UNCLASSIFIED UNCLASSIFIED

Size: px
Start display at page:

Download "UNCLASSIFIED UNCLASSIFIED"

Transcription

1 Exhibit R, RDT&E Budget Item Justification: PB : Research, Development, Test & Evaluation, / BA 7: Operational Systems Development COST ($ in Millions) FY 00 FY 0 FY 0 FY 0 Program Element EF6: JADOCS EF7: PocketSized Forward Entry Device (PFED) Inc EF8: AFATDS Increment A. Mission Description and Budget Item Justification This program element provides development for fire support command and control systems used by all Services from platoon to echelons above Corps. There are two developmental efforts that are being executed concurrently and beyond: Pocketsized Forward Entry Device (Increment II) (project code EF7) and Advanced Field Artillery Tactical Data System (AFATDS) (Increment I) (project code EF8). The development on the Joint Automated Deep Operations Coordination System (JADOCS) (project code EF6) was completed in. Joint Automated Deep Operations Coordination System (JADOCS) is a Joint and Coalition targeting, coordination mission management software application. It links Command and Control (C), Intelligence, and Air operations information with execution systems using real time collaborative targeting managers, customized for each service or specific functional area. JADOCS is used to significantly enhance the Joint Force and Component Command's capability to simultaneously develop, coordinate and execute Dynamic and Time Sensitive targets and fire missions, as well as battle space coordination worldwide. JADOCS provides coordination and deconfliction of targeting information at all levels of command structure for the military. JADOCS is used by Air, Ground, Maritime, and Special Operations forces. It provides horizontal (across Services) as well as vertical (within Services) coordination of missions to ensure a common picture of targeting operational status across the entire joint force. As a software application, JADOCS can be configured and customized for each user and location. Pocketsized Forward Entry Device (PFED) Increment II is a software application that operates on the Nett Warrior End User Device (EUD). It will provide the dismounted Forward Observer (FO) and Fire Support Teams (FISTs) the capability and functionality to accurately and rapidly locate ground targets and digitally process a Call For Fire. PFED Increment II answers the Mobile Handheld Computing Environment requirement that all handheld applications reside on the Nett Warrior EUD. AFATDS 7.0 modernizes the existing AFATDS program currently in the field. AFATDS 7.0 enhances the existing AFATDS baseline by: () Providing a modernized web service based backend that will simplify longterm maintenance of the software, () Bringing AFATDS into full compliance with the 's Common Operating Environment (COE) Command Post Computing Environment (CPCE) initiative and () Enhancing overall usability of the system through the implementation of a rolebased capability architecture with embedded training that allows the AFATDS operator to receive onthespot training for any aspect of AFATDS via interactive instruction. Page of R Line #99 8

2 Exhibit R, RDT&E Budget Item Justification: PB : Research, Development, Test & Evaluation, / BA 7: Operational Systems Development B. Program Change Summary ($ in Millions) Previous President's Budget Current President's Budget Adjustments Congressional General Reductions Congressional Directed Reductions Congressional Rescissions Congressional Adds Congressional Directed Transfers Reprogrammings SBIR/STTR Transfer Adjustments to Budget Page of R Line #99 8

