Great Lakes and Ohio River Division
|
|
- Duane Green
- 5 years ago
- Views:
Transcription
1 Great Lakes and Ohio River Division Olmsted Project Update Inland Waterways Users Board (Meeting No. 85) MR. MIKE BRADEN, PE, PMP, CCE CHIEF, Olmsted Division Louisville District 03 Nov 2017 The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation. 1 ISO-9001
2 Olmsted Bottom Line Up Front Current Schedule: Ahead of Schedule 2018 (Project Operational) 2022 (Project Complete) Current Cost: Under Budget TEP ($329M) Total Estimated Price (updated monthly) TPCS ($153M) Total Project Cost Summary (reflects FY17 update) Keys: 1. Efficient funding (annual capability) has allowed the PDT to effectively plan and execute our annual work plan. 2. Advantageous river conditions have allowed the work to expand beyond the contractual low water season (15 Jun 30 Nov). 2
3 Olmsted Project Overview - Status Fixed Weir Navigable Pass NP-12A (last shell) precast complete (stretch goal) Locks & Approach Walls Tainter Gates Re-water TG-5 Bay NLT 28 Nov 2017 TW-1A, TW-1B set 12, 14 Oct 2017 TW-6A, TW-6B precast complete (sched set 25, 27 Oct 2017) SB-5, SB-6 precast complete (sched set 05, 06 Dec 2017) Maintenance & Lock Master s Building NTP issued 10 Feb 2017 Construction complete NLT 06 May 2018 Left Boat Abutment Lift 16 placed 20 Oct 2017 CIP scheduled finish (Lift 19) NLT 31 Oct 2017 Resident Engineers Office River Dikes (LRL) Scheduled award Nos. 5 7 (D/S Kentucky) 2 nd QTR FY18 Scheduled award Nos (U/S Illinois) 4 th QTR FY18 Dam Access Road Wicket Lifter Wicket Lifter arrives Olmsted 21 Dec 2017 Completed Under Contract Future 3
4 1 Olmsted Status Photos 2 3 Miter Gate 6 Repairs 4 Lockmaster Building 5 Training Wall (TW-1A) Left Boat Abutment (LBA) Maintenance Box Test Fit 4
5 2017 Plan-to-Complete 5
6 Olmsted Project Time and Cost Scorecard Expenditures (thru Sep) Planned (BCWS) $2.258B Earned (BCWP) $2.636B Actual (ACWP) $2.439B BCWP: Reports the value (based on % complete) of the work performed to date. Target: Actual as compared to Planned: ( <1% = Green) (>1%and <3% = Yellow) and (>3% = Red) Budget (thru Sep) Schedule (thru Sep) (PACR)/(Current) Project Complete April 2026/Mar 2022 Dam Operational Oct 2022/Oct 2018 Measures: Planned project completion and Dam contract operational dates Target: Green: Current = PACR-12 months Yellow: Current = PACR-11 months to PACR-7 months Red: Current = PACR-6 months to after PACR date Major Activity Schedule TEP in Billions Jun-17 Jul-17 Aug-17 Sep-17 PACR w/risk COE TEP
7 12 Month & 5 Year Cost Trends TPCS (Last 5 Years) $3.100 $3.075 $3.050 Billions $3.025 $3.000 $2.975 $2.950 $2.925 $2.900 PACR FY13 FY14 FY15 FY16 FY17 Annual Update (Even Years are certified) $2.800 $2.790 $2.780 TEP (Last 12 Months) Olmsted Locks and Dam Super Gantry Crane Billions $2.770 $2.760 $2.750 $2.740 Sep-16 Oct-16 Nov-16 Dec-16 Jan-17 Feb-17 Mar-17 Apr-17 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Months 7
8 Equipment Disposition Olmsted Finishing Strong In excess of $150M (original acquisition value) and over 10,000 discrete items Opportunity to reduce cost of Project by an estimated $25M and offset future programming Pursuing Waiver (Direct Sale Authority) and Agency Notification (GSA Screening Exemption) to maximize efficiency and increase ROI. Out Year Marine Work Packages Completed J&As to advance various marine scopes of work concurrent with Dam construction and within operational footprint Miter Gate Repairs and Culvert Flushing underway. Upstream Mooring Cells (4) construction and Partial L&D 53 demolition approved. Functional Transition War-gaming contingency COA to hold pool 1 Jan
9 Discussion Wicket Testing Army Strong Building Strong Finishing Strong Wicket Lifter 9
Olmsted Locks & Dam. Informational Brief. 21 May 2015 BUILDING STRONG. Guest Nick Mariano. Briefer Mike Braden, Chief Olmsted Division
Olmsted Locks & Dam Informational Brief Guest Nick Mariano Briefer Mike Braden, Chief Olmsted Division 21 May 2015 US Army Corps of Engineers BUILDING STRONG Status Organization Agenda Orientation/Importance/Relevance
