U.S. Army Test and Evaluation Command (ATEC) Command Overview
|
|
- Claud Page
- 5 years ago
- Views:
Transcription
1 U.S. Army Test and Evaluation Command (ATEC) Command Overview 2019
2 Mission, Vision, End State Mission* ATEC plans, integrates and conducts developmental testing, independent operational testing and independent evaluations and assessments to provide essential information to acquisition decision makers and commanders. Vision To be a team of highly skilled test and evaluation professionals focused on informing equipping decisions for today s and tomorrow s warfighter. End State The Army possesses a versatile mix of adaptable Soldiers and units equipped with proven materiel based on decisions informed by independent evaluations of technically proficient and versatile developmental and operational tests. * Under Revision 2
3 How We Fit Why We Do It 3 Director, OTE Operational T&E DUSA DUSA-TE (T&E Executive) Army Evaluation Center Mr. James Cooke Legend Secretary of Defense Secretary of the Army Vice Chief of Staff Army Test and Evaluation Command MG Tyler Operational Test Command T&E Policy, Funding, or Oversight Chief of Staff BG Taylor USD (AT&L), DASD (DT&E) Developmental T&E Assistant Secretary of the Army for AL&T Direct Reporting Unit ATEC Test Centers A T C D P G E P G R T C W S M R Y P G Independent Reporting Mandated by US Code, OMB, and OSD CRTC TRTC YTC Operational Test Agency: Army is the only service which unifies developmental testing, operational testing, and independent evaluation under a single Command (ATEC). General Orders No. 13, Signed CSA 16 Oct 06 LAW (Section 139, Title 10, U.S. Code) Establish office of Director, Operational Test and Evaluation Requires annual report to Congress for oversight systems LAW (Section 2366, Title 10, U.S. Code) Live Fire Test & Evaluation Requires survivability testing of major systems meant to protect their occupants Requires lethality testing of munitions Requires a LFT&E test report to congressional defense committees LAW (Section 2399, Title 10, U.S. Code) Defense Appropriations Act Requires independent Initial Operational Test & Evaluation (IOTE) before proceeding beyond low-rate initial production (LRIP) for all major defense acquisition programs Three qualifications - production or production-like materiel; typical users; realistic conditions Limits system contractor involvement in IOTE LAW (Section 2400, Title 10, U.S. Code) Low-Rate Initial Production (LRIP) Quantities for IOTE are established by the DOT&E for oversight systems, and by OTAs for others 3
4 Where We Are HQ ATEC FY18 Assigned Personnel (8,355)* 481 Military 3,472 Civilians 4,402 Contractors AEC Dugway Proving Ground West Desert Test Center Aberdeen Proving Ground Aberdeen Test Center Ft Bragg Yuma Proving Ground Yuma Test Center Ft Huachuca Electronic Proving Ground Ft Bliss Ft Sill White Sands Missile Range White Sands Test Center x4 Ft Hood OTC Redstone Arsenal Redstone Test Center Legend Headquarters Test Center Operational Test Dir Ft Greely Cold Regions Test Center Panama Tropic Test Site * as of 31May18 AEC Army Evaluation Center OTC Operational Test Command 4
5 Major Range and Test Facility Base (MRTFB) Cold Regions Test Center Managed by OSD Test Resource Management Center (TRMC) Nevada Test and Training Range Legend: Army, Navy, AF, Defense Agency NUWC Keyport (Nanoose & Dabob ranges) NAWC-WD China Lake 30 th Space Wing NAWC-WD Point Mugu 412 th Test Wing Yuma Test Center Utah Test and Training Range West Desert Test Center Electronic Proving Ground 23 DoD Sites; Army-8, Navy-6, Air Force-7, Defense Agency-2 DISA Aberdeen Test Center NAWC-AD Patuxent River Arnold Engineering Development Complex 45 th Space Wing Tropic Regions Test Center, various locations PMRF U.S. Army Kwajalein Atoll Reagan Test Site DISA,JITC 96 th Test Wing (Includes 96 th Test Group) White Sands Test Center The DoD MRTFB is comprised of test capabilities across the DoD test ranges which are considered national assets Atlantic Undersea Test and Evaluation Center *DoDD and DoDI
6 U.S. ARMY REDSTONE TEST CENTER Command Overview 2018
