total FY 214 FY 215 FY 216 FY 217 To Complete
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Office of the Secretary Of Defense Date: February 2016 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 2: Applied Research COST ($
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Missile Defense Agency Date: February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 3: Advanced Development (ATD) COST ($
More informationSELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES. As of Date: December 31, 2001 INDEX. SAR Narrative Highlights 1. Program Acquisition Cost 12
SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES As of Date: December 31, 2001 INDEX SUBJECT PAGE SAR Narrative Highlights 1 Program Acquisition Cost 12 Distribution of Cost Changes - Base-Year Dollars
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0207445F PE TITLE: FIGHTER TACTICAL DATA Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE Cost ($ in Millions) FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Program MDAP/MAIS Code: 121
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)
More informationARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)
BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE COST (In Thousands) FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate
More informationFOR IMMEDIATE RELEASE No June 27, 2001 THE ARMY BUDGET FISCAL YEAR 2002
FOR IMMEDIATE RELEASE No. 01-153 June 27, 2001 THE ARMY BUDGET FISCAL YEAR 2002 Today, the Army announced details of its budget for Fiscal Year 2002, which runs from October 1, 2001 through September 30,
More informationF-16 Fighting Falcon The Most Technologically Advanced 4th Generation Fighter in the World
F-16 Fighting Falcon The Most Technologically Advanced 4th Generation Fighter in the World Any Mission, Any Time... the F-16 Defines Multirole The enemies of world peace are changing. The threats are smaller,
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) All Prior FY 2014 Years FY 2012 FY 2013 # Base FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
More informationFIGHTER DATA LINK (FDL)
FIGHTER DATA LINK (FDL) Joint ACAT ID Program (Navy Lead) Prime Contractor Total Number of Systems: 685 Boeing Platform Integration Total Program Cost (TY$): $180M Data Link Solutions FDL Terminal Average
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Office of Secretary Of Defense DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete Total Total
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Air Traffic Control/Approach/Landing System (ATCALS) FY 2013 OCO
COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 26.209 20.644 43.187-43.187 28.526 19.802 7.405 5.225 Continuing Continuing
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 211 FY 212 FY 213 Base PE 64256A: THREAT SIMULATOR
More informationDEPARTMENT OF DEFENSE OPERATION AND MAINTENANCE. Operation and Maintenance, Defense-Wide
OPERATION AND MAINTENANCE Operation and Maintenance, Defense-Wide For an additional amount for "Operation and Maintenance, Defense-Wide," to remain available until expended, $1,400,000,000, which may be
More informationPROVIDING THE WARFIGHTER S EDGE
MISSION OVERVIEW BRIEF Brig Gen Michael Schmidt PEO, Fighters and Bombers PROVIDING THE WARFIGHTER S EDGE Current as of 5 Apr 16 Air Force Materiel Command Center Mission Areas Continue to Strengthen AFMC
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 211 FY 212 FY 213 Base PE 6531A: ARMY KWAJALEIN ATOLL
More informationDifferences Between House and Senate FY 2019 NDAA on Major Nuclear Provisions
Differences Between House and Senate FY 2019 NDAA on Major Nuclear Provisions Topline President s Request House Approved Senate Approved Department of Defense base budget $617.1 billion $616.7 billion
More informationGreat Decisions Paying for U.S. global engagement and the military. Aaron Karp, 13 January 2018
Great Decisions 2018 Paying for U.S. global engagement and the military Aaron Karp, 13 January 2018 I. Funding America s four militaries not as equal as they look Times Square Strategy wears a dollar sign*
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy Date: February 2015 1319: Research,, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years R1 Program Element
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0603860F PE TITLE: Joint Precision Approach Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE Cost ($ in Millions) FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: ASW Systems Development
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Navy DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 Navy Page 1 of 17 R-1 Line Item #30 To Program Element 25.144
More informationArms Control Today. U.S. Missile Defense Programs at a Glance
U.S. Missile Defense Programs at a Glance Arms Control Today For the past five decades, the United States has debated, researched, and worked on the development of defenses to protect U.S. territory against
More informationThe Cruise Missile Threat: Prospects for Homeland Defense
1 June 2006 NSW 06-3 This series is designed to provide news and analysis on pertinent national security issues to the members and leaders of the Association of the United States Army and to the larger
More informationMEADS DoD Budget FY2013-FY2017. RDT&E U.S. Army
MEADS DoD Budget FY2013-FY2017 RDT&E U.S. Army Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Army DATE: February 2012 BA 5: Development & Demonstration (SDD) FY 2013 FY 2013 FY 2013 Cost To COST
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 7: Operational Systems Development COST ($ in Millions) Years R1 Program
More informationDepartment of Defense
Department of Defense Selected Acquisition Reports (SARs) Summary Tables, 2000-2009 Collected and OCRed by AltGov2 www.altgov2.org/sars SELECTED ACQUISITION REPORT (SAR) SUMMARY TABLES
More informationUNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #10
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 2: Applied Research COST ($ in Millions) Prior Years FY 2013 FY 2014
More informationLESSON 5: THE U.S. AIR FORCE
LESSON 5: THE U.S. AIR FORCE avionics parity payload proliferation stealth INTRODUCTION The U.S. Air Force exemplifies the dominant role of air and space power in meeting this nation s security needs across
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3020F: Missile Procurement, Air Force / BA 03: Modification of Inservice Missiles / BSA 1: Class IV ID Code (A=Service
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 23 R-1 Line #126
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Prior
More informationUNCLASSIFIED FY 2017 OCO. FY 2017 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) Prior Years FY 2018 FY 2019 FY 2020 FY 2021 To Complete Program Element - 130.376 166.297 132.795 0.000
More informationRDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001
PE NUMBER: 0604617F PE TITLE: Agile Combat Support BUDGET ACTIVITY RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001 PE NUMBER AND TITLE 05 - Engineering and Manufacturing Development 0604617F
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY
More information