More informationNATIONAL WATERWAYS CONFERENCE, WASHINGTON, D.C. MARCH 5-7, 2018
NATIONAL WATERWAYS CONFERENCE, WASHINGTON, D.C. MARCH 5-7, 2018 Thomas P. Smith, PE, SES Chief, Operations and Regulatory Division HQ U.S. Army Corps of Engineers Washington, D.C. 6 March 2018 U.S. PORTS
More informationEnlisted Professional Military Education FY 18 Academic Calendar. Table of Contents COLLEGE OF DISTANCE EDUCATION AND TRAINING (CDET):
Enlisted Professional Military Education FY 18 Academic Calendar Table of Contents STAFF NON-COMMISSIONED OFFICER ACADEMIES: SNCO Academy Quantico SNCO Academy Camp Pendleton SNCO Academy Camp Lejeune
More informationMEDIA KIT OLMSTED LOCKS AND DAM. USACE, Olmsted Project. Public Affairs Office. USACE, Great Lakes and Ohio River Division. Public Affairs Office
OLMSTED LOCKS AND DAM MEDIA KIT USACE, Olmsted Project Public Affairs Office John Kelly (o) 618-748-6435 john.p.kelly@usace.army.mil USACE, Great Lakes and Ohio River Division Public Affairs Office Jacqueline
More informationCorporate Services Employment Report: January Employment by Staff Group. Jan 2018 (Jan 2017 figure: 1,462) Overall 1,
Corporate Services Employment Report: January Employment by Staff Group Jan (Jan 20 figure: 1,462) Jan % Overall 1,520 +58 +4.0% 8 Management (VIII+) 403 +52 4.8% Clerical & Supervisory (III to VII) 907
More informationCompliance Division Staff Report
Compliance Division Staff Report Polygraph Advisory Board Meeting Tuesday, September 26, 2017 Public Outreach Compliance Division routinely attends annual industry meetings held by TALEPI (Texas Association
More informationCHC-A Continuity Dashboard. All Sites Continuity - Asthma. 2nd Qtr-03. 2nd Qtr-04. 2nd Qtr-06. 4th Qtr-03. 4th Qtr-06. 3rd Qtr-04.
PPC1: ACCESS AND COMMUNICATION Element B: Access and Communication Results Item 1: Visits with assigned PCP Continuity data is reviewed each month at our Office Redesign Committee (ORDC). The data is collected
More informationCommandant Education Boards. Major Jerry A. Godfrey Combat Service Support Majors Monitor Manpower Management Officer Assignments
Commandant Education Boards Major Jerry A. Godfrey Combat Service Support Majors Monitor Manpower Management Officer Assignments 24 January 2018 Purpose / Agenda Purpose: provide an overview of the Commandant
More informationJANUARY 2018 (21 work days) FEBRUARY 2018 (19 work days)
AND CORRESPONDING DATES FOR JANUARY AND FEBRUARY 2018 JANUARY 2018 ( work days) Deadline* 12-27 12-28 12-29 1-2 1-3 1-4 1-5 1-8 1-9 1-10 Benefit Hold ** 12-28 12-29 1-2 1-3 1-4 1-5 1-8 1-9 1-10 1-11 Mailing
More informationBOROUGH OF ROSELLE PUBLIC NOTICE ANNUAL NOTICE OF CALENDAR YEAR 2018 WORKSHOP SESSIONS, PRE-AGENDA MEETINGS AND REGULAR MEETINGS
BOROUGH OF ROSELLE PUBLIC NOTICE ANNUAL NOTICE OF CALENDAR YEAR 2018 WORKSHOP SESSIONS, PRE-AGENDA MEETINGS AND REGULAR MEETINGS BE IT RESOLVED, by the Mayor and Borough Council of the Borough of Roselle,
More informationCalendar of Key Deadlines for Apportionments July 18, 2016
Mary Jane Burke Marin County Superintendent of Schools Business Services Department Business Bulletin 17 04 Calendar of Key Deadlines for 2016 2017 Apportionments July 18, 2016 Please find the Calendars
More informationConnect NC Bond Information. The Connect NC Bond Act was passed by the General Assembly in 2015 and approved by the Voters in March 2016
Connect NC Update Joint Legislative Oversite Committee on Capital Improvements Prepared by: The Office of State Budget and Management October 11, 2017 Mark Bondo Monica Scott Andrew Shaw Jim Lora Connect
More informationHospitals and the Economy. Anne McLeod Vice President, Finance Policy California Hospital Association
Anne McLeod Vice President, Finance Policy California Hospital Association American hospitals are financially challenged and the trends in revenues and expenses will put and even greater burden on the