7 U.S. Army Redstone Test Center Mission Statement Resources As of 30 May 2018 Provide Technical Expertise, State-of-the-Art Facilities, and Capabilities to Plan, Execute, and Report the Test Results on Aviation, Aviation Systems, Missiles, and Sensors at all levels. Component Subsystem System System of Systems The Income Statement / / 27 Military Civilian Contractor (On Hand / Authorized) PPC/Staff Fac & Log Engr Tech Mil/Pilots IT Engineers Government Mechanics/ Laborers PPC/Staff Facilities/ Logistics Engineers Contractors Over 50% of our Workforce is Engineers & Engineering Technicians Key Programs IT Engineering Technicians Only Army test center that is not a Major Range and Test Facility Base. No centralized funding for civilian pay, operations and support. 100% reimbursable for each test directorate. RTC Must Operate With a Business Mentality ( Profit vs Loss ) Rotary Wing AH-64E UH-60V CH-47F Fixed Wing ARL-E UAS Avn Survivability CMWS/ATIRCM CIRCM Aviation Testing 1,350,000 Labor Hours Sensor & Other Missile Testing Integrated Base Defense Tactical Signals Intel Payload Counter UAS Risk Reduction Active Protection Systems HELLFIRE Test Sets SRP Joint Air-to-Ground Missile Javelin Precision Fire Missiles 7
8 8
9 RTC Unique Capabilities Indicates Technical Experimental Developer Army Civilian Aircraft Flight Testing Test Pilot School Trained: 28 XPs (DAC/MIL) 12 Flight Test Engineers (FTEs) Flight Quality and Engine and Aircraft Performance Structural and Rotary Dynamics Aircraft Survivability Aircraft Icing Natural & Artificial Aviation Systems Test & Integration Lab (AvSTIL) Missiles Mobile & Fixed TM Ground Stations Advanced Optical & Radar Target Tracking Liquid, Solid & Hybrid Rocket Motor Testing Warhead and Small Rocket Testing Custom Surveillance Test Vans Missile Seeker and AUR HWIL Facilities Sensors Open Air Sensor Testing EO/IR, LASER, Visible, Hyperspectral and Acoustic Laboratories Captive Carry & Ground Based Sensor Testing Stabilized Electro-Optical Airborne Instrumentation Platform (SEAIP) Instrumentation Environmental Advanced T&E Methods Aviation and Missile Custom Instrumentation, Telemetry and Ground Viewing Rapid Custom Test Instrumentation Development to Support Unique Customer Requirements Test Set Design/Build/Field to Support Systems Life-Cycle Sustainment Extreme Miniaturization of Instrumentation/ASIC Custom Design/Build TM kits and FTSs for R&D and Fielded Systems Custom Precision TSPI Systems Internationally Recognized Experts: Dynamics, Climatics & E3 Contributing authors: MIL-STDs, TOPs/ITOPs, STANAGs One-of-a-Kind Large Capacity 6DOF Motion Replication Unique Acoustic & Vibro-Acoustic Chamber w/realistic 6DOF motion Over 40 Environmental Chambers Distributed Test and Modeling & Simulation Internationally Recognized Network & Simulation Architecture Expertise Leaders in Live-Virtual-Constructive Distributed Environment (LVC-DE) for System of System Testing Scalable Tactical Emulated Network and LVC- DE Combine to Support System-of-Systems Testing in a Realistic Net-Enabled Battlefield Advanced Materials Analysis of Metallic and Composite Structures Highly Educated World Renowned Expertise 9
10 Flight Test Areas Stateline I-65 East Redstone Arsenal South Delegated Airworthiness Authority 10
Test Resource Management Center (TRMC) Perspective
Cleared for Public Release 24 February 2017 Case # 17-S-0939 Test Resource Management Center (TRMC) Perspective 32 nd Annual National Defense Industry Association Test and Evaluation Conference Mr. Darrin
More informationDepartment of Defense DIRECTIVE
Department of Defense DIRECTIVE NUMBER 3200.11 December 27, 2007 USD(AT&L) SUBJECT: Major Range and Test Facility Base (MRTFB) References: (a) DoD Directive 3200.11, Major Range and Test Facility Base,
More informationThe Armed Forces Communications and Electronics Association (AFCEA)
U.S. ARMY TEST AND EVALUATION COMMAND The Armed Forces Communications and Electronics Association (AFCEA) MG John W. Charlton 8 November 2017 Mission What does ATEC do for the Army? ATEC plans, integrates,
More informationATEC Testing In Support of the War
ATEC Testing In Support of the War James B. Johnson U.S. Army Developmental Test Command 6 Feb 07 1 Understand Who We Are Full Spectrum Testing All phases of testing; developmental, operational & evaluation
More informationCommon Range Integrated Instrumentation System (CRIIS)
Common Range Integrated Instrumentation System (CRIIS) National Defense Industrial Association 50 th Annual Targets, UAVs & Range Operations Symposium & Exhibition CRIIS Program Overview October 2012 Ms.
