St. George Branch (New Armour Annex)

Size: px
Start display at page:

Download "St. George Branch (New Armour Annex)"

Transcription

1 ILLINOIS DEPARTMENT OF PUBLIC HEALTH AHERA THREE YEAR REINSPECTION ASBESTOS ABATEMENT PROGRAM SCHOOL INFORMATION FORM SECTION I NAME OF SCHOOL DISTRICT: SCHOOL ID NUMBER: ADDRESS OF SCHOOL: CITY: CHICAGO SCHOOL DIST St. George Branch (New Armour Annex) Chicago, IL, DATE LAST THREE YEAR REINSPECTION WAS COMPLETED 3/26/2013 If the address on this form is different than the address of the building, submit a written explanation. SECTION II (Please type or print) PLEASE COMPLETE THE FOLLOWING FOR YOUR THREE YEAR REINSPECTION: DATE REINSPECTION COMPLETED: 5/16/2016 IDPH INSPECTOR LICENSE NUMBER: IDPH LICENSED INSPECTOR NAME (Please Print): Steven Doran IDPH MP LICENSE NUMBER: IDPH LICENSED MANAGEMENT PLANNER NAME (Please Print): DESIGNATED PERSON (Please Print): Robert Christlieb ENROLLMENT 281 Daniel Juneau PHONE: (773) /16/2016 Signature of Designated Person Date SECTION III PLEASE COMPLETE THE FOLLOWING INFORMATION FOR ANY CHANGES WITHIN THE SCHOOL DISTRICT. School building has been sold. Date of Sale: School has been closed. Date closed: School building has been demolished. School building is asbestos free since last reinspection: Please explain in writing why the school building is now asbestos free and include the supporting documentation. If a new school building has been added to the district, submit either and exclusionary statement or a management plan and inspection report. Include the complete name, address and city of school building. Explain in writing if the address of the building is different than the address on this form: IL Revised 10.03

2 THREE YEAR REINSPECTION CHICAGO SCHOOL DIST 299 St. George Branch (New Armour Annex) Chicago, IL, Unit: Building ID: IDPH ID Number: REPORT DATE: Monday, May 16, 2016 Prepared for: 125 S. Clark Street Chicago, IL Prepared by: 600 West Van Buren St., Ste 500 Phone (312) Fax (312) DO NOT REMOVE FROM SCHOOL REQUIRED BY FEDERAL LAW

3 April 28, 2016 Mr. R. Kent Cook Asbestos Program Illinois Department of Public Health 525 West Jefferson Street Springfield, Illinois Re: Three-Year Reinspections Dear Mr. Cook:, Managing Environmental Consultant (MEC), conducted the ThreeYear Reinspections and performed management plan updates for the (CPS) facilities in Region 3,4,5 Elementary Schools. Please update your records with the following information. School District: 299 Unit: School: St. George Branch (New Armour Annex) Region: 04 IDPH ID: Building ID: Address: Chicago, IL, Building Contact: James, Michael Contact Phone: Current Building Owners: Review 05/16/2016 Inspector: Steven Doran Management Planner: Daniel Juneau Inspector IDPH License: Management Planner IDPH License: If you have any questions or comments, please contact us at (312) Sincerely, Daniel Juneau

4 Environmental Notification to Occupants To: Faculty, Staff and Parents From: April 28, 2016 RE: St. George Branch (New Armour Annex), Unit Chicago, IL, Dear Faculty, Staff and Parents, This letter is to notify you that the 2016 asbestos three year re-inspection has been completed at St. George Branch (New Armour Annex), following the Federal Asbestos Hazard Emergency Response Act (AHERA), 40 CFR Part 763, Subpart E and is available for your review at the main office of the school. Although asbestos-containing materials have been identified at St. George Branch (New Armour Annex), there is no reason to believe that any threat to the health of students or staff exists at this time. CPS will continue to carefully monitor the condition of asbestos-containing materials and if conditions warrant, all appropriate steps will be taken to maintain the health and safety of all building occupants. If you have any questions regarding this matter or require additional information, please feel free to contact Robert Christlieb, the designated Local Education Authority's Designated Person at (773)

5 Table of Contents I. School and Inspection Information II. Executive Summary III. Methodology IV. Abatement History V. Reassessments and Recommendations VI. Conclusions Table I: Inspector's Reinspection Findings Table II: Management Planner's Review APPENDICES: Appendix A: Assessment Sheets, Drawings and Photos Appendix B: Inspector and Management Planner Licenses Appendix C: Laboratory Accreditations Appendix D: Laboratory Results Appendix E: Chain of Custody Forms

6 SCHOOL AND INSPECTION INFORMATION 1. School Information School: St. George Branch (New Armour Annex) Address: IDPH ID: Contact: James, Michael 2. Unit: Chicago, IL, Building ID: Phone: Description of Facility Original Construction: 1901 Total Square Footage: Current Occupancy: Additional Construction: No of Floors: 3 Fax: (312) Inspector Inspector Name: Steven Doran Inspector IDPH license # 6. Phone: (773) Managing Environmental Consultant MEC: Contact: Dan Juneau Address 600 West Van Buren St., Ste 500 Phone: (312) LEA Designated Person Contact: Robert Christlieb Address: 125 South Clark Street, 17th Floor Chicago, IL Region: 04 Signature: 4/28/2016 Management Planner Management Planner Name: Daniel Juneau Management Planner IDPH license # Review 05/16/ LEA Designated Person's Acknowledgement Signature: 05/16/2016 The reinspection report and recommendations have been received by me and appropriate action will be taken by the School District. Signature: 5/16/2016 Name: Robert Christlieb Unit : St. George Branch (New Armour Annex) Building:

7 II. EXECUTIVE SUMMARY was retained by the (CPS) to perform a three-year asbestos reinspection of the St. George Branch (New Armour Annex). This inspection was conducted in accordance with the United States Environmental Protection Agency (USEPA) Asbestos Hazard Emergency Response Act (AHERA) part (b), and the ongoing Operations and Maintenance Program (O&M) originally designed in the School's Asbestos Management Plan. The purpose of this three-year reinspection is to record any condition changes in the asbestos-containing building material (ACBM) in the school since the previous three-year reinspection and the six-month periodic surveillance, to identify, assess, and include any Homogeneous Areas (HA) not identified in the Management Plan, and to recommend an appropriate response action to manage asbestos. The inspector conducted a three-year reinspection of this facility under Illinois Department of Public Health (IDPH) school reinspection requirements and AHERA, sections and The main building and each addition to the main building, if constructed at different dates, were inspected separately. Laboratory accreditations are included in Appendix C, laboratory results are included in Appendix D, and chain of custody forms are included in Appendix E. Note: During previous inspections, some of the HA(s) were identified together as 9" x 9" floor tile (FT), mastics assoc. with 9" x 9" FT, 12" x 12" FT, mastics assoc. with 12" x 12" FT, pipe insulation, etc. Some of these HA(s) have been re-identified by areas that are uniform in color, texture, construction date, application date, and general appearance. The inspector has determined the following: A. The following HAs have changed assessment categories for Building : Unit: Plaster 61 12" x 12" Beige Floor Tile 62 12" x 12" Beige Floor Tile Mastic 64 12x12 Gray Floor Tile with gray/white specks 65 Mastic on 12x12 Gray FT with gray/white specks 70 Mastic associated w/ 12x12 Brown Speckled Floor Tile 83 Carpet Mastic St. George Branch (New Armour Annex) Building:

8 B. The following new homogenous areas have been identified for Building : Unit: Carpet Mastic 84 Plaster Patching St. George Branch (New Armour Annex) Building:

9 C. This reinspection covered only physically accessible and visible areas and materials that were identified in the LEA's management plan. The following materials were concealed and/or contained in areas that were inaccessible for sampling and have been classified as : A A 23 23A A Unit: " x 12" Brown w/cream & Dark Brown Flecks FT 9" x 9" White/Cream/Tan Multi-Flecked Floor Tile Black Linoleum Plaster 12" x 12" Brown w/cream & drk Brwn FT Mastic 12" x 12" Beige w/red Wood, Cream & Tan Flecks Floor Tile - REMOVED Spotlight Wiring Insulation Joint Compound of Sheet Rock Material Black Vinyl Step Cap Material Black Vinyl Step Cap Material Adhesive Beaver Board Exterior Metal Window Caulk - Not AHERA Metal Window Glide Insulation Ext. Metal Window Glass Glazing Material-Not AHERA Interior Metal Window Glass Glazing Material 12"x12"Beige w/red Wood/Cream/Tan Flecks FT Mastic Wood Grained Linoleum Metal Pipe Collar Caulk Wall Board Material 12" x 12" Off-White Floor Tile 12" x 12" Off-white Floor Tile Mastic 12" x 12" Dark Beige w/mix Speckles Floor Tile 12"x12"Dark Beige w/mix Speckles Floor Tile Mastic 9" x 9" Chocolate Floor Tile 9" x 9" Chocolate Floor Tile Mastic 9" x 9" Rust Floor Tile Green and White Linoleum Pink Fire Proof Curtain Maroon Fire Proof Curtain Fire Door Insulation Boiler Rope Gasket Masonite/Marlite With Wood Texture Masonite/Marlite With Beige Smooth Finish Boiler Stack Insulation Caulking Compound Masonite/Marlite With White Smooth Finish Masonite/Marlite w/beige & Pink Mix Smooth Finish St. George Branch (New Armour Annex) Building:

10 59 5B A Trowled on Plaster Tar Paper Under 12x12 FT Grey Roofing Material - Not AHERA 12" x 12" Beige Floor Tile 12" x 12" Beige Floor Tile Mastic Chalk Board/Poster Board Adhesive 12x12 Gray Floor Tile with gray/white specks Mastic on 12x12 Gray FT with gray/white specks Gray Ceramic Floor Tile Grout Black Ceramic Tile Grout Black Ceramic Tile Adhesive 12x12 BrownSpeckled Floor Tile 12" x 12" Lt. Green w/dark Green Streaks FT Mastic Mastic associated w/ 12x12 Brown Speckled Floor Tile Beige Ceramic Tile Grout 12" x 12" Blue floor tile Mastic for 12" x 12" floor tile 12"x12" Blue Mottled VFT 12"x12" Blue Mottled VFT Mastic 12"x12" Green Mottled VFT 12"x12" Green Mottled VFT Mastic Carpet Mastic The following areas were deemed to be inaccessible: 1A " x 12" Brown w/cream & drk Brwn FT Mastic Mastic Under Wall Board Material 12" x 12" Beige Floor Tile Mastic Chalk Board/Poster Board Adhesive Mastic on 12x12 Gray FT with gray/white specks Black Ceramic Tile Adhesive Mastic associated w/ 12x12 Brown Speckled Floor Tile 12"x12" Blue Mottled VFT Mastic 12"x12" Green Mottled VFT Mastic Carpet Mastic Materials were also listed as "assumed" if they were in good condition and sampling was not conducted to avoid damage. This reinspection was conducted by Steven Doran, IDPH License #. The Management Plan was updated by Daniel Juneau, IDPH License # Inspector and Management Planner Licenses are included in Appendix B. Unit: St. George Branch (New Armour Annex) Building:

11 III. METHODOLOGY Tasks performed on-site included the following: IV. 1. Review current management plan, identify HA(s) and extract appropriate information. 2. Examine and verify abatement records. 3. Touch and visually and physically reinspect and reassess the condition of all friable known or assumed ACBM. 4. Touch and visually and physically reinspect all non-friable known or assumed ACBM to determine whether these materials have become friable since the last inspection or periodic surveillance. 5. Identify any condition changes that may affect Hazard Ranking of known ACBM or ACBM, as well as any HA(s) that have become friable since the last reinspection. 6. Collect bulk samples from each newly discovered friable HA or previously assumed and submit for laboratory analysis. 7. Tabulate reinspection findings and submit for management planner review and recommendations with appropriate response actions based on the AHERA Damage Category of the ACBM. 8. Submit reinspection findings and management planner recommendations to the LEA within thirty (30) days for inclusion into the management plan. ABATEMENT HISTORY The information collected from the existing management plan and inspection report(s) and from interviews with the school official revealed that the following asbestos abatement was conducted at the school since the previous Three year Reinspection. Abatement Dates: V. REASSESSMENTS AND RECOMMENDATIONS The reassessments and recommendations are summarized in Tables I and II on the following pages. Detailed Hazard Assessment Sheets and Drawings and Photos (if applicable) are included in Appendix A. VI. CONCLUSIONS The St. George Branch (New Armour Annex) Building Three-Year reinspection has been completed and response actions have been recommended for both friable and non-friable materials. A timely execution of the response actions recommended will enable the LEA and the Designated Person(s) to effectively manage the existing ACBM. This three-year reinspection report should be inspected in the current Management plan at the CPS Central Office, and one (1) copy should be kept at the school for use when planning any renovation and/or demolition activities in areas where ACBM has been identified. Also, periodic surveillance documentation and any summary reports from any response actions that are executed at the school should be used to update the Management Plan. Unit: St. George Branch (New Armour Annex) Building:

12 Table I Inspector's Reinspection Findings

13 School St. George Branch (New Armour Annex) Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA No Material Description " x 12" Brown w/cream & Dark Brown Flecks FT 9" x 9" Tan Floor Tile w/ Dark Brown Streaks Abated 9" x 9" Tan w/dark Brown Streaks Floor Tile Mastic Abated 9" x 9" White/Cream/Tan Multi-Flecked Floor Tile 9" x 9" white/cream/tan Multi flecked FT Mastic Sub Floor Wood Like Material Black Linoleum Spray-on Insulation 17 Plaster 1A 21 12" x 12" Brown w/cream & drk Brwn FT Mastic 12" x 12" Beige w/red Wood, Cream & Tan Flecks Floor Tile - REMOVED Spotlight Wiring Insulation 22 22A Drywall Material Joint Compound of Sheet Rock Material 23 Black Vinyl Step Cap Material 50 LF 23A Black Vinyl Step Cap Material Adhesive 50 LF Beaver Board Exterior Metal Window Caulk - Not AHERA 27 Metal Window Glide Insulation 28 Ext. Metal Window Glass Glazing 10 10A 11 11A 2 Material Quantity 450 Material Units Material Location Asbestos Type Material Category Friable Damage Type Stage in Basement ASSUMED N NONE Office Washroom ABATED Office Washroom ABATED Room 205 ASSUMED 205 & Library CHR None Moderate Rooms 112 A-C, library CHR None Moderate ASSUMED UNDEFINE D ASSUMED SURFACE Y NONE 0 Yes ASSUMED N NONE 0 No N NONE 0 Not a suspect material Throughout 1st and 2nd Floor 15, Stage in Basement ASSUMED 50 LF Lunchroom and Gym ASSUMED Boy's Toilet in Basement Stairway Steps by Main Office Stairway Steps by Main Office 2nd Floor Hallway Room 403 E Wall Center Window, Room 407 SW Corner Window, Main Office SW Corner Window Rm 403 E wall center window, Rm 407 SW corner wall, Main office SW corner window Throughout the ASSUMED ASSUMED N NONE ASSUMED N NONE ASSUMED ASSUMED ASSUMED ASSUMED Damage Quantity 0 Damage Units Change in Assessment Category No Damage Category ACBM with the potential for damage Damage Reason Disturbance Potential LOW Any remaining friable ACBM or friable suspect ACBM ACBM with the potential for damage LOW No ACBM with the potential for damage LOW 0 No No ACBM with the potential for damage ACBM with the potential for damage LOW 0 LOW LOW

14 School St. George Branch (New Armour Annex) Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA No Material Description Material Quantity Material Units Material Location Material Category Friable Damage Type ASSUMED ASSUMED ASSUMED ASSUMED ASSUMED CHR ASSUMED N NONE ASSUMED ASSUMED ASSUMED N N Material-Not AHERA Interior Metal Window Glass Glazing Material 12"x12"Beige w/red Wood/Cream/Tan Flecks FT Mastic Wood Grained Linoleum Metal Pipe Collar Caulk Wall Board Material 32 Mastic Under Wall Board Material 33 12" x 12" Off-White Floor Tile 34 12" x 12" Off-white Floor Tile Mastic 35 12" x 12" Dark Beige w/mix Speckles Floor Tile "x12"Dark Beige w/mix Speckles Floor Tile Mastic 9" x 9" Chocolate Floor Tile 9" x 9" Chocolate Floor Tile Mastic 9" x 9" Rust Floor Tile Green and White Linoleum 9" x 9" Rust Floor Tile Mastic Pink Fire Proof Curtain 1 EA Engineer's Office Auditorium Stage ASSUMED ASSUMED ASSUMED ASSUMED CHR ASSUMED 42 Maroon Fire Proof Curtain 1 EA Auditorium Stage ASSUMED Fire Door Insulation Boiler Rope Gasket Brown Vinyl Baseboard Brown Vinyl Base Board Adhesive Masonite/Marlite With Wood Texture Masonite/Marlite With Beige Smooth Finish Interior Brick Material Boiler Room Boiler Room Auditorium Stage Auditorium Stage Room 415 Room 415 ASSUMED ASSUMED TSI 29 2A " x 9" Dark Brown w/tan and Cream Streaks FT Building Throughout the Building Room 215 Asbestos Type 1,500 Room 209 Room 203, 207 & 212 Throughout Building Main Office Closet and Toilet, and Engineer's Office Main Office Closet and Toilet, and Engineer's Office Main Office E Side by Wall, W wall Center, and SW Corner Main Office Engineer's Office Engineer's Office Engineer's Office Boiler Room Southeast Corner Main Office Areas and 215 ASSUMED ASSUMED Damage Quantity Damage Units Change in Assessment Category Damage Category 0 No ACBM with the potential for damage None NONE 0 No NONE 0 No ACBM with the potential for damage ACBM with the potential for damage Damage Reason Disturbance Potential LOW Moderate LOW LOW CHR None Moderate

15 School St. George Branch (New Armour Annex) Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA No Material Description Interior Brick Mortar Exterior Brick Material - Not AHERA 52 Exterior Brick Mortar - Not AHERA 53 Exterior Door Caulking - Not AHERA 54 Boiler Stack Insulation Caulking Compound Masonite/Marlite With White Smooth Finish Masonite/Marlite w/beige & Pink Mix Smooth Finish 12" x 12" Chocolate Floor Tile Material Quantity Material Units Mastic w/sub Floor Material Under 12x12 Grey Floor Tile Trowled on Plaster " x 12" Beige Floor Tile Mastic Chalk Board/Poster Board Adhesive x12 Gray Floor Tile with gray/white specks Mastic on 12x12 Gray FT with gray/white specks Gray Ceramic Floor Tile Grout 5B ,800 1,800 1, Black Ceramic Tile Grout Black Ceramic Tile Adhesive x12 BrownSpeckled Floor Tile Asbestos Type Material Category NO_ACBM NO_ACBM CHR ASSUMED TSI Room 215 ASSUMED Room 215 ASSUMED Room 215 (Under HA 64) Room 215 CHR None Moderate CHR None Moderate Throughout Building Main Office Areas and 215 ASSUMED SURFACE CHR None Moderate ASSUMED ASSUMED ASSUMED N NONE 0 Yes ASSUMED N NONE 0 Yes ASSUMED N NONE 0 No ASSUMED N NONE 0 Yes ASSUMED N NONE 0 Yes ASSUMED N NONE 0 No ASSUMED N NONE 0 No ASSUMED N NONE 0 No ASSUMED N NONE 0 No Boiler Room Northeast Side of Building Northeast Side of Building Main East Entrance Door Boiler Room 9"x9" Dark Brown w/tan and Cream Streaks FT Mastic Tar Paper Under 12x12 FT Grey 12" x 12" Light Green w/dark Green Streaks FT Roofing Material - Not AHERA 12" x 12" Beige Floor Tile 5A Material Location Service Hallway to Main Office Roof Main Office, 112A & 112B Rooms Main office, 112A & 112B All Classrooms Rooms 110, 110A, and 215 Rooms 110, 110A, and 215 Basement Boys and Girls Restrooms Basement Restrooms Basement Restrooms 1st Floor Teachers Lounge Washroom Foyer Friable Damage Type Damage Quantity Damage Units Change in Assessment Category Damage Category ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage ACBM with the potential for damage Damage Reason Disturbance Potential LOW LOW LOW LOW LOW LOW LOW LOW LOW

16 School St. George Branch (New Armour Annex) Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA No Material Description 6A 12" x 12" Lt. Green w/dark Green Streaks FT Mastic Mastic associated w/ 12x12 Brown Speckled Floor Tile 70 Material Quantity 325 Material Units 71 Beige Ceramic Tile Grout " x 12" Blue floor tile Mastic for 12" x 12" floor tile 12"x12" Blue Mottled VFT 7A Mastic/Tar Paper Under 9x9 Drk Green w/tan Streaks 7B 9" x 9" Dark Green w/cream and Tan Streaks ' x 2' Black Border Tile Abated 12"x12" Blue Mottled VFT Mastic 1, "x12" Green Mottled VFT 1, "x12" Green Mottled VFT Mastic 1, Carpet Mastic Plaster Patching 8A Mastic & Tar Paper Under 1' x 2' Black Border Tile Abated 9"x9"Deep Burgundy w/cream and Red Wood Streaks FT ABATED 9"x9"Deep Burgundy w/cream/red Wood Strk FT Mastic ABATED 9 9A 1,800 Material Location Asbestos Type Material Category Friable Damage Type N NONE Service Hallway to Main Office 1st Floor Teachers Lounge Washroom Foyer 1st Floor Teachers Lounge Washroom Rm 116 Library Rm 116 Library Room 116,211, 2nd Floor Elevator Lobby Distributed Under Floor Tile in Rm 117-A and Toilet Distributed Under Floor Tile in Rm 117-A and Toilet Engineer's Office Room 116,211, 2nd Floor Elevator Lobby 1st Floor Elevator Vestibule, Room 111, 117A 1st Floor Elevator Vestibule, Room 111, 117A Room 214 w/ Adjacent Hall 1st Floor Fire Escape Engineer's Office ASSUMED ASSUMED ASSUMED None ASSUMED ASSUMED ASSUMED None None NONE CHR None Moderate CHR None Moderate ABATED ASSUMED N NONE 0 No ACBM with the potential for damage ASSUMED N NONE 0 No ACBM with the potential for damage LOW ASSUMED N NONE 0 No ACBM with the potential for damage LOW ASSUMED N NONE 0 Yes ACBM with the potential for damage LOW NO_ACBM ABATED Office Washroom ABATED Office Washroom ABATED N Damage Quantity 0 Damage Units Change in Assessment Category Damage Category Yes ACBM with the potential for damage Damage Reason Disturbance Potential LOW Moderate 0 No ACBM with the potential for damage Low LOW Moderate LOW Moderate