More informationA. Amend the FY LACMTA Budget to add $3,000,000 from Measure R 3% Commuter Rail funds for the Rancho Vista Grade Separation Project
17 One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2000 Tel metro. net PLANNING AND PROGRAMMING COMMITTEE SEPTEMBER 19, 2012 SUBJECT: ACTION: RANCHO VISTA GRADE SEPARATION AND REGIONAL RAIL UPDATE
More informationALBERTA TRANSPORTATION North Central Region Edson Area Instrumentation Monitoring Results
ALBERTA TRANSPORTATION North Central Region Edson Area Instrumentation Monitoring Results Fall 1 Section D Data Presentation Site NC3: Hwy :3 Lazy S -15 -.5.5 15 LEGEND Initial 1 Sep 1 Sep -75-37.5 37.5
More informationAnalysis of Incurred Claims Trend and Provider Payments
Analysis of Incurred Claims Trend and Provider Payments Board of Trustees Meeting May 24, 2013 Presentation Overview Trends in Incurred Claims Paid through March 31, 2013 Per Member Per Month (PMPM) By
More informationQuality Management Report 2017 Q2
Quality Management Report 2017 Q2 Quality Management Program CMS STAR Ratings Member Satisfaction (CAHPS & HOS) HEDIS Risk Adjustment DHS Member Incident Reporting Member Satisfaction Surveys Pay for Performance
More informationSmithsonian Institution
Smithsonian Institution Recovery Act, 2009 Agency-wide and Program-specific Plan Updated May 2010 Smithsonian Institution American Recovery and Reinvestment Act of 2009 Agency-wide and Program-specific
More informationRiver Use Update Oct by Steve Sullivan
Grand Canyon River Office River Use Update Oct-2014 -by Steve Sullivan Topics Commercial Use Numbers Noncommercial Use (NC) Numbers NC Lottery Applications NC Trip Sizes, Boats, and TAOTs NC Unused Launches
More informationNorth Carolina Division of Medical Assistance
North Carolina Division of Medical Assistance Medicaid Clinical Policy and Programs Update on Medicaid In-Home Personal Care Services (PCS) Presented Larry Nason, Ed.D. Chief, Medicaid Facility by: and
More informationSummary Minutes Inland Waterways Users Board Meeting No. 76 Gaylord Opryland Hotel and Convention Center Nashville, Tennessee August 12, 2015
Summary Minutes Inland Waterways Users Board Meeting No. 76 Gaylord Opryland Hotel and Convention Center Nashville, Tennessee August 12, 2015 Inland Waterways Users Board Meeting No. 76 was called to order
More informationResearch Implementation Plan for Female Enlisted Marines at Infantry Training Battalion, School of Infantry East
Research Implementation Plan for Female Enlisted Marines at Infantry Training Battalion, School of Infantry East Information Brief for Media Roundtable Training and Education Command 25 Sep 2013 For Official
More informationA View from a LHIN Breakfast with the Chiefs
A View from a LHIN Breakfast with the Chiefs Matthew Anderson Chief Executive Officer October 22 nd, 2008 To change the world To change the world To change the world 6 Months of Learning The good news
More informationChange Management at Orbost Regional Health
Change Management at Orbost Regional Health Our change management journey 1 Medication Change System Meds at Beds 2 The slightly exaggerated before process 3 Project Goals The purpose of the Meds at Beds
More informationUNCLASSIFIED. LandWarNet Army Request for IT (ARFIT) Information Exchange Forum (IEF)
LandWarNet 2011 Army Request for IT (ARFIT) Information Exchange Forum (IEF) CIO/G-6 Governance, Acquisitions and Chief Knowledge Officer (GA&CKO) Governance Division Strategic Goals Approach Objectives
More informationYear. Figure 5.2
3 1997 2 1998 1 Time (Year) 1999 2 1 21 2 22 3 23 14E 16E 18 16W 14W 12W 1W 8W Figure 5.1 Copyright 211 John Wiley & Sons, Inc. 4 3 Niño 3 Index Niño 4 Index 2 Deg C 1 1 2 3 195 1955 196 1965 197 1975
More informationSujit M. CanagaRetna Senior Fiscal Analyst The Council of State Governments Southern Legislative Conference (SLC)
Sujit M. CanagaRetna Senior Fiscal Analyst The Council of State Governments Southern Legislative Conference (SLC) 48 Length of Contraction Period (In Months) 43 36 24 12 13 8 11 10 8 10 11 16 6 16 8 8