More informationCommon Range Integrated Instrumentation System (CRIIS)
Common Range Integrated Instrumentation System (CRIIS) National Defense Industrial Association 49 th Annual Targets, UAVs & Range Operations Symposium & Exhibition CRIIS Program Overview October 2011 Mr.
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY
More informationDOT&E Initiatives from the Middle
Dugway Proving Ground DOT&E Initiatives from the Middle NDIA Test & Evaluation Conference Darren Jolley March 12-15, 2012 The Bun Holds Us Together, But Where s The Beef? DOT&E, DUSA-TE and JRO-CBRND OTA
More informationUNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Army Technical Test Instrumentation and Targets. Prior Years FY 2013 FY 2014 FY 2015
Exhibit R2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2013
More informationATEC Overview and the AEC Logistics Mission
ATEC Overview and the AEC Logistics Mission Brian M. Simmons Director, US Army Center 23 January 2008 Presentation to SOLE Aberdeen Proving Ground MD Agenda ATEC Mission & Roles in Acquisition Army Center
More informationUNCLASSIFIED. UNCLASSIFIED Army Page 1 of 7 R-1 Line #142
Exhibit R2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2013
More informationDepartment of Defense DIRECTIVE
Department of Defense DIRECTIVE NUMBER 3200.11 May 1, 2002 Certified Current as of December 1, 2003 SUBJECT: Major Range and Test Facility Base (MRTFB) DOT&E References: (a) DoD Directive 3200.11, "Major
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY
More informationArmy Test and Evaluation Command Scheduling Process Perspective
Army Test and Evaluation Command Scheduling Process Perspective 32nd Annual National Defense Industry Association Test and Evaluation Conference Prepared by Darrin K Loken White Sands Missile Range darrin.k.loken.civ@mail.mil
More informationThe DoD T&E/S&T Program
The DoD T&E/S&T Program George Rumford Program Manager Test Resource Management Center Test & Evaluation / Science & Technology Program (TRMC, T&E/S&T) NDIA 11 TH Annual Science & Engineering Technology
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Test & Evaluation Support FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 212 Navy DATE: February 211 COST ($ in Millions) FY 21 FY 211 FY 212 Base PE 65864N: Test & Evaluation Support FY 212 OCO FY 212 Total FY 213 FY 214 FY
More informationAGENDA ARMY DEVELOPMENTAL AND OPERATIONAL TEST PLAN REVIEW PROCESS. How Does ATEC FIT IN? Developmental Testing What:
AGENDA ARMY DEVELOPMENTAL AND OPERATIONAL TEST PLAN REVIEW PROCESS Dal M. Nett Safety Director US Army Test and Evaluation Command (ATEC) 27 June 08 ATEC/DTC/OTC DT 101 What is Developmental Testing? Why
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 FY 213 Base FY 213 OCO FY 213 Total FY 214 FY 215 FY 216 FY 217 Navy Page 1 of 5 R-1 Line
More informationUNCLASSIFIED UNCLASSIFIED
: February 216 Exhibit R2, RDT&E Budget Item Justification: PB 217 2: Research, Development, Test & Evaluation, / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) FY 215 FY 216 R1 Program
More informationUNCLASSIFIED. Cost To Complete Total Program Element JA6: Joint Air-To-Ground Missile (JAGM)
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years
More informationPrepared for Milestone A Decision
Test and Evaluation Master Plan For the Self-Propelled Artillery Weapon (SPAW) Prepared for Milestone A Decision Approval Authority: ATEC, TACOM, DASD(DT&E), DOT&E Milestone Decision Authority: US Army