17 School St. George Branch (New Armour Annex) Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report Reinspection Date 4/28/2016 Inspector Name Inspector's Comments Steven Doran 5/15/2016 Inspector's IDPH License Number / Expiration Date HA Number: A 11 11A A A 23 23A A 3 30 Inspector Comments: Brown w/ Orange Flecks Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016

18 School St. George Branch (New Armour Annex) Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: Inspector Comments: Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016

19 School St. George Branch (New Armour Annex) Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: A 5B A A 7B Inspector Comments: Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed in Main Office - Tile is tan w/ streaks Not observed in Main Office - Tile is tan w/ streaks Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed 2016 Not observed - Underneath floor tile in room

20 School St. George Branch (New Armour Annex) Unit Building ID Address Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Inspector's Reinspection Findings Table 1 Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Inspector's Comments are Summarized at the End of the Report HA Number: 8A 9 9A Inspector Comments:

21 Table II Management Planner's Review

22 School Address St. George Branch (New Armour Annex) Unit Building ID Chicago, IL, Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response " x 12" Brown w/cream & Dark Brown Flecks FT 9" x 9" Tan Floor Tile w/ Dark Brown Streaks Abated 9" x 9" Tan w/dark Brown Streaks Floor Tile Mastic Abated 9" x 9" White/Cream/Tan Multi-Flecked Floor Tile 9" x 9" white/cream/tan Multi flecked FT Mastic Sub Floor Wood Like Material Black Linoleum Spray-on Insulation Plaster 450 Stage in Basement Office Washroom Abated No 0 6 ACBM with the potential for damage Follow O&M Plan Office Washroom Abated Room & Library Rooms 112 A-C, library 15,000 Not a suspect material Throughout 1st and 2nd Floor Chrysotile Chrysotile Undefined SURFACE Yes 0 Follow O&M Plan 450 Stage in Basement No A 23 23A " x 12" Brown w/cream & drk Brwn FT Mastic 12" x 12" Beige w/red Wood, Cream & Tan Flecks Floor Tile - REMOVED Spotlight Wiring Insulation Drywall Material Joint Compound of Sheet Rock Material Black Vinyl Step Cap Material Black Vinyl Step Cap Material Adhesive Beaver Board Exterior Metal Window Caulk - Not AHERA 7 Any remaining friable ACBM or friable suspect ACBM 6 ACBM with the potential for damage 50 LF Lunchroom and Gym No 0 LF 6 ACBM with the potential for damage Follow O&M Plan LF LF No No 0 0 LF LF 6 ACBM with the potential for damage 6 ACBM with the potential for damage Follow O&M Plan Follow O&M Plan 27 Metal Window Glide Insulation 28 Ext. Metal Window Glass Glazing Material-Not AHERA Interior Metal Window Glass Glazing Material 12"x12"Beige w/red Wood/Cream/Tan Flecks FT Mastic Wood Grained Linoleum Metal Pipe Collar Caulk Boy's Toilet in Basement Stairway Steps by Main Office Stairway Steps by Main Office 2nd Floor Hallway Room 403 E Wall Center Window, Room 407 SW Corner Window, Main Office SW Corner Window Rm 403 E wall center window, Rm 407 SW corner wall, Main office SW corner window Throughout the Building Throughout the Building Room 215 Room A 11 11A A A 3 30 Follow O&M Plan

23 School Address St. George Branch (New Armour Annex) Unit Building ID Chicago, IL, Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Wall Board Material Mastic Under Wall Board Material 12" x 12" Off-White Floor Tile 34 12" x 12" Off-white Floor Tile Mastic 35 12" x 12" Dark Beige w/mix Speckles Floor Tile 36 12"x12"Dark Beige w/mix Speckles Floor Tile Mastic 9" x 9" Chocolate Floor Tile 9" x 9" Chocolate Floor Tile Mastic 9" x 9" Rust Floor Tile Green and White Linoleum 9" x 9" Rust Floor Tile Mastic Pink Fire Proof Curtain Maroon Fire Proof Curtain Fire Door Insulation Boiler Rope Gasket Brown Vinyl Baseboard Brown Vinyl Base Board Adhesive Masonite/Marlite With Wood Texture Masonite/Marlite With Beige Smooth Finish Interior Brick Material 9" x 9" Dark Brown w/tan and Cream Streaks FT Interior Brick Mortar Exterior Brick Material - Not AHERA Exterior Brick Mortar - Not AHERA Exterior Door Caulking - Not AHERA Boiler Stack Insulation Caulking Compound Masonite/Marlite With White Smooth Finish Masonite/Marlite w/beige & Pink Mix Smooth Finish 12" x 12" Chocolate Floor Tile Mastic w/sub Floor Material Under 12x12 Grey Material Quantity Material Units 1, EA EA Material Location Asbestos Type Material Category Room 203, 207 & 212 Throughout Building Main Office Closet and Toilet, and Engineer's Office Main Office Closet and Toilet, and Engineer's Office Main Office E Side by Wall, W wall Center, and SW Corner Main Office Chrysotile Engineer's Office Engineer's Office Engineer's Office Chrysotile TSI TSI Engineer's Office Auditorium Stage Auditorium Stage Boiler Room Boiler Room Auditorium Stage Auditorium Stage Room 415 Room 415 Boiler Room Southeast Corner Main Office Areas and 215 Boiler Room Northeast Side of Building Northeast Side of Building Main East Entrance Door Boiler Room Room 215 Room 215 Room 215 (Under HA 64) Room 215 Chrysotile No ACBM No ACBM Chrysotile Chrysotile Chrysotile Friable Damage Quantity Damage Units Damage Category Response No 0 6 ACBM with the potential for damage Follow O&M Plan No No 0 0 EA EA 6 ACBM with the potential for damage 6 ACBM with the potential for damage Follow O&M Plan Follow O&M Plan

24 School Address St. George Branch (New Armour Annex) Unit Building ID Chicago, IL, Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num 59 5A 5B A A Material Description Floor Tile Trowled on Plaster 9"x9" Dark Brown w/tan and Cream Streaks FT Mastic Tar Paper Under 12x12 FT Grey 12" x 12" Light Green w/dark Green Streaks FT Roofing Material - Not AHERA 12" x 12" Beige Floor Tile 12" x 12" Beige Floor Tile Mastic Chalk Board/Poster Board Adhesive 12x12 Gray Floor Tile with gray/white specks Mastic on 12x12 Gray FT with gray/white specks Gray Ceramic Floor Tile Grout Black Ceramic Tile Grout Black Ceramic Tile Adhesive 12x12 BrownSpeckled Floor Tile 12" x 12" Lt. Green w/dark Green Streaks FT Mastic Mastic associated w/ 12x12 Brown Speckled Floor Tile Beige Ceramic Tile Grout 12" x 12" Blue floor tile Mastic for 12" x 12" floor tile 12"x12" Blue Mottled VFT Material Quantity ,800 1,800 1, ,800 Material Units 7B Mastic/Tar Paper Under 9x9 Drk Green w/tan Streaks 9" x 9" Dark Green w/cream and Tan Streaks ' x 2' Black Border Tile Abated 12"x12" Blue Mottled VFT Mastic 1, "x12" Green Mottled VFT 1,000 Material Location Asbestos Type Material Category Throughout Building Main Office Areas and 215 Chrysotile SURFACE Service Hallway to Main Office Roof Main Office, 112A & 112B Rooms Main office, 112A & 112B All Classrooms Rooms 110, 110A, and 215 Rooms 110, 110A, and 215 Basement Boys and Girls Restrooms Basement Restrooms Basement Restrooms 1st Floor Teachers Lounge Washroom Foyer Service Hallway to Main Office 1st Floor Teachers Lounge Washroom Foyer 1st Floor Teachers Lounge Washroom Rm 116 Library Rm 116 Library Room 116,211, 2nd Floor Elevator Lobby Distributed Under Floor Tile in Rm 117A and Toilet Distributed Under Floor Tile in Rm 117A and Toilet Engineer's Office Room 116,211, 2nd Floor Elevator Lobby 1st Floor Elevator Vestibule, Room Friable Damage Quantity Damage Units Damage Category Response No No No No No No No No No ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage 6 ACBM with the potential for damage Follow O&M Plan Follow O&M Plan Follow O&M Plan Follow O&M Plan Follow O&M Plan Follow O&M Plan Follow O&M Plan Follow O&M Plan Follow O&M Plan No 0 6 ACBM with the potential for damage Follow O&M Plan No 0 6 ACBM with the potential for damage Follow O&M Plan Chrysotile Chrysotile Abated No 0 6 ACBM with the potential for damage Follow O&M Plan No 0 6 ACBM with the potential for damage Follow O&M Plan

25 School Address St. George Branch (New Armour Annex) Unit Building ID Chicago, IL, Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Num Material Description Material Quantity Material Units 82 12"x12" Green Mottled VFT Mastic 1, A Carpet Mastic Plaster Patching Mastic & Tar Paper Under 1' x 2' Black Border Tile Abated 9"x9"Deep Burgundy w/cream and Red Wood Streaks FT ABATED 9"x9"Deep Burgundy w/cream/red Wood Strk FT Mastic ABATED A Material Location Asbestos Type Material Category Friable Damage Quantity Damage Units Damage Category Response No 0 6 ACBM with the potential for damage Follow O&M Plan No ACBM Abated No 0 6 ACBM with the potential for damage Follow O&M Plan Office Washroom Abated Office Washroom Abated 111, 117A 1st Floor Elevator Vestibule, Room 111, 117A Room 214 w/ Adjacent Hall 1st Floor Fire Escape Engineer's Office

26 School Address St. George Branch (New Armour Annex) Unit Building ID Chicago, IL, Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report 5/16/2016 Review Date Manager Planner Name Daniel Juneau /15/2016 Manager IDPH License No/Expiration HA Number A 11 11A A A 23 23A A 3 Management Comments if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M

27 School Address St. George Branch (New Armour Annex) Unit Building ID Chicago, IL, Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number Management Comments if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M

28 School Address St. George Branch (New Armour Annex) Unit Building ID Chicago, IL, Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number Management Comments A 5B A A if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M if Identified, Continue O&M

29 School Address St. George Branch (New Armour Annex) Unit Building ID Chicago, IL, Region 04 ASBESTOS REINSPECTION FINDINGS AND RECOMMENDATIONS Management Planner's Review Table II Managing Environmental Consultant (MEC) 600 West Van Buren St., Ste 500 Phone: (312) Fax: (312) Management Planner's Comments Summarized at the End of the Report HA Number Management Comments 7B A 9 9A Do Not disturb top layer of tile. Continue O&M

30 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 1 12" x 12" Brown w/cream & Dark Brown Flecks FT HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Stage in Basement 450 COMMENTS: Brown w/ Orange Flecks Inspector's Signature: 04/28/2016

31 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ " x 12" Brown w/cream & Dark Brown Flecks FT Stage in Basement In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

32 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 10 9" x 9" Tan Floor Tile w/ Dark Brown Streaks Abated HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Office Washroom COMMENTS: Inspector's Signature: 04/28/2016

33 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ " x 9" Tan Floor Tile w/ Dark Brown Streaks Abated Office Washroom In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

34 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 10A 9" x 9" Tan w/dark Brown Streaks Floor Tile Mastic Abated HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Office Washroom COMMENTS: Inspector's Signature: 04/28/2016

35 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ A 9" x 9" Tan w/dark Brown Streaks Floor Tile Mastic Abated Office Washroom In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

