AIR FORCE SPECIAL OPERATIONS COMMAND Air Commandos Quiet Professionals. FY Counter Terrorism Aviation Training, Manpower, & Budget
|
|
- Shona McLaughlin
- 6 years ago
- Views:
Transcription
1 AIR FORCE SPECIAL OPERATIONS COMMAND Air Commandos Quiet Professionals FY Counter Terrorism Aviation Training, Manpower, & Budget
2 PN Training, Manpower, & Budget Overview Purpose Facts and Assumptions CT Aviation Proposal Review English Language Training Discussion Contractor Provided MX Training C08 & Border Patrol Aircraft Breakout CONUS based & OCONUS based Mil-to-Mil engagements
3 Purpose Present constraints, limitations, and planning factors for group discussion with regard to proposed FY 14/15/ CT aviation proposal training, manning, and budget:
4 Facts and Assumptions Facts: Further training with PN forces at US English Language Training (ELT) will be required in FY and possibly beyond Additional initial skills contractor training will be required through at least FY15 Solid numbers on available PN pilots/mx available to train on C-08 and proposed Border Patrol Aircraft are required in order to ensure personnel to operate and maintain any future year aircraft buys. Assumptions: CT aviation proposal consisting of a mix of C08s and dedicated border patrol aircraft is accepted 106/FMF will be a player for the next 3 years Continued engagement is cheaper than later direct involvement
5 6 SOS CT Aviation Recommendation Continue procurement of airdrop & medevac modified C-08s as dedicated light lift assets for PN 1 st SQDN. Purchase dedicated armed reconnaissance to replace PN F-5 SQDN. Initial versions should be recce only with hard points. Phased approach: PN pilots/mx learn to operate & maintain aircraft along with basic airborne reconnaissance training. Additional capabilities (weapons) as skills develop. 5
6 Future Aircraft Inventory Fiscal Year CN-35 Cessna 08(total) BPA (total) 013(Funded) (5) (8) 4(6) (10) 4(10) Total Basic 6
7 Future CT Air Support FY 13: FY 14: FY 15: FY 16:
8 English Language Training Based on FY13 lessons learned any future ELT training should be based on a competition model: Example: 6 contractor training slots for pilots in Jan 14, 10 pilots arrive at DLI 1 Oct. knowing that only 6 slots exist. The top 6 ELT scores will go to training, remaining pilots are sent home to continue study and may return in following FY. This competition will put a focus on getting the most out of limited time available at DLI(not a focus on getting the 80 but rather competition to do better than their peers) Additionally this will filter back to squadron and show that studying prior to arrival in CONUS will help your score. This system sets a time limit at DLI so that the ELT program does not drain program money by continually dragging on (ref. FY13 model). 106 cases are Pseudo FMS: there is no min-score for contractor training and the training contracts should reflect that. 8
9 Training Plan FY14 Contractor Flight/MX Training month C08 Pilot Group C08 MX Group BPA Pilots BPA MX Mil-to-Mil Engagement DLI 6 6 6(airframe) 4(avionics/Electrical training) Contractor Provided Training C-08 CONUS Engagement w/ FY13 pilots(train the trainer 6 Border Patrol Aircraft Engagement w/ just graduated From contractor training pilots 6 6 PN MX 9
10 C08 FY14 Training Plan FY14: 3 Total Aircraft: 10 PN pilots to English Language top 6 proceed on to C08 initial skills training with contractor FY14Q1: English Language Training FY14Q: In country MX assessment for quarterly review FY14Q: Feb-Mar14: 45 day CONUS engagement 6 SOS & 4 FY13 trained YAF 08 pilots(phase training) Need aircraft available + fuel+mx FY14Q3(Apr 14):In country in country training(in country assessment for quarterly review) FY14Q4: 10