More information2016 DOD T&E Spectrum Activity
2016 DOD T&E Spectrum Activity Western Regional Partnership (WRP) Test Resource Management Center (TRMC) 4800 Mark Center Drive Alexandria, VA 22350 July 12, 2016 Chris Mazur, DoD T&E Ranges Sustainability
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2013 OCO
COST ($ in Millions) FY 2011 FY 2012 FY 2013 Base FY 2013 OCO FY 2013 Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 157.971 156.297 144.109-144.109 140.097 141.038
More informationDEPARTMENT OF THE ARMY. Modernizing Army Test Range Infrastructure to Support Transformation
DEPARTMENT OF THE ARMY Modernizing Army Test Range Infrastructure to Support Transformation PRESENTED BY: RAYMOND J. WAGNER, DEPUTY DIRECTOR RESOURCES TEST & EVALUATION MANAGEMENT AGENCY RM 2C139A, PENTAGON
More informationUNCLASSIFIED. UNCLASSIFIED Army Page 1 of 24 R-1 Line #152
Exhibit R2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2013
More informationUNCLASSIFIED. UNCLASSIFIED Navy Page 1 of 26 R-1 Line #159
Exhibit R2, RDT&E Budget Item Justification: PB 2015 Navy Date: March 2014 1319: Research, Development, Test & Evaluation, Navy / BA 6: RDT&E Management Support COST ($ in Millions) Prior Years FY 2013
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE A: Programwide Activities FY 2012 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 212 Army DATE: February 211 24: Research, Development, Test & Evaluation, Army FY 21 FY 211 PE 6581A: Programwide Activities Total FY 213 FY 214 FY 215
More informationARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)
BUDGET ACTIVITY ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) PE NUMBER AND TITLE COST (In Thousands) FY 2001 FY 2002 FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost Actual Estimate Estimate
More informationARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)
ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) Total Program Element (PE) Cost 64312 68659 71079 72540 77725 77145 78389 Continuing Continuing DV02 ATEC Activities 40286 43109 44425 46678 47910 47007
More informationARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)
Exhibit R-2 0605602A Army Technical Test Instrumentation and Targets ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) COST (In Thousands) FY 2006 Actual FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012
More informationAn Overview of Army Test and Evaluation. Published by: The Army Test and Evaluation Management Agency
An Overview of Army Test and Evaluation Published by: The Army Test and Evaluation Management Agency September 2007 Table of Contents Topic Page Introduction 1 I Test and Evaluation Mandate 1 II The Army
More informationUNCLASSIFIED. UNCLASSIFIED Army Page 1 of 10 R-1 Line #10
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 2: Applied Research COST ($ in Millions) Prior Years FY 2013 FY 2014
More informationCOMPLIANCE WITH THIS PUBLICATION IS MANDATORY
BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE POLICY DIRECTIVE 99-1 3 JUNE 2014 Test and Evaluation TEST AND EVALUATION COMPLIANCE WITH THIS PUBLICATION IS MANDATORY ACCESSIBILITY: Publications
More informationCommon Range Integrated Instrumentation System (CRIIS)
Common Range Integrated Instrumentation System (CRIIS) National Defense Industrial Association 48 th Annual Targets, UAVs & Range Operations Symposium & Exhibition CRIIS Program Overview October 2010 Mr.