36 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 11 9" x 9" White/Cream/Tan Multi-Flecked Floor Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 205 COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

37 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ " x 9" White/Cream/Tan Multi-Flecked Floor Tile Room 205 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

38 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 11A 9" x 9" white/cream/tan Multi flecked FT Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate 205 & Library COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

39 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ A 9" x 9" white/cream/tan Multi flecked FT Mastic 205 & Library In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

40 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 12 Sub Floor Wood Like Material HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Rooms 112 A-C, library COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

41 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Sub Floor Wood Like Material Rooms 112 A-C, library In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

42 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 15 Black Linoleum HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

43 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Black Linoleum In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

44 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 16 Spray-on Insulation HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Undefined FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Not a suspect material COMMENTS: Inspector's Signature: 04/28/2016

45 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Spray-on Insulation Not a suspect material In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

46 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 17 Plaster HISTORICAL AHERA DAMAGE CATEGORY 7 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: Yes RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 7. Any remaining friable ACBM or friable suspect ACBM DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Throughout 1st and 2nd Floor COMMENTS: Inspector's Signature: 04/28/2016

47 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Plaster Throughout 1st and 2nd Floor In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

48 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 1A 12" x 12" Brown w/cream & drk Brwn FT Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Stage in Basement 450 COMMENTS: Inspector's Signature: 04/28/2016

49 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 1A 12" x 12" Brown w/cream & drk Brwn FT Mastic Stage in Basement In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

50 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 2 12" x 12" Beige w/red Wood, Cream & Tan Flecks Floor Tile REMOVED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

51 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ " x 12" Beige w/red Wood, Cream & Tan Flecks Floor Tile - REMOVED In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

52 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 21 Spotlight Wiring Insulation HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Lunchroom and Gym 50 LF LF COMMENTS: Inspector's Signature: 04/28/2016

53 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Spotlight Wiring Insulation Lunchroom and Gym 50 LF 0 LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

54 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 22 Drywall Material HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

55 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Drywall Material In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

56 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 22A Joint Compound of Sheet Rock Material HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boy's Toilet in Basement COMMENTS: Inspector's Signature: 04/28/2016

57 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ A Joint Compound of Sheet Rock Material Boy's Toilet in Basement In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

58 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 23 Black Vinyl Step Cap Material HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Stairway Steps by Main Office 50 LF LF COMMENTS: Inspector's Signature: 04/28/2016

59 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Black Vinyl Step Cap Material Stairway Steps by Main Office 50 LF 0 LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

60 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 23A Black Vinyl Step Cap Material Adhesive HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Stairway Steps by Main Office 50 LF LF COMMENTS: Inspector's Signature: 04/28/2016

61 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ A Black Vinyl Step Cap Material Adhesive Stairway Steps by Main Office 50 LF 0 LF In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

62 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 25 Beaver Board HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: 2nd Floor Hallway COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

63 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Beaver Board 2nd Floor Hallway In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

64 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 26 Exterior Metal Window Caulk - Not AHERA HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 403 E Wall Center Window, Room 407 SW Corner Window, Main Office SW Corner Window COMMENTS: Inspector's Signature: 04/28/2016

65 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Exterior Metal Window Caulk - Not AHERA Room 403 E Wall Center Window, Room 407 SW Corner Window, Main Office SW Corner Window In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

66 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 27 Metal Window Glide Insulation HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Rm 403 E wall center window, Rm 407 SW corner wall, Main office SW corner window COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

67 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Metal Window Glide Insulation Rm 403 E wall center window, Rm 407 SW corner wall, Main office SW corner window In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

68 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 28 Ext. Metal Window Glass Glazing Material-Not AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout the Building COMMENTS: Inspector's Signature: 04/28/2016

69 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Ext. Metal Window Glass Glazing Material-Not AHERA Throughout the Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

70 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 29 Interior Metal Window Glass Glazing Material HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout the Building COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

71 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Interior Metal Window Glass Glazing Material Throughout the Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

72 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 2A 12"x12"Beige w/red Wood/Cream/Tan Flecks FT Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 215 COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

73 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 2A 12"x12"Beige w/red Wood/Cream/Tan Flecks FT Mastic Room 215 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

74 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 3 Wood Grained Linoleum HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

75 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Wood Grained Linoleum In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

76 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 30 Metal Pipe Collar Caulk HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 209 COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

77 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Metal Pipe Collar Caulk Room 209 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

78 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 31 Wall Board Material HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 203, 207 & 212 COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

79 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Wall Board Material Room 203, 207 & 212 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

80 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 32 Mastic Under Wall Board Material HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: Chrysotile FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Throughout Building 1500 COMMENTS: Inspector's Signature: 04/28/2016

81 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Mastic Under Wall Board Material Throughout Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

82 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 33 12" x 12" Off-White Floor Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Main Office Closet and Toilet, and Engineer's Office COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

83 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ " x 12" Off-White Floor Tile Main Office Closet and Toilet, and Engineer's Office In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

84 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 34 12" x 12" Off-white Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Main Office Closet and Toilet, and Engineer's Office COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

85 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ " x 12" Off-white Floor Tile Mastic Main Office Closet and Toilet, and Engineer's Office In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

86 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 35 12" x 12" Dark Beige w/mix Speckles Floor Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Main Office E Side by Wall, W wall Center, and SW Corner COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

87 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ " x 12" Dark Beige w/mix Speckles Floor Tile Main Office E Side by Wall, W wall Center, and SW Corner In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

88 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 36 12"x12"Dark Beige w/mix Speckles Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Main Office COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

89 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ "x12"Dark Beige w/mix Speckles Floor Tile Mastic Main Office In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

90 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 37 9" x 9" Chocolate Floor Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Engineer's Office COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

91 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ " x 9" Chocolate Floor Tile Engineer's Office In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

92 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 38 9" x 9" Chocolate Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Engineer's Office COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

93 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ " x 9" Chocolate Floor Tile Mastic Engineer's Office In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

94 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 39 9" x 9" Rust Floor Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Engineer's Office COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

95 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ " x 9" Rust Floor Tile Engineer's Office In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

96 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 4 Green and White Linoleum HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

97 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Green and White Linoleum In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

98 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 40 9" x 9" Rust Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Engineer's Office COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

99 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ " x 9" Rust Floor Tile Mastic Engineer's Office In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

100 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 41 Pink Fire Proof Curtain HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Auditorium Stage 1 EA EA COMMENTS: Inspector's Signature: 04/28/2016

101 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Pink Fire Proof Curtain Auditorium Stage 1 EA 0 EA In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

102 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 42 Maroon Fire Proof Curtain HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Auditorium Stage 1 EA EA COMMENTS: Inspector's Signature: 04/28/2016

103 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Maroon Fire Proof Curtain Auditorium Stage 1 EA 0 EA In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

104 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 43 Fire Door Insulation HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler Room COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

105 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Fire Door Insulation Boiler Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

106 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 44 Boiler Rope Gasket HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler Room COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

107 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Boiler Rope Gasket Boiler Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

108 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 45 Brown Vinyl Baseboard HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Auditorium Stage COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

109 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Brown Vinyl Baseboard Auditorium Stage In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

110 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 46 Brown Vinyl Base Board Adhesive HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Auditorium Stage COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

111 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Brown Vinyl Base Board Adhesive Auditorium Stage In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

112 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 47 Masonite/Marlite With Wood Texture HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 415 COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

113 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Masonite/Marlite With Wood Texture Room 415 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

114 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 48 Masonite/Marlite With Beige Smooth Finish HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 415 COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

115 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Masonite/Marlite With Beige Smooth Finish Room 415 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

116 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 49 Interior Brick Material HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler Room Southeast Corner COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

117 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Interior Brick Material Boiler Room Southeast Corner In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

118 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 5 9" x 9" Dark Brown w/tan and Cream Streaks FT HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Main Office Areas and 215 COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

119 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ " x 9" Dark Brown w/tan and Cream Streaks FT Main Office Areas and 215 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

120 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 50 Interior Brick Mortar HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler Room COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

121 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Interior Brick Mortar Boiler Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

122 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 51 Exterior Brick Material - Not AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Northeast Side of Building COMMENTS: Inspector's Signature: 04/28/2016

123 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Exterior Brick Material - Not AHERA Northeast Side of Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

124 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 52 Exterior Brick Mortar - Not AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: No ACBM FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Northeast Side of Building COMMENTS: Inspector's Signature: 04/28/2016

125 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Exterior Brick Mortar - Not AHERA Northeast Side of Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

126 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 53 Exterior Door Caulking - Not AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Main East Entrance Door COMMENTS: Inspector's Signature: 04/28/2016

127 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Exterior Door Caulking - Not AHERA Main East Entrance Door In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

128 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 54 Boiler Stack Insulation Caulking Compound HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Boiler Room COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

129 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Boiler Stack Insulation Caulking Compound Boiler Room In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

130 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 55 Masonite/Marlite With White Smooth Finish HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 215 COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

131 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Masonite/Marlite With White Smooth Finish Room 215 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

132 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 56 Masonite/Marlite w/beige & Pink Mix Smooth Finish HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Room 215 COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

133 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Masonite/Marlite w/beige & Pink Mix Smooth Finish Room 215 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

134 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 57 12" x 12" Chocolate Floor Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Room 215 (Under HA 64) COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

135 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ " x 12" Chocolate Floor Tile Room 215 (Under HA 64) In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

136 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 58 Mastic w/sub Floor Material Under 12x12 Grey Floor Tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Room 215 COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

137 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Mastic w/sub Floor Material Under 12x12 Grey Floor Tile Room 215 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

138 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 59 Trowled on Plaster HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Throughout Building COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

139 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Trowled on Plaster Throughout Building In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

140 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 5A 9"x9" Dark Brown w/tan and Cream Streaks FT Mastic HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Main Office Areas and 215 COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

141 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 5A 9"x9" Dark Brown w/tan and Cream Streaks FT Mastic Main Office Areas and 215 In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

142 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 5B Tar Paper Under 12x12 FT Grey HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

143 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 5B Tar Paper Under 12x12 FT Grey In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

144 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 6 12" x 12" Light Green w/dark Green Streaks FT HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Service Hallway to Main Office COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

145 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ " x 12" Light Green w/dark Green Streaks FT Service Hallway to Main Office In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

146 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 60 Roofing Material - Not AHERA HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Roof COMMENTS: Inspector's Signature: 04/28/2016

147 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Roofing Material - Not AHERA Roof In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

148 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 61 12" x 12" Beige Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Main Office, 112A & 112B 950 COMMENTS: Not observed in Main Office - Tile is tan w/ streaks Inspector's Signature: 04/28/2016

149 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ " x 12" Beige Floor Tile Main Office, 112A & 112B In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

150 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 62 12" x 12" Beige Floor Tile Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Rooms Main office, 112A & 112B 950 COMMENTS: Not observed in Main Office - Tile is tan w/ streaks Inspector's Signature: 04/28/2016

151 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ " x 12" Beige Floor Tile Mastic Rooms Main office, 112A & 112B In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

152 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 63 Chalk Board/Poster Board Adhesive HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW All Classrooms 140 COMMENTS: Inspector's Signature: 04/28/2016

153 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Chalk Board/Poster Board Adhesive All Classrooms In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

154 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 64 12x12 Gray Floor Tile with gray/white specks HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Rooms 110, 110A, and COMMENTS: Inspector's Signature: 04/28/2016

155 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ x12 Gray Floor Tile with gray/white specks Rooms 110, 110A, and In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