11 Border Patrol Aircraft FY14 Training Plan Total Aircraft: 6 PN pilots/6 PN MX to ELT FY14Q1:ELT 6 PN Pilots/6 PN MX 4 US Pilots/4 US MX to Contractor for initial qual FY14Q:PN pilot/mx Contractor Training on Border Patrol Aircraft In country MX assessment for quarterly review (in conjunction w/08) FY14Q3/Q4: (June-July14) 45 day CONUS engagement 6 SOS & 6 PN pilots/mx focused on gaining experience on the aircraft as well as air to ground integration/mil-mil engagement prior to delivery Need aircraft available + fuel+mx 11
12 Pilot Manpower Manpower Available: 1 st SQDN(CN-35/C08/Non-airworthy C130B) CN35: Contractor Trained w/eads Spain: 6 (4 from 1 st SQDN, from 4 th SQDN, Antonovs) C08: US trained Pilots w/6 th SOS : 4 C08: US trained via Contractor: 4 Total: 8 Pilots Available for future training (per PN SQDN/CC)=40 Manpower Available: PN F-5 SQDN Currently.5% MC rate Due Out: Requires PN buy in (limit available funds for any F-5 MX/Sustainment) 1
13 Border Patrol Training CONUS Flight and Ground School Training Tailwheel Transition weeks (15 flight hours) Turbine Tailwheel 4 weeks (30 flight hours) Recon Sys Officer (RSO) Training Sensor Operation, Collection/Recording Ground School weeks (80 hours) Thrush 710 Border Patrol 4 weeks (30 flight hours) EO/IR ISR & Streaming Video Data Link Pilot Flight Crew Training MX Training Aircraft Maintenance: Engine, Airframe, Mechanical School 8 weeks (30 hours) Avionics/SME Maintenance: Electrical Power Distribution Instruments Comm, Navigation,& ISR School 18 weeks (70 hours) 13
14 Border Patrol FY14 Training Flight Training month Tailwheel transition Turbine tailwheel 710 BPA Recon Sys Officer Training 4 US Pilots 6 PN Pilots MX Training Aircraft Maintenance: Engine, Airframe, Mechanical 4 6 Avionics/SME Maintenance: Electrical Power Distribution Instruments Comm, Navigation,& ISR 4 US MX PN MX 14
15 Aircraft Delivery/MX Logistics Layout A/C Delivery FY13Q4 x08/1xcn35 08/35FMF Parts Block 1 08/CTA FMF Parts Block x FY14Q1 Q Q3 Q4 FY15Q1 Q Q3 Q4 FY16Q1 Q Q3 Q4 FY17 Q4 x1 X3 x x3 x4 08/CTA FMF Parts Block 4 08/CTA FMF Parts Block 3 FY0Q1 Q4 Q3 Q FY19Q1 Q4 Q3 Q FY18Q1 Q4 Q3 Q FY17Q1 10x x =Full program review/site visit 10x Yr Parts/Mx sustainment x4
16 MX Manpower Manpower Available: 1 st SQDN(CN-35/C08/Non-airworthy C130B) CN35: Contractor Trained Via EADS Spain: Unkown C08: US trained MX w/6 th SOS Through PH 1: 8 Remaining MX Available For Training(per sqdn CC) 16
17 MX Sustainment Package FY 13: CN-35 has a year Parts/Logistic package: Expires FY15 FY14: C08(Initial ) has a year Parts/Logistic package: Expires FY16 C08(3 Aircraft) has a year Parts/Logistics package: Expires FY 16 FY15: Border Patrol Aircraft ( Aircraft) has a year Parts/Logistics package: Expires FY 16 C08(3 Aircraft) has a year Parts/Logistics package: Expires FY 17 FY16: Border Patrol Aircraft (4 Aircraft) has a year Parts/Logistics package: Expires FY 17 C08( Aircraft) has a year Parts/Logistics package: Expires FY 18 Border Patrol Aircraft (4 Aircraft) has a year Parts/Logistics package: Expires FY 18 17
18 Comms Aircraft must be able to talk to anyone on the ground or air Purchase a robust comm suite early that interfaces not only with existing networks but also US and potential regional partners BLOS capability is critical: need the ability to phone home/retask What is the ground/naval component comm capability? What has been purchased? 18
19 PN Training Costs English Language Training Avg $35K per student ELT Costs:14 Pilots+6MX=$770K C08 6 SOS Training PH II:$14K per student*4 Pilots & MX:$86K Border Patrol Aircraft Initial Training 6 pilots/6 MX: TBD Border Patrol Aircraft 6 SOS PH I Training: TBD 19