More informationM&S for OT&E - Examples
Example 1 Aircraft OT&E Example 3.4.1. Modeling & Simulation. The F-100 fighter aircraft will use the Aerial Combat Simulation (ACS) to support evaluations of F-100 operational effectiveness in air-to-air
More informationAMRDEC. Core Technical Competencies (CTC)
AMRDEC Core Technical Competencies (CTC) AMRDEC PAMPHLET 10-01 15 May 2015 The Aviation and Missile Research Development and Engineering Center The U. S. Army Aviation and Missile Research Development
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2012 OCO
COST ($ in Millions) FY 2010 FY 2011 FY 2012 Base FY 2012 OCO FY 2012 Total FY 2013 FY 2014 FY 2015 FY 2016 Cost To Complete Total Cost Total Program Element 160.351 162.286 140.231-140.231 151.521 147.426
More informationARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit)
ARMY RDT&E BUDGET ITEM JUSTIFICATION (R-2 Exhibit) COST (In Thousands) FY 1998 Actual FY 2002 FY 2003 FY 2004 FY 2005 to Program Element (PE) 21847 26628 51644 61033 57237 50551 23977 22303 Continuing
More informationUNCLASSIFIED. UNCLASSIFIED Army Page 1 of 16 R-1 Line #45
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army Date: March 2014 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Office of Secretary Of Defense DATE: April 2013 0400: Research, Development, Test &, Defense-Wide COST ($ in Millions) All Prior FY 2014 Years FY 2012
More informationUNCLASSIFIED. UNCLASSIFIED Army Page 1 of 8 R-1 Line #124
Exhibit R2, RDT&E Budget Item Justification: PB 2015 Army : March 2014 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years FY
More informationNAVAL AIR SYSTEMS COMMAND RESEARCH AND ENGINEERING GROUP & NAVAL AIR WARFARE CENTER AIRCRAFT DIVISION
NAVAL AIR SYSTEMS COMMAND RESEARCH AND ENGINEERING GROUP & NAVAL AIR WARFARE CENTER AIRCRAFT DIVISION PRESENTED TO: NAVAIR SMALL BUSINESS AVIATION TECHNOLOGY CONFERENCE 1 RDML STEVE EASTBURG ASSISTANT
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 7: Operational Systems Development COST ($ in Millions) FY 2017 FY 2018
More informationMission & Capabilities Overview
U.S. ARMY DUGWAY PROVING GROUND Mission & Capabilities Overview May 2018 Agenda and Purpose Mission and Vision Organization Quality of Life Location Test Center Capabilities Recent & Future Activities
More informationARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)
Budget Item Justification Exhibit R-2 ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) - COST (In Thousands) INTERIM ARMORED VEHICLE (IAV) FAMILY FY 2010 FY 2011 FY 2012 FY 2013 to 8391 143568 108012
More informationDepartment of Defense DIRECTIVE
Department of Defense DIRECTIVE NUMBER 5141.02 February 2, 2009 DA&M SUBJECT: Director of Operational Test and Evaluation (DOT&E) References: See Enclosure 1 1. PURPOSE. This Directive: a. Reissues DoD
More informationDevelopmental Test and Evaluation Is Back
Guest Editorial ITEA Journal 2010; 31: 309 312 Developmental Test and Evaluation Is Back Edward R. Greer Director, Developmental Test and Evaluation, Washington, D.C. W ith the Weapon Systems Acquisition
More informationMission Based T&E Progress
U.S. Army Evaluation Center Mission Based T&E Progress Christopher Wilcox Deputy/Technical Director Fires Evaluation Directorate, US AEC 15 Mar 11 2 Purpose and Agenda Purpose: To review the status of
More informationUNCLASSIFIED. UNCLASSIFIED Office of Secretary Of Defense Page 1 of 8 R-1 Line #163
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Office of Secretary Of Defense Date: March 2014 0400: Research, Development, Test &, Defense-Wide / BA 6: RDT&E Management Support COST ($ in Millions)
More informationARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)
Budget Item Justif ication Exhibit R-2 0604814A Artillery Munitions - EMD ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) COST (In Thousands) Actual Estimate Estimate to XM982 ILE 62490 79134 42452 Continuing
More informationIndustry Day RDML Mat Winter Commander, Naval Air Warfare Center Weapons Division. 23 May 2012
Industry Day 2012 Presented by: 23 May 2012 RDML Mat Winter Commander, Naval Air Warfare Center Weapons Division Distribution Statement A: Approved for public release; 1 distribution is unlimited. Strategic
More informationHeadquarters U. S. Air Force. The Air Force s Perspective
Headquarters U. S. Air Force I n t e g r i t y - S e r v i c e - E x c e l l e n c e The Air Force s Perspective Mr. Jack Manclark Phone: 703-697-4774 or DSN 227-4774 E-mail: John.Manclark@pentagon.af.mil
More informationARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)
Budget Item Justification Exhibit R-2 ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) COST (In Thousands) FY 2010 FY 2011 FY 2012 FY 2013 to Complete XM982 ILE 99344 64214 78197 43313 2778 2115 2315
More informationPROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD)
EXHIBIT R-2, FY 2001 RDT&E,N BUDGET ITEM JUSTIFICATION SHEET BUDGET ACTIVITY: 7 PROGRAM ELEMENT: 0305206N PROGRAM ELEMENT TITLE: Airborne Reconnaissance Advanced Development (ARAD) (U) COST: (Dollars in
More informationWEAPONS DEVELOPMENT AND INTEGRATION DIRECTORATE OVERVIEW SPACE AND MISSILE DEFENSE WORKING GROUP 22 SEPTEMBER 2016
Presented to: SPACE AND MISSILE DEFENSE WORKING GROUP WEAPONS DEVELOPMENT AND INTEGRATION DIRECTORATE OVERVIEW Distribution Statement A - Approved for Public Release - Distribution Unlimited. Review completed
More informationTest and Evaluation of Highly Complex Systems
Guest Editorial ITEA Journal 2009; 30: 3 6 Copyright 2009 by the International Test and Evaluation Association Test and Evaluation of Highly Complex Systems James J. Streilein, Ph.D. U.S. Army Test and
More informationGerry Christeson Test Resource Management Center 20 October 2010
Building Next Generation Range Capabilities Central Test and Evaluation Investment Program (CTEIP) Gerry Christeson Test Resource Management Center 20 October 2010 1 Test Resource Management Center (TRMC)
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Technology Development (ATD) COST ($ in Millions) Prior
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Major T&E Investment. FY 2011 Total Estimate. FY 2011 OCO Estimate
Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 Air Force Page 1 of 12 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program
More informationSTRL Update 13 May 2016
STRL Update 13 May 2016 Integrity Service Excellence Michelle Williams LQEP Personnel Subpanel Chair Chief, Workforce Effectiveness Air Force Research Laboratory 1 AT&L Criteria to be an STRL Organization
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R2, RDT&E Budget Item Justification: PB 2016 Navy : February 2015 1319: Research, Development, Test & Evaluation, Navy / BA 7: Operational Systems Development COST ($ in Millions) Years R1 Program
More informationTesting in a Joint Environment. Janet Garber Director Test and Evaluation Office Office of the Deputy Under Secretary of the Army
Testing in a Joint Environment Value Added and Considerations Janet Garber Director Test and Evaluation Office Office of the Deputy Under Secretary of the Army June 2008 UNCLASSIFIED 1 Why do we test?
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 213 Navy DATE: February 212 COST ($ in Millions) FY 211 FY 212 Total FY 214 FY 215 FY 216 FY 217 To Complete Total Total Program Element.96 8.765 21.17-21.17
More information2018 Annual Missile Defense Small Business Programs Conference
2018 Annual Missile Defense Small Business Programs Conference DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. 15 May 2018 Mr. Joseph C. Keelon Program Executive for Advanced
More informationCommand Overview Naval Surface Warfare Center, Carderock Division
Command Overview Naval Surface Warfare Center, Division CAPT Mark Vandroff Commanding Officer, NSWCCD February 2018 Dr. Paul Shang Technical Director (Acting), NSWCCD Distribution Statement A: Approved
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) FY 2017 FY 2018
More informationUNCLASSIFIED. FY 2017 Base FY 2017 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2017 Air Force : February 2016 COST ($ in Millions) Years FY 2018 FY 2019 FY 2020 FY 2021 To Program Element 966.537 66.374 29.083 54.838 0.000 54.838 47.369
More informationAMRDEC Fuzing Activities
Presented to: NDIA Fuze Conference 2014 AMRDEC Fuzing Activities DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Control Number: pr0898 29 July 2014 Presented by: Anthony
More informationFOR IMMEDIATE RELEASE No June 27, 2001 THE ARMY BUDGET FISCAL YEAR 2002
FOR IMMEDIATE RELEASE No. 01-153 June 27, 2001 THE ARMY BUDGET FISCAL YEAR 2002 Today, the Army announced details of its budget for Fiscal Year 2002, which runs from October 1, 2001 through September 30,
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Central Test and Evaluation Investment Program (CTEIP) FY 2011 Total Estimate. FY 2011 OCO Estimate
COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program Element 143.612 160.959 162.286 0.000 162.286 165.007 158.842 156.055 157.994 Continuing Continuing
More informationMaking Warfighter Materiel Solutions Better
DoD R&D Laboratories Making Warfighter Materiel Solutions Better Joseph D. Wienand, Technical Director U.S. Army Edgewood Chemical Biological Center (ECBC) 17 April 2011 Approved for Public Release AGENDA
More informationUNCLASSIFIED. UNCLASSIFIED R-1 Line Item No. 4 Page 1 of 6