3 Exhibit RA, RDT&E Project Justification: PB 09 COST ($ in Millions) EF6: JADOCS Quantity of RDT&E Articles.77 FY 00 FY 0 EF6 / JADOCS FY 0 FY 0.77 A. Mission Description and Budget Item Justification Joint Automated Deep Operations Coordination System (JADOCS) is a Joint and Coalition targeting, coordination mission management software application. It links Command and Control (C), Intelligence, and Air operations information with execution systems using real time collaborative targeting managers, customized for each service or specific functional area. JADOCS is used to significantly enhance the Joint Force and Component Command's capability to simultaneously develop, coordinate and execute Dynamic and Time Sensitive targets and fire missions, as well as battle space coordination worldwide. JADOCS provides coordination and deconfliction of targeting information at all levels of command structure for the military. JADOCS is used by Air, Ground, Maritime, and Special Operations forces. It provides horizontal (across Services) as well as vertical (within Services) coordination of missions to ensure a common picture of targeting operational status across the entire joint force. As a software application, JADOCS can be configured and customized for each user and location. JADOCS fires and targeting capabilities will migrate to AFATDS v 7.. JADOCS v.0 will be sustained throughout the force until AFATDS 7. is fielded and satisfies the requirement for JADOCS fires and targeting functionality. JADOCS v.0 software is being developed by CECOM Life Cycle Management Command, Software Engineering Center (SEC). There is no RDTE funding request. B. Accomplishments/Planned Programs ($ in Millions) Title: JADOCS Software Development Efforts Description: Software development of JADOCS v.0 software. Title: Program Management Support s for JADOCS Description: Program support for JADOCS v.0 software development efforts. Title: and Joint Testing Activities Description: Conduct and support and Joint Testing Activities. Title: FFRDC Page of R Line #99 8

4 Exhibit RA, RDT&E Project Justification: PB 09 EF6 / JADOCS B. Accomplishments/Planned Programs ($ in Millions) Description: FFRDC Title: SBIR/STTR Accomplishments/Planned Programs s C. Other Program Funding Summary ($ in Millions) Line Item B8504: JOINT AUTOMATED DEEP OPNS COORDINATION SYSTEM Remarks FY FY 0 FY 0 FY D. Acquisition Strategy JADOCS v.0 is the last version of JADOCS software. JADOCS v.0 will interoperate with AFATDS. JADOCS v.0 will be maintained and sustained until the Joint Users requirements are met by AFATDS and other systems. JADOCS.0 is developed under agreement with the LCMC SEC. E. Performance Metrics Page 4 of R Line #99 84

5 Exhibit R, RDT&E Project Analysis: PB 09 Product Development ($ in Millions) Category Item Software Development IA CECOM LCMC SEC FD : Ft. Sill, OK Program Management Support Various PM Mission Command (MC) : APG, MD Category Item Various Joint Service Testing : Various Project s Test and Evaluation ($ in Millions). and Joint Test Support.55 Support ($ in Millions) Category Item EF6 / JADOCS Remarks Page 5 of R Line #99 85

6 Exhibit R4, RDT&E Schedule Profile: PB 09 Page 6 of EF6 / JADOCS R Line #99 86

7 Exhibit R4A, RDT&E Schedule Details: PB 09 EF6 / JADOCS Schedule Details Start Quarter Year 04 Quarter Year 07 Independent Validation & Verification (IV&V) v Govt Confidence Demo (OT) v Air Force Developmental Test v Air Force Operational Test v Deployment Decision v Initial Operational Capability (IOC) v Fielding v Full Operational Capability (FOC) v Software Development v.0 Events End Page 7 of R Line #99 87

8 Exhibit RA, RDT&E Project Justification: PB 09 COST ($ in Millions) EF7: PocketSized Forward Entry Device (PFED) Inc Quantity of RDT&E Articles FY 00.8 EF7 / PocketSized Forward Entry Device (PFED) Inc FY 0 FY FY A. Mission Description and Budget Item Justification Pocketsized Forward Entry Device (PFED) Increment II is a software application that operates on the Nett Warrior End User Device (EUD). It will provide the dismounted Forward Observer (FO) and Fire Support Teams (FISTs) the capability and functionality to accurately and rapidly locate ground targets and digitally process a Call For Fire. PFED Increment II answers the Mobile Handheld Computing Environment requirement that all handheld applications reside on the Nett Warrior EUD. funding of $.884 million supports the evolutionary software development and testing of PFED Increment II and transition to the mounted computing environment. B. Accomplishments/Planned Programs ($ in Millions) Title: Program Management Support s for PFED Increment II Description: Program support for PFED INC II software development efforts. Plans: Provide Program Management Office (PMO) support (Core, Matrix, and SETA) for all aspects of the PFED Inc II program including requirements development, software development efforts, logistics, and business management support. Plans: Provide Program Management Office (PMO) support (Core, Matrix, and SETA) for all aspects of the PFED Inc II program including requirements development, software development efforts, logistics, and business management support. to Increase/Decrease Statement: RDTE management requirements decreasing as development moves to fielding Title: PFED INC II Software Development Description: PFED INC II Software Development Plans: Development and testing of Block capabilities. hardware/software integration with Nett Warrior EUD and MFOCS. software Information Assurance certification. Plans: Page 8 of R Line #99 88