More informationGrant Reporting for Faculty Grant Expense Detail
Grant Reporting for Faculty Grant Expense Detail This report provides line item detail expenses for a user-specified Sponsored Program. The report allows faculty and department administrators to more easily
More informationSTATISTICAL PRESS NOTICE MONTHLY CRITICAL CARE BEDS AND CANCELLED URGENT OPERATIONS DATA, ENGLAND March 2018
STATISTICAL PRESS NOTICE MONTHLY CRITICAL CARE BEDS AND CANCELLED URGENT OPERATIONS DATA, ENGLAND March 2018 Main Findings March 2018: Critical Care Beds There were 4,064 adult critical care beds available
More informationArizona State Parks Board June 22, 2011
Arizona State Parks Board June 22, 2011 1 Executive Director E.1. STATE OF ARIZONA STATE PARKS 2 FY 2008 What We Had 29 State Parks Open and Operated by ASP 2.5 million visitors 328 Full-time filled positions
More informationUSACE Huntington - Indefinite Delivery Contracts
Type Description Contractor Name Cost Cost Design Design Design Geospatial Geospatial Geospatial Work is primarily for major USACE customer Dept of Energy but will also be available for Dept of Homeland
More informationFuture of Logistics Civil Augmentation Program
Future of Logistics Civil Augmentation Program Mr. Jay T. Carr LOGCAP Executive Director U.S. Army Sustainment Command Background Program Consistency For 28 years the Logistics Civil Augmentation Program
More informationCOMPLIANCE WITH THIS PUBLICATION IS MANDATORY
BY ORDER OF THE COMMANDER ROBINS AIR FORCE BASE AIR FORCE INSTRUCTION 36-2905 ROBINS AIR FORCE BASE Supplement 30 JANUARY 2018 COMPLIANCE WITH THIS PUBLICATION IS MANDATORY Personnel FITNESS PROGRAM ACCESSIBILITY:
More informationPATIENT CARE SERVICES REPORT Submitted to the Joint Conference Committee, August 2016
Report Contents: PATIENT CARE SERVICES REPORT Submitted to the Joint Conference Committee, August By: Terry Dentoni, MSN, RN, CNL, SFGH Chief Nursing Officer 1. Professional Nursing..1 2. Emergency Department
More informationOhioHealth s Mission: To Improve the Health of Those We Serve
Enhancing SAFE SKIN Through Computer Utilization OhioHealth s Mission: To Improve the Health of Those We Serve 2 1 3 Grant Medical Center 21,000 patient discharges/year Average daily census of 260 Magnet
More informationNavy ManTech Program. ManTech Update. Tom Hite CTC 15 October 2014
Navy ManTech Program ManTech Update Tom Hite CTC 15 October 2014 Navy ManTech Overview Agenda CNST Recompete Update Navy ManTech Support Recompete FY16 Investment Strategy Affordability Assessment Update
More informationPERFORMANCE MANAGEMENT MEETING. Health Department:
PERFORMANCE MANAGEMENT MEETING Health Department: 5.20.14 May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr EXHIBIT 1: Health Service Request Volume Month
More informationWelcome and Introductions
Fiscal Matters: An Overview of Annual Head Start and Early Head Start Grant Requirements U.S. Department of Health and Human Services, Welcome and Introductions Staff Grantee Representatives 1 Goals for
More informationNational Trends Winter 2016
National Trends Winter 216 About the National Trends data This report presents a unique and real-time view of trends within temporary nursing including bank and agency usage. The data used has been drawn
More informationNATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION NOAA ADMINISTRATIVE ORDER SERIES TABLE OF CONTENTS. as of December 8, 2008
NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION NOAA ADMINISTRATIVE ORDER SERIES TABLE OF CONTENTS as of December 8, 2008 Attached is a revision to the Table of Contents for the NOAA Administrative Order
More informationCONGRESSIONAL DISTRICT: KY 01
CONGRESSIONAL DISTRICT: KY 01 John T. Myers Locks & Dam Lock Improvements Project, GRR Newburgh Lower Salt River Basin Conservation Vision, PAS Olmsted Locks & Dam Olmsted Hickman Ohio River Shoreline
More informationUNIVERSITY OF DAYTON DAYTON OH ACADEMIC CALENDAR FALL Incoming First Year students move into UD Housing