Exhibit R-2, RDT&E Project Justification February 2007 OPERATIONAL TEST AND EVALUATION, DEFENSE (0460) BUDGET ACTIVITY SIX LIVE FIRE TEST AND EVALUATION (LFT&E) PROGRAM ELEMENT (PE) 0605131OTE Cost ($
More informationARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)
Budget Item Justification Exhibit R-2 ARMY RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) 114 812 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 to Total COST (In Thousands) Actual Estimate
More informationUNCLASSIFIED UNCLASSIFIED
EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-6 0604759N Major T & E Investment Prior Total COST ($
More informationUNCLASSIFIED. UNCLASSIFIED Army Page 1 of 20 R-1 Line #121
Exhibit R-2, RDT&E Budget Item Justification: PB 2015 Army : March 2014 2040: Research,, Test & Evaluation, Army / BA 5: System & Demonstration (SDD) COST ($ in Millions) # FY 2016 FY 2017 FY 2018 FY 2019
More informationTHAAD Program Summary
Program Summary Lockheed Martin Space Systems Company Program Overview_1 1 Unique Battlespace High Altitude Area Defense Battlespace SM3 Block 1A Aegis SM3 / SM3 Altitude (km) / SM3 Atmosphere Transition
More informationARMY TACTICAL MISSILE SYSTEM (ATACMS) BLOCK II
ARMY TACTICAL MISSILE SYSTEM (ATACMS) BLOCK II Army ACAT ID Program Total Number of BATs: (3,487 BAT + 8,478 P3I BAT) Total Number of Missiles: Total Program Cost (TY$): Average Unit Cost (TY$): Full-rate
More informationUNCLASSIFIED. R-1 Program Element (Number/Name) PE A / Other Missile Product Improvement Programs. Prior Years FY 2013 FY 2014 FY 2015
Exhibit R2, RDT&E Budget Item Justification: PB 2015 Army : March 2014 2040: Research, Development, Test & Evaluation, Army / BA 7: Operational Systems Development COST ($ in Millions) # FY 2016 FY 2017
More informationUNCLASSIFIED. Cost To Complete Total Program Element ED8: Paladin Integrated Management (PIM)
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army : February 2015 2040: Research, Development, Test & Evaluation, Army / BA 5: System Development & Demonstration (SDD) COST ($ in Millions) Years
More informationMULTIPLE LAUNCH ROCKET SYSTEM (MLRS) M270A1 LAUNCHER
MULTIPLE LAUNCH ROCKET SYSTEM (MLRS) M270A1 LAUNCHER Army ACAT IC Program Prime Contractor Total Number of Systems: 857 Lockheed Martin Vought Systems Total Program Cost (TY$): $2,297.7M Average Unit Cost
More informationTest By Trial. The unique 46th Test Group tries out a wide range of weapons systems over the white sands of southern New Mexico.
The unique 46th Test Group tries out a wide range of weapons systems over the white sands of southern New Mexico. Test By Trial Staff photo by Guy Aceto 66 AIR FORCE Magazine / August 2004 Photography
More informationUNCLASSIFIED. UNCLASSIFIED R-1 Line Item No. 3 Page 1 of 15
Exhibit R-2, RDT&E Project Justification May 2009 OPERATIONAL TEST AND EVALUATION, DEFENSE (0460) BUDGET ACTIVITY 6 (RDT&E MANAGEMENT SUPPORT) OPERATIONAL TEST ACTIVITIES AND ANALYSES (OT&A) PROGRAM ELEMENT
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE. FY 2014 FY 2014 OCO ## Total FY 2015 FY 2016 FY 2017 FY 2018
Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Navy DATE: April 2013 COST ($ in Millions) Years FY 2012 FY 2013 # ## FY 2015 FY 2016 FY 2017 FY 2018 To Program Element 92.713 23.188 31.064 46.007-46.007
More informationCommand Overview USASMDC/ARSTRAT. for the Huntsville Rotary Club. LTG Richard P. Formica 20 Sep Distribution A 1291 (As of 20 Sep 2011)
USASMDC/ARSTRAT Command Overview for the Huntsville Rotary Club LTG Richard P. Formica 20 Sep 2011 1 Our Reporting Chain Our Mission USASMDC/ARSTRAT conducts space and missile defense operations and provides
More informationAn Enterprise Environment for Information Assurance / Computer Network Defense Testing and Evaluation
An Enterprise Environment for Information Assurance / Computer Network Defense Testing and Evaluation Parker Horner, EWA Gov t Systems Inc. Steve Moore, Booz Allen Hamilton Today s Agenda Introduction
More informationARMY MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM-LOW VOLUME TERMINAL 2 (MIDS-LVT 2)
ARMY MULTIFUNCTIONAL INFORMATION DISTRIBUTION SYSTEM-LOW VOLUME TERMINAL 2 (MIDS-LVT 2) Joint ACAT ID Program (Navy Lead) Total Number of Systems: Total Program Cost (TY$): Average Unit Cost (TY$): Low-Rate
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Air Force DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Total Program Element 752.328 704.475 722.071-722.071 701.000 702.979 716.873 725.979
More informationCol Alan Pratt, USMC Commander. Distribution Statement A Approved for Public Release. Mr. Matthew Craig Acting Technical Director
1 Col Alan Pratt, USMC Commander Mr. Matthew Craig Acting Technical Director 2 TEAM Crane 3 rd Largest Naval Installation in the World (100 Square Miles) TEAM Crane $2.24 B FY 11 Business Base 4,372+ Govt.