9 Exhibit RA, RDT&E Project Justification: PB 09 EF7 / PocketSized Forward Entry Device (PFED) Inc B. Accomplishments/Planned Programs ($ in Millions) Development and testing of Block capabilities. hardware/software integration with Nett Warrior EUD and MFOCS. software Information Assurance certification. to Increase/Decrease Statement: RDTE development requirements decreasing as development moves to fielding Title: Testing Description: Conduct and Support Testing Activities Plans: Prepare and execute Engineering Release Evaluation/Testing. Plans: Prepare and execute Engineering Release Evaluation/Testing. to Increase/Decrease Statement: RDTE test requirements decreasing as development moves to fielding Accomplishments/Planned Programs s C. Other Program Funding Summary ($ in Millions) Line Item BZ985: BZ985 POCKET FORWARD ENTRY DEVICE (PFED) OPA Remarks FY FY 0.80 FY FY 0 Continuing Continuing D. Acquisition Strategy On 8 May 05, the Milestone Decision Authority (PEO CT) signed the Acquisition Decision Memorandum (ADM) approving the PFED Increment II Milestone B. The Acquisition Decision Memorandum (ADM) officially approved entry into the Development phase as an Acquisition Category (ACAT) III program. The system received a limited deployment decision in Dec 06 to enter into operational test and subsequently expects to receive full material release in Jan 08 PFED Increment II leverages an Science and Technology investment by transitioning a software application that has been developed and used in proponent experimentation events (e.g. Expeditionary Warrior Experiment (AEWE) and Bold Quest). Upon a successful Milestone B decision in FY05, this software application transitioned to PM Mission Command to conduct all developmental and operational test and evaluation requirements. PFED Increment II will be Page 9 of R Line #99 89

10 Exhibit RA, RDT&E Project Justification: PB 09 EF7 / PocketSized Forward Entry Device (PFED) Inc integrated onto the Nett Warrior End User Devices (EUDs) and will be fielded by PM Soldier Warrior (PM SWAR). Training on the PFED Increment II software will be conducted by PM Mission Command as units are fielded the capability. PM Mission Command will continue to manage future capability blocks of software development. PM Mission Command will continue to coordinate with PM Soldier Warrior to field and train future versions of the software, as described above. E. Performance Metrics Page 0 of R Line #99 90

11 Exhibit R, RDT&E Project Analysis: PB 09 Management Services ($ in Millions) Category Item Program Management Support for PFED Inc (CORE) Program Management Support for PFED Inc (Matrix) IA Various Mix Orgs (Govt) : APG, MD Program Management Support for PFED Inc (SETA) C/FFP CRSA : APG, MD Product Development ($ in Millions) Category Item PFED Increment II Software Development efforts IA PM Mission Sub Allot Command (MC) : APG, MD AMRDEC : Redstone, AL EF7 / PocketSized Forward Entry Device (PFED) Inc Oct Continuing Continuing Continuing Continuing Continuing Remarks SW development contract awarded 6 October 07 Support ($ in Millions) Category Item Program Management Support Various PM Mission Command (MC) : APG, MD Continuing Continuing Continuing Continuing Continuing Page of R Line #99 9

12 Exhibit R, RDT&E Project Analysis: PB 09 Test and Evaluation ($ in Millions) Category Item Test Support (Engineering Release) Various Testing : Various Continuing Continuing Continuing Continuing Continuing Project s EF7 / PocketSized Forward Entry Device (PFED) Inc Continuing Continuing Remarks Page of R Line #99 9