20 PN Training Costs English Language Training Avg $35K per student ELT Costs:14 Pilots+6MX=$770K C08 6 SOS Training PH II:$14K per student*4 Pilots & MX:$86K Border Patrol Aircraft Initial Training 6 pilots/4 MX: Included in aircraft price Border Patrol Aircraft 6 SOS PH I Training: TBD 0
Precision Strike Conference Aircraft Discussion
AIR FORCE SPECIAL OPERATIONS COMMAND Air Commandos Quiet Professionals Precision Strike Conference Aircraft Discussion Major Brian Daniels Major David Bruton Major Russell Underwood Mr. Joe Klipstein Purpose
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate
Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 57.205 93.145
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete
More informationUNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7
CLASSIFICATION: EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 R-1 ITEM NOMENCLATURE 0305205N Endurance Unmanned Aerial Vehicles
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 Air Force Page 1 of 16 R-1 Line #227 To Program
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #232
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) # FY
More informationOwn the fight forward, build Airmen in a lethal and relevant force, and foster a thriving Air Commando family
U.S. Air Force Fact Sheet 27TH SPECIAL OPERATIONS WING Cannon Air Force Base, home of the 27th Special Operations Wing, lies in the high plains of eastern New Mexico, near the Texas Panhandle. The base
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationNavy & Marine Corps Vertical Lift: Past and Future
Navy & Marine Corps Vertical Lift: Past and Future 22 Oct 2015 Cleared for public release NAVAIR-PEOA-055-2014 1 Presented to: Center for Strategic and International Studies Presented by: Michael Fallon
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 109.887 133.105 148.297-148.297
More informationSTATEMENT OF GENERAL BRYAN D. BROWN, U.S. ARMY COMMANDER UNITED STATES SPECIAL OPERATIONS COMMAND BEFORE THE HOUSE ARMED SERVICES COMMITTEE
FOR OFFICIAL USE ONLY UNTIL RELEASED BY THE HOUSE ARMED SERVICES COMMITTEE STATEMENT OF GENERAL BRYAN D. BROWN, U.S. ARMY COMMANDER UNITED STATES SPECIAL OPERATIONS COMMAND BEFORE THE HOUSE ARMED SERVICES
More informationFY19 President s Budget Request
FY19 President s As of 04 April 2018 www.nationalguard.mil/ll Table of Contents EXECUTIVE SUMMARY... - 1 - ARMY NATIONAL GUARD OVERVIEW... - 2 - AIR NATIONAL GUARD OVERVIEW... - 2 - ARMY NATIONAL GUARD
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0401132F PE TITLE: C-130J PROGRAM Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0401132F C-130J PROGRAM Cost ($ in Millions)
More informationReconnaissance and Surveillance Leaders Course EXECUTIVE SUMMARY
Reconnaissance and Surveillance Leaders Course EXECUTIVE SUMMARY RSLC Mission Statement Conduct the Reconnaissance and Surveillance Leaders Course to train leaders to plan and execute reconnaissance, surveillance,
More informationUNCLASSIFIED FY 2017 OCO. FY 2017 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research,, Test & Evaluation, Air Force / BA 7: Operational Systems COST ($ in Millions) FY 2018 FY 2019 FY 2020 FY
More informationSECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK (FOR DEFINITIONS OF TERMS SEE EXHIBIT 1 PAGE 75)
PAGE-2 S-OPRAQ-98-C-0051 SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK (FOR DEFINITIONS OF TERMS SEE EXHIBIT 1 PAGE 75) C.0. INCORPORATION OF CONTRACTOR S TECHNICAL PROPOSAL (05/95) (a) The
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 P-1 Line #50
Exhibit P-40, Budget Line Item Justification: PB 2017 Air Force Date: February 2016 3010F: Aircraft Procurement, Air Force / BA 05: Modification of Inservice Aircraft / BSA 5: Other Aircraft ID Code (A=Service
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years