UNIVERSITY OF DAYTON DAYTON OH 2018-2019 ACADEMIC CALENDAR FALL 2018 Mon. Aug 6 TBD Thu, Aug 16 Fri, Aug 17 Sat, Aug 18-21 Sun, Aug 19 Tue, Aug 21 Tue, Aug 21 Wed, Aug 22 Tue, Aug 28 Mon, Sep 3 Fri, Sep
More informationDepartments to Improve. February Chad Faiella RN, Terri Martin RN. 1 Process Excellence
Coordination of Multiple Departments to Improve ED Throughput February 2011 Chad Faiella RN, Terri Martin RN 1 Agenda OhioHealth information Grant Medical Center facts Bed assignment process Key takeaways
More informationAccreditation Support for Ohio Local Health Districts Request for Training or Technical Assistance - Round 1 The Ohio Department of Health
12-28-2016 Accreditation Support for Ohio Local Health Districts Request for Training or Technical Assistance - Round 1 The Ohio Department of Health OVERVIEW With funding from the Ohio Department of Higher
More informationLocation Factors in the Food Processing Industry
Location Factors in the Food Processing Industry 2011 Meet the Consultants Forum- Atlanta May 12-13 Robert Pittman, Co Founder & Principal Janus Economics, LLC Atlanta, Georgia 404 431 1255 rpittman@januseconomics.com
More informationTina Nelson, MBA, BSN Lisa Stepp, BSN, RN Rebecca Fyffe, BSN, RN Jessica Coughenour, LPN
Establishing a Conservative Approach to the Prevention of Pressure Ulcers with the Utilization of Data Analytics to Monitor Effectiveness of Quality Efforts and Best Practice Models Tina Nelson, MBA, BSN
More informationNew Hope Crushed Stone. Monthly Update Solebury Communications Group November 2017
New Hope Crushed Stone Monthly Update Solebury Communications Group November 2017 Tom Wolf, Governor Patrick McDonnell, Secretary November 2017 Project Status STATUS AS OF: December 4, 2017 PROJECT START
More information* Passenger includes electronic and hydraulic elevators ** Pieces of equipment designated as 'unknown' do not receive a certificate of operation
Elevator Advisory Board September 27, 2017 Elevator Contractors, Inspectors, & Equipment Licensing Statistics REGISTRANTS Total # of Active Contractors Total # of Active Inspectors Total # of Active Designee's
More informationWhat happened before MMC?
Modernising Medical Careers: Foundation Programme Application Process Dr (Insert Name) (insert title) What happened before MMC? PRHO (F1) and SHO (F2) Applications all year round Multiple applications
More informationDoD-State Liaison Office
U N I T E D S T A T E S D E P A R T M E N T O F D E F E N S E DoD-State Liaison Office www.usa4militaryfamilies.dod.mil Working with states on issues important to Service members and their families! Thank-you
More informationSheffield Teaching Hospitals NHS Foundation Trust
Sheffield Teaching Hospitals NHS Foundation Trust @seamlesssurgery Seamless Surgery Team Sheffield Teaching Hospitals NHS Foundation Trust July 2017 PROUD TO MAKE A DIFFERENCE PROUD TO MAKE A DIFFERENCE
More informationCAMDEN CLARK MEDICAL CENTER:
INSIGHT DRIVEN HEALTH CAMDEN CLARK MEDICAL CENTER: CARE MANAGEMENT TRANSFORMATION GENERATES SAVINGS AND ENHANCES CARE OVERVIEW Accenture helped Camden Clark Medical Center, (CCMC), a West Virginia-based
More informationDRAFT//PRE-DECISIONAL
1 2 3 4 5 6 123456789012345678901234567890123456789012345678901234567890123456789 MSGID/GENADMIN/CMC WASHINGTON DC// SUBJ/FY2018 CLASS DATES FOR THE REGIONAL STAFF NONCOMMISSIONED OFFICER ACADEMIES// REF/A/MCO
More informationWelcome SUPT Students
Welcome SUPT Students Welcome to Specialized Undergraduate Pilot Training. Please take advantage of this welcome package we have provided for you. If you have any additional questions, feel free to call
More informationQuarterly Report on Agency Services to Floridians with Developmental Disabilities and Their Costs
Quarterly Report on Agency Services to Floridians with Developmental Disabilities and Their Costs First Quarter Fiscal Year 2012/13 (July, August, September) Submitted November 2012 Barbara Palmer Director
More informationPatient Experience: Good to Great!