13 Exhibit R4, RDT&E Schedule Profile: PB 09 Page of EF7 / PocketSized Forward Entry Device (PFED) Inc R Line #99 9

14 Exhibit R4A, RDT&E Schedule Details: PB 09 EF7 / PocketSized Forward Entry Device (PFED) Inc Schedule Details Start Events Software Development & Testing Block End Quarter Year 05 Quarter Year 07 Developmental Test (DT) Block Limited Deployment Decision (LDD) Block Operational Test (OT) Block Full Deployment Decision (FDD) Block Initial Operational Capability (IOC) Block Training/Fielding Block (OPA Funded) 08 0 Software Development & Testing Block Developmental Test (DT) Block Limited Deployment Decision (LDD) Block Operational Test (OT) Block Full Deployment Decision (FDD) Block Training/Fielding Block (OPA Funded) Page 4 of R Line #99 94

15 Exhibit RA, RDT&E Project Justification: PB 09 COST ($ in Millions) EF8: AFATDS Increment Quantity of RDT&E Articles FY FY 0 EF8 / AFATDS Increment FY FY A. Mission Description and Budget Item Justification Advanced Field Artillery Tactical Data System (AFATDS) 7.0 modernizes the existing AFATDS software currently in the field. AFATDS 7.0 enhances the existing AFATDS baseline by: () Providing a modernized web service based backend that will simplify longterm maintenance of the software, () Bringing AFATDS into full compliance with the 's Common Operating Environment (COE) Command Post Computing Environment (CPCE) initiative and () Enhancing overall usability of the system through the implementation of a rolebased capability architecture with embedded training that allows the AFATDS operator to receive onthespot training for any aspect of AFATDS via interactive instruction. funding in the amount of $7.070 million will be used to continue development efforts on AFATDS version 7.0. B. Accomplishments/Planned Programs ($ in Millions) Title: Program Management s for AFATDS software development Description: Provide program support for AFATDS software development efforts. Plans: Provide Program Management Office (PMO) support (Core, Matrix, and SETA) for all aspect of the AFATDS program including requirements analysis, software development efforts, logistics, and business management support. Plans: Provide Program Management Office (PMO) support (Core, Matrix, and SETA) for all aspect of the AFATDS program including requirements analysis, software development efforts, logistics, and business management support. to Increase/Decrease Statement: Economic adjustment. Title: AFATDS software development efforts Description: Development of AFATDS software including V6.8.. and V7.0 Plans: Development will focus on the AFATDS v7.0 effort to include building fire support, fire control and fire direction role based capabilities, integrating available CP CE v common components, and updating the user interface for the application. Plans: Page 5 of R Line #99 95

16 Exhibit RA, RDT&E Project Justification: PB 09 EF8 / AFATDS Increment B. Accomplishments/Planned Programs ($ in Millions) Development will continue to focus on the AFATDS v7.0 effort to include building fire support, fire control and fire direction role based capabilities, integrating available CP CE v common components, and updating the user interface for the application to Increase/Decrease Statement: Software development continuing at a steady rate. Title: Defensive Cyber Tools Description: Integration of Tactical Public Key Infrastructure (TPKI) defensive cyber tools into AFATDS v7.0 Title: Operational and Developmental Testing Description: Conduct and support test activities for AFATDS development. Accomplishments/Planned Programs s C. Other Program Funding Summary ($ in Millions) Line Item B860: MOD OF INSVC EQUIP, AFATDS Remarks FY FY FY FY D. Acquisition Strategy On May 05, the Acquisition Executive (AAE) determined that a modernization of the existing AFATDS software code is required to comply with Common Operating Environment (COE) standards to be executed as AFATDS 7.0. In V7.0, the PM will redesign AFATDS to provide the operator role/dutybased interaction, a dynamic embedded training capability, integration of COE compliant architectures and allowance for more efficient insertion of future capabilities. Development of future AFATDS capabilities will be considered based on requirements approved through the Fires Center of Excellence (FCoE) Tactical Software Requirements Governance Board. E. Performance Metrics Page 6 of R Line #99 96