156 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 65 Mastic on 12x12 Gray FT with gray/white specks HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Rooms 110, 110A, and COMMENTS: Inspector's Signature: 04/28/2016

157 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Mastic on 12x12 Gray FT with gray/white specks Rooms 110, 110A, and In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

158 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 66 Gray Ceramic Floor Tile Grout HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Basement Boys and Girls Restrooms 1200 COMMENTS: Inspector's Signature: 04/28/2016

159 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Gray Ceramic Floor Tile Grout Basement Boys and Girls Restrooms In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

160 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 67 Black Ceramic Tile Grout HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Basement Restrooms 250 COMMENTS: Inspector's Signature: 04/28/2016

161 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Black Ceramic Tile Grout Basement Restrooms In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

162 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 68 Black Ceramic Tile Adhesive HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Basement Restrooms 250 COMMENTS: Inspector's Signature: 04/28/2016

163 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Black Ceramic Tile Adhesive Basement Restrooms In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

164 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 69 12x12 BrownSpeckled Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW 1st Floor Teachers Lounge Washroom Foyer 325 COMMENTS: Inspector's Signature: 04/28/2016

165 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ x12 BrownSpeckled Floor Tile 1st Floor Teachers Lounge Washroom Foyer In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

166 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 6A 12" x 12" Lt. Green w/dark Green Streaks FT Mastic HISTORICAL AHERA DAMAGE CATEGORY ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Service Hallway to Main Office COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

167 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 6A 12" x 12" Lt. Green w/dark Green Streaks FT Mastic Service Hallway to Main Office In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

168 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 70 Mastic associated w/ 12x12 Brown Speckled Floor Tile HISTORICAL AHERA DAMAGE CATEGORY 6 HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW 1st Floor Teachers Lounge Washroom Foyer 325 COMMENTS: Inspector's Signature: 04/28/2016

169 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Mastic associated w/ 12x12 Brown Speckled Floor Tile 1st Floor Teachers Lounge Washroom Foyer In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

170 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 71 Beige Ceramic Tile Grout HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate 1st Floor Teachers Lounge Washroom COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

171 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Beige Ceramic Tile Grout 1st Floor Teachers Lounge Washroom In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

172 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 72 12" x 12" Blue floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Rm 116 Library COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

173 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ " x 12" Blue floor tile Rm 116 Library In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

174 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 73 Mastic for 12" x 12" floor tile HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Low Rm 116 Library COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

175 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Mastic for 12" x 12" floor tile Rm 116 Library In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

176 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 79 12"x12" Blue Mottled VFT HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Room 116,211, 2nd Floor Elevator Lobby 1800 COMMENTS: Inspector's Signature: 04/28/2016

177 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ "x12" Blue Mottled VFT Room 116,211, 2nd Floor Elevator Lobby In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

178 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 7A Mastic/Tar Paper Under 9x9 Drk Green w/tan Streaks HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Distributed Under Floor Tile in Rm 117-A and Toilet COMMENTS: Not observed 2016 Inspector's Signature: 04/28/2016

179 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 7A Mastic/Tar Paper Under 9x9 Drk Green w/tan Streaks Distributed Under Floor Tile in Rm 117-A and Toilet In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: if Identified, Continue O&M Management Planner's Signature: 05/16/2016

180 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 7B 9" x 9" Dark Green w/cream and Tan Streaks HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Chrysotile FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Distributed Under Floor Tile in Rm 117-A and Toilet COMMENTS: Not observed - Underneath floor tile in room Inspector's Signature: 04/28/2016

181 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 7B 9" x 9" Dark Green w/cream and Tan Streaks Distributed Under Floor Tile in Rm 117-A and Toilet In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Do Not disturb top layer of tile. Continue O&M Management Planner's Signature: 05/16/2016

182 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 8 1' x 2' Black Border Tile Abated HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Engineer's Office COMMENTS: Inspector's Signature: 04/28/2016

183 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ ' x 2' Black Border Tile Abated Engineer's Office In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

184 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 80 12"x12" Blue Mottled VFT Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW Room 116,211, 2nd Floor Elevator Lobby 1800 COMMENTS: Inspector's Signature: 04/28/2016

185 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ "x12" Blue Mottled VFT Mastic Room 116,211, 2nd Floor Elevator Lobby In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

186 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 81 12"x12" Green Mottled VFT HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW 1st Floor Elevator Vestibule, Room 111, 117A 1000 COMMENTS: Inspector's Signature: 04/28/2016

187 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ "x12" Green Mottled VFT 1st Floor Elevator Vestibule, Room 111, 117A In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

188 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 82 12"x12" Green Mottled VFT Mastic HISTORICAL AHERA DAMAGE CATEGORY 6 ACBM with the potential for damage HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: Follow O&M Plan ASBESTOS TYPE: FRIABLE: No RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be 6. ACBM with the potential for damage DAMAGE REASON: DISTURBANCE POTENTIAL: LOW 1st Floor Elevator Vestibule, Room 111, 117A 1000 COMMENTS: Inspector's Signature: 04/28/2016

189 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ "x12" Green Mottled VFT Mastic 1st Floor Elevator Vestibule, Room 111, 117A In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Follow O&M Plan Comments: Management Planner's Signature: 05/16/2016

190 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 8A Mastic & Tar Paper Under 1' x 2' Black Border Tile Abated HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Moderate Engineer's Office COMMENTS: Inspector's Signature: 04/28/2016

191 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 8A Mastic & Tar Paper Under 1' x 2' Black Border Tile Abated Engineer's Office In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

192 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 9 9"x9"Deep Burgundy w/cream and Red Wood Streaks FT ABATED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Office Washroom COMMENTS: Inspector's Signature: 04/28/2016

193 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ "x9"Deep Burgundy w/cream and Red Wood Streaks FT ABATED Office Washroom In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

194 Inspector Assessment Form (REASSESSMENT) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM PREVIOUS INSPECTION 9A 9"x9"Deep Burgundy w/cream/red Wood Strk FT Mastic ABATED HISTORICAL AHERA DAMAGE CATEGORY HISTORICAL DAMAGE REASON: HISTORICAL RESPONSE ACTION: ASBESTOS TYPE: Abated FRIABLE: RESULTS OF REINSPECTION AND REASSESSMENT This homogeneous area was reinspected and reassessed in accordance with Section and of AHERA and it's condition HAS NOT CHANGED when compared to the conditions of the last AHERA reinspection. The current AHERA DAMAGE CATEGORY is determined to be. DAMAGE REASON: DISTURBANCE POTENTIAL: Office Washroom COMMENTS: Inspector's Signature: 04/28/2016

195 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/2016 9A 9"x9"Deep Burgundy w/cream/red Wood Strk FT Mastic ABATED Office Washroom In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: Comments: Management Planner's Signature: 05/16/2016

196 Inspector Assessment Form (New Homogeneous Area) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM CURRENT INSPECTION 84 Plaster Patching 1st Floor Fire Escape MATERIAL CATEGORY: ASBESTOS TYPE: No ACBM DISTURBANCE POTENTIAL: FRIABLE: CONDITION: AHERA DAMAGE CATEGORY: ACCESSIBILITY: DAMAGE REASON: DAMAGE REASON: DAMAGE REASON: COMMENTS: Inspector's Signature: 04/28/2016

197 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Plaster Patching 1st Floor Fire Escape In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: COMMENTS: Management Planner's Signature: 05/16/2016

198 Inspector Assessment Form (New Homogeneous Area) AHERA INSPECTOR: Steven Doran St. George Branch (New Armour Annex) INSPECTION DATE: 4/28/2016 INFORMATION FROM CURRENT INSPECTION 83 Carpet Mastic Room 214 w/ Adjacent Hall 950 MATERIAL CATEGORY: FRIABLE: No ASBESTOS TYPE: DISTURBANCE POTENTIAL: LOW AHERA DAMAGE CATEGORY: CONDITION: 6 ACBM with the potential for damage ACCESSIBILITY: Not Reachable 0 DAMAGE REASON: DAMAGE REASON: DAMAGE REASON: COMMENTS: Inspector's Signature: 04/28/2016

199 Management Planner Review Form MANAGEMENT PLANNER: Daniel Juneau St. George Branch (New Armour Annex) REVIEW DATE: 5/16/ Carpet Mastic Room 214 w/ Adjacent Hall In accordance with Sections and of the Asbestos Hazard Emergency Response Act (AHERA) the LEA must select a management planner to review the results of the inspection and assessment and recommend appropriate response actions. The original inspection of the above identified homogeneous area has been reviewed in accordance with Sections and with the following recommendations. The RESPONSE ACTION recommendation is: COMMENTS: Management Planner's Signature: 05/16/2016

200 APPENDIX B Inspector and Management Planner Licenses

201

202

203

204

205

206

Enclosed please find the inspection report for the above-referenced location.

Enclosed please find the inspection report for the above-referenced location. February 19, 2010 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE: Farnsworth Aerospace Magnet Asbestos Inspection Project #0924022 Dear Ted, Enclosed please find the

More information

Enclosed please find the inspection report for the above-referenced location.

Enclosed please find the inspection report for the above-referenced location. February 18, 2010 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE: American Indian Magnet (Mounds Park) Asbestos Inspection IEA Project #0924022 Dear Ted, Enclosed please

More information

Enclosed please find the inspection report for the above-referenced location.

Enclosed please find the inspection report for the above-referenced location. November 25, 2008 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE: Asbestos Inspection Project #0824003 Dear Ted: Enclosed please find the inspection report for the above-referenced

More information

May 15, Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN Wilson School Asbestos Inspection IEA Project #

May 15, Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN Wilson School Asbestos Inspection IEA Project # May 15, 2009 Ted Sherman Saint Paul Public Schools 360 Colborne Street Saint Paul, MN 55102 RE: Wilson School Asbestos Inspection Project #0824003 Dear Ted, Enclosed please find the inspection report for

More information

HS16 Asbestos Management

HS16 Asbestos Management HS16 Asbestos Management Occupational Health, Safety and Injury Prevention Subject Matter Expert Greg Smith GJS25 CONTENTS 1.0 INTRODUCTION... 3 2.0 OBJECTIVES AND METRICS... 3 3.0 APPLICABILITY... 3 4.0

More information

Stoughton Public Library. Feasibility & Design Study Report by CBT January 28, 2011

Stoughton Public Library. Feasibility & Design Study Report by CBT January 28, 2011 Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969 Proposed Library for the Future Library Overview Stoughton Public Library opened in 1969

More information

Instructions to Bidders Asbestos Abatement

Instructions to Bidders Asbestos Abatement Quinault Indian Nation P.O Box 189 Taholah, WA. 98587 Instructions to Bidders Asbestos Abatement BID DATE TIME Locations and legal address of project: 1. 411 Queets Ave. Queets, WA 98331 (survey attached).