Patient Experience: Good to Great! April, 2016 Angela Kramer & Nancy Burden FSASC Quality & Risk Management Conference April 2016 Renaissance Orlando at SeaWorld OBJECTIVES Upon completion of this presentation
More informationThe SOMC Employee Wellness Program
The SOMC Employee Wellness Program A Focus on Results Not Participation Pike County Health Coalition Julie Thornsberry, RN, BSN Manager Employee Health & Wellness What are today s objectives? Identify
More informationMANAGEMENT DEVELOPMENT PROGRAMMES CODE COURSE DURATION DATES
MANAGEMENT DEVELOPMENT PROGRAMMES MDP 101 Management Development programme(mdp) 4 Weeks 03 Mar - 28 Mar 07 Jul - 01 Aug 06 Oct - 31 Oct MDP 102 Result Oriented Management 4 Weeks 24 Feb - 21 Mar 23 Jun
More informationExecutive Director s Report: Customer Experience Update
Executive Director s Report: Customer Experience Update Board of Directors Meeting, November 12, 215 Seconds Calls Service Center Performance 2, 18, 16, 14, 12, 1, 8, 6, 4, 2, Calls Offered Jan 215 Sept
More informationThe Toyota Foundation 2018 International Grant Program Application Form
The Toyota Foundation 2018 International Grant Program Application Form Notes: Please be sure to read the Program Guidelines before filling out this form. DO NOT alter the size of the text boxes. Altered
More informationREQUEST FOR PROPOSAL CITY OF PORT ARANSAS GAS DEPARTMENT FOR NATURAL GAS SUPPLY. RFP # Gas
REQUEST FOR PROPOSAL BY CITY OF PORT ARANSAS GAS DEPARTMENT FOR NATURAL GAS SUPPLY RFP # Gas-20170501 Issue Date May 1, 2017 Questions Due Thursday, May 25, 2017 by 3pm Due Date & Time for Proposals Friday,
More informationReadmission Reduction: Patient Interviews. KHA Quality Conference March, 2018
Readmission Reduction: Patient Interviews KHA Quality Conference March, 2018 Initial Driver Diagram Use Data and Root Cause Analysis to drive Continuous Improvement Analyze data to inform targeting approach
More informationCase Study BACKGROUND. Recovering Ambulance Linen. Larry J Haddad, CLLM Textile Management Consultant. Midwest Region
Title: Facility: Author: Recovering Ambulance Linen Midwest Region Larry J Haddad, CLLM Textile Management Consultant Midwest Region BACKGROUND A 294-bed, not-for-profit community hospital in the Midwest
More informationPATIENT CARE SERVICES REPORT Submitted to the Joint Conference Committee, November 2017
Report Contents: PATIENT CARE SERVICES REPORT Submitted to the Joint Conference Committee, November By: Terry Dentoni, MSN, RN, CNL - ZSFG Chief Nursing Officer 1. Professional Nursing.....1 2. Emergency
More informationSeawall Earthquake Safety + Disaster Prevention Program Community Meeting June 21, 2018
Seawall Earthquake Safety + Disaster Prevention Program Community Meeting June 21, 2018 WELCOME! This is our first Seawall Community Meeting, so, we ll start at the beginning Tonight, I will present a
More informationThe Reduction of Seclusion & Restraint in the University of Michigan Psychiatric Emergency Services with the Introduction of 24/7 Nurse Staffing
The Reduction of Seclusion & Restraint in the University of Michigan Psychiatric Emergency Services with the Introduction of 24/7 Nurse Staffing Sharon P. Stetz MSN Marvella M. Muzik, MS PMHNP, BC Objectives
More informationJun 03 Jul 03 Aug 03 Sep 03 Oct 03 Nov 03 Dec 03 Jan 04 Feb 04 Mar 04 Apr 04 May 04
7000 6000 5000 4000 Power 01 Jun 04 Goal Planned 3000 2000 3193 3236 3263 3543 3948 3582 3452 Jun 03 Jul 03 Aug 03 Sep 03 Oct 03 Nov 03 Dec 03 Jan 04 Feb 04 Mar 04 Apr 04 May 04 Electrical Generation Pre-War
More informationFundraising Opportunities in Your Community
Fundraising Opportunities in Your Community 1 Are You Fundraising Ready? Mission and Goals Annual Workplan Board and Volunteer Support Budget Fundraising Plan 2 Are You Fundraising Ready? Do you have??
More informationHIMSS Nicholas E. Davies Award of Excellence Case Study Nebraska Medicine October 10, 2017
HIMSS Nicholas E. Davies Award of Excellence Case Study Nebraska Medicine October 10, 2017 Nebraska Medicine $1.2 billion academic health system 8,000 employees More than 1,000 affiliated physicians Primary
More informationVPAC Productions. Managing the Venice Performing Arts Center. Maximizing cultural and educational return on investment
VPAC Productions Managing the Venice Performing Arts Center Maximizing cultural and educational return on investment 4/10/15 VPAC Joint Management Advisory Board 1 Serving several segments of our community
More informationWorkflow. Optimisation. hereweare.org.uk. hereweare.org.uk
Workflow Optimisation Dr. Paul Deffley & Jaivir Pall Clinical Lead & Commercial Lead About Here Not-for-profit social enterprise Membership organisation (our members are local GPs, Practice Managers, Practice
More informationPublic Transport Access to the new Southmead Hospital (Information report)
Agenda Item 13 West of England Joint Transport Executive Committee 19th June 2012 Public Transport Access to the new Southmead Hospital (Information report) Purpose 1 To report on the current joint working
More informationFalls City Engineer September/October 2016
Falls City Engineer September/October 2016 VOL. 8, Issue 5 www.lrl.usace.army.mil U.S. Army Corps of Engineers Louisville District Corps reopens river after emergency closure at Dam 52 page 3 Corps consults
More informationOMBIL. Wednesday, April 19 th, 2:10 3:10 Dena Williams Miriam Fleming Jeff Krause
1 OMBIL 237 237 237 217 217 217 200 200 200 80 119 27 252 174.59 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 102 56 48 130 120 111 Wednesday, April 19 th, 2:10
More informationCAUTI Reduction A Clinton Memorial Presentation
CAUTI Reduction 2016 A Clinton Memorial Presentation Clinton Memorial Statistics Rurally situated in a primarily agricultural community with a population of 42,000 The hospital is licensed for 165 beds
More informationPATIENT CARE SERVICES REPORT Submitted to the Joint Conference Committee, March 2018
Report Contents: PATIENT CARE SERVICES REPORT Submitted to the Joint Conference Committee, March By: Terry Dentoni, MSN, RN, CNL - ZSFG Chief Nursing Officer 1. Professional Nursing......1-2 2. Emergency
More informationUS Army Corps of Engineers. Kansas City District Programs. Arthur Saulsberry Deputy for Small Business Kansas City District May 6, 2015
US Army Corps of Engineers Kansas City District Programs Arthur Saulsberry Deputy for Small Business Kansas City District May 6, 2015 US Army Corps of Engineers Agenda Kansas City District Missions Program
More informationWater Conservation Industrial,Commercial,Institutional (ICI) Audit and Rebate Program. City of Dallas Water Utilities February 13, 2012
Water Conservation Industrial,Commercial,Institutional (ICI) Audit and Rebate Program City of Dallas Water Utilities February 13, 2012 Briefing Purpose To provide background on implementation of additional
More informationCreating A Niche: Medical-Surgical Nurses Role in Succesful Program Development (Oral)
Lehigh Valley Health Network LVHN Scholarly Works Patient Care Services / Nursing Creating A Niche: Medical-Surgical Nurses Role in Succesful Program Development (Oral) Eileen Sacco MSN, RN, CNRN, ONC
More informationAugust 2018 Labor Market Review Reported by: Cassie Janes
August 2018 Labor Market Review Reported by: Cassie Janes Regional Workforce Analyst Tel: 765-454-4760 Email Cassie cjanes@dwd.in.gov Economic Growth Region 4 Statistical Data Report for August 2018, Released
More informationIntergovernmental Working Group of Experts on International Standards of Accounting and Reporting (ISAR) Sustainability Reporting
Intergovernmental Working Group of Experts on International Standards of Accounting and Reporting (ISAR) 29th SESSION 31 October 2 November 2012 Room XIX, Palais des Nations, Geneva Friday, 2 November
More informationAlaska Psychiatric Institute. Admissions & Demographic Annual Report
Alaska Psychiatric Institute Admissions & Demographic Annual Report (As of 8/2/27) 1 Total Admissions FY, FY4, FY, FY, FY7 18 1 Number Of 14 12 1 8 FY FY4 FY FY FY7 4 2 FY Admissions - 1,227 FY Admisions
More informationSUNDAY MONDAY TUESDAY WEDNESDAY THURSDAY FRIDAY SATURDAY 1 January Q. New Year s Day Holiday CTC Term 3 On-Site College Classes Begins
JANUARY 2014 KEY DANTES DATES FOR USEUCOM 1 January Q 2 Q 3 Q 4 Q Term 3 [2013-2014] Classes Begins New Year s Day CTC Term 3 On-Site UO Term 3 On-Site 5 Q closes today. Mail, fax or scan quarterly inventories.
More informationSHEFFIELD TEACHING HOSPITALS NHS FOUNDATION TRUST EXECUTIVE SUMMARY REPORT TO THE BOARD OF DIRECTORS MEETING HELD MAY 2011
SHEFFIELD TEACHING HOSPITALS NHS FOUNDATION TRUST K EXECUTIVE SUMMARY REPORT TO THE BOARD OF DIRECTORS MEETING HELD MAY 2011 Subject Supporting TEG Member Author Status 1 Pharmacy and medicines management
More informationOverview of Home Health Star Ratings
Overview of Home Health Star Ratings September 23, 2015 Presented by: Liz Silva Deyta Analytics, a division of HEALTHCAREfirst Agenda Home Health Star Ratings Quality of Patient Care Star Rating Patient
More informationEmbedded Physician-Scholar Program
Page 1 James R. & Helen D. Russell Institute for Research & Innovation Advocate Lutheran General Hospital Embedded Physician-Scholar Program Purpose of the program is to: Strengthen and expand the hospital
More informationU.S. Government Contract FAR and DFARs Clauses Incorporated by Reference
U.S. Government Contract and Ds Clauses Incorporated by For covered subcontracts: 1. The clauses listed below are incorporated by reference herein and in this Order, as applicable, with the same force
More informationPROJECTS. FOR THE MONTHS OF October-November 2017
PROJECTS FOR THE MONTHS OF October-November 2017 Foundation Marketing 2017 Foundation Websites - Web Usage Report (Jan - Oct 2017) * ** ** ** Column R Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
More informationGreat Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues
Great Lakes Navigation Stakeholder Meeting Shallow Draft Harbor Needs & Issues Marie Strum U.S. Army Corps of Engineers Great Lakes Navigation Team Leader April 10, 2018 The views, opinions and findings
More informationFalls Prevention In Rehabilitation
Falls Prevention In Rehabilitation Robyn Walker Rankin Park Centre Greater Newcastle Cluster March 2008 1 Frequency of Falls A total of 157 patients fell in Rankin Park Centre during the 12 months from
More informationOPTIMUM/12/2016 CORPORATE RATE PROGRAMME O PTIMUM. BENEFITS TAILOReD FOR SMALL and MEDIUM ENTERPRISES. by langham
OPTIMUM/12/2016 O PTIMUM by langham CORPORATE RATE PROGRAMME BENEFITS TAILOReD FOR SMALL and MEDIUM ENTERPRISES JOIN LANGHAM S OPTIMUM PROGRAMME TO ENJOY YEAR ROUND PRIVILEGES AT OUR PORTFOLIO WORLDWIDE.
More informationCardinal Bank & George Mason University
Cardinal Bank & George Mason University 2th Annual Economic Conference Friday, January 13, 212 cra.gmu.edu Cardinal Bank/George Mason University 2 th Annual Economic Conference Is This a Recovery or What?
More informationFHWA/USDOT Role in Project Finance
April 2008 Federal Tools for Project Finance Transportation Infrastructure Finance Workshop U.S. DOT/AASHTO Center for Excellence Chicago, IL Jennifer R. Mayer Federal Highway Administration Resource Center
More informationApproaches to reducing DNA and CNA
Quality and Efficiency Support Team (QuEST) Directorate for Health Workforce and Performance Approaches to reducing DNA and CNA Lesley White, National Improvement Advisor, QuEST Mike Henderson, Consultant
More informationDischarge and Follow-Up Planning. Presented by the Clinical and Quality Team
Discharge and Follow-Up Planning Presented by the Clinical and Quality Team After today s training you will be able to: Identify and summarize important information about discharge planning Have adequate
More informationEgypt National Railways Restructuring Project (ENRRP) Procurement Plan Updated on April 21, 2014
84 Million $ Estimated Cost US$ Selection Method ToR Request for Expressions of Interest Short List Conclude RfP Wb No-objection to RfP Invitation to submit proposals Proposals due date losure Authorized
More informationPATIENT CARE SERVICES REPORT Submitted to the Joint Conference Committee, May 2010 Sharon McCole-Wicher, RN, MS, Chief Nursing Officer
PATIENT CARE SERVICES REPORT Submitted to the Joint Conference Committee, May 2010 Sharon McCole-Wicher, RN, MS, Chief Nursing Officer 1. April 2010 2320 RN VACANCY RATE: Overall 2320 RN vacancy rate for
More informationBCMA Multidisciplinary Process Improvement Phase 2: Post Implementation System Evaluation
BCMA Multidisciplinary Process Improvement Phase 2: Post Implementation System Evaluation Kathryn G. Sapnas, PhD. RN, CCRN, CNOR Cathleen Rhoades, MS, RN Kathryn Ginger Ward-Presson, MSN, RN Marie Schafer,
More informationHiller Plumbing, Heating, Cooling & Electrical partnered with Total Tech, LLC Transition to Trades (TtT) Fort Campbell, KY
Hiller Plumbing, Heating, Cooling & Electrical partnered with Total Tech, LLC Transition to Trades (TtT) Fort Campbell, KY Candidate Application & Assessment Packet Version 10: July 28 2017 Total Tech,
More informationLong Creek Nature Preserve Overview and Update. Community Development Department
Long Creek Nature Preserve Overview and Update Long s Landing Estuary Sites LONG CREEK SITE Water Routes Connection to IntraCoastal Waterway College Waterway (City s salt water canal system) Long Creek
More information