More informationCLASSIFICATION: UNCLASSIFIED
Exhibit P-40, BUDGET ITEM JUSTIFICATION APPROPRIATION/BUDGET ACTIVITY Aircraft Procurement, Navy/APN-5 Aircraft Modifications Program Element for Code B Items: P-1 ITEM NOMENCLATURE 051100, EA-6 SERIES
More informationSTATEMENT OF. MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE
NOT FOR PUBLICATION UNTIL RELEASED BY THE SENATE ARMED SERVICES COMMITTEE STATEMENT OF MICHAEL J. McCABE, REAR ADMIRAL, U.S. NAVY DIRECTOR, AIR WARFARE DIVISION BEFORE THE SEAPOWER SUBCOMMITTEE OF THE
More informationForeign Military Sales (FMS) Checklist for Developing Acquisition of Advanced Medium-Range Air-to-Air Missile (AMRAAM) Letter of Request (LOR)
Foreign Military Sales (FMS) Checklist for Developing Acquisition of Advanced Medium-Range Air-to-Air Missile (AMRAAM) Letter of Request (LOR) THIS AMRAAM FMS CHECKLIST WILL BE USED IN DEVELOPMENT OF THE
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0604261F PE TITLE: Personnel Recovery Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE ($ in Millions) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012
More informationARS 2004 San Diego, California, USA
ARS 2004 San Diego, California, USA The Challenge of Supporting Aging Naval Weapon Systems RDML Michael C. Bachman Assistant Commander for Aviation Logistics Naval Air Systems Command PRESENTATION SLIDES
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 22.63 3.676 32.789-32.789 35.932
More informationMSSE CAPSTONE REVIEW
1 MSSE CAPSTONE REVIEW Proposed Functional Architecture and Associated Benefits Analysis of a Common Ground Control Station for Unmanned Aircraft Systems Douglas Mousseau CDR Michael Supko NAVAIR NPS Cohort
More informationSubj: REQUIRED OPERATIONAL CAPABILITY AND PROJECTED OPERATIONAL ENVIRONMENT STATEMENTS FOR FLEET AIR RECONNAISSANCE SQUADRON SEVEN (VQ-7)
DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAV INSTRUCTION 3501.338B From: Chief of Naval Operations OPNAVINST 3501.338B N2/N6 Subj: REQUIRED
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Joint Strike Fighter Squadrons
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element - 217.561 47.841-47.841 132.495 131.844
More informationPROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD)
EXHIBIT R-2, FY 2001 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0305206N PROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD) (U) COST: (Dollars in
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 27448F PE TITLE: C2ISR Tactical Data Link Exhibit R-2, RDT&E Budget Item Justification 27448F C2ISR Tactical Data Link 23 24 25 26 27 28 29 Total Actual Complete Total Program Element (PE) Cost
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Preparation (MTPS) Total FY 2014 FY 2015 FY 2016
More informationUNCLASSIFIED UNCLASSIFIED
EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-7 0307207N Aerial Common Sensor COST ($ in Millions) *FY
More informationSTATEMENT OF LIEUTENANT GENERAL MICHAEL W. WOOLEY, U.S. AIR FORCE COMMANDER AIR FORCE SPECIAL OPERATIONS COMMAND BEFORE THE
FOR OFFICIAL USE ONLY UNTIL RELEASED BY THE HOUSE ARMED SERVICES COMMITTEE STATEMENT OF LIEUTENANT GENERAL MICHAEL W. WOOLEY, U.S. AIR FORCE COMMANDER AIR FORCE SPECIAL OPERATIONS COMMAND BEFORE THE HOUSE
More informationOgden Air Logistics Center
Ogden Air Logistics Center TRAINING SYSTEMS MANAGEMENT DIRECTORATE ADVANCED PLANNING INFORMATION Col Robert C. Halbert, Director OO-ALC/YW, Hill AFB UT DSN 777-4721, 801-777-4721 Robert.Halbert@hill.af.mil
More informationUNCLASSIFIED UNCLASSIFIED
: February 216 Exhibit R2, RDT&E Budget Item Justification: PB 217 24: Research, Development, Test & Evaluation, / BA 5: tem Development & Demonstration (SDD) COST ($ in Millions) FY 215 FY 216 R1 Program