More information

Facilities Services Division

Facilities Services Division Facilities Services Division Frequently Asked Questions Asbestos 1. What does the head custodian do with the completed 6 month asbestos surveillance report? 2. What is asbestos containing material (ACM)

More information

FORT RUCKER Environmental Document

FORT RUCKER Environmental Document Approved by: Melissa Lowlavar/Johnny Buchanan 1.0 PURPOSE This procedure defines the requirements for submitting abatement plans and close-out documents for asbestos projects on Fort Rucker. Control of

More information

Training Course Catalog

Training Course Catalog 2018-2019 Training Course Catalog Asbestos, Lead Paint, Mold, OSHA Chem Scope, Inc. 15 Moulthrop Street, North Haven CT 06473 203-865-5605 Fax 203-498-1610 www.chem-scope.com chem.scope@snet.net Table

More information

Northern Arizona University Asbestos O&M Program Second Revision: Implemented Feb 23, 2017

Northern Arizona University Asbestos O&M Program Second Revision: Implemented Feb 23, 2017 Northern Arizona University Asbestos O&M Program Second Revision: Implemented Feb 23, 2017 Introduction This is the Northern Arizona University Asbestos Operations and Maintenance guide. This document

More information

ASBESTOS MANAGEMENT PLAN

ASBESTOS MANAGEMENT PLAN ADMINISTRATIVE PROCEDURE Approval Date 2014 Review Date 2019 Contact Person/Department Human Resources Administrator Replacing All Previous Procedures Page 1 of 6 Identification HR - 4206 ASBESTOS MANAGEMENT

More information

ASBESTOS ABATEMENT AND DEMOLITION/RENOVATION NOTIFICATION FORM

ASBESTOS ABATEMENT AND DEMOLITION/RENOVATION NOTIFICATION FORM COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF AIR QUALITY ASBESTOS ABATEMENT AND DEMOLITION/RENOVATION NOTIFICATION FORM For Official Use Only Date Received 1 Date Received

More information

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY

COMPLIANCE WITH THIS PUBLICATION IS MANDATORY BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE INSTRUCTION 32-1052 24 DECEMBER 2014 Civil Engineering FACILITY ASBESTOS MANAGEMENT COMPLIANCE WITH THIS PUBLICATION IS MANDATORY ACCESSIBILITY: Publications

More information

City of Waterbury Safety & Security Assessment

City of Waterbury Safety & Security Assessment City of Waterbury Safety & Security Assessment Dear School Official, Pursuant to guidelines set forth by the Department of Justice, Office of Domestic Preparedness and the Department of Homeland Security,

More information

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW

UNCONTROLLED IF PRINTED. Issued with the authority of the Chief Commissioner and General Manager of Scouts Australia NSW PROCEDURE Management of Asbestos Issued with the authority of the Chief Commissioner and General Manager of Chief Commissioner signature Chief Executive Officer signature Sponsor Head of risk Document

More information

Capital Fund Financing Program OMB No Expires 4/30/2011 Part I: Summary PHA Name: Housing Authority of the City of Warner Robins

Capital Fund Financing Program OMB No Expires 4/30/2011 Part I: Summary PHA Name: Housing Authority of the City of Warner Robins Part I: Summary PHA Name: Housing Authority of the City of Warner Robins Date of CFFP: FFY of Grant: 2009 FFY of Grant Approval: Type of Grant Original Annual Statement Reserve for Disasters/Emergencies

More information

TSI TSI. TSItraining.com. Check out our multi-state approvals and recognition U.S. POSTAGE PAID WILLOUGHBY, OH PERMIT NO.

TSI TSI.  TSItraining.com. Check out our multi-state approvals and recognition U.S. POSTAGE PAID WILLOUGHBY, OH PERMIT NO. 2011 Check out our multi-state approvals and recognition www. training.com 1-866 866-666 666-8438 TM PRESORTED STANDARD MAIL U.S. POSTAGE PAID WILLOUGHBY, OH PERMIT NO. 414 Corporate Office 33150 Lakeland

More information

November 7, 2013 November 7, To establish an asbestos management program for County facilities and projects.

November 7, 2013 November 7, To establish an asbestos management program for County facilities and projects. TO: FROM: PREPARED BY: SUBJECT: PPM#: ALL COUNTY PERSONNEL ROBERT WEISMAN COUNTY ADMINISTRATOR RISK MANAGEMENT ASBESTOS MANAGEMENT PROGRAM CW-L-010 ISSUE DATE EFFECTIVE DATE November 7, 2013 November 7,

More information

Asbestos Management Plan Commercial Services and Development, University of Tasmania

Asbestos Management Plan Commercial Services and Development, University of Tasmania Asbestos Management Plan Commercial Services and Development, University of Tasmania Prepared by: Alan Mason Risk and Compliance Officer Infrastructure Planning and Compliance Unit Commercial Services

More information

ASBESTOS ABATEMENT WORK PLAN APARTMENT BUILDINGS AT 80 BIRCH STREET AND 92 WALNUT STREET LEWISTON, MAINE BID #

ASBESTOS ABATEMENT WORK PLAN APARTMENT BUILDINGS AT 80 BIRCH STREET AND 92 WALNUT STREET LEWISTON, MAINE BID # ASBESTOS ABATEMENT WORK PLAN APARTMENT BUILDINGS AT 80 BIRCH STREET AND 92 WALNUT STREET LEWISTON, MAINE BID # 2013-049 Prepared for: City of Lewiston 27 Pine Street Lewiston, Maine 04240 Prepared by:

More information

Hawthorne Community Redevelopment Agency Facade Beautification Grant Program 2012

Hawthorne Community Redevelopment Agency Facade Beautification Grant Program 2012 Hawthorne Community Redevelopment Agency Facade Beautification Grant Program 2012 I. Purpose The Hawthorne Community Redevelopment Agency (CRA) is offering a grant program as an incentive to owners of

More information

DOWNTOWN FAÇADE IMPROVEMENT GRANT

DOWNTOWN FAÇADE IMPROVEMENT GRANT DOWNTOWN FAÇADE IMPROVEMENT GRANT Clayton Downtown Development Association Eligibility, Guidelines, and Criteria PURPOSE Recognizing the fact that the appearance of a downtown is largely determined by

More information

Associated with the District s Measure A Bond Program and Facilities Improvement Projects

Associated with the District s Measure A Bond Program and Facilities Improvement Projects Request for Qualifications / Proposal (RFQ/P) for Hazardous Material Assessment, Abatement Plan, Cost Estimating, and Monitoring Services Associated with the District s Measure A Bond Program and Facilities

More information

ASBESTOS MANAGEMENT PLAN

ASBESTOS MANAGEMENT PLAN (insert title/site) ASBESTOS MANAGEMENT PLAN (insert date) This document primarily contains non-intrusive management survey information. Note: any refurbishment or maintenance projects must be individually

More information

Asbestos Management Plan for an Essex County Council premises

Asbestos Management Plan for an Essex County Council premises Asbestos Management Plan for an Essex County Council premises An electronic copy of this document is available on the ECC intranet and the Essex Schools Infolink. The Control of Asbestos Regulations 2006

More information

Asbestos Management Policy

Asbestos Management Policy Asbestos Management Policy Drafted by: Malcolm Chalmers Approved by the Governing Body: March 2011 Date of next review: March 2014 Person to initiate review: Business Manager Asbestos Management Policy

More information

ASBESTOS MANAGEMENT PLAN

ASBESTOS MANAGEMENT PLAN ASBESTOS MANAGEMENT PLAN Engage a Qualified Inspector to perform an inspection of the site and establish if disturbed material contains asbestos Prepared for: The Corporation of the Synod of the Diocese

More information

YOU MUST HAVE ALL ITEMS LISTED BELOW:

YOU MUST HAVE ALL ITEMS LISTED BELOW: Dear Housewarming Applicant: We look forward to serving you under the Housewarming Program. However, in order to begin the process there are documents that we must have. Please review the list below and

More information

CITY OF BLUE EARTH AGENDA CITY COUNCIL WORKSESSION MONDAY MAY 21, 4:30 P.M.

CITY OF BLUE EARTH AGENDA CITY COUNCIL WORKSESSION MONDAY MAY 21, 4:30 P.M. CITY OF BLUE EARTH AGENDA CITY COUNCIL WORKSESSION MONDAY MAY 21, 2018 @ 4:30 P.M. Call to order. Roll call. Old Business. 1. Ron Ziegler CEDA- Recommendations for 3 Sisters Project a. Project Memo b.

More information

ASBESTOS POLICY PROCEDURES & GUIDANCE

ASBESTOS POLICY PROCEDURES & GUIDANCE Academy name: ASBESTOS POLICY PROCEDURES & GUIDANCE Aim: Academy name: Asbestos Policy, Procedures and Guidance to comply with current Health and Safety Legislation -wide Health and Safety Management procedures

More information

2018 TRAINING SCHEDULE

2018 TRAINING SCHEDULE SITE LOCATION: ALBANY, NY OSHA COMPLIANCE COURSES 40-Hr. HAZWOPER $675.00 HAZWOPER Refresher (1 Day) $150.00** 24-Hr. HAZWOPER (Limited Site Worker) $365.00 8-Hr. HAZWOPER Supervisor $150.00 ** 30-Hr.

More information

IMR Plan. IMR Funds available for 2017/2018 are as follows:

IMR Plan. IMR Funds available for 2017/2018 are as follows: 2018-2020 IMR Plan The Infrastructure Maintenance and Renewal (IMR) Program of Alberta Education/Alberta Infrastructure provides funding to school divisions for three purposes: 1. To replace building and

More information

REQUEST FOR PROPOSAL (RFP)

REQUEST FOR PROPOSAL (RFP) 38 Liberty Street Concord, New Hampshire 03301 REQUEST FOR PROPOSAL (RFP) Flooring Replacement 2016 Broken Ground, Beaver Meadow, and Rundlett Middle School The Concord School District is looking to replace

More information

McCracken Power Plant

McCracken Power Plant McCracken Power Plant Herrick Archives Number 069 A. IDENTIFICATION & LOCATION 1. Name 1.1 Officially named "McCracken Power Plant" by Board of Trustees on May 5, 1960. 1.2 Alternate names noted: Power

More information

ASBESTOS MANAGEMENT PLAN

ASBESTOS MANAGEMENT PLAN ASBESTOS MANAGEMENT PLAN Policy Scope: All academies Responsibility: Audit, Risk Management & Policy Committee Date Adopted: 27 February 2017 Review Frequency: Annual Review Date: January 2019 CONTENTS

More information

Asbestos Management Procedure

Asbestos Management Procedure Asbestos Management Procedure 1.0 General It is the policy of Hitchin Boys School not to allow staff, employees or pupils to sample, remove or work with Asbestos Containing Materials (ACMs). Asbestos products

More information

HARRIETT FULLER RUST FACADE PROGRAM

HARRIETT FULLER RUST FACADE PROGRAM HARRIETT FULLER RUST FACADE PROGRAM APPLICATION GUIDELINES The City of Bloomington has committed itself to the continued revitalization of its central business district. This commitment manifests itself

More information

EXISTING CONDITIONS

EXISTING CONDITIONS 02 00 00 EXISTING CONDITIONS 02 01 00 Maintenance of Existing Conditions 02 01 50 Maintenance of Site Remediation 02 01 65 Maintenance of Underground Storage Tank Removal 02 01 80 Maintenance of Facility

More information

FAÇADE IMPROVEMENT MATCHING GRANT PROGRAM

FAÇADE IMPROVEMENT MATCHING GRANT PROGRAM FAÇADE IMPROVEMENT MATCHING GRANT PROGRAM As the viability of downtown Albion is vital to the commercial viability of Albion as a whole, the purpose of this Façade Improvement Matching Grant Program is

More information

FAÇADE & INFRASTRUCTURE IMPROVEMENT PROGRAM GRANT APPLICATION PACKET

FAÇADE & INFRASTRUCTURE IMPROVEMENT PROGRAM GRANT APPLICATION PACKET FAÇADE & INFRASTRUCTURE IMPROVEMENT PROGRAM GRANT APPLICATION PACKET Program description and rules Design guidelines Application forms and documents Balch Springs Economic Development Corporation 13503

More information

School Energy Efficiency Project Grant IWAS Application Instructions

School Energy Efficiency Project Grant IWAS Application Instructions School Energy Efficiency Project Grant IWAS Application Instructions Illinois State Board of Education School Business Services Division (Revised September 2013) James T Meeks, Chairman Tony Smith Ph.D.