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Army Date: February 2015 2040: Research, Development, Test & Evaluation, Army / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior Years FY
More informationUNCLASSIFIED R-1 ITEM NOMENCLATURE
Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 80.911 108.395 - - - - - - - 0.000
More informationReport No. D February 23, Reimbursable Fees at Four Major Range and Test Facility Bases
Report No. D-2011-044 February 23, 2011 Reimbursable Fees at Four Major Range and Test Facility Bases Report Documentation Page Form Approved OMB No. 0704-0188 Public reporting burden for the collection
More informationGROUND RADAR AND GUIDED MUNITIONS. Increased Oversight and Cooperation Can Help Avoid Duplication among the Services Programs
United States Government Accountability Office Report to Congressional Committees December 2014 GROUND RADAR AND GUIDED MUNITIONS Increased Oversight and Cooperation Can Help Avoid Duplication among the
More informationHuntsville Aerospace Marketing Association (HAMA)
PROGRAM EXECUTIVE OFFICE MISSILES AND SPACE Huntsville Aerospace Marketing Association (HAMA) Marcia Holmes Chief Engineer Program Executive Office Missiles and Space 9 October 2015 Program Executive Office
More informationTest and Evaluation and the ABCs: It s All about Speed
Invited Article ITEA Journal 2009; 30: 7 10 Copyright 2009 by the International Test and Evaluation Association Test and Evaluation and the ABCs: It s All about Speed Steven J. Hutchison, Ph.D. Defense
More informationUNCLASSIFIED UNCLASSIFIED. EXHIBIT R-2, RDT&E Budget Item Justification February 2007 RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4
EXHIBIT R-2, RDT&E Budget Item Justification APPROPRIATION/BUDGET ACTIVITY R-1 ITEM NOMENCLATURE RESEARCH DEVELOPMENT TEST & EVALUATION, NAVY / BA-4 0604272N, TADIRCM COST ($ in Millions) FY 2006 FY 2007
More informationTest and Evaluation:
Test and Evaluation: How Well Your Equipment Performs Mr. James C. Cooke, Director Deputy Under Secretary of the Army Test and Evaluation Office 25 June 2009 1 Unclassified Support the Warfighter to accomplish
More informationDepartment of Defense INSTRUCTION. Policy and Procedures for Management and Use of the Electromagnetic Spectrum
Department of Defense INSTRUCTION NUMBER 4650.01 January 9, 2009 Incorporating Change 1, October 17, 2017 ASD(NII) DoD CIO SUBJECT: Policy and Procedures for Management and Use of the Electromagnetic Spectrum
More informationUNCLASSIFIED. FY 2016 Base FY 2016 OCO
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force Date: February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 3: Advanced Development (ATD) COST ($ in Millions) Prior
More informationUNCLASSIFIED FY 2016 OCO. FY 2016 Base
Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Office of the Secretary Of Defense Date: February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 6: RDT&E Management Support
More informationUNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: MQ-9 Development and Fielding. FY 2011 Total Estimate. FY 2011 OCO Estimate
Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Air Force DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 To Complete Program Element 57.205 93.145
More information