More informationDISTRIBUTION STATEMENT A
IFPC Inc 2-I DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. 31 IFPC Inc 2-I Mission Mission: Primary Indirect Fire Protection Capability Increment 2 Intercept (IFPC Inc
More informationCOMPLIANCE WITH THIS PUBLICATION IS MANDATORY
BY ORDER OF THE COMMANDER AIR COMBAT COMMAND AIR FORCE INSTRUCTION 21-103 AIR COMBAT COMMAND Supplement ADDENDUM_X 16 OCTOBER 2013 Maintenance EQUIPMENT INVENTORY, STATUS, AND UTILIZATION REPORTING SYSTEM/MQ-1
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 Total FY 214 FY 215 FY 216 FY 217 To Complete Total Total Program Element - 75.7 122.481-122.481
More informationMission-Based Test & Evaluation Strategy: Creating Linkages between Technology Development and Mission Capability
U.S. Army Research, Development and Engineering Command Mission-Based Test & Evaluation Strategy: Creating Linkages between Technology Development and Mission Capability NDIA Systems Engineering Conference
More informationOPNAVINST F N4 5 Jun 2012
DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 4440.19F N4 OPNAV INSTRUCTION 4440.19F From: Chief of Naval Operations Subj: POLICIES
More informationUNCLASSIFIED FY 2017 OCO. FY 2017 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) Prior Years FY 2018 FY 2019 FY 2020 FY 2021 To Complete Program Element - 130.376 166.297 132.795 0.000
More informationAircraft Procurement Plan Fiscal Years (FY) Submitted with the FY 2012 Budget
Aircraft Procurement Plan Fiscal Years (FY) 212-241 Submitted with the FY 212 Budget March 2, 29 March 211 March 2, 29 Preparation of this study/report cost the Department of Defense a total of approximately
More informationRDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) February 2002
COST ($ in Thousands) Actual 4689 Global Access Architecture 8,430 8,887 7,200 7,311 7,447 7,730 8,019 Continuing TBD Quantity of RDT&E Articles 0 0 0 0 0 0 0 0 0 A. Mission Description Global Air Traffic
More informationNAVAIR Commander s Awards recognize teams for excellence
NAVAIR News Release NAVAIR Commander Vice Adm. David Architzel kicks of the 11th annual NAVAIR Commander's National Awards Ceremony at Patuxent River, Md., June 22. (U.S. Navy photo) PATUXENT RIVER, Md.
More informationFY18 President s Budget Request
FY18 President s As of May 23, 2017 www.nationalguard.mil/ll Table of Contents EXECUTIVE SUMMARY... - 1 - ARMY NATIONAL GUARD OVERVIEW... - 2 - AIR NATIONAL GUARD OVERVIEW... - 2 - ARMY NATIONAL GUARD
More informationUNCLASSIFIED FY Quantity of RDT&E Articles
COST ($ in Millions) Prior Years FY 2013 FY 2014 Base OCO # Total FY 2016 FY 2017 FY 2018 FY 2019 Air Force Page 1 of 5 R-1 Line #159 Cost To Complete Total Program Element - 1.447 1.406 1.782-1.782 1.770
More informationHeadquarters Air Combat Command A4 AFSO 21. Lt Col Matthew D. Cox ACC/A4 AFSO21 Mar 09 This Briefing is: UNCLASSIFIED
Headquarters Air Combat Command A4 AFSO 21 This Briefing is: UNCLASSIFIED Lt Col Matthew D. Cox ACC/A4 AFSO21 Mar 09 A4.AFSO21@langley.af.mil 1 Purpose Overview of where ACC A4 and ACC is in AFSO 21 Transformation
More informationThe Navy P-8A Poseidon Aircraft Needs Additional Critical Testing Before the Full-Rate Production Decision
Report No. DODIG-2013-088 June 10, 2013 The Navy P-8A Poseidon Aircraft Needs Additional Critical Testing Before the Full-Rate Production Decision This document contains information that may be exempt
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 65.844 127.925 21.000-21.000 8.000 -
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0207445F PE TITLE: FIGHTER TACTICAL DATA Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE Cost ($ in Millions) FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013