More information

Guidelines on a Grant on the Purchase of Roof Insulation and Double Glazing Products for Domestic Use that Reduce the Consumption of Energy.

Guidelines on a Grant on the Purchase of Roof Insulation and Double Glazing Products for Domestic Use that Reduce the Consumption of Energy. Guidelines on a Grant on the Purchase of Roof Insulation and Double Glazing Products for Domestic Use that Reduce the Consumption of Energy. 1. Overview of the scheme The application for a grant is made

More information

Asbestos - Duty to Manage & Learning From its Mismanagement

Asbestos - Duty to Manage & Learning From its Mismanagement Asbestos - Duty to Manage & Learning From its Mismanagement Presented by Tim Harrison Health and Safety Manager Hywel Dda Health Board Presentation Contents The problem What is asbestos? Why is it dangerous?

More information

Wilmington Downtown Incorporated. Facade Improvement Program POLICIES AND PROCEDURES Updated 8/30/17

Wilmington Downtown Incorporated. Facade Improvement Program POLICIES AND PROCEDURES Updated 8/30/17 Wilmington Downtown Incorporated Facade Improvement Program POLICIES AND PROCEDURES Updated 8/30/17 Wilmington Downtown Incorporated (WDI) has designed a pilot Facade Improvement Program to stimulate new

More information

ASBESTOS MANAGEMENT. Policy and Arrangements. Oxfordshire County Council December 2013

ASBESTOS MANAGEMENT. Policy and Arrangements. Oxfordshire County Council December 2013 ASBESTOS MANAGEMENT Policy and Arrangements Oxfordshire County Council December 2013 Document Control 2013/V2e Draft Review Date: December 2015 TABLE OF CONTENTS 1.0 Asbestos Policy Statement 1.1 Policy

More information

Façade Improvement Program Application for Participation

Façade Improvement Program Application for Participation The Friends of SW 9 th and Des Moines East and South Chamber of Commerce (DMESC) Façade Improvement Program is funded by the City of Des Moines and administered by the DMESC. For information regarding

More information

2018 OPEN ENROLLMENT SCHEDULE Environmental, Health & Safety Training State & Federal EPA Accredited Programs

2018 OPEN ENROLLMENT SCHEDULE Environmental, Health & Safety Training State & Federal EPA Accredited Programs 2016 SCHEDULE 2018 OPEN ENROLLMENT SCHEDULE Environmental, Health & Safety Training State & Federal EPA Accredited Programs ASBESTOS * Abatement Worker/Supervisor Air Sampling Technician (NYS) Allied Trades

More information

STRATFORD MIDDLE SCHOOL RENOVATION AND ADDITION

STRATFORD MIDDLE SCHOOL RENOVATION AND ADDITION STRATFORD MIDDLE SCHOOL RENOVATION AND ADDITION ARLINGTON PUBLIC SCHOOLS HALRB DECEMBER 21, 2016 PROJECT SCHEDULE 1 PROJECT SCHEDULE USE PERMIT 2016 2017 2018 2019 2/2017 CERT. OF APPROP. 2/2017 DESIGN

More information

Right to Refuse The City of Coralville reserves the right to reject any and all quotes.

Right to Refuse The City of Coralville reserves the right to reject any and all quotes. City of Coralville Coralville Parks & Recreation Invitation to Submit Proposals Coralville Center for the Performing Arts Donor Signage and Office/Auxiliary Space Signage The Coralville Parks & Recreation

More information

REQUEST FOR QUALIFICATIONS. Architectural/Engineering Design Services

REQUEST FOR QUALIFICATIONS. Architectural/Engineering Design Services REQUEST FOR QUALIFICATIONS Architectural/Engineering Design Services Logistics DISTRICT CONTACTS FOR QUESTIONS Jeff Collum Superintendent Phone: 903-668-5990 Email: jcollum@hisd.com REQUEST FOR STATEMENT

More information

Centennial Infant and Child Centre. Emergency Management Policy and Procedures:

Centennial Infant and Child Centre. Emergency Management Policy and Procedures: Policy and Procedures: Centennial Infant and Child Centre (CICC) is committed to providing a safe and healthy environment for children, families, staff, students and volunteers. Policy Staff will follow

More information

Fiscal Year 2018 COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM Application for Funding

Fiscal Year 2018 COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM Application for Funding Fiscal Year 2018 COMMUNITY DEVELOPMENT BLOCK GRANT PROGRAM Application for Funding Project category: (check one only) Agency Title Public Service Economic Development Capital Improvement Project (CIP)

More information

Green Building Incentive Guidelines

Green Building Incentive Guidelines Green Building Incentive Guidelines A program of Andersonville Special Service Area #22 Administered by Andersonville Development Corporation 5314 N. Clark St., 2 nd Fl. Chicago, Illinois 60640 Phone:

More information

An electronic copy of this document is available on the SC intranet and the Learning Gateway.

An electronic copy of this document is available on the SC intranet and the Learning Gateway. Shropshire Council Premises Plan for Asbestos Management An electronic copy of this document is available on the SC intranet and the Learning Gateway. The Control of Asbestos Regulations 2012 requires

More information

Belmar Business Partnership, Inc. Business Development Committee

Belmar Business Partnership, Inc. Business Development Committee Belmar Business Partnership, Inc. Business Development Committee Façade Improvement and Renovation Grant Program 2017 To encourage existing businesses to improve the appearance of their place of business,

More information

Asbestos Notification Form ANF-001 Instructions and Supporting Materials

Asbestos Notification Form ANF-001 Instructions and Supporting Materials Instructions and Supporting Materials Table of Contents Introduction Permit fact sheet Contact list Introduction The Asbestos Notification Form (ANF-001) must be submitted to the Massachusetts Department

More information

Duties of a Principal

Duties of a Principal Duties of a Principal 1. Principals shall strive to model best practices in community relations, personnel management, and instructional leadership. 2. In addition to any other duties prescribed by law

More information

Present: Dr. Thomas Baynum, Leslie Anderson, Chanda Dowell, Doug Hoenig, Dr. Bettie Truitt, Karen Mowers

Present: Dr. Thomas Baynum, Leslie Anderson, Chanda Dowell, Doug Hoenig, Dr. Bettie Truitt, Karen Mowers MINUTES CAPITAL COMMITTEE February 3, 2014 Black Hawk Room 2:00 p.m. Present: Dr. Thomas Baynum, Leslie Anderson, Chanda Dowell, Doug Hoenig, Dr. Bettie Truitt, Karen Mowers 1. Core Value: Responsibility

More information

Green Building Incentive Program Guidelines & Procedures

Green Building Incentive Program Guidelines & Procedures Green Building Incentive Program Guidelines & Procedures A program of Andersonville Special Service Area #22 Administered by Andersonville Development Corporation 5153 N. Clark St., Suite 204 Chicago,

More information

Tile Moving And Handling Assessment Nursing

Tile Moving And Handling Assessment Nursing Tile Moving And Handling Assessment Nursing Risk Assessments. The Moving And Handling Of The Deceased Patient. Manual Handling Operations Regulations 1992 (MHORegs) Amended 2002 Types of flooring thick

More information

Tapping the Future: CSC Student Design Competition 2017 /2018 cscdesignchallenge.ca

Tapping the Future: CSC Student Design Competition 2017 /2018 cscdesignchallenge.ca Tapping the Future: CSC Student Design Competition 2017 /2018 cscdesignchallenge.ca CSC Student Design Competition 2017 2018 Document: 00 01 01 r1, issued: 2017 11 28 cscdesignchallenge.ca Page 1 Student

More information

Commercial White Box Grant Program

Commercial White Box Grant Program Commercial White Box Grant Program City of Racine 730 Washington Ave. Program Contact: Ken Plaski Chief Building Official (262) 636-9161 The White Box Program is targeted to currently vacant, first-floor

More information

2018 Facility Master Plan

2018 Facility Master Plan 2018 Facility Master Plan 1 Contact Information District LEA: 6302 District Physical Address: 207 W. Conway Benton, AR 72015 District Mailing Address: PO Box 939 Benton, AR 72018 District Phone Number:

More information

Attitudes to Residential Asbestos Assessments

Attitudes to Residential Asbestos Assessments Attitudes to Residential Asbestos Assessments Conference presentation EY Sweeney contacts: Date: November 2015 Stuart Attwood, Head of Quantitative Research Page 1 Agenda Background and objectives Overview

More information

FACADE IMPROVEMENTS INCENTIVE PROGRAM for EXISTING COMMERICAL BUILDINGS

FACADE IMPROVEMENTS INCENTIVE PROGRAM for EXISTING COMMERICAL BUILDINGS GAINESVILLE COMMUNITY REDEVELOPMENT AGENCY DOWNTOWN COMMUNITY REDEVELOPMENT AREA FACADE IMPROVEMENTS INCENTIVE PROGRAM for EXISTING COMMERICAL BUILDINGS 802 NW 5th Avenue Suite 200 Gainesville, FL 32601

More information

SAFE STATE ENVIRONMENTAL PROGRAMS ADMINISTRATIVE CODE

SAFE STATE ENVIRONMENTAL PROGRAMS ADMINISTRATIVE CODE SAFE STATE ENVIRONMENTAL PROGRAMS ADMINISTRATIVE CODE CHAPTER 822 X 1 REGISTRATION AND ACCREDITATION OF LEAD TRAINING PROGRAMS AND INDIVIDUALS ENGAGED IN LEAD HAZARD REDUCTION ACTIVITIES TABLE OF CONTENTS

More information

SERVICES REQUEST FOR PROPOSAL (RFP) FOR JANITORIAL

SERVICES REQUEST FOR PROPOSAL (RFP) FOR JANITORIAL REQUEST FOR PROPOSAL (RFP) FOR JANITORIAL SERVICES FRIENDSHIP BAPTIST CHURCH 80 WALNUT STREET ATLANTA GA 30314 Tel: (404) 688-0206 Email: info@fbcatlanta.org JUNE 15, 2017 Table of Contents 1. SUMMARY

More information

ABUDHABI INDIAN SCHOOL DISASTER MANAGEMENT POLICY-STANDARD OPERATING PROCEDURES FOR EVICTION

ABUDHABI INDIAN SCHOOL DISASTER MANAGEMENT POLICY-STANDARD OPERATING PROCEDURES FOR EVICTION ABUDHABI INDIAN SCHOOL DISASTER MANAGEMENT POLICY-STANDARD OPERATING PROCEDURES FOR EVICTION DISASTER MANAGEMENT POLICY Name of Policy : Disaster Management Policy- Standard Operating procedures for Eviction

More information

MAIN STREET PALESTINE FAÇADE IMPROVEMENT PROGRAM GRANT APPLICATION PACKET

MAIN STREET PALESTINE FAÇADE IMPROVEMENT PROGRAM GRANT APPLICATION PACKET MAIN STREET PALESTINE FAÇADE IMPROVEMENT PROGRAM GRANT APPLICATION PACKET Program description and rules Design guidelines Application forms and documents www.palestinetexas.net Palestine Economic Development