17 Exhibit R, RDT&E Project Analysis: PB 09 Management Services ($ in Millions) Category Item Program Management Support for AFATDS (Core) PM Mission Sub Allot Command (MC) : APG, MD Various Matrix Orgs (Govt) : Aberdeen PG, MD Feb IA Program Management Support for AFATDS (SETA Contr) C/FFP CRSA : Aberdeen PG, MD Program Management Support for AFATDS (FFRDC) FFRDC MITRE : APG, MD.88 Product Development ($ in Millions) Category Item.49 Program Management Support for AFATDS (Matrix) EF8 / AFATDS Increment.50 Software Development of AFATDS Version C/CPFF Raytheon Systems Corp. : Ft. Wayne, IN Software Development of AFATDS Version 7.0 C/CPFF TBD : TBD Jun Remarks AFATDS 7.0 contract awarded 8 June 07 Page 7 of R Line #99 97

18 Exhibit R, RDT&E Project Analysis: PB 09 Support ($ in Millions) Category Item Information Assurance and Engineering Support for AFATDS requirements C/CPFF Defensive Cyber Tools (TPKI) TBD Risk Reduction Analysis, Solution Refinement, Requirements Development, RFP Development. IA CSC : Various Locations TBD : TBD US Operational Test Command : Ft Hood, Tx Test and Evaluation ($ in Millions) Category Item Government Confidence Demo for AFATDS V6.8.x requirements. IA Independent Verification and Validation of AFATDS V7.0 requirements C/CPFF Developmental Testing for AFATDS v7.0 IA.060 Test & Evaluation Command (ATEC)/Fires Test Directorate (FTD) : Various Locations 0.66 Engility : Various Locations 0.55 Multiple Govt Test Agencies (ATEC, ATC, EPG) : Multiple Project s EF8 / AFATDS Increment Page 8 of R Line #

19 Exhibit R, RDT&E Project Analysis: PB 09 EF8 / AFATDS Increment Remarks Page 9 of R Line #99 99

20 Exhibit R4, RDT&E Schedule Profile: PB 09 Page 0 of EF8 / AFATDS Increment R Line #99 00

21 Exhibit R4A, RDT&E Schedule Details: PB 09 EF8 / AFATDS Increment Schedule Details Start Quarter 4 Year 08 Quarter Year 09 V6.8.. P Development V6.8.. P Customer Test V6.8.. P Fielding 00 0 V7.0 Request For Proposal V7.0 Development (Primary) V7.0 Development ( Period) V7.0 Test for Record (Developmental Test/Operational Test) 00 0 V7.0 Fielding Decision 0 0 V7.0 Fielding & New Equipment Training (OPA Funded) V7.0.X Development (Option) Option V7.0.X Development (Option Period) 00 0 V6.8.. P Fielding (OPA Funding) Events End Page of R Line #99 0

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Joint Automated Deep Operation Coordination System (JADOCS)

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Joint Automated Deep Operation Coordination System (JADOCS) Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army : March 2014 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) Years FY 2013 FY

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing EF4: Integrated Broadcast System

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing EF4: Integrated Broadcast System Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) Years FY 2014

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) COST (In Thousands) FY1999 Actual FY 2002 FY 2003 FY2004 FY2005 to Program Element (PE) 33993 38970 33420 37335 35713 23230 23441 Continuing Continuing

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Program Element 24.648 42.347 68.325-68.325 66.869 4.46 -

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 125.44 31.649 4.876-4.876 25.655

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 0.000 24.500 23.016-23.016 25.350 26.026

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #82

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #82 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Army : March 2014 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) # FY 2016

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) FY 2017 FY 2018

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 Navy Page 1 of 8 R-1 Line #82 To Program Element - -

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Tactical Electronic Surveillance System - Adv Dev. Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Tactical Electronic Surveillance System - Adv Dev. Prior Years FY 2013 FY 2014 FY 2015 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Army : March 2014 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #156

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #156 Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

UNCLASSIFIED FY 2017 OCO. FY 2017 Base

UNCLASSIFIED FY 2017 OCO. FY 2017 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Army : February 2016 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) Years FY 2015

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Adv Field Artillery Tactical Data System

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Adv Field Artillery Tactical Data System Exhibit R-2, RDT&E Budget Item Justification: PB 212 Army DATE: February 211 COST ($ in Millions) FY 21 FY 211 FY 213 FY 214 FY 215 FY 216 To Program Element 29.127 24.622 29.546-29.546 24.448 24.593 24.444

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 214 Navy DATE: April 213 COST ($ in Millions) Years FY 212 FY 213 # ## FY 215 FY 216 FY 217 FY 218 To Program Element 217.794 3.418 3.773 3.262-3.262 3.433

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Air Force Integrated Personnel and Pay System (AF-IPPS) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Air Force Integrated Personnel and Pay System (AF-IPPS) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2013 FY 2014 FY 2015 FY 2016 To Complete Program Element 20.405 43.300 91.866-91.866 90.598 129.201

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Army DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Program Element 23.812 29.5 32.556-32.556 33.14 3.238 28.483

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #90

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #90 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 5: System Development & Demonstration (SDD) COST ($ in Millions)

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) Years FY 2014

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #164

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 9 R-1 Line #164 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #222

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 15 R-1 Line #222 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) (+) #

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 4.846 3.825 4.316-4.316 3.813 3.582 3.336 3.379 Continuing Continuing

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Integrated Personnel and Pay System-Army (IPPS-A) Prior Years FY 2013 FY 2014 FY 2015

UNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Integrated Personnel and Pay System-Army (IPPS-A) Prior Years FY 2013 FY 2014 FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army : March 2014 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) # FY 2016

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Defense Information Systems Agency : February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

UNCLASSIFIED. FY 2016 Base

UNCLASSIFIED. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Defense Security Cooperation Agency : February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 8 R-1 Line #124

UNCLASSIFIED. UNCLASSIFIED Army Page 1 of 8 R-1 Line #124 Exhibit R2, RDT&E Budget Item Justification: PB 2015 Army : March 2014 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years FY

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 68.421 62.044 71.300-71.300 27.600

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 3.288 8.653 7.029-7.029

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Army Integ Military Human Resources Sys (A-IMRS)

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Army Integ Military Human Resources Sys (A-IMRS) Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element - 100.500 68.693-68.693 53.968 64.534

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Consolidated Afloat Network Ent Services(CANES) FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Consolidated Afloat Network Ent Services(CANES) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Navy DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 46.823 63.563 12.906-12.906 15.663 15.125

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Defense Information Systems Agency : February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: ARMY INTEGRATED AIR AND MISSILE DEFENSE (AIAMD) FY 2012 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE A: ARMY INTEGRATED AIR AND MISSILE DEFENSE (AIAMD) FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 MISSILE Total FY 2013 FY 2014 FY 2015 FY 2016 Army Page 1 of 11 R-1 Line Item #128 To

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0603850F PE TITLE: Integrated Broadcast Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE Cost ($ in Millions) FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Preparation (MTPS) Total FY 2014 FY 2015 FY 2016

More information

UNCLASSIFIED. Cost To Complete Total Program Element S750: Mission Training and Preparation Systems FY 2015

UNCLASSIFIED. Cost To Complete Total Program Element S750: Mission Training and Preparation Systems FY 2015 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 United States Special Operations Command Date: March 2014 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Development

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 4: Advanced Component Development & Prototypes (ACD&P) COST ($ in Millions)

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research,, Test & Evaluation, Navy / BA 5: System & Demonstration (SDD) COST ($ in Millions) FY 2017 FY 2018 FY 2019 FY

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 205 Exhibit R2, RDT&E Budget Item Justification: PB 2040: Research, Development, Test & Evaluation, / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) R Program Element (Number/Name)

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element 174.037 11.276 8.610 1.971-1.971

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) COST (In Thousands) Actual FY 2002 FY 2003 FY2004 FY 2005 to Force XXI Battle Command, Brigade & Below (FBCB2) 52003* 65176 63601 37699 29154 12179 0 0 264137 * Database presently shows 56328. Internal

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: SPECIAL TACTICS/COMBAT CONTROL

UNCLASSIFIED R-1 ITEM NOMENCLATURE PE F: SPECIAL TACTICS/COMBAT CONTROL Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2013 FY 2014 FY 2015 FY 2016 To Complete Program Element 9.693 17.670 7.118-7.118 7.538 7.651

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE 5 - System Development and Demonstration 0604321A - ALL SOURCE ANALYSIS SYSTEM COST (In Thousands) FY 2002 FY 2003

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Office of the Secretary Of Defense : February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 4: Advanced Component Development

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 COST ($ in Millions) Years FY 2014 FY 2015 FY 2017 FY 2018 FY 2019 FY 2020 To Program Element - 13.610 13.355 12.874-12.874

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Combat Identification FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Combat Identification FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 212 Army DATE: February 211 COST ($ in Millions) FY 21 FY 211 FY 213 FY 214 FY 215 FY 216 To Program Element 7.74 29.884 - - - - - - - Continuing Continuing

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Region/Sector Operation Control Center Modernization Program

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Region/Sector Operation Control Center Modernization Program Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # PE 0102326F: Region/Sector Operation Control Center Modernization Program ## FY 2015 FY 2016 FY 2017

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Tactical Data Links. FY 2011 OCO Estimate. FY 2011 Total Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Tactical Data Links. FY 2011 OCO Estimate. FY 2011 Total Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Navy DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2012 FY 2013 FY 2014 FY 2015 To Program Element 4.053 14.948 28.854 0.000 28.854 65.152

More information

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Counter Narcotics Technology Program Office

UNCLASSIFIED. Cost To Complete Total Program Element Continuing Continuing : Counter Narcotics Technology Program Office Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 4: Advanced Component Development & Prototypes (ACD&P) COST

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Program Element 3.997 3.72 3.773-3.773 3.327 3.424 3.539 3.69

More information

Exhibit R-2, RDT&E Budget Item Justification February 2004

Exhibit R-2, RDT&E Budget Item Justification February 2004 PE NUMBER: 27438F PE TITLE: Theater Battle Management Exhibit R-2, RDT&E Budget Item Justification February 24 7 Operational System Development 27438F Theater Battle Management Cost ($ in Millions) 23

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total Program Element 9.334 6.602 - - - - - - - 0.000 15.936 9.334 6.602 - - - - - -

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Joint Command and Control. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Joint Command and Control. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Program Element 3.140 0.000 0.000 0.000

More information

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / NAVSTAR Global Positioning System (User Equipment) (SPACE) Prior Years FY 2013 FY 2014

UNCLASSIFIED. R-1 Program Element (Number/Name) PE F / NAVSTAR Global Positioning System (User Equipment) (SPACE) Prior Years FY 2013 FY 2014 Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Air Force : March 2014 COST ($ in Millions) Years FY 2013 FY 2014 # FY 2016 FY 2017 FY 2018 FY 2019 To Program Element 0.000 63.687 127.172 156.659-156.659

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 Navy Page 1 of 8 R-1 Line #142 To Complete Total

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 Total FY 214 FY 215 FY 216 FY 217 To Complete Total Total Program Element - 75.7 122.481-122.481

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 216 Exhibit R2, RDT&E Budget Item Justification: PB 217 24: Research, Development, Test & Evaluation, / BA 5: tem Development & Demonstration (SDD) COST ($ in Millions) FY 215 FY 216 R1 Program

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE BB: Special Operations Aviation Systems Advanced Development Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete

More information

B. Program Change Summary: RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) FEBRUARY 2008 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7

B. Program Change Summary: RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) FEBRUARY 2008 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7 RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) DATE FEBRUARY 2008 APPROPRIATION / BUDGET ACTIVITY RDT&E, DEFENSE-WIDE / 7 R-1 ITEM NOMENCLATURE / PROJECT NO. PE 1160427BB Mission Training and Preparation

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Control and Reporting Center (CRC) FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Control and Reporting Center (CRC) FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual Air Force Page 1 of 23 FY 2012 FY 2013 FY 2014 FY 2015 To Program Element 18.688

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Biometrics Enabled Intelligence FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Biometrics Enabled Intelligence FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Army DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element - 14.114 15.018-15.018 15.357 15.125

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: Development & Demonstration (SDD) COST ($ in Millions) Years FY 2014

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational s Development COST ($ in Millions) FY 2017

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 Navy Page 1 of 7 R-1 Line #203 To Program Element

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Office of the Secretary Of Defense Date: February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 6: RDT&E Management Support

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 7: Operational Systems Development COST ($ in Millions) Years R1 Program

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Distributed Common Ground/Surface Systems FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Distributed Common Ground/Surface Systems FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 212 Army DATE: February 211 24: Research, Development, Test & Evaluation, Army COST ($ in Millions) FY 21 FY 211 PE 3528A: Distributed Common Ground/ FY

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 R-1 Line #201

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 10 R-1 Line #201 Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research,, Test & Evaluation, Navy / BA 5: System & Demonstration (SDD) COST ($ in Millions) Years R1 Program Element (Number/Name)

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 United States Special Operations Command DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total FY 2014 FY 2015 FY 2016 FY 2017 To Complete

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Space & Missile Test & Evaluation Center FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Space & Missile Test & Evaluation Center FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 3.578 4.572 196.254-196.254 218.131

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior

More information

UNCLASSIFIED. Cost To Complete Total Program Element : TECH SURVEIL COUNTER MEAS EQPT. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. Cost To Complete Total Program Element : TECH SURVEIL COUNTER MEAS EQPT. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 4.270 1.629 3.680-3.680 3.696 3.742 3.811 3.827 Continuing Continuing

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 0.000 4.007 2.218-2.218

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018

UNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element - 0.914 1.119 0.542-0.542 0.894 0.800 0.643 0.655 Continuing Continuing 675352: Guardian Angel RDT&E - 0.914 1.119 0.542-0.542

More information

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) Budget Item Justification Exhibit R-2 ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) COST (In Thousands) FY 2010 FY 2011 FY 2012 FY 2013 to Complete XM982 ILE 99344 64214 78197 43313 2778 2115 2315

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Program Element 147.268 6.751 61.163-61.163 94.537 369.826

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 26 Exhibit R2, RDT&E Budget Item Justification: PB 27 2: Research, Development, Test & Evaluation, / BA 7: Operational Systems Development COST ($ in Millions) FY 25 FY 26 R Program Element

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Theater Battle Management (TBM) C4I FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Theater Battle Management (TBM) C4I FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 18.374 15.170 15.528-15.528 15.817 15.217

More information

UNCLASSIFIED. Cost To Complete Total Program Element : R/SAOC MODERNIZATION. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. Cost To Complete Total Program Element : R/SAOC MODERNIZATION. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) FY

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Army DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 58.348 68.628 158.646-158.646 144.625

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) FY 2017 FY 2018

More information

UNCLASSIFIED. Cost To Complete Total Program Element ED8: Paladin Integrated Management (PIM)

UNCLASSIFIED. Cost To Complete Total Program Element ED8: Paladin Integrated Management (PIM) Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 214 FY 215 FY 216 FY 217 To Complete Program Element 25.229.872.863 7.6 8.463.874.876.891.96

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Air Control

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Air Control Exhibit R-2, RDT&E Budget Item Justification: PB 212 Navy DATE: February 211 COST ($ in Millions) FY 21 FY 211 PE 6454N: Air Control FY 213 FY 214 FY 215 FY 216 To Complete Program Element 6.373 5.665

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles

UNCLASSIFIED. FY 2016 Base FY 2016 OCO. Quantity of RDT&E Articles Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) PE

More information