More informationDATE: FY 2016 President's Budget February 2015 PRIOR YR FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 TO COMP TOTAL PROG QUANTITY
APPROPRIATION/BUDGET ACTIVITY /BA 2 Other Warships BUDGET ITEM JUSTIFICATION SHEET (P-40) DATE: P-1 LINE ITEM NOMENCLATURE LITTORAL COMBAT SHIP () BLI: 2127 / SUBHEAD NO. (Dollars in Millions) PRIOR YR
More informationOpportunities for Enlisted Women in Submarines
Opportunities for Enlisted Women in Submarines Enlisted Women in Submarines Task Force 1 Modify SSGN/SSBNs NEWCON VACL starting with SSN-796 Integrate 14 OHIO crews total Integrate SSNs when VA submarines
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0207134F PE TITLE: F-15E SQUADRONS Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0207134F F-15E SQUADRONS Cost ($ in Millions)
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 42.067 6.509 5.000-5.000 41.500 30.000
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 Navy Page 1 of 26 R-1 Line #87 To Complete Program Element 51.826
More informationOgden Air Logistics Center
Ogden Air Logistics Center SIMULATORS SUSTAINMENT MANAGEMENT ADVANCED PLANNING INFORMATION Linda Y. Gay, Deputy Director 508 MASSG/GFMM, Hill AFB UT DSN 777-7823, 801-777-7823 Linda.Gay@hill.af.mil Training
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 22.756 - - - - - - - - Continuing Continuing 675043: Fighter Tactical
More informationAssembly Area Operations
Assembly Area Operations DESIGNATION OF ASSEMBLY AREAS ASSEMBLY AREAS E-1. An AA is a location where the squadron and/or troop prepares for future operations, issues orders, accomplishes maintenance, and
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0207581F PE TITLE: JOINT STARS Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0207581F JOINT STARS Cost ($ in Millions) FY
More informationDepartment of Military Instruction Overview
Department of Military Instruction Overview 1 Required Courses For Graduation MS Core Courses (100, 200, 300) Cadet Basic Training (CBT) Cadet Field Training (CFT) Cadet Leader Development Training (CLDT)
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 11.589 20.727 63.853-63.853 60.995 19.248 19.291 15.230 Continuing
More informationFighter/ Attack Inventory
Fighter/ Attack Fighter/ Attack A-0A: 30 Grounded 208 27.3 8,386 979 984 A-0C: 5 Grounded 48 27. 9,274 979 984 F-5A: 39 Restricted 39 30.7 6,66 975 98 F-5B: 5 Restricted 5 30.9 7,054 976 978 F-5C: 7 Grounded,
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: C2ISR Tactical Data Link FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 1.604 1.584 1.536-1.536 1.626
More informationPhase I Submission Name of Program: Project Liberty
Phase I Submission Name of Program: Project Liberty Name of Program Leader: Michael McCombs and Chris Byrd Phone Number: 903.457.3251 and 903.457.4724 Email: michael.mccombs@l-3com.com and christopher.a.byrd@l-3com.com
More informationExhibit R-2, RDT&E Budget Item Justification February 2007
PE NUMBER: 27133F PE TITLE: F-16 SQUADRONS Exhibit R-2, RDT&E Budget Item Justification February 27 7 Operational System Development 27133F F-16 SQUADRONS ($ in Millions) 2671 Total Program Element (PE)
More informationLSI P-3 FMS Training Support Catalog 01 November 2015
LSI P-3 FMS Training Support Catalog Mr. Ed Turner Vice President of International and Training Services Email: eturner@lsijax.com Mr. Casey Woods Director of International Training Programs Email: cwoods@lsijax.com
More informationDEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS WASHINGTON, DC MCO A MMEA-5 3 Mar 92
DEPARTMENT OF THE NAVY HEADQUARTERS UNITED STATES MARINE CORPS WASHINGTON, DC 20380-0001 MCO 1300.31A MMEA-5 3 Mar 92 MARINE CORPS ORDER 1300.31A From: Commandant of the Marine Corps To: Distribution List
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0101113F PE TITLE: B-52 SQUADRONS Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE 07 Operational System Development 0101113F B-52 SQUADRONS ($ in Millions) FY
More information36 APS Annual Training Courses
How to use the course list: Program managers: Schedule classes on specific class tabs. Indicate the instructor on the final line next to the asterisk. Contact the Scheduling NCO to add additional classes
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete
More informationExhibit R-2, RDT&E Budget Item Justification
PE NUMBER: 0207701F PE TITLE: Full Combat Mission Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE ($ in Millions) FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 25.229.872.863 7.6 8.463.874.876.891.96
More informationUNCLASSIFIED. UNCLASSIFIED Army Page 1 of 8 R-1 Line #124
Exhibit R2, RDT&E Budget Item Justification: PB 2015 Army : March 2014 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years FY
More informationFuture Combat Systems Industry Day Briefing
Future Future Industry Day Briefing MG Joseph L. Yakovac Program Executive Officer, Ground 11 February 2003 Program Manager s Intent: Field FCS-Equipped Units of Action With Threshold Objective Force Capability
More informationUSAF Gunship Precision Engagement Operations: Special Operations in the Kill Chain
USAF Gunship Precision Engagement Operations: Special Operations in the Kill Chain Lieutenant Colonel Brenda P. Cartier Commander, 4th Special Operations Squadron Hurlburt Field, Florida Overview AC130U
More informationAIR NATIONAL GUARD FISCAL YEAR (FY) 2001 BUDGET ESTIMATES APPROPIATION 3850 NATIONAL GUARD PERSONNEL, AIR FORCE
AIR NATIONAL GUARD FISCAL YEAR (FY) 2001 BUDGET ESTIMATES APPROPIATION 3850 NATIONAL GUARD PERSONNEL, AIR FORCE February 2000 TABLE OF CONTENTS Summary Of Requirements By Budget Program 1.1 Introduction
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: KC-10S. FY 2011 Total Estimate. FY 2011 OCO Estimate
Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 Air Force Page 1 of 12 FY 2012 FY 2013 FY 2014 FY 2015 To Program Element
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Air Traffic Control/Approach/Landing System (ATCALS) FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2013 FY 2014 FY 2015 FY 2016 Air Force Page 1 of 10 R-1 Line Item #185 To Program Element 12.939
More informationAcquisition Insights & Transformation. CG 9 RADM Gary T. Blore 31 October, 2007
Acquisition Insights & Transformation CG 9 RADM Gary T. Blore 31 October, 2007 CG-9 Full Operational Capability, FY09 Director of Contracting and Procurement HCA/SES CG-91 Deputy HCA GS-15 CG-91D Matrix
More informationOC-ALC/LK. Contractor Logistics Support (CLS) CLS. DOD Maintenance Symposium. Maintenance in Theatre & CLS. 28 Oct 2003
OC-ALC/LK OC-ALC/LK Contractor Logistics Support () DOD Maintenance Symposium Maintenance in Theatre & 28 Oct 2003 Col Ken Merch Merchant Materiel Group Director OC-ALC/LK Mission AIRCRAFT SPO USAF Center
More information1THE ARMY DANGEROUSLY UNDERRESOURCED' AUSA Torchbearer Campaign Issue
1THE ARMY DANGEROUSLY UNDERRESOURCED' AUSA Torchbearer Campaign Issue Ffty years ago, Task Force Smith of the 241h Infantry Division- the first American ground forces deployed to defend South Korea - engaged
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Unmanned Combat Air Veh(UCAV) Adv Cp/Proto Dev. FY 2011 Total Estimate. FY 2011 OCO Estimate
Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Navy DATE: February 2010 COST ($ in Millions) FY 2009 Actual Navy Page 1 of 19 FY 2012 FY 2013 FY 2014 FY 2015 To Program Element 266.469 304.907 266.368
More informationOPNAVINST DNS-3/NAVAIR 24 Apr Subj: MISSIONS, FUNCTIONS, AND TASKS OF THE COMMANDER, NAVAL AIR SYSTEMS COMMAND
DEPARTMENT OF THE NAVY OFFICE OF THE CHIEF OF NAVAL OPERATIONS 2000 NAVY PENTAGON WASHINGTON, DC 20350-2000 OPNAVINST 5450.350 DNS-3/NAVAIR OPNAV INSTRUCTION 5450.350 From: Chief of Naval Operations Subj:
More informationI fd DATE: DECLASSIFIED BY: CNO (N09N2) OPNAVINST SERIES
HELICOPTER COMBAT SUPPORT SQUADRON FOUR (HC-4) FPO NEW YORK I fd IN REPLY REFER TO: 1650 Ser 10/061 21 Feb 90 From: Commanding Officer, Helicopter Combat Support Squadron FOUR To : Director of Naval History
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #86
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)
More informationUNCLASSIFIED. R-1 Program Element (Number/Name) PE F / Distributed Common Ground/Surface Systems. Prior Years FY 2013 FY 2014 FY 2015
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force Date: March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Prior
More informationUNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 R-1 Line #201
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 0.000 24.500 23.016-23.016 25.350 26.026
More informationSTATE OF COLORADO DEPARTMENT OF MILITARY AND VETERANS AFFAIRS STRATEGIC PLAN FOR FISCAL YEAR
STATE OF COLORADO DEPARTMENT OF MILITARY AND VETERANS AFFAIRS STRATEGIC PLAN FOR FISCAL YEAR 2011 2012 H. Michael Edwards Major General, Colorado Air National Guard The Adjutant General and Executive Director
More informationYEMEN. Security Assistance Planning for Equipping the ROYG Armed Services
YEMEN Security Assistance Planning for Equipping the ROYG Armed Services Office of Military Cooperation SOC-Forward NAVCENT August 2010 1 FY11 Prioritized List of Capability Packages Package Recipient
More informationCOMMAND MISSION COMMAND ORGANIZATION
CY-01 VAW 120 COMMAND HISTORY COMMAND MISSION Carrier Airborne Early Warning Squadron ONE HUNDRED TWENTY is the Fleet Replacement Squadron for the Carrier Airborne Early Warning and Fleet Logistics Support
More informationProduct Manager Air Warrior Update AAAA ASE Symposium
Project Manager Soldier Warrior Our Strength and Purpose Product Manager Air Warrior Update to the 2017 AAAA ASE Symposium Jim Isaacs Deputy Product Manager Air Warrior james.r.isaacs.civ@mail.mil Slide
More informationOgden Air Logistics Center
Ogden Air Logistics Center SIMULATORS SUSTAINMENT MANAGEMENT ADVANCED PLANNING INFORMATION Sherel L. Hardy, Squadron Director 507 ACSS, Hill AFB UT DSN 777-7823, 801-777-7823 sherel.hardy@hill.af.mil Training
More informationFY16 Spend - DoD as Funding Dept Services = 51% of Obligations
FY16 Spend - DoD as Funding Dept = 51% of Obligations ($155.3B) 51% 4 S&E ($148.8B) Svcs ($17.8B) ($13.3B) Svcs ($9.4B) 6% Transportatio n Svcs ($5.9B) Logistics Mgmt Svcs ($4.9B) 3% ($36.4B) 23% ($20.8B)
More informationDANGER WARNING CAUTION
Training and Evaluation Outline Report Task Number: 01-6-0447 Task Title: Coordinate Intra-Theater Lift Supporting Reference(s): Step Number Reference ID Reference Name Required Primary ATTP 4-0.1 Army
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete
More informationTORP 0225 Overview. Contacts (include name, , and phone number(s) for contractor POCs)
TORP 0225 Overview Task Order Name: FixedWing Tactical HeavyLift Aircraft Current PoP End Date: 29 Mar 2012 Contract and Task Order Number: W9113M07D00060050 Current PoP Total Value: Type of TORP: FFP
More information(111) VerDate Sep :55 Jun 27, 2017 Jkt PO Frm Fmt 6601 Sfmt 6601 E:\HR\OC\A910.XXX A910
TITLE III PROCUREMENT The fiscal year 2018 Department of Defense procurement budget request totals $113,906,877,000. The Committee recommendation provides $132,501,445,000 for the procurement accounts.
More information