More information

Emergency Management Policy and Procedures

Emergency Management Policy and Procedures Emergency Management Policy and Procedures Name of Child Care Centre: Immanuel Child Care Centre Date Policy and Procedures Established: July 1, 2017 Date Policy and Procedures Updated: July 14, 2017 Purpose

More information

School Safety Audit Checklist

School Safety Audit Checklist School Safety Audit Checklist Based on work done by Virginia State Education Department and modified by the New York State Police as a resource for school personnel. Components of the Audit Process School

More information

Historic Resources Commission

Historic Resources Commission Historic Resources Commission Meeting Agenda October 13, 2015 at 6:00pm Council Chambers, 201 S Main St 1. Approve minutes of the July 14, 2015 meeting 2. Court Square Historic District Façade Grant 2015-2016

More information

Public Copy/Copie du public

Public Copy/Copie du public the Health System Accountability and Performance Division Performance Improvement and Compliance Branch Division de la responsabilisation et de la performance du système de santé Direction de l'amélioration

More information

3. Mission. To publish instructions for the conduct, recordkeeping, and reporting of the Asbestos Control Program.

3. Mission. To publish instructions for the conduct, recordkeeping, and reporting of the Asbestos Control Program. UNITED STATES MARINE CORPS MARINE AIR GROUND TASK FORCE TRAINING COMMAND MARINE CORPS AIR GROUND COMBAT CENTER BOX 788100 TWENTYNINE PALMS, CA 92278-8100 COMBAT CENTER ORDER 5100. 2B ceo 5100.2B 4 From:

More information

Downtown Interior Improvement Grant Program Application Packet

Downtown Interior Improvement Grant Program Application Packet VILLAGE OF GLEN ELLYN Downtown Interior Improvement Grant Program Application Packet Village Manager s Office 535 Duane Street Glen Ellyn, IL 60137 Telephone 630.547.5345 Fax 630.469.8849 X:\Plandev\PLANNING\FORMS\Downtown

More information

PROGRAM GUIDE. ELIGIBLE APPLICANTS To be eligible to apply to the program:

PROGRAM GUIDE. ELIGIBLE APPLICANTS To be eligible to apply to the program: PROGRAM GUIDE PROGRAM PURPOSE AND GOAL The City of Williams Lake is pleased to provide the business façade improvement program with funding from Northern Development Initiative Trust. The purpose of the

More information

Dallas County Community College District Bond Program. July 10, 2007

Dallas County Community College District Bond Program. July 10, 2007 Dallas County Community College District 2004 Bond Program July 10, 2007 1 2004 Bond Program Eastfield College 2 Industrial Technology Site Plan Workforce Development Eastfield College Learning Center

More information

MODEL PLAN. (Name of School) INDOOR ENVIRONMENTAL QUALITY MANAGEMENT PLAN

MODEL PLAN. (Name of School) INDOOR ENVIRONMENTAL QUALITY MANAGEMENT PLAN Form 5140.12 MODEL PLAN (Name of School) INDOOR ENVIRONMENTAL QUALITY MANAGEMENT PLAN MISSION STATEMENT The health and safety of students, staff and visitors to Catholic schools is of primary importance.

More information

One-Time Grant for Non-Designated Commercial Heritage Property Application Package Deadlines: March 1 and October 1 (Updated: April, 2016)

One-Time Grant for Non-Designated Commercial Heritage Property Application Package Deadlines: March 1 and October 1 (Updated: April, 2016) One-Time Grant for Non-Designated Commercial Heritage Property Application Package Deadlines: March 1 and October 1 (Updated: April, 2016) This one-time grant provides up to $10,000 to assist the owners

More information

Downtown Retail Interior Improvement Award Program Application Packet

Downtown Retail Interior Improvement Award Program Application Packet VILLAGE OF GLEN ELLYN Downtown Retail Interior Improvement Award Program Application Packet Village Manager s Office 535 Duane Street Glen Ellyn, IL 60137 Telephone 630.547.5345 Fax 630.547.8849 1 VILLAGE

More information

City Wide Signage Grant Program

City Wide Signage Grant Program City Wide Signage Grant Program Contact: Rhonda Manuel 809 N. Broadway APPLICATION Milwaukee, WI 53202 414-286-8201 APPLICANT INFORMATION Name: FOR OFFICE USE ONLY Application Date: Phone: Approval Date:

More information

ABRIDGED SUMMARY OF CATEGORICAL USE OF FORCE INCIDENT AND FINDINGS BY THE LOS ANGELES BOARD OF POLICE COMMISSIONERS

ABRIDGED SUMMARY OF CATEGORICAL USE OF FORCE INCIDENT AND FINDINGS BY THE LOS ANGELES BOARD OF POLICE COMMISSIONERS ABRIDGED SUMMARY OF CATEGORICAL USE OF FORCE INCIDENT AND FINDINGS BY THE LOS ANGELES BOARD OF POLICE COMMISSIONERS K-9 CONTACT REQUIRING HOSPITALIZATION 036-15 Division Date Duty-On (X) Off () Uniform-Yes

More information

RULES OF DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF SOLID WASTE MANAGEMENT CHAPTER LEAD-BASED PAINT ABATEMENT TABLE OF CONTENTS

RULES OF DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF SOLID WASTE MANAGEMENT CHAPTER LEAD-BASED PAINT ABATEMENT TABLE OF CONTENTS RULES OF DEPARTMENT OF ENVIRONMENT AND CONSERVATION DIVISION OF SOLID WASTE MANAGEMENT CHAPTER 1200-1-18 LEAD-BASED PAINT ABATEMENT TABLE OF CONTENTS 1200-1-18-.01 Lead-Based Paint Abatement 1200-1-18-.04

More information

- request for determination of eligibility meets the documentation

- request for determination of eligibility meets the documentation United States Department of the Interior National Park Service NATIONAL REGISTER OF HISTORIC PLACES REGISTRATION FORM 2. Location... street & number: 14TH & BYRON STREETS not for publication: N/A city/town:

More information

City of Cambridge. Designated Heritage Property Grant Program

City of Cambridge. Designated Heritage Property Grant Program City of Cambridge Designated Heritage Property Grant Program Table of Contents 1. Eligible Properties 1 2. Projects 1 3. Eligible Projects 1 a) General Conservation Projects 3 b) Repair or Restoration

More information

2014 SAHBA Member Awards Categories & Submission Information

2014 SAHBA Member Awards Categories & Submission Information Categories & Submission Information Categories, Descriptions & s Required 1. Production Builder of the Year: s A, B, & C Please see form A for submission requirements. Description: Any publicly traded

More information

Salida School District, R-32-J Central Administration Office 310 East 9 th Street Salida, Colorado 81201

Salida School District, R-32-J Central Administration Office 310 East 9 th Street Salida, Colorado 81201 Request for Qualifications for Environmental Consulting Services at: Salida School District, R-32-J Central Administration Office 310 East 9 th Street Salida, Colorado 81201 Request for Qualifications

More information

INSIGNIA OF APPROVAL INFORMATION BOOKLET

INSIGNIA OF APPROVAL INFORMATION BOOKLET INSIGNIA OF APPROVAL INFORMATION BOOKLET Arnold Schwarzenegger, Governor Sunne Wright McPeak, Secretary Business, Transportation and Housing Agency Judy Nevis, Acting Director Department of Housing and

More information

City of Aurora Façade Improvement Matching Grant Program

City of Aurora Façade Improvement Matching Grant Program P.O. Box 158 Third & Main Streets Aurora, IN 47001 812-926-1777 Fax 812-926-0838 www.aurora.in.us City of Aurora Façade Improvement Matching Grant Program Purpose of the Façade Improvement Grant funds:

More information

Emergency Codes - Ouellette Campus

Emergency Codes - Ouellette Campus The Emergency Codes # is: 555 CODE RED - FIRE 555 CODE PURPLE - HOSTAGE SITUATION OR PERSON WITH WEAPON CODE BLUE - CARDIAC ARREST CODE GREEN - EVACUATION CODE YELLOW - MISSING PATIENT CODE BLACK - CODE

More information

Façade Improvement Program Fiscal Year Program Description

Façade Improvement Program Fiscal Year Program Description Façade Improvement Program Fiscal Year 2016-2017 Program Description The Façade Improvement Program (FIP) is a reimbursement grant program provided to business and/or property owners for the improvement

More information

July 1, 2017 EMERGENCY PROCEDURES FOR DEPARTMENT OF ALLIED HEALTH SCIENCES IN BONDURANT HALL

July 1, 2017 EMERGENCY PROCEDURES FOR DEPARTMENT OF ALLIED HEALTH SCIENCES IN BONDURANT HALL EMERGENCY PROCEDURES FOR DEPARTMENT OF ALLIED HEALTH SCIENCES IN BONDURANT HALL These procedures set forth the steps to be followed in the event of an emergency. It is important that all employees thoroughly

More information

Norcross Downtown Development Authority

Norcross Downtown Development Authority Norcross Downtown Development Authority Chairman Pat Eidt, Member Ed Flynn, Member Chuck Cimarick, Member Chris Collins Member Rob Girard, Member Al Karnitz, Member Tanya Moore October 8, 2013 DOWNTOWN

More information

REQUEST FOR PROPOSAL (RFP) Design And Construction NEW RESTROOM CONSTRUCTION

REQUEST FOR PROPOSAL (RFP) Design And Construction NEW RESTROOM CONSTRUCTION Detroit Hispanic Development Corporation REQUEST FOR PROPOSAL (RFP) Design And Construction NEW RESTROOM CONSTRUCTION Detroit Hispanic Development Corporation 1211 Trumbull St Detroit, Michigan 48216 Phone:

More information

I. Asbestos Abatement Grant Program Summary

I. Asbestos Abatement Grant Program Summary I. Asbestos Abatement Grant Program Summary The Arkansas Legislature authorized the Arkansas Department of Environmental Quality (ADEQ) to award grants for certain activities relating to asbestos assessment,

More information

NEW BRAUNFELS DOWNTOWN DEVELOPMENT/MAIN STREET PROGRAM FACADE IMPROVEMENT GRANT PROGRAM GUIDELINES

NEW BRAUNFELS DOWNTOWN DEVELOPMENT/MAIN STREET PROGRAM FACADE IMPROVEMENT GRANT PROGRAM GUIDELINES NEW BRAUNFELS DOWNTOWN DEVELOPMENT/MAIN STREET PROGRAM FACADE IMPROVEMENT GRANT PROGRAM GUIDELINES PROGRAM OBJECTIVES Property owners desire to generate adequate rents from their commercial buildings while

More information

Business Façade Improvement Program Available

Business Façade Improvement Program Available MEDIA RELEASE City of Williams Lake For Immediate Release March 1, 2017 Tel: 250-392-2311 Fax: 250-392-4408 450 Mart Street Williams Lake, BC V2G 1N3 Business Façade Improvement Program Available Northern

More information

CULTURAL HISTORY The Columbia Rosenwald School

CULTURAL HISTORY The Columbia Rosenwald School CULTURAL HISTORY The Columbia Rosenwald School by Teena Maenza Editor's note: This month's column was written by guest author Teena Maenza. Maenza is the Editor of the Brazoria County News and has written

More information

Arapahoe County Weatherization Income Guidelines for Traditional Weatherization Services

Arapahoe County Weatherization Income Guidelines for Traditional Weatherization Services Arapahoe County Weatherization Income Guidelines for Traditional Weatherization Services Arapahoe County Weatherization has been providing energy conservation services to homes for over twenty-five